REVISION NOTES:
B
Number
Description
Date
1 2
Reconfiguration of Workshop and Bathroom Gas bottle position and gas geyser installation
14/03/2023 27/03/2023
NOTE: IMPORTANT Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Vehicle Access
1E 5
4800
210 1235
8.5m2
Line
Scale 1:200
S.O.P dim
270
6805
6315
6315 270
1175
1035
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2 124/313= 39.61%
18745
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
5880
340 8030
12145
PROJECT
House Lategan
11195 Planter Box
RE 2
Section 35
B
Scale 1:50
270
1E 3 Slope 1E 2
1865
8
500
340
RES 1
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
1195
270
DRAWING
TANKS TO RECIEVE A LOUVERED TIMBER CANOPY OVERHEAD
Site Plan & Ground Floor Plan CLIENT
6415
C
Ground Floor
ZONING
CONCRETE ROOF/ROOF AREA%
RAINWATER TO BE COLLECTED IN WATER STORAGE TANKS
Lategan
Section 34
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
As indicated
395
00
UP
40mm ⌀ uPvc waste water pipe layed under concrete bed.
N Site Plan
832 m2
1E 2 150mm risers 300mm treads stairs to NBR
HW
Height at start of steps 1.040m high. Boundary wall to act as balustrade at steps section.
CW
RE 3
HW
11m²
3025 SHOWER
WHB
450
Boundary Walls Note for aesthetics: Second Yard to screen rainwater tanks Height 2m-2.4m from NGL.
N
1015
ERF (sqm)
Sill height of wall to be 1275mm with accessible sill above
10 9
153
A
Gulley
Tank Yard
CW
5.3m2 Tiles
1
WC
2
CW
Domestic Bathroom
Retaining wall and sub-soil drainage asper engineers detail.
Section 34
MUNICIPAL INFORMATION ERF nr.
4245
W03 01
7
ERF1334
5825
CW
....................................................................
Concrete
1035
925
TAP
3
110
D03 03
805
W17 01
W17 425 x 900mm @ 2380mm lintel height
2815
DB BOARD. & INVERTOR POSITION
110
9.7m2 Tiles
.............................................................................
220
220 900
Workshop
bic
Boundary Walls Note for aesthetics: Height of boundary wall on front to line up with lintel height to be perceived as entryway into house.
1E 5 1E 4
SS & VP
Duct
Area to be Landscaped
Golf Cart W02 01
D10 06
1415
600 110
900
new workshop wall indicated in yellow to be built at a later date. Thicken slab to 200m deep and 400mm wide, add 193 mesh for this section as per Eng. specification
RE 4
Slope Nutec Cladded duct Painted to match wall
2M BUILDING LINE
Fire wall to NBR
11550
350 X 510mm downstand beam to engineers specifications
110mm ⌀ uPvc sewer pipe, minimum fall 1:40 and 450mm under n.g.l
RWDP
LINE OF SLAB OVERHEAD
Fire wall to NBR W01 425 x 3600mm
@ 2380mm lintel height
LINE OF SLAB OVERHEAD
11550 4045
LINE OF SLAB OVERHEAD
D02 01
10mm minumum step to garage
2865
IE 2
Drainage encased in soffit
3 x 2000L ECO TANK
D
Boundary
Concrete
4
4000
3855
17 730mm
52m2 X 151200
2925
TYPE C @ 1650MM AFFL
2015
D04 01
Extended Double Garage
5 153
14455
ALLOW CONDUIT BELOW PAVING/CONCRETE WALKWAY FOR LIGHTING ON BOUNDARY WALL. ALL TO BE CONFIRMED ONCE LANDSCAPING HAS BEEN RESOLVED!!
5
C as per pitched roof ns io ct se
2000
TYPE C @ 1650MM AFFL
6
RWDPoncrete flat roof below
350 X 510mm downstand beam to engineers specifications
300
gate 1.8m high to NRB
ilding Line 4000mm Bu ecking Outdoor D Garapa
1790
2000
00 530
1.8m high gate to NRB
RWDP
A
805
wall
1
MINIUM OATED ALU X 85MM -C R E D W O M YP 5M DOVE GRE OGEE GUTTERS, 12 WNPIPES E GULAR DO WATERTIT GEE WITH RECTAN O DOMESTIC
W01 01
TYPE C @ 1650MM AFFL
1720
undry
igh bo
500
Client
Architect
1465
0
TYPE C @ 1650MM AFFL
3335
Drainage encased soffit
0 30
15
G05 01
S.O.P dim
200X200MM COBLE STONE PAVING TO FALL
TANKS TO RECIEVE A LOUVERED TIMBER CANOPY OVERHEAD
ALL HOT WATER PIPING IS TO BE INSULATED WITH A MINIMUM OF 21MM NITRILE RUBBER (ARMAFLEX) INSULATION OR EQUAL APPROVED TO ACHIEVE AN R-VALUE OF 1.0 M2K/WAND HOT WATER STORAGE TO SANS151 AND CLASS B PERFORMANCE.
Lockable steel gate according to SANS 10400 standards
2000
3480
2.4mm high gate to NBR
RAINWATER TO BE COLLECTED IN WATER STORAGE TANKS
RE 1
8960
2.5m h
6230
K ROOF Y KLIP-LO DOVE GRE IXED TO 76 X 50 F RMEDIATE SHEETING PINE INTE A S MM D E T A TRE MAX. 1200 URLINS AT BER TRUSSES TIMBER P IM T FIXED IN . CENTRES IFICATION ERS SPEC E IN G N E TO
Garbage diposal
TYPE L BELOW PAVING. DETAIL TBC.
LINTOLS AND BEAMS OVER TO ENG'S DETAIL
W02 425 x 2130mm @ 2380mm lintel height
1.8m to
RO
D01 01
340
H 5° OF PITC
200X200MM COBLE STONE PAVING TO FALL
5395
site
152
Drying Yard Paved
rpass
000
G04 01
6 ERF 101
500 152 1.8m Boundary wall
hall su
tion s
ed w pitch n of belo a te flat ro tions with Cle c Concre per se pebbles not roof as ontop e d Ston placed Crushe g 19-25mm BC. T in exceed te roof slab, re of conc
152
Gas bottles position and installation by specialist
4800
3615
as per main open Patio to re ing plan ild bu
LLING NEW DWE ERF 1015
200X200MM COBLE STONE PAVING TO FALL
820
SLOPE
ing
1105
755
Garage doors to comply with sans 10400 Part T section 4,9,3 ( a,b,c)
000 152
RE 2
e
ry Line
Outdoor Deck Garapa
Gas pipe line from gas bottles to gas stove (SANS 10087/1) Installed to specialist details and specifications to NBR
2440
150 250
C TYPE FFL 0MM A @ 165
2130
pitched t roof below Concrete fla ctions with Clean se r pe roof as s not tone pebble Crushed S -25mm placed ontop 19 g in C. exceed roof slab, TB of concrete
ding Lin
nda nda re/fou m Bou tructu rt of s No pa y line r bound
m Buil
RE 3
2000m
m 38 000
E
RF 1014
RWDP
151
1855
500
270205270
1035
1075
RE 7
SLOPE
4800
pedestrian access
4885
340
SLOPE
485 190
S.O.P
P1-P3 PIPE INDICTED AS PER INTERNAL SERVICES LAYOUT DRAWING NO. G4419-124
Grass area
340
Concrete flat roof below pitched roof as per sections with Clean Crushed Stone pebbles not exceeding 19-25mm placed ontop of concrete roof slab, TBC.
1E 7
SLOPE
2000mm Building Line
1E 3
id to be la t) on anels lis Solar p d by specia ications to e if (install to eng spec f flatroo eyser g assist
RE 4
ycads. with C lanted p e b nter to red pla Contou OURE
CONT
1E 4
THIS A
745
LINE OF SLAB OVERHEAD
500 151
1E 2
D
D LAN
REA
ROOF PITCH 5°
G IN SCAPIN
Area to be lanndscaped
00
DOVE GREY KLIP-LOK ROOF SHEETING FIXED TO 76 X 50 TREATED SA PINE INTERMEDIATE TIMBER PURLINS AT MAX. 1200MM CENTRES FIXED IN TIMBER TRUSSES TO ENGINEERS SPECIFICATION.
Garbage disposal
0 151
6560
Entrance Walkway
ine
gL Buildin
RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. PORCH TO REMAIM OPEN AS PER BUILDING PLAN. LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY SANS 10400 PART P. DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2
LINE
Fire door to NBR
RE 6
G ILDIN 5M BU
No part of structure/foundation shall surpass site boundry line
m 5000m
RE 5
B
9090 1E 6
8495
RE 6
PEDESTRIAN ACCESS
RE 5
MH
5955
900
STORMWATER MANAGEMENT AS PER ENGINEER'S SPECIFICATION
1.6m to 2.4m Boundary wall
A
DRAINAGE TO BE PROTECTED AS PER SANS 10400 PART P
DRIVEWAY FALL AS PER ENGINEER'S SPECIFICATION
DRAINAGE TO BE PROTECTED AS PER SANS 10400 PART P
40 100mm Boundary Line
TO EX. ESTATE SEWER CONNECTION
000 151
Refer to basement plan for SOP
1.3m to 2.4m Boundary wall
150
ounda mm B 0 8 1 5 2
4800
600
URE URNIT EET F ED R T S CT NO AFFE
e ry Lin
500
R
Duct
LULA
VEHIC
B
SS ACCE
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C100-00
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:16 PM
AY LDS B HERA 1015 ERF
REVISION NOTES:
LP GAS: MAX 38KG ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF THE COMMUNITY FIRE SAFETY BY-LAW . LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATION UNDER BUILDING WORK MUST BE INSTALLED IN TERMS OF PART P OF SANS 10400(4.19.4). SANITARY FITTINGS DISCHARGING TO GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATIONS IN THE BUILDING WITH SANS 10400 PART P.ROTECTED IN TERMS OF SANS 10400 (4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BE ENCLOSED WITHIN ADUXT AND TO BE OF A SHAPE AND SIZE READILY ACCESSE FOR CLEANING IN TERMS OF SANS 10400 PART P, 4,18.2.
Number 1
(P1) GAS INSTALLATION - CONTAINERS SHALL BE AT LEAST: 1M AWAY FROM ANY WINDOW AND OPENING INTO A BUILDING. 2M AWAY FROM ANY DRAIN, PIT OR MANHOLE. 3M AWAY FROM THE PROPERTY BOUNDARY UNLESS ITS UP A AGAINST A FIREWALL. THEN ITS REDUCED TO 1M. FIRE WALL =220MM WALL. NON-FIRE WALL = 110MM WALL. 5M AWAY FROM A SWITCHABLE ELECTRICAL POINT I.E. PLUG SOCKET, INLINE POWER ISOLATOR, AIRCON UNITS, POOL PUMPS, WATER PUMPS ETC. NOTE, A WALL LIGHT ONLY NEEDS TO BE 1.5M TO THE LEFT/RIGHT OF THE BOTTLES, OR 1.5M ABOVE THE BOTTLES. ALL REQUIREMENTS ARE TO CONFORM TO SANS 10400
2 3
A
TO EX. ESTATE SEWER CONNECTION
SANS 10087-1:2013, All gas installations must have a Certificate of Conformity according to the Pressure Equipment Regulations that have been promulgated under the Occupation Health and Safety Act (No 85 of 1993). MAXIMUM 19KG IN TOTAL GAS ALLOWED AS PER SANS 10400 PART A. SHUT OFF / ISOLATION VALVES TO ALL APPLIANCES CONNECTED TO THE GAS LINE.
14235
1.8m 1.3m to wall
ounda
g seatin
24
)
eck 01
38m2 Garapa
14550 6090
2990
1140
330
870
330
5825
2790
1475
NE
5550
Lockable steel gate according to SANS 10400 standards
2025
865
330
1m high glass balustrade to SANS and to nbr.
1E 7
5m2 X 154000 Tiles
SS & VP
11m2 X 154000 Tiles
L01 02
D09 02
W14 01
SS & VP
W14 02
230
5m2 Tiles
3820
aircon pos.
20m2 X 154055 Laminate timber
B
9090
CW
SHR HW
7
6
5
4
3
UP 2
Study
BIC.
4m2 Tiles
2m2 Tiles
3135
BIC.
Section 35
11m2
Paving
2020
Drying Yard
G03 02
3x 2000L raintwater tanks
SS & VP Duct
W06 01
GULLY BELOW
WC
RWDP
3880
RE 1
RE 2
CW
CW
11m2
RE 3
1E 4
1E 3
Boundary Walls Note for aesthetics: Drying Yard used for laundry. Height 2.2m-2.7m from NGL(Neighbouring site).
N
The Internal height of the courtyard is 1.8m high. 1920
530
900
2160
270
4110
110
990
No part of structure/foundation shall surpass site boundry line
300
230
RE 4
110mm ⌀ uPvc sewer pipe, minimum fall G05 1:40 and 450mm under n.g.l
No part of structure/foundation shall surpass site boundry line
Boundary Walls Note for aesthetics: Height of boundary wall on front to line up with lintel height to be perceived as entryway into house.
A
6970
1505 270
7785
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2 124/313= 39.61%
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
PROJECT
DRAWING
Lategan 1E 5
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
1 : 50
AB
Height at start of steps 1.040m high. Boundary wall to act as balustrade at steps section.
530
Section 34
4890
83 m2
CLIENT
RE 5
1265
6010
1390
- BASEMENT
01
Boundary Walls Note for aesthetics: Second Yard to screen rainwater tanks Height 2m-2.4m from NGL.
1565
435 m2
3120
Gas bottle position below at entrance
150
1.8m high gate to NRB
GROSS FLOOR AREA (GFA)
First Floor Plan
Garbage disposal
Slope
1E 2
39.0625 %
2040
HW
W05 01
150
IE 2
230mm wall
Scale 1:50
Tank Yard
COVERAGE PERCENTAGE
House Lategan
C
First Floor Plan
W4 01
BATH
Area to be Landscaped below
Slope
325 m2
270
Tiles
270 Section 35
COVERAGE
79 °
W06 02
RWDP
G03 01
Oubaai
HW Frameless shower panel
9m2 X 154055
230
SHR
1770
650
CW
WHB
270
270
1.8m high gate to NRB
ALLOTMENT AREA
620
890 650 40mm ⌀ uPvc waste water pipe layed under concrete bed.
450
HW
CW HW
400
520
8
WHB
Main Bathroom
Sill height of wall to be 1200mm with accessible sill above
CW
Wc Room
Dressing
10m2 Laminate timber
To pipe below
D10 04 CW
9
1375
HW
CW
900
900 D10 01
BIC.
400
1310
110
RES 1
1220
1365
1265
Line of conrete soffit above
W07 01
RWDP
220
110
1145
665
BIN
15 14 13 12 11 10
4
2895
1250
WC
2440
3
Tiles
110
WHB
270
CW
540
150mm risers 300mmm treads stairs to NBR
2
9m2 X 18 025
900
BIC.
900
1
20m2 Tiles
270
110
D10 02
950
UP
X 153345 Tiles
1m high balustrade wall to SANS and to NBR.
1985
Hallway
1200
1200
Entry Foyer/ Hallway
230
BIC. BIC. lintel over to line up with D10 lintel
ZONING
4380
CW
400
HW
Main Bedroom
150 D10 03
832 m2
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
Frameless shower panel
1500
1500
CW
Frameless shower panel
Sill height of wall to be 1200mm
HW
En-suite 02
900
HW CW
5m2 Tiles
3550
D03 01
1015
ERF (sqm)
CONCRETE ROOF/ROOF AREA%
1325 5030
1500
1500 900
En-suite 03
1240 230 2595
14m2 Laminate timber
SHR
220 600
2565
Weatherstep 1765
Bedroom 02
WHB
D03 02
WHB
300 300
1565
530
sofit above
D06 01
RE 6
CW
WC
WC
900
W08 01
TAP
BIC.
