Slope
13
14
15
16
17
0mm Building line
56 682 BOUNDRY LINIE
ALL STORM WATER MANAGEMENT TO ENGINEERS SPECIFICATIONS
Existing Vibracrete wall
1 : 200
105.43
105.00 104.90m2
2.40m2
104.50
105.00 104.90m2
3 x 110⌀ pipes in wall at 1:70 slope
3.12m2
104.40
105.00 104.90m2
104.80
1.80m2
s.s 01 COVER LEVEL -1 853 INVERT LEVEL -2 240 DEPTH 450 DISTANCE FALL
104.30 104.90
STORMWATER BOUNDRY WALL DETAIL 2
1 : 20
2.63m 1:60
IE 1 RE 1 IE 2
-1 853 -2 460 607
ALL LEVELS TO BE CONFIRMED ON SITE BEFORE CONSTRUCTION COMMENCES
105.00
STORM WATER MANAGEMENT 1 : 200
new ⌀110mm soil pipe to slope min 1:60 fall to connect into drainage line 02
Concrete surface as per engineers details
10m
104.90
wc
PROJECT
ERF 1981 NEWTON PARK
ERF 321 LANE
DRAWING
NGL
Plastered Bund/brick wall as per engineers details
10m
105.00
whb
2630
GROUND STOREY
8m
1.28m2 104.60
ss/vp
drainage/sewerage lines underneath load bearing wall to be encased in concrete.
SITE PLAN. 1
IE 3
Slope
External wall of proposed new building
24 BAYS
Ex.MH to be moved to new position
lope :70 s
588m 2
EXISTING
@1
4 BAYS PER 100m2 GLA BAYS PROVIDED
....................................................................
10⌀
ERF 1980
1:10 104.30
.............................................................................
3x1
N
Existing vibracreate wall
104.80
Client
Architect
G
new ⌀110mm PVC stubstack and vent point to be min 1m from ffl
12
13.8° Roof pitch
11
New paving to match 18existing 19
110mm uPVC Drainage pipe min 450 mm below NGL TO COMPLY TO SANS 10400 PART P
PROPOSED NEW WAREHOUSE ERF 1981
5050
10
Slope
2° Roof pitch
6
9
2400
New parking
5050
Existing Clearvu fence
2400
5
105.00
150mm x 120mm Custom aluminum conealed box gutters notched to suit profile 1:100
Existing paving (Highlited in light grey)
6627
Ex. Vehicular Exit
1:10
104.40 1:10
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P.
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
SDP SITE PLAN CLIENT
Wayne Mukheibir ALLOTMENT
ERF NUMBER
Erf 1981
NEWTON PARK DRAWN
SCALE
Drainage Line 03.
As indicated DWG USE
DATE ISSUED
1 : 100
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
SM
001 - 01
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 2:59:42 PM
104.90
Ex. gate
Storm water to attenuate in an controlled manner
NOTE: IMPORTANT
IE 4
Existing parking to remain unaffected
UP
0mm Building line 28 341 BOUNDRY LINIE
6201
ss/vp
8
Storm water management to engineers specification Slope Slope
IBR 686 colour tbc fixed with fastners on steel cchannel as per manufacturer
drainage line 02
Slope
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
DRAINAGE LINE 02
1:80 Slope 1:100 Slope Slope
Existing Clearvu fence
5mm Building line
New paving to match existing
Total pond area = 268m2 Total pond volume = 66.92m2 Pond volume required = 51m2
01
4
7
Slope
Existing drainage line to remain
630
Slope
UP
Existing Roof to remain unaffected
Ex. steps to remain unaffected
105.00
1:10 1:12 RAMP
Existing drainage line to be made redundant
E
EXISTING PARKING TO REMAIN UNAFFECTED
UP
1:10
104.50
20
LIN
3
EXISTING ERF 1981
Ex. Clearvu pedestrian gate
321
105.0024
paving sloped down towards the middle
GE
28 341 BOUNDRY LINIE
Existing Pedestrian access
Ex. paving (Highlited in light grey)
NA
EXISTING PARKING TO REMAIN UNAFFECTED
2
Existing drainage line to remain
23
AI
MANGOLD STREET
1
24
Date
EXISTING drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
DR
Street furniture unaffected
NEW PARKING
Ex. MH to be 21 moved to new position.
