Work Experience at mayaPraxis

Page 1

BENGALURU

mayaPRAXIs, located in Panduranga Nagar in Bengaluru is a design studio that looks at architecture and its landscape. The work runs along a path of diverse scales, types and settings – architecture, urban design, interior, furniture, exhibition and art. Design is creative and collaborative at mayapraXiS. the firm explores the spirit of the project – something that is often hidden behind the ‘functional’ requirements and project economics.

Dimple Mittal

Director & Design Principal

Dimple is a strong and passionate designer who leads with experience and intuition. She is technically driven, creative in design and inspired to think critically and in detail. She has a Masters in History and Theory of architecture from University of Cincinnatti [USA] and a Bachelor of Architecture from School of Planning and Architecture, New Delhi. In her 24 years of experience, she has worked in Delhi, Bangalore, Ahmedabad and USA on a wide variety of design projects and research.

Vijay Narnapatti

Director & Design Principal

Vijay likes to work on design creatively with structure, materials and space . He works with an intuitive, inspired spirit and likes to rationalise it to practical matters of the project. He has a Masters in History and Theory of architecture from University of Cincinnatti [USA] and a Bachelor of Architecture from School of Planning and Architecture, New Delhi. The past 25 years have seen him work on design projects, academics, research and professional practice initiatives with different collaborations.

Architects

Administration

ARcAsIA Gold Medal 2017- sustainability ARCASIA [Architects Council of Asia] Forum Jaipur 2017 shortlist 100 – 2017, The MERIT LIsT Matter Foundation, Goa National commendation Award for the Best wellness spaces IIID Awards 2013 By Indian Institute of Interior Design Regional winner Award for the Best wellness spaces IIID Awards 2013 By Indian Institute of Interior Design Nominated for the International Aga khan Award Architecture 2012 National Runner up Award for the Residential Multi Dwelling IID Awards 2011 By Indian Institute of Interior Design Regional winner Award for the Residential Multi Dwelling IIID Awards 2011 By Indian Institute of Interior Design Designing windows Asia winner Award

By Hunter Douglas in 2010 Zonal winner – Best Architecture+ Interior Design IIID Awards 2008, By Indian Institute of Interior Design young Designer 2007, india Indian Architect & Builder Magazine young architects award india

16th Architect of the Year Awards, JK Cement Awards Foundation 2006 young architects award india 21st Architect of the Year Awards, JK Cement Awards Foundation 2006 Zonal Award – Best Interior Design Project, 2006, south Zone India Hindware ARCHIDESIGN Awards for Excellence the young Enthused architect award

A+D Spectrum Foundation Architecture Awards 2006

PRojEcTs

house Mercara, coorg- Design development drawings, 3 dimensional model and presentation drawings

house Badam, hyderabad- Design development drawings and presentation drawings

Purlieu hilltop resort, coorg- Design development drawings, working drawings, physical model making, 3 dimensional model and presentation drawings

hotel hQ6, kingdom of Bahrain- Design development drawings, 3 dimensional model and presentation drawings

Venkat’s farmhouse, kanakpura, Bengaluru- Design development drawings and working drawings

harangi backwaters resort, coorg- Working drawings

TAP apartments, Bengaluru- Working drawings

Ayurvedic spa at Taj westend, Bengaluru- Design development drawings, working drawings and interior details

footover Bridge, st. john’s circle, Bengaluru- 3 dimensional model and working drawings

Gandhi Bazaar street redesign, Bengaluru- Documentation, analysis, presentation drawings, design development

sampige road streetscape, Bengaluru- Design development drawings and presentation drawings

Principal Architect DIMPLE MITTAL ABoUT ThE fIRM AwARDs woRkED oN Interns Visualization team structural team Sanjana Raju Aparna Prasad Shahid Jaffar P K Manjunath Dhairya Prajapati Sneha Moorthy Anirudh Govind Priyanka Thakur Bakul Roy Javeed Rasheed Principal Architect Vijay NarNapatti

hoUsE MERcARA

Project Info: The house is gathered around a tree-filled courtyard with al-fresco, a jacuzzi and an open bar. The east facade of the building has large glazed openings fro morning sun whereas the west and south side are protected by the roof.

Type of Project: RESIDENTIAL site Location: MADIKERI, COORG site Area: 1228 SQ. MTS. client: MR. GANESH Commencement year: 2017 stage of Project: DESIGN DEVELOPMENT Team: AR. ANIRUDH GOVIND work contribution: DESIGN DEVELOPMENT, 3D MODEL AND PRESENTATION DRAWINGS

coNcEPTUAL skETch of GRoUND fLooR PLAN

coNcEPTUAL skETch of fIRsT fLooR PLAN

HOUSE MERCARA, COORG NOT TO SCALE
HOUSE MERCARA, COORG SCALE- 1:150
fLooR PLAN
GRoUND
HOUSE MERCARA, COORG SCALE- 1:150 fIRsT fLooR PLAN BAsEMENT PLAN sEcTIoN ThRoUGh ThE jAcUZZI scALE 1:150 sEcTIoN ThRoUGh ThE BAR scALE 1:150 sEcTIoN ThRoUGh ThE DINING AND kITchEN scALE 1:150

hoUsE foR ThE BADAMs

Project Info: The project sits among rocks and is defined by parallel stone walls where spaces are held together with the help of landscape elements. The house is designed keeping vaastu in mind.

Type of Project: RESIDENTIAL site Location: BANJARA HILLS, HYDERABAD site Area: 2750 SQ. MTS. client: MR. BALAKRISHNA BADAM Commencement year: 2017 stage of Project: DESIGN DEVELOPMENT Team: AR. ANIRUDH GOVIND work contribution: DESIGN DEVELOPMENT, 3D MODEL AND PRESENTATION DRAWINGS

8 10

[5'-8"] 3400 [11'-4"] 4900 [16'-4"] 1550 [5'-2"]1800 [6'] 5850 [19'-6"] 3275 [10'-11"] 6750 [22'-6"] 9 1825 [6'-1"]

(10'8''x 8'6") UTILITY

(16'4"x 8' 4") DECK

COURT

(5'4"x 5')

(21'6"x 11'8") KITCHEN LOUNGE (24'10"x 29'6")

FAMILY ROOM (16'4"x 29'6")

(10'8''x 9'2") LAUNDRY STAFF ROOM (12' x 11'8'') STAFF ROOM TOILET (6' x 6') VERANDAH

DIINING AREA (21'6"x 17'10")

LIVING ROOM

MASTER BEDROOM VERANDAH SWIMMING POOL

ENTRANCE FOYER MUD ROOM

TOILET (9'10"x 10') DRESSER (11'6"x 10') TOILET (6'8" x 6' 2")

TOILET GRoUND fLooR PLAN

SCALE- 1:150 hoUsE foR ThE BADAMs, HyDEraBaD
LIFT
LAWN LAWN
A B C D E 3350 [11'-2"] 5700 [19'] 7600 [25'-4"] 2850 [9'-6"] 1 2 3 4 5 6 7
11 5700
1700
PUJA ROOM (10'8"x 12' 2") UP
KITCHEN (10'8"x 16' 8") UP WATER
KITCHEN GARDEN
[19']
BODY (12' x 11'8'') (6' x 6') TOILET

1

5 6 1550 [5'-2"] 4900 [16'-4"] 1700 [5'-8"] 3400 [11'-4"]

7 1800 [6']

PANELS

UP (5'4"x 5') (20'10" x 16'8") HOME THEATRE BALA'S ROOM (20'10" x 12'2")

LIFT LOUNGE (13' x 29'6")

8 5850 [19'-6"] A B 3350 [11'-2"]

KITCHEN GARDEN BELOW LAWN

DN

BALCONY (16'4" x 9'4") (6'7" x 25'2") BALCONY

GUEST BEDROOM (16'4" x 22'4") TOILET (6'10" x 10') TOILET (6'10" x 10') (6'6" x 10') DRESSER (21'4" x 17'10") GUEST BEDROOM

(11'4" x 30'10") (8'2" x 15') BALCONY TOILET (7'6" x 9'6") LAWN BELOW

MYTHRI'S BEDROOM (20'3" x 25'2")

11 6750 [22'-6"] C D E

2 3 4 5700 [19'] fIRsT fLooR PLAN hoUsE foR ThE BADAMs, HyDEraBaD SCALE- 1:150

BALCONY
SOLAR
BELOW
10 9 1825 [6'-1"] 3275 [10'-11"] 5700 [19'] 7600 [25'-4"] 2850 [9'-6"]
VIEw fRoM ThE LIVING RooM
hoUsE foR ThE BADAMs, HyDEraBaD
VIEw of PooL AND DEck AERIAL VIEw of ThE hoUsE

hoTEL hQ6

Project Info: The form depicts the idea of tree of hospitality and is generated from a careful understanding of the hot and humid weather. The building is occupied by restaurants, spa, sauna, swimming pool, banquet hall and guest rooms.

Type of Project: HOSPITALITY site Location: KINGDOM OF BAHRAIN site Area: 2038 SQ. MTS. client: DADABHAI GROUP Commencement year: 2018 stage of Project: DESIGN DEVELOPMENT Team: AR. ANIRUDH GOVIND, AR. DHAIRYA PRAJAPATI, AAROHI BHATT (INTERN) AND ABHIJEET (INTERN) work contribution: DESIGN DEVELOPMENT, 3D MODEL AND PRESENTATION DRAWINGS