765
WM
870
G
rete Line of con
HW
CW
CW
CW
14m2 Laminate timber
650
2750
Laundry
360
15mm
DW
SINK
950 1550
1820
BIC .
2940
110290
915
270
220
53
990
00 Kiwot gas 18 gyser
Bedroom 03
570
1360
llery / Scmu 2
1E 6
1250
110 600
BIC.
TD
FR
1050
1720
1180
1500
e to am abov Steel be rs enginee tions. specifica
W5 0 01
1600
1550
600
STOVE
FRZ
COFFEE STATION
270
BIC.
16 Tiles
W10 01 Above
1600
3050
CW
Column to engineer specification.
Balcony
1210
Balcony
L01 01
firewall
23m2 X 153345 Tiles
1110
110
1325
ERF nr.
400
duct
Braai Room
710
lintel over
built-in braai/gas combo
PREP
110
1100
D12 01
150
CW
935
4m2 X 154000 Tiles
RE 7
CW
1210
M VIEWS
2960
2940
H DA UNTER WIT
W11 01
19m Tiles
1800
COFFEE CO
eck 02
220
B
hen Kitc 2
D11 01
1870
1820
13740
s sleeve to
4190
270
Balcony
W16 01 Above
1205
Aluminium frame swing vertical Louvres used for privacy .
330
D08 01
330
Gas pipe line from gas bottles to gas stove (SANS 10087/1) Installed to specialist details and specificationsto NBR
530
26m2 Garapa
Outdoor D
10 Tiles
270
530
W13 01
W15 01 Above
2150
(P1) GAS INSTALLATION Gas geysers to be installed in duct
765
Steel beam above to engineers specifications.
840
330
19m2 X 153290 Tiles
above to Steel beam ns. specificatio s er ne gi en
270
330
270
Stoep
2025
10200
en as per
op To remain building plan
6770
1625
onal ga allow additi re tu fu island for
....................................................................
MUNICIPAL INFORMATION
R 2240
1625
om
.............................................................................
Architect
Slope
7715
ing Ro Din m2
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Section 34
D07 01
14m2 X 153290 Tiles
NOTE: IMPORTANT
Client
main open PATIO To re plan g in ild bu r as pe
22265
Stoep
09/05/2023 17/05/2023
ALL HOT WATER PIPING IS TO BE INSULATED WITH A MINIMUM OF 21MM NITRILE RUBBER (ARMAFLEX) INSULATION OR EQUAL APPROVED TO ACHIEVE AN R-VALUE OF 1.0 M2K/WAND HOT WATER STORAGE TO SANS151 AND CLASS B PERFORMANCE.
Outdoor D
W12 02 Above
4500
4500
EAD SLAB LI 1.2M OVERH
Tiles tbc
70m2
ineers
om
Above
Grass area
eng m above to Steel bea s. n specificatio
920
D07 02
D
ing Ro L28iv m2
0
lanting
R2
5480
W12 01
es & p
Section 33
inth detail Concrete pl TBC
D
ved tre
75
650
270
ith TV UNIT w Fireplace
(appro
Slope
R4
230
530
Fireplace to NBR
RDEN
Slope 5780
Slope
bench
270
1 810
27/03/2023
RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. PORCH TO REMAIM OPEN AS PER BUILDING PLAN. LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY SANS 10400 PART P. DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2
ED GA
530
above te slab re c n o C ineers to eng tions. a if c spe ic
G02 01
RWDP
r used fo Louvre erties g in d li p dS pro ium an ouring L02 Alumin from neighb se. 01 u y privac orth Deck in N n e h w
505
igh 1.8m h RB N to te ga
Section 33
5480
530
DEN (a
E PLANT
nting)
s & pla
d tree pprove
D GAR
site
C
6540
ry ounda High B
PLANT
ig
rpass
all su tion sh
cture/f
of stru No part line ry d n bou 2.5m H
Gas bottle position and gas geyser installation FF Electrical Duct and cavity door position
1590
6410 7180
1800 270
2895
700
1800
220
2280 21280
4825 270
1035
230
2460 3060
230
1690 3880
270
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C101-00
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:18 PM
6230
1.8m to wall
Date
MH
Gas installation/upgrade must be completed in accordance to the regulations of both the South African National Standard (SANS: 10087) and with the Liquefied Petroleum Gas Safety Association of South Africa (LPGSA) and SAQCC Gas.
dary h Boun
Description
REVISION NOTES:
Number 1 2
Description
Date
FF Electrical Duct and cavity door position
09/05/2023 17/05/2023
1100MM ROOF OVERHANG
SKIMMED CEILING @ 2700mm high SKIMMED CEILING @ 2700mm high
Klip-Lok 406 Zincalume roof sheeting complete with 145mm Isotherm flexible roll insulation with Plasterboard ceiling below.
SKIMMED CEILING @ 3410mm high
CONCRETE FLAT ROOF
SKIMMED CEILING @ 2700mm high
RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. PORCH TO REMAIM OPEN AS PER BUILDING PLAN. LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY WITH SANS 10400 PART P. DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2
Client
SKIMMED CEILING @ 3410mm high
SKIMMED CEILING @ 2700mm high
255mm RC slabs with a min 50mm screed over and waterproofing. 50mm Isoboard over this with 19-25mm Clean Crushed Stone pebbles
RWDP
.............................................................................
Architect
....................................................................
MUNICIPAL INFORMATION
EILING TO RAKED C AFTER R F O U/S
1100MM ROOF OVERHANG
ED TO ETING FIX OOF SHE INE R K O -L IP KL SA P T REATED URLINS A 76 X 50 T TIMBER P ED IN E T IA D E INTERM TRES FIX ERS 0MM CEN E MAX. 120 USSES TO ENGIN R TIMBER T ION. AT SPECIFIC
1100MM ROOF OVERHANG
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
RHANG OOF OVE 1200MM R
2 130m GE OVERA F ROO C
Klip-Lok 406 Zincalume roof sheeting complete with 145mm Isotherm flexible roll insulation with Plasterboard ceiling below.
1200MM ROOF OVERHANG
ALUMINIUM GUTTER 125 X 85MM DOMESTIC OGEE PROFILE GUTTER.
KLIP-LOK ROOF SHEETING FIXED TO 76 X 50 TREATED SA PINE INTERMEDIATE TIMBER PURLINS AT MAX. 1200MM CENTRES FIXED IN TIMBER TRUSSES TO ENGINEERS SPECIFICATION.
188m2 SHEETING ROOF AREA
RHANG
OOF OVE
350MM R
EILING TO RAKED C RAFTER F O /S U
NS PLY TO SA RC TO COM XA D AN 0 1040 ONS. ALL TO CALCULATI ESIGN AN D R EE ENGIN ION SPECIFICAT
ALL FLAT ROOF CONCRETE SLABS WATERPROOFING MUST BE PAINTED TO MATCH THE SHEETINGS COLOUR
1855
131m2 FLAT Roof AREA
ROOF ALL FLAT E SLABS CONCRET OOFING WATERPR TED TO IN PA BE MUST GS E SHEETIN MATCH TH COLOUR
1200MM ROOF OVERHANG
255mm RC slabs with a min 50mm screed over and waterproofing. 50mm Isoboard over this with 19-25mm Clean Crushed Stone pebbles
ROOF PITCH 5°
Klip-Lok 406 Zincalume roof sheeting complete with 145mm Isotherm flexible roll insulation with Plasterboard ceiling below.
CONCRETE FLAT ROOF
NOTE: IMPORTANT
ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
CONCRETE ROOF/ROOF AREA% R M GUTTE ALUMINIU DOMESTIC M M 5 8 125 X TTER. OFILE GU OGEE PR
255mm RC slabs with a min 50mm screed over and waterproofing. 50mm Isoboard over this with 19-25mm Clean Crushed Stone pebbles.
12
124/313= 39.61%
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
RWDP
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
VERHANG 00 ROOF O
RWDP
N
N ROOF PLAN
CEILING PLAN
Scale 1:100
Scale 1:100
PROJECT
House Lategan RE 3
IE 2
IE 4
IE 5
RE 4
IE 6
DRAWING
vp RE 5 wc
DW
WM
DRAINAGE TO BE PROTECTED AS PER SANS 10400 PART P
G
NGL
Roof & Ceiling Plan & Drainage
MH
RE 6
bath
CLIENT
Lategan MH
NGL
G
ALLOTMENT
ERF NUMBER
1015
1:20 GRADIENT PIPE TO ONLY HOUSE WATER FROM THE SCLLERY Cover Level Invert Level Depth Distance Gradient
16 839 15 813 1 026
7938 1 : 20
DRAINAGE SECTION 01 Scale 1:100
15 549 14 968 581
15 097 14 524 524 1 : 20
2953 1 : 60
14 961 14 475 486 2 244 1 : 60
14 930 14 437 493 346 1 : 60
14 920 14 427 740 1 : 60
14 910 14 416 494 1 : 60
14 864 14 361 503
Cover Level Invert Level Depth Distance Gradient
14 880 14 369 511
11 100 1 : 60
14 796 14 141 655
11 100 1 : 60
14 541 13 982 559
Oubaai
DRAWN
SCALE
1 : 100
AB
1 : 60
DRAINAGE SECTION 02 Scale 1:100
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C102
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:25 PM
RE 2
whb
RE 1
(L1) PITCHED / SINGLE PITCHED ROOFS
158026 x ROOF HEIGHT
(L6) INSULATION ROOFS
(L5) SISALATIONS ROOFS
5°
(L4) CONCRETE FLATROOFS
425
(L)GUTTERS
W12 02
(K1) STRUCTURAL WALLS (K2) WALLS DPC (K5) WALLS LINTELS / BEAMS
DUCT
HALLWAY
BEDROOM 02
20m2 Tiles
(J1) FLOORS
D09 02
20m2
D10 02
4680
(L7) SUSPENDED CEILING
PATIO TO REMAIN OPEN AS PER BUILDING PLAN
Carpet X 154055
3230
155780 x U/S of Lintel
Part 1: General All building work must comply with the revised national building regulations SANS 10400 and the standard building lay (1977/REV1989) and the requirement of the local authority. All building material must be SABS approved or have an agreement certificate This project must stay with all specifications of this drawing, and for any changes the architect professional must be informed within 30 days. When adding to an existing building a structural engineer must do a rational assessment which should be submitted to the local municipality in writing. The plumber must be registered
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
(L4) CONCRETE FLATROOFS
156575 x US Ceiling Ground (slab)
TYPE B STAINLESS STEELOR GALVANISED GAS FLUES. ACCORDING TO SUPPLIERS DETAILS.
(K1) STRUCTURAL WALLS (K2) WALLS DPC
6825
D07 02
WEATHERSTEP 5375
154195 x 154090 Level 11x Upper First Floor
Number
Description
Date
Class of occupancy of this building: H4 Dwelling unit on its own site Population: 2 persons per bedroom
CHIMNEY TO NBR AND MIN 1M ABOVE ROOF.
1000
CHIMNEY TO NBR AND MIN 1M ABOVE ROOF.
REVISION NOTES:
General Notes:
TYPE B STAINLESS STEELOR GALVANISED GAS FLUES. ACCORDING TO SUPPLIERS DETAILS.
8000MM BUILDING HEIGHT RESTRICTIONS
(M1) STAIRWAYS
153345 x First Floor Plan
NOTE: IMPORTANT
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site Part B: Structure with particular reference to boundaries and building lines. A structural engineer must be appointed for the complete structure, foundations, ground Contractor to verify all levels and dimensions on site and conditions, walls, all concrete word and the roof. These drawings must be read in conjunction with the check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled engineer’s plans and specifications. dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the Part C: Dimensions architect immediately for clarification before work is The architect professional must immediately be informed when any dimensions, height or levels undertaken. All drainage lines indicated are diagrammatic. differs from plans. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Part D: Public Safety Contractor. External cavity walls to have galvanized wire ties A balustrade that complies, must be provide at any change in level that exceeds 1M. Vehicle ramp provided at a rate of 4 tiles/sqm. All glazing to doors and shall be 1:25, 5M away from street, wheel chair ramps shall be 1.8, 1.2M wide with 150MM kerb. windows to comply with SABS 0137 code of practice. Final Swimming pool safety must comply with SANS 1390, a wall or fence of min 1.2m must be provided to earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire prevent public from the street to have access to the pool. Self-closing and self-locking mechanism must be provided on pedestrian’s gates (1.2 high with no opening to exceed ?100) or a safety net and Engineer's Drawings.
2890
warning devises can be provided, to comply with SANS 10134. ENTRANCE WALKWAY
NO PART OF STRUCTURE/FOUNDATION SHALL SURPASS SITE BOUNDRY LINE
8.5m2
Concrete
NGL
EXTENDED DOUBLE GARAGE
FIRE WALL 270MM BRICK WALL 120MIN FIREWALL BETWEEN HOUSE AND GARAGE BUILT TO UNDERSIDE OF ROOF
52m2 X 151200
D03 01
NO PART OF STRUCTURE/FOUNDATIO N SHALL SURPASS SITE BOUNDRY LINE
FIRE WALL 340MM BRICK WALL 120MIN FIREWALL BETWEEN HOUSE AND GARAGE BUILT TO UNDERSIDE OF ROOF
Concrete
NGL
151200 x Ground Floor Plan
(J1) FLOORS (J2) FLOORS DAMP PROOFING BOUNDARY WALL FOUNDATIONS FOOTINGS ALL CONCRETE FOUNDATION FOOTINGS OF BOUNDARY WALLS TO BE INSIDE BOUDARY LINES OF ERF AS PER ENG. SPEC.
SECTION A-A
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
SURFACE BED: 100mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
Part H: Foundations Excavations for foundations must be level and the concrete must have a compressive strength of 15 MPA, Mixed at 5:4:0 No Foundation wall may be higher than 1.5m or a structural engineer must be appointed. For any ground conditions, an engineer must be appointed to design the foundations, Client Geological reports can be obtained from the local authority, if and when not available the municipality may request the owner to provide such a report (Geological Engineer)
Scale 1:100
BUILDING NOTES (H1) FOUNDATIONS - All the foundations of any building shall be designed to safely transmit all the loads from such a building to the ground. All Foundations to be constructed according to SANS 10400 Part H and NBR.
(K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
SA Pine Roof Purlins to be fitted to Prefabricated Roof Trusses or Timber Rafters all in accordance with Truss Manufacturers Design Layout & Specification. All roofs to be constructed according to SANS 10400 Part L and NBR
(J1) FLOORS - All floor finishes to be confirmed with client and to be constructed according to Engineers drawing specifications. All floors to be constructed according to SANS 10400 Part J and NBR.
(HH1-2.3) GENERAL FOUNDATIONS - Any foundation constructed in accordance with subrules HH2.2 to HH2.8 lnclusive shall not be used to support any wall forming part of the structural system of any building except where (a) such wall Is placed centrally on such foundation; (b) such wall is the wall of any building contemplated In rule KK2 of this code; and (c) the soil supporting such foundation Is not a heaving soil or shrinkable clay or a soil with a collapsible fabric. Any such foundation shall be constructed In concrete having a compressive strength of not less than 10 MPa at 28 days, or be mixed In proportions by volume of 1 part of cement , 4 parts of sand and 5 parts of coarse aggregate. Any continuous strip foundation shall have a thickness of not less than 200 mm: Provided that where the foundation Is laid on solid rock such thickness shall not apply.
