Sichao wang portfolio

Page 1

PORTFOLIO SELECTED WORK 2013-2018 SICHAO WANG


To whom it may concern, I am current 4th year student in the Kansas State University Interior Architecture and Product Design accelerated

• Born and raised in China

master’s program. It is a five year, CIDA, NASAD accredited degree, and I will graduate in the spring of 2018. I believe that a good design should change people’s lifestyle in a good way, and make their lives much better, easier and less chaotic. My design based on how people will feel using the particular space or product. By putting myself into the design during the creation process, I try to provide the user

• Bachelor and Master Degree in the U.S. • U.S. Citizen

the best experience while using the design I made. I am still developing more design skills to perfect my design process. Thank you,

Sichao Wang

• Study abroad in Denmark while studying in the U.S


5.......................................RESTAURANT DESIGN 15.............................................................Task Light 23............................................Artist LOFT DESIGN 31.........................................................Other Works

CONTENTS


Location: Street of Southglenn, Denver, CO Project Period: Mar, 2016 - May, 2016 This Project was the branding of a restaurant and re-design of an existing restaurant space located on Street of Southglenn in Denver, CO. I am designing a high-end Chinese restaurant, complete with a to-go box and a menu as part of branding for this project.

RESTAURANT DESIGN


Section Rendering

Overview of the whole restaurant.

nalP roolF Floor Plan

DINING AREA

BAR/WAITING AREA PATIO DINING CIRCULATION PATH

AERA GNINID AERA GNITIAW/RAB GNINID OITAP HTAP NOITALUCRIC

FLOOR PLAN 0’ 1’

5’

NALP ROOLF 10’

’01

’5

’1 ’0


Plans nalP roolF Floor Plan

DINING AREA BAR/WAITING AREA PATIO DINING CIRCULATION PATH

DINING AREA DINNING AREA BAR/WAITING AREA BAR/WAITING AREA PATIO DINING PATIO DINNING CIRCULATION PATH CIRCULATION PATH

Floor FloorPlan Plan

DINING AREA BAR/WAITING AREA PATIO DINING CIRCULATION PATH

AERA GNINID AERA GNITIAW/RAB GNINID OITAP HTAP NOITALUCRIC

Floor Plan

Reflected Ceiling Plan

LUMINOUSCEILING CEILINGWITH WITH PRISMATIC LENS 9’ AFF LUMINOUS PRISMATIC LENS @ 9’@ AFF

2’X4’ 12’AFF AFF 2’x 4’ACOUSTIC ACOUSTIC CEILING CEILING TILE TILE @@12’

LIGHTING LEGEND: TRACK TRACK LIGHT LIGHT

PENDANT LIGHT LIGHT PENDENT

RECESSED DOWNLIGHT RECESSED DOWN LIGHT FLUORESSENT STRIP FLUORESSENT STRIP RECESSED WALL RECESSED WALLWASHER WASHER

FLOOR PLAN

FLOOR PLAN 0’ 1’

5’

10’

0’ 1’

5’

NALP ROOLF

REFLECTED CEILING PLAN 10’

0’ 1’

5’

10’

’01

’5

’1 ’0


nalP roolF

AERA GNINID AERA GNITIAW/RAB GNINID OITAP HTAP NOITALUCRIC

Renderings NALP ROOLF ’01

’5

’1 ’0


To-go Box Design nalP roolF Floor Plan

DINING AREA BAR/WAITING AREA PATIO DINING CIRCULATION PATH

AERA GNINID AERA GNITIAW/RAB GNINID OITAP HTAP NOITALUCRIC

FLOOR PLAN 0’ 1’

5’

NALP ROOLF 10’

’01

’5

’1 ’0

This To-go box is designed as a part of the branding. Make this box very high quality, so people will keep it and it can work as a business card.


To design a task light to solve a specific problem and make life much easier in the working environment.

Task Light (Product Design)


Hand Rendering

Working Prototype


Shop Drawings Plan Detail Light Disk Detail Section Detail

This light was created for designers to use, and to help them generate ideas during the design phases. This light gives the designer something to play with when they run out ideas.


Light Disk Detail

Light Disk Exploded Axon

The design has two components, light disk and charging stand. By turning a task light into toy (like LEGO), designer can play with it when they are out of their ideas.

Light Disk Photos

Computer Rendering

Model Picture


Location: San Diego, CA Project Period: Sep., 2014 - Dec., 2014 The design was to renovate an existing space and transform it into a loft for an artist couple, the husband is a photographer and the wife is a fashion designer. This Project is based on a modernism painting by Wassily Kandinsky: Arch and Point.

ARTIST LOFT DESIGN


Hand Crafted Model


First Floor Plan Waterfall

Storage

Secondary Living

Studio 1

Garden Kitchen

Studio 2 Living Room

Patio

Hand Rendered Plan

Hand Drafted Plan

Entrance The design program of this loft is based on the cosideration of that clients will have a very high chance to work at home, a seperation of the work area (MARKED RED) and living area is created. Also there is a lounge as the secondary/private living room for the clients so that they can take breaks there and meet with each other.


Second Floor Plan Bathroom

Reading Room

Loft Area Open to Below

Hand Drafted Plan and Section Master Bedroom Open to Below

Balcony

Hand Rendered Plan

Sections


Other Work


Revit CD Set A A

General Notes: * Bathrooms on Level 1 & 2 are same layout * Bathroom Details are on FFE Plan.

A

1

0"

Open Gallery 111 1299 SF

DN

119' To Exit 2

Learning Lab 203 Not Enclosed

3 Room 105 133 SF

106' To Exit 2

5 116' To Stair R 75 ' - 0" ' - 0" R 75

VESTIBULE 110 182 SF

1 WALL-EXISTING

Level 2 Life Safety Plan 1/16" = 1'-0"

HSKP 003 48 SF Material Lab Director 010 189 SF

IDF 001 80 SF Material Lab 009 825 SF

Security 011 198 SF

R 75' - 0"

Women's Bathroom 004 191 SF

Men's Bathroom 005 153 SF

Elevator 030 73 SF

Head Librarian Office 006 176 SF

Level 1 Code Calculation

FEC 81' To Exit 1

79' To Exit 2

Existing Wall Section

3

DN

11' - 9 1/8"

105A

7' - 6 7/8" Room 105 133 SF

Architect's Stamp

4 4

5

2-LAYERS 58" TYPE-X GYP. BD.

