Revit Work Sample Architectural Designer | CCW Architects
1.1
1.2
2
3
4
5
6
7
9
10
11
12
6" TO 6 -W A Y P UM P TE S T HE A D E R
JOC KE Y PU M P C O NT RO L LE R
AUTOMATIC TR ANSFER SWITCH
FIR E P UMP CONTR OLLER
A
8
G
UP DN
B FREEZER ROOM
C
DN
DE-FROST
40 x 48 GMA
40 x 48 GMA
F
SCREW INCLINE CONVEYOR ROLLER GRAVITY
PU
DISCH HT 22"
GRINDER
LINE#8-4 - 3/4 HP
PU
LINE#7-2 - 2 HP
PITCH UP
PU
PALLETIZING PACK-OFF
TOR 24"
LINE#8-5 - 3/4 HP PU
BOX CP
TABLE SS PACK-OFF
BOX
[70/MIN] PORTIONER MMP 220 VEMAG
CP
PU
CP
40 x 48 GM
CP
GRAVITY ROLLER
LINE#6-1 - 3/4 HP LABELER FLAKER
C.P.
TRAY
TRAY
METAL DETECTOR
TABLE PACK-OFF SS
C.P.
PACK-OFF PALLETIZING
LINE#6-2 - 3/4 HP
MAIN LOBBY
LINE#8-5 - 3/4 HP PU
LINE#7-1 1 HP PU
DISPENSER
PU
LINE#5-1 - 3/4 HP
TRAY
NEW TAPER BY OTHERS
LINE#5-3 3/4 HP PU TRAY
TRAY
TRAY
LINE#5-2 - 3/4 HP
STORAGE COOLER
PROCESSING AREA NEW GRAVITY ROLLER
PU
METAL DETECTOR
LABELER
C.P.
PALLET
TRAY
PALLET
A E
PU TRAY
AMBIENT STORAGE
LINE#7-4 - 3/4 HP
CHECK TOC WEIGHER 24"
DN
LINE#7-3 3/4 HP PU
C.P.
SCREW INCLINE CONVEYOR
TRAY
CP
PU
STUFFER
TRAY
METAL 4' DETECTOR
LINE#8-3 - 3/4 HP
TOC 15"
LABELER
LINE#5-4 3/4 HP PU
TABLE PACK-OFF SS
A E
PU
GENERAL OFFICE
FLAKER
PALLET
CP
PALLET
CP
LINE#3-1 3/4 HP PU
FABBRI 75 LINE#3-2 3/4 HP PU STRETCH OVERWRAP
LINE#3-5 3/4 HP PU
LABELER
LINE#3-6 3/4 HP PU
METAL 4' DETECTOR
CP
CP GRINDER
BAG
BOX BOX
TOR 24" PALLET
[190/MIN] PATTY FORMER FM250 VEMAG
STUFFER
DISCH HT 22"
REL
TAPER
1 2
K
HP20E VEMAG
SCREW INCLINE CONVEYOR TOC 15"
SUPER VAC
BOX
LINE#3-7 3/4 HP PU
SCALE RELOCATE
SCALE
JLS ROBOT LINE#3-4 3/4 HP PU
BOX
PACKER
LINE#3-3 3/4 HP PU
SUPER VAC EL 40"
PITCH UP
CVP
BAG BAG
CP
BOX
PALLET
LINE#3-8 1 HP PU
CHECK TOC WEIGHER 24"
A E
H J
LUNCH ROOM
UP
LINE#8-2 - 3/4 HP
STRETCH OVERWRAP FABBRI 75
[190/MIN] PATTY FORMER FM250 VEMAG
HP20E VEMAG
G
40 x 48 GMA
E
10
BLAST FREEZER 40 x 48 GMA
D
REFRIGERATED TRASH AREA
REFRIGERATED LOADING DOCK
GRINDER
SCREW INCLINE CONVEYOR
Schuster Meats | Ground Floor Plan Existing New First floor area - 57,620 SF 55,618 SF; Second floor area - 0 SF 6,642 SF; Gross building area - 57,620 SF 62,640 SF; Building perimeter - 1,094 LF 1,180 LF
DN
Schuster Meats | Isometric View
Perspective section | Main Lobby Area
Maximized natural lighting | Entrance Lobby
1.1
1.2
2
3
4
A 4
WS1 A-303 5
B
EVAP.
FREEZER ROOM
BLAST FREEZER
EVAP.
D
CARD BD. DUMPSTER
TRASH COMPACTOR
EVAP.
EVAP.
C
WH106
WH104
3
EDIBLES
AMB. VEST.
STORAGE
10 1/4"
WH102
H&C
[190/MIN] PATTY FORMER FM250 VEMAG
HP20E VEMAG
EVAP.
G
PROCESS CHECK 4700 PPI INTERLEAVER VEMAG EV-6 VEMAG
[70/MIN] PORTIONER MMP 220 VEMAG
EVAP.
0' - 0"
H&C TRAY
-3' - 8 1/4"
H
Part Plan - Storage 1.1
1.2 REFRIGERATED TRASH AREA
BOTTOM OF DECK 35' - 0"
TOP OF PANEL
TO PACK
A E
DN
SC VEMAG 261 SHUTTLE
TRAY FEEDER 2380
DISPENSER
H&C
WH103
6
WS2 A-408
AMBIENT STORAGE
REFRIGERATED TRASH AREA
F
40 x 48 GM
S1 Ps1
HB
E
EVAP.
