Fair Park Presentation

Page 1

Fair Park

reviving a public landscape

Fair Park

5/9/17


Fair Park

AERIAL: Circa 1930’s

5/9/17


1 MILE U

NPAVED

TRACK

BROWN

’S CREE

K

INFIELD FAIRGROUNDS

GRANDSTANDS ROLLER COASTER / FAIR ENTRANCE

Fair Park

LIVESTOCK ARENA

PAVILIONS

AERIAL: Circa 1930’s

1/3 MILE COVERED HORSE TRACK AND STABLES

5/9/17


NOLENSVIL

LE PIKE

Fair Park

AERIAL: Circa 1960’s

5/9/17


ROLLERCOASTER

NOLENSVIL

LE PIKE

CASCADE PLUNGE POOL ½ MILE PAVED TRACK PAVILIONS

Fair Park

LIVESTOCK ARENA

AERIAL: Circa 1960’s

5/9/17


King of the Hill

Fair Park

Fairgrounds Cultural Relevance

5/9/17


Fair Park

Aerial: Present Day

5/9/17


Fair Park

Corporate Breakfast 2016

Planning Context: Brown’s Creek and 440 Greenways

5/9/17


31 of the 46 acre

site (67%) is covered by the floodway, zone 1 or zone 2 buffer.

Fair Park

Site Plan Improvements

5/9/17


FLOODWAY “No Disturb Zone.” Cannot disturb vegetation unless approved by Metro Water. No impervious surface. ZONE 1 “No Disturb Zone.” Cannot disturb vegetation unless approved by Metro Water. No impervious surface. ZONE 2 Can be disturbed and replanted. No impervious surface. 100 YEAR FLOODPLAIN Structures must be a foot above base flood elevation. Any volume added within the floodplain must be compensated by cutting elsewhere.

Fair Park

Site Plan Improvements

5/9/17


Fair Park

Existing Conditions: Surface Inventory

5/9/17


Fair Park

Proposed: Removal of Impervious Surface

5/9/17


Fair Park

Existing Conditions: Site Pavement Photos

5/9/17


Fair Park

Existing Conditions: Brown’s Creek

5/9/17


Fair Park

Existing: Fairgrounds

5/9/17


Fair Park

Proposed: Fair Park Plan

5/9/17


PROPOSAL

•  PROJECT SCOPE: 46 ACRES •  LANDSCAPE •  RESTORED RIPARIAN VEG.: 10 AC •  REFORESTATION: 0.75 AC •  BIORETENTION: 1.8AC •  RECREATION •  GREENWAY: 1.3 MI •  DOG PARK: 1 AC •  MULTIUSE FIELDS: 8 FIELDS •  3 YOUTH (300’x165’) •  1 U8 (150’x90’) •  4 U6 (60’x90’) •  PARKING SPACES •  PERMANENT: 237 •  TEMPORARY: 1367

Fair Park

Proposed: Fair Park Plan

5/9/17


Fair Park

Existing: Fair Park Plan Detail

5/9/17


Fair Park

Proposed: Fair Park Plan Detail

5/9/17


Fair Park

Existing: Fair Park Plan Detail

5/9/17


Fair Park

Proposed: Fair Park Plan Detail

5/9/17


Fair Park

Proposed: Permanent and Lawn Parking

5/9/17


Fair Park

Greenway and Riparian Restoration Precedents

5/9/17


Fair Park

Multipurpose Field Precedents

5/9/17


Fair Park

Pavilion and Trailhead Precedents

5/9/17


Fair Park

Dog Park Precedents

5/9/17


Fair Park will add 1.3 of 53 recommended miles of paved multiuse trails.

PLAN

play

to

Fair Park

Plan to Play: Greenways Vision Plan

5/9/17


Fair Park will add 46 of 379 recommended acres of community park and fill a level of service gap.

PLAN

play

to

Fair Park

Plan to Play: Community Park Level of Service Map

5/9/17


Fair Park will add 1 of 8 recommended dog parks and fill a level of service gap.

PLAN

play

to

Fair Park

Plan to Play: Dog Park Level of Service Map

5/9/17


Fair Park will add 8 of 46 recommended multipurpose fields.

PLAN

play

to

Fair Park

Plan to Play: Multipurpose Field Level of Service Map

5/9/17


PRE-APPLICATION MEETING WITH METRO STORMWATER MAY 10TH STORMWATER VARIANCE COMMITTEE SUBMITTAL MAY 31ST STORMWATER VARIANCE COMMITTEE PUBLIC HEARING JULY 6TH

Fair Park

NEXT STEPS

5/9/17


Fair Park

5/9/17