10 minute read
08. ILLA TEMPORAL AUTOCONSTRUÏDA
from PROJECTES EFIMERS PER A BARCELONA I LA SEVA ÀREA / Ephemeral projects for Barcelona and its area
08. ILLA TEMPORAL AUTOCONSTRUÏDA 08. ILLA TEMPORAL AUTOCONSTRUÏDA 08. ILLA TEMPORAL AUTOCONSTRUÏDA
LA CONSTRUCCIÓ O MUNTATGE D’UNA UNITAT PER SER CONSTRUÏDA PER PERSONES NO PROFESSIONALS I SENSE HABILITATS MANUALS ÉS UN REPTE MOLT INTERESSANT. LA CONSTRUCCIÓ O MUNTATGE D’UNA UNITAT PER SER CONSTRUÏDA PER PERSONES NO PROFESSIONALS I SENSE HABILITATS MANUALS ÉS UN REPTE MOLT INTERESSANT. LA CONSTRUCCIÓ O MUNTATGE D’UNA UNITAT PER SER CONSTRUÏDA PER PERSONES NO PROFESSIONALS I SENSE HABILITATS MANUALS ÉS UN REPTE MOLT INTERESSANT. DISSENYADA PERQUÈ L’OBRA PUGUI ESTAR LA MAJOR PART DEL TEMPS ATURADA I ES TREBALLI LES HORES QUE ES PUGUI I ELS DISSABTES I DIUMENGES. DISSENYADA PERQUÈ L’OBRA PUGUI ESTAR LA MAJOR PART DEL TEMPS ATURADA I ES TREBALLI LES HORES QUE ES PUGUI I ELS DISSABTES I DIUMENGES. DISSENYADA PERQUÈ L’OBRA PUGUI ESTAR LA MAJOR PART DEL TEMPS ATURADA I ES TREBALLI LES HORES QUE ES PUGUI I ELS DISSABTES I DIUMENGES. LA PROPOSTA ÉS LA SEGÜENT: LA PROPOSTA ÉS LA SEGÜENT: LA PROPOSTA ÉS LA SEGÜENT:
Advertisement
EL NOMBRE DE PECES DE QUÈ POT CONSTAR UNA CASA QUE ES PUGUI MUNTAR HA DE SER POCA QUANTITAT. I PER TANT ES POT TENIR UN CONTROL PERFECTE D’AQUESTES PECES. EL NOMBRE DE PECES DE QUÈ POT CONSTAR UNA CASA QUE ES PUGUI MUNTAR HA DE SER POCA QUANTITAT. I PER TANT ES POT TENIR UN CONTROL PERFECTE D’AQUESTES PECES. EL NOMBRE DE PECES DE QUÈ POT CONSTAR UNA CASA QUE ES PUGUI MUNTAR HA DE SER POCA QUANTITAT. I PER TANT ES POT TENIR UN CONTROL PERFECTE D’AQUESTES PECES. EL DISSENY COMPORTA QUE CADA PEÇA NO PESI MÉS DEL QUE UNA PERSONA PUGUI AIXECAR AMB FACILITAT. EL DISSENY COMPORTA QUE CADA PEÇA NO PESI MÉS DEL QUE UNA PERSONA PUGUI AIXECAR AMB FACILITAT. EL DISSENY COMPORTA QUE CADA PEÇA NO PESI MÉS DEL QUE UNA PERSONA PUGUI AIXECAR AMB FACILITAT. LA PART MÉS COMPLEXA D’INSTAL·LACIONS ÉS UNA CAIXA LLARGA DE 6 METRES PER UNA ALÇADA DE 60 CM I 12 CM DE GRUIX PENJADA A LA PARET AMB TOTA UNA SÈRIE DE ROSQUES PER COLLAR-HI LES INSTAL·LACIONS D’AIGUA I DESGUASSOS. LA PART MÉS COMPLEXA D’INSTAL·LACIONS ÉS UNA CAIXA LLARGA DE 6 METRES PER UNA ALÇADA DE 60 CM I 12 CM DE GRUIX PENJADA A LA PARET AMB TOTA UNA SÈRIE DE ROSQUES PER COLLAR-HI LES INSTAL·LACIONS D’AIGUA I DESGUASSOS. LA PART MÉS COMPLEXA D’INSTAL·LACIONS ÉS UNA CAIXA LLARGA DE 6 METRES PER UNA ALÇADA DE 60 CM I 12 CM DE GRUIX PENJADA A LA PARET AMB TOTA UNA SÈRIE DE ROSQUES PER COLLAR-HI LES INSTAL·LACIONS D’AIGUA I DESGUASSOS. LA INSTAL·LACIÓ DE LLUM ÉS UNA GUIA PERIMETRAL AMB UN ENDOLL