(K3) WALLS ROOF FIXING - Timber roof trusses, rafters and similar structures shall be fixed to walls by means of the following anchor types, selected in accordance with table 29: a) Type A: two strands of 2,4 mm diameter galvanized steel wire b) Type B: 30 mm × 1,2 mm galvanized steel strap c) Type C: 30 mm × 1,6 mm galvanized steel strap As per SANS 10400 Part K 4.2.11.1
(L)GUTTERS - All Gutters to be powder-coated aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting. CONFIRM COLOUR WITH ARCHITECT. All Aluminium Gutters to be installed by specialist. All Gutters to be constructed according to SANS 10400 Part P and NBR.
(J2) FLOORS DAMP PROOFING - All ground floor finishes to have a layer of DPC underneath floor slab to prevent rising damp. All floors to be constructed according to SANS 10021 Gundle® API A.T USB Green 250µm damp proof membrane under concrete surface beds conforming to SANS 952-1:2011 laid with minimum 150mm overlaps and sealed with Gunplas pressure sensitive tape. To Engineers Specifications & Design.
(K4) FIRE WALLS - Any garage wall to be a fire wall and be constructed according to SANS 10400 Part T and K. (K5) WALLS LINTELS - Lintels shall be provided above all window and door openings in accordance with the requirements of SANS 10400 Part K 4.2.9. All to Engineers specifications and design. (K10) BALUSTRADE WALLS - Any balustrade wall shall conform to the requirements contained in SANS 10400 Part A rule DD2 and B1 and will not be less than 1m above FFL.
(H) ENG. FOUNDATIONS - All the foundations to be constructed according to structural Engineers drawings.
(L1) ROOFS - 0.47mm thick 'Klip-Lok' 406™ profile Zincalume® AZ150 spelter roof sheeting, fixed to timber intermediate purlins at MAX 1200mm centres and eaves and ridge purlins at MAX 1200mm centres (final spacing to be calculated by an Engineer) using KL 65 clips fixed with 10No.11 x 45mm long self-drilling wafer head PH2 screws, type 17 drill point fasteners (fastener lengths may vary depending on the insulation used or requirements), all following the manufacturer`s specifications. • Roof Pitch: 5° • Colour to be "DOVE GREY" To be confirmed • Roof Profile: Klip-Lok 406™ • Material: AZ150 spelter Zincalume®
(K1) WALLS STRUCTURAL - All walls to be plaster and painted clay brick >14mpa (SABS). Cavity in walls shall not be less than 50mm and more than 110mm wide. Wall ties in every second brick course. Brickforce shall be manufactured from pregalvanized wire, and the galvanizing shall be in accordance with SANS 935 for a grade 2 coating; and rod reinforcement shall be galvanized in accordance with the requirements of SANS 935 for a grade 2 coating or SANS 121, as appropriate. All walls to be constructed according to SANS 10400 Part K and NBR. (K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
(L7) CEILINGS - SUSPENDED CEILING: Ceiling Plasterboard Gypsum 2400 X 1200 X 9 FIXED TO 38X38MM SA PAR BATTENS. TO BE SKIMMED AND PAINTED WHITE CEILING PAINT
(L6) INSULATION ROOFS
158026 x ROOF HEIGHT
(LL3) FASCIAS AND BARGE BOARDS - All Fascias and Barge Boards to match sheeting and to be installed by specialist. All Fascias and Barge Boards to be constructed according to SANS 10400 and NBR.
(P1) DRAINAGE - Drainage Installations to comply with Sans 10400 Part P. Drainage installations under building work must be installed in terms of Part P of Sans10400 (4.19.4). Sanitary fittings discharging to a gully to discharge over that gully as Per Part P of Sans 10400 (4.21). Drainage installations in the building work must be protected in terms of Part P of Sans10400 (4.22.2). Discharge pipes located within a building to be enclosed within a duct and to be of a shape and size readily accessible for cleaning in terms of Sans 10400 part P (4.18.2.). Accessible duct to be at least 440mmx220m. Drainage installation as per regulation A2(1)(D) drainage. Information as per sans Part A(A8).
(M1) STAIRWAYS - All Staircases to comply to NBR and SANS 10400 Part M. Stairs riser not to exceed 200mm and tread shall be not less than 250mm, provided that where the stairways does not have solid risers, each tread shall overlap the next lower tread by not less than 25mm.
(L4) CONCRETE FLAT ROOF - 255mm thick concrete flat roof screeded to fall to fullbore outlets with Aluminium rainwater downpipe. With one Layer Derbigum SP3 or SP4 waterproofing membrane sealed by 'torch-fusion' to side and top of parapet walls to receive paint. All to be applied by specialist installer. 50mm Isoboard over with Clean Crushed Stone pebbles not exceeding 19-25mm placed ontop of concrete roof slab, TBC. All flat roofs to be constructed according to SANS 10400 Part L. Reinforced concrete roof slab to the engineer's design and specifications.
(M2) BALUSTRADE - GHI balustrade comprising spigots (Code: GSP006SSS) fitted to 10mm laminated safety glass (elsewhere specified) including all necessary 316 Satin Stainless Steel fittings and installed in accordance with the manufacturer`s recommendations. Quantities of hardware dependant on dimensions and design of balustrade. To be confirmed. • Balustrade style: surface mounted. • Balustrade to be min. of 1000mm high.
(L5) SISALATION ROOFS - Sisalation® 405 has been specifically reformulated to fully comply with the National Building Legislation SANS 10400 as specified for the residential market. This standard incorporates all the factors pertaining to fire-hazard or fire-risk assessment of the materials or assemblies under actual fire conditions. 1250 mm x 40 m (50 m2) Effective coverage including 150mm overlap (44 m2) Roll mass ±8,49 kg
(N1) GLAZING - Any material used in the glazing of any building shall be of a secure and durable type and shall be fixed in a manner and position that will ensure that it will safely sustain any wind loads and not allow water penetration. All glazing to be in accordance with SANS 10400 Part N and section 3 of SABS 0400. (N2) GLAZING AND VENTALATION The fenestration design meets the requirements as per SANS 204:2011, 4.3.4 Fenestration, as per attached calculations. Air leakage and infiltration to doors and windows is to be restricted as per SANS 613. External doors that serve a habitable room are to have a seal to restrict air leakage and infiltration, consisting of a foam or rubber compressible strip or a fibrous seal.
(L6) INSULATION ROOFS - 145mm Isotherm flexible roll thermal insulation (Density: 11,5 kg/m³), complying with SANS1381-1:2013, laid over ceiling brandering closely fitted between rafters Climatic Zone 4. • R-value: 3.37m².K/W • Thermal conductivity: 0,039 W/mK
(L1) PITCHED / SINGLE PITCHED ROOFS
(L5) SISALATIONS ROOFS
(L4) CONCRETE FLATROOFS
(P1) GAS INSTALLATION - Containers shall be at least: 1m away from any window and open into a building. 2m away from any drain, pit or manhole. 3m away from the property boundry unless its up and against a firewall. then its reduced to 1m. fire wall =220mm wall. non-fire wall = 110mm wall. 5m awat from a switchable electrical point I.E. plug socket, inline power isolator, aircon units, pool pumps, water pumps etc. note, a wall light only needs to be 1.5m to the left/right of the bottles, or 1.5m above the bottles. all requirements are to conform to sans 10400 Gas installation/upgrade must be completed in accordance to the regulations of both the South African National Standard (SANS: 10087) and with the Liquefied Petroleum Gas Safety Association of South Africa (LPGSA) and SAQCC Gas. SANS 10087-1:2013, All gas installations must have a Certificate of Conformity according to the Pressure Equipment Regulations that have been promulgated under the Occupation Health and Safety Act (No 85 of 1993). MAXIMUM 19KG IN TOTAL GAS ALLOWED AS PER SANS 10400 PART A. SHUT OFF / ISOLATION VALVES TO ALL APPLIANCES CONNECTED TO THE GAS LINE.
Part J: Floors Any laundry, kitchen and bathroom must have a water resistant floor. Suspended floors must comply with SANS 10400 B, j and T SANS 10082 and not be exposed to the elements. Concrete floor supported on the ground must be 100mm thick, constructed of concrete of 10 MPA and mixed 5:4:1 (as per SANS 2001-CC1) on hard core filling (compacted in 150mm thick layers, while moist) a civil engineer must design any fills where the height of fill beneath the floor exceeds 400 mm Provide a polyolefin under any membrane of 250. All other concrete slabs must be designed by a structural engineer.
Architect
....................................................................
MUNICIPAL INFORMATION ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
8000MM BUILDING HEIGHT RESTRICTIONS
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
.............................................................................
Part K: Walls 39.0625 % The span between roof supporting walls must be 8M max. The height above any opening to the wall COVERAGE PERCENTAGE plate height may not be less than 400mm (Ceiling height + 2.55mmMin & 3M Max) GROSS FLOOR AREA (GFA) 435 m2 The compressive strength of masonry units may not be less than 4 MPA. - BASEMENT 83 m2 Masonry units on the lower story of a double storey building may not be less than 10MPA. - BASEMENT COV. ENTRANCE 27 m2 Cass II Morter (Mixture of 4:1) to comply with SANS 2001-CM1. A Concrete floor slab may not span more than 6M. Wall construction must comply within SANS 2001- - GROUND FLOOR 265 m2 CM1 - GROUND COVERED PATIOS 60 m2 Lintels must be provided above all openings. Pre-stressed concrete brick force as per SANS 10400 Park K a structural Engineer must design any EXTERNAL DECK AREA (OPEN) 87 m2 opening in a wall that exceeds 2.5M COURTYARD 22 m2 See detail 6, 7 & 8 for free standing and garden walls. CONCRETE ROOF/ROOF AREA% 124/313= 39.61% Provide control joints in concrete slab and walls as per engineer’s specifications. Provide damp proofing against walls subject to damp from the ground horizontally. Horizontal damp proofing with mastoid or similar must be provided in the wall on UGGL and may not © COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED be lower than 150mm above the natural ground level. OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART
(L5) SISALATIONS ROOFS
(L6) INSULATION ROOFS
(L5) SISALATIONS ROOFS
(L4) CONCRETE FLATROOFS
5°
(K1) STRUCTURAL WALLS (K2) WALLS DPC
RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. Part F: Site operations PORCH TO REMAIM OPEN AS PER BUILDING PLAN. Provide protection against termite activity according to SANS 10124. All storm water disposal during LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE construction shall comply with SANS 10400 Part R. A water closet shall be provided on site during COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY construction. The contractor is responsible to make provision for public safety on the construction WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER site. No building rubble may be left on the site, other stands, sidewalks or any other public place, after BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) construction. SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY WITH SANS 10400 PART Part G Excavations P. Excavations (temporary and permanent) must comply see detail 1,2,3 DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). The owner shall be responsible for damage to any existing structure due to excavations on his site. DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED Blasting permitted, see SANS 10400 Part G (PG 6) for minimum distance between existing WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2 structures and the blast hole!
Part E: Demolish No building may be demolished prior to applying for permission from the municipality.
305
(L4) CONCRETE FLATROOFS 156575 x US Ceiling Ground (slab)
(L)GUTTERS
PROJECT
House Lategan
Tiles
D13 01
BEDROOM 2
EN-SUITE 3
Carpet
Carpet
14m2
BEDROOM 3
14m2
14m2
D03 02
Carpet
BRAAI ROOM 23m2 Tiles
ENTRY FOYER
KITCHEN
20m2 Tiles
DRAWING
19m2 Tiles
X 153345
W11 01
X 153345
W07 01
D11 01
NEW OUTDOOR TIMBER DECKING
255
695
EXTENDED DOUBLE GARAGE 2635
52m2 X 151200
Garage doors to comply with sans 10400 Part T section 4,9,3 ( a,b,c)
3.86m2
D02 01
Concrete
Section A-A & B-B CLIENT
Lategan
ALLOTMENT
ERF NUMBER
1015
WORKSHOP
Concrete
D01 01
GUMPOLE CCA TREATED H4 100MM DIAMETRE
350 x 510mm concrete downstand beam to egineers specifications
2600
153345 x First Floor Plan
3230
X 154055 Carpet
5m2
2435
EN-SUITE 2
1000
6825 5375
154195 x 154090 Level 11 x Upper First Floor
WEATHERSTEP
MAIN BEDROOM 20m2
(J1) FLOORS.
4680
155780 x U/S of Lintel
(J1) FLOORS (J2) FLOORS DAMP PROOFING
SURFACE BED: 100mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
(J1) FLOORS (J2) FLOORS DAMP PROOFING
SURFACE BED: 100mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
Oubaai
DRAWN
SCALE
As indicated
AB
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
SECTION B-B Scale 1:100
(J1) FLOORS (J2) FLOORS DAMP PROOFING (H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
SURFACE BED: 100mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C103
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:33 PM
151200 x Ground Floor Plan
Part L: Roofs The roof span may not exceed 8M Roof timbers to comply with SABS 563, 653, 976, 1089, 1245 all timber used in the building must be SABS approved, treated against termite and other, according to SANS10005. The timber must also be treated with preservative treatment. Roof fixing to walls with 2 x 2mm galvanised steel wires, 300mm deep for concrete roof tiles and 600mm deep for metal roof sheeting. Complete roof construction as per engineers design,
8000MM BUILDING HEIGHT RESTRICTIONS
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
158026 x ROOF HEIGHT
270
1030
CHIMNEY TO NBR AND MIN 1M ABOVE ROOF.
(L6) INSULATION ROOFS
(K5) WALLS LINTELS / BEAMS
(L1) PITCHED / SINGLE PITCHED ROOFS
TYPE B STAINLESS STEELOR GALVANISED GAS FLUES. ACCORDING TO SUPPLIERS DETAILS.
(L5) SISALATIONS ROOFS (K5) WALLS LINTELS / BEAMS 270
Part M: Stairways Stairs comply with SANS 10400 Part M Riser to be 200max and the tread to be 250Min. Min2.1M head room Provided a handrail or balustrade to comply: min 850 and max 1M above the pitch line and opening in the balustrade may exceed Ø100. Masonry stairways must comply with SANS 2001-CM1, CC1 &2. Timber Stairways to SAN 10400 Part M 4.5
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
(L4) CONCRETE FLATROOFS (L4) CONCRETE FLATROOFS
340
155780 x U/S of Lintel
SCULLERY
LIVING ROOM
KITCHEN 19m2 Tiles
16m2 Tiles
(K5) WALLS LINTELS / BEAMS
W12 01
28m2 X 153345 Tiles tbc
(K1) STRUCTURAL WALLS (K2) WALLS DPC
(J1) FLOORS. W08 01
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
L02 01
W11 01 D07 01
W5 01
153345 x First Floor Plan
NO PART OF STRUCTURE/F OUNDATION SHALL SURPASS SITE BOUNDRY LINE
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
NO PART OF STRUCTURE/FOUNDATION SHALL SURPASS SITE BOUNDRY LINE
1810
154195 x Level 11
4680
W10 01
(K1) STRUCTURAL WALLS (K2) WALLS DPC
Part S: Facilities for persons with disabilities Not applicable for single dwelling units (H4)
3230
156575 x US Ceiling Ground (slab)
NGL
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
(J1) FLOORS (J2) FLOORS DAMP PROOFING
BOUNDARY WALL FOUNDATIONS FOOTINGS ALL CONCRETE FOUNDATION FOOTINGS OF BOUNDARY WALLS TO BE INSIDE BOUDARY LINES OF ERF AS PER ENG. SPEC.
SECTION C-C
SURFACE BED: 170mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
NGL BOUNDARY WALL FOUNDATIONS FOOTINGS ALL CONCRETE FOUNDATION FOOTINGS OF BOUNDARY WALLS TO BE INSIDE BOUDARY LINES OF ERF AS PER ENG. SPEC.