Conceptual Sketches
hoTEL hQ6, kINGDoM of BAhRAIN
VIEw AT swIMMING PooL LEVEL EXTERIoR VIEw of BUILDING
RAMP GAS BANK RECV. ROOM BATELCO RM. OUTLET 1- RESTAURANT OUTLET 2- NIGHT CLUB
TIME RM. HOT KITCHEN AREA SUBSTATION SWITCH ROOM SERV. LIFT SERV. LIFT SERVICE LOBBY UP STAIRCASE 2 PS UP TOILET (F) TOILET (M) VEG PREP AREA MEAT PREP AREA DISHWASH AREA COLD STORAGE
FOR OUTLETS TRAVEL DESK
LOBBY FOR GUEST ROOMS
(M) TOILET (F) 270 SQ MT
25 SQ M 200 SQ M
x 3.8m 3.8m x 3.8m
x 3.8m
x
x
11.7m x 3.9m 11.7m x 6.47m
2 m WIDE CORRIDOR 1.825m WIDE CORRIDOR 250 SQ M
+300 TOS
+300 TOS +300 TOS 15 sqm 15 sqm +300 TOS 88 SEATS 64 SEATS 11725 1825 10150 4618 6815 14950 17425 3900 6475 6000 19700 1500 16950 2400 17765 4800 4300 6028 2000 57500 35500 SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL 0 fLooR PLAN (GRoUND fLooR)
RAMP LENGTH = 43000mm@1:10
PUMP ROOM AND TANKS BELOW RAMP
MANAGER ROOM CLOAK ROOM VESTIBULE LOBBY
RECEPTION
TOILET
4.4m x 6.75m
2.8m
3.15m
2.0m
3.8m 3.0m x 2.1m 3.0m x 2.1m 6.5m
3.8m 2.8m x 3.8m 3.85m x 2.0m
4.8mx3.0m 4.8mx4.4m
2.6m x 2.3m 2.6m x 2.3m 3.45m x 7.2m 4.3mx 4.8m LIFTS 2.2m x 6.9m 4.3m x 2.2m LIFTS 3.25m x 6.0m 3.05m x 6.0m
DISABLED FRIENDLY TOILET 2.25m x 2.45m 3.65m x 3.4m TOILET (F) 3.9m x 4.45m TOILET (M)
+4600 TOS +5200 TOS RAMP LENGTH= 9600 @ 1:16 +4600 TOS RAMP LENGTH = 24000 @ 1:16 +6700 TOS 1 2 3 4 5 6 9 7 8 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 RAMP LENGTH = 43000mm @1:10 +6700 TOS +6700 TOS +6700 TOS +6100 TOS UP UP 10 11 12 13 14 15 UP UP 3.45m x 7.2m 4.4m x 2.85m 2.0m x 5.1m LIFT LOBBY LIFT LOBBY LIFT LOBBY SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL 1 fLooR PLAN (PARkING 1)
38 RAMP LENGTH= 9600 @ 1:16 RAMP LENGTH = 24000 @ 1:16 +8200 TOS +8800 TOS +10300 TOS RAMP LENGTH= 9600 @ 1:16 +10900 TOS 39 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 RAMP LENGTH = 24000 @ 1:16 +6700 TOS +8200 TOS +8800 TOS +10300 TOS +10300 TOS +10300 TOS +9700 TOS UP UP UP 40 41 42 43 44 45 46 47 48 LIFT LOBBY LIFTS LIFT LOBBY LIFTS STAIRCASE 1 UP SERV. LIFT SERV. LIFT STAIRCASE 2 PS UP UP LIFT LOBBY 3.45m x 7.2m 4.4m x 2.85m 2.0m x 5.1m SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL 2 fLooR PLAN (PARkING 2)
80 81 SERV. LIFT SERV. LIFT STAIRCASE 2 PS UP STAIRCASE 1 LIFT LOBBY LIFT LOBBY RAMP LENGTH= 9600 @ 1:16 +12400 TOS +13000 TOS 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 RAMP LENGTH = 24000 @ 1:16 +10900 TOS +12400 TOS +13700 TOS +13700 TOS +13100 TOS GENERAL STORE (DRY) HOUSEKEEPING STORE HR DEPARTMENT GM'S ROOM SALES F & B TOILETS TOILETS AND LOCKERS STAFF DINING/COMMON ROOM FEEDER UNIT CCTV ROOM MAINTAINANCE DEPT. RECEPTION LOUNGE UP UP UP UP +13700 TOS LIFTS LIFTS LIFT LOBBY 8.9m
7.3m
10.5m 6.245m x 10.0m
5.1m
SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL 3 fLooR PLAN (PARkING 3 AND ADMINIsTRATIoN)
x 7.5m
x 9.5m 7.3m x 4.0m 5.0m x 3.05m 5.0m x 3.05m 5.0m x 3.05m 6.25m x 3.4m 8.3m x
6.6m x 9.5m 2.0m x
3.45m x 7.2m 4.4m x 2.85m

OUTDOOR SEATING 246 SQ M

VEG PREP AREA 3.0m x 2.1m 3.0m x 2.1m

KITCHEN 80 SQ MTS

VEG PREP AREA MEAT PREP AREA 3.0m x 2.1m 3.0m x 2.1m DISHWASH/ POTWASH AREA

DRY STORE AREA DISHWASH/ POTWASH AREA

SERV. LIFT SERV. LIFT

MEAT PREP AREA 1.8m x 5.1m TOILET (M) 6.7x2.2m

STAIRCASE 2 PS UP

UP

2.6m x 2.3m 2.6m x 2.3m 4.4m x 2.85m

LIFT LOBBY OUTLET 3 280 SQ MTS

TOILET (M) FOR SPA 38 SQ MTS

SH. WC STEAM SAUNA SAUNA

STEAM

TREATMENT ROOM TREATMENT ROOM

KITCHEN 68 SQ MTS OUTLET 4 310 SQ M

WC SH. CH. CH.

TOILET (M) FOR SPA 31 SQ MTS

LIFTS 2.2m x 6.9m 4.3m x 2.2m LIFTS

LIFT LOBBY 3.3m x 7.2m

TOILET (F) 6.7mx3.1m 124 SEATS 118 SEATS

TREATMENT ROOM TREATMENT ROOM 4.0mx3.35m 4.0mx4.4m

TREATMENT ROOM 4.0mx3.4m

LIFT LOBBY SPA RECEPTION 42 SQ M 4.0m x 2.8m

SPA MANAGER ROOM

LEVEL 4 fLooR PLAN (2 oUTLETs)

ELEC. ROOM 3.0m x 5.1m 4.0mx3.35m 4.0mx3.35m SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN
OUTLET 5 260SQ MTS OUTLET 6 330 SQ MTS FILTRATION AND STORAGE 130 SQ MTS 10.4m X 12.2m
SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL
PLAN (2 oUTLETs)
KITCHEN DISHWASH/ POTWASH AREA VEG PREP AREA MEAT PREP AREA COLD STORAGE VEG PREP AREA MEAT PREP AREA KITCHEN TOILET (F) TOILET (M) 4.15m x 5.1m 3.5m x 4.55m LIFT LOBBY LIFTS 2.2m x 6.9m 4.3m x 2.2m LIFTS UP 4.4m x 2.85m LIFT LOBBY 3.3m x 7.2m STAIRCASE 2 PS UP SERV. LIFT SERV. LIFT 2.6m x 2.3m 2.6m x 2.3m LIFT LOBBY 1.8m x 5.1m 124 SEATS 118 SEATS 110 SQ M
5 fLooR
ALL DAY DINING
SQ MTS
SH SH
VEG
FISH
SWIMMING POOL KID'S POOL
PS
122
270 SQ M 68 SQ M 16 SQ M
110 SQ M SH SH SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN LEVEL 6 FLOOr pLaN (SWiMMiNG pOOL aND aLL Day DiNiNG)
GYM CHANGING ROOMS (M) 33
TOILETS (M) KITCHEN 180 SQ MTS TOILETS (F)
ROOM SERVICE 4m X4m
PREP AREA
PREP AREA MEAT PREP AREA PASTRY AREA DISHWASH/ POTWASH AREA LIVE KITCHEN
LIFT LOBBY LIFTS 2.2m x 6.9m 4.3m x 2.2m LIFTS UP 4.4m x 2.85m LIFT LOBBY 3.3m x 7.2m STAIRCASE 2
UP SERV. LIFT SERV. LIFT 2.6m x 2.3m 2.6m x 2.3m LIFT LOBBY 2.5m x 5.1m CHANGING ROOMS (M) 33 SQ MTS
SEATS
3.575m x 3.475m 3.575m x 3.475m

8.3Mx4.0m 1BHK 8.0Mx5.1m STUDIO 2.1Mx2.7m TOILET 1.8Mx2.4m TOILET

4.7Mx7.1m STORE

2.4Mx1.8m TOILET 6.9Mx4.0m STUDIO

2.4Mx1.8m TOILET

3.4Mx7.4m LOBBY LIFT LIFT

2.7Mx2.1m 2.7mx2.1m

BEDROOM

6.2Mx4.0m

7.8Mx4.0m 1BHK SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN

6.5Mx4.0m 1BHK

TOILET 3.2Mx1.8m 5.2Mx5.4m 2BHK 4.9Mx5.8m BEDROOM 3.2Mx1.8m TOILET 2.4Mx1.8m TOILET 1.8Mx1.8m TOILET 4.0Mx5.2m BEDROOM

3.2Mx1.8m TOILET 3.2Mx2.1m TOILET 4.0Mx6.8m BEDROOM

TOILET 3.2Mx2.1m 4.0Mx7.8m 2BHK 4.0Mx6.4m STUDIO

4.0Mx7.8m 1BHK 4.0Mx6.8m BEDROOM

TOILET TOILET 2.7mx2.1m TOILET 2.7mx2.1m TOILET

6.2Mx4.0m STUDIO 6.2Mx4.0m STUDIO 6.2Mx4.0m BEDROOM 7.1Mx5.3m 1BHK STUDIO 4.0Mx6.4m

LEVEL 7 fLooR PLAN (GUEsT RooMs)

SERV. LIFT SERV. LIFT STAIRCASE 2 PS UP STAIRCASE 1 UP TFA PHE
PS PS CWS
ELECTRICAL ROOM
PANTRY LINEN
6.9Mx4.0m STUDIO 2.0Mx1.5m TOILET

7.9mx4.0m 1BHK

1BHK 5.7mx4.5m LINEN PANTRY

1.9mx2.0m TOILET 4.6mx6.8m 1BHK

2.1Mx2.7m TOILET 1.8mx2.0m TOILET 1.8mx2.0m TOILET 2.1mx2.7m TOILET 2.1mx2.7m TOILET STUDIO 4.0Mx5.2m

4.7Mx7.1m STORE

4.5mx4.0m STUDIO 2.4mx1.8m TOILET SCALE- 1:150 hoTEL hQ6, kINGDoM of BAhRAIN

4.0Mx7.9m 2BHK 4.0Mx5.7m 2BHK 4.0Mx5.0m BEDROOM 4.0Mx4.0m BEDROOM

1BHK 4.0Mx7.6m 4.0Mx4.9m BEDROOM

2.7Mx2.1m TOILET 6.2Mx4.0m BEDROOM 7.1Mx4.0m 1BHK 6.2Mx4.0m STUDIO 2.7mx2.1m TOILET 2.7mx2.1m TOILET 6.2Mx4.0m STUDIO 2.7mx2.1m TOILET BEDROOM 6.2Mx4.0m 7.1Mx5.3m 1BHK

5.7mx4.0m STUDIO 2.0mx1.8m TOILET LEVEL 15 fLooR PLAN (GUEsT RooMs)

LIFT LIFT STAIRCASE 1 UP TFA PHE PS PS CWS SERV. LIFT
LIFT
2
SERV.
STAIRCASE
PS UP
ELECTRICAL ROOM 8.0Mx5.1m STUDIO 1.8Mx2.4m TOILET