13.8° Roof pitch
e
Description
1500
Slope 22
M H ss/vp
Slop
Number
X
2° Roof pitch
e
REVISION NOTES:
s.o.p
105.00
1:10 Slope
Slop
Existing paving (Highlited in light grey)
Existing gate
104.60
105.43
0mm Building line
Existing vibracreate wall Existing Vehicular Entrance
ERF 1983
ss/vp G
56 682 BOUNDRY LINE
New Disabled parking
ERF 2816
Slope
Existing water meter
27721 3146 2500 24121 15237
G
WC
CW
2500mm x 2700mm New Roller shutter door
new 270mm brick fire wall to have a bagged finish
2180
475 1100 270
drainage/sewerage lines underneath load bearing wall to be encased in 230mm concrete to comply with planter existing MH to SANS 10400 PART P wall be moved to new position Beam above to Engineers specification
900
1
1 : 100
360
230
18 17 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1
UP 1000
1040
4216
1138
paving sloped down to the middle
Slope
2500mm x 2700mm New Roller shutter door
6600
D2 02
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish. 110
3210 3754
230
2500
484
W4 01
1540
RECEPTION 02 Epoxy 5 m² D04
900
01
D04 10
W3 01
New planter box
3146 Beam above
Slope
114 x 38mm Timber composite column
Slope 2084 230
230 593 4719
114 x 38mm Timber composite column
1800 110
2005 1243
Wayne Mukheibir ALLOTMENT
ERF NUMBER
510
W3 02
420
DRAWING
CLIENT
OFFICE 02 Epoxy 10 m²
900
UP
2000
SDP GROUND STOREY PLAN
270
LOBBY 02 Epoxy D3 3 m²
1598
D3 01
PROJECT
ERF 1981 NEWTON PARK existing wall demolished
new 110mm brick wall to be finished to match existing from ffl till u/s slab
270 1000
....................................................................
All structural columns to engineer
Erf 1981
SCALE
230
270
.............................................................................
Architect 14800
2500 270
1800 17655
Client
40 10
2858
1800
GROUND FLOOR PLAN
900 16
900
1025
1353
441270 973
270 270
Slope
Slope
CW 20mm
WHB
Minimum of 1m spacing shelving
02
Slope
1000
D04 05
1
1025
1025
1309
2500mm x 2700mm New Roller shutter door
1860 1598
Slope 3932 7955
2 m²
D04 04
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M to be treated against termites
9441
1:12 RAMP 133 900
2 m²
WHB CW 20mm
existing wall demolished
Slope
Slope
Slope 1690
MALE
2
Existing drainage line to remain
530
FEMALE
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
WC
ABLUTIONS ABLUTIONS HW HW
528
2044
230
CW
Date
NOTE: IMPORTANT
ss/vp
CW
Description
900
All structural columns to engineer
D1 01
W1 05
Minimum of 1m spacing shelving
1512
LOBBY 01 Epoxy 2 m²
WC
new 230mm brick wall to be finished to match existing from ffl till u/s slab
existing wall demolished
D2 01
W6 01
D1 02 1507
New planter box
W6 02
830
Number Fire screen wall up till lintel height to Enginneers specification
WAREHOUSE 02 Epoxy 158 m²
1320
New 230mm wall to be plastered and painted to match exising from ffl to u/s of slab
WC
06
D04 09
RECEPTION 01 Epoxy 21 m²
D04 08
947
2500mm x 2700mm New Roller shutter door
2500
900
CW
ss/vp MHW1
Existing door frame to be relocated to new position
New 230mm wall to have an exposed finish
HW
Disabled Wc Tile WHB 5 m²
230
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
D2 03
W1 04
W10 G 01
D04 03
new 230mm brick wall to be finished to match existing from ffl till u/s slab
new 230mm brick wall to be finished to match existing from ffl till u/s slab
COUNTER
2000
20mm CW
2534
270
5279 2868
Existing window and frame moved to new window position as indicated. Remaining wall to be demolished till u/s Lintel, make good in all trades
existing Water tank be moved
IE 4
KITCHEN 02 TILE 3 m²
new 230mm brick wall to be finished to match existing from ffl till u/s slab