VESTIBULE 109 202 SF

No.

Description

Date

MTL. CHANNEL W/ (3) BEADS OF ACOUSTICAL SEALANT ACOUSTICAL SEALANT EACH SIDE

2Hr Rated 5" Wall Section

2Hr Rated 6 1/2" Wall Section

4

Sichao Wang

Sichao Wang

New Seation Complex Life Safety Plan

New Seation Complex Level 1 Floor Plan

Project number Date Drawn by Checked by

Basement Life Safety Plan 1/16" = 1'-0"

MTL. CHANNEL W/ (3) BEADS OF ACOUSTICAL SEALANT ACOUSTICAL SEALANT EACH SIDE

28' - 8"

Consultant Address Address Phone Fax e-mail

3

3

Library 007 2513 SF

Level 2 Code Calculation

1

12

1

2

Basement Code Calculation

A401

5

FEC VESTIBULE 020 144 SF

Coffee KIOSK 106 295 SF

25 GA. 6" MTL. STUDS @ 16" O.C.

2-LAYER 5/8" TYPE "X" GYP. BD. EA. SIDE

19' - 7 7/8"

Consultant Address Address Phone Fax e-mail

2 A802

Mens 104 170 SF

FLOOR LINE

89.5' To Exit 1

UP

' - 0" R 75

14

103A 15Level 1

99.5' To Exit 1

Open Collaboration Space 008 779 SF

67.5' To Exit 1

EXIST. WALLVARIES

9' - 10 7/8"

MTL. CHANNEL W/ (3) BEADS OF ACOUSTICAL SEALANT

3" SOUND ATTENTUATION BLANKET

2

ELECTRICAL ROOM 002 120 SF

10' - 11 1/4"

UP

RESILIENT CHANNELS @ 24" OC

Date

A101 Scale

003 20 March 2016 Author Checker

1/16" = 1'-0"

1 4/22/2016 10:54:39 AM

72' To Exit 1

Description

15' - 10 7/8"

106A

ACOUSTICAL SEALANT EACH SIDE

1-LAYER 58" TYPE-X GYP. BD.

3

10

A401

Level 1 Men's Women's 104A 11 Elevation 3 Elevation 3

9 Level 1 Men's Elevation 1

ACOUSTICAL SEALANT EACH SIDE

6-1/8"

No.

16

1

2 Basement Men's Elevation 2 4

37' - 5"

LINE OF A.B. CEILING

UNDERSIDE OF EXISTING CEILING ABOVE

2 LAYERS TYPE "X" 5/8" DRYWALL GLUE AND SCREW

34.5' To Exit 1

A401

Consultant Address Address Phone Fax e-mail

2

107A

25 GA. 358" MTL. STUDS @ 16" O.C.

3

3 108A

Level 1 Women's 13 Elevation 1

Women 103 181 SF

1

MTL. CHANNEL W/ (3) BEADS OF ACOUSTICAL SEALANT

Level 1 Life Safety Plan 1/16" = 1'-0"

Vending 108 167 SF

UP

UNDESIDE OF STRUC. DECK

Architect's Stamp

2

Basement Men's Elevation 44

Open Gallery 111 1299 SF

Consultant Address Address Phone Fax e-mail

FEC

Consultant Address Address Phone Fax e-mail

10' - 9 1/4"

Consultant Address Address Phone Fax e-mail

ROOF TERRACE 201 746 SF

FEC

1 Student Learning Commons/Lounge 107 1351 SF

Consultant Address Address Phone Fax e-mail

4

DN

VESTIBULE 109 202 SF

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

3 CONF ROOM 202 207 SF

5

2

Consultant Address Address Phone Fax e-mail

2

117' To Exit 2

Meeting Rooms 204 339 SF

85' To Stair

Coffee KIOSK 106 295 SF

DN

FEC

Womens 206 181 SF

Mens 205 170 SF

108' To Exit 2

4

UP 45' To Exit 1

FEC

97' To Stair

Level 1 Floor Plan 3/32" = 1'-0"

Project number Date Drawn by Checked by

A202 Scale

003 20 March 2016 Author Checker

3/32" = 1'-0"

4/22/2016 10:54:40 AM

Mens 104 170 SF

Level 1 Women's Elevation 2

2

83' To Exit 1

Level 1 Women's Elevation 4

Women 103 181 SF

Kansas State University Manhattan, KS 66506

Level 1 Men's Elevation 4

FEC

UP

1 75 '-

Level 1 Men's Elevation 2

Vending 108 167 SF

R

Basement Men's Elevation 1

VESTIBULE 110 182 SF

Student Learning Commons/Lounge 107 1351 SF

16' - 3 3/4"

1

Seaton Learing Commons

Kansas State University Manhattan, KS 66506

16' - 2 1/2"

101' To Exit 2

SICHAO WANG

Seaton Learing Commons

17' - 5 7/8"

"

' - 0" R 75

24' - 9 7/8"

0 5' R7

FEC

R 75 ' - 0"

SICHAO WANG


Revit CD Set A

B

Demolition Drawing I created for permitting during Internship.

C

D D.1

E E.1 E.2

F

F.9 G

G.9

H

I

J

A

K

B

C

D D.1

E E.1 E.2

F

F.9 G

OFFICE

OFFICE

OFFICE

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

FEC

FEC

OPEN OFFICE

OPEN OFFICE

OFFICE

D1

D2

D3

D4

CONFERENCE

D5

3.4

3.4

PHONE

PHONE

OFFICE

BOARD ROOM STORAGE

STORAGE (VCT FLOOR

SERVER/ STORAGE (VCT FLOOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MID CONFERENCE

OFFICE

OFFICE

HALLWAY

OFFICE

4.2

STAIR

OPEN OFFICE D1

D2

D3

D4

OFFICE

ELEC.