CADA METRE. LA INSTAL·LACIÓ DE LLUM ÉS UNA GUIA PERIMETRAL AMB UN ENDOLL CADA METRE. LA INSTAL·LACIÓ DE LLUM ÉS UNA GUIA PERIMETRAL AMB UN ENDOLL CADA METRE. ES PRETÉN OBTENIR UN VOLUM HABITABLE PROTEGIT DEL VENT I DE LA PLUJA. A PARTIR D’AQUÍ ES POT ANAR PERFECCIONANT QUANT A AÏLLAMENTS I ACABATS DE TOTS TIPUS. ES PRETÉN OBTENIR UN VOLUM HABITABLE PROTEGIT DEL VENT I DE LA PLUJA. A PARTIR D’AQUÍ ES POT ANAR PERFECCIONANT QUANT A AÏLLAMENTS I ACABATS DE TOTS TIPUS. ES PRETÉN OBTENIR UN VOLUM HABITABLE PROTEGIT DEL VENT I DE LA PLUJA. A PARTIR D’AQUÍ ES POT ANAR PERFECCIONANT QUANT A AÏLLAMENTS I ACABATS DE TOTS TIPUS.
08. TEMPORAL AUTOBUILT ISLAND 08. TEMPORAL AUTOBUILT ISLAND 08. TEMPORAL AUTOBUILT ISLAND
THE CONSTRUCTION OR ASSEMBLY OF ONE OF THE UNITS COULD BE DONE BY NON PROFESSIONAL WORKERS, WITHOUT SPECIAL HABILITIES, THUS BECOMING AN INTERESTING AND FUN CHALLENGE. THE CONSTRUCTION OR ASSEMBLY OF ONE OF THE UNITS COULD BE DONE BY NON PROFESSIONAL WORKERS, WITHOUT SPECIAL HABILITIES, THUS BECOMING AN INTERESTING AND FUN CHALLENGE. THE CONSTRUCTION OR ASSEMBLY OF ONE OF THE UNITS COULD BE DONE BY NON PROFESSIONAL WORKERS, WITHOUT SPECIAL HABILITIES, THUS BECOMING AN INTERESTING AND FUN CHALLENGE. THE BUILDING ITSELF IS DESIGNED AS A WAY AS IT COULD BE STOPPED MOST OF THE TIME DURING THE CONSTRUCTION PROCESS. THEREFORE, IT COULD BE BUILT ONLY DURING SPARE TIME ON WEEKENDS. THE BUILDING ITSELF IS DESIGNED AS A WAY AS IT COULD BE STOPPED MOST OF THE TIME DURING THE CONSTRUCTION PROCESS. THEREFORE, IT COULD BE BUILT ONLY DURING SPARE TIME ON WEEKENDS. THE BUILDING ITSELF IS DESIGNED AS A WAY AS IT COULD BE STOPPED MOST OF THE TIME DURING THE CONSTRUCTION PROCESS. THEREFORE, IT COULD BE BUILT ONLY DURING SPARE TIME ON WEEKENDS. THE PROPOSAL CONSISTS IN: THE PROPOSAL CONSISTS IN: THE PROPOSAL CONSISTS IN: THE BUILDING PARTS HAVE TO BE AS LESS AS POSSIBLE, SO IT IS EASIER TO HAVE CONTROL OF THE PROCESS. THE BUILDING PARTS HAVE TO BE AS LESS AS POSSIBLE, SO IT IS EASIER TO HAVE CONTROL OF THE PROCESS. THE BUILDING PARTS HAVE TO BE AS LESS AS POSSIBLE, SO IT IS EASIER TO HAVE CONTROL OF THE PROCESS. THE DESIGN IS THOUGHT AS EACH PART OF THE HOUSE WEIGHS THE RIGHT AMOUNT SO A SINGLE WORKER CAN MANAGE IT EASILY. THE DESIGN IS THOUGHT AS EACH PART OF THE HOUSE WEIGHS THE RIGHT AMOUNT SO A SINGLE WORKER CAN MANAGE IT EASILY. THE DESIGN IS THOUGHT AS EACH PART OF THE HOUSE WEIGHS THE RIGHT AMOUNT SO A SINGLE WORKER CAN MANAGE IT EASILY. THE MOST COMPLEX PART IS THE INSTALLATIONS, BEING A 60x12CM BOX, BY 6 METERS LONG, HANGED IN THE WALL, WITH SOME THREADS FOR WATER PLUMBING. THE MOST COMPLEX PART IS THE