BANQUET HALL PARTITION 2 200 SQ M 38 SQ M

BANQUET HALL PARTITION 1

STAIRCASE 2 2.6m x 2.3m

SERV. LIFT 2.6m x 2.3m

PRE FUNCTION AREA 148 SQ M 200 SQ M

4.3m x 2.2m LIFTS 2.2m x 6.9m LIFTS LIFT LOBBY 3.3m x 7.2m

LIFT LOBBY 4.4m x 2.85m

SERV. LIFT 3.6mx6.0m LOUNGE hoTEL hQ6, kINGDoM of BAhRAIN

BANQUET STORE PANTRY

5.5mx5.1m 5.9mx7.9m

PRE FUNCTION AREA

TOILETS (M) 7.8m x 3.2m TOILETS (F) 5.3mx3.6m DISABLED TOILETS

PRAYER ROOM

PS UP UP PRAYER ROOM MEETING ROOM

7.1mx3.3m

LEVEL 16 fLooR PLAN (BANQUET hALL)

SCALE- 1:150
LIFT LOBBY 1.8m x 5.1m
NOT TO SCALE hoTEL hQ6, kINGDoM of BAhRAIN LEVEL TERRACE LEVEL LEVEL LEVEL LEVEL BANQUET HALL LEVEL LEVEL LEVEL LEVEL 54.50m LEVEL LEVEL LEVEL 71.50m SWIMMING POOL ALL DAY DINING LEVEL LEVEL LEVEL ADMIN PARKING OUTLET 4 OUTLET 3 SPA POOL FILTRATION OUTLET 6 LEVEL LEVEL LEVEL ENTRANCE DRIVEWAY 17.00m OUTLET 1 PARKING PARKING PARKING PARKING LEVEL 17 TERRACE LEVEL 13 LEVEL 14 LEVEL 15 LEVEL 16 BANQUET HALL LEVEL 9 LEVEL 10 LEVEL 11 LEVEL 12 LEVEL 6 LEVEL 7 LEVEL 8 SWIMMING POOL ALL DAY DINING LEVEL 3 LEVEL 4 LEVEL 5 ADMIN PARKING OUTLET 4 OUTLET 3 SPA POOL FILTRATION OUTLET 6 LEVEL 1 LEVEL 2 LEVEL 0 ENTRANCE DRIVEWAY OUTLET 1 PARKING PARKING PARKING PARKING LoNGITUDINAL sEcTIoN TRANsVERsE sEcTIoN

PURLIEU hILLToP

REsoRT

Project Info: A place to relax with nature where the architecture sits lightly on the hilltop. The design allows itself to be engulfed by the landscape, using steel structure, local stone and stabilized earth blocks from the site and technology that are non intrusive.

Type of Project: HOSPITALITY site Location: GALIBEEDU, COORG site Area: 7 ACRES client: AMBIENCE PROPERTIES LTD. Commencement year: 2016 stage of Project: CONSTRUCTION Team: AR. ANIRUDH GOVIND, AR. DHAIRYA PRAJAPATI, AR. SNEHA MURTHY, AMRUTA PATIL (INTERN) work contribution: DESIGN DEVELOPMENT AND WORKING DRAWINGS

PURLIEU hILLToP REsoRT, cooRG SCALE- 1:1000 MAsTER PLAN
VIEw of TwIN coTTAGEs VIEw of sINGLE coTTAGEs INTERIoR of BEDRooM INTERIoR of LIVING AREA AND jAcUZZI pHySiCaL MOEL OF tWiN COttaGES VIEw of VILLAs
PURLIEU hILLToP REsoRT, cooRG NOT TO SCALE
ENTRANcE of TwIN coTTAGEs
BAsEMENT PLAN of RooMs BLock PURLIEU hILLToP REsoRT, cooRG NOT TO SCALE
fIRsT
fLooR PLAN of RooMs BLock
PLAN of TwIN coTTAGE PLAN of VILLA GRoUND fLooR PLAN of RooMs BLock
SCALE- 1:50 PURLIEU hILLToP REsoRT, cooRG
PLAN of VILLA

sEcTIoN 5

sEcTIoN 6

sEcTIoN 2 ELEVATIoN 1 sEcTIoN 3 sEcTIoN 4

SCALE- 1:100 PURLIEU hILLToP REsoRT, cooRG
PURLIEU hILLToP REsoRT, cooRG
PURLIEU hILLToP REsoRT, cooRG
To sTAff QUARTERs DETAIL of coNcRETE sTEPs LINTEL LEVEL INsIDE sTAff QUARTERs sToNE RETAINING wALL foRMATIoN of INcLINED EGDEs GAP BETwEEN BUILDING AND wALL VIEw of sITE fRoM sTAff QUARTERs coRNER jUNcTIoN DETAIL
ENTRANcE

sAMPIGE RoAD sTREETscAPE

Project Info: The project aims at de-congesting traffic, managing pedestrian movement, and designing the public realm while creating a foreground for Mantri Square.

Type of Project: PUBLIC INFRASTRUCTURE site Location: SAMPIGE ROAD, BENGALURU site Area: 500M STRETCH client: MANTRI DEVELOPERS Commencement year: 2017 stage of Project: SANCTION Team: AR. ANIRUDH GOVIND, AR. DHAIRYA PRAJAPATI work contribution: DESIGN DEVELOPMENT AND PRESENTATION DRAWINGS

sAMPIGE RoAD sTREETscAPE, BENGALURU SCALE- 1:1500 EXIsTING sITE PLAN
NOT TO SCALE sAMPIGE RoAD sTREETscAPE, BENGALURU EXIsTING sITE sEcTIoN
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN PRoPosAL- oPTIoN 1
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN PRoPosAL- oPTIoN 1
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN PRoPosAL- oPTIoN 1
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN PRoPosAL- oPTIoN 1
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN
oPTIoN 2
PRoPosAL-
sAMPIGE RoAD sTREETscAPE, BENGALURU NOT TO SCALE DEsIGN PRoPosAL- oPTIoN 2

MEETING NOTES

Project Sampige Road Streetscape

Held on 12thApril, 2018

Held at Mantri Developers Head Office

Attendees

mayaPRAXIS: Vijay Narnapatti Anirudh Govind Dhairya Prajapati

Sonali Bordia Infrasupport: Rathnakar Reddy Nandakumar

Mantri Infrastructure Private Limited (MIPL): Moumita Som Kumarswamy

Space Matrix: Ragavendra Praveen

MEETING AGENDA : Purpose of the meeting was to discuss the design proposal.

1) DISCUSSION

1. SM confirmed about the site boundary after relinquishing 20m road and the drawing showing the 8 mtr setback which is minimum and is claimed and should not be used for the road design.

2. Moumita added that after the 8 mtr setback, there will be a compound wall after which the road should start.

3. mP questioned regarding the location of a temple from the survey drawing.

4. Praveen stated that if it is feasible enough and if possible then instead of taking the road through the mantri property, the road should be offset more towards railway property.

5. RR asked for a drawing from mantri which highlights the exact mantri site boundaries and if possible then the railway property line as well.

6. RR suggested that mantri should mark the compound wall first from which all the property lines we can get considering the compound wall as base property line.

7. RR asked for the clear information regarding the land ownership at the starting of the 20m wide road i.e., bellmouth. and continued the discussion saying the 20 mtrs road will be heavily loaded and will require 4 lanes.

8. Mantri asked for an option where the road goes in between the temples or else the temple needs to be shifted which CMD only will take the decision.

9. mP showed the option where the road goes through the temple and concluded that it is not feasible to take a road in between the temple as there will be only one lane then.

10. An overlapped drawing will be issued to mP by mantri (moumita) on Tuesday (17th April 2018) or Wednesday(18th April 2018).

11. Mantri suggested that we should propose a design first so that CMD can take a decision based on that.

12. Mantri confirmed regarding the parking that there will be around 1800 cars in total and also 4 mtrs from the site edges on sampige road is yet to be relinquished.

MEETING NOTES

Project Sampige Road Streetscape

Held on 24thApril, 2018

Held at Mantri Developers Head Office

Attendees

mayaPRAXIS: Vijay Narnapatti Anirudh Govind Sonali Bordia

Infrasupport: Rathnakar Reddy Nandakumar

Mantri Infrastructure Private Limited (MIPL): Sushil Mantri Sowmya Prakash Moumita Som

Space Matrix: Ragavendra

MEETING AGENDA : Purpose of the meeting was to clarify issues that came up during the design process.

1) DISCUSSION

1. Retaining wall built by the railways:

a) SM explained that discussions were underway with the railways and that an MOU would be signed soon.

b) Retaining wall will be demolished and rebuilt by MIPL in the correct location. c) If for some reason this land cannot be accessed, single lane roads will be built. d) Curb/divider to segregate traffic will be ideal.

2. Temple Area:

a) No portion of the road can extend into Mantri Property. b) If possible, one or two of the temple blocks will be shifted. Movement of the temple blocks is to be minimized.

3. Rajiv Gandhi Circle:

a) Bus bays will be raised such and demarcated as a separate area. b) Two design options are to be kept ready. the first option will be as designed. If approvals for this cannot be obtained, then the second option will be used. Second option will consist of minimal intervention.

c) The island around Rajiv Gandhi circle is to be kept as similar to the existing condition as possible in option 2.

d) Auto stand and bus bay positions are to be switched. Bus bays cannot cover over the nala.

4. General Notes:

a) A package of design drawings will be given to MIPL on 30th April, 2018. This will be used for internal discussions and will be subsequently submitted for approvals after the elections.

sAMPIGE RoAD sTREETscAPE, BENGALURU
sAMPIGE RoAD sTREETscAPE, BENGALURU 20M RoAD PRoPosED IN fRoNT of REsIDENTIAL BUILDING TEMPLE AT sITE MILL coRNER jUNcTIoN raiLWay LiNE (LEFt) & MEtrO LiNE (riGHt) VIEw of sAMPIGE RoAD LEVEL DIffERENcE oN RoAD BELow METRo PARkING of MANTRI sQUARE MALL UNDERPAss jUNcTIoN BUs sTAND AT RAjIV GANDhI cIRcLE

GANDhI BAZAAR sTREET DEsIGN

Project Info: The project aims the formalization of the street market along with improvements to infrastructure and hygiene conditions under the “Green Logistics ProjectSustainable Supply Chains for Perishables into Cities”.

