PRACTICAL CONSERVATION GUIDELINES FOR TRADITIONAL BUILDINGS IN HIMARA COASTAL VILLAGES APPENDICES
4. Appendices This section includes detailed information on legislation and regulations in force in the focus area of this Himara Villages Rehabilitation Guidebook along with descriptions of the cultural heritage terminology applied in these areas. Regulations regarding Historical Centres and detailed maps of each of the Historical Centres are also included here. It also contains information on how to acquire permission and the lists of necessary documents for permission in the Cultural Heritage institutions as well as Municipality. This section also provides a list of architects with license in restoration and contacts of institutions where you can acquire more information. This document was developed in June 2018. Any information stated here may be subject to change.
Appendices Content: 4.1 Appendix A: Laws and Regulations 4.2 Appendix B: Terminology in the law 4.3 Appendix C: Historic Centres 4.4 Appendix D: How to get Permission 4.5 Appendix E: Important Contacts Imprint
appendices
1
4.1 Laws and regulations The traditional villages of Himara Municipality have a significant cultural and historical value. These settlements should be protected and developed in a sustainable way. Certain regulations are drafted for the protection and the future development of these important assets. These documents are the basis regulating policies for the territorial development in these areas. They define the allowed interventions as well as conditions for development. Some of these areas are more specifically regulated than the other ones, according to the level of importance. These laws/regulations are: 1. Cultural Heritage Laws: • Law Nr. 90 48, date 07.04.2003 “For Culture Heritage”, amended • Law Nr. 27/2018 27.06.2018 “For Cultural Heritage and Museums” 2. Decision of Council of Ministers (DCM) for the designation of Historic Centres Since January 2016, four villages in Himara Municipality are designated as protected historic centres. These villages are Himara village, Dhërmi, Vuno and Qeparo village. These villages are protected historic centres and as such, there are certain rules to be followed. • D.C.M Nr.28, date 20.01.2016 “On the Declaration of the Historic Center of Himara and the adoption of the regulation for the administration of the buffer zone around”. • D.C.M. Nr.29, date 20.01.2016 “On the Declaration of the Historic Center of Dhërmi and the adoption of the regulation for the administration of the buffer zone around”. • D.C.M. Nr.30, date 20.01.2016 “On the Declaration of the Historic Center of Vuno and the adoption of the regulation for the administration of the buffer zone around”. • D.C.M. Nr.636, date 7.9.2016 “On the Declaration of the Historic Center of Qeparo and the adoption of the regulation for the administration of the buffer zone around”. 3. Himara General Local Plan Approved form the National Territorial Council on 16.10.2017 Decision Nr.02 These laws envision rules and development policies that need to be followed. Developments and new construction are more restricted in some areas, depending on their protection status. Categories of Protection Status:
1• Monuments of 1st or 2nd Category 2• Inside a Historic Centre or Buffer zone (in Dhërmi, Vuno, Himara, Qeparo) 3• A building that doesn’t have Cultural Heritage Status (does not fall under any of the categories above) but is part of a traditional village.
2
LAWS AND REGULATIONS
For more details on what these regulations envision and detailed maps of the historic centers, see page 4-9.
4.2 Terminology in the law 1. Extracts from the Law Nr. 27/2018 “For Cultural Heritage and Museums” (unofficial translation).
2. Extracts from the Decisions of the Council of Ministers for the designation of Historic Centres of Himara, Dhërmi, Vuno and Qeparo (unofficial translation).
1 What is a Cultural Monument? “Cultural monument”, is the object or the construction of historical-cultural values that is protected by the state1. Division of Monuments according to the categories
• “Cultural Monument of the 1-st Category” is the construction of special
importance for the cultural heritage which is preserved in the entirety of their architectural and technical components1. 1. Compositional and architectural components cannot be changed. 2. Volume composition, architectural treatment of the outer and inner faces as well as the functional solutions (plan arrangements) can’t be changed, 3. Architectural and technical components (construction techniques and materials) cannot be changed 4. The yards, the fences, the outer gate and the supporting structures are an organic part of the monuments and as such, are prone to the same rules. 5. When a part of the monument has been damaged transformed or is missing, complementary interventions can be undertaken, in accordance with the initial state. 6. For Monuments outside the Protected Centres, it is not allowed to build new structures in the properties in the borders of Culture Monuments. 7. For Monuments outside the Protected Centres, it is not allowed to build new structures in the properties in the borders of Culture Monuments. 8. Each case should be analyzed from the National Restoration Council2.
