Rural Development Eslarn The Eslarn wastewater projects. sanitizing the sewer system "schellenbachstrasse"
ISSUE 04.2016 | 24.07.2016
ISSUE 06.2016 | 27.08.2016 Images created: 27.08.2016. Starting point with the selfbuilt wastewater tank (end of May 2016) actual working area the whole part 1 of the project
1 2
© OpenStreetMap Mitwirkende
3
Liz.: CC BYSA 2.0
4
This is the point which is to be achieved by the end of the year 2016. The red dotted lines have to be done 2017 and maybe the following years.
1
2
3
page 01 of 02
Rural Development Eslarn The Eslarn wastewater projects. sanitizing the sewer system "schellenbachstrasse"
ISSUE 06.2016 | 27.08.2016
4
IMPRINT DEEZ Die Erste Eslarner Zeitung, Editorial: Theresia M. Zach, LudwigMüllerStr. 2, D92693 Eslarn. Phone: 0049 (0)163 7093031, Fax: 0049 (0)9653 40 70 001, Email: oikossms@office.eu.org. Responsible for the content (in German "V.i.S.d.P.:"): Michael W. Zach, LudwigMüllerStr. 2, D92693 Eslarn. Phone: 0049 (0)163 7093031, Fax: 0049 (0)9653 40 70 001, Email: oikossms@office.eu.org. Images are re usable under the Common Creatives License CCBYSA 3.0 non ported
page 02 of 02