Type of Project: URBAN DESIGN site Location: BENGALURU site Area: 700M STRETCH client: GOVT OF KARNATAKA/GIZ/DULT Commencement year: 2017 stage of Project: DPR PREPARATION Team: MAYAPRAXIS work contribution: DOCUMENTATION, RESEARCH, ANALYSIS & PRESENTATION DRAWINGS

GANDhI BAZAAR sTREET
BENGALURU BUiLt
NOT TO SCALE
DEsIGN,
ZONE aNaLySiS
GANDhI BAZAAR
sTREET DEsIGN, BENGALURU
NOT TO SCALE

Vendors based on age groups

categorization based on elements used for shelter

categorization based on gender Vendor Mobility

categorization based on generation commodity sold by vendors

VENDiNG ZONE aNaLySiS

GANDhI BAZAAR sTREET DEsIGN, BENGALURU

NOT TO SCALE
GANDhI BAZAAR sTREET
BENGALURU DEsIGN
1 NOT TO SCALE
DEsIGN,
PRoPosAL- oPTIoN
SCALE- 1:500 GANDhI BAZAAR sTREET
BENGALURU
of GANDhI BAZAAR cIRcLE
DEsIGN,
ENLARGED PLAN
GANDhI BAZAAR sTREET DEsIGN,
3
2
1 NOT TO SCALE
BENGALURU sEcTIoN
sEcTIoN
sEcTIoN
GANDhI BAZAAR sTREET
BENGALURU DEsIGN
oPTIoN2 NOT TO SCALE
DEsIGN,
PRoPosAL-
SCALE- 1:500 GANDhI BAZAAR sTREET
BAZAAR cIRcLE
DEsIGN, BENGALURU ENLARGED PLAN of GANDhI
GANDhI BAZAAR sTREET DEsIGN, BENGALURU DEsIGN PRoPosAL- oPTIoN 1 NOT TO SCALE sEcTIoN 3 sEcTIoN 2 sEcTIoN 1
GANDhI BAZAAR sTREET
BENGALURU DEsIGN
oPTIoN 3 NOT TO SCALE
DEsIGN,
PRoPosAL-
SCALE- 1:500 GANDhI BAZAAR sTREET
BAZAAR cIRcLE
DEsIGN, BENGALURU ENLARGED PLAN of GANDhI
GANDhI BAZAAR sTREET DEsIGN, BENGALURU DEsIGN PRoPosAL- oPTIoN 1 NOT TO SCALE sEcTIoN 3 sEcTIoN 2 sEcTIoN 1

VENkAT’s fARMhoUsE

Project Info: The house sits in the undulating landscape typical of the Deccan Plateau in a corner of the 3-acre site overlooking the farmland. The simple layout allows a free flowing indoor space, which opens on to the landscape in between the mud brick walls.

Type of Project: RESIDENTIAL site Location: KANAKPURA, BENGALURU site Area: 3 ACRES client: MR. VENKAT MURTHY Commencement year: 2016 stage of Project: CONSTRUCTION Team: AR. ANIRUDH GOVIND work contribution: DESIGN DEVELOPMENT AND WORKING DRAWINGS

SCALE- 1:100 VENkAT’s fARMhoUsE, BENGALURU +0.45M LVL +0.35M LVL +0.35M LVL +0.35M LVL 1 A-3.5 2
1
1
21' x 14' GUEST BEDROOM 15'6" x 14'11" MOTHERS BEDROOM POOL DECK +0.45M LVL +0.45M LVL
LVL +0.45M LVL +0.45M LVL DINING
+0.00M LVL T=250 R=200 2
+0.35M LVL
LVL 4 5 6 7 8 9 10 11 3 UP OPEN
DW1 DW2 D2 D2 D1 D1 W2 DW1 W3 D1 D1 DW5 D2 D2 2 1 A3.1 1 A3.2 2 A3.1 6' WIDE CORRIDOR O.T.S W4 W5 2 A3.2 D1 D2 UP T=600 R=150 PLANTER POOL DEPTH-1350 LOW WALL TILL 1250 MM SHOWER W.C. 6' X 4' 6' X 4' UPS W.C. SHOWER 6'6'' X 6' 6'6'' x 7' 1" PLANTER DECK DECK DECK 4' X 6' W.C. SHOWER 4' X 6' W6 V3 V3 V2 V2 V1 V4 +0.45M LVL D2 D2 V3 DRESSER 9' x 7' 4' X 4' 1 6' WIDE CORRIDOR +0.45M LVL DW3 DW4 PLANTER LILY POND 5' x 6' 6 7 4 1 A B C 2125 E G H 2125 2125 1 3 4 6 7 A B C 1675 5025 2 2 3 2450 4575 4575 1825 2125 2125 2450 4575 4575 5 2125 5 F 2125 D 6375 D E F G H 5025 1675 2125 6375 2125 2125 2125 1825 2125 J J 4250 4250 POOL DEPTH- 600 WINDOW WILL BE FIXED ON A 150 mm THK LEDGE 1 A9.1 1 A9.1 2 A9.1 2 A9.1 3 A9.1 3 A9.1 3 A9.1 3 A9.1 3 A9.1 3 A9.1 6 A9.1 6 A9.1 7 A9.1 +0.60M LVL 450 mm THK RUBBLE STONE LOW WALL 1 A-3.6 GRoUND fLooR PLAN
A-3.3
A-3.3
A-3.4 19'11" x 15' LIVING ROOM KITCHEN 19'11" x 14' 19'11" x 16' DINING ROOM
+0.45M
DECK 14'11" x 15'
A-3.4
+0.45M
KITCHEN 19' 11"x 6'11''

GROUND FLOOR CONCRETE COPING IN ELEVATION

1650 2450

MEZZANINE

MEZZANINE ROOF RIDGE LVL +7.0M 1900 7 6 4 3 2 5 V3 V1 V3 W5 V4

PARRAPET LVL +4.55 m 650 GROUND FLR T.O.S LVL +0.45m GROUND LVL +0.00m VENkAT’s fARMhoUsE, BENGALURU

ROOF RIDGE LVL MEZANNINE T.O.S LVL +2.90m

450 sEcTIoN

2- A-3.2 sEcTIoN 1- A-3.2

+7.0M PARRAPET WALL LVL +4.55m

SCALE- 1:100 DW5 DW3 DW1 W1 D1 W1 D1 W7
D E F G H J C B A W2
450 V3
2375 T.O.S LVL +0.45m
ROOF RIDGE LVL +5.10M GROUND LVL +0.00m 2450
+2.825m CORRIDOR T.O.S CLAY TILES ON MS ANGLE PURLINS RAMMED EARTH WALL PLINTH IN RUBBLE MASONRY
DW6 1625 100 mm THK CONCRETE COPING
SCALE- 1:100 D2 GROUND FLR
LVL
GROUND LVL
450
DECK SHOWER W.C. DECK MEZZANINE STAIRCASE AS PER DESIGN
2450 1050 2450 600 GUEST BEDROOM CLAY TILES ON MS ANGLE PURLINS 2 X ISA 50 RAFTER AS PER DETAIL 1825 2125 2125 2450 4575 PLINTH BEAM COMPACTED EARTH RUBBLE MASONRY FOUNDATON 7 6 5 4 3 2 7 A9.1 D2 D1 MS WINDOWS AS PER DESIGN ISMB 150 MEZZANINE 16 MM DIA TIE ROD MASONRY PLINTH TERRACE MOTHERS BEDROOM 1 D1 CORRIDOR DINING DECK POOL 2125 2125 1825 2450 4575 T.O.S LVL
ROOF
LVL
GROUND LVL
450 POOL
7 6 5 4 3 2 5 A9.1 1100 TYP. 2 X ISA 50 RAFTER AS PER DETAIL IPS FLOORING AS PER SPECIFICATION 150 mm THK RCC SLAB COMPACTED EARTH RUBBLE MASONARY FOUNDATON CLAY TILES ON MS ANGLE PURLINS LOUVRE SYSTEM PLINTH BEAM 2 xISA 50 COLUMN AS PER DETAIL
1250 KITCHEN 1200 2200 W6 W4 MS WINDOWS AS PER DESIGN W4 OPEN KITCHEN FABRIC ROOF AS PER DESIGN
550 900 1400 VENkAT’s fARMhoUsE, BENGALURU
sEcTIoN
A-3.5
T.O.S
+0.45m
+0.00m TERRACE T.O.S LVL +3.50m
ROOF RIDGE LVL
MEZANNINE T.O.S LVL +2.90m +7.00M PARRAPET WALL LVL +4.55m
+0.45 m
RIDGE
+5.10m
+0.00m
T.O.S -1.1 m
T.O.SLVL +2.9m SILLLVL +1.7m
KITCHEN
sEcTIoN 1- A-3.4
1-
SCALE- 1:100 6 7
1 A B C 2125 E G H 2125 2125 1 3 4 6 7 A B C 1675 5025 2 2
4575 4575 1825 2125 2125 2450 4575 4575 5
5 F 2125 D 6375 D E F G H 5025 1675 2125 6375 2125 2125 2125 1825
J J 4250 4250
450
WALL
450
750
GUTTER AS PER DETAIL
SLAB PROJECTION FROM TOP OF BEAM TYP. TYP. TYP. VENkAT’s fARMhoUsE, BENGALURU sLAB AND BEAM DETAIL PLAN
4
3 2450
2125
2125
M3-INV. BEAM (230 x 450mm) M2-PART. INV. BEAM (230 x 900mm) +2.90M LVL +3.50M LVL +2.90M LVL +2.90M LVL 150 THK. 150 THK. 150 THK. 150 THK. M2-PART. INV. BEAM (230 x 900mm) M1-INV. BEAM (230 x 750mm) SLOPE @1:200
450 2850 OPENING B/W SLAB & WALL WALL BELOW STARICASE IN MS WILL BE ANCHORED TO THE SLAB +2.825M LVL 75 THK. SLOPE @1:200 CORRIDOR GUTTER SLAB TO BE WATERPROOFED & LAID TO A SLOPE SLOPE @1:200 COLUMN HAS TO CONTINUE BEYOND THE SLAB TILL THE RAFTERS WALL BELOW
BELOW
600
+3.50M LVL 150 THK. 2 AS2.2b 1 AS2.2b CORRIDOR GUTTER SLAB TO BE WATERPROOFED & LAID TO A SLOPE 3 AS2.2b
GUTTER AS PER DETAIL 4 AS2.2b 5 AS2.2b 6 AS2.2b

600 100 350

M3-INV. BEAM (230 x 450mm)

230 230 700 150 100 500

2 3 4 5 6 3.50M TERRACE.LVL 2.90M MEZZANINE.LVL

2xISA50 COLUMNS

M2-PART. INV. BEAM (230 x 900mm)

MASONRY WALL IN RAT TRAP BOND

MASONRY WALL IN RAT TRAP BOND 5025

sLAB DETAIL of MoThER’s BEDRooM scALE 1:50

A B 3.50M TERRACE.LVL

230 300 230 230 900

M1-INV. BEAM (230 x 750mm) M2-PART. INV. BEAM (230 x 900mm)