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
Scale 1:100
BUILDING NOTES (H1) FOUNDATIONS - All the foundations of any building shall be designed to safely transmit all the loads from such a building to the ground. All Foundations to be constructed according to SANS 10400 Part H and NBR.
(K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
(HH1-2.3) GENERAL FOUNDATIONS - Any foundation constructed in accordance with subrules HH2.2 to HH2.8 lnclusive shall not be used to support any wall forming part of the structural system of any building except where (a) such wall Is placed centrally on such foundation; (b) such wall is the wall of any building contemplated In rule KK2 of this code; and (c) the soil supporting such foundation Is not a heaving soil or shrinkable clay or a soil with a collapsible fabric. Any such foundation shall be constructed In concrete having a compressive strength of not less than 10 MPa at 28 days, or be mixed In proportions by volume of 1 part of cement , 4 parts of sand and 5 parts of coarse aggregate. Any continuous strip foundation shall have a thickness of not less than 200 mm: Provided that where the foundation Is laid on solid rock such thickness shall not apply.
(K3) WALLS ROOF FIXING - Timber roof trusses, rafters and similar structures shall be fixed to walls by means of the following anchor types, selected in accordance with table 29: a) Type A: two strands of 2,4 mm diameter galvanized steel wire b) Type B: 30 mm × 1,2 mm galvanized steel strap c) Type C: 30 mm × 1,6 mm galvanized steel strap As per SANS 10400 Part K 4.2.11.1 (K4) FIRE WALLS - Any garage wall to be a fire wall and be constructed according to SANS 10400 Part T and K. (K5) WALLS LINTELS - Lintels shall be provided above all window and door openings in accordance with the requirements of SANS 10400 Part K 4.2.9. All to Engineers specifications and design. (K10) BALUSTRADE WALLS - Any balustrade wall shall conform to the requirements contained in SANS 10400 Part A rule DD2 and B1 and will not be less than 1m above FFL.
(H) ENG. FOUNDATIONS - All the foundations to be constructed according to structural Engineers drawings.
(L1) ROOFS - 0.47mm thick 'Klip-Lok' 406™ profile Zincalume® AZ150 spelter roof sheeting, fixed to timber intermediate purlins at MAX 1200mm centres and eaves and ridge purlins at MAX 1200mm centres (final spacing to be calculated by an Engineer) using KL 65 clips fixed with 10No.11 x 45mm long self-drilling wafer head PH2 screws, type 17 drill point fasteners (fastener lengths may vary depending on the insulation used or requirements), all following the manufacturer`s specifications. • Roof Pitch: 5° • Colour to be "DOVE GREY" To be confirmed • Roof Profile: Klip-Lok 406™ • Material: AZ150 spelter Zincalume®
(K1) WALLS STRUCTURAL - All walls to be plaster and painted clay brick >14mpa (SABS). Cavity in walls shall not be less than 50mm and more than 110mm wide. Wall ties in every second brick course. Brickforce shall be manufactured from pregalvanized wire, and the galvanizing shall be in accordance with SANS 935 for a grade 2 coating; and rod reinforcement shall be galvanized in accordance with the requirements of SANS 935 for a grade 2 coating or SANS 121, as appropriate. All walls to be constructed according to SANS 10400 Part K and NBR. (K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
(L7) CEILINGS - SUSPENDED CEILING: Ceiling Plasterboard Gypsum 2400 X 1200 X 9 FIXED TO 38X38MM SA PAR BATTENS. TO BE SKIMMED AND PAINTED WHITE CEILING PAINT
SA Pine Roof Purlins to be fitted to Prefabricated Roof Trusses or Timber Rafters all in accordance with Truss Manufacturers Design Layout & Specification. All roofs to be constructed according to SANS 10400 Part L and NBR (L)GUTTERS - All Gutters to be harcoal powder-coated aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes, colour to match sheeting. CONFIRM COLOUR WITH ARCHITECT. All Aluminium Gutters to be installed by specialist. All Gutters to be constructed according to SANS 10400 Part P and NBR. (LL3) FASCIAS AND BARGE BOARDS - All Fascias and Barge Boards to match sheeting and to be installed by specialist. All Fascias and Barge Boards to be constructed according to SANS 10400 and NBR. (L4) CONCRETE FLAT ROOF - 255mm thick concrete flat roof screeded to fall to fullbore outlets with Aluminium rainwater downpipe. With one Layer Derbigum SP3 or SP4 waterproofing membrane sealed by 'torch-fusion' to side and top of parapet walls to receive paint. All to be applied by specialist installer. 50mm Isoboard over with Clean Crushed Stone pebbles not exceeding 19-25mm placed ontop of concrete roof slab, TBC. All flat roofs to be constructed according to SANS 10400 Part L. Reinforced concrete roof slab to the engineer's design and specifications. (L5) SISALATION ROOFS - Sisalation® 405 has been specifically reformulated to fully comply with the National Building Legislation SANS 10400 as specified for the residential market. This standard incorporates all the factors pertaining to fire-hazard or fire-risk assessment of the materials or assemblies under actual fire conditions. 1250 mm x 40 m (50 m2) Effective coverage including 150mm overlap (44 m2) Roll mass ±8,49 kg (L6) INSULATION ROOFS - 145mm Isotherm flexible roll thermal insulation (Density: 11,5 kg/m³), complying with SANS1381-1:2013, laid over ceiling brandering closely fitted between rafters in Climatic Zone 4. • R-value: 3.37m².K/W • Thermal conductivity: 0,039 W/mK
(J1) FLOORS - All floor finishes to be confirmed with client and to be constructed according to Engineers drawing specifications. All floors to be constructed according to SANS 10400 Part J and NBR. (J2) FLOORS DAMP PROOFING - All ground floor finishes to have a layer of DPC underneath floor slab to prevent rising damp. All floors to be constructed according to SANS 10021 Gundle® API A.T USB Green 250µm damp proof membrane under concrete surface beds conforming to SANS 952-1:2011 laid with minimum 150mm overlaps and sealed with Gunplas pressure sensitive tape. To Engineers Specifications & Design. (M1) STAIRWAYS - All Staircases to comply to NBR and SANS 10400 Part M. Stairs riser not to exceed 200mm and tread shall be not less than 250mm, provided that where the stairways does not have solid risers, each tread shall overlap the next lower tread by not less than 25mm. (M2) BALUSTRADE - GHI balustrade comprising spigots (Code: GSP006SSS) fitted to 10mm laminated safety glass (elsewhere specified) including all necessary 316 Satin Stainless Steel fittings and installed in accordance with the manufacturer`s recommendations. Quantities of hardware dependant on dimensions and design of balustrade. To be confirmed. • Balustrade style: surface mounted. • Balustrade to be min. of 1000mm high. (N1) GLAZING - Any material used in the glazing of any building shall be of a secure and durable type and shall be fixed in a manner and position that will ensure that it will safely sustain any wind loads and not allow water penetration. All glazing to be in accordance with SANS 10400 Part N and section 3 of SABS 0400. (N2) GLAZING AND VENTALATION The fenestration design meets the requirements as per SANS 204:2011, 4.3.4 Fenestration, as per attached calculations. Air leakage and infiltration to doors and windows is to be restricted as per SANS 613. External doors that serve a habitable room are to have a seal to restrict air leakage and infiltration, consisting of a foam or rubber compressible strip or a fibrous seal.
(P1) DRAINAGE - Drainage Installations to comply with Sans 10400 Part P. Drainage installations under building work must be installed in terms of Part P of Sans10400 (4.19.4). Sanitary fittings discharging to a gully to discharge over that gully as Per Part P of Sans 10400 (4.21). Drainage installations in the building work must be protected in terms of Part P of Sans10400 (4.22.2). Discharge pipes located within a building to be enclosed within a duct and to be of a shape and size readily accessible for cleaning in terms of Sans 10400 part P (4.18.2.). Accessible duct to be at least 440mmx220m. Drainage installation as per regulation A2(1)(D) drainage. Information as per sans Part A(A8). (P1) GAS INSTALLATION - Containers shall be at least: 1m away from any window and open into a building. 2m away from any drain, pit or manhole. 3m away from the property boundry unless its up and against a firewall. then its reduced to 1m. fire wall =220mm wall. non-fire wall = 110mm wall. 5m awat from a switchable electrical point I.E. plug socket, inline power isolator, aircon units, pool pumps, water pumps etc. note, a wall light only needs to be 1.5m to the left/right of the bottles, or 1.5m above the bottles. all requirements are to conform to sans 10400 Gas installation/upgrade must be completed in accordance to the regulations of both the South African National Standard (SANS: 10087) and with the Liquefied Petroleum Gas Safety Association of South Africa (LPGSA) and SAQCC Gas.
Part T: Fire Protection The wall and or ceiling separating a garage and any habitable room must have a fire resistance as stated in the SANS Part T A 220 MM Brick wall, called a fire wall is constructed which must be built to the underside of the roof covering and a fire door must be installed between a garage and the house and the door must have a threshhold of not less than 10MM. Part V Space heating No Flue pipe or chimney shall be installed to be a fire hazard to adjacent material. No combustible material shall be built within 200 mm of the inside, of a chimney. The chimney outlet must be 1M above the roof minimum) and 1 M above the top of a window or ventilation opening. Part W Fire Installation Not applicable for single dwelling units (H4) Unless rational design is required from the local unless rational design is required form the local authority. A fire engineer needs to be appoint for this. Part XA: Energy Usage in buildings Volume of hot water supply must be calculated 50% of hot water supply not to be from electricity. Solar water heating must comply with SAND 1307, 10106, 10254 and SANS 10252-1 All hot water pipes must be insulated (R Value =1) TIMBERS TO COMPLY WITH SANS 10163 Structural timber s to comply with SANS 10163 Timbers and dry walling to comply with SANS 082 Roof timbers to comply with SABS 563, 653 975, 1089, 1245 All timber used in the building must be SABS approved, treated against termite and other, according to SANS 1005. The timber must also be treated with preservative treatment. S/T ALL TIMBER USED IN THE ERECTION OF A BUILDING BE TREATED AGAINST TERMITE AND WOOD BORER ATTACK & FUNGAL DECAY IN ACCORDANCE WITH SANS 10005. NOTES TO OWNER AND CONTRACTOR No work to commence prior to approval of the drawings by the Local Authority. No deviations from the Approved plans are allowed and the architectural professional must be informed of any changes, The contractor must check all levels and dimension prior to commencement of any work. Any discrepancies must be reported to the Architectural Professional. Do not scale the drawings, if in doubt, ask. All plumbing and electrical work to be carried out be registered persons, and on completion must provide a certificate of completion and compliance. The owner is responsible for soil test. The site must be identified, verified and the building must be set out by a registered land surveyor. All finishing products (window frames, roof tiles, tiles, cornices etc.) must be approved by the Owner / APPOINTED PROFESSIONAL prior to ordering and installation. All products must comply with SABS standards.
SANS 10087-1:2013, All gas installations must have a Certificate of Conformity according to the Pressure Equipment Regulations that have been promulgated under the Occupation Health and Safety Act (No 85 of 1993).
REVISION NOTES:
Number
Description
Date
NOTE: IMPORTANT Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings. RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. PORCH TO REMAIM OPEN AS PER BUILDING PLAN. LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY WITH SANS 10400 PART P. DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2
Client
.............................................................................
Architect
....................................................................
MUNICIPAL INFORMATION ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
CONCRETE ROOF/ROOF AREA%
MAXIMUM 19KG IN TOTAL GAS ALLOWED AS PER SANS 10400 PART A. SHUT OFF / ISOLATION VALVES TO ALL APPLIANCES CONNECTED TO THE GAS LINE.
124/313= 39.61%
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
8000MM BUILDING HEIGHT RESTRICTIONS
TYPE B COWL DETAIL
CHIMNEY TO NBR AND MIN 1M ABOVE ROOF.
TYPE B STAINLESS STEELOR GALVANISED GAS FLUES. ACCORDING TO SUPPLIERS DETAILS.
(K1) STRUCTURAL WALLS (K2) WALLS DPC
5°
(L4) CONCRETE FLATROOFS
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
(L1) PITCHED / SINGLE PITCHED ROOFS
(L5) SISALATIONS ROOFS
1245
(K5) WALLS LINTELS / BEAMS
(L)GUTTERS
PROJECT
CONCRETE SLAB ABOVE TO ENGINEERS SPECIFICATIONS.
(L4) CONCRETE FLATROOFS.
House Lategan
156575 x US Ceiling Ground (slab)
LIVING ROOM 28m2 X 153345 Tiles tbc
W12 02
254 X 146 X 31MM STEEL BEAM TO BE GALVANISED AND POWDER COATED TO L02 MATCH ALUMUNIUM. 01
D07 01
(J1) FLOORS
D07 02
NEW OUTDOOR TIMBER DECKIG .
154195 x Level 11
GUMPOLE CCA TREATED H4 100MM DIAMETRE 153345 x First Floor Plan
PATIO TO REMAIN OPEN AS PER BUILDING PLAN
DRAWING
4680
155780 x U/S of Lintel
W12 01
ALUMINIUM SLIDING LOUVRE USED FOR PRIVACY FROM NEIGHBOURING PROPERTIES WHEN NORTH DECK IN USE.
Section C-C & D-D
3230
254 X 146 X 31MM STEEL BEAM TO BE GALVANISED AND POWDER COATED TO MATCH ALUMINIUM .
CLIENT
Lategan
NEW OUTDOOR TIMBER DECKIG .
WEATHERSTEP WEATHERSTEP
ALLOTMENT
ERF NUMBER
1015
NGL (J1) FLOORS (J2) FLOORS DAMP PROOFING
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
SECTION D-D Scale 1:100
SURFACE BED: 100mm Thick mesh reinforced surface bed with floor finish, as specified elsewhere. ALL TO ENG. SPECIFICATIONS AND DETAIL.
Oubaai
DRAWN
SCALE
GUMPOLE CCA TREATED H4 100MM DIAMETRE
As indicated
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
NGL
(H) ENG. FOUNDATIONS (H1) FOUNDATIONS (HH1-2.3) GENERAL FOUNDATIONS
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C104
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:41 PM
158026 x ROOF HEIGHT
(L6) INSULATION ROOFS
REVISION NOTES:
(M1) STAIRWAYS - All Staircases to comply to NBR and SANS 10400 Part M. Stairs riser not to exceed 200mm and tread shall be not less than 250mm, provided that where the stairways does not have solid risers, each tread shall overlap the next lower tread by not less than 25mm. (M2) BALUSTRADE - GHI balustrade comprising spigots (Code: GSP006SSS) fitted to 10mm laminated safety glass (elsewhere specified) including all necessary 316 Satin Stainless Steel fittings and installed in accordance with the manufacturer`s recommendations. Quantities of hardware dependant on dimensions and design of balustrade. To be confirmed. • Balustrade style: surface mounted. • Balustrade to be min. of 1000mm high. (N1) GLAZING - Any material used in the glazing of any building shall be of a secure and durable type and shall be fixed in a manner and position that will ensure that it will safely sustain any wind loads and not allow water penetration. All glazing to be in accordance with SANS 10400 Part N and section 3 of SABS 0400.
KLIP-LOK ROOF SHEETING SLIDING SCREEN ALUMINIUM LOUVERED SCREEN
158026 x ROOF HEIGHT
(N2) GLAZING AND VENTALATION The fenestration design meets the requirements as per SANS 204:2011, 4.3.4 Fenestration, as per attached calculations. Air leakage and infiltration to doors and windows is to be restricted as per SANS 613. External doors that serve a habitable room are to have a seal to restrict air leakage and infiltration, consisting of a foam or rubber compressible strip or a fibrous seal.
