Revit Work Sample

Page 1



Revit Work Sample Architectural Designer | CCW Architects


1.1

1.2

2

3

4

5

6

7

9

10

11

12

6" TO 6 -W A Y P UM P TE S T HE A D E R

JOC KE Y PU M P C O NT RO L LE R

AUTOMATIC TR ANSFER SWITCH

FIR E P UMP CONTR OLLER

A

8

G

UP DN

B FREEZER ROOM

C

DN

DE-FROST

40 x 48 GMA

40 x 48 GMA

F

SCREW INCLINE CONVEYOR ROLLER GRAVITY

PU

DISCH HT 22"

GRINDER

LINE#8-4 - 3/4 HP

PU

LINE#7-2 - 2 HP

PITCH UP

PU

PALLETIZING PACK-OFF

TOR 24"

LINE#8-5 - 3/4 HP PU

BOX CP

TABLE SS PACK-OFF

BOX

[70/MIN] PORTIONER MMP 220 VEMAG

CP

PU

CP

40 x 48 GM

CP

GRAVITY ROLLER

LINE#6-1 - 3/4 HP LABELER FLAKER

C.P.

TRAY

TRAY

METAL DETECTOR

TABLE PACK-OFF SS

C.P.

PACK-OFF PALLETIZING

LINE#6-2 - 3/4 HP

MAIN LOBBY

LINE#8-5 - 3/4 HP PU

LINE#7-1 1 HP PU

DISPENSER

PU

LINE#5-1 - 3/4 HP

TRAY

NEW TAPER BY OTHERS

LINE#5-3 3/4 HP PU TRAY

TRAY

TRAY

LINE#5-2 - 3/4 HP

STORAGE COOLER

PROCESSING AREA NEW GRAVITY ROLLER

PU

METAL DETECTOR

LABELER

C.P.

PALLET

TRAY

PALLET

A E

PU TRAY

AMBIENT STORAGE

LINE#7-4 - 3/4 HP

CHECK TOC WEIGHER 24"

DN

LINE#7-3 3/4 HP PU

C.P.

SCREW INCLINE CONVEYOR

TRAY

CP

PU

STUFFER

TRAY

METAL 4' DETECTOR

LINE#8-3 - 3/4 HP

TOC 15"

LABELER

LINE#5-4 3/4 HP PU

TABLE PACK-OFF SS

A E

PU

GENERAL OFFICE

FLAKER

PALLET

CP

PALLET

CP

LINE#3-1 3/4 HP PU

FABBRI 75 LINE#3-2 3/4 HP PU STRETCH OVERWRAP

LINE#3-5 3/4 HP PU

LABELER

LINE#3-6 3/4 HP PU

METAL 4' DETECTOR

CP

CP GRINDER

BAG

BOX BOX

TOR 24" PALLET

[190/MIN] PATTY FORMER FM250 VEMAG

STUFFER

DISCH HT 22"

REL

TAPER

1 2

K

HP20E VEMAG

SCREW INCLINE CONVEYOR TOC 15"

SUPER VAC

BOX

LINE#3-7 3/4 HP PU

SCALE RELOCATE

SCALE

JLS ROBOT LINE#3-4 3/4 HP PU

BOX

PACKER

LINE#3-3 3/4 HP PU

SUPER VAC EL 40"

PITCH UP

CVP

BAG BAG

CP

BOX

PALLET

LINE#3-8 1 HP PU

CHECK TOC WEIGHER 24"

A E

H J

LUNCH ROOM

UP

LINE#8-2 - 3/4 HP

STRETCH OVERWRAP FABBRI 75

[190/MIN] PATTY FORMER FM250 VEMAG

HP20E VEMAG

G

40 x 48 GMA

E

10

BLAST FREEZER 40 x 48 GMA

D

REFRIGERATED TRASH AREA

REFRIGERATED LOADING DOCK

GRINDER

SCREW INCLINE CONVEYOR

Schuster Meats | Ground Floor Plan Existing New First floor area - 57,620 SF 55,618 SF; Second floor area - 0 SF 6,642 SF; Gross building area - 57,620 SF 62,640 SF; Building perimeter - 1,094 LF 1,180 LF

DN


Schuster Meats | Isometric View


Perspective section | Main Lobby Area


Maximized natural lighting | Entrance Lobby


1.1

1.2

2

3

4

A 4

WS1 A-303 5

B

EVAP.

FREEZER ROOM

BLAST FREEZER

EVAP.

D

CARD BD. DUMPSTER

TRASH COMPACTOR

EVAP.

EVAP.

C

WH106

WH104

3

EDIBLES

AMB. VEST.

STORAGE

10 1/4"

WH102

H&C

[190/MIN] PATTY FORMER FM250 VEMAG

HP20E VEMAG

EVAP.

G

PROCESS CHECK 4700 PPI INTERLEAVER VEMAG EV-6 VEMAG

[70/MIN] PORTIONER MMP 220 VEMAG

EVAP.

0' - 0"

H&C TRAY

-3' - 8 1/4"

H

Part Plan - Storage 1.1

1.2 REFRIGERATED TRASH AREA

BOTTOM OF DECK 35' - 0"

TOP OF PANEL

TO PACK

A E

DN

SC VEMAG 261 SHUTTLE

TRAY FEEDER 2380

DISPENSER

H&C

WH103

6

WS2 A-408

AMBIENT STORAGE

REFRIGERATED TRASH AREA

F

40 x 48 GM

S1 Ps1

HB

E

EVAP.