INSTALLATIONS, BEING A 60x12CM BOX, BY 6 METERS LONG, HANGED IN THE WALL, WITH SOME THREADS FOR WATER PLUMBING. THE MOST COMPLEX PART IS THE INSTALLATIONS, BEING A 60x12CM BOX, BY 6 METERS LONG, HANGED IN THE WALL, WITH SOME THREADS FOR WATER PLUMBING. THE LIGHT INSTALLATION CONSISTS IN A PERIMETRAL GUIDE WITH A SWITCH EVERY 1 METER. THE LIGHT INSTALLATION CONSISTS IN A PERIMETRAL GUIDE WITH A SWITCH EVERY 1 METER. THE LIGHT INSTALLATION CONSISTS IN A PERIMETRAL GUIDE WITH A SWITCH EVERY 1 METER. IT IS PREFERRED TO HAVE A HABITABLE UNIT PROTECTED FROM THE WIND AND RAIN. AFTER THAT, IT CAN BE PERFECTED WITH ISOLATION WALLS AND WITH DIFFERENT FINISHES. IT IS PREFERRED TO HAVE A HABITABLE UNIT PROTECTED FROM THE WIND AND RAIN. AFTER THAT, IT CAN BE PERFECTED WITH ISOLATION WALLS AND WITH DIFFERENT FINISHES. IT IS PREFERRED TO HAVE A HABITABLE UNIT PROTECTED FROM THE WIND AND RAIN. AFTER THAT, IT CAN BE PERFECTED WITH ISOLATION WALLS AND WITH DIFFERENT FINISHES.
A LA PLAÇA CENTRAL DE L’ILLA ÉS ON S’HAURIEN DE FER TOTES LES A LA PLAÇA CENTRAL DE L’ILLA ÉS ON S’HAURIEN DE FER TOTES LES A LA PLAÇA CENTRAL DE L’ILLA ÉS ON S’HAURIEN DE FER TOTES LES A LA PLAÇA CENTRAL DE L’ILLA ÉS ON S’HAURIEN DE FER TOTES LES EXPLICACIONS PER LA CONSTRUCCIÓ. EXPLICACIONS PER LA CONSTRUCCIÓ. EXPLICACIONS PER LA CONSTRUCCIÓ. EXPLICACIONS PER LA CONSTRUCCIÓ. BÀSICAMENT PER FER LA PROGRAMACIÓ DELS TREBALLS DE LA SETMANA BÀSICAMENT PER FER LA PROGRAMACIÓ DELS TREBALLS DE LA SETMANA BÀSICAMENT PER FER LA PROGRAMACIÓ DELS TREBALLS DE LA SETMANA BÀSICAMENT PER FER LA PROGRAMACIÓ DELS TREBALLS DE LA SETMANA SEGÜENT. SEGÜENT. SEGÜENT.SEGÜENT. CONVINDRIA QUE LES PERSONES I FUTURS USUARIS TINGUESSIN ASSIGNAT I CONVINDRIA QUE LES PERSONES I FUTURS USUARIS TINGUESSIN ASSIGNAT I CONVINDRIA QUE LES PERSONES I FUTURS USUARIS TINGUESSIN ASSIGNAT I CONVINDRIA QUE LES PERSONES I FUTURS USUARIS TINGUESSIN ASSIGNAT I TREBALLESSIN EN EL LLOC I EN EL TERRENY A ON HA D’ANAR LA SEVA CASA. TREBALLESSIN EN EL LLOC I EN EL TERRENY A ON HA D’ANAR LA SEVA CASA. TREBALLESSIN EN EL LLOC I EN EL TERRENY A ON HA D’ANAR LA SEVA CASA. TREBALLESSIN EN EL LLOC I EN EL TERRENY A ON HA D’ANAR LA SEVA CASA. ELS MATERIALS HAURIEN D’ANAR ARRIBANT ORDENADAMENT. SEGONS L’ORDRE ELS MATERIALS HAURIEN D’ANAR ARRIBANT ORDENADAMENT. SEGONS L’ORDRE ELS MATERIALS HAURIEN D’ANAR ARRIBANT ORDENADAMENT. SEGONS L’ORDRE ELS MATERIALS HAURIEN D’ANAR ARRIBANT ORDENADAMENT. SEGONS L’ORDRE DE LA CONSTRUCCIÓ I LA PROGRAMACIÓ QUE ES FACI. DE LA CONSTRUCCIÓ I LA PROGRAMACIÓ QUE ES FACI. DE LA CONSTRUCCIÓ I LA PROGRAMACIÓ QUE ES FACI. DE LA CONSTRUCCIÓ I LA PROGRAMACIÓ QUE ES FACI.