• “Cultural Monument of the 2-nd Category” 1. Second category monuments are buildings with cultural-historic values, mainly as an integral part of the urban-architectural ensemble, which are part of the urban fabric of the village along with their own architectural values. 2. Second Category monuments are kept intact in terms of their initial volumes and architectural treatment both inner and outer in cases when it is necessary to preserve typical environments and elements such as wood carvings, gypsum work, ornaments or valuable architectural furnishings. 3. In the inner parts of second category monuments it is allowed to change the compositional structure as well as the usage of contemporary techniques, without damaging the outer composition2.
2 What is a Historical Centre? “Historical Centre” is a distinct urban territory, part of a city/village, representative of a historical period or of a development city stage, consisting of elements of intangible cultural heritage which, apart from the urban structure, include architectural, environmental, cultural, historical elements, landscapes within and around the area, archaeological evidence, panoramas, urban profiles, prospects and the points of the reference. Historical Centres are important areas of historical and cultural value, and as such, they are protected from the law. Every intervention that will be done in Historical Centres should follow the regulations provided in the Decision of Council of Ministers and be approved from the National Territorial Council1. 3 What is a Buffer Zone? “Buffer zone” is a defined territory with clear boundaries outside the historical centre, the architectural / urban ensemble, the architectural complex and the cultural monument, whose role is the protection of the values of these cultural properties, and the provision of the light, perspective, cultural landscaping, viewing, enjoying and using by the public1.
TERMINOLOGY
3
4.3 Historic Centres Himara Fshat The Historic Centre of Himara city is confined from the southern, western and northern part from the surrounding walls of the Himara Castle and it is the area with significant historic and architectural values, documenting the development path of this settlement since antiquity up to the present. It contains antique monuments such as Himara Castle, whose beginnings date back to the IV-III B.C. centuries, monuments of worship, such as the Church of St. Sergius and Bacchu, which must belong to the Episcopalian centre of Himara, a series of other post-Byzantine churches as well as a series of dwellings with a great variety and a cobblestoned path network. The Borders of the Historic Centre of Himara, and the protected area around are illustrated in the zoning map below.
II Buffer zone Sub-category 2 (Green Area) Historic Centre
I
Buffer zone Sub-category 1
Culture Monument Buildings
4
historic CENTRES
Historic Centre Sub-category 1
Sub-category 2 (Green Area)
0
50
100 (m)
Dhërmi The Historic Centre also includes the green areas inside of its boundaries. The historical centre of Dhërmi is comprised of two zones: • Zone I which includes buildings in both sides of the National road, at the entrance of Dhërmi village; • Zone II which includes old part of Dhërmi and extends in the north-eastern direction, up to the ruins of the Monastery of Panaisë, and extends up to the National road in the south-western direction.
I
Historic Centre
II
Buffer zone Sub-category 2 (Green Area)
II
Buffer zone Sub-category 1
I
Culture Monument Buildings
Historic Centre Sub-category 1
Sub-category 2 (Green Area)
0
0 100
50
100200 150
300 (m)
historic CENTRES
5
4.3 Historic Centres Vuno The Historic Center of Vuno Village is comprised in two zones: • Zone I which includes the buildings on both sides of the national road (mainly Old Vuno); • Zone II which includes the section located below the national road that consists of the Church of St. Spiridon ensemble together with the school and the Church of St. Mehill. In these areas there are included a considerable number of dwellings with a varied typology and a cobblestone road network, sometimes developed in gradients on the steep terrain sometimes with tunnel passageways under village dwellings.