156575 x US Ceiling Ground (slab) 155780 x U/S of Lintel
(K3) WALLS ROOF FIXING - Timber roof trusses, rafters and similar structures shall be fixed to walls by means of the following anchor types, selected in accordance with table 29: a) Type A: two strands of 2,4 mm diameter galvanized steel wire b) Type B: 30 mm × 1,2 mm galvanized steel strap c) Type C: 30 mm × 1,6 mm galvanized steel strap As per SANS 10400 Part K 4.2.11.1
Gas installation/upgrade must be completed in accordance to the regulations of both the South African National Standard (SANS: 10087) and with the Liquefied Petroleum Gas Safety Association of South Africa (LPGSA) and SAQCC Gas. SANS 10087-1:2013, All gas installations must have a Certificate of Conformity according to the Pressure Equipment Regulations that have been promulgated under the Occupation Health and Safety Act (No 85 of 1993). MAXIMUM 19KG IN TOTAL GAS ALLOWED AS PER SANS 10400 PART A. SHUT OFF / ISOLATION VALVES TO ALL APPLIANCES CONNECTED TO THE GAS LINE.
1.8M HIGH GATE TO NBR
RAINWATER NOT TO DISCHARGE ONTO NEIGHNOURING PROPERTY
SOUTH ELEVATION
8000MM BUILDING HEIGHT RESTRICTIONS
(L7) CEILINGS - SUSPENDED CEILING: Ceiling Plasterboard Gypsum 2400 X 1200 X 9 FIXED TO 38X38MM SA PAR BATTENS. TO BE SKIMMED AND PAINTED WHITE CEILING PAINT
RWDP
RAINWATER NOT TO DISCHARGE ONTO NEIGHNOURING PROPERTY
RE 1
IE 2
IE 3
IE 4
DW
RE 3
IE 2
W06 02
3 X 2000L ECO TANK
IE 3
IE 4
RE 4
vp
W06 01
wc
W03 01
WALL TO BE PLASTERED AND PAINTED GREY
WALL TO BE PLASTERED AND PAINTED GREY
G
151 168
150 776
150 419
150 388
150 347
150 301
150 366
EAST ELEVATION
INVERT LEVEL
151 969
150 427
149 982
149 933
149 895 149 853
149 798
149 713
DEPTH
1 079
741
794
486
493
503
653
Scale 1:100
DISTANCE
7932
4457
2955
2189
GRADIENT
1:10
1:10
1:60
1:60
494
722
ALL WALLS TO BE PLASTERED AND PAINTED. COLOUR TO BE OUBAAI APPROVED ALABASTER. WITH OUBAAI CEM FEATURE WALLS
RE 5 158026 x ROOF HEIGHT
bath
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
(L1) PITCHED / SINGLE PITCHED ROOFS
150 776
150 419
150 388
150 347
150 301
150 366
INVERT LEVEL
151 969
150 427
149 982
149 933
149 895 149 853
149 798
149 713
DEPTH
1 079
741
794
486
493
503
653
1:10
1:60
1:60
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2 60 m2
1:60
1:60
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
(K5) WALLS LINTELS / BEAMS
3310
5060
1:60
1:60
3230
D07 02
1035
6825
(M2) BAULSTRADE
D01 01
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS. NO PART OF STRUCTURE/FOUNDATION SHALL SURPASS SITE BOUNDRY LINE
GARAGE DOOR TO COMPLY WITH SANS 10400 PART T, SECTION 4,9,3(A,B,C)
151200 x Ground Floor Plan
124/313= 39.61%
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
8000MM BUILDING HEIGHT RESTRICTIONS
PATIO TO REMAIN OPEN AS PER BUILDING PLAN
2890 151 168
1:10
1015
ERF (sqm)
- GROUND COVERED PATIOS
W12 02
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
5375
153345 x First Floor Plan
153 048
GRADIENT
MUNICIPAL INFORMATION ERF nr.
5060
1.8M HIGH GATE TO NBR
154195 x 154090 x Level 11 Upper First Floor
COVER LEVEL
722
....................................................................
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
STEPPED PLANTER PLANTED WITH CYCADS. STEPPED AT 500MM MAX
(L)GUTTERS
156575 x US Ceiling Ground (slab)
NGL
G
2189
Architect
3310
155780 x U/S of Lintel
2955
.............................................................................
NGL
153 048
G
4457
bath
COVER LEVEL
WM
7932
Client
CONCRETE ROOF/ROOF AREA%
wc
DISTANCE
W05 01
WM
450 151200 x Ground Floor Plan
RE 4
494
RE 5
G
vp
whb
W07 01
D06 01
154090 x Upper First Floor
(L5) SISALATION ROOFS - Sisalation® 405 has been specifically reformulated to fully comply with the National Building Legislation SANS 10400 as specified for the residential market. This standard incorporates all the factors pertaining to fire-hazard or fire-risk assessment of the materials or assemblies under actual fire conditions. 1250 mm x 40 m (50 m2) Effective coverage including 150mm overlap (44 m2) Roll mass ±8,49 kg
ALL WALLS TO BE PLASTERED AND PAINTED WHITE UNLESS STATED OTHERWISE
RWDP
RE 2
W08 01
153345 x First Floor Plan
(L4) CONCRETE FLAT ROOF - 255mm thick concrete flat roof screeded to fall to fullbore outlets with Aluminium rainwater downpipe. With one Layer Derbigum SP3 or SP4 waterproofing membrane sealed by 'torch-fusion' to side and top of parapet walls to receive paint. All to be applied by specialist installer. 50mm Isoboard over Clean Crushed Stone pebbles not exceeding 19-25mm placed ontop of concrete roof slab, TBC. All flat roofs to be constructed according to SANS 10400 Part L. Reinforced concrete roof slab to the engineer's design and specifications.
NUTEC CLADDED DUCT PAINTED TO MATCH WALL
(L1) PITCHED / SINGLE PITCHED ROOFS
(L)GUTTERS
RWDP
1810
(LL3) FASCIAS AND BARGE BOARDS - All Fascias and Barge Boards to match sheeting and to be installed by specialist. All Fascias and Barge Boards to be constructed according to SANS 10400 and NBR.
(L4) CONCRETE FLATROOFS
RWDP
4680
155780 x U/S of Lintel
154195 x Level 11
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
(L)GUTTERS
156575 x US Ceiling Ground (slab)
(L)GUTTERS - All Gutters to be harcoal powder-coated aluminium WaterTite OGEE Gutters, 125mm x 85mm domestic OGEE with rectangular downpipes,, colour to match sheeting. CONFIRM COLOUR WITH ARCHITECT. All Aluminium Gutters to be installed by specialist. All Gutters to be constructed according to SANS 10400 Part P and NBR.
ALL WALLS TO BE PLASTERED AND PAINTED. COLOUR TO BE OUBAAI APPROVED ALABASTER. WITH OUBAAI CEM FEATURE WALLS
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
158026 x ROOF HEIGHT
SA Pine Roof Purlins to be fitted to Prefabricated Roof Trusses or Timber Rafters all in accordance with Truss Manufacturers Design Layout & Specification. All roofs to be constructed according to SANS 10400 Part L and NBR
RE 3
RAINWATER NOT TO DISCHARGE ONTO NEIGHBOUR PROPERTY. NO STRUCTURE OR ANY PORTION THEREOF TO ENCROACH THE PROPRTY BOUNDRY. WALLS ON BOUNDRY TO BE FINISH TO SATISFACTION OF THE ADJENCT OWNER. PATIO TO REMAIM OPEN AS PER BUILDING PLAN. PORCH TO REMAIM OPEN AS PER BUILDING PLAN. LP GAS: MAX 38KG ALLOWED ON PREMISES WITHOUT A FLAMMABLE SUBSTANCE CERTIFICATE IN TERMS OF SECTION 37(6) OF HE COMMUNITY FIRE SAFETY BY-LAW. LPG INSTALLATION MUST COMPLY WITH SANS 10087/1 DRAINAGE INSTALLATIONS UNDER BUILDINGWORK MUST BE INSTALLED IN TERMS OF PART P SANS 10400 (4.19.4) SANITARY FITTINGS DISCHARGING TO GULLEY TO A GULLY TO DISCHARGEOVER THAT GULLEY AS PER PART P OF SANS 10400 (4.21). DRAINAGE INSTALLATION TO COMPLY WITH SANS 10400 PART P. DRAINAGE INSTALLATIONS IN THE BUILDING WORK MUST BE PROTECTED IN TERMS OF PART P OF SANS 10400(4.22.2). DISCHARGE PIPES LOCATED WITHIN A BUILDING TO BEEN CLOSED WITHIN A DUCT AND TO BE OF SHAPE AND SIZE READILY ACCESS FOR CLEANING IN TERMS OF SANS 10400 PART P, 4.18.2
Scale 1:100
(L1) ROOFS - 0.47mm thick 'Klip-Lok' 406™ profile Zincalume® AZ150 spelter roof sheeting, fixed to timber intermediate purlins at MAX 1200mm centres and eaves and ridge purlins at MAX 1200mm centres (final spacing to be calculated by an Engineer) using KL 65 clips fixed with 10No.11 x 45mm long self-drilling wafer head PH2 screws, type 17 drill point fasteners (fastener lengths may vary depending on the insulation used or requirements), all following the manufacturer`s specifications. • Roof Pitch: 5° • Colour to be "DOVE GREY" To be confirmed • Roof Profile: Klip-Lok 406™ • Material: AZ150 spelter Zincalume®
RE 2
DW
D07 01
W5 01
W11 01
1.8M HIGH GATE TO NBR
153345 x First Floor Plan
(L6) INSULATION ROOFS - 145mm Isotherm flexible roll thermal insulation (Density: 11,5 kg/m³), complying with SANS1381-1:2013, laid over ceiling brandering closely fitted between rafters in Climatic Zone 4. • R-value: 3.37m².K/W • Thermal conductivity: 0,039 W/mK
RE 1
154195 x Level 11
WALL TO BE PLASTERED AND PAINTED GREY
6825
(K10) BALUSTRADE WALLS - Any balustrade wall shall conform to the requirements contained in SANS 10400 Part A rule DD2 and B1 and will not be less than 1m above FFL.
(P1) GAS INSTALLATION - Containers shall be at least: 1m away from any window and open into a building. 2m away from any drain, pit or manhole. 3m away from the property boundry unless its up and against a firewall. then its reduced to 1m. fire wall =220mm wall. non-fire wall = 110mm wall. 5m awat from a switchable electrical point I.E. plug socket, inline power isolator, aircon units, pool pumps, water pumps etc. note, a wall light only needs to be 1.5m to the left/right of the bottles, or 1.5m above the bottles. all requirements are to conform to sans 10400
Outdoor decking to remain open as per building plan
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
NO PART OF STRUCTURE/FOUNDATIO N SHALL SURPASS SITE BOUNDRY LINE
W10 01
(K5) WALLS LINTELS / BEAMS
NOTE: IMPORTANT
5375
(J1) FLOORS - All floor finishes to be confirmed with client and to be constructed according to Engineers drawing specifications. All floors to be constructed according to SANS 10400 Part J and NBR.
(P1) DRAINAGE - Drainage Installations to comply with Sans 10400 Part P. Drainage installations under building work must be installed in terms of Part P of Sans10400 (4.19.4). Sanitary fittings discharging to a gully to discharge over that gully as Per Part P of Sans 10400 (4.21). Drainage installations in the building work must be protected in terms of Part P of Sans10400 (4.22.2). Discharge pipes located within a building to be enclosed within a duct and to be of a shape and size readily accessible for cleaning in terms of Sans 10400 part P (4.18.2.). Accessible duct to be at least 440mmx220m. Drainage installation as per regulation A2(1)(D) drainage. Information as per sans Part A(A8).
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
450
(K5) WALLS LINTELS - Lintels shall be provided above all window and door openings in accordance with the requirements of SANS 10400 Part K 4.2.9. All to Engineers specifications and design.
Date
ALUMINIUM GUTTER 125 X 85MM DOMESTIC OGEE PROFILE GUTTER.
(K4) FIRE WALLS - Any garage wall to be a fire wall and be constructed according to SANS 10400 Part T and K.
(K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
(J2) FLOORS DAMP PROOFING - All ground floor finishes to have a layer of DPC underneath floor slab to prevent rising damp. All floors to be constructed according to SANS 10021 Gundle® API A.T USB Green 250µm damp proof membrane under concrete surface beds conforming to SANS 952-1:2011 laid with minimum 150mm overlaps and sealed with Gunplas pressure sensitive tape. To Engineers Specifications & Design.
ALL WALLS TO BE PLASTERED AND PAINTED. COLOUR TO BE OUBAAI APPROVED ALABASTER. WITH OUBAAI CEM FEATURE WALLS RWDP
W12 01
NO PART OF STRUCTURE/FOUNDATION SHALL SURPASS SITE BOUNDRY LINE
3230
(K1) WALLS STRUCTURAL - All walls to be plaster and painted clay brick >14mpa (SABS). Cavity in walls shall not be less than 50mm and more than 110mm wide. Wall ties in every second brick course. Brickforce shall be manufactured from pre-galvanized wire, and the galvanizing shall be in accordance with SANS 935 for a grade 2 coating; and rod reinforcement shall be galvanized in accordance with the requirements of SANS 935 for a grade 2 coating or SANS 121, as appropriate. All walls to be constructed according to SANS 10400 Part K and NBR.
3230
(K2) WALLS DPC - Gundle® API Brickgrip DPC 250µm damp proof course in cavity walls conforming to SANS 952-1:2011 laid with minimum 150mm overlaps.
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
RWDP
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
4680
(H) ENG. FOUNDATIONS - All the foundations to be constructed according to structural Engineers drawings.
Description
8000MM BUILDING HEIGHT RESTRICTIONS
4680
(HH1-2.3) GENERAL FOUNDATIONS - Any foundation constructed in accordance with subrules HH2.2 to HH2.8 lnclusive shall not be used to support any wall forming part of the structural system of any building except where (a) such wall Is placed centrally on such foundation; (b) such wall is the wall of any building contemplated In rule KK2 of this code; and (c) the soil supporting such foundation Is not a heaving soil or shrinkable clay or a soil with a collapsible fabric. Any such foundation shall be constructed In concrete having a compressive strength of not less than 10 MPa at 28 days, or be mixed In proportions by volume of 1 part of cement , 4 parts of sand and 5 parts of coarse aggregate. Any continuous strip foundation shall have a thickness of not less than 200 mm: Provided that where the foundation Is laid on solid rock such thickness shall not apply.
900
(H1) FOUNDATIONS - All the foundations of any building shall be designed to safely transmit all the loads from such a building to the ground. All Foundations to be constructed according to SANS 10400 Part H and NBR.
Number
whb
BUILDING NOTES
WALL TO BE PLASTERED AND PAINTED GREY
NORTH ELEVATION
PROJECT
Scale 1:100
8000MM BUILDING HEIGHT RESTRICTIONS
House Lategan
DRAINAGE SECTION 01 Scale 1:100
DRAWING
L01 02
156575 x US Ceiling Ground (slab) 155780 x U/S of Lintel
COVER LEVEL
150 366
150 357
INVERT LEVEL
149 713
149 549
DEPTH
653
808
DISTANCE
9821
GRADIENT
1:60
DRAINAGE SECTION 02 Scale 1:100
151200 x Ground Floor Plan
BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
WEST ELEVATION Scale 1:100
(L)GUTTERS
CLIENT
Lategan L02 01
(M2) BAULSTRADE
W01 01
2890
153345 x First Floor Plan
1035
154090 x Upper First Floor
6825
154195 x Level 11
Elevations
(L1) PITCHED / SINGLE PITCHED ROOFS
L01 02
D09 02
5375
Line to MH
SLIDING SCREEN ALUMINIUM LOUVERED SCREEN
W02 01
RETAINING WALL TO BE PLASTERED AND PAINTED GREY
WALL TO BE PLASTERED AND PAINTED GREY
RAINWATER NOT TO DISCHARGE ONTO NEIGHNOURING PROPERTY BOUNDARY WALL 140MM CONCRETE BLOCK WALL TO CONFIRM WITH ENGINEERS.