Existing drainage line to be made redundant
Counter flap
D6 02
D2 05
REVISION NOTES:
1260 270 500 668
1025
1025
270
New 270mm wall to be plastered and painted to match exising from ffl to u/s of slab
existing wall demolished
2347
598 598 270
2000
270
New 230mm wall to be plastered and painted to match exising from ffl to u/s of slab
new door position for Existing door and frame 1025
Ex.MH to be moved to new position
2500mm x 2700mm New Roller shutter door
2178
800
All structural columns to engineer
D2 04
900 732
9200
13568 12970
Office 01 Tile 28 m²
230 928
1500
D6 01
230 1198 592 500
NEW .MH
4214
3271 110
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
drainage line 01
MALE 6 5 4 3 2 1 ABLUTIONS18 17 16 15 14 13 12 11 10 9 8 7 boardroom HW 2 m² 4275 Tile WHB WHB Existing DB BATHROOM 01 10 m² D04 new CW CW D04 new treaded timber steps . 20mm 20mm Tile 01 02 position treads @ 270mm 6 m² HW risers @ 170mm in accordance 900 828 900 230 Existing wall to SANS 10400 Part M, to be WHB to remain Existing window and frame to be treated against termites CW trades. 20mm removed and bricked up to be D04 plastered and painted to match 07 elsewhere Maximum sink KITCHEN stacking of 3m Tile 230 HW New 230mm Ex. window frame to be 5 m² wall to be relocated as indicated to make D04 CW WAREHOUSE 01 20mm plastered and space for now door opening 06 Epoxy painted to match Minimum Minimum 110 900 270 exising from ffl 99 m² of 1m of 1m 1280 to u/s of slab Existing DB to be spacing spacing moved to new position shelving shelving Sh
FEMALE ABLUTIONS 2 m² HW
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
New below 250L Gyser with drip tray ceiling
WC
1500 1200
1800 110
1554 3424
10066
230
DRAWN
1 : 100
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
2
NEWTON PARK
001 - 02
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 2:59:49 PM
CW
IE 3
W1 03 ss/vp
230 530
110
WC CW
IE 2
1060
HW
20mm CW
270
existing wall demolished
ss/vp
W1 02
810
9704
260
W1 01
All structural columns to engineer
747
4584
5533
IE 1
975
RE 1
4878 2500
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
1:12 ramp to comply with SANS 104400 PART S
Fire screen wall up till lintel height to Enginneers specification
1500
1500
7901
270 1511
270
230 491
1950
810
230
5534
5801
23367
230
2840
1198 500
270
230 844
1167
500
1200 500
New below 250L Gyser with drip tray ceiling
270 915
4220
1750
CW 20mm
270 2040
HW
3060 1600 3600
2178
270 1000
REVISION NOTES:
Number
2 27721 270
17385 3940
1000
270
1600
5206
1600
W5 02
W6 01
1600
All structural columns to engineer
W5 03
2564
1600
W5 04
2788
2
NOTE: IMPORTANT
W5 05
11470
new timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M, to be treated against termites
INTERNAL: new 270mm brick fire wall to have a bagged finish
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
Mezzanine Epoxy 68m2
Maximum stacking of 3m
new timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M, to be treated against termites
Maximum stacking of 3m
Maximum stacking of 3m 1025
8750
1025
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
4252
INTERNAL: new 270mm brick wall to have a bagged finish
10930
4275
2118
Mezzanine storage Epoxy 12 m²
2178
2180
6090
1060
270
18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2 1 4
Date
9796
2285
270
All structural columns to engineer
3538
Description
1
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
UP 1000
1025
1
Existing parapety wall to be demolished till u/s of decking make good all trades
Client
............................................................................. ....................................................................