I Historic Centre
15
Qendra Historike I
Buffer zone Zona e Mbrojtur
II
Qendra Historike II
Culture Monument Buildings
6
historic CENTRES
Historic Centre Sub-category 1
Sub-category 2 (Green Area)
0
100
200
300 (m)
Qeparo The historic center of the village of Qeparo (old village) includes all the existing buildings and consists of a compact traditional composition that develops around the church and the central square. The built ensemble represents interesting typologies, especially in the formation of urban spaces, and includes a considerable number of dwellings with a varied typology among which a dwelling of 1st category cultural monument (Minella Gjika’s house) and a cobblestone road network, sometimes developed in gradients on the steep terrain and sometimes with tunnel passageways under village dwellings. The buildings are generally 2-storey and are constructed with stone wall.
Buffer zone Sub-category 1 Buffer zone Sub-category 2 (Green Area) 15
Qendra Historike I
Historic Centre
Zona e Mbrojtur
II I Qendra Historike II
0
Culture Monument Buildings
50
100
150
Historic Centre Sub-category 1
Sub-category 2 (Green Area)
0
100
200
300 (m)
historic CENTRES
7
4.3 Historic Centres Allowed Interventions in the Historic Centre: • The restoring and revitalizing interventions in the Historic Centre of as well as in monuments of both categories will hold the purpose of converting the historic centre in an important touristic centre of rural and familiar character. In order to accomplish this scope, studies on the restoring and revitalizing intervention methods are conducted for the Historic Centre as well as for the rehabilitation of its special areas. In order to preserve the urban-architectural values of the Historic Centre, inside this area it is only permitted: • Systematic preservative interventions, restoring and maintenance in the Historic Centre, as well as in the monuments of both categories, which lean on the criteria for the preservation and restoration as specified in the national and international normative acts of the field, implementable in our country as well. • Restoration interventions which aim at the preservation of urban-architectural spaces, the traditional path network both in terms of technical aspects and composition, keeping intact the land configuration of the urban fabric (solid vs void ratio) as well as traditional vegetation; • surveys for the rehabilitation of the particular parts, regarding the structures which being built, damage the values and compositional unity of the Historic Centre. • surveys that define the structures where preservation and restoration work is going to be done, in order to increase their values, objects in state of decay or inappropriate for the function they hold that affect the urban fabric of the area where it is allowed to intervene as well as the green plots. • Rehabilitation and preservation or restoration interventions in a series of structures in the Historic Centre which are in state of decay, in order to prevent their further degradation. In cases that the ruins are preserved and represent architectural, compositional values, but affect the ensemble of objects they are part of, reconstruction process can be done on the same volume of the existing structure (circumferential walls), with the main aim of preservation, as much as possible, of the authentic visible inner and outer elements, based on the clear graphic, photographic, based on the typology, architectural treatment, and the original construction technique. In cases that the ruins are less than 3 meters, they must be strengthened and can be re-erected in special occasions, in accordance with the principles mentioned above. The Projects for these interventions must be analyzed and approved by the Scientific Council as well as the National Restoration Council. • In cases of natural disasters, such as dam collapses or combustions of valuable cultural heritage objects, the reconstruction can be done on the existing structures, in accordance with the compositional and architectonic arrangement of the state prior to the combustion, based on the clear graphic documentation. • The retreading and reconstructions which are integrated in the architectural ensemble of the area, in accordance with the composition and treatment of the outer facades, keeping the maximum height intact. • In the Historical Centre it is not allowed to build new structures with the exception of underground engineering systems and reconstructions also mentioned above. • Projects for th adaptation, reconstructions or new additions are approved from the National Restoration Council.
8
historic CENTRES
Extracts from the Decision of the Council of Ministers for the designation of the Historic Centres of Himara, Vuno, Dhërmi and Qeparo (unofficial translation).
The Buffer zone and its boundaries The buffer zone consists of: • Buffer zone 1 • Buffer zone 2 Buffer zone 1 contains a series of dwellings with architectural values as well as the village’s typical path network. Buffer zone 2 is an area with structured vegetation, which consists of an ancient plot, planted with olive trees. The buffer zone’s boundaries are defined with geographical coordinates as well as in the zoning map of each of the villages.
Extracts from the Decision of the Council of Ministers for the designation of the Historic Centres of Himara, Vuno, Dhërmi and Qeparo (unofficial translation).