40 x 48 GM A

3

1”= 30’-0” 2

3

4

LINE#5-1 - 3/4 HP PU

5

TOP OF PANEL 39' - 0"

WH103

23' - 2"

FREEZER ROOM

WH106

GROUND FLOOR 0' - 0"

Building Section - S1


7

8

6" TO 6-WAY PUMP TEST HEADER

11

FIRE PUMP CONTROLLER

X-BRACING

AUTOMATIC TRANSFER SWITCH

PUMP ROOM

10

J O C K EY PUMP C O N TR O L L ER

A

9

B

H&C

G

WATER TANK

UP

STAIR 3 DN -4' - 0"

AMBIENT MAINTENANCE ROOM

EVAP.

0' - 0" EVAP.

6

3

EVAP.

H&C

REFRIGERATED LOADING DOCK

WH107

EVAP.

X-BRACING

C

EVAP.

S1 Ps1

D

6

X-BRACING

MH

PROCESSING AREA

G H

H&C

WH101

H&C

Part Plan - Loading Dock 7

8

EVAP.

WH111

H&C

F

CORRIDOR

X-BRACING

WH105

E

STAIR 2

EVAP.

DE-FROST

STORAGE COOLER

WH100

1”= 30’-0”

9

10 TOP OF PANEL 38' - 3 3/4"

REFRIGERATED LOADING DOCK

WH107

1”=30’-0”


2'-0" FOAM BAND

B

7"

1

11

5 Det 1 P_S3

2

12

2'-0" PVC WRAP DEPTH

3 4 5 6

BOTTOM OF DECK 35' - 0"

7 2'-0" FOAM BAND

11"

1

2

DRAIN LEADER. ROOF DRAIN FROM ABOVE TIES INTO SITE STORM DRAIN SYSTEM

3

4" VERTICAL IMP WALL

4

25' - 6 1/4"

11"

6" INSULATED METAL PANEL.. INSTALL METAL PANEL TO SUB SLAB INSULATION & MAKE FOAM TO PANEL CONNECTION

1'-1"

5

8 9

10

1

HEAT WELDED PVC LAYER

7

1-1/2" RING SHANK NAILS @6" O.C.

2

LAYER WRAP ENDS

8

GUTTER

6" INSULATED METAL WALL PANEL POLYESTER FINISH IGLOO WHITE

3

HOT AIR WELD 1-1/2" MIN

9

DRAIN LEADER

4

CUT-EDGE SEALANT

GIRT LOCATION

5

MIN 22 GA. CONT. CLEAT

11 POLYISO ROOF INSULATION

6

PVC COATED METAL

12 3.5" MECH.FASTENER

10 2X8 BUILT UP WOOD BLOCKING

Roof Gutter - Det 1

3/4”= 1’-0” 1

FREEZER ROOM

6

6" CONCRETE SLAB

4" IMP

7

2 LAYERS OF 3 INCH 40 PSI OWENS CORNING RIGID INSULATION WITH OVERLAPPING JOINTS

6" IMP

WH106 6 7 8 11" 1'-1" 1"

GROUND FLOOR 0' - 0"

9

8

VAPOR BARRIER

9

3" SAND BED

10

6" CONCRETE SLAB

11

THERMAL BREAK

2 3 4 5 6 7 8 9 10 11

10 Det 2 A-505

12

11

13

10 GRADE -4' - 0"

1 2

Wall Section - WS1

3/16”= 1’-0”

CAULK TO MATCH TRIM RIVET

7 8

FINISH SLAB 6" CONCRETE SLAB

9

VAPOR BARRIER

3

3"X3" BENT 24 GA METAL TRIM.

4

CONCRETE SMOOTH FINISH

10

5

METAL REBARS

6

1" EPOXY COVE BASE

11 12

Wall Base - Det 2

RIGID INSULATION 3" SAND BED FOAM AT BASE OF WALL

3/4”= 1’-0”


1.1 TOP OF FASCIA

E

24' - 5 3/4"

1

3

1/4" / 1'-0"

4 7 TOP OF PANEL

6

Det 3 A-504

24' - 8"

TOP OF FASCIA

SIM 1/8" / 1'-0"

10 2-0". FOAM BAND

8

23' - 2"

TOP OF PANEL

9

23' - 0 1/2"

BOTTOM OF DECK

1

BOUNDING ADHESIVE

7 1-1/2" RING SHANK NAILS

2

METAL FASCIA

8 BUILT UP WOOD BLOCKING

3

HOT AIR WELD 1-1/2" MIN

9 MEMBRANE LAYER WRAP

4 5

MIN 22 GA. CONT. CLEAT 10 RIGID POLYISO ROOF INSULATION CUT-EDGE SEALANT

6

POLYISO ROOF INSULATION

1

5" IMP CEILING SUPPORT FROM STRUCTURE ABOVE

2

1/2”= 1’-0”

5

1

6

2 3

7

4

8 9

18' - 0"

24'-9"

Roof Edge - Det 3

5" IMP WALL

REFRIGERATED TRASH AREA

WH103

6

Det 4 P_S3 GROUND FLOOR 0' - 0"

10 11 12 1

CAULK TYP.

7

6" CONCRETE SLAB

2

26 GAGE METAL TRIM

8

BUTYL SEALANT

3

TYP. CONCRETE CURB

9

14 GA. PANEL CLIP

4

1" DIA. EPOXY COVE BASE

10

BASE TRIM

5

RIVET

11

BASE FLASHING

6

5" IMP WALL

12

URETHANE SEALANT

Wall Base - Det 4

3/4”= 1’-0”

2" INSULATION HORIZONTAL (24") & VERTICAL AROUND ENTIRE PERIMETER

3

NEW FOUNDATION WALL

4

10"

23' - 0"

9

5

2

Wall Section - WS 2

3/16”= 1’-0”


East Side Elevation

Staircase | Offices area

Structural Framing


Refrigerated Loading Dock


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.