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
As indicated
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C105
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:49 PM
158026 x ROOF HEIGHT
SCREEN ALUMINIUM LOUVERED SCREEN
(L4) CONCRETE FLATROOFS
RC TO COMPLY TO SANS 10400 AND XA CALCULATIONS. ALL TO ENGINEER DESIGN AN SPECIFICATION
4680
IE 6
ALL WALLS TO BE PLASTERED AND PAINTED. COLOUR TO BE OUBAAI APPROVED ALABASTER. WITH OUBAAI CEM FEATURE WALLS
3230
IE 5
ROOF OVERHANG WITH 4MM THICK NUTEC CEILING BOARD INBETWEEN RAFTERS
3615 615
2390
2130 590
U/S LINTEL HEIGHT
615
W3
945
REVISION NOTES:
W4
Number
590
Description
Date
400
U/S LINTEL HEIGHT
690
425
U/S LINTEL HEIGHT
W2
425
W1
U/S WINDOW HEIGHT 4245
NOTE: IMPORTANT
450
2400
690
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
900
1025
1350
1990
1990
2400
U/S LINTEL HEIGHT
2400
U/S WINDOW HEIGHT
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY: FRAME MATERIAL:
FFL
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Garage Powder Coated Aluminium - Grey
QUANTITY: FRAME MATERIAL:
OVERALL SIZE:
3755mm x 400mm
Top Hung
MATERIAL:
Laminate safety glass as per fenestration calculation Obscure White Translucent
W5
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Garage Powder Coated Aluminium - Grey
QUANTITY:
Top Hung
OVERALL SIZE: MATERIAL:
Laminate safety glass as per fenestration calculation Obscure White Translucent
W6
QUANTITY:
1 - Entrance Passage Powder Coated Aluminium - Grey
FRAME MATERIAL:
2130mm x 400mm
FRAME MATERIAL:
Fixed
OVERALL SIZE:
4335mm x 450mm
MATERIAL:
Laminate safety glass as per fenestration calculation
W7
U/S LINTEL HEIGHT
Top Hung
MATERIAL:
Laminate safety glass as per fenestration calculation Obscure White Translucent
1500
1500
885
455
1500
U/S WINDOW HEIGHT
EQ
Client FIXED
450
FIXED
1800
EQ
2400mm x 400mm
3210
1650
2175
2755
1200
1650 1200
FFL
FFL
QUANTITY:
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
2 - WC ROOM & STUDY Powder Coated Aluminium - Grey
FRAME MATERIAL:
OVERALL SIZE:
1800mm x 450mm
OVERALL SIZE:
3210mm x 1590mm
GLAZING:
Laminate safety glass as per fenestration calculation Obscure White Translucent
MATERIAL:
MATERIAL: Laminate safety glass as per fenestration calculation Obscure White Translucent
OVERALL SIZE:
2460mm x 450mm
GLAZING:
Laminate safety glass as per fenestration calculation Obscure White Translucent
FRAME MATERIAL:
W8
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Entry Foyer/ Hallway Powder Coated Aluminium - Grey
QUANTITY:
Sliding Window
FFL
QUANTITY:
1 - Main Bathroom Powder Coated Aluminium - Grey
FRAME MATERIAL:
150
FFL ALL DIMENSIONS TO BE CONFIRMED ON SITE
....................................................................
MUNICIPAL INFORMATION
U/S WINDOW HEIGHT
U/S WINDOW HEIGHT
.............................................................................
Architect
450
U/S LINTEL HEIGHT
EQ
OVERALL SIZE:
4500
U/S CONCRETE SOFIT
U/S LINTEL HEIGHT
2460
1 - Main Bathroom Powder Coated Aluminium - Grey
W12
U/S LINTEL HEIGHT 1590
EQ
SANS 10400-XA The building complies with windows being single glazed safety glass with a U value 5.8W/m2·K, and a SHGC value of 0.77 in aluminium frames
ALL DIMENSIONS TO BE CONFIRMED ON SITE
Sliding Window
W9
Fixed
QUANTITY: OVERALL SIZE:
FRAME MATERIAL:
950
950
U/S CONCRETE SOFIT
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2 124/313= 39.61%
4410 1470 1470
U/S LINTEL HEIGHT
U/S WINDOW HEIGHT
U/S LINTEL HEIGHT
ZONING
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
Fixed
Laminate safety glass as per fenestration calculation
455
U/S CONCRETE SOFIT HEIGHT
832 m2
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
W11
W10
1015
ERF (sqm)
CONCRETE ROOF/ROOF AREA%
3 - Living Room/ braai Powder Coated Aluminium - Grey 4500mm x 455mm
ERF nr.
2940 1470
1470
1800 EQ
EQ
3110
2400
2400
U/S WINDOW HEIGHT
2015
U/S WINDOW HEIGHT
PROJECT
House Lategan
2655
1175
FIXED
1500
U/S LINTEL HEIGHT
DRAWING
840
900
Window & Door schedule 01 CLIENT
Lategan FFL
FFL
FFL
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
1 : 25
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY:
1 - Scullery/ Laundry
QUANTITY: FRAME MATERIAL:
OVERALL SIZE:
Powder Coated Aluminium - Grey 2400mm x 950mm FIXED
MATERIAL:
Laminate safety glass as per fenestration calculation
1 - Scullery/ Laundry Powder Coated Aluminium - Grey
QUANTITY:
OVERALL SIZE:
1800mm x 450mm
MATERIAL:
Laminate safety glass as per fenestration calculation Obscure White Translucent
FRAME MATERIAL:
Sliding Window
ALL DIMENSIONS TO BE CONFIRMED ON SITE
FRAME MATERIAL:
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - scullery Powder Coated Aluminium - Grey
QUANTITY:
OVERALL SIZE:
950mm x 455mm
MATERIAL:
OVERALL SIZE:
Laminate safety glass as per fenestration calculation
Fixed
FRAME MATERIAL: MATERIAL:
1 - Kitchen Powder Coated Aluminium - Grey Cavity Slider Window 4o10mm x 1500mm Laminate safety glass as per fenestration calculation
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C106
© Copyright Retained
CHECK
AB
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:50 PM
FFL
W13
W14
D1
REVISION NOTES:
D2
Number
Description
Date
U/S CONRTE SOFIT HEIGHT
U/S STEEL BEAM HEIGHT
900
4800
870
1625
U/S CONRTE SOFIT HEIGHT
FIXED
U/S CONRTE SOFIT HEIGHT
2855
700
NOTE: IMPORTANT
1700
2400
DOOR TO BE FIRE RATED
2345
2400
2400 2250
FIXED
FFL
150
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY:
1 - Entry foyer/ Hallway
QUANTITY:
2 - Bathroom 02 & Bathroom 03
QUANTITY:
FRAME MATERIAL:
Powder Coated Aluminium - Grey 2400mm x 1625mm Fixed
FRAME MATERIAL:
Powder Coated Aluminium - Grey 870 x 700mm Top Hung
MATERIAL:
Laminate safety glass as per fenestration calculation
MATERIAL:
Laminate safety glass as per fenestration calcs. Obscure White Translucent
MATERIAL:
W15
W16
1625
U/S CONRTE SOFIT HEIGHT
OVERALL SIZE:
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Garage Powder coated aluminium - matt stone grey
QUANTITY:
1 - Garage
FRAME MATERIAL:
OVERALL SIZE:
4800mm x 2345mm
OVERALL SIZE:
Timber 2855mm x 900mm
GLAZING:
N/A
MATERIAL:
D3
4200 EQ
U/S CONRTE SOFIT HEIGHT
EQ
D4
1870 935
900
U/S CONRETE BEAM HEIGHT
EQ
MDF Harboard / Semi solid Door with galv. steel plate insert
1085
U/S CONRETE SOFIT HEIGHT
Client
.............................................................................
455
455
OVERALL SIZE:
SANS 10400-XA The building complies with windows being single glazed safety glass with a U value 5.8W/m2·K, and a SHGC value of 0.77 in aluminium frames
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Architect U/S WINDOW HEIGHT
U/S WINDOW HEIGHT
....................................................................
1050
1050
2655
3110
2025
2400
ALUMINIUM
2485
2480
MUNICIPAL INFORMATION
FFL
FFL
ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
CONCRETE ROOF/ROOF AREA%
124/313= 39.61%
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
FFL ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY: FRAME MATERIAL:
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Entrance foyer/ Hallway Powder Coated Aluminium - Grey
QUANTITY: FRAME MATERIAL:
OVERALL SIZE:
1625mm x 455mm
Fixed
MATERIAL:
Laminate safety glass as per fenestration MATERIAL: calculation
OVERALL SIZE:
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
1 - Entrance Walkway Powder Coated Aluminium - Grey
1 - Braai Powder Coated Aluminium - Grey
QUANTITY:
1- Domestic Bathroom
QUANTITY:
4775mm x 455mm
FRAME MATERIAL:
FRAME MATERIAL:
OVERALL SIZE:
Timber 2400mm x 815mm
OVERALL SIZE:
2900mm x 1085mm
MATERIAL:
MDF Harboard / Semi solid Door
MATERIAL:
Powder Coated Aluminium sheet
Fixed
Laminate safety glass as per fenestration calculation
D5
D6
3670
2425 900
EQ
EQ
150
EQ
EQ
U/S CONRETE SOFIT HEIGHT
EQ
U/S CONRETE SOFIT HEIGHT
PROJECT
House Lategan
2400
EQ
DRAWING
Window & Door Schedule 02
FFL
ALUMINIUM
1015
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY:
OVERALL SIZE:
7255mm x 2400mm
OVERALL SIZE:
2400mm x 900mm
MATERIAL:
Laminate safety glass as per fenestration calculation
MATERIAL:
Laminate safety glass as per fenestration calcs. Obscure White Translucent
Sliding door
DRAWN
1 : 25
1 - Main Bedroom Powder Coated Aluminium - Grey
FRAME MATERIAL:
Oubaai
SCALE
steel post to engineers specification
QUANTITY:
ALLOTMENT
ERF NUMBER
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
Lategan
FRAME MATERIAL:
1 - Scullery Powder Coated Aluminium - Grey
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C107
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:51 PM
1095
1020
1050
CLIENT
D7 4480 EQ
EQ
U/S CONRETE SOFIT HEIGHT
D8
6105
1630 1630
EQ
REVISION NOTES:
D10
5700
Number 900
1 2
U/S CONRETE SOFIT HEIGHT
U/S CONRETE SOFIT HEIGHT
Description
Date
FF Electrical Duct and cavity door position
09/05/2023 17/05/2023
FFL
QUANTITY:
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY: 4 - Main Bedroom, Bedroom 2, Bedroom 3 & WC Room Timber FRAME MATERIAL:
QUANTITY:
OVERALL SIZE:
6105mm x 2400mm
OVERALL SIZE:
6475mm x 2400mm
MATERIAL:
Laminate safety glass as per fenestration calculation
MATERIAL:
Laminate safety glass as per fenestration calculation
FRAME MATERIAL:
Cavity Slider
D9
2150 EQ
EQ
400
SANS 10400-XA The building complies with windows being single glazed safety glass with a U value 5.8W/m2·K, and a SHGC value of 0.77 in aluminium frames
ALL DIMENSIONS TO BE CONFIRMED ON SITE
2 - Living Room Powder Coated Aluminium - Grey
FRAME MATERIAL:
2445
FFL
ALL DIMENSIONS TO BE CONFIRMED ON SITE
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
1090
1050
1050
2400
2400
NOTE: IMPORTANT
1 - Braai Room Powder Coated Aluminium - Grey Cavity Slider
2400mm x 900mm
OVERALL SIZE: MATERIAL:
D11
D12
U/S CONRETE SOFIT HEIGHT
U/S CONRETE SOFIT HEIGHT
MDF Harboard / Semi solid Door
D13
U/S CONRETE SOFIT HEIGHT
900
U/S LINTEL HEIGHT
EQ
Client
.............................................................................
Architect
....................................................................
2400
2400
1050
1050
1045
1050
1050
2485
2400
EQ
MUNICIPAL INFORMATION
FFL
FFL 1800
1600
ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
CONCRETE ROOF/ROOF AREA%
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
ALL DIMENSIONS TO BE CONFIRMED ON SITE
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY:
1 - Kitchen
QUANTITY:
1 - Braai
QUANTITY:
FRAME MATERIAL:
OVERALL SIZE:
Timber 2400mm x 1600mm
FRAME MATERIAL:
OVERALL SIZE:
Timber 2400mm x 1800mm
FRAME MATERIAL:
OVERALL SIZE:
2095mm x 2400mm
OVERALL SIZE:
2400mm x 915mm
MATERIAL:
Laminate safety glass as per fenestration calculation
MATERIAL:
MDF Harboard / Semi solid Door
MATERIAL:
MDF Harboard / Semi solid Door
MATERIAL:
MDF Harboard / Semi solid Door
FRAME MATERIAL:
L2
L1
12520 6485
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
2 - Bathroom 2 & 3 Timber
2 - Bedroom 2 & Bedroom 3 Powder Coated Aluminium - Grey
QUANTITY:
124/313= 39.61%
6035
U/S CONRETE SOFIT HEIGHT
930
PROJECT
2380
2300
U/S CONRETE SOFIT HEIGHT
House Lategan
2400
DRAWING
U/S LOUVRE HEIGHT
Window & Door schedule 03 CLIENT
910
Lategan
ALLOTMENT
ERF NUMBER
1015
FFL 0
Oubaai
DRAWN
SCALE
1 : 25
ALL DIMENSIONS TO BE CONFIRMED ON SITE
QUANTITY: FRAME MATERIAL:
1 - Outdoor Deck Powder Coated Steel - Matt Grey (to match aluminium) with hulabond slats to suit
OVERALL SIZE:
12520mm x 2400mm
MATERIAL:
N/A
AB
ALL DIMENSIONS TO BE CONFIRMED ON SITE
FRAME MATERIAL:
2 - Bathroom 2 & 3 Powder Coated Aluminium - Black
OVERALL SIZE:
2400mm x 930mm
GLAZING:
N/A
QUANTITY:
Aluminium/ timber slats
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C108
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:52 PM
FFL
REVISION NOTES:
Number 1 2
TYPE S4 - SWITCH REFERENCE (BLACK IMAGE NOT AVAILABLE ONLINE)
Downlights (Internal)
Recessed Downlight
-
A
49
Downlights (Int. Surf)
Surface Downlight
-
A(2)
3
Downlights (External)
Recessed Waterproof Downlight
-
A(3)
2
Single Surface Spots
-
-
External wall light 01
2-Way Wall Light
External Wall Light 2
1-Way Wall Light
Track & spots
-
B
-
D
2
-
-
E
Braai light
-
-
F
1
Pendant 01 (Bedside)
-
-
G
2
Bedside wall light
-
-
H
4
Task light
-
-
I
1
Pendant 02
-
-
J
1
Linear LED
-
-
K
1
-
-
L
As indicated
Exterior Footlight
-
-
M
6
Interior Footlight
-
-
N
1
-
-
O
2
OMIT
OMIT
P
0
-
-
Q
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Tracks as indicated 14 Spots
LED Strip light (Interior & Exterior)
Surface Ceiling Lights
EQ
EQ
13 @ TYPE L M AFF 1350M
SANS 10400-XA COMPLIANCE: refer to DEVS rational energy efficiency assement
C TYPE FFL 0MM A
@ 165
EQ
The lighting power density modelled was 5W/m2 as per SANS 204 Table 12 throughout the building
TYPE L BELOW PAVING. DETAIL TBC.