D2

D3

D4

IT

HALLWAY

STORAGE

OFFICE

CONFERENCE D1

CONFERENCE

D5

D2

OFFICE

D5

OFFICE

SERVER/ STORAGE

TRAINING

CONFERENCE

OFFICE

STORAGE

OFFICE #

PERMIT BID

SW/EW SW/EW

DATE

ISSUE

BY / CHECK

7

8

8

EXISTING CONSTRUCTION TO BE REMOVED

DESCRIPTION

EXISTING CONSTRUCTION TO REMAIN

AREA NOT IN SCOPE OF WORK

SHEET NOTES REMOVE POWER POLES THROUGHOUT, TYP REMOVE EXISTING FLOOR FINISHES TO EXPOSE CONCRETE SLAB. REMOVE BASE AT REMAINING CORE AND PERIMETER WALLS. REMOVE EXISTING CEILING GRID, ACOUSTICAL TILE AND LIGHT FIXTURES AND ALL CEILING DEVICES THROUGHOUT, U.O.N. CONTRACTOR TO MAINTAIN MINIMUM EMERGENCY LIGHTING THROUGHOUT. KEEP EVERY OTHER ROW OR EVERY OTHER CIRCUITS. AT EXISTING FLOOR OUTLETS, REMOVE DATA CABLING TO SOURCE MAINTAIN ELECTRICAL WIRING, TYP. SEE ELECTRICAL GENERAL NOTES. PATCH FLOOR TO MAINTAIN RATING REMOVE (E) SURFACE MOUNTED RECEPTACLES AND CONDUIT THROUGHOUT

FIRE PROTECTION GENERAL NOTES 1. CONTRACTOR SHALL MAINTAIN EXISTING SPRINKLER SYSTEM MAIN AND BRANCH PIPING. PROVIDE UPRIGHT HEADS WHERE CEILING IS TO BE DEMOLISHED. CONTRACTOR SHALL ENSURE MINIMUM SPRINKLER COVERAGE FOR THE ENTIRE SCOPE OF WORK. SEE SPRINKLER DRAWINGS. 2. CONTRACTOR SHALL REMOVE ANY GASEOUS FIRE SUPPRESSION OR PRE-ACTION EQUIPMENT AND REPLACE SPRINKLER COVERAGE IN THESE SPACES WITH STANDARD WET SPRINKLER PROTECTION.

PLUMBING GENERAL NOTES 1. CONTRACTOR SHALL REMOVE ALL EXISTING TENANT PLUMBING FIXTURE, WATER HEATERS AND ASSOCIATED WASTE, VENT, AND DOMESTIC HOT AND COLD WATER PIPING. REMOVE PIPING BACK TO THE SOURCE AND CAP AT THE CORE WALL. PROVIDE DOMESTIC COLD WATER WITH SHUTOFF VALVE TO ALLOW FUTURE TENANT CONNECTION.. ALL EXISTING ABANDONED PLUMBING PIPING IN THE SCOPE OF WORK SHALL BE REMOVED. 2. EXISTING BASE BUILDING CORE TOILETS TO REMAIN UNLESS OTHERWISE NOTED. 3. EXISTING PLUMBING PIPING SERVING FLOORS ABOVE AND FLOOR BELOW TENANT TO REMAIN.

DEMOLITION GENERAL NOTES 1. SCOPE OF WORK FOR THIS PROJECT IS TO DEMOLISH ALL EXISTING PARTITIONS, DOORS, MILLWORK, CEILING DEVICES, GRID, LIGHTING, FLOORING AND EQUIPMENT. REMOVE ALL ELECTRICAL & HVAC DUCT WORK BACK TO MAIN LOOP. 2. GRIND DOWN ANY BOLTS, SCREWS FITTINGS AND/OR PROTRUSIONS IN SLAB, LEVEL FLOOR THROUGHOUT TO WITHIN A 1/4" TOLERANCE AND FILL HOLES. 3. (E) LIFE SAFETY SYSTEM TO REMAIN INTACT AND OPERATIONAL THROUGHOUT DEMOLITION. 4. REMOVE ALL SPRINKLER HEADS EXCEPT AS REQUIRED FOR MINIMUM COVERAGE. TURN SPRINKLER HEADS UPRIGHT. MAIN LOOP TO REMAIN. 5. REPAIR ALL CORE WALLS DAMAGED BY DEMOLITION TO MAINTAIN ANY RATING. 6. CONTRACTOR TO WALK FLOOR PRIOR TO ISSUANCE OF BID. 7. REMOVE ALL WINDOW COVERING. NO PATCHING AT SCREW HOLES. 8. DEMOLISH DATA CONDUITS BACK TO THE RISER CLOSET.

ELECTRICAL GENERAL NOTES 1. CONTRACTOR SHALL REMOVE ALL BRANCH CIRCUIT CONDUIT AND WIRING ASSOCIATED WITH ALL ELECTRICAL WALL, FLOOR, AND CEILING WIRING DEVICES, LIGHTING FIXTURES EXCEPT AS NEEDED TO MAINTAIN EMERENCY EGRESS LIGHTING, AND MECHANICAL EQUIPMENT FROM THE SCOPE OF WORK AREA. 2. BRANCH CIRCUIT CONDUIT AND WIRING MAY REMAIN FROM BASE BUILDING PANELS OUT TO EXISTING ABOVE THE CEILING PULL BOXES, IF POSSIBLE, AND EXISTING LOCATIONS DO NOT INFRINGE ON NEW WALLS OR CEILING LAYOUT. 3. CONTRACTOR SHALL ENSURE ALL EXISTING BRANCH CIRCUIT CONDUCTORS TO REMAIN ARE PROPERLY LABELED WITHIN PULL BOX 4. CONTRACTOR SHALL REMOVE ALL EXISTING SIGNAL CABLING AND ASSOCIATED CONDUIT STUBS FROM WALL, FLOOR, AND CEILING DEVICES IN THEIR ENTIRETY BACK TO POINT OF ORIGIN. 5. CONTRACTOR SHALL REMOVE ALL ELECTRICAL AND FIRE ALARM COMPONENTS FOR ANY GASEOUS FIRE SUPPRESSION OR PRE ACTION EQUIPMENT ROOMS. 6. REMOVE ANY ASSOCIATED CONDUIT AND SIGNAL CABLING BACK TO BASE BUILDING TELECOM RISER CLOSET. ALL REMOVED DEVICES SHALL BE DISPOSED OF OFF THE PREMISES. 7. CONTRACTOR SHALL REMOVE ALL LIFE SAFETY DEVICES AND ASSOCIATED CONDUIT AND CABLING EXCEPT AS NEEDED TO MAINTAIN FOR MINIMUN LIFE SAFETY REQUIREMENTS BACK TO BASE BUILDING LOOPS ON THE FLOOR 8. MAINTAIN ALL ELECTRICAL, SIGNAL, AND LIFE SAFETY SERVICES TO BASE BUILDING SYSTEMS.

