IDS60804 DETAILING AND WORKING DRAWINGS
SILVIENA 0335921 MS AZIAH & MS JERYN
assignment 3
NAME STUDENT ID MODULE
: : :
PROJECT
:
LECTURER
:
SILVIENA 0335921 IDS 60804 DETAILING AND WORKING DRAWINGS FINAL PROJECT-DRAWING CONVENTION-WARCHT JERYN LEE
REVISION TRACKING (DRAWING SHEET LIST) SHEET SHEET NAME CURRENT REVISION DATE DESCRIPTION DWG_WD_NN_ST Setting Out Plan 3 6/2/2020 DWG_WD_NN_FLP_02 Furniture Layout Plan 3 6/2/2020 DWG_WD_NN_RCP_03 Reflected Ceiling Plan 3 6/20/2020 DWG_WD_NN_FFP_04 Floor Finishes Plan 3 6/20/2020 DWG_WD_NN_SC_05 Section Plan 3 6/20/2020 DWG_WD_NN_WS_06 Water Supply 3 6/20/2020 DWG_WD_NN_ST_07 Staircase 3 6/20/2020 DWG_WD_NN_ST_08 Staircase Detailing 3 6/26/2020 DWG_WD_NN_BS_09 Bespoke Plan 1 6/30/2020 DWG_WD_NN_BS_10 Bespoke Section 1 6/30/2020 DWG_WD_NN_BS_11 Bespoke Blow-up 7/8/2020 DWG_WD_NN_LEG Legend 3 6/20/2020 DWG_WD_NN_BQ Bill of Quantities 3 6/26/2020
ISSUED
CHANGES
BILL OF QUANTITIES (BQ) DESCRIPTION QUANTITY
ITEM NOS. Staircase 1 Thread and Riser
UNIT
1.1
To supply and install 1150MMX225MM 2MM thick metal pan threads and risers
16
sqm
1.2
To apply black paint to the 1150mmx225mm 2mm thick metal pan threads and risers with matte finishes
2
L
1.3
To install 7mm (D) DIN571 bolts to the 1150mmX225mm 2mm thick metal pan threads and risers with the metal single stringer
32
nos
1.4
32 bolts of DIN571 with diameter of 7mm and a length of 160mm
32
nos
1.5
16 pieces of 1150mmX225mm 2mm thick metal pan threads and rises
16
nos
2
Stringer
2.1
To supply and install 2880mmX250mm metal single stringer to the concrete mezzanine floor
1
sqm
2.2
To apply black paint to the 2880mmX250mm metal single stringer with matte finishes
2
L
1
sqm
3 3.1
Railings To weld 50mmX50mm mild steel railings into the 2880mmX250mm metal single stringer
UNIT PRICE
TOTAL PRICE
reflection ASSIGNMENT 3
For the final project, we are doing construction drawings of our design studio 4 project. The drawings include setting out plan, furniture layout plan, floor finishes plan, reflected ceiling plan, section plan, water supply, staircase, be-spoke, and bill of quantities of either staircase or be-spoke drawings. For this final project, I tried my best to do all the things I couldn’t do and do it wrong for the previous assignments, which are project 1 (staircase) and project 2 (kitchen and bathroom). From this project, I learned about the water supply and bill of quantities. Also, I learned a lot from the mistakes that I’ve made from project 1 and project 2. Therefore, I tried to fix them all for this final project.
assignment 2
NAME : SILVIENA STUDENT ID : 0335921 : IDS 60804 DETAILING AND MODULE WORKING DRAWINGS : 02-DRAWING CONVENTIONPROJECT KITCHEN AND BATHROOM LECTURER : NOR AZIAH HASSAN
KITCHEN
CONTENTS
FLOOR PLAN ELEVATION A ELEVATION B SECTION A-A' SECTION B-B' CABINET DETAILING PREPARATION AREA DETAILING SCHEDULES IMAGES
1 2 3 4 5 6 7 8 9
BATHROOM FLOOR PLAN ELEVATION A ELEVATION B SECTION A-A' SECTION B-B' FLOOR AND WALL DETAILING WC DETAILING LIGHTINGS SCHEDULES IMAGES
10 11 12 13 14 15 16 17 18 19
REPORT
20
REPORT (CONCLUSION) All the kitchen plans and bathroom plans that I've drawn for this assignment, overall I have some issues I would like to change. For the first issue, I had some problem with the lighting for night time in the kitchen. Since the ceiling for my kitchen is quite height which is 9300MM from the ground floor. And because of that, I would like to add wall lightings around the preparation area and the cooking area. So, during night time, the kitchen will be brighter because there are no natural lighting come in. Sometimes it might hurt our eyes if the space is kind of dim when we're making something, so adding the wall lighting would help a lot. For the second issue, it's the space for the bathroom. The space given within each sanitary wares are quite narrow. Both spaces between the W&C and shower, as well as the space between the shower and wash basin. Sometimes when I shower, I could bump into either the W&C or the wash basin. In conclusion, by doing this assignment I learnt a lot about installation of kitchen appliances and fittings, as well as the installation of sanitary wares in bathroom. Through this assignment, I would know proper materials needed for each space according to the use. I learnt that I need to study more about detailing drawings and installation drawings because there are still lot of things other than the kitchen and bathroom that has fittings installation to it.
reflection ASSIGNMENT 2
For project 2, we have to measure and draw our own house’s kitchen and bathroom in AutoCAD software. We are needed to draw the plan, elevation, section, 2 blow-up details, floor finishes, wall finishes, ceiling finishes, kitchen cabinets, door or windows, tile adhesives, and building services (electrical, lighting, and water plumbing). For this assignment, I realize I didn’t detail up more for the blow-up drawings. From this project assignment, I experienced doing a measuring site of a bigger space, which are the kitchen area and as well as the restroom. I also learned more about legends and cross-referencing.
assignment 1
reflection ASSIGNMENT 1
For project 1, we have to measure and draw our own house’s staircase in AutoCAD software. We are needed to draw the plan, elevation, section, and 2 blow-up details. Since this is my first time as well to draw construction drawings in AutoCAD, I lack a lot in many aspects regarding this assignment about construction drawings. I didn’t add enough specifications and information on each of the plans. I also learned about line weights to show different elements inside the drawing. By doing this assignment, I do realize that I need to add more information and specifications on each plans for people to understand my drawings.
THANKYOU