3260
16980
Architect
270
W7 07
W5 08
1025
1025
1138
20470
1025
All structural columns to engineer
W5 09
2° roof pitch
150mm x 120mm Custom aluminum concealed box gutters notched to suit profile
Maximum stacking of 3m
IBR 686 colour tbc fixed with fastners on 76 x 38mm timber purlin
270 1400
3525
ERF 1981 NEWTON PARK
2
14009 3530
230 1600
PROJECT
5130
3146 1600
870
DRAWING
17655
SDP MEZZANINE
2840
110
Lobby to be boxed using 12mm Rhino board and timber battens .
All structural columns to engineer
MEZZANINE STOREY PLAN Copy 1 1
1 : 100
4679
110 10196
150mm x 120mm Custom aluminum conealed box gutters notched to suit profile
1243
110
ALLOTMENT
Erf 1981
NEWTON PARK DRAWN
SCALE
2° roof pitch 400
Wayne Mukheibir ERF NUMBER
270
UP
CLIENT
1 : 100
3384
2 IBR 686 colour tbc fixed with fastnerS on 76 x 38mm timber purlins
270
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 03
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 2:59:55 PM
All structural columns to engineer
12068 598270
7549
110
2868
3271
REVISION NOTES:
270
9200
Number
Description
Date
1600
270 3060
3600
2040
270 1750 230 1198 230 1200 270
1000
230 1167 270
17750
5801
MALE ABLUTIONS 2 m² WC WB
230
1950
27721
230 3146
24121
270 4878 230 1500
IE 4
530 810
W1 05
270 1260 230 1198 230
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
W10 01 W1 04
FEMALE ABLUTIONS 2 m²
D04 04 D04 05
G
KITCHEN 02 TILE 3 m² sink
D04 03
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Client
747 UP
230
1000
1554
4250
D6 02
ss/vp
WAREHOUSE 02 Epoxy 158 m²
360 866 298 866 528 900 600230
D04 01
500 844 500 915 500 5534
D2 05
D3 02
OFFICE 02 Epoxy 10 m²
W3 01
491 810
D2 03
2500
D2 04
1511
D2 01
2044 1540
D6 01
1040
2500
900
NOTE: IMPORTANT
1060
2635
270
110
260 250 900
1512
D2 02
300 300 300 839
2500 420
1598
1320
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1200
2858
RECEPTION 02 Epoxy 5 m²
W3 02
2005
2635
1800
6600 2500
D3 01
262
1800
10066
110 1243 110 3424
270
LOBBY 02 Epoxy 3 m²
230
1854
230
EXISTING BUILDING TO REMAIN UNAFFECTED
1860 1598
W1 03
668 500 928 500 592
4480
3754
EX. kitchen tile 6 m²
WAREHOUSE 01 Epoxy 99 m²
9441 441270 441532
G
18
W1 01
218017
RECEPTION 01 line to be made D1 redundant 02 Epoxy 21 m²
Existing drainage line to remain
ss/vp
828 230 900
MALE ABLUTIONS 2 m² WC
4275
1800
270
Existing drainage
W1 02
FEMALE ABLUTIONS 2 m²
900
270 270
LOBBY 01 Epoxy 2 m²
D1 01
ss/vp
sink 270 900 270 1100 475
IE 1 RE 2
1500
BATHROOM 01 Tile WC WB 6 m²
IE 2
1307
SH
1507
230
Ex. Storage 01 timber 14 m²
Ex. Office 03 timber 26 m²
1 2 3 4 5 6 7 8
3146
Ex.OFFICE 02 timber 17 m²
WC ROOM 02 tile 3 m²
Ex. PASSAGE timber 12 m²
732 KITCHEN Tile 5 m²
2804
2907
Ex. Reception tile 11 m²
17655
WC ROOM 01 tile 3 m²
Ex. Lobby tile 4 m²
843
D04 07
1800
Ex. Storage 02 timber 29 m²
Ex. Office 01 timber 17 m²
4702
Ex. Server room concrete 6 m²
Disabled Wc Tile WC 5 m²
5202
ss/vp
MH
D9 12
boardroom Tile 10 m²
1010
IE 3
Office 01 Tile 28 m²
900 110
1690 900 133
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
230
2983
530
Existing wall to remain
.............................................................................
drainage/sewerage lines underneath load bearing wall to be Architect encased in concrete to comply with SANS 10400 PART P
....................................................................