MECHANICAL GENERAL NOTES

DEMOLITION LEGEND

1. CONTRACTOR SHALL REMOVE ALL EXISTING TENANT BRANCH DUCTS DOWNSTREAM OF THE VAV BOX, SUPPLY DIFUSERS, LIGHT TROFFERS, RETURN AND EXHAUST REGISTERS.

3. ALL EXISTING TENANT AC UNITS, DUCTWORK, CONDENSER WATER PIPING, CIRCULATION PUMP, CONDENSATE DRAIN PUMPS AND PIPES, DIFFUSERS AND REGISTERS AND CONTROLS TO BE REMOVED. 4. ALL EXISTING TENANT CEILING EXHAUST FANS, DUCTWORK, DIFFUSERS AND REGISTERS TO BE REMOVED. 5. ALL EXISTING SUPPLY DUCTS TO BE REMOVED. REMOVE PIPING AND SUPPLY DUCTS BACK TO THE MAINS AND CAP (CAP CHILLED WATER PIPING WITHIN COLUMN ENCLOSURE). 6. ALL EXISTING ABANDONED CONDENSER WATER PIPING IN THE SCOPE OF WORK SHALL BE REMOVED. 7. REMOVE EXISTING VAV BOXES AND T-STATS. REMOVE MEDIUM PRESSURE DUCT BETWEEN VAV AND MAIN. 8. EXISTING BASE BUILDING PRIMARY AIR DUCTS AND MAIN AIR SLEEVES TO REMAIN. 9. EXISTING BASE BUILDING CORE TOILET EXHAUST DUCTWORK AND GRILLS TO REMAIN. 10. EXISTING CONDENSER WATER PIPES SERVING FLOORS ABOVE AND FLOOR BELOW TENANT TO REMAIN.

FLOOR 4 DEMOLITION PLAN 1/8" = 1'-0"

9. MAINTAIN EXISTING ELECTRICAL, SIGNAL, AND LIFE SAFETY SERVICE TO ALL BASE BUILDING ROOMS AND AREAS OUTSIDE SCOPE OF WORK. 10. MAINTAIN MINIMUM LIFE SAFETY, EMERGENCY EGRESS LIGHTING, AND EXIT SIGNS IN SCOPE OF WORK AND BASE BUILDING AREAS.

SYMBOL

DESCRIPTION

#

SHEET NOTE

EXISTING CONSTRUCTION TO BE REMOVED

EXISTING CONSTRUCTION TO REMAIN

AREA NOT IN SCOPE OF WORK

2. ALL DUCTWORK, FIRE/SMOKE DAMPERS AND RETURN AIR SLEEVES SERVING THE EXISTING TENANT EXIT CORRIDOR TO BE REMOVED.

NORTH

04A-3.1

C:\REVIT\temp\17003.01-75 Hawthorne Flrs 4-5-20_Demo--R17-CENTRAL_scw.rvt

SYMBOL

FILE:

SHEET NOTE

D2

D5

D4

D6

BREAK ROOM

D3

BREAK-OUT LOUNGE #

7

DEMOLITION LEGEND

C:\REVIT\temp\17003.01-75 Hawthorne Flrs 4-5-20_Demo--R17-CENTRAL_scw.rvt

05/04/2017 03/24/2017

D1

PANTRY

6

OFFICE

ELEV. NO.1

OPEN OFFICE

ELEV. NO.2

SERVER/ STORAGE

DESCRIPTION

CONFERENCE D3

5.6

6

#

OFFICE

OFFICE TRAINING

OFFICE

SYMBOL

WOMEN

5

OPEN OFFICE

5.6

IDF

D

OFFICE D1

FEC

D

MEN

4.8

5

ELEVATOR LOBBY

WOMEN

HALLWAY

4.8

OFFICE

STORAGE

ELEVATOR LOBBY

HALLWAY

FAN ROOM MEN

D5

OFFICE

PRINT

TELE.

IDF ELEV. LOBBY

OFFICE

HR STORAGE OFFICE

STORAGE

ELEV. LOBBY

ELEC.

OFFICE

STORAGE

4.2

HALLWAY

TELE. STAIR

FILE:

OFFICE

RECEPTION

IT

4

4

D5

K

FEC

3

3

D4

J

2

2

D3

I

1

1

D1 D2

G.9 H

SYMBOL

DESCRIPTION

FIRE PROTECTION GENERAL NOTES 1. CONTRACTOR SHALL MAINTAIN EXISTING SPRINKLER SYSTEM MAIN AND BRANCH PIPING. PROVIDE UPRIGHT HEADS WHERE CEILING IS TO BE DEMOLISHED. CONTRACTOR SHALL ENSURE MINIMUM SPRINKLER COVERAGE FOR THE ENTIRE SCOPE OF WORK. SEE SPRINKLER DRAWINGS. 2. CONTRACTOR SHALL REMOVE ANY GASEOUS FIRE SUPPRESSION OR PRE-ACTION EQUIPMENT AND REPLACE SPRINKLER COVERAGE IN THESE SPACES WITH STANDARD WET SPRINKLER PROTECTION.

DEMOLITION GENERAL NOTES 1. SCOPE OF WORK FOR THIS PROJECT IS TO DEMOLISH ALL EXISTING PARTITIONS, DOORS, MILLWORK, CEILING DEVICES, GRID, LIGHTING, FLOORING AND EQUIPMENT. REMOVE ALL ELECTRICAL & HVAC DUCT WORK BACK TO MAIN LOOP. 2. GRIND DOWN ANY BOLTS, SCREWS FITTINGS AND/OR PROTRUSIONS IN SLAB, LEVEL FLOOR THROUGHOUT TO WITHIN A 1/4" TOLERANCE AND FILL HOLES. 3. (E) LIFE SAFETY SYSTEM TO REMAIN INTACT AND OPERATIONAL THROUGHOUT DEMOLITION. 4. REMOVE ALL SPRINKLER HEADS EXCEPT AS REQUIRED FOR MINIMUM COVERAGE. TURN SPRINKLER HEADS UPRIGHT. MAIN LOOP TO REMAIN. 5. REPAIR ALL CORE WALLS DAMAGED BY DEMOLITION TO MAINTAIN ANY RATING.