Allowed Interventions in the buffer zone • In the buffer zone the path network’s composition is preserved • The environmental values are preserved, keeping the land configuration as well as the variety of the traditional vegetation. • It is not allowed to change the existing path network. Interventions must preserve the traditional techniques and materials. • Restorations, adaptations and reconstructions are done in order to increase the values of the structures as well as improve the living conditions, which must be in accordance with the architectural and urban character of the ensemble. • The maximum height of floor number must be equal to the average floor number of the adjacent buildings. However, not more than 2 storeys-6.5 m up to the roof cornice. • The architectonic composition of the buildings must be adapted to the architectonic and ornamental character of the traditional architecture, using stylizations(small interpretations) of its morphological, compositional, volume and color features. • The projects for adaptation, reconstruction as well as new buildings are approved by the National Council of Restoration. The survey, design and implementation of work in the Historic Centre as well as specific monuments. • The Restoration projects and culture monument’s restoration are done by specialized governmental institutions and licensed subjects. The projects are evaluated in the Scientific Council of Institute of Culture Monuments and approved by the National Restoration Council. • The implementation of the previous work is done by the Regional Directorate of the National Culture Vlorë or by licensed subjects in restoration under the surveillance of the supervisor, appointed by the Institute of Culture Monuments. • Studies and projects for the intervention on the street network and underground infrastructure are drafted by the Institute of Culture Monuments, Regional Directorate of National Culture Vlorë in collaboration with Himara municipality or from licensed subjects in restoration field. Exploitation of monuments • The Culture Monuments are part of the contemporary environment. They are utilized, according to each specific case, for the functions they were initially built for as well as for other functions, provided that this new function does not affect the values for which the monument is protected. • The exploitation of culture monuments, for purposes other than the one they were initially built for, can be done only after it is approved in the National Restoration Council.
historic CENTRES
9
4.4 How to get Permission • If your house is a Culture Monument or located in one of the Historic Centres, follow Case A, and then Case B • If your house is not a Culture Monument or in a Protected Centre, skip to Case B directly
Case A: Protected centres & Culture Monuments In Protected Centers and in cases of buildings that are Culture Monuments (either first or second category) the permission procedures in the villages go through two steps: • Firstly, it is required to apply for permission in the Institute of Culture Monuments. To do so, you need to submit the full documents to the National Directorate of Culture Monuments (DRKK Vlorë). After it is inspected from the DRKK, the documents are sent to the Institute of Culture Monument, the Technical and Scientific Secretariat and then to the National Territorial Council (KKR). Only after being granted the permission • From the Institute of culture Monuments, you can follow the process and apply for permission in the Municipality (list of documents to apply for permission can be found in the next page). • After completing the first step, the process continues by applying for permission in the Municipality.
In case of Culture Monuments or Historic Centres, before initiating the procedures of application, it is advisable to go to the Regional Directorate of Culture Monuments Office (DRKK) in Vlora. There, you will find all the necessary information regarding the application procedures. The project should be drafted by an architect with a license in restoration work The Project should follow the restrictions and rules provided in the Albanian Restoration Card, The Law for Cultural Heritage (see page..) and the Decision of Council of Ministers (see page..) for Protected Historic Centres.
Documents that are required for permission: 1. The detailed project of restoration which should include detailed plans, façades, sections of the existing and proposed structure. This package should also contain the property titles of the structure. The package should be in three copies and should have the sign of the architect who drafted the project. 2. Technical Report; This report should contain a short description of the structure’s history, its current status, location, previous interventions (if any), existing state, as well as all envisioned interventions. These report should be accompanied with photographic evidence and signed by the architect who drafted the project. 3. Technical specifications. All materials used and interventions should be specified clearly. This document should be signed by the architect who drafted the project.
2
4. Project Report and Financial Projections / Estimation Costs of Construction, with clear and detailed budget items and signed by the architect.
DRKK Vlorë
5. Graphical Materials: there should be clear specifications regarding: the position of the object in Google Earth and zoning map, pictures of the existing state, drawings of the existing state and proposed interventions. 6. A CD With all graphical materials of the project, either in PDF or Autocad format. 7. A presentation in Power Point (for presentation at the Scientific Council and National Restoration Council).