Ex.MH to be moved to new position
270
21867
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M
GROUND STOREY FFL.
ERF 1981 NEWTON PARK
1 : 200 EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
new 230mm panter wall
22308
Internal : 270mm brick wall to be finished to match existing from ffl till u/s slab
SDP GROUND FFL CLIENT
Wayne Mukheibir
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
new. manhole COVER LEVEL 10 500 INVERT LEVEL9 519 DEPTH 981 DISTANCE FALL
ALL LEVELS TO BE CONFIRMED ON SITE BEFORE CONSTRUCTION COMMENCES
DRAINAGE LINE 01. 1 : 100
DRAWING
Internal :new 230mm brick wall to be finished to match existing from ffl till u/s slab
new. manhole
Ex. drainage line
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
22.308m 1:40
drainage/sewerage lines underneath load bearing wall to be encased in concrete to comply with SANS 10400 PART P
ALLOTMENT
ERF NUMBER
Erf 1981
NEWTON PARK DRAWN
SCALE
new. manhole 9 366 8 904 462
As indicated
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 04
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:02 PM
1
PROJECT
REVISION NOTES:
2125mm Fire screen wall to Enginneers specification
Description
Date
1500
2125mm Fire screen wall to Enginneers specification
Number
NOTE: IMPORTANT
MALE ABLUTIONS FEMALE Tile 18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2 1 4 ABLUTIONS 2 m²
boardroom Tile 10 m²
Tile 2 m²
BATHROOM 01 Tile 6 m²
A3
A3
KITCHEN 02 TILE 3 m²
E2
Minimum of 1m spacing shelving
WB
WB
FEMALE MALE ABLUTIONS ABLUTIONS 2 m² 2 m²
F5 Maximum stacking of 3m
A3 1028
1025
1025
1025
WAREHOUSE 01 Epoxy 99 m²
1280
2500
732
sink KITCHEN Tile 5 m²
E2
E2
UP
Office 01 Tile 28 m²
A1
Disabled Wc Tile 5 m²
A2 RECEPTION 01 Epoxy 21 m²
E5
4216
F13
WAREHOUSE 02 Epoxy 158 m²
Maximum stacking of 3m
1025
E3
1025
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Client 1025
1138
.............................................................................
Architect
....................................................................
E2 Minimum of 1m spacing between shelving
LOBBY 01 Epoxy 2 m²
E2
PROJECT
ERF 1981 NEWTON PARK
DRAWING
SDP GROUND FLOOR FIRE PLAN
E5
RECEPTION 02 Epoxy 5 m²
OFFICE 02 Epoxy 10 m²
E3
CLIENT
Wayne Mukheibir ALLOTMENT
ERF NUMBER
Erf 1981
NEWTON PARK DRAWN
SCALE
1 : 100
GROUND Fire plan Copy 1 1
1 : 100
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 05
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:09 PM
UP
LOBBY 02 Epoxy 3 m²
REVISION NOTES:
A1
F13
E16
18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2 1 4
1060
Number
Mezzanine storage Epoxy 12 m²
A1
F13
Maximum stacking of 3m
New Fire wall
E16 18
Maximum stacking of 3m
UP
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1000
Description
Date
NOTE: IMPORTANT Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Client
.............................................................................
Architect
....................................................................
Maximum stacking of 3m
PROJECT Maximum stacking of 3m
ERF 1981 NEWTON PARK
DRAWING
SDP MEZZANINE FIRE PLAN UP
CLIENT
Wayne Mukheibir ALLOTMENT
ERF NUMBER
Erf 1981
NEWTON PARK DRAWN
SCALE
1
1 : 100
1 : 100
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 06
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:14 PM
mezzanine fire plan Copy 1
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
2125 2804 GROUND FLOOR 10 520
WAREHOUSE 01 Epoxy 99 m²
Existing wall to remain
Existing wall to remain
D04 07
NGL
KITCHEN Tile 5 m²
D6 01
D04 02
D04 Sink 01
New 110mm wall to be plastered and painted to match exising from ffl to u/s of slab
Existing concrete slab. Existing concrete foundation.
Maximum of 3m stacking height
Maximum of 3m stacking height
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M, to be treated against termites
Existing concrete foundation.