SHEET NOTES D1 D2

D3 D4 D5 D6

REMOVE EXISTING FLOOR FINISHES TO EXPOSE CONCRETE SLAB. REMOVE EXISTING CEILING GRID, ACOUSTICAL TILE AND LIGHT FIXTURES AND CEILING DEVICES THROUGHOUT, U.O.N. AND RETURN TO BUILDING OWNER OR AS DIRECTED CONTRACTOR TO MAINTAIN MINIMUM EMERGENCY LIGHTING THROUGHOUT REMOVE RECTANGULAR WAINSCOT TRIM ON WALL. REMOVE DOOR REMOVE (E) SURFACE MOUNTED RECEPTACLES AND CONDUIT THROUGHOUT REMOVE ALL CONNECTIONS TIED TO ROOF UNIT AT 95 HAWTHORNE AND CAP LINES AT BUILDING LINE. UNITS AND ASSOCIATED LINES AT 95 HAWTHORNE IS OUT OF SCOPE.

PLUMBING GENERAL NOTES 1. CONTRACTOR SHALL REMOVE ALL EXISTING TENANT PLUMBING FIXTURE, WATER HEATERS AND ASSOCIATED WASTE, VENT, AND DOMESTIC HOT AND COLD WATER PIPING. REMOVE PIPING BACK TO THE SOURCE AND CAP AT THE CORE WALL. PROVIDE DOMESTIC COLD WATER WITH SHUTOFF VALVE TO ALLOW FUTURE TENANT CONNECTION.. ALL EXISTING ABANDONED PLUMBING PIPING IN THE SCOPE OF WORK SHALL BE REMOVED. 2. EXISTING BASE BUILDING CORE TOILETS TO REMAIN UNLESS OTHERWISE NOTED. 3. EXISTING PLUMBING PIPING SERVING FLOORS ABOVE AND FLOOR BELOW TENANT TO REMAIN.

6. CONTRACTOR TO WALK FLOOR PRIOR TO ISSUANCE OF BID. 7. REMOVE ALL WINDOW COVERING. NO PATCHING AT SCREW HOLES. 8. DEMOLISH DATA CONDUITS BACK TO THE RISER CLOSET.

ELECTRICAL GENERAL NOTES 1. CONTRACTOR SHALL REMOVE ALL BRANCH CIRCUIT CONDUIT AND WIRING ASSOCIATED WITH ALL ELECTRICAL WALL, FLOOR, AND CEILING WIRING DEVICES, LIGHTING FIXTURES EXCEPT AS NEEDED TO MAINTAIN EMERENCY EGRESS LIGHTING, AND MECHANICAL EQUIPMENT FROM THE SCOPE OF WORK AREA. 2. BRANCH CIRCUIT CONDUIT AND WIRING MAY REMAIN FROM BASE BUILDING PANELS OUT TO EXISTING ABOVE THE CEILING PULL BOXES, IF POSSIBLE, AND EXISTING LOCATIONS DO NOT INFRINGE ON NEW WALLS OR CEILING LAYOUT. 3. CONTRACTOR SHALL ENSURE ALL EXISTING BRANCH CIRCUIT CONDUCTORS TO REMAIN ARE PROPERLY LABELED WITHIN PULL BOX 4. CONTRACTOR SHALL REMOVE ALL EXISTING SIGNAL CABLING AND ASSOCIATED CONDUIT STUBS FROM WALL, FLOOR, AND CEILING DEVICES IN THEIR ENTIRETY BACK TO POINT OF ORIGIN. 5. CONTRACTOR SHALL REMOVE ALL ELECTRICAL AND FIRE ALARM COMPONENTS FOR ANY GASEOUS FIRE SUPPRESSION OR PRE ACTION EQUIPMENT ROOMS. 6. REMOVE ANY ASSOCIATED CONDUIT AND SIGNAL CABLING BACK TO BASE BUILDING TELECOM RISER CLOSET. ALL REMOVED DEVICES SHALL BE DISPOSED OF OFF THE PREMISES. 7. CONTRACTOR SHALL REMOVE ALL LIFE SAFETY DEVICES AND ASSOCIATED CONDUIT AND CABLING EXCEPT AS NEEDED TO MAINTAIN FOR MINIMUN LIFE SAFETY REQUIREMENTS BACK TO BASE BUILDING LOOPS ON THE FLOOR 8. MAINTAIN ALL ELECTRICAL, SIGNAL, AND LIFE SAFETY SERVICES TO BASE BUILDING SYSTEMS.

05/04/2017 03/24/2017

PERMIT BID

SW/EW SW/EW

DATE

ISSUE

BY / CHECK

MECHANICAL GENERAL NOTES 1. CONTRACTOR SHALL REMOVE ALL EXISTING TENANT BRANCH DUCTS DOWNSTREAM OF THE VAV BOX, SUPPLY DIFUSERS, LIGHT TROFFERS, RETURN AND EXHAUST REGISTERS. 2. ALL DUCTWORK, FIRE/SMOKE DAMPERS AND RETURN AIR SLEEVES SERVING THE EXISTING TENANT EXIT CORRIDOR TO BE REMOVED. 3. ALL EXISTING TENANT AC UNITS, DUCTWORK, CONDENSER WATER PIPING, CIRCULATION PUMP, CONDENSATE DRAIN PUMPS AND PIPES, DIFFUSERS AND REGISTERS AND CONTROLS TO BE REMOVED. 4. ALL EXISTING TENANT CEILING EXHAUST FANS, DUCTWORK, DIFFUSERS AND REGISTERS TO BE REMOVED. 5. ALL EXISTING SUPPLY DUCTS TO BE REMOVED. REMOVE PIPING AND SUPPLY DUCTS BACK TO THE MAINS AND CAP (CAP CHILLED WATER PIPING WITHIN COLUMN ENCLOSURE). 6. ALL EXISTING ABANDONED CONDENSER WATER PIPING IN THE SCOPE OF WORK SHALL BE REMOVED. 7. REMOVE EXISTING VAV BOXES AND T-STATS. REMOVE MEDIUM PRESSURE DUCT BETWEEN VAV AND MAIN. 8. EXISTING BASE BUILDING PRIMARY AIR DUCTS AND MAIN AIR SLEEVES TO REMAIN. 9. EXISTING BASE BUILDING CORE TOILET EXHAUST DUCTWORK AND GRILLS TO REMAIN. 10. EXISTING CONDENSER WATER PIPES SERVING FLOORS ABOVE AND FLOOR BELOW TENANT TO REMAIN.

