Behind the Curtain
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
1
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
Behind the Curtain Behind the curtain is a room with a calm and relaxed atmosphere that provides groups the power to change their spatial conditions to suit their needs. The main element in the room is a double curtain that has the potential to divide the room in two or three smaller spaces. The users can also play with the light conditions and the arrangement of the furnitures to create new and interesting ways to meet, discuss and make decisions. As the nature of the meetings changes over the day the room can easily continue to change by opening, separating, connecting, moving, stacking, grouping darkening, lightening up…
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
2
LiAi Folkets Hus Room Project // UMA
In such a situation, it would probably help if the group split up for a while, discussed the subject Detailing, Estimating, LiAi | Umeå of Architecture in smaller groups,Planning and then//came backSchool together to sum up the ideas. By dividing the room by curtain ´walls´, the group can split and reunite in seconds. There´s no need to move chairs or reposition tables. By a simple pulling of the curtains, a new setting is created, a setting maybe quite convenient for shy or introvert people, that tend to express their ideas lot easier in a more casual, private atmosphere.
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
3
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
4
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
5
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
Instructions of use Behind the curtain is a room that can be changed regarding space division, light and furnitures. The transformation from one condition to another is quick and easy to do, making is possible for the room the change several times over a day. Curtains The walls of the room are encompassed by light colored curtains spanning from the floor to the ceiling. Inside the room are two additional sets of curtains, one opaque and one translucent, sliding on two parallel tracks in the ceiling. By pulling the curtains along the tracks the room can quickly be divided into several smaller spaces. Position 1 - One big space Curtains are stored along one of the walls. In this position the room can host presentations, discussions, exhibitions in bigger groups.
Position 2 - One big and one small space One (or both) curtains are slided half way along the track, creating one smaller enclosed space within the room. This posi tion could be usable for smaller meetings or interviews.
Position 3 - Three smaller spaces Pulling both curtains from the starting position to the opposite side of the room creates three smaller spaces. This is conve nient when a bigger group temporarily wants to divide into sma ller groups.
Light fixtures The main light sources in the room are light fixtures placed in-between the curtain tracks in the ceiling. When the curtains are pulled infront the light is filtered and softened through the fabric. This makes is possible to change and play with the qualities of the light. The rooms also contains three ceiling lights that can be operated individually. This creates a possibility for different light situations when the room is divided by the curtains. Furnitures Storage To enable the users to move freely and get a more intimate and relaxed relation with the room, shoes are left in a shoe-storage outside the meeting room. The storage is made of untreated (?) plywood sheets, with slots big enough for individual sets of shoes. The shoe-shelf also have low parts for sitting on. One wall in the room contains a bench with storage. Parts of the storage are fixed shelves and parts are mobile boxes. The boxes can be moved around in the room to be used as tables or stools. The bench is hidden behind a curtain, giving easy access to pens, papers and other necessities. Flexible seating The only visible furnitures in the room are easy to move, cushion-like seatings. The seatings are tactile and can be arranged in many different ways depending on the type of meetings and activities taking place.
The curtains can be placed in-between the above mentioned positions, letting different groups find create a room/different rooms that suits their needs.
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
6
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
Position 1
Position 2
Position 3
Position 3
Light - even distributed
Light - focused
Light - focused
Light - focused
Furniture - auditorium
Furniture - circular
Furniture - groups
Furniture - even distributed
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
7
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
Scenario 01 - Big meeting Users: 25 people Equipment: Internet Projector Projection screen 14 poufs seats 16 box seats 4 box tables The planning of a new school in Umeå is starting and a group of teachers, students, civil servants and architects are meeting in ’Behind the curtain’ to talk about their needs and expectations of the project. The room start as one big space as the group presents ideas for each other. Later the room is divided into smaller spaces so specific topics can be discussed in smaller groups.
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
8
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
...
...
...
...
...
...
...
... ...
...
...
... ...
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
9
...
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
Scenario 02 - Interview room Users: 25 people Equipment: Internet Projector Projection screen 14 poufs seats 16 box seats 4 box tables Interview 01 The yearly literature festival in Umeå has just started and a highly esteemed writer has been invited to a talk about her recent publication; a long awaited collection of short stories. Media are eager to meet her and ’Behind the curtain’ is chosen to host the interviews. The curtains are pulled so a intimate interview-space is created inside the room. The light in the rest of the space is dimmed down and used by journalists and photographers waiting for their turn to talk with the author. Interview 02 A local company is hiring a new colleague. The success of the company is depending on collaboration and everyone is eager to find someone who will fit in the group. The interview is held in ’Behind the curtain’ because of the possibility for everyone in the company to be part in the decision without creating an intimidating situation for the person being interviewed. The room is divided into two spaces, the space closest to the door is used for the interviews and the other for the staff, so they can listen to what is said and later give their opinion on the applicants.
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
10
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
...
...
...
...
... ...
...