MASONRY WALL IN RAT TRAP BOND

MASONRY WALL IN RAT TRAP BOND

sLAB DETAIL of MoThER’s BEDRooM scALE 1:50

230 75 325

2 3 2.825M TOP.OF.CORRIDOR

1825 75 300 175

RCC SLAB 150MM THICK 150 80 150

MASONRY WALL

175

300

sLAB DETAIL of coRRIDoR scALE 1:50

100 125

INVERTED BEAM

ISA 50 x 50 x 6mm ANGLE FIXED TO INVERTED BEAM 2 x ISA 50 x 50 x 6mm COLUMN WELDED TO BASEPLATE ELEVATION

300 1000

PLINTH BEAM 20 mm THK BASE PLATE

ISA 50 x 50 x 6mm ANGLE FIXED TO INVERTED BEAM 2 x ISA 50 x 50 x 6mm COLUMN WELDED TO BASEPLATE

75

ISA 50 x 50 x 6mm ANGLE FIXED TO INVERTED BEAM

RCC INVERTED BEAM 2 x ISA 50 x 50 x 6mm COLUMN WELDED TO BASEPLATE

DRIP MOULD IN R.C.C 325

230 2 x ISA 50 x 50 x 6 mm COLUMN

R.C.C. INVERTED BEAM PLAN

12 mm THK PLATE

SCALE- 1:10
2450 2125 1825 2125
VENkAT’s fARMhoUsE, BENGALURU
typ. BEaM typE B
typ. BEaM typE a typ. SLaB BEariNG DEtaiL typ. ELEVatiON typE a

LINE OF PLINTH BEAM

LANDSCAPING

150MM THK PCC LEDGE 300MM THK RAMMED EARTH WALL

RCC COPING

D3

2.45M

1050 1850

TOP.OF.WALL.LVL TOP.OF.SLAB.LVL

3350 B A 0.15M

PLINTH BEAM

PLAN of ToILET BLock sEcTIoN 1

TOWEL ROD HOT WATER VESSEL 3350 1 2 0.15M

RCC COPING 300MM THK RAMMED EARTH WALL

2.45M

WOODEN DOOR

TOP.OF.WALL.LVL TOP.OF.SLAB.LVL

3350 1 2 0.15M

2.45M

LANDSCAPING

300MM THK RAMMED EARTH WALL

PLINTH BEAM

150MM THK PCC LEDGE VENkAT’s fARMhoUsE, BENGALURU

RCC COPING TOP.OF.WALL.LVL TOP.OF.SLAB.LVL

sEcTIoN 2 fRoNT ELEVATIoN

SCALE- 1:50
3350 3350 1 2 A B 900 2000 2150 900 300 300 12150 300 300
300MM THK RAMMED EARTH WALL
VENkAT’s fARMhoUsE, BENGALURU
VENkAT’s fARMhoUsE, BENGALURU PLINTh BEAM oN sITE coNsTRUcTIoN of RAMMED EARTh wALLs coNsTRUcTIoN IN PRoGREss MUD BRIck PRoDUcTIoN oN sITE coNsTRUcTIoN of UD BRIck wALLs coRNER jUNcTIoN DETAIL IN MUD BRIck LiLy pOND ON SitE sELEcTIoN of sITE foR oThER BUILDING BLocks cAsTING of coRRIDoR sLAB Roof fRAME foRMATIoN INsTALLING Ms fRAMEs

ayUrVEDiC Spa at TAj wEsT END

Project Info: The design is inspired from the traditional architecture of Kerela. Extensive use of wood and brass has been incorporated with the functional aspect of the design. A soothing and relaxing ambience is created using a sober material palette and lighting.

Type of Project: INTERIORS site Location: SAMPANGI RAMA NAGAR, BENGALURU client: TAJ GROUP Commencement year: 2018 stage of Project: TENDER Team: AR. SANJANA RAJU, AAROHI BHATT (INTERN) work contribution: DESIGN DEVELOPMENT, PRESENTATION DRAWINGS AND WORKING DRAWINGS

ayUrVEDiC Spa, TAj wEsT END, BENGALURU
VIEw of sPA RooM VIEw of hAND wAsh AREA VIEw of RELAXATIoN RooM

steam chamber as per selection

niche refer detail A 4.3

wash basin cabinet 3 refer detail A 6.4

basin as per selection

small stool as per selection mirror refer detail A6.6

wash basin cabinet refer detail A 6.2 basin as per selection partition 2 refer deail A4.1

lockers refer detail A6.3

mirror refer detail A6.6 chair as per selection

toilet doors D4 refer detail A 4.3 W2

D4 D4

850 1400

1200X1525 TOILET 1200X1525 SHOWER floor lamp as per selection

600

610 440 1400

2565X2690 HAND WASH

900 820 1660 100 1418

2440X2100 RELAXATION ROOM

D2 D3

D1 W1 W1

cushioned stool with backrest as per selection wooden troly as per selection 600

1800

500 esthetica foot ritual brass bowl

1. NOTES X 2. 3. KEY NOTES: X 2 3

solidwood ayurveda table as per selection double wooden step as per selection

console table with art works refer detail A 6.1

console table detail A 6.5 C 2018 mayaPRAXIS AYURVEDIC SPA

shirodhara oil stand with brass bowl 1000 urli as per selection

partition 1 refer deail A4.1

esthetica foot ritual chair as slected by clients wooden still refer detail A4.3

1 TAJ WEST END ayUrVEDiC Spa, TAj wEsT END, BENGALURU

x x xx/xx/xx

REVISIONS Description No. Date All drawings and related written material appearing herein constitute original work of the Architect. No part of these materials may be utilized, referenced, disclosed or reproduced, in any and all manner or by any and all means, for design, construction or related purposes, or any other purposes, without prior written consent of the Architect.

First Floor, 188, 3rd Cross Road SCALE

Panduranga Nagar, Bengaluru 560076 (080) 26483693, 26481881, 41713787 TEL

PROJECT: 28/05/2018

www.mayapraxis.com FLOOR PLAN

1:33 MP/18/371 SANJANA DATE PROJECT NO. DEALT BY SHEET NO.

PRoPosED fLooR PLAN

SCALE- 1:33
cabinet frame without niche refer detail A6.7 toilet doors refer A4.3 A-2.1

5amp socket & switch @ 600mm height

box made of ply and veneer refer detail A 4.2

5/15 amp socket & switch @ 600mm height for the steam chamber heat generator wall light @ 2100ht as per selection

mirror light @ 2100ht as per selection

switch board @ 1200mm height switch board @ 1200mm height 5 amp switch and socket @ 1200mm ht for utility use

5amp socket & switch @ 900mm height for hair dryer wall lights fixture as per selection @ 1800 height

1200X1525 TOILET 1200X1525 SHOWER 400 2064 2064 400

2076 2013

2565X2690 HAND WASH

RELAXATION ROOM

5amp socket & switch @ 600mm for floor lamp

2440X2100

5amp socket & switch @ 600mm height for the troly

5amp sockets @ 600mm height with only one switch for spa use

existing wooden beam

LED strip lighting refer detail A 4.2

5amp socket & switch @ 600mm height for customers to charge the phones

A-2.3 C 2018 mayaPRAXIS PROJECT: 23/05/2018 1:33 MP/18/371 SANJANA DATE PROJECT NO. DEALT BY SHEET NO. Panduranga Nagar,
TEL First Floor, 188, 3rd Cross Road SCALE x x xx/xx/xx REVISIONS Description No. Date All drawings and related written material appearing herein constitute original work of the Architect. No part of these materials may be utilized, referenced, disclosed or reproduced, in any and all manner or by any and all means, for design, construction or related purposes, or any other purposes, without prior written consent of the Architect. www.mayapraxis.com ELECTRICAL PLAN 1. NOTES X 2. 3. KEY NOTES: X 2 3 1 AYURVEDIC SPA TAJ WEST END SCALE- 1:33 ayUrVEDiC Spa, TAj wEsT END, BENGALURU ELECtriCaL LayOUt pLaN
Bengaluru 560076 (080) 26483693, 26481881, 41713787

Ceiling Panelling refer sheet A4.2

Partition 1 Refer sheet A4.1

Existing Window

20 mm thk Wooden Plank Sill refer sheet A4.3

150 mm high skirting

Ceiling Panelling refer sheet A4.2

Existing Storage in the Wall Refer sheet A6.7

Steam Chamber as per selection

Wash Basin Cabinet 1 Refer sheet A6.2

Basin as per selection

Wooden beading refer sheet A7.1

Lockers Refer sheet A6.3

Ceiling Panelling Refer sheet A4.2

Existing door polished

Partition 2 Refer sheet A4.1

Wall Paintings as per selection

Wash Basin as per selection

Wash Basin Cabinet 3 Refer sheet A6.4 Steam Chamber as per selection

ELEVATIoN- ENTRANcE PARTITIoN

ELEVATIoN- cABINET 3 sIDE

Ceiling Panelling refer sheet A4.2

Niche with Console

Cabinet 1 Refer sheet A6.1

Cabinet 1 Refer sheet A6.1

Wooden Trolley as per selection cushioned stool with backrest as peR selection

150mm high skirting

ELEVATIoN- NIchE sIDE

Wall Paintings as per selection

Esthetica Foot Ritual Chair as slected by clients

Esthetica foot ritual brass bowl

ELEVATIoN- cABINET 1 sIDE

SCALE- 1:50 ayUrVEDiC Spa, TAj wEsT END, BENGALURU

Existing Wood Rafters polished

Mirror refer sheet A6.6

Gypsum board False Ceiling

Tiles as per selection

Mirror refer sheet A6.6

Mirror Lights as per selection

Partition 2 refer sheet A4.1

Relaxation Room chair as per selection

Partition 2 refer sheet A4.1

Existing Door polished

150 mm high skirting

ELEVATIoN- MIRRoR sIDE

Existing Window polished Relaxation Room chair as per selection

Urli as per selection

ELEVATIoN- wINDow sIDE

Gypsum board False Ceiling

Lockers refer sheet A6.3 Wash Basin Cabinet Refer sheet A6.2

Wash Basin as per selection

Tiles as per selection

WC as per selection

Partition 2 refer sheet A4.1

ELEVATIoN- cABINET 2 sIDE

ELEVATIoN- ToILET PARTITIoN sIDE

SCALE- 1:50 ayUrVEDiC Spa, TAj wEsT END, BENGALURU

100

39 631

39 631 100 400 400 400 400

316

1800

20mm thk stone as per selection

Wooden beading as per detail 6

Brass hinges

Wooden beading as per detail 7

1800 850

1mm thk brass jaali

40x40 mm Wooden legs

20mm thk stone as per selection 500

Wooden beading as per detail

40x40 mm Wooden legs

19mm thk ply with 4mm veneer on both sides

Existing brick wall

fRoNT ELEVATIoN

20mm thk stone as per selection

Wooden beading as per detail 6

sIDE ELEVATIoN

19mm thk ply with 4mm veneer on both sides 40x40 mm Wooden legs

1800 40x40 mm Wooden legs

500

20mm thk stone as per selection 850

Wooden beading as per detail 6 6mm thk Black tint glass

1mm thk Brass jaali 19mm thk ply with 4mm veneer on both sides 40x40 mm Wooden legs