FLOOR 5 DEMOLITION PLAN 1/8" = 1'-0"

9. MAINTAIN EXISTING ELECTRICAL, SIGNAL, AND LIFE SAFETY SERVICE TO ALL BASE BUILDING ROOMS AND AREAS OUTSIDE SCOPE OF WORK. 10. MAINTAIN MINIMUM LIFE SAFETY, EMERGENCY EGRESS LIGHTING, AND EXIT SIGNS IN SCOPE OF WORK AND BASE BUILDING AREAS.

NORTH

05A-3.1


Computer Rendering Prosthesis Design 3D Scan: Human Body Model: Rhinoceros 5 Render: V-Ray for Rhino

Near Environment Model: Rhinoceros 5 Render: V-Ray for Rhino


Computer Rendering NEXT Office Design Model: Revit 2016 Render: Revit 2016

NEXT Office Design Model: Revit 2016 Render: Revit 2016


Computer Rendering High School Rennovation

Model: Revit 2017 Render: Revit 2017

High School Rennovation Model: Revit 2017 Render: Revit 2017


Grasshopper Surface Map Render: 3DS Max

Model: Rhinocero 5 & Grasshopper

Interior rendering for Urban House project executed in spring 2014

Hand Made Model for Urban House project executed in spring 2014

Hand Modeling


Wood Working Desk Orgnizer Designed and Built Product Design Studio Spring 2016.

Watch Display Designed and Built Wood Working Shop Spring 2016.


Hand Rendering

Graphite rendering of Theme Vals interior, designed by Peter Zumthor. Media: Graphite

Color rendering of Wassily Chair designed by Marcel Breuer Media: Marker, Color Pencil.

Color rendering designed by Marce

Media: Marker, Color


Sichao Sichao Wang Wang Sichao Wang Sichao Wang Sichao Wang Work Experience Huntsman Architectural Group

