PROFESSIONAL WORK SAMPLE
SPORTFOLIO H E ROFEPROFESSIONAL E S E T RWORKS U M2017 PET
table of contents 1822 HUNT AVENUE, BRONX NY 214 SOUTH DEAN STREET, ENGLEWOOD NJ 4 INDIAN HILL LANE, PALISADES NY 1 PERRY LANE, UPPER NYACK NY 143 MAIN STREET, NYACK NY 443 12TH STREET, BROOKLYN NY 250 EAST 87TH STREET #9HJ 655 6TH AVENUE, BROOKLYN NY 1 PLAZA STREET #7AB, BROOKLYN NY
SHEREESETRUMPET Shereese.t@gmail.com 646.399.0113
1822 HUNT AVENUE, BRONX NY Residen al Project NarratIve General renova on of all finishes, replacement of oil boiler to gas boiler. Gut renova on of kitchens and bathrooms on all floors. Addi on of Laundry room. Associated Mechanical work.
21'-1" O.A.
DECK 111 128 S.F
3'-0"
REVISED WOOD DECK
D-112
REPLACE TUB
EXISTING CLEANOUT
2" CO
2"
HALF-BATH 004
4"
2"
EXISTING SANITARY SEWER RISER, SIZE TO REMAIN SAME
2" NEW TOILET
NEW LAV.
2" NEW WASHER
4"
3" YARD DRAIN TO REAR YARD
A
WASH 1 SINK
NEW NEW UTILITY WASHER SINK
2"
4"
CO
EXISTING 3" YARD DRAIN TO FRONT
D-003 EXISTING 4" COMBINED SEWER TO STREET
18'-4"
20'-11 1/2"
S/CM
D-208
52'-5"
7'-9 3/4"
15'-10 3/4"
1/2"
8'-11"
9'-0" HALL 205
GWB PAINTED CEILING
CLG 96" GWB 5'-8 1/2" PAINTED STAIR HALL CEILING 201 DN CLG 96"
GWB PAINTED CEILING
D-106 CL 5'-0"
CL
GWB PAINTED CEILING
D-207
NEW WOOD FLOORING D-201
2'-7 1/2"
2'-10 1/2"
BEDROOM 204 97 S.F CLG 111"
S/CM
CL 4'-6 3/4"
D-202
D-105
D-206 CL 5'-0"
D-205
3'-4" D-203 D-104
D-102
NEW WOOD FLOORING
ADD 1 ELEC. METER ENTRANCE 102
NEW NAVIEN NCB-210 GAS COMBINATION BOILER WATERHEATER 17"W X 12"D AHRI number 8580771
GWB PAINTED CEILING BEDROOM 104 172 S.F CLG 98"
CLG 113.5"
RELOCATED GAS METERS
EX'G WATER METER
NEW TUB W/ TILE SURROUND
NEW WOOD FLOORING
10'-6"
GWB PAINTED CEILING
BEDROOM 202 81 S.F CLG 112"
13'-5 1/2"
NEW WOOD FLOORING
1'-4"
D-204 BEDROOM 203 146 S.F CLG 103" NEW WOOD FLOORING GWB PAINTED CEILING
1'-4"
12'-0 1/2"
7'-5" CLG 98"
NEW F.A.I. D-002 NEW KITCHEN EXHAUST
REPLACE RANGE
BASEMENT FRONT 001 118 S.F
D-101
GWB PAINTED CEILING
GWB PAINTED CEILING D-001
EXISTING CERAMIC TILE FLOOR
5'-7 1/2"
GENERAL NOTES DEMOLITION PLANS PROPOSED PLANS PLUMBING AND GAS DIAGRAMS, NYCECC TABULAR ANALYSIS
BEDROOM 106 91 S.F CLG 98"
D-209
BATHROOM 207 CLG 96" D-210 GWB PAINTED CEILING
PORCH 101 111 S.F
SECOND FLOOR
21'-1" EXT'G CONC. STAIRS NEW KITCHEN EXHAUST
DN
EXT'G STONE STAIRS
REPLACE RANGE
EX'G. 4" S.S.
FIRST FLOOR NEW F.A.I.
NEW DRYER VENT EXHAUST
MECHANICAL 002
LAUNDRY 004 NEW DRYER
BASEMENT
NEW DRYER
NEW BOILER
2 EXISTING GAS METERS NEW BOILER
M-3
M-2
M-1
TO EXISTING GAS MAIN
GAS RISER DIAGRAM N.T.S.
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
14 RISERS
11'- 4 21" 14 RISERS
6'-0" LANDING
18'-3"
18'-3" 21'-1" BUILDING FRONTAGE
21'-1"
22'-7" O.A.