...
... ...
... ...
... ...
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
11
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
Physical Qualities 1. Fixed curtain A semi opaque curtain blurs the borders of the room and creates a diffuse endless space. The off white color and the texture of the material has a natural and soothing quality. 2. Moveable opaque curtain This velvet sky curtain catches the light and creates a blurred horizon along the back wall, until it moves through the room in a soft gesture, dividing and embracing. 3. Moveable translucent curtain Like a sheer cloud this translucent curtain moves in the room, at times it covers the velvet sky, at times it glides like a wind through the room. 4. Carpet The stripes in the carpet widens, and creates a more proportional room. The wool acts as the soft ground of this interior landscape and slightly tickles its visitors. 5. Seating It looks like stone but it feels like cotton. Soft stone like poufs are scattered in the room, they are inhabited and distributed by the visitors. These flexible stones enable various forms of meetings, discussions and presentations. 6. Cushions Just like the rocks, the pebble stone pillows might look hard, but they are soft like cushions. The pebble pillows together with the rocks, create a mysterious yet playful atmosphere and at the same time they provide the visitors with comfortable and creative seating.
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
7. Boxes A storage built of plywood boxes is hiding behind the curtain along the wall. It is the host of everything from paper and pens to pebble pillows. But the boxes are not always hiding behind the curtain, one by one they sometimes leave their hiding place and move into the room, acting as tables and stools. 8. Shoe shelf The entrance to this room is different from all the others, it is not just a door, it is a transition. It is made of plywood sheets and the lower part consists of benches and shelves. The benches provides a place where the visitor can sit down to take the shoes off before stepping in to the landscape of the room. The shelves are filled with shoes, gossiping about the owners inside the room. 9. Lighting system A light track marks the footprint of the curtains in the ceiling. The light changes as the curtains move through the room, hiding and revealing the light. 10. Punctual lights When the room is divided by the curtains, the smaller spaces can be lit by floor lamps accessible from the storage area behind the curtain. These creates a good light situation and a comfortable atmosphere in each of the spaces.
12
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
1. Fixed Curtain
2. Movable Opaque Curtain
3. Movable Translucent Curtain
4. Carpet
5. Seating
6. Cushions
7. Boxes
8. Shoe shelf
9. Lighting System
10. Punctual Lights
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
13
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
Drawings
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
14
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
15
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
16
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
17
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
18
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
19
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
20
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
21
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
22
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
23
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
24
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
25
LiAi Folkets Hus Room Project // UMA
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
26
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
Quantity Survey
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
27
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
SPECIFICATIONS
FOLKETSHUS ROOM CHALLENGE Valuation
C.01 Demolition
0,00
C.02 Masonry
0,00
C.03 Framing
0,00
C.04 Internal linings
35 963,25
C.05 Finishes
46 423,00
C.06 Joinery, furniture and doors
92 388,60
Bought seating and pillows
84 500,00
C.07 Heating and ventilation
0,00
C.08 Electrics Punctual lights
28 676,50 18 000,00
Total
203 451,35
1
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
28
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.01.01
hours
Labour, demolish cealing
450,00
0,00
C.01.02 C.01.03
hours hours
Labour, demolish door Labour, demolish fixed window
450,00 450,00
0,00 0,00
C.01.04
hours
Labour, extract carpet
450,00
0,00
C.01.05
hours
Labour, extract ventilation system
450,00
0,00
C.01.06 C.01.07
hours hours
Labour, extract electrical system, power outlets Labour, remove internet outlets
450,00 450,00
0,00 0,00
hours hours
Labour, extract baseboard, preserve parts for reuse if possible Labour, remove coat hanger
450,00
0,00
450,00
0,00
C.01 Demolition
C.01.08 C.01.09
Total
0,00
1
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
29
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.02.01
m2
…
…
…
…
C.02.02
…
…
…
…
…
C.02 Masonry
Total
1