Thank You! Sichao Wang

sichao.w@gmail.com | 316.573.9003

Jan. 2017 - Aug. 2017

State University Graduated: Dec, 2012 Communicate with customers to make sure Wichita they are enjoying their meal. Work with supervisor to help with projects. Bachelor of Business Administration Help preparing CD sets. 918 918 Garden Garden Way Way Apt Apt 4, 4, Manhattan, Manhattan, KS KS 66502 66502 | sichao.w@gmail.com | sichao.w@gmail.com | 316-573-9403 | 316-573-9403 D.I.S (Copenhagen, June, 2016 - Aug. 2016 Expected Danmark) Graduation: May, 2018 Education Kansas State University Talking with clients to find out what they need and give out design suggestions. Studing abroad, experience different culture context in Scandinavia. Master of Interior Architecture and Product Design Work Work Experience Experience Huntsman Huntsman Architectural Architectural Group Group Jan. Jan. 2017 2017 - Aug. - Way Aug. 2017 20174, Manhattan, KS 66502 | sichao.w@gmail.com Spark Aug. 2016 - Dec. 2016 918 Garden Apt | 316-573-9403 Worked on a existing warehouse renovation and change to a multifunction store. Cumulative GPA: 3.96 Work Work with with supervisor supervisor toto help help with with projects. projects. Preparing lecture to teaching hand/computer skills to fellow students Help Help preparing preparing CDCD sets. sets.Dec, 2012 Wichita State University Graduated: Work Experience Hague Huntsman Architectural Group Jan. 2017 - Aug. 2017 Quality 2013 with John Norris Feb.Water 2015 Involvement CharetteTalking Talking with with clients clients toto find find out out what what they they need need and and give give out out design design suggestions. suggestions. Bachelor of Business Administration Work with supervisor Door to Door sale. to help with projects. Working in a group of 7 to design a sitting area in Denver Mid-Town. D.I.S (Copenhagen, Danmark) June, 2016 - Aug. 2016 918 Garden Way Apt 4, Manhattan, KS 66502 | sichao.w@gmail.com | 316-573-9403 Spark Spark Aug. Aug. 2016 2016 - water Dec. -preparing Dec. 2016 2016 Help sets.of house holders. Do tests inCD front Helping students from Digital Fabrication class to generate idea for a project. Studing abroad, experience different culture contextPreparing inPreparing Scandinavia. lecture lecture toto teaching teaching hand/computer hand/computer skills skills toto fellow fellow students students Educate Talking with clients to find what they needwater. and give out design suggestions. house holders whyout they need better Charette with Jordan Mozer Oct. 2014 Work Experience HuntsmanWorked Architectural Group Jan. 2017 - Aug. on a existing warehouse renovationHague and change to aWater multifunction store.2017 Hague Quality Quality Water 2013 20134, Manhattan, KS 66502 | sichao.w@gmail.com Spark Aug. 2016 -2008-2011 Dec. 2016 Kwan Court Restaurant 918 Garden Way Apt | 316-573-9403 Designing a space on a existing site in Minneapolis. Work with supervisor to help with projects. Door Door toto Door Door sale. sale. Preparing lectureto tochoose teaching to fellow students Assist customers thehand/computer meal they wantskills the most. Propose idea to Jordan Mozer and he give us feedbacks on what we did. Help preparing CD sets. Feb. 2015 Involvement Charette with John Norris DoDo water water tests tests in in front front of of house house holders. holders. Work Experience Hague Quality Water withGroup 2013 Communicate customers to make sure they are enjoying their meal. Huntsman Architectural Jan. 2017 - Aug. 2017 Environmental Design Student Association Treasurer 2013-2014 Talking withinclients toof find out what athey need and out design suggestions. Working a group 7 to design sitting area ingive Denver Mid-Town. Educate Educate house house holders holders why why they they need need better better water. water. Door Door sale. to help with projects. Work to with supervisor Assist president managing Spark Aug. - Dec.fund. 2016 Helping students from Digital Fabrication class to generate idea for a2016 project. Kwan Kwan Court Court Restaurant Restaurant 2008-2011 2008-2011 Do water tests inCD front Help preparing sets.of house holders. University Expected Graduation: May, 2018 Education Kansas State Help setting up Open House to2014 display students’ works. Preparing lectureMozer to teaching hand/computer skills to fellow students Charette with Jordan Oct. Assist Assist customers customers toto choose choose thethe meal meal they they want want thethe most. most. Educate house holders whyout they need better water. Talking of with clients to find what they need and give out design suggestions. Master Interior Architecture and Product Design Lead a team of students to sell college souvenir to raise fund. Hague Quality Watera space on a existing site in Minneapolis. Communicate 2013 Designing Communicate with with customers customers toto make make sure sure they they areare enjoying enjoying their their meal. meal. Kwan Court Restaurant Cumulative GPA: 3.96 Spark Aug. 2016 -2008-2011 Dec. 2016 Door to Door sale. Propose idea to Jordan Mozer and he give us feedbacks on what we did. Assist customers thehand/computer meal they wantskills the most. Preparing lectureto tochoose teaching to fellow students Wichita State University Graduated: Dec, 2012 Honors Palmquist Architecture and Design Scholarship 2014-2015 & 2016-2017 Do water tests in front of house holders. Environmental Design Student Association Treasurer 2013-2014 Kansas Kansas State State University University Expected Expected Graduation: Graduation: May, May, 2018 Education Education Communicate with customers to make sure they are enjoying their meal. Bachelor of2018 Business Administration Hague Quality Water 2013 Dean’s Honor List Fall 2013 | Spring and Fall 2014 Educate house holders why they need better water. Assist president managing fund. Master Master of of Interior Interior Architecture Architecture and and Product Product Design Design D.I.S (Copenhagen, Danmark) June, 2016 - Aug. 2016 Door to Door sale. GLMV Architecture Scholarship 2015-2016 Kwan Court Restaurant 2008-2011 Help setting up Open House to display students’ works. Cumulative Cumulative GPA: GPA: 3.96 3.96 University Graduation: May, 2018 Education Kansas State Studing abroad, different culture context Expected in Scandinavia. Do water tests inexperience front of house holders. Assist chooseto the theysouvenir wantWichita the Leadcustomers a team of to students sellmeal college tomost. raise fund. Wichita State State University University Graduated: Graduated: Dec, Dec, 2012 2012 Master ofon Interior Architecture and Product Design Worked a existing warehouse renovation and change to a multifunction store. Educate house holders why they need better water. Communicate with customers to makeSkills sure they are enjoying their meal. Computer Revit Hand Modeling Bachelor Bachelor of of Business Business Administration Administration Cumulative GPA: 3.96 Kwan Court Restaurant 2008-2011 Rhinocero Sketchup Honors Palmquist Architecture and Design Scholarship D.I.S 2014-2015 D.I.S (Copenhagen, (Copenhagen, Danmark) Danmark)& 2016-2017 June, June, 2016 2016 - Aug. - customers Aug. 2016 2016 Wichita State University Graduated: Dec, with John Norris Feb. 2012 2015 Involvement Charette Assist to choose the meal they want the most. State University Expected Graduation: May, 2018 Education Kansas Studing abroad, abroad, experience experience different different culture culture context context in in Scandinavia. Scandinavia. Working V-Ray Studing AutoCAD Dean’s Honor List Fall 2013 | Spring and Fall 2014 Bachelor of aBusiness in group ofAdministration 7 to design a sitting inare Denver Mid-Town. Communicate with customers to make surearea they enjoying their meal. of Interior Architecture and Product Design Worked Worked onon a existing a existing warehouse warehouse renovation renovation and and change change a multifunction a multifunction store. store.students GLMVMaster Architecture Scholarship 2015-2016 D.I.S (Copenhagen, Danmark) 2016 - Aug. 2016 Adobe CC 3DS Max toto Helping from Digital Fabrication class to generate idea forJune, a project. Cumulative GPA: 3.96 Studing abroad,Mozer experience different culture context Expected in Scandinavia. withUniversity Jordan Oct. 2014 Kansas State Graduation: May, 2018 Hand Drafting Grasshopper Education Charette Graduated: Charette with with John John Norris Norris Dec, 2012 Feb. Feb. 2015 Involvement Involvement Charette Worked aspace existing renovation and change to a multifunction store. Computer Skills Wichita Revit State University Hand Modeling Designing a2015 on warehouse a existingand site in Minneapolis. Master ofon Interior Architecture Product Design Bachelor of Business Administration (Proficient) Language Skills English Working Working in in a|group aChinese group of of 7(Native) to 7 to design design a sitting a sitting area area in in Denver Denver Mid-Town. Mid-Town. Propose ideaGPA: to Jordan Cumulative 3.96 Mozer and he give us feedbacks on what we did. Rhinocero Sketchup D.I.S (Copenhagen, Danmark) June, 2016 - Digital Aug. 2016 Helping Helping students students from from Digital Fabrication Fabrication class class to to generate generate idea idea for for a project. a project. Charette withUniversity John Norris Feb. 2012 2015 Involvement Environmental Design Student Association Treasurer Wichita State Graduated:2013-2014 Dec, V-RayStuding abroad, experience different culture context AutoCAD in Scandinavia. Ryadi Adityavarman Skip Soskin (AIA | LEED AP) Working Reference Charette Charette with with Jordan Jordan Mozer Mozer Oct. Oct. 2014 in aBusiness group ofAdministration 7 to design Assist president managing fund. a sitting area in Denver Mid-Town. Bachelor of2014 AdobeWorked CC on a existing warehouse renovation and 3DS Max change to a multifunction Associate Designing Designing aProfessor space a space onstore. on a existing a existing site site in in Minneapolis. Minneapolis.Senior Associate Helping students fromHouse DigitaltoFabrication class toworks. generate idea forJune, a project. Help setting up Open display students’ D.I.S (Copenhagen, Danmark) 2016 - Aug. 2016 Hand Drafting Grasshopper Propose Propose idea idea toto Jordan Jordan Mozer Mozer and and hehe give give usus feedbacks feedbacks onon what what we we did. did.Lead 1109 Seaton Hall Huntsman Architectural Group Charette with Oct. 2014 a Jordan team of Mozer students to sell collegeculture souvenir to raise fund. Studing abroad, experience different context in Scandinavia. with John Norris Feb. 2015 Involvement Ryadi@ksu.edu Environmental Environmental Design Design Student Student Association Association Treasurer Treasurer skip@huntsmanag.com 2013-2014 2013-2014 Designing on warehouse a existing site in Minneapolis. Worked onaaspace existing renovation and change to a multifunction store. English (Proficient) | Chinese (Native) Language Skills Charette Working in a group of 7 to design a sitting area in Denver Mid-Town. 315-409-8968 415-394-1212 Assist Assist president president managing managing fund. fund. Propose idea to Jordan Mozer Scholarship and he give us feedbacks on what we did. & 2016-2017 Honors Palmquist Architecture and Design 2014-2015 Helping students from Digital Fabrication class to generate idea for aupproject. Help Help setting setting up Open Open House House toto display display students’ students’ works. works. Environmental Design Student Association Treasurer 2013-2014 Charette with John Norris Feb. 2015 Involvement Skip Soskin (AIA | LEED AP) Reference Ryadi Adityavarman Dean’s Honor List Fall 2013 | Spring and Fall 2014 Note Legal USLead permanent resident. Charette with Jordan Mozer Oct. 2014 Lead a team a team of of students students toto sell sell college college souvenir souvenir toto raise raise fund. fund. GLMV Architecture Assist president managing fund. a sitting area in Denver Mid-Town. Working in a Scholarship group of 7 to design Associate Professor 2015-2016 Designing a space on a existing site in Minneapolis. Senior Associate Help setting up Open display students’ Helping students fromHouse DigitaltoFabrication class toworks. generate idea for a project. 1109 Seaton Huntsman Architectural Group Propose idea toHall Jordan Mozer and he give us feedbacks onArchitecture what we did.and Honors Honors Palmquist Palmquist Architecture and Design Design Scholarship Scholarship Computer Skills2014-2015 2014-2015 &with & 2016-2017 2016-2017 a Jordan team of Mozer students to sell college souvenir to raise fund. CharetteLead Oct. 2014 Revit Hand Modeling Ryadi@ksu.edu skip@huntsmanag.com Environmental Design Student Association Treasurer 2013-2014 Dean’s Dean’s Honor Honor List List Fall Fall 2013 2013 |Rhinocero Spring | Spring and and Fall Fall 2014 Designing a2014 space on a existing site in Minneapolis. 315-409-8968 415-394-1212 Sketchup Assist president managing fund. Honors Palmquist Architecture and Design 2014-2015 idea to Jordan Mozer Scholarship and he give us feedbacks on what we did. & 2016-2017 GLMV GLMV Architecture Architecture Scholarship Scholarship 2015-2016 2015-2016 V-Ray Propose AutoCAD Help setting upresident. Open House to display students’ works. Note Legal US permanent Dean’s Honor List Fall 2013 | Spring and Fall 2014 Environmental Design Student Association Treasurer 2013-2014 Lead a team of students to sell college souvenir to raise fund. Adobe CC 3DS Max Computer Computer Skills Skills Revit Revit Hand ModelingGLMV Architecture Hand Modeling Assist president managing fund. Scholarship 2015-2016 Hand Drafting Grasshopper Help setting up Open House to display students’ works. Rhinocero 2014-2015 & 2016-2017 Sketchup Sketchup Honors Palmquist Architecture and Design Scholarship Rhinocero Lead a team of students to sell college souvenir to raise fund. Computer Skills Revit Hand Modeling V-Ray AutoCAD V-Ray AutoCAD Language Skills English (Proficient) | Chinese (Native) Dean’s Honor List GLMV Architecture Scholarship