EQ
C TYPE FFL 0MM A @ 165
TYPE 2 @ 300MM AFFL
EQ EQ
TYPE C @ 1650MM AFFL
TYPE 10 (allow power for garage door motor)
4
- PAIRS OF DOWNLIGHTERS TO BE SPACED 150MM FROM CENTER TO CENTER - PAIRS OF WALL LIGHTS TO BE SPACED 100MM FROM CENTER TO CENTER - MOTION SENSOR POSITIONS TO BE CONFIRMED ON SITE BY SPECIALIST - ALL GARDEN SPOT POSITIONS TO BE CONFIRMED ON SITE BY ARCHITECT - FINAL DIMENSIONS TO BE TAKEN ON SITE - FINAL POSITIONS OF LIGHT FIXTURES TO BE CONFIRMED BY ARCHITECTS & CLIENT ON SITE!!!! - ALL CONCRETE SOFFIT FORMWORK FOR LIGHT FITTINGS TO BE DONE PRIOR TO CAST IN SITU CONCRETE SLAB. - ELECTRICAL & LIGHTING PREP-WORK TO BE CHECKED BY ARCHITECT PRIOR TO CAST IN SITU CONCRETE SLAB. - PLEASE MAKE NOTE OF WHERE SOCKETS/SWITCHES/LIGHTS LINE UP. INCORRECT PLACEMENT WILL NEED TO BE CORRECTED BY ELECTRICIAN ON SITE. - POSITION OF LED STRIP LIGHTS IN SLAB TO BE CONFIRMED BY ENGINEER. POSITION OF DRIVER TO BE CONFIRMED BY ELECTRICIAN. - DIMMER SWITCHES INDICATED IN RED - TWO-WAY SWITCHES INDICATED WITH ORANGE LINES - ALL SWITCHES TO BE AT 1050MM AFFL (TO THE CENTER OF THE SWITCH) - ALL ELECTRICAL POINTS TO COMPLY WITH REGULATIONS. ANY CHANGES TO BE APPROVED BY INTERIOR DESIGNER PRIOR TO COMPLETION - ELECTRICIAN TO CONFIRM SOCKET AND SWITCH COLOURS PRIOR TO ORDERING!!!
Client
TYPE 15 (at recommended height and position)
4X4 3-lever switch
Matrix onesto
S3
1
4-Lever Switch
4X4 4-lever switch
Matrix onesto
S4
3
5-Lever Switch
4X4 5-lever switch
Matrix onesto
S5
1
6-Lever Switch
OMIT
OMIT
S6
0
7-Lever Switch
8X2 7-lever switch
Matrix onesto
S7
1
Single Socket
4x2 single socket
Matrix onesto
1
7
Double Socket
4x4 double socket
Matrix onesto
2
17
Combination Socket
4x4 combination socket
Matrix onesto
3
7
Multiplug for TV
Combination of sockets for satelite, power, data, etc.
Matrix onesto
4
2
Matrix onesto
5
6
Matrix onesto
6
1
Distribution Board
As per electrician's spec
Matrix onesto
7
1
WiFi Router
Allow points & connections
Matrix onesto
8
1
Power Point
For power & light in mirrors, island & boundary wall
-
9
3
Power for Garage Motor
As per requirements
-
10
1
Extractor fan
OMIT
OMIT
11
0
Power to blinds
TBC if required
-
12
-
Intercom
TBC
-
13
2
Inverter
Allow necessary supply
-
14
1
Motion Sensor
As per installer's spec
-
15
3 or more
Airconditioner
TBC
TBC
16
1
Floor Plug
TBC
TBC
17
1
Ceiling Heater
TBC
TBC
18
1
USB Socket
4x4 combination socket with USB module
Matrix onesto
19
4
bic
Workshop TYPE Q @ U/S OF SOFFIT
1410
ALLOW SLEEVE FOR FUTURE SOLAR!!!!! SEE PANEL POSITIONS ON ROOF PLAN.
EQ
1415 TYPE A (2) @ U/S OF SOFFIT
RECOMMENDED INVERTER POSITION. ALLOW NECESSARY CONNECTIONS.
TYPE 19 (W) - SOCKET REFERENCE
EQ
EQ
TYPE 19 (B) - SOCKET REFERENCE
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2 124/313= 39.61%
TYPE M @ 200MM AFFL
TYPE M @ 200MM AFFL TYPE L (recessed into riser)
TYPE 5 @ 300MM AFFL
TYPE L (recessed into riser)
PROJECT Tank Yard
3 4 6
House Lategan
DRAWING
7
Ground Floor Electrical CLIENT
Lategan
2-WAY LIGHT TO BE SWITCHED ABOVE WITH DOWNLIGHTS
N
Planter Box
TYPE 6 - SOCKET REFERENCE
RES 1
TYPE M @ 200MM AFFL
TYPE A (2) @ U/S OF SOFFIT
11 10 8
TYPE 5 - SOCKET REFERENCE
ZONING
Domestic Bathroom
5
wifi
832 m2
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
TYPE 7 - DB AS PER ELECTRICIAN'S SPECIFICATIONS
TYPE S2 @ 1050MM AFFL
TYPE Q @ U/S OF SOFFIT
TYPE 2 @ 900MM AFFL
1015
ERF (sqm)
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
2
TYPE 4 - SWITCH REFERENCE ELECTRICIAN TO CONFIRM NECESSARY MODULES FOR TV POINT!!
TYPE 2 @ 300MM AFFL
TYPE 2 @ 300MM AFFL
MUNICIPAL INFORMATION ERF nr.
CONCRETE ROOF/ROOF AREA% 6390
3-Lever Switch
TYPE A (2) @ U/S OF SOFFIT
EQ
7
TYPE 2 @ 300MM AFFL
EQ
S2
TYPE 15 @ RECOMMENDED HEIGHT
565
Matrix onesto
300
4X4 2-lever switch
EQ
2-Lever Switch
4x4 30 amp isolator
TYPE S2@ 1050MM AFFL
110
5
1435
S1
TYPE S4 DIRECTLY ABOVE TYPE 2!!!
EQ
Matrix onesto
Isolator
TYPE Q @ U/S OF SOFFIT (on motion-sensor)
1500
4X4 1-lever switch
Single socket in waterproof casing
EQ
Extended Double Garage
Qty
1-Lever Switch
Exterior Single Socket
EQ
TYPE S4 @ 1050MM AFFL
....................................................................
1
TYPE 3 (B) - SOCKET REFERENCE
Type
TYPE A(3) AT U/S OF SOFFIT (150mm center to center of fittings)
EQ
TYPE 3 (W) - SOCKET REFERENCE
TYPE 2 (B) - SOCKET REFERENCE
1490
TYPE Q @ U/S OF SOFFIT (on motion-sensor)
Brand/Supplier
EQ
EQ
2975
1800
TYPE 2 (W) - SOCKET REFERENCE
Name
EQ
TYPE O @ U/S OF SOFFIT
EQ
1405 1490
TYPE 1 (B) - SOCKET REFERENCE
Electrical Fixtures:
TYPE 9 HEIGHT TBC
TYPE C @ 1650MM AFFL
TYPE O @ U/S OF SOFFIT
.............................................................................
Architect ALLOW CONDUIT BELOW PAVING/CONCRETE WALKWAY FOR LIGHTING ON BOUNDARY WALL. ALL TO BE CONFIRMED ONCE LANDSCAPING HAS BEEN RESOLVED!!
EQ
TYPE 1 (W) - SOCKET REFERENCE
TYPE S7 - SWITCH REFERENCE
50% of hot water is to be generated by Solar thermal hot water system and the remainder is to be generated by electrical resistance element.
TYPE C @ 1650MM AFFL
Please Note:
TYPE S5 - SWITCH REFERENCE (BLACK IMAGE NOT AVAILABLE ONLINE)
18/04/2023
NOTE: IMPORTANT
12 14
Garden spot
27/03/2023
Qty
C
Flourescent
Gas bottle position and gas geyser installation GF Electrical
FOOTLIGHTS ABOVE TO BE ON SAME 2-WAY SWITCH AND SWITCHED IN SCULLERY
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
1 : 50
AB
Ground Floor Electrical Plan Scale 1:50
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C110
© Copyright Retained
CHECK
AB
REV
3
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:54 PM
TYPE S3 - SWITCH REFERENCE (BLACK IMAGE NOT AVAILABLE ONLINE)
TYPE S2 - SWITCH REFERENCE (BLACK IMAGE NOT AVAILABLE ONLINE)
Type
EQ
TYPE S1 - SWITCH REFERENCE (BLACK IMAGE NOT AVAILABLE ONLINE)
Brand/Supplier
EQX2
FINAL QUANTITIES & POSITIONS OF BLACK AND WHITE SOCKETS AND SWITCHES TO BE CALULATED ON SITE! ELECTRICIAN TO CONFIRM SOCKET AND SWITCH COLOURS PRIOR TO ORDERING - AS COLOURS MAY CHANGE DEPENDING ON WALL PAINT CHOICES.
Name
Date
EQX2
Light Fixtures:
Description
REVISION NOTES:
Number 1
Light Fixtures:
Recessed Downlight
-
A
49
1-Lever Switch
4X4 1-lever switch
Matrix onesto
S1
5
Downlights (Int. Surf)
Surface Downlight
-
A(2)
3
2-Lever Switch
4X4 2-lever switch
Matrix onesto
S2
7
Downlights (External)
Recessed Waterproof Downlight
-
A(3)
2
3-Lever Switch
4X4 3-lever switch
Matrix onesto
S3
1
Single Surface Spots
-
-
12
4-Lever Switch
4X4 4-lever switch
Matrix onesto
S4
3
C
14
5-Lever Switch
4X4 5-lever switch
Matrix onesto
S5
1
2
6-Lever Switch
OMIT
OMIT
S6
0
7-Lever Switch
8X2 7-lever switch
Matrix onesto
S7
1
Single Socket
4x2 single socket
Matrix onesto
1
7
Double Socket
4x4 double socket
Matrix onesto
2
16
Combination Socket
4x4 combination socket
Matrix onesto
3
7
Combination of sockets for satelite, power, data, etc.
Matrix onesto
4
2
Matrix onesto
5
6
4x4 30 amp isolator
Matrix onesto
6
1
Distribution Board
As per electrician's spec
Matrix onesto
7
1
WiFi Router
Allow points & connections
Matrix onesto
8
1
Power Point
For power & light in mirrors, island & boundary wall
-
9
3
Power for Garage Motor
As per requirements
-
10
1
Extractor fan
OMIT
OMIT
11
0
Power to blinds
TBC if required
-
12
-
Intercom
TBC
-
13
2
Please Note:
Inverter
Allow necessary supply
-
14
1
- PAIRS OF DOWNLIGHTERS TO BE SPACED 150MM FROM CENTER TO CENTER - PAIRS OF WALL LIGHTS TO BE SPACED 100MM FROM CENTER TO CENTER - MOTION SENSOR POSITIONS TO BE CONFIRMED ON SITE BY SPECIALIST - ALL GARDEN SPOT POSITIONS TO BE CONFIRMED ON SITE BY ARCHITECT - FINAL DIMENSIONS TO BE TAKEN ON SITE - FINAL POSITIONS OF LIGHT FIXTURES TO BE CONFIRMED BY ARCHITECTS & CLIENT ON SITE!!!! - ALL CONCRETE SOFFIT FORMWORK FOR LIGHT FITTINGS TO BE DONE PRIOR TO CAST IN SITU CONCRETE SLAB. - ELECTRICAL & LIGHTING PREP-WORK TO BE CHECKED BY ARCHITECT PRIOR TO CAST IN SITU CONCRETE SLAB. - PLEASE MAKE NOTE OF WHERE SOCKETS/SWITCHES/LIGHTS LINE UP. INCORRECT PLACEMENT WILL NEED TO BE CORRECTED BY ELECTRICIAN ON SITE. - POSITION OF LED STRIP LIGHTS IN SLAB TO BE CONFIRMED BY ENGINEER. POSITION OF DRIVER TO BE CONFIRMED BY ELECTRICIAN. - DIMMER SWITCHES INDICATED IN RED - TWO-WAY SWITCHES INDICATED WITH ORANGE LINES - ALL SWITCHES TO BE AT 1050MM AFFL (TO THE CENTER OF THE SWITCH) - ALL ELECTRICAL POINTS TO COMPLY WITH REGULATIONS. ANY CHANGES TO BE APPROVED BY INTERIOR DESIGNER PRIOR TO COMPLETION - ELECTRICIAN TO CONFIRM SOCKET AND SWITCH COLOURS PRIOR TO ORDERING!!!
Motion Sensor
As per installer's spec
-
15
3 or more
EQ
EQ
Airconditioner
TBC
TBC
16
1
External Wall Light 2
1-Way Wall Light
-
D
Track & spots
-
-
E
eck 01
Outdoor D TYPE B @ U/S OF CEILING
TYPE B @ U/S OF CEILING
om
Living Ro
Tracks as indicated 14 Spots
Braai light
-
-
F
1
Pendant 01 (Bedside)
-
-
G
2
Bedside wall light
-
-
H
4
Multiplug for TV
Task light
-
-
I
1
Exterior Single Socket
Pendant 02
-
-
J
1
Isolator
-
-
K
Single socket in waterproof casing
1 wifi
-
L
6
As indicated
Exterior Footlight
-
-
M
Interior Footlight
-
-
N
1
-
-
O
2
OMIT
OMIT
P
0
-
-
Q
4
Date
Duct and cavity door position
17/05/2023
NOTE: IMPORTANT Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
SANS 10400-XA COMPLIANCE: refer to DEVS rational energy efficiency assement The lighting power density modelled was 5W/m2 as per SANS 204 Table 12 throughout the building 50% of hot water is to be generated by Solar thermal hot water system and the remainder is to be generated by electrical resistance element.
Client
.............................................................................
Architect
....................................................................
MUNICIPAL INFORMATION ERF nr.
1015
ERF (sqm)
832 m2
Floor Plug
TBC
TBC
17
1
Ceiling Heater
TBC
TBC
18
1
ZONING
RES 1
USB Socket
4x4 combination socket with USB module
Matrix onesto
19
4
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
Grass area
CONCRETE ROOF/ROOF AREA%
Balcony EQ
EQ
EQ
EQ
EQEQ
TYPE 16 (height TBC)
Main Bedroom
1000
EQ
TYPE S1 @ 750MM AFFL TYPE 19 @ 450MM AFFL
EQ
TYPE G (final position TBC on site)
EQ
EQ
EQ
EQ EQ
TYPE S2 @ 1050MM AFFL
TYPE A @ U/S OF CEILING
TYPE E @ U/S OF SOFFIT
2
3
TYPE S2 @ 1050MM AFFL
EQ
Study TYPE 3 @ UP
14 13 12 11 10 9
8
7
6
5
4
3
2
Planter Box
1
900MM AFFL & TYPE S1 @ 1050MM AFFL
WIFI SOCKET DIRECTLY ABOVE TYPE 2!!
TYPE 2 @ 900MM & TYPE 8 @ 1300MM AFFL
TYPE A @ U/S OF SOFFIT
TYPE S1 DIRECTLY ABOVE TYPE 3!!!