D2 04
D2 05
WAREHOUSE 02 Epoxy 158 m²
D6 02
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
D04 03
D04 04
D04 05
stepped dpc and weephole
NGL
new 270mm cavity foundation wall to be filled with concrete till weephole.
new concrete foundation to engineers detail.
new concrete foundation to engineers detail.
Fire screen wall up till lintel height to Enginneers specification
FEMALE ABLUTIONS 2 m²
new 270mm cavity foundation wall to be filled with concrete till weephole. NGL new concrete foundation to engineers detail.
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
W4 01
OFFICE 02 Epoxy 10 m²
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
1 : 100
4750 2125
Maximum of 3m stacking height
IBR 686 colour tbc fixed with fastnerS on 76 x 38mm timber battens
W3 01
WHB
SECTION B-B Copy 1
.............................................................................
114 x 38mm Timber composite column to
stepped dpc and weephole
new 270mm cavity foundation wall to be filled with concrete till weephole.
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M, to be treated against termites
....................................................................
TOP OF ROOF 02 18 235
679
WAREHOUSE 02 Epoxy 158 m²
INTERNAL: new brick wall to have a bagged brick finish
INTERNAL: new brick wall to have a bagged brick finish.
WC
stepped dpc and weephole
2
New Concrete to Engineers detail
1100
Mezzanine storage Epoxy 12 m²
Client
PROJECT
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
INTERNAL: new brick wall to have a bagged finish.
W5 05
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
13.80°
Steel C - channels @ 1200mm cc to engineers specifications
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel truss to Engineers specification
13.80°
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
Steel Girder to Engineers specification
7715
Prefabricated steel truss to have support plate fixed on columnsa all to Engineers specificatins
U/S LINTEL 03 15 449
ERF 1981 NEWTON PARK
TOP OF ROOF 01 13 485
DRAWING
MEZZANINE FLOOR 13 324
SDP SECTIONS
U/S LINTEL 12 645
2125 2965
1 : 100
Date
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Architect
SECTION A-A Copy 1 1
Description
NOTE: IMPORTANT
W5 05
04
1100
2125
New Concrete slab to Engineers detail
Office 01 Tile 28 m²
INTERNAL: new brick wall to have a bagged finish.
INTERNAL: new brick wall to have a bagged finish
4929 679
U/S LINTEL 12 645
W5 02
W6 01
MEZZANINE FLOOR 13 324
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M. W5
REVISION NOTES:
Number
CLIENT
Wayne Mukheibir GROUND FLOOR 10 520
ALLOTMENT
ERF NUMBER
Erf 1981
NEWTON PARK DRAWN
SCALE
1 : 100
new concrete foundation to engineers detail.
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 07
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:16 PM
Steel Truss to engineers specificatins
INTERNAL: new brick wall to have to have a bagged finish.
TOP OF ROOF 01 13 485
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
1100
U/S LINTEL 03 15 449
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel truss to Engineers specification
Steel C - channels @ 1200mm cc to engineers specifications
2804
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel truss to Engineers specification
REVISION NOTES:
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications
Transverse 231mm x 231mm apex flashing to be installed as per manufactors specifications
Number
Description
Date
13.8° roof pitch TOP OF ROOF 02 18 235
Maximum of 3m stacking height
Maximum of 3m stacking height
W6 01
W3 02
D1 02
2503
W4 01
W7 07
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M. W6 02
24 17
Existing
D9 12
EXTERNAL: Existing exterior wall to remain.
NGL
Client
Prefabricated steel truss to have support plate fixed on columnsa all to Engineers specificatins
INTERNAL: new brick wall to have to have a bagged finish. INTERNAL: new brick wall to have to have a bagged finish.
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
Maximum of 3m stacking height new door COUNTER position for Ex. window frame to be Existing door INTERNAL: new brick and framerelocated as indicated to make space for now door wall to have to have a opening bagged finish.
stepped dpc and weephole new 270mm cavity foundation wall to be filled with concrete till weephole.
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
new concrete foundation to engineers detail.
SECTION D-D Copy 1 2
1 : 100
Steel C - channels @ 1200mm cc to engineers specifications
Architect
....................................................................