Computer Skills Revit Rhinocero V-Ray Adobe CC Hand Drafting

Fall 2013 | Spring and Fall 2014 Adobe Adobe CCCC 2015-2016 Hand Drafting Hand Drafting Hand Modeling English (Proficient) (Proficient) | Chinese | Chinese (Native) (Native) Language Language Skills Skills English Sketchup AutoCAD Ryadi Adityavarman Adityavarman Reference Reference Ryadi 3DS Max Associate Associate Professor Professor Grasshopper 1109 1109 Seaton Seaton Hall Hall

Language Skills English (Proficient) | Chinese (Native) Reference Ryadi Adityavarman

Associate Professor

1109 Seaton Hall Ryadi@ksu.edu 315-409-8968

Note Legal US permanent resident.

Ryadi@ksu.edu Ryadi@ksu.edu 315-409-8968 315-409-8968

Skip Soskin (AIA | LEED AP) Note Note Legal Legal USUS permanent permanent resident. resident. Senior Associate

Huntsman Architectural Group skip@huntsmanag.com 415-394-1212

Rhinocero Sketchup 3DS Max 3DS Max Honors Palmquist Architecture and Design Scholarship Skip Ryadi Soskin (AIA |2014-2015 LEED AP) & 2016-2017 V-Ray Adityavarman AutoCAD Reference Grasshopper Grasshopper Dean’s Honor List Fall 2013 | Spring and Fall 2014 Associate Professor Senior Associate Adobe CC 3DS Max GLMV Drafting Architecture 1109 Seaton Scholarship Hall Huntsman Architectural 2015-2016 Group Hand Grasshopper Ryadi@ksu.edu

Computer Skills Skip Skip Soskin Soskin (AIA (AIA | LEED | Revit LEED AP) AP) English (Proficient) | Chinese (Native) Language Skills 315-409-8968 Senior Senior Associate Associate Rhinocero Note Architectural Legal US permanent Ryadi Adityavarman Reference Huntsman Huntsman Architectural Group Group resident. V-Ray skip@huntsmanag.com skip@huntsmanag.com Associate Professor Adobe CC 415-394-1212 415-394-1212

1109 Seaton Hall Hand Drafting Ryadi@ksu.edu

| Chinese (Native) Language Skills English (Proficient) 315-409-8968

Note Legal permanent resident. RyadiUS Adityavarman Reference

Associate Professor

1109 Seaton Hall Ryadi@ksu.edu 315-409-8968

skip@huntsmanag.com

Hand 415-394-1212 Modeling Sketchup Skip Soskin (AIA | LEED AP) AutoCAD Senior Associate 3DS Max Huntsman Architectural Group Grasshopper skip@huntsmanag.com 415-394-1212

Resume

Skip Soskin (AIA | LEED AP) Senior Associate

Huntsman Architectural Group skip@huntsmanag.com 415-394-1212


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.