AT THE CENTRAL SQUARE OF THE BLOCK IS WHERE ALL THE CONSTRUCTION AT THE CENTRAL SQUARE OF THE BLOCK IS WHERE ALL THE CONSTRUCTION AT THE CENTRAL SQUARE OF THE BLOCK IS WHERE ALL THE CONSTRUCTION AT THE CENTRAL SQUARE OF THE BLOCK IS WHERE ALL THE CONSTRUCTION EXPLANATIONS SHOULD BE MADE. EXPLANATIONS SHOULD BE MADE. EXPLANATIONS SHOULD BE MADE. EXPLANATIONS SHOULD BE MADE. THEREFORE, THE COMPLETE SCHEDULE FOR THE NEXT WEEKS SHOULD BE THEREFORE, THE COMPLETE SCHEDULE FOR THE NEXT WEEKS SHOULD BE THEREFORE, THE COMPLETE SCHEDULE FOR THE NEXT WEEKS SHOULD BE THEREFORE, THE COMPLETE SCHEDULE FOR THE NEXT WEEKS SHOULD BE SET UP.SET UP. SET UP.SET UP. IT WOULD BE CONVENIENT THAT EVERY SINGLE USER WORKS ON HIS HOUSE. IT WOULD BE CONVENIENT THAT EVERY SINGLE USER WORKS ON HIS HOUSE. IT WOULD BE CONVENIENT THAT EVERY SINGLE USER WORKS ON HIS HOUSE. IT WOULD BE CONVENIENT THAT EVERY SINGLE USER WORKS ON HIS HOUSE. MATERIALS SHOULD COME IN THE ASSIGNATED ORDER ACCORDING TO HOW MATERIALS SHOULD COME IN THE ASSIGNATED ORDER ACCORDING TO HOW MATERIALS SHOULD COME IN THE ASSIGNATED ORDER ACCORDING TO HOW MATERIALS SHOULD COME IN THE ASSIGNATED ORDER ACCORDING TO HOW THE CONSTRUCTION EVOLVE. EVERYTHING SHOULD BE PLANNED IN ADVANCE. THE CONSTRUCTION EVOLVE. EVERYTHING SHOULD BE PLANNED IN ADVANCE. THE CONSTRUCTION EVOLVE. EVERYTHING SHOULD BE PLANNED IN ADVANCE. THE CONSTRUCTION EVOLVE. EVERYTHING SHOULD BE PLANNED IN ADVANCE.