PROJECT
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish. Fire screen wall up till lintel height to Enginneers specification
ERF 1981 NEWTON PARK 6070
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
.............................................................................
TOP OF ROOF 02 17 445
U/S LINTEL 03 15 449
9035
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel truss to Engineers specification
Transverse 231mm x 231mm apex flashing to be installed as per manufactors specifications
IBR 686 colour tbc fixed with fastnerS on 76 x 38mm treated timber battens
Existing concrete foundation.
2125
1 : 100
Existing concrete foundation.
679
1
SECTION C-C Copy 1
13.80°
new concrete foundation to engineers detail.
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
new concrete slab, to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
new treated timber steps . treads @ 270mm risers @ 170mm in accordance to SANS 10400 Part M, to be treated against termites stepped dpc and weephole new 270mm cavity foundation wall to be filled with concrete till weephole.
new concrete foundation to engineers detail.
SDP SECTIONS CLIENT
MEZZANINE FLOOR 13 324
Wayne Mukheibir
U/S LINTEL 12 645
ALLOTMENT
ERF NUMBER
Erf 1981
GROUND FLOOR 10 520
NGL
DRAWING
TOP OF ROOF 01 13 485
2125 2965
new 270mm cavity foundation wall to be filled with concrete till weephole.
U/S LINTEL 12 645
GROUND FLOOR 10 520
Existing concrete slab.
NGL
TOP OF ROOF 01 13 485 MEZZANINE FLOOR 13 324
New 230mm wall to be plastered and painted to match exising from ffl to u/s of slab
stepped dpc and weephole
New Concrete slab to Engineers detail
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
NEWTON PARK DRAWN
SCALE
1 : 100
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 08
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:20 PM
W5 09
7712
W5 08
679
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
2122 2962
INTERNAL: new brick wall to have to have a bagged finish.
NOTE: IMPORTANT
Transverse 231mm x 231mm apex flashing to be installed as per manufactors specifications
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
TOP OF ROOF 02 18 235
13.8° roof pitch
U/S LINTEL 03 15 449
W1 05
W10 01
D2 05
D6 02
D2 04
D6 01
NGL
W1 02
9065
MEZZANINE FLOOR 13 324 U/S LINTEL 02 13 185 U/S LINTEL 12 645
W6 01 W1 03
1154
Existing
W1 01
NGL GROUND FLOOR 10 520
WEST ELEVATION.
SOUTH ELEVATION.
4
1 : 200 IBR 686 colour tbc fixed with fastnerS on 38 x 38mm timber battens
Transverse 231mm x 231mm apex flashing to be installed as per manufactors specifications
EXTERNAL: new 270mm Aluminium WaterTite OGEE cavity wall to have wall Gutters, 125mm x 85mm ties staggered every 3rd domestic OGEE with rectangular downpipes, brickcourse, and to have colour to match sheeting 150mm x 120mm Custom an exposed brick finish. aluminum conealed box gutters notched to suit profile TOP OF ROOF 02
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel rafter to Engineers specification
W6 02
W1 06
W6 01
D1 01
2500mm x 2700mm New Roller shutter door
W3 02
D2 01
Existing window and frame moved to new window position as indicated.
114 x 38mm Timber composite column
whb wc
GROUND FLOOR
NGL
s.s 01 COVER LEVEL 9 367 INVERT LEVEL 8 917 DEPTH 450 DISTANCE FALL
W3 01
4750
GROUND FLOOR 10 520
.............................................................................
Architect
....................................................................
2810
whb
480
New Air bricks with a minimum 1500mm spacing
2125
IBR 686 colour tbc fixed with fastnerS on 76 x 38mm timber battens
NGL
NGL All Fascias and Barge Boards to match sheeting and to be installed by specialist..
New planter box
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
EAST ELEVATION. 1 : 200
15382
SINK
wc
wc
978
whb
1222
whb
wc
wc
gulley existing manhole depth to be confirmed on site
DRAINAGE LINE 02.