10
Tiranë IMK KKR
HOW TO GET PERMISSION
1 Bashkia Himarë
Houses that have the status of Culture Monument in Himara Municipality: In Himara Municipality, there are no Second Category Cultural Monuments.
DhĂŤrmi
Vuno
Old Himara
Old Qeparo
House of Strati Zhupa
Ruins of Odise Kasneci House
House of Tano Jorgji Goro
Minella Gjika House
House of Lluk Petro Zhupa
House-monument of Nushi brothers The House with tower of Shane Koka
Lilo Llazari House
Ali Pasha (Vlashaj) Tower
Kumi Tower Vreto Tower
Ilias House of Lluk Gjideda
Vongli Tower
Ornamental Ceiling of Pirro Gjikopulli House Petro Marko House
Case A: Protected centres & Culture Monuments Local Resident
Architect with license in restoration
To apply for permission you need to posses ownership title
Prepare full materials package
Submit package to DRKK
Updated list of Architects can be found in DRKK Office, VlorĂŤ
If there is any problem with documents application is sent back
DRKK sends package to the Institute of Culture Monuments
Institue of Culture Monuments revises documents
Application is revised in the upcoming Scientific Council by National Restoration Council
Continue with application in the Municipality (follow Case B)
Permission is granted
HOW TO GET PERMISSION
11
4.3 How to get Permission Case B: Application at Municipality If the house is not a Monument and neither inside a protected historical centre, you should only apply for permission at the municipality. There are three types of categories if you want to make changes in your house
1• Interventions which do not require a permission, 2• Interventions which only require submitting a preliminary statement 3• Interventions which require a permission for reconstruction work
What procedure applies to the intervention I want to carry out?
1
Interventions that do not require a preliminary statement or construction permission: • External Interventions for Repairing and Replacing Finishing • Interventions in the exterior of buildings, provided the original features are preserved • Refreshment /relaying of painting, plastering and coating of facades with materials that have the same characteristics and colors as existing ones; • Cleaning of the facades • Repair and replacement of windows and doors, shutters and shopfronts (including the use of different materials) without changing its features such as, shape, color, design and dimensions of open elements • Partial replacement of roof covering, without changing the shape, slope and characteristics of the coating; • Repairing and replacement of gutters and chimneys, even with different materials • Repairing of balconies, terraces, basements or protective barriers; • Placing window security bars • Placement of sun shades and mosquito nets; • Courtyard Arrangement • Repairing of existing surrounding walls / fences • Inner interventions: • Floor structure repairing and reconstruction; • Repairing and restoration of plaster and paint; • Repairing and renovation of doors and windows, including the placement of glass panels. • Interventions in sanitary facilities: • Repairing and replacement of sanitary and other plant facilities • Works for the elimination of architectural barriers and adaptation • Addition of structures for persons with disabilities; • The movement of soil, that is related in particular to the exercise of agricultural or livestock activities, including interventions in hydraulic farming plants.
12
HOW TO GET PERMISSION
If the intervention you want to do is not stated here, please contact Municipality.
Case B: Application at Municipality 2
If the intervention you want to do is not stated here, please contact Municipality.