Existing brick wall

6mm thk black tint glass

50x25 mm Wooden frame

19mm thk ply with 4mm veneer on both sides 20mm thk stone

5 5 10 8 TRANsVERsE sEcTIoN LoNGITUDINAL sEcTIoN PLAN of cABINET 1

400 50 50 1700 50 50 400 400 400 400
10 13 7 5 4 10 10 11 4 5 5 5
19mm thk ply with 4mm veneer on both sides SCALE- 1:2 SCALE- 1:10 ayUrVEDiC Spa, TAj wEsT END, BENGALURU
20mm thk stone 2mm Radius 16mm Radius 6mm Radius 2mm Radius 2mm Radius 1mm thk Brass jaali 6mm Black tint glass Wooden beading JOiNEry DEtaiL wooDEN BEADING DETAIL

Basin as per selection

Basin as per selection

600

39 750

511

155 550 50

20mm thk stone as per selection

155

155

155 750

100 511 39 750

60 90 70

Wooden beading as per detail 6 50x20 mm Wooden frame Brass hinges

90X19 mm Wooden plank 610 610 100

1300

39 750

100

1300

Wooden beading as per detail 6 50x20 mm Wooden frame Brass hinges

20mm thk stone as per selection

Basin as per selection 40x40 mm Wooden legs

750

20mm thk stone as per selection

90X19 mm Wooden plank 610 610

Basin as per selection 40x40 mm Wooden legs

40x40 mm Wooden legs

fRoNT ELEVATIoN

Basin as per selection 20mm thk stone as per selection

Basin as per selection 20mm thk stone as per selection

Wooden beading as per detail 6

19mm thk ply with 4mm veneer outside 40x40 mm Wooden legs

19mm thk ply with 4mm veneer outside 550

610 610 1300 50 50 550 50 600

90X19 mm Wooden plank

50x20 mm Wooden frame

19mm thk ply with 4mm veneer outside 40x40 mm Wooden legs 20mm thk stone

40x40 mm Wooden legs LoNGITUDINAL sEcTIoN PLAN of cABINET 3

19mm thk ply with 4mm veneer outside

90X19 mm Wooden plank

50x20 mm Wooden frame

19mm thk ply with 4mm veneer outside 550

Basin as per selection 90X19 mm Wooden plank

750 40x40 mm Wooden legs

Existing brick wall 550

20mm thk stone as per selection

Existing brick wall 550

155 Existing brick wall 10 20 20

19mm thk ply with 4mm veneer outside

Basin as per selection 90X19 mm Wooden plank 19mm thk ply with 4mm veneer outside

750 40x40 mm Wooden legs

sIDE ELEVATIoN TRANsVERsE sEcTIoN

20mm thk stone

20mm thk stone as per selection

20mm thk stone

39

155 Existing brick wall 10 20 20

Wooden beading 40x40 mm Wooden legs

39

19mm thk ply with 4mm veneer outside

19mm thk ply with 4mm veneer outside

ayUrVEDiC Spa, TAj wEsT END, BENGALURU SCALE- 1:2 SCALE- 1:10 wooDEN BEADING DETAIL

100 511 39 750
Wooden beading as per detail 6 1300 610 610 1300 50 50
Wooden beading 40x40 mm Wooden legs
511
19mm thk ply with 4mm veneer outside 40x40 mm Wooden legs
1300 155
40x40 mm Wooden legs 20mm thk stone
20mm thk stone as per selection
60 90
70 155

150 800

1000 150 800

19mm thk ply with 4mm veneer on top 500x100mm Drawer

40x40 mm Wooden legs

450

19mm thk ply with 4mm veneer on top

40x40 mm Wooden legs

sIDE ELEVATIoN

150 800

1000 19mm thk ply with 4mm veneer on top 40x25 mm Wooden frame

12 mm thk ply with 4mm veneer outside 40x40 mm Wooden legs

12 mm thk ply with 4mm veneer both side 19mm thk ply with 4mm veneer on top

12mm thk ply with 4mm veneer on both sides

12mm thk ply with 4mm veneer outside

40x40 mm

450 19mm thk ply with 4mm veneer on top 12 mm thk ply with 4mm veneer outside 40x25 mm Wooden frame 40x40 mm Wooden legs SCALE- 1:10 ayUrVEDiC Spa, TAj wEsT END, BENGALURU

Wooden legs

19mm thk ply with 4mm veneer on top REfERENcE IMAGE

TRANsVERsE sEcTIoN LoNGITUDINAL sEcTIoN PLAN of coNsoLE

1000 450
150 800
fRoNT ELEVATIoN

rod

19mm thk ply with 4mm veneer on both sides

12mm thk ply with 4mm veneer on both sides

50x25 mm Wooden frame

40x40 mm

Wooden legs

Hanger rod

rod

50x25 mm Wooden frame

19mm thk ply with 4mm veneer on both sides

40x40 mm Wooden legs

19mm thk ply with 4mm veneer on both sides 600

19mm thk ply with 4mm veneer on both sides

12mm thk ply with 4mm veneer on both sides 19mm thk ply with 4mm veneer on both sides

40x40 mm Wooden legs

600 850
Hanger
1800 1010 591 850 850 268 268 200 792 1800 100
SCALE- 1:10 ayUrVEDiC Spa, TAj wEsT END, BENGALURU
Hanger
100 268 1800 268 200 792
of LockERs
TRANsVERsE sEcTIoN fRoNT ELEVATIoN LoNGITUDINAL sEcTIoN
PLAN

20x10 mm Wooden beading

8mm ply with 4mm veneer on both sides

50x20 mm Wooden frame

25x50 mm Wooden frame

Wooden beading 25x50 mm Wooden frame 50x20 mm Wooden frame

with

Existing brick wall

beading

995 1195

995 1195

100 100

100 100

100 100 600

100 100 600 100x25mm Wooden frame

6mm thk mirror on 8mm thk ply

100x25mm Wooden frame

6mm thk mirror on 8mm thk ply 100x25mm Wooden frame

8mm thk ply

6mm thk mirror Existing brick wall 10 600 100 800

6mm thk mirror

8mm thk ply

100x25mm Wooden frame

Existing brick wall 10 600 100 800

20 25 50 230 50 20 25 50 230 50 330 330 205
80 210 Wooden
20 50 40 150 40 50 50 40 150 40 50 20
750 355 355
8mm ply
4mm veneer on both sides 270 40 50 20 40 100 40 724 40 50 20 1444
727 150
350 804
25 25
25 25
SCALE- 1:10 ayUrVEDiC Spa, TAj wEsT END, BENGALURU
cABINET IN
fRoNT ELEVATIoN fRoNT ELEVATIoN of MIRRoR
PLAN of
NIchE PLAN of MIRoR

fooT oVER BRIDGE

Project Info: The function of the footover bridge changes to a sculptural and experiential public architecture by using a triangular geometry. The structure is designed as long span base trusses that carry the tubular lattice which holds up the bridge and the billboard.

Type of Project: PUBLIC INFRASTRUCTURE site Location: ST. JOHN’S CIRCLE, HOSUR, BENGALURU client: PRAKASH ARTS PVT. LTD. Commencement year: 2016 stage of Project: CONSTRUCTION Team: AR. JAVEED RASHEED work contribution: WORKING DRAWINGS AND 3D MODEL

SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU EXIsTING sITE PLAN
635 1665 651 1014 1635 11866 832 3500 833 3000 233 2100 435 3500 4500 2800 3300 4A 4 J 6 7 3 C 1B D F H G 5 E A 2 B K L B' 1 3B 1A 2B 4B 5138 5867 3800 6000 MS RAILING AS PER SPECIFICATION 2000 2500 UP 1 2 3 4 5 6 LIFT PIT (2000X2500) LIFT 1 220 SHS COLUMN 323 DIA CHS COLUMN MS RAILING AS PER SPECIFICATION UP 150 SHS COLUMN RAMP UP RAMP UP 6 BOTTOM LANDING ±10196 PROPOSEDCARRIAGEWAY 500 DIA CHS CENTRAL COLUMN UP RAMP PROPOSED ISLAND RAMP 323 DIA CHS COLUMN 180 SHS Y SHAPED COLUMN 180 SHS STRINGER PROPOSED CURB 1 1800 2 3 4 5 BOTTOMLANDING 7 8 10 11 12 13 UP ±8042 PROPOSED CARRIAGEWAY ±18543 PROPOSED CARRIAGEWAY ±14151 PROPOSEDCARRIAGEWAY BOTTOMLANDINGWITH SQUARECEMENTPAVERS 220SHSCOLUMN 21 150SHSCOLUMN 5 6 T=300mmR=150mm 3 MSRAILINGASPERSPECIFICATION LIFTPIT(1800X1800) 1800 UP BOTTOM LANDING WITH SQUARE CEMENT PAVERS SKYWALK ABOVE SKYWALKABOVE 323DIACHSCOLUMN 4 TOWARDS ELECTRONIC CITY TOWARDS ADUGODI TOWARDS SARJAPUR TOWARDS ADUGODI LIFT2 +00 LVL +100 LVL +00 LVL +100LVL +00LVL T = 300mm R = 150mm 1 A3.1 2 A3.1 @ 1:20 @ 1:20 STAIRCASE 1 BUS BAY SIDE STAIRCASE 2 CENTRAL JUNCTION SIDE @1:20 @1:20 HOSPITAL SIDE STAIRCASE3 T = 300mm R = 152mm MS RAILING AS PER SPECIFICATION RISER LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS. RISERLEVELSSHOULDBE EQUAL&SUBJECTTOCHANGEASPERSITECONDITIONS. RISER LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS. 1750 PROPOSED CURB EDGE PROPOSEDCURBEDGE 150 SHS STRINGER 323 DIA CHS COLUMN 150 SHS ROOF SUPPORTS 34950 37721 150SHSSTRINGER SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU BoTToM LANDING PLAN
1 2 3 4 7 8 10 11 12 13 UP 14 15 16 17 18 19 20 21 22232425 LIFT2 MIDLANDING 76 8 161514131211109 181920212223 UP DN 11 12 13 14 15 17 18 19 20 21 22 23 MID LANDING DN UP 635 1665 651 1014 1635 11866 832 3500 833 3000 233 2100 435 3500 4500 2800 3300 4A 4 J 6 7 3 C 1B D F H G 5 E A 2 B K L B' 1 3B 1A 2B 4B 5138 5867 3800 6000 +2450LVL +2450 LVL +00 LVL 25 SHS GRILL @ 150mm c/c 150 SHS SUPPORTS 150 SHS STAIRCASE STRINGER 150 180 SHS STAIRCASE STRINGER 1 A3.1 2 A3.1 BUS BAY SIDE HOSPITAL SIDE PROPOSED ISLAND 2 A3.2 10 9 8 7 6 5 4 3 2 1 LIFT 1 2150 2650 +1976 LVL 17 8mm THK CHEQUERED PLATE FLOORING 5 4 3 21 CENTRAL JUNCTION SIDE SKYWALKABOVE SKYWALK ABOVE T=300mmR=150mm T = 300mm R = 152mm T = 300mm R = 150mm +00 LVL MID LANDING +3192 LVL MID LANDING STAIRCASE 1 STAIRCASE 2 STAIRCASE3 TOWARDS ADUGODI TOWARDS ELECTRONIC CITY TOWARDS ADUGODI TOWARDS SARJAPUR RISER LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS. RISER LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS. RISERLEVELSSHOULDBE EQUAL&SUBJECTTOCHANGEASPERSITECONDITIONS. 16 1950 1950 8MMTHKCHEQUERED PLATEFLOORING 150SHSSTAIRCASESTRINGER 150 SHS STAIRCASE ROOF SUPPORTS SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU MID LANDING PLAN
635 1665 651 1014 1635 11866 832 3500 833 3000 233 2100 435 3500 4500 2800 3300 4A 4 J 6 7 3 C 1B D F H G 5 E A 2 B K L B' 1 3B 1A 2B 4B 5138 5867 3800 6000 29 30 31 32 33 34 35 36 37 38 DN TOP LANDING +5900 LVL +5900 LVL SKYWALK LEVEL SKYWALK+5900LVL LEVEL 165MM DIA CHS WEB CHORD 1160 1000 LIFT 1 28 29 30 31 32 33 34 35 36 37 38 DN 76DIARUNGSFOR CATWALKACCESS 750 39383736353433323130 39 8MM THK CHEQUERED PLATE FLOORING DN +5900LVL TOPLANDING +00 LVL 1 A3.1 2 A3.1 BUS BAY SIDE HOSPITAL SIDE PROPOSED ISLAND 2650 2150 LIFT2 +4050LVL SKYWALK LEVEL +5900 LVL SLOPE DN @ 1:5 29 @1:5SLOPEDN GALVALUME ROOFING METAL SHEET CENTRAL JUNCTION SIDE +4250 LVL MID LANDING T = 300mm R = 150mm T=300mmR=150mm T = 300mm R = 152mm MID LANDING SLOPE DN @ 1:5 TOWARDS ADUGODI TOWARDS ELECTRONIC CITY TOWARDS ADUGODI TOWARDS SARJAPUR 27 28 26 25 24 8mm THK CHEQUERED PLATE FLOORING 150 SHS DIAPHRAGM MEMBER 1950 1950 22232425262728 MIDLANDING +4250LVL SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU ToP LANDING PLAN
635 1665 651 1014 1635 11866 832 3500 833 3000 233 2100 435 3500 4500 2800 3300 4A 4 J 6 7 3 C 1B D F H G 5 E A 2 B K L B' 1 3B 1A 2B 4B 5138 5867 3800 6000 165 DIA CHS WEB MEMBER 100 SHS BILLBOARD STRUCTURE 8MM THK CHEQUERED PLATE FLOORING FOR CATWALK LEVEL CATWALK LEVEL +9000 LVL CATWALK+9000LVLLEVEL 588 1 A3.1 2 A3.1 BUS BAY SIDE HOSPITAL SIDE PROPOSED ISLAND SLOPE DN @ 1:5 SLOPE DN @ 1:5 @ 1:5 SLOPE DN CENTRAL JUNCTION SIDE @SLOPEDN 1:5 @SLOPEDN 1:5 @SLOPEDN 1:5 50DIACHSRAILING FORCATWALKACCES 165MM CHS ADDITIONAL BRACING MEMBER 150 SHS DIAPHRAGM MEMBER SLOPE DN TOWARDS ADUGODI TOWARDS ELECTRONIC CITY TOWARDS ADUGODI TOWARDS SARJAPUR @ 1:5 SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU Roof PLAN
A B B' C 635 1014 651 29283 833 832 1635 D E F G H +2450MM LANDING MID+4250MM LANDING TOP+5900MM LEVEL SKYWALK +9000MM LEVEL CATWALK +11170MM LEVEL +10875MM BILLBOARD TOP.OF 76MM CHS BOTTOM TRUSS 165MM CHS BOTTOM CHORD 165MM CHS WEB MEMBER 100 SHS BILLBOARD STRUCTURE 3500 TYPICAL MODULE 500 DIA CENTRAL COLUMN 150 SHS STAIRCASE STRINGER 50 DIA CHS HANDRAIL 50 SHS GRILL 25 SHS GRILL MS RAILING AS PER SPECIFICATIONS MEDIAN 323 DIA CHS COLUMN 150 SHS DIAPHRAGM MEMBER 25 SHS GRILL 50 DIA CHS HANDRAIL 150 SHS STAIRCASE STRINGER CARRIAGE WAY STAIRCASE 1 STAIRCASE 2 STAIRCASE 3 GALVALUME SHEET ROOFING 5900 CENTRAL JUNCTION SIDE HOSPITAL SIDE BUS BAY SIDE LIFT.ROOF RAILING FOR CATWALK ACCESS 50 CHS HANDRAIL FOR ROOF ACCESS CONCRETE PEDESTAL 150 SHS STAIRCASE ROOF SUPPORT 180 SHS STAIRCASE STRINGER STAIRCASE 3 STAIRCASE 2 STAIRCASE 1 LIFT 2 GALVALUME SHEET ROOFING MS CLADDING FOR LIFT 200X75 C-SECTION COLUMN CATWALK ACCESS WITH RUNGS 150 SHS DIAPHRAGM MEMBER 150 SHS STAIRCASE STRINGER 50 DIA CHS HANDRAIL 76MM CHS BOTTOM TRUSS 165MM CHS BOTTOM CHORD 165MM CHS WEB MEMBER 100 SHS BILLBOARD STRUCTURE GALVALUME SHEET ROOFING 25 SHS GRILL 50 DIA CHS HANDRAIL 150 SHS STAIRCASE STRINGER SUPPORT GRANITE CLADDING TO THE LIFT DOOR LEVEL MS CLADDING FOR LIFT H G F E D 833 832 1635 C B' B A 635 1014 651 +2450MM LANDING MID+4250MM LANDING TOP+5900MM LEVEL SKYWALK +9000MM LEVEL CATWALK +11170MM LEVEL +10875MM BILLBOARD TOP.OF PAVEMENT CARRIAGE WAY CARRIAGE WAY HOSPITAL SIDE CENTRAL JUNCTION SIDE BUS BAY SIDE LIFT.ROOF 2185 500 DIA CENTRAL COLUMN GRANITE CLADDING TO THE LIFT DOOR LEVEL CONCRETE PEDESTAL SCALE- 1:250 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU REAR ELEVATIoN fRoNT ELEVATIoN
165
CHS
76 DIA CHS
8MM
2950 1050 3500 2300 600 3600 600 165 1880 1910 1037 4750 +5900MM SKYWALK.LVL +9000MM CATWALK.LVL +10875MM BILLBOARD TOP.OF 165MM CHS TOP CHORD 100 SHS BILLBOARD STRUCTURE 25X25 SHS HANDRAIL SUPPORT 25X8 MS FLAT 50 DIA CHS HANDRAIL 165MM CHS WEB CHORD 76MM CHS BOTTOM TRUSS 165MM CHS BOTTOM CHORD NOT TO SCALE fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU typiCaL SECtiON OF BriDGE AXoNoMETRIc VIEw
165MM CHS TOP CHORD MEMBER 165MM CHS WEB MEMBER PERFORATED METAL SCREEN ON THE INNER SIDE 165MM CHS BOTTOM CHORD
DIA
BOTTOM TRUSS CUT OBLIQUE IN SECTION
BOTTOM TRUSS CUT OBLIQUE IN SECTION 165MM CHS WEB MEMBER 25 SHS HANDRAIL SUPPORT PERFORATED METAL FALSE CELING 100 SHS BILLBOARD STRUCTURE 50 CHS HANDRAIL 8MM THK CHEQUERED PLATE FLOORING
THK CHEQUERED PLATE FLOORING
1635 11866 832 833 3300 5867 6000 D E F G 5 6 7 +00 LVL CENTRAL JUNCTION SIDE PROPOSED CURB EDGE 150 SHS DIAPHRAGM STAIRCASE 2 180 SHS STRINGER 13 STEPS @ TREAD = 300 RISER = 152 323 DIA CHS COLUMN 180 SHS Y SHAPED COLUMN 1 2 5 6 3 4 1 A4.2B 1 A4.2B 1 A4.2C 1 A4.2C 323 DIA CHS COLUMN 1635 11866 832 833 3300 5867 6000 D E F G 5 6 7 PROPOSED CURB EDGE 150 SHS DIAPHRAGM STAIRCASE 2 180 SHS STRINGER 13 STEPS @ TREAD = 300 RISER = 152 323 DIA CHS COLUMN 1 2 5 6 3 4 8 STEPS @ TREAD = 300 RISER = 152 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 FIRST MID LANDING +1976MM LVL SECOND MID LANDING +3192MM LVL +00 LVL CENTRAL JUNCTION SIDE 180 SHS Y SHAPED COLUMN 1 A4.2B 1 A4.2C 1 A4.2C 1 A4.2B 7 STEPS @ TREAD = 300 RISER = 151 180 SHS Y SHAPED COLUMN BASE PLATE 150 SHS DIAPHRAGM 1635 11866 832 833 3300 5867 6000 D E F G 5 6 7 3800 150 SHS DIAPHRAGM STAIRCASE 2 180 SHS STRINGER 7 STEPS @ TREAD = 300 RISER = 151 THIRD MID LANDING +4245MM LVL 30 31 32 33 34 35 36 37 38 39 28 11 STEPS @ TREAD = 300 RISER = 151 TOP LANDING +5900MM LVL +00 LVL CENTRAL JUNCTION SIDE 1 A4.2B 1 A4.2C 1 A4.2C 1 A4.2B 29 SCALE- 1:50 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU PLAN of sTAIRcAsE @ ToP LANDING PLAN of sTAIRcAsE @ MID LANDING PLAN of sTAIRcAsE @ BoTToM LANDING
5 6 7 6000 5867 27°
165 DIA CHS BOTTOM TRUSS 76 DIA CHS BOTTOM TRUSS 500 DIA CHS
323 CHS
7 STEPS
1177 300 152 152
953 8 STEPS
1050 PERFORATED METAL FALSE CELING 1050 1767 50 4000 CONCRETE IMPACT GUARD GUTTER
25 SHS
50 2200 1050 50 SCALE- 1:50 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU sEcTIoN 1- A-4.2B
+10875MM TOP.OF.BILLBOARD +9000MM CATWALK.LVL +5900MM TOP-LANDING +1976MM FIRST-MID-LANDING +3192MM SECOND-MID-LANDING +4245MM THIRD-MID-LANDING SHS 180 STRINGER 13 STEPS @ TREAD = 300 RISER = 152 6MM THK CHEQUERED PLATE ON SHS 50 CHS 50 HANDRAIL CHS 50 HANDRAIL 150 SHS DIAPHRAGM GALVALUME SHEET ROOFING GALVALUME SHEET ROOFING 150 SHS ROOF MEMBER 180 SHS Y SHAPED COLUMN 323 DIA CHS COLUMN 165MM CHS TOP CHORD MEMBER 165MM CHS WEB MEMBER METAL SHEET FALSE CELING 100 SHS BILLBOARD STRUCTURE 6MM THK CHEQUEREDPLATE FLOORING
COLUMN
MEMBER
@ TREAD = 300 RISER = 151
300
@ TREAD = 300 RISER = 152
-SLOPE @ 1:200
MEMBER