TYPE 2 @ 900MM AFFL
EQ
TYPE 9 (allow power for mirror LED)
300 TYPE S2 @ 1050MM AFFL
TYPE A @ U/S OF SOFFIT
TYPE A @ U/S OF CEILING
Wc Room
TYPE A @ U/S OF SOFFIT
EQ
EQ
TYPE A @ U/S OF CEILING
1040
1040
TYPE N @ 200MM AFFL
House Lategan
DRAWING
First Floor Electrical
Main Bathroom
CLIENT TYPE A @ U/S OF CEILING
TYPE A @ U/S OF CEILING
Lategan
TYPE 18 @ U/S OF SOFFIT
FINAL POSITION TBC ON SITE
ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
EQ
1 : 50
N TYPE 15 @ RECOMMENDED HEIGHT
TYPE M @ 200MM AFFL
TYPE M @ 200MM AFFL
AB
TYPE M @ 200MM AFFL
Tank Yard FOOTLIGHTS BELOW TO BE ON SAME 2-WAY SWITCH AND SWITCHED AT FRONT DOOR
150
11m2
Scale 1:50
PROJECT
TYPE A (final positions to be confirmed once basins are installed)
EQ EQ
EQ TYPE A @ U/S OF CEILING
350
TYPE 2 @ 300MM AFFL
TYPE A @ U/S OF CEILING
EQ
TYPE C @ 1800MM AFFL
Drying Yard
First Floor Electrical Plan
EQ
TYPE S4 DIRECTLY ABOVE TYPE 2!!!
Dressing TYPE S2 @ 1050MM AFFL
TYPE 2 @ 300MM AFFL
TYPE A @ U/S OF CEILING
300
TYPE A @ U/S OF CEILING
EQ
TYPE S4 @ 1050MM AFFL
EQ
TYPE A @ U/S OF CEILING
EQ
TYPE A @ U/S OF CEILING
4
EQX2
EQ
900
1
FINAL POSITION TBC ON SITE
350
EQ
TYPE 17 WITHIN SLAB
1315
En-suite 02
300
En-suite 03
EQ 1000 EQ
2-WAY LIGHTS TO BE SWITCHED BELOW WITH DOWNLIGHTS AND LED
EQEQ
EQ
Hallway
UP
Entry Foyer/ Hallway
TYPE A @ U/S OF CEILING
EQ 300
1225 TYPE A @ U/S OF CEILING
TYPE A @ U/S OF CEILING
TYPE S1 @ 1050MM AFFL
TYPE H @ 1050MM AFFL TYPE 3 @ 450MM AFFL
EQ
DIRECTLY ABOVE TYPE S1 WHICH IS DIRECTLY ABOVE TYPE 18!!!
EQ
300
TYPE D @ FL 1800MM AF
TYPE 5 @ 300MM AFFL
TYPE H @ 1050MM AFFL TYPE 3 @ 450MM AFFL
TYPE S3 @ 1050MM AFFL
EQ
EQ
TYPE 1 @ FL 300MM AF
TYPE S1 @ 1050MM AFFL
EQ
EQ
DW
TYPE S2 @ 1050MM AFFL
TYPE 1 @ 300MM AFFL
TYPE 2 @ 300MM AFFL
300
WM
Scu
TYPE 3 @ 1050mm AFFL
TYPE 4 @ 1600MM AFFL
TYPE A @ U/S OF CEILING
EQ
TYPE 13 @ 1350MM AFFL
TYPE 2 @ 950MM AFFL
Bedroom 02
EQ
400
EQ
U/S OF TYPE K @ CEILING
TYPE A @ U/S OF CEILING
TYPE 2 @ 300MM AFFL
TO BE DISCUSSED ON SITE WITH CLIENT!!
EQ EQ
ndry llery / Lau
350
TYPE H DIRECTLY ABOVE TYPE 18 & 03 RESPECTIVELY!!!
EQ
500
EQ
TYPE 2 @ 300MM AFFL
TYPE S1 @ 750MM AFFL
350
EQ EQ
FL
0MM AF PE 1 @ 30
Bedroom 03
wifi
225
TYPE L ery) (within join
TD
TYPE 1 @ FL 300MM AF
EQ
350
EQ
EQ
225
EQ
EQ
EQ
TYPE A @ U/S OF CEILING
TYPE 1 @ 300MM AFFL
TYPE 4 DIRECTLY ABOVE TYPE 2!!!
TY
FRZ
300
225
500 TYPE 1 @ & 2700MM AFFL
EQ
EQ
300
TYPE L (within joinery)
TYPE S5 @ 1050MM AFFL
EQ
300
TYPE 2 @ 1750MM AFFL
EQ
TYPE 3 @ 1050mm AFFL
TYPE 6&3 @ 1050mm AFFL
4505
TYPE B @ U/S OF CEILING
TYPE L ery) (within join
Braai Room
TYPE S4 @ 1050MM AFFL
TYPE H DIRECTLY ABOVE TYPE 18 & 03 RESPECTIVELY!!!
TYPE L (within joinery)
EQ
1870 900
TYPE 19 @ 450MM AFFL
TYPE A @ U/S OF CEILING
350
950
TYPE S7 @ 1050MM
ECTLY TYPE 2s DIR ABOVE !! EACHOTHER
EQ EQ
TYPE 1 @ 1750MM AFFL
300
Kitchen
TYPE A @ U/S OF CEILING
TYPE G
EQ
TYPE A @ U/S OF SOFFIT
on site confirmed U/S to be (height to designer) by interior
PREP
TYPE I
TYPE H @ 1050MM AFFL
TYPE A @ U/S OF CEILING
420
er for (allow pow nd) plug in isla
EQ
EQ
TYPE 9
TYPE F (height TBC on site by client)
TYPE A @ U/S OF CEILING
EQ
1500
TYPE H @ 1050MM AFFL
EQ
EQ EQ
Balcony
TYPE G (final position TBC on site)
TYPE 19 @ 450MM AFFL
1225
TYPE E @ U/S OF SOFFIT
TYPE C @ 1800MM AFFL
TYPE 19 @ 450MM AFFL
match opposite
EQ
TYPE B @ U/S OF CEILING
TYPE 2 @ 700mm AFFL
EQ
TYPE C @ 1800MM AFFL TYPE C @ 1800MM AFFL
TYPE 3 @ 300mm AFFL
EQ
EQ
EQ
TYPE 5 @ 1050MM AFFL
Balcony
1315
TYPE D DIRECTLY ABOVE TYPE 5!!!
300
275
EQ
EQ
Stoep
EQ
TYPE C @ 1800MM AFFL
TYPE B @ U/S OF CEILING
to be con (position erior designer) int
EQ
eck 02
Outdoor D
EQ
TYPE 5 @ 300MM & TYPE D @ 1600MM AFFL
TYPE Jfirmed on site by
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
TYPE L (recessed into slab above)
350
om
Dining Ro
TYPE C @ 1800MM AFFL
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
EQ
Stoep
124/313= 39.61%
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C111
© Copyright Retained
CHECK
Checker
REV
4
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:56 PM
EQ
EQ
EQ
EQ
EQ
TYPE 2 @ 500MM AFFL
-
2-Way Wall Light
Surface Ceiling Lights
EQ
TYPE 4 DIR
TYPE 4 @ 1450MM AFFL
B
External wall light 01
Garden spot
TYPE L (recessed into slab above)
Qty
Downlights (Internal)
Flourescent
VE TYPE 2!!! ECTLY ABO
Type
Type
LED Strip light (Interior & Exterior)
TYPE C @ FL 1800MM AF
Brand/Supplier
Brand/Supplier
BE ON TO POSITI SITE BY FINAL ON IRMED CONF CLIENT!!
Qty
Name
Name
Linear LED
TYPE 5 M @ 300M AFFL
Electrical Fixtures:
Description
REVISION NOTES:
Number 1
EXTERIOR
Description
Date
Duct and cavity door position
17/05/2023
INTERIOR 8mm tsg glass to comply with SANS and NBR
NOTE: IMPORTANT aluminium swing door to door schedule
floor finish, as specified elsewhere, on min 30mm screed layer on concrete slab to engineers detail
aluminium threshold to be recessed into screed layer
non-shrink grout layer
40
abe dura.®flex with abe®mesh to be applied in strict coherence with manufacturers specification, or equally approved product by designer to be used.
10
140
100
100
polysulphide sealant
30
aluminium threshold to be recessed into screed with nonshrink grout and stepped dpc
10 30 40
floor finished, as specified elsewhere, on screed to slope, 1:100 fall, away from entrance on concrete slab to engineers detail
aluminium swing door to door schedule
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
aluminium waterproofing angle fixed into screed/concrete to aluminium contractor
Detail Section 03
Detail Section 04
Detail Section 04
Detail Section 01
Detail Callout 01
Scale 1:10
Scale 1:2
Detail Section 03
1190
270 110
50
110
INTERIOR 30
Detail Section 02
concrete slab to step 20mm and build up with screed to create fall for shower
270mm cavity wall to be plastered and painted as specified elsewhere, with cavity wall ties to be staggered
Architect
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
concrete slab to engineers detail
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
drip groove
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
weephole with stepped dpc
20
N
ERF nr.
v-joint between concrete and brick connection
235
295
Detail Section 05
off-shutter concrete soffit
First Storey Plan - Weather Step
30 50 1025
Scale 1:100
....................................................................
MUNICIPAL INFORMATION
shower wall to be treated with ABE approved waterproofing system
10
Detail Section 02
Client
1190
shower floor to be treated with ABE approved waterproofing system
Detail Section 05
.............................................................................
EXTERIOR
270 1290
CONCRETE ROOF/ROOF AREA%
Detail Section 02
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
Scale 1:10
270
270 110
abe dura.®flex with abe®mesh to be applied in strict coherence with manufacturers specification, or equally approved product by designer to be used.
EXTERIOR
abe dura.®flex with abe®mesh to be applied in strict coherence with manufacturers specification, or equally approved product by designer to be used.
concrete slabwith min 30mm screed layer with new floor finish as specified elsewhere
v-joint between concrete and brick connection
10 30 295
concrete slab to engineers detail
concrete slab to engineers detail
255
200 slip joint position if and where neccessary to structural engineers details
230
30
10
weephole with stepped dpc
PROJECT
House Lategan
DRAWING off-shutter concrete soffit 30 50 150
drip groove
slip joint position if and where neccessary to structural engineers details v-joint between concrete and brick connection
Weather Step Details 01 CLIENT
Lategan
340mm cavity wall to be plastered and painted as specified elsewhere, with cavity wall ties to be staggered
120
270mm cavity wall to be plastered and painted as specified elsewhere, with cavity wall ties to be staggered
ALLOTMENT
ERF NUMBER
110
1015
340
Detail Section 03
Detail Section 04
Detail Section 05
Scale 1:10
Scale 1:10
Scale 1:10
Oubaai
DRAWN
SCALE
As indicated
AB
DWG USE
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C112
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:57 PM
1065
concrete slab to engineers detail
drip groove 30 50
255
295 off-shutter concrete soffit
concrete slabwith min 30mm screed layer with new floor finish as specified elsewhere
screed layer to slopeas indicated with min 30mm thickness
30 200
295
255
200
v-joint between concrete and brick connection
110
110
weephole with stepped dpc
screed layer to slopeas indicated with min 30mm thickness
slip joint position if and where neccessary to structural engineers details
50
270mm cavity wall to be plastered and painted as specified elsewhere, with cavity wall ties to be staggered
30
10
110
150
INTERIOR
EXTERIOR
aluminium sliding door to door schedule
40
110
30
INTERIOR
50
124/313= 39.61%
REVISION NOTES:
Description
Date
Section 34
Number
Section 35
Section 35
Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor to verify all levels and dimensions on site and check same against architects drawings before commencing work. Figured dimensions to be used in preference to scaled dimensions. Large scale details to be used where available. Errors, discrepancies or omissions are to be reported to the architect immediately for clarification before work is undertaken. All drainage lines indicated are diagrammatic. Allow 30mm for floor finish and screed. Ensure a flush junction between different floor finishes. All necessary brick walls to be furnished with weepholes, wall ties, dpc etc. as per Contractor. External cavity walls to have galvanized wire ties provided at a rate of 4 tiles/sqm. All glazing to doors and windows to comply with SABS 0137 code of practice. Final earthworks to be checked and confirmed on site. All drawings to be read in conjunction with Engineer's Drawings & Fire Engineer's Drawings.
Section 30
1200
340mm concrete filled retaining wall as per engineers detail, to have waterproofing.
15
14
13
12
treads to have 600x1200x8mm porcelain tile on screed 11 layer, as per tiling layout
10
concrete staircase, to engineers detail. risers @ 145mm. treads @ 300mm. stairs to comply with SANS 10 400 Part M.
9
8
7
6
5
riser @ 145mm. treads @ 600mm. stairs to comply with SANS 10 400 Part M.
4
3
treads to have 22mm timber finish, to be treated
Section 30
2
1
Planter Box
riser @ 145mm. treads @ 900mm. stairs to comply with SANS 10 400 Part M.
NOTE: IMPORTANT
340mm concrete filled retaining wall as per engineers detail, to have waterproofing. 300
Client
.............................................................................
300
300
300
300
300
300
300
300
300
300
300
600
50
3600
1450 5050
Section 34
Architect
....................................................................
MUNICIPAL INFORMATION
Ground Storey Plan - Entrance Staircase Scale 1:25
154195 x Level 11
ERF nr.
1015
ERF (sqm)
832 m2
ZONING
RES 1
ALLOTMENT AREA
Oubaai
COVERAGE
325 m2
COVERAGE PERCENTAGE
39.0625 %
GROSS FLOOR AREA (GFA)
435 m2
- BASEMENT
83 m2
- BASEMENT COV. ENTRANCE
27 m2
- GROUND FLOOR
265 m2
- GROUND COVERED PATIOS
60 m2
EXTERNAL DECK AREA (OPEN)
87 m2
COURTYARD
22 m2
CONCRETE ROOF/ROOF AREA% 600
300
300
300
300
300
300
300
300
300
300
300
300
850
© COPYRIGHT. THIS DRAWING MAY NOT BE REPRODUCED
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE PERMISSION OF STRUKT ARCHITECTS. DO NOT SCALE - USE FIGURED DIMENSIONS ONLY. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. REPORT ANY DISCREPANCIES IMMEDIATELY. SHOP DRAWINGS TO BE APPROVED PRIOR TO CONSTRUCTION. ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH NATIONAL BUILDING REGULATIONS, SOUTH AFRICAN NATIONAL STANDARDS, AND LOCAL AUTHORITY BY-LAWS.
15 153345 x First Floor Plan
0 223
10 9 8
515
900
riser @ 145mm. treads @ 900mm. stairs to comply with SANS 10 400 Part M.
600
300
riser @ 145mm. treads @ 600mm. stairs to comply with SANS 10 400 Part M.
2035
7 6 5 4 3
2 1
151200 x Ground Floor Plan
void
340mm concrete filled retaining wall as per engineers detail.
2145
430
11
1715
12
430
13
145 145 145 145 145 145 145 145 145 145 145 145 145 145 145
14 concrete staircase, to engineers detail. risers @ 145mm. treads @ 300mm. stairs to comply with SANS 10 400 Part M.
124/313= 39.61%
PROJECT
House Lategan concrete stairccase to have footing to engineers detail, on 50mm blinding layer with 250micron dpc on well compact earth not exceeding 150mm layers.
DRAWING
Entrance Staircase Detail
Detail Section 06
CLIENT
Lategan
Scale 1:25 ALLOTMENT
ERF NUMBER
1015
Oubaai
DRAWN
SCALE
1 : 25
AB
DATE ISSUED
CONSTR.
2023/07/28
PROJECT No.
DRAWING No.
0170
C113
© Copyright Retained
CHECK
Checker
REV
SACAP REG-24751337
WD BASSON (MArch NMMU, PrArch)cell : 084 331 2244
12/14/2023 12:03:59 PM
DWG USE