Interventions that require preliminary statement
• Interventions of general maintenance when they bring changes in existing features, such as shapes and colours; • Interventions in the interiors such as: - reinforcement of internal bearing structures; - opening and closing of internal doors; • The construction, removal or alteration of internal (non-bearing) walls, for example, for toilet facilities; • The placement of new sanitary facilities and heating / cooling plants. • Construction of ramps for the adaptation of buildings for persons with disabilities; • Structures that are installed for instant and temporary needs, without foundations, with demountable materials, without using reinforced concrete structures, concrete blocks or masonry and concrete flat roofs, which are removed in any case, within a maximum period of 6-months; • The installation of solar, photo-voltaic panels, in service of buildings, in accordance with the restrictions that may arise from the legislation on the protection of cultural, historical or environmental heritage; • Public infrastructure and electronic communications facilities, that do not affect the house’s constructive system, do not change the use and size of infrastructure, as well as development conditions in the surrounding area; • The repair, maintenance and rehabilitation of irrigation, drainage and flood protection infrastructure systems; • Placement of sun tents and pergolas, in accordance with the guidelines mentioned above (see page..) • Interventions aimed at maintaining or enhancing energy efficiency and acoustics in an existing structure that does not affect the constructive system of the building (e.g., foundation-based interventions, retaining wall, etc.); • Demountable greenhouses, without foundation, serving to agricultural activities; • Placing advertisements on the exterior facades, for the purpose of promoting private economic activity
HOW TO GET PERMISSION
13
4.3 How to get Permission Case B: Application at Municipality 3
Interventions that require construction permission
• Interventions that result in the construction of new structures, including temporary ones, except for cases provided in this regulation: • Interventions that result in reconstruction, renovations and restoration leading to the creation of a wholly or partially different structure from the previous one and resulting in the addition of units and / or alteration of the construction volume, the surface of the building, the external appearance of the building, the use or the constructive system • Placement of advertising on the outer facades, with the purpose of promoting private economic activity.
Case B: Application at Municipality What Documents do I need to submit for each of the procedures? Documents needed for the Preliminary Statement: 1. An authorization from the owner to the applicant (usually architect). 2. A notarized statement from the owner / co-owner of the property regarding the type of work they are going to carry out. 3. The ownership title or a certificate from the office of property registration (ZRPP), acquired in the last three months from the time of the application. (the cadastral map and the accompanying files should be attached). If you don’t posses ownership titles, a certification from the Municipality and the village chief confirming that the you are the owner of that property is also accepted. 4. The technical project, which includes existing and intervention plans needed to be submitted, the technical report from the architect / designer and architect’s personal license (notarized), where the license category is in accordance with the type of interventions that will be made, within the validity period.
14
HOW TO GET PERMISSION
Case B: Application at Municipality In cases that you don’t posses ownership titles, a certification from the Municipality and the village chief confirming you are the owner of that property is also accepted. For more information, please consult the village chief or Municipality office.
Documents needed for Reconstruction Permission 1. The application form. 2. A notarized statement of the applicant’s authorization. 3. Certificate of ownership or a certification from the property office, with the map attached, acquired from the property registration office (in case you don’t posses ownership titles, a certification from the Municipality and village chief is enough). 4. A venture contract, bound between developers, landowners (or their proxy representative), and the constructor who will complete the work, which should be original and bound before the notary. 5. License of the construction company. The subject should be registered in the National Registration Centre. 6. A certification by the General Directorate of Local Taxes, that the construction company has paid the local taxes and fees. 7. A topographic survey in scale 1:2000 8. Building’s plan in 1:500 scale (drafted by a licensed surveyor). 9. Timeline of the construction period 10. Construction Cost Estimation drafted according to the referential prices 11. A certificate from OSHEE (the operator of the electricity distribution) that all the payments have been done. 12. The Architectural Project • A Technical Report, drafted by the architect with all the technical specifications. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power. • Copy of the insurance policy of the designer 13. The Construction Project : • Attached to the project: • The technical report including a description and respective calculations. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power. • Copy of the insurance policy of the designer 14. The hydro-sanitary project: • The technical report including a description and respective calculations. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power.
HOW TO GET PERMISSION
15
4.3 How to get Permission • Copy of the insurance policy of the designer 15. The electrical project: • The technical report including a description and respective calculations. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power. • Copy of the insurance policy of the designer 16. The thermal and ventilation project:: • The technical report including a description and respective calculations. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power. • Copy of the insurance policy of the designer 17. Fire Protection Project of the structure, approved by the Fire Protection Directorate (signed) Attached to the project: • The technical report including a description and respective calculations. • The architect’s license with the respective categories of the construction work that will be carried out and within the respective time-frame. The designer should be registered in the National Registration Center. • A signed declaration of the architect, in which the architect declares his responsibility in drafting the project, in accordance to all the standards and regulations in power. • Copy of the insurance policy of the designer. 18. Technical assistance from the Construction Institute (Instituti i Ndërtimit) for all type of constructions. 19. Proof of payment of the application fee. 20. Proof of payment of the infrastructure impact tax.