GALVALUME SHEET ROOFING

CHS 50 HANDRAIL CHS 50 HANDRAIL

6MM THK CHEQUERED PLATE ON SHS 50

150 SHS ROOF MEMBER

GALVALUME SHEET ROOFING

100 SHS BILLBOARD STRUCTURE 180 SHS Y SHAPED COLUMN 323 DIA CHS COLUMN

METAL SHEET FALSE CELING

165MM CHS TOP CHORD MEMBER 150 SHS DIAPHRAGM

150 SHS DIAPHRAGM 11 STEPS @ TREAD = 300 RISER = 151

165 DIA CHS BOTTOM TRUSS 76 DIA CHS BOTTOM TRUSS 7 STEPS @ TREAD = 300 RISER = 151

+9000MM CATWALK.LVL

+5900MM TOP-LANDING

+10875MM TOP.OF.BILLBOARD THIRD-MID-LANDING +4245MM

+3192MM 13 STEPS @ TREAD = 300 RISER = 152

165MM CHS WEB MEMBER 1050 953 1177

CONCRETE IMPACT GUARD

GUTTER -SLOPE @ 1:200 25 SHS MEMEBER PERFORATED METAL FALSE CELING 1050 50 1050

50 SCALE- 1:50 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU

2200

sEcTIoN 1- A-4.2c

5 6 7 5867 6000 27°
SECOND-MID-LANDING FIRST-MID-LANDING +1976MM SHS 180 STRINGER
UP
1665 3500
435 J K L 1B 2B 3B
BOTTOM
WITH SQUARE CEMENT PAVERS
+00 LVL +100MM
1 A4.3B 1 A4.3B 220 SHS
LIFT
150 SHS
MS RAILING AS PER SPECIFICATION 323 DIA CHS COLUMN 150 SHS
PROPOSED CURB EDGE RISER
3
15
SHS
16
LIFT
FIRST
6 7 8 9 10 11 12 13 14 15 16 18 19
UP DN 17
1950 1950 6MM THK
PLATE
1665
435 J K L 1
1B 2B
+2450MM
323
STAIRCASE 3 220 SHS COLUMN LIFT (1950X1950) 150 SHS COLUMN 12 STEPS @ TREAD
300 RISER = 150 3075 1160 25 DIA RUNGS FOR CATWALK ACCESS 750 35 34 33 32 31 30 36 37 38 39 DN TOP LANDING LIFT 2 29 1950 1950 27 26 25 24 23 22 28 SECOND MID
1665 3500 3000 2100 435 +4250MM LVL +5900MM LVL J K L 1B 2B 3B 4B 1 A4.3B 1 A4.3B HOSPITAL SIDE 21 20 19 18 17 STAIRCASE 3 11 STEPS @
300 RISER
150 RISER
100 SHS
1050 SCALE- 1:50 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU PLAN of sTAIRcAsE @ ToP LANDING PLAN of sTAIRcAsE @ MID LANDING PLAN of sTAIRcAsE @ BoTToM LANDING
UP
RAMP 1800 BOTTOM LANDING 1 2 5 6 3 1800 UP 4 LIFT 2 @ 1:20 HOSPITAL SIDE STAIRCASE 3
3000 2100
4B
LANDING
@ 1:30 RAMP
LVL
COLUMN
PIT (1800X1800)
COLUMN
STRINGER
LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS.
A4.3C
0
COLUMN
STEPS @ TREAD = 300 RISER = 153
2
MID LANDING
20 21 22 23
5 4 3 2 1
CHEQUERED
FLOORING
3500 3000 2100
A4.3B 1 A4.3B
3B 4B RISER LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS.
LVL HOSPITAL SIDE
DIA CHS COLUMN 150 SHS STRINGER
=
LANDING
TREAD =
=
LEVELS SHOULD BE EQUAL & SUBJECT TO CHANGE AS PER SITE CONDITIONS.
COLUMN
50 X 25
16
300 RISER
153 SHS 150 STRINGER 50MM
6MM MS
SHS 150
SHS 150
GALVALUME SHEET ROOFING 6MM THK CHEQUERED PLATE ON SHS 150 SHS 150 SUPPORTING
SHS 150 COLUMN 27° 12 STEPS @ TREAD = 300 RISER = 150 11 STEPS @ TREAD = 300 RISER = 150 300 153 150 300 150 300 1500 1050 1B 2B 3B 4B 10° +100MM PAVEMENT +2450MM FIRST-MID-LANDING +4250MM SECOND-MID-LANDING +5900MM TOP-LANDING +9000MM CATWALK.LVL +10875MM TOP.OF.BILLBOARD 2 A4.3C KPTCL CABLE 300 450 600 600 +11170MM LIFT.ROOF.LVL 50 X 25 RHS HANDRAIL SHS 150 MEMBER 27° 1050 1050 1180 1050 2316 1050 1975 600 2300 600 1525 1 A4.3C 2100 3500 3000 VDF FINISH CONCRETE FLOORING SCALE- 1:50 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU sEcTIoN 1- A-4.3B
RHS HANDRAIL 6MM THK CHEQUERED PLATE ON SHS 50
STEPS @ TREAD =
=
X
FLAT
ROOF MEMBER
DIAPHRAGM
MEMBER
SHS 50 SUPPORT SHS 150 STRINGER 6MM THK CHEQUERED PLATE 50MM X 6MM MS FLAT 50 X 25 RHS HANDRAIL 39 38 37 36 SHS 50 SUPPORT SHS 150 SUPPORTING MEMBER 6MM THK CHEQUERED PLATE
150 INCLINED
50MM X 6MM MS FLAT 50 X 25 RHS RAILING 1050
150 SUPPORTING
50 X 25 RHS RAILING 50MM X 6MM MS FLAT 50 X 25 RHS RAILING 200 200 207 268 268 200 200 207 1750 200 200 207 268 268 200 200 207 1750 318 234 234 238 50° 40° EQ EQ EQ EQ EQ EQ 318 234 234 238 40° 50° EQ EQ EQ EQ EQ EQ 50° 40° SCALE- 1:10 fooT oVER BRIDGE, sT. johN;s cIRcLE, BENGALURU sEcTIoN AcRoss BoTToM LEVEL sEcTIoN AcRoss ToP LANDING sTAIRcAsE RAILING DETAIL
SHS
MEMBER
SHS
MEMBER

cRITIcAL APPRAIsAL

pLaCE MayapraXiS, BENGaLUrU

sPAcE

The design of the spaces allow them to flow into each other. Partition walls are minimized and furniture and structural members are used to delineate space. A similar palette of materials is used through out the structure creating a cohesive set of spaces.

sTRUcTURE

The inclusion of the double height spaces allow both the house and the studio to occupy one and a half floors each.

Exterior view of building Interior view of building

Location: Bangalore

Site Area: 260 Sq. mts

Built Up Area: 510 Sq. mts

Month/Year of commencement: January 2012

Completion Of Project: June 2014

Located on a north facing site, the building includes both the mayaPraxis studio as well as the residence of the principal architects. A composition of angled walls, double height spaces and exposed materials, the home and studio remain distinct entities.

The building is supported on a network of RCC columns and steel stanchions. The RCC columns are largely hidden within the structure where as the stanchions are left exposed.

By inverting beams, the roof of the studio appears to be a flat slab which allows it to be decorated without the interruption of beams. These beams are further concealed on the terrace floor by the rooftop garden.

Slabs are projected from the beams to create a platform on which the brickwork can continue, thereby hiding the beams and allowing only the thin line of the slab to be exposed.

Also, be angling the walls, space is created for a window, the slab overhead acts as a sunshade. This, in addition to the angled wall, allows diffused light into the building while still allowing views outside.

Section

mayaPraxis studio Residence

The expanse of the studio Openings in facade Section along the longer length of the building along the shorter length of the building

cRITIcAL APPRAIsAL

pLaCE MayapraXiS, BENGaLUrU

MEZZANINE PLAN

GRoUND fLooR PLAN
wEsT ELEVATIoN NoRTh ELEVATIoN
fIRsT fLooR PLAN sEcoND fLooR PLAN

cRITIcAL APPRAIsAL

pLaCE MayapraXiS, BENGaLUrU

MATERIALs AND coNsTRUcTIoN

The building was constructed using Cement Stabilised Earth Blocks, made from the earth found on the site.

The use of CSEB in a rat trap bond allows electrical conduits to be located in the voids between the blocks.

Composed of palette largely of exposed concrete, reclaimed wood, MDF and steel, the surfaces are left free of plaster and paint.

LIGhT AND VENTILATIoN

The western facade of the building is left free of openings. Large windows on the northern and eastern facade provide the bulk of the light in the studio space. Additionally, three large skylights punctuate the roof slab and allow light to penetrate through the various levels.

The double height space and windows help in effective cooling of the space. Further, the use of CSEB in a rat trap bond create a thermal mass which keeps the interiors cool.

Double height space in the studio with a skylight Section along the longer length of the building View of conference hall