40 x 48 GM A
3
1”= 30’-0” 2
3
4
LINE#5-1 - 3/4 HP PU
5
TOP OF PANEL 39' - 0"
WH103
23' - 2"
FREEZER ROOM
WH106
GROUND FLOOR 0' - 0"
Building Section - S1
7
8
6" TO 6-WAY PUMP TEST HEADER
11
FIRE PUMP CONTROLLER
X-BRACING
AUTOMATIC TRANSFER SWITCH
PUMP ROOM
10
J O C K EY PUMP C O N TR O L L ER
A
9
B
H&C
G
WATER TANK
UP
STAIR 3 DN -4' - 0"
AMBIENT MAINTENANCE ROOM
EVAP.
0' - 0" EVAP.
6
3
EVAP.
H&C
REFRIGERATED LOADING DOCK
WH107
EVAP.
X-BRACING
C
EVAP.
S1 Ps1
D
6
X-BRACING
MH
PROCESSING AREA
G H
H&C
WH101
H&C
Part Plan - Loading Dock 7
8
EVAP.
WH111
H&C
F
CORRIDOR
X-BRACING
WH105
E
STAIR 2
EVAP.
DE-FROST
STORAGE COOLER
WH100
1”= 30’-0”
9
10 TOP OF PANEL 38' - 3 3/4"
REFRIGERATED LOADING DOCK
WH107
1”=30’-0”
2'-0" FOAM BAND
B
7"
1
11
5 Det 1 P_S3
2
12
2'-0" PVC WRAP DEPTH
3 4 5 6
BOTTOM OF DECK 35' - 0"
7 2'-0" FOAM BAND
11"
1
2
DRAIN LEADER. ROOF DRAIN FROM ABOVE TIES INTO SITE STORM DRAIN SYSTEM
3
4" VERTICAL IMP WALL
4
25' - 6 1/4"
11"
6" INSULATED METAL PANEL.. INSTALL METAL PANEL TO SUB SLAB INSULATION & MAKE FOAM TO PANEL CONNECTION
1'-1"
5
8 9
10
1
HEAT WELDED PVC LAYER
7
1-1/2" RING SHANK NAILS @6" O.C.
2
LAYER WRAP ENDS
8
GUTTER
6" INSULATED METAL WALL PANEL POLYESTER FINISH IGLOO WHITE
3
HOT AIR WELD 1-1/2" MIN
9
DRAIN LEADER
4
CUT-EDGE SEALANT
GIRT LOCATION
5
MIN 22 GA. CONT. CLEAT
11 POLYISO ROOF INSULATION
6
PVC COATED METAL
12 3.5" MECH.FASTENER
10 2X8 BUILT UP WOOD BLOCKING
Roof Gutter - Det 1
3/4”= 1’-0” 1
FREEZER ROOM
6
6" CONCRETE SLAB
4" IMP
7
2 LAYERS OF 3 INCH 40 PSI OWENS CORNING RIGID INSULATION WITH OVERLAPPING JOINTS
6" IMP
WH106 6 7 8 11" 1'-1" 1"
GROUND FLOOR 0' - 0"
9
8
VAPOR BARRIER
9
3" SAND BED
10
6" CONCRETE SLAB
11
THERMAL BREAK
2 3 4 5 6 7 8 9 10 11
10 Det 2 A-505
12
11
13
10 GRADE -4' - 0"
1 2
Wall Section - WS1
3/16”= 1’-0”
CAULK TO MATCH TRIM RIVET
7 8
FINISH SLAB 6" CONCRETE SLAB
9
VAPOR BARRIER
3
3"X3" BENT 24 GA METAL TRIM.
4
CONCRETE SMOOTH FINISH
10
5
METAL REBARS
6
1" EPOXY COVE BASE
11 12
Wall Base - Det 2
RIGID INSULATION 3" SAND BED FOAM AT BASE OF WALL
3/4”= 1’-0”
1.1 TOP OF FASCIA
E
24' - 5 3/4"
1
3
1/4" / 1'-0"
4 7 TOP OF PANEL
6
Det 3 A-504
24' - 8"
TOP OF FASCIA
SIM 1/8" / 1'-0"
10 2-0". FOAM BAND
8
23' - 2"
TOP OF PANEL
9
23' - 0 1/2"
BOTTOM OF DECK
1
BOUNDING ADHESIVE
7 1-1/2" RING SHANK NAILS
2
METAL FASCIA
8 BUILT UP WOOD BLOCKING
3
HOT AIR WELD 1-1/2" MIN
9 MEMBRANE LAYER WRAP
4 5
MIN 22 GA. CONT. CLEAT 10 RIGID POLYISO ROOF INSULATION CUT-EDGE SEALANT
6
POLYISO ROOF INSULATION
1
5" IMP CEILING SUPPORT FROM STRUCTURE ABOVE
2
1/2”= 1’-0”
5
1
6
2 3
7
4
8 9
18' - 0"
24'-9"
Roof Edge - Det 3
5" IMP WALL
REFRIGERATED TRASH AREA
WH103
6
Det 4 P_S3 GROUND FLOOR 0' - 0"
10 11 12 1
CAULK TYP.
7
6" CONCRETE SLAB
2
26 GAGE METAL TRIM
8
BUTYL SEALANT
3
TYP. CONCRETE CURB
9
14 GA. PANEL CLIP
4
1" DIA. EPOXY COVE BASE
10
BASE TRIM
5
RIVET
11
BASE FLASHING
6
5" IMP WALL
12
URETHANE SEALANT
Wall Base - Det 4
3/4”= 1’-0”
2" INSULATION HORIZONTAL (24") & VERTICAL AROUND ENTIRE PERIMETER
3
NEW FOUNDATION WALL
4
10"
23' - 0"
9
5
2
Wall Section - WS 2
3/16”= 1’-0”
East Side Elevation
Staircase | Offices area
Structural Framing
Refrigerated Loading Dock