16
HOW TO GET PERMISSION
Case B: Application at Municipality
Local Resident
Check in the list provided in this documents what type of procedure you need to follow
If the interventions you will carry out don’t require permission, you don’t need to go through the other steps
For Reconstruction Permission or Preliminary Statement
Get a notarized letter that allows the architect to take actions in your behalf
Hire an Architect
Get an ownership certificate or a certification from the Municipality and the village chief
Check the documents needed for the type of your intervention Make sure you have a complete package (list is provided in this booklet)
If any document is lacking Municipality sends application back
Submit package to Municipality
Permission is granted
HOW TO GET PERMISSION
17
4.4 Who to Contact List of Architects with a license in Restoration work
*Based on Data from the Institute of Culture Monuments, last edited on 23 April, 2018 A* - THE LICENSE INCLUDES ALL POINTS A/1;A/2;A/3;A/4 DESIGN - IMPLEMENTATION “AP. Design in the restoration of cultural heritage monuments and architecture.” “AP/1. Design in the conservation and restoration of archaeological ruins.” “AP/2.Design in the restoration of medieval architecture and monuments (not included monuments mentioned in points AP/3, AP/4).” “AP/3.Design in the restoration of civic buildings, monuments of 1st and 2nd categories.” “AP/4. Design in the restoration and re-qualification of historic centres.” AZ. Project implementation and restoration of cultural heritage monuments and architecture “AZ/1. Implementation in the conservation and restoration of archaeological ruins.” “AZ/2.Implementation in the restoration of medieval architecture and monuments.” “AZ/3.Implementation in the restoration of civic buildings, monuments of 1st and 2nd categories.” “AZ/4.Implementation in the restoration and requalification of historic centres.” B. Project implementation and restoration of art pieces and museum artefacts. “B/1. Design and Implementation in restoration of mosaics.” “ B/2. Design and Implementation in restoration of frescoes.” “B/3. Design and Implementation in restoration of wooden art pieces.”
NR
18
DREJTUESI TEKNIK
LICENSE
KATEGORIA
Lloji i licenses
ADRESA
TEL.
1 Jorgo Jani Xuhano
R.P. 11
KAT A* (A/1;A/2;A/3;A/4)
PROJEKTIM -ZBATIM
Gjirokaster
0692090049
2 Gentian Petraq Stratobërdha
R.P. 12
KAT A* (A/1;A/2;A/3;A/4)
PROJEKTIM -ZBATIM
Tirane
069 2083562
3 Uljam Thanas Çikopano
R.P. 13
KAT B *
PROJEKTIM -ZBATIM
Tirane
-
4 Hasan Mustafa Nallbani
R.P. 15
KAT B/2
PROJEKTIM -ZBATIM
Tirane
-
5 Hasan Mustafa Nallbani
R.P. 15/1
KAT B/1,B/3
PROJEKTIM -ZBATIM
Tirane
-
6 Spiro Zoi Laçka
R.P. 13
KAT B
PROJEKTIM -ZBATIM
Tirane
0692946754
7 Florenc Ruzhdi Sharka
R.P. 17
KAT A* (A/1;A/2;A/3;A/4)
PROJEKTIM -ZBATIM
Tirane
0682075359
8 Lida Fabian Miraj
R.P. 18
KAT A* (A/1;A/2;A/3;A/4)
PROJEKTIM -ZBATIM
Durres
0662031891
9 Agron Haxhi Doraci
R.P. 19
KAT A* (A/1;A/2;A/3;A/4)
PROJEKTIM -ZBATIM
Gjirokaster
0697300807
10 Aleko Ilo Papakozma
R.P. 20
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Korce
0692065432
11 Veli Hivzi Shehu
R.P. 22
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
04 22 74778
12 Adelina Vasil Baballëku
R.P. 23
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Berat
0692029050
13 Sokrat Thellor Kuvarati
R.P. 24