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
30
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.03.01
m2
…
…
…
…
C.03.02
…
…
…
…
…
C.03 Framing
Total
1
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
31
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.04 Internal linings C.04.01
m2
C.04.02
liters
C.04.03
liters
C.04.04 C.04.05 C.04.06
hours hours hours
C.04.07
hours
Carpet. Kasthall Flatweave, Macro Mellange 9211 Light Grey. Paint, Beckers white primer. 10 liters/bucket. 4-7m2/liter (Price including VAT) Paint, Beckers, wall paint matte. 9 liters/bucket. 6-8m2/liter (Price including VAT) Labour, installing new ceiling Labour, installing new carpet. Labour, installing new baseboard
45,00
785,00
35 325,00
0,25
595,00
148,75
0,50
979,00
489,50
0,00
450,00 450,00 450,00
0,00 0,00 0,00
350,00
0,00
Labour, painting the existing green wall with 1 coat of primer and two coats of white NCS 0300-N Total
35 963,25
1
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
32
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.05 Finishes C.05.01
m
Fixed curtain semi opaque. Kinnasand Unix 6704 100% Polyester, flame retardant. H3400 Roll width 1,55m
60,00
318,00
19 080,00
C.05.02
m
Fixed curtain, window part, semi opaque. Kinnasand Unix 6704 100% Polyester, flame retardant. H3100 Roll width 1,55
14,50
318,00
4 611,00
C.05.03
m
Flexible curtain, translucent. Kinnasand Tampico 6000 100% Polyester Trevira CS, flame retardant. H3100 Roll width 3m
16,50
226,00
3 729,00
C.05.04
m
Flexible curtain, opaque. Kirkeby Ion Cream K5107/02 100% Polyester velvet, flame retardant backcoated. H3100 Roll width 1,4
33,00
262,00
8 646,00
C.05.05 C.05.06
m units
Curtain rod, Silent gliss 6103, rod length 6m Minitrissa (short pulley), Silent gliss 6283, 12/m
16,00 981,00
99,00 6,00
1 584,00 5 886,00
C.05.07 C.05.08
units units
103,00 6,00
13,00 258,00
1 339,00 1 548,00
C.05.09
hours
0,00
450,00
0,00
C.05.10
hours
Ceiling attachment, Silent gliss 6124, 1/80cm Rod joints, Silent bliss 6512 Labour, sewing curtains. Hemming top and bottom. Selvedge edges. Attatching curtains to curtain rod. Labour, installing Curtain rod. Cassemble curtain rod and attatch to ceiling.
0,00
450,00
0,00
Total
46 423,00
1
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
33
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.06 Joinery, furniture and doors C.06.01
units
New door, plywood sheet 18x1220x2440
2,00
433,97
867,94
C.06.02 C.06.03
units units
New door, wood studs 45x70x5400 New door, door handle
2,00 1,00
61,34 209,00
122,68 209,00
C.06.04
units
Furniture, shoe shelf in hallway, plywood sheet 18x1220x2440
14,00
433,97
6 075,58
C.06.05 C.06.06
units units
Furniture, shoe shelf in hallway, wood studs 45x70x5400 Furniture, storage, plywood 18x1220x2440
10,00 0,00
61,34 433,97
613,40 0,00
C.06.07
units
1,00
41000,00
41 000,00
C.06.08
units
1,00
14500,00
14 500,00
C.06.09
units
1,00
11500,00
11 500,00
C.06.10
units
Furniture, Livingstone Enza 100% wool. 1800x1000x700 (Price including VAT) Furniture, Livingstone Monica 100% wool. 1000x780x400cm. (Price including VAT) Furniture, Livingstone Rosa 100% wool. 950x640x400 (Price including VAT) Furniture, Livingstone Carla 100% wool. 700x600x400. (Price including VAT)
2,00
7500,00
15 000,00
C.06.12
units
2,00
650,00
1 300,00
C.06.13
units
Furniture, Pebble stone pillows, pack of 6. (Price including VAT) Furniture, Stuffing for pebble stone pillows
12,00
100,00
1 200,00
C.06.14
hours
Labour, installing new door
450,00
C.06.15 C.06.16
hours hours
Labour, building and installing shoeshelf Labour building and installing storage unit
450,00 450,00 Total
92 388,60
1
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
34
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Umeå School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.07 Heating and ventilation C.07.01
units
Ventilation system
C.07.02
…
…
0 …
…
…
Total
1
Umeå School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
35
LiAi Folkets Hus Room Project // UMA
Detailing, Estimating, Planning // LiAi | Ume책 School of Architecture
SPECIFICATIONS Code
FOLKETSHUS ROOM CHALLENGE Unit
Description
Quantity
Price per unit
Valuation
C.08 Electrics C.08.01
units
Flexible LED strip 3528 SMD-24W, 5 m, White, 12V
7,00
320,00
2 240,00
C.08.02 C.08.03
units units
Aluminium profile, frosted glass, 20x197x1000 Punctual, moveable lights, CESTA lantern
35,00 4,00
160,00 4500,00
5 600,00 18 000,00
C.08.04
units
C.08.05
units
Switch ELKO Art. No: 008,072
6,00
95,90
575,40
Socket ELKO Art. No: 008,112
9,00
95,90
863,10
C.08.06
units
2,00
699,00
1 398,00
C.08.07
hours
C.08.08 C.08.09
hours hours
475,00
0,00
475,00 475,00
0,00 0,00
C.08.10
hours
475,00
0,00
Wall Dimmer 10-300W VADSBO BD600 Quiet operation with high efficiency for LED lights Install new electric systems with power otlets along the wall, according to drawing. Install projector in ceiling according to drawings Install projector screen in ceiling according to drawings Install internet outlets along the wall according to drawing. Total
28 676,50
1
Ume책 School of Ar
chit ectur e
Labor atory of Immediate Architectur
al In te rv entio n
36