EXISTING 4" COMBINED SEWER TO STREET
A
PROPOSED BASEMENT PLAN 1/4"=1'-0"
B
UP
4'-6"
T-001.00 A-100.00 A-101.00 A-102.00
GWB PAINTED CEILING
10'-5" CL 5'-0"
STAIR HALL 103
UP
GWB PAINTED CEILING
CLOSE UP & INSULATE WALL UNDER WINDOW
NEW WOOD FLOORING
D-107
LAV
WC
GWB PAINTED CEILING
S/CM
1 NEW GAS METER FOR HOUSE EQUIPMENT
EXISTING SLAB 2 EXISTING ELEC. METERS TO REMAIN
GWB PAINTED CEILING
NEW NAVIEN NCB-180 GAS COMBINATION BOILER WATERHEATER 17"W X 12"D AHRI number 8580770
GWB PAINTED CEILING MECH. ROOM 005 124 S.F
D-108
NEW WOOD FLOORING
NEW FLOORING ON EXISTING CONC. SLAB
LAV
UP
N.T.S.
DN
WC
EXT'G STEEL COL. TO REMAIN
PLUMBING RISER DIAGRAM
GWB PAINTED CEILING
NEW LAV NEW TOILET
NEW WOOD FLOORING
D-103
6'-0" O.C. D-004
HALL 205
6'-4 1/2"
NEW CABINET
WASH
2"
4"
EX'G. CO
NEW TUB W/ TILE SURROUND
BATHROOM 004
YARD DRAIN
EX'G. CO
DRY
10'-6 1/4"
LAUNDRY ROOM 003
4"
4"
BASEMENT
D-005
6'-11"
EXISTING 4" DIA. UP
S/CM
D-110
9'-3"
REPLACE WC
BATHROOM 108
6'-0"
FIRST FLOOR
2"
BATHROOM 108 CLG 96" GWB PAINTED CEILING
WC
BEDROOM 206 81 S.F CLG 108"
CL
NEW TILE FLOORING
13'-11 1/2"
2" 2"
REPLACE LAV.
LAV
NEW TOILET
8'-8 1/2"
2" 2" REPLACE KIT. SINK
NEW LAV
DRYER VENT EXHAUST DRY
8'-8"
LAUNDRY ROOM 003 91 S.F GWB PAINTED CEILING
NEW BASEBOARD HEATER (TYP.)
BEDROOM 107 93 S.F CLG 98"
1'-9"
REPLACE TUB
4" 2"
KITCHEN 110
4'-3
NEW TILE FLOORING
2" CO
EXISTING VENT PIPE, SIZE TO REMAIN SAME
DRAWING LIST
6'-0"
EXT'G STEEL COL. TO REMAIN
BATHROOM 207
5'-8 1/2"
14'-5 1/2"
2" REPLACE WC
6'-9"
SECOND FLOOR
REPLACE LAV.
58'-0 1/2" O.A.
REPLACE KIT. SINK
GWB PAINTED CEILING
D-211
NEW KITCHEN EXHAUST
62'-6 1/2" O.A.
2"
2" KITCHEN 209
NEW WOOD FLOORING REF
NEW BASEBOARD HEATER
CL D-109
10'-5"
CLG 110"
GWB PAINTED CEILING
NEW STOVE W/ EXT. EXHAUST FAN IN MICROWAVE UNIT
1
LIVING ROOM 208 207 S.F
CLG 111"
NEW SINK
D-111
NEW KITCHEN EXHAUST
14'-3" O.C.
1822 HUNT AVENUE 4051 16 2043522 211 4b R5
NEW REFRIGERATOR
GWB PAINTED CEILING
2"
2"
EX'G. 4" S.S.
ADDRESS: BLOCK: LOT: BIN#: CB: MAP: ZONE:
NEW BASEBOARD HEATER
NEW WOOD FLOORING GWB PAINTED CEILING
REF
KITCHEN 209 168 S.F
33'-10 1/4"
10'-10"
NEW VENT RISER, 4"
NEW STOVE W/ EXT. EXHAUST FAN IN MICROWAVE UNIT
EXISTING SLAB
CLG 112"
GWB PAINTED CEILING
NEW SINK BASEMENT REAR 002 596 S.F
18'-5 1/2"
21'-2 1/2"
3'-2"
EX'G. 4" S.S.
CLG 96"
12'-0"
8'-6"
LIVING ROOM 109 200 S.F
1'-9"
8'-6"
12'-0" KITCHEN 110 169 S.F
NEW REFRIGERATOR
GENERAL ZONING INFORMATION
1/4" 4'-4
8'-11 1/2"
2 X 4 STL. STUDS (158" X 358") ON THE MASONRY FOUNDATION WALL WITH 58" GYP. BD. FINISH WITH RIGID INSULATION BETWEEN STUDS
2'-5"
D-006
EXISTING P-TRAP
21'-1" O.A.