ERF 1981 NEWTON PARK
ELEVATIONS CLIENT
Wayne Mukheibir
whb shw
ALLOTMENT
ERF NUMBER
Erf 1981
gulley
ex. manhole 9 367 9 367 9 367 8 737 8 512 8 512 630 855 855 430m 3.015m 1:60 1:60
Fire screen up till lintel height wall to Enginneers specification
PROJECT
DRAWING
sink
ALL LEVELS TO BE CONFIRMED ON SITE BEFORE CONSTRUCTION COMMENCES
1 : 100
TOP OF ROOF 01 13 485 MEZZANINE FLOOR 13 324 U/S LINTEL 12 645
1
new ⌀110mm PVC stubstack and vent point to be min 1m from ffl
1 : 200
All Fascias and Barge Boards to match sheeting and to be installed by specialist..
7715
W5 09
NORTH ELVATION. 2
Client
new ⌀110mm soil pipe to slope min 1:60 fall to connect into existing manhole
15.225m 1:60
NEWTON PARK DRAWN
SCALE
As indicated s.s 02 gulley 01 s.s 03 9 939 9 972 10 032 9 451 9 509 9 582 488 463 450 978m 1.222m 1:60 1:60
SM
DWG USE
DATE ISSUED
Minicipal
2023-07-11
PROJECT No.
DRAWING No.
0206
001 - 09
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
7/11/2023 3:00:38 PM
New paving to match existing.
NOTE: IMPORTANT
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. IBR 686 colour tbc fixed Contractor to verify all levels and dimensions on site and with fastnerS on 76 x check same against architects drawings before commencing 38mm timber battens work. Figured dimensions to be used in preference to scaled All Fascias and dimensions. Large scale details to be used where available. Barge Boards to Errors, discrepancies or omissions are to be reported to the match sheeting and architect immediately for clarification before work is to be installed by specialist.. undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick 114 x 38mm Timber composite walls to be furnished with weepholes, wall ties, dpc etc. as column per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
Transverse ridge flashing 2- piece slider internal ribs only
Date
2965 2125
7715 2125
W5 08
W7 07
679 2125
GROUND FLOOR 10 520
New Air bricks with a minimum 1500mm spacing
Description
13.8° roof pitch
U/S LINTEL 02 15 449
TOP OF ROOF 01 13 485 MEZZANINE FLOOR 13 324 U/S LINTEL 12 645
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel truss to Engineers specification
18 235
TOP OF ROOF 02 18 235
U/S LINTEL 02 15 449
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications
13.80°
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
Transverse ridge flashing 2- piece slider internal ribs only
1 : 200
REVISION NOTES:
Number
679
3
D3 01
D2 02
Fire screen up till lintel height wall to Enginneers specification
new galv. steel ball and stanchion balustrade to be 1000mm height from ffl according to manufacturers details, to comply with SANS 10 400 Part M.
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
2500mm x 2700mm New Roller shutter door
Existing
new ⌀110mm PVC stubstack and vent point to be min 1m from ffl
GROUND FLOOR 10 520
W1 04
W5 02
new ⌀110mm PVC stubstack and vent point to be min 1m from ffl
2125
679
U/S LINTEL 12 645
W5 03
2500mm x 2700mm New Roller shutter door
2125
W5 04
2500mm x 2700mm New Roller shutter door
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
679
7715 2125
U/S LINTEL 02 13 185
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
New Air bricks with a minimum 1500mm spacing
EXTERNAL: new 270mm cavity wall to have wall ties staggered every 3rd brickcourse, and to have an exposed brick finish.
2125
W5 05
MEZZANINE FLOOR 13 324
U/S LINTEL 03 15 449 TOP OF ROOF 01 13 324
New Air bricks with a minimum 1500mm spacing 13.80°
TOP OF ROOF 02 18 235
IBR 686 colour tbc fixed with fastners on steel c- channel fixed on structural wall
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel rafter to Engineers specification
Transverse 231mm x 231mm apex flashing to be installed as per manufactors specifications
13.80°
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel rafter to Engineers specification
Aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications
ROOF : IBR 686 colour tbc fixed with fastners on steel c- channel fixed on steel rafter to Engineers specification
13.80°
77 x 231 Headwall flashing to be inst6alled as per manufacturers specifications