ES PODRIA FER EL TRASLLAT DE TOTA LA CONSTRUCCIÓ DISPOSANT DE QUATRE HABITATGES MÉS PER ANAR FENT EL TRASLLAT CADA QUATRE FAMÍLIES I REUBICAR-LES DE NOU. LA IDEA ÉS QUE AMB UN FULL DIN-A4 ES PUGUI CONSTRUIR TOTA L’ILLA. LA IDEA ÉS QUE AMB UN FULL DIN-A4 ES PUGUI CONSTRUIR TOTA L’ILLA.LA IDEA ÉS QUE AMB UN FULL DIN-A4 ES PUGUI CONSTRUIR TOTA L’ILLA. SERIA COM UN MUNTATGE D’IKEA A GRAN ESCALA I AMB ASSESSORAMENT. SERIA COM UN MUNTATGE D’IKEA A GRAN ESCALA I AMB ASSESSORAMENT. SERIA COM UN MUNTATGE D’IKEA A GRAN ESCALA I AMB ASSESSORAMENT. HI HAURIA D’HAVER UN ENCARREGAT GENERAL AMB MOLTA EXPERIÈNCIA I HI HAURIA D’HAVER UN ENCARREGAT GENERAL AMB MOLTA EXPERIÈNCIA I HI HAURIA D’HAVER UN ENCARREGAT GENERAL AMB MOLTA EXPERIÈNCIA I PREFERENTMENT JUBILAT. PREFERENTMENT JUBILAT. PREFERENTMENT JUBILAT. A LES ORDRES D’AQUEST ENCARREGAT CONVINDRIA QUE HI HAGUÉS UNS DEU A LES ORDRES D’AQUEST ENCARREGAT CONVINDRIA QUE HI HAGUÉS UNS DEU A LES ORDRES D’AQUEST ENCARREGAT CONVINDRIA QUE HI HAGUÉS UNS DEU ESTUDIANTS D’ARQUITECTURA PER CONTROLAR I AJUDAR A FER LA ESTUDIANTS D’ARQUITECTURA PER CONTROLAR I AJUDAR A FER LA ESTUDIANTS D’ARQUITECTURA PER CONTROLAR I AJUDAR A FER LA CONSTRUCCIÓ. CONSTRUCCIÓ. CONSTRUCCIÓ. ES PODRIA FER EL TRASLLAT DE TOTA LA CONSTRUCCIÓ DISPOSANT DE QUATRE ES PODRIA FER EL TRASLLAT DE TOTA LA CONSTRUCCIÓ DISPOSANT DE QUATRE ES PODRIA FER EL TRASLLAT DE TOTA LA CONSTRUCCIÓ DISPOSANT DE QUATRE HABITATGES MÉS PER ANAR FENT EL TRASLLAT CADA QUATRE FAMÍLIES I HABITATGES MÉS PER ANAR FENT EL TRASLLAT CADA QUATRE FAMÍLIES I HABITATGES MÉS PER ANAR FENT EL TRASLLAT CADA QUATRE FAMÍLIES I REUBICAR-LES DE NOU. REUBICAR-LES DE NOU.REUBICAR-LES DE NOU.
THE MAIN PLANS HAVE TO BE ABLE TO FIT IN ONLY ONE DIN-A4.
IT WOULD BE LIKE AN IKEA ASSEMBLY IN A BIGGER SCALE AND WITH SOME EXTERNAL ASSESSMENT.
IT WOULD BE PERFECT TO HAVE AN ELDERLY RETIRED PROJECT MANAGER WITH EXPERIENCE TO GIVE THE RIGHT INSTRUCTIONS.
THE MAIN PLANS HAVE TO BE ABLE TO FIT IN ONLY ONE DIN-A4.THE MAIN PLANS HAVE TO BE ABLE TO FIT IN ONLY ONE DIN-A4. IT WOULD BE LIKE AN IKEA ASSEMBLY IN A BIGGER SCALE AND WITH SOME IT WOULD BE LIKE AN IKEA ASSEMBLY IN A BIGGER SCALE AND WITH SOME EXTERNAL ASSESSMENT. EXTERNAL ASSESSMENT. IT WOULD BE PERFECT TO HAVE AN ELDERLY RETIRED PROJECT MANAGER WITH IT WOULD BE PERFECT TO HAVE AN ELDERLY RETIRED PROJECT MANAGER WITH EXPERIENCE TO GIVE THE RIGHT INSTRUCTIONS. EXPERIENCE TO GIVE THE RIGHT INSTRUCTIONS. WITH HIM OR HER, THERE WOULD BE 10 ARCHITECTURE STUDENTS ABLE TO WITH HIM OR HER, THERE WOULD BE 10 ARCHITECTURE STUDENTS ABLE TO WITH HIM OR HER, THERE WOULD BE 10 ARCHITECTURE STUDENTS ABLE TO CONTROL AND ASSESS DURING THE PROCESS. CONTROL AND ASSESS DURING THE PROCESS. CONTROL AND ASSESS DURING THE PROCESS.