8'-3"
6'-2"
1'-4" O.C.
Project Involvement Survey Photo Documenta on DOB Permit Set DOB Objec ons List
14'-9 1/2"
2'-10"
2'-8 1/4"
16'-2"
6'-2"
5"
B
PROPOSED FIRST FLOOR PLAN 1/4"=1'-0"
C
PROPOSED SECOND FLOOR PLAN 1/4"=1'-0"
NEW GAS METER FOR HOUSE EQUIPMENT
03|04
214 SOUTH DEAN STREET, ENGLEWOOD NJ Commercial | Bakery Project NarratIve Reconfigura on of approximately 375 S.Q. FT. addi on. Design enclosure for mechanical equipment needed to service addi onal ovens.
Project Involvement Building Sec ons Plan Revisions Sec on Details CSK drawings for clarifica ons
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
05|06
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
07|08
4 INDIAN HILL LANE, PALISADES NY Residen al Project NarratIve Ground up construc on of 1 family home. Architectural and Engineering services provided.
B
A
C
15'-93 4"
D
7'-113 4"
12'-5"
E
G
F 17'-13 4"
3'-6"
H
16'-81 2"
23'-5"
A B200
LEGEND 97'-0"
PROPERTY LINE 36'-25 8"
SET BACK LINE 9'-25 8"
9'-57 8"
15'-65 8"
26'-15 8"
12'-113 8"
20'-4"
X
WOOD FENCING
X
ROOF LINE ABOVE
W.I.C.
112
113 50 S.F. 10'-83 4"
5'-11 8"
W.I.C.
50 S.F.
15 MASTER BATHROOM
SHEET NOTES:
114 13
167 S.F.
14
BEDROOM
20'-91 2"
111
1
CENTRAL STEEL SUPPORT FOR CANTILIVER WOOD STEPS ON METAL PANS
2
STEEL PAN STRINGERS WITH CONCRETE TREAD STAIRS
300 S.F.
14'-7"
Project Involvement Floor Plans for Client Reviews Eleva ons for Client Review Interior Eleva ons Material Sourcing
10
3
GLASS AND STAINLESS STEEL RAIL
4
STAINLESS STEEL RAIL
5
STONE STEPS
6
STONE LANDING
7
STAINLESS STEEL CABLE RAILING
FIREPLACE
11
16'-31 2"
OFFICE/ SOLARIUM
MILLWRK
115
9
225 S.F.
8
7'-43 4"
9
CL BEDROOM
13'-63 8"
CORTEN STEEL EDGE WITH WOOD CAP STONE FLOORING
11
WIDE PLANK HARDWOOD FLOORING
12
POLISHED CONCRETE FLOORING
110 210 S.F.
58'-7"
8
CORTEN STEEL PLANTER WITH WOOD CAP
10
7'-01 2"
11 15'-0"
7
13
PLANK STYLE TILE FLOORING
14
STONE COUNTER
15
GLASS DOOR
16
PERGOLA POST
17
FIREPLACE
CL
19'-4"
SUNROOM
11'-07 8"
15 8'-41 2"
116 BATHROOM
13'-0"
79 S.F.
230 S.F. 5'-91 2"
109 14
86'-107 8"
13 11
B A201
B A201
6
11 5'-1"
14'-0"
BEDROOM
33'-0"
108
UPPER CABINETS
DW
4'-0"
CL
X
104
15
14 10
BATHROOM
14
102
2
12'-33 4"
90 S.F.
4
14'-0"
BEDROOM
REF
KITCHEN/LIVING/DINING
11
11
13
103
210 S.F.
1,175 S.F.
REF
GARAGE
DESK
15'-0"
PANTRY
100
MILLWRK
3
X
DN.
14 HALL
420 S.F.
107
X
MILLWRK
TR
23'-618"
X
CL
22'-318"
2'-0"
4
DN.
6'-101 4"
DW
3
10'-15 8"
210 S.F.
5
600 S.F.
9'-91 2"
7'-73 4"
3'-13 4"
12 7'-83 4"
MILLWRK
9'-6"
B A300
4
DN.
10 LAUNDRY ROOM
MUDROOM
106
2
101
75 S.F.
BATHROOM
15
13
13
4
150 S.F.
2 DN.
105 67 S.F.
2
14
DRY
MILLWRK
CL
1
2'-0"
4'-71 2"
WASH
6 7'-73 4"
11'-01 4"
1'-117 8"
5
9
A
5 26'-21 8"
7
97'-0"
A A301
6 15'-77 8"
6'-71 2"
22'-111 4"
8
N
A A300
A A200
FIRST FLOOR PLAN 1/4" = 1'
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
09|10
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
11|12
1 PERRY LANE, UPPER NYACK NY Residen al Project NarratIve Renova on of Living Room, Master Bath and Kitchen. All exterior windows and doors upgrade. Project Involvement Floor Plan Revisions for Client Review Rhino Massing Explora on
83'-3 1/2"
24'-0 3/4"
4"
4"
LEGEND 5'-1"
PROPERTY LINE EXISTING MASONRY WALL TO REMAIN NEW LOAD BEARING WALL
4" 3'-0"
3'-0"
11'-3"
4"
4" 3'-0"
3'-0"
EXISTING WALKWAY
4" 1'-11 3/4"
3'-0"
W-12 W-11
W-05
ROOM 101 ROOM 101
W-05
ROOM 101
W-06
ROOM 101
W-07
ROOM 101
W-08
ROOM 101
W-09
ROOM 101
THICKNESS
FIRE RATING
W-13
W-09 PANTRY 105 600 S.F
W-10 EX'G TUB
HARDWARE SET
LINES OF WALKWAY ABOVE
EX'G 6" STEP
EX'G CABINETS TO REMAIN
UP 6 TREADS @ 10" = 5'-0"
ROOM 101
W-04
HEIGHT
W-08
LINE OF RIDGE ABOVE
EX'G BEDROOM 107
FP
NO WORK
FP
LIVING ROOM 101 513 S.F
FP
W-10 W-11
EX'G STAIR TO CELLAR
W-12 W-13
EX'G 6" STEP
EX'G STOVE TO REMAIN 8'-0"
ROOM 101
W-03
WIDTH
W-07
LANDING 3'-0"
W-01 W-02
TYPE
23'-4"
ROOM NAME
MASTER BATH 109 NO WORK
OFFICE 108 NO WORK
WINDOW SCHEDULE TAG
W-06
6'-2 1/4"
NEW NON-LOAD BEARING PARTITION WALL
FP DINING ROOM 102 198 S.F
1'-3"
KITCHEN 104
0'-9"
0'-0"
17'-2 1/2"
258 S.F
6'-0"
EX'G 6" STEP DN D-03
DOOR SCHEDULE TAG
ROOM NAME
D-01
ROOM 101
TYPE
WIDTH
HEIGHT
THICKNESS
FIRE RATING
EX'G 1 2 BATH 115 NO WORK
HARDWARE SET
W-01
W-02
W-03
0'-2"
W-04
1'-3"
DN
EX'G D-01 EX'G
SUN ROOM 103
D-02
128 S.F
A/A301
EX'G
DECK 106 NO WORK
EX'G
EX'G
EX'G
EX'G
W-14
25'-7 1/2"
1'-10"
3'-0"
3'-0" 4"
6'-4"
3'-0" 4"
4"
34'-8 1/2"
3'-0" 4"
1'-5 1/2"
22'-9 1/4"
11'-10 3/4"
13'-0 1/2"
82'-7 1/2" EXISTING - NO WORK
A
AREA OF NEW CONSTRUCTION
EXISTING CONSTRUCTION / NEW RENOVATION
PROPOSED FIRST FLOOR 1/4"=1'-0"
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
13|14
143 MAIN STREET, NYACK NY Commercial | Office Project NarratIve Gut renova on of exis ng building. Design new 3-story office space for architecture and engineering firm. Project Involvement Reflected Ceiling Plans Ligh ng & Electrical Plans HVAC Plans coordina on
Shereese Trumpet | Shereese.t@gmail.com | Dominick Pilla & Associates
15|16
443 12 STREET, BROOKLYN NY Residen al
250 EAST 87 STREET, BROOKLYN NY Residen al
Project NarratIve Interior renova on of basement Family Room & Kitchen
Project Involvement Select Interior Finishes for Client Review
Project Involvement Design development of Family Room entertainment Center 3D modeling for client review
a
a b
Stone Source Madreperola Top - bottom Dry Sage 2142-40 Gray Horse 2140-50 Bunny Gray 2124-50
c
Ann Sacks Savoy Mosaics color: Dove Heath Ceramics G-14.2 New Pebble_3
b
d c
d
Shereese Trumpet | Shereese.t@gmail.com | TOLA architecture
17|18
655 6 AVENUE #3F, BROOKLYN NY Residen al
Shereese Trumpet | Shereese.t@gmail.com | TOLA architecture
1 PLAZA STREET #7AB, BROOKLYN NY Residen al
19|20
SHEREESETRUMPET Shereese.t@gmail.com 646.399.0113