B/2;B/3
PROJEKTIM -ZBATIM
Gjirokaster
-
14 Mantho Thoma Bozhori
R.P. 24
B/2;B/3
PROJEKTIM -ZBATIM
Gjirokaster
-
15 Romen Myqerem Çeçi
R.P. 26
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Vlore
0672343371
16 Genc Vasfi Samimi
R.P. 27
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0692054802
17 Arben Nazmi Biçoku
R.P. 28
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0682023589
WHO TO CONTACT
18 Sotir Spiro Kosta
R.P. 29
B/3
PROJEKTIM -ZBATIM
Tirane
0693965170
19 Valter Veli Shtylla
R.P. 30
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
-
20 Reshat Sami Gega
R.P. 31
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0695195814
21 Shpresa Mihal Prifti
R.P. 32
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0682320457
22 Skender Neki Bejko
R.P. 33
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0692071315
23 Florian Kristo Denek
R.P. 34
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Sarande
-
24 Sulejman Isuf Dashi
R.P. 35
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0682072974
25 Genci Riza Bregu
R.P. 36
A/2;A/3;A/4
PROJEKTIM -ZBATIM
Korce
0694097123
26 Gligor Stefan Marto
R.P. 38
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Sarande
0692862099
27 Kozeta Toli Angjeliu
R.P. 37
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0692273370
28 Hekuran Safet Halili
R.P. 39
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Sarande
-
29 Pirro Thoma Thomo
R.P. 40
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0672343371
30 Gjerak Mazllem Karaiskaj
R.P. 41
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0692070172
31 Gjergj Kristo Frashëri
R.P. 42
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
32 Kliti Miço Kallamata
R.P. 43
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Korce
0692147022
33 Albert Stefan Plumbi
R.P. 44
B/3
PROJEKTIM -ZBATIM
Korce
-
34 Mustafa Muhamed Arapi
R.P. 45
B/3
PROJEKTIM -ZBATIM
Tirane
0682148893
35 Daniel Dhimitër Gjoni
R.P. 46
A/3;A/4
PROJEKTIM -ZBATIM
Tirane
-
36 Florian Faslli Nepravishta
R.P. 47
A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0682071811
37 Elena Sokrat Mamani
R.P. 48
A/3;A/4
PROJEKTIM -ZBATIM
Gjirokaster
-
38 Alban Romeo Efthimi
R.P. 49
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
-
39 Maksim Pipi Mitrojorgji
R.P. 50
A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0699829505
40 Luçjano Theollor Bojaxhiu
R.P. 51
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0692947707
41 Zaim Xhevat Lila
R.P. 52
A/1;A/2;A/3;A/4
PROJEKTIM -ZBATIM
Tirane
0682249108
42 Eda Vladimir Trebicka
R.P. 53
AP/3, AP/4
PROJEKTIM
Tirane
0694035333
43 Eda Vladimir Trebicka
R.P. 54
AZ/3, AZ/4
ZBATIM
Tirane
0694035333
44 Frida Kujtim Pashako
R.P. 55
AP/3, AP/4
PROJEKTIM
Tirane
0693720218
45 Adrian Enver Kalamishi
R.P. 56
AZ/2,AZ/3, AZ/4
ZBATIM
Shkoder
-
46 Fatjon Përparim Saliu
R.P. 57
AP/3, AP/4
PROJEKTIM
Vlore
0692293461
47 Fatjon Përparim Saliu
R.P. 58
AZ/3, AZ/4
ZBATIM
Vlore
0692293461
WHO TO CONTACT
19
4.4 Who to Contact 48 Dhimiter Nikolla Kondakçi
R.P. 59
AP/2,AP/3, AP/4
PROJEKTIM
Korce
-
49 Dhimiter Nikolla Kondakçi
R.P. 60
AZ/2,AZ/3, AZ/4
ZBATIM
Korce
-
50 Klejdi Naim Mlloja
R.P. 61
AZ/3
ZBATIM
Korce
-
51 Alfred Moisi Çomo
R.P.62
AP/2
PROJEKTIM
Tirane
0682074215
52 Alfred Moisi Çomo
R.P.63
AZ/1;AZ/2;AZ/3;AZ/4
ZBATIM
Tirane
0682074215
53 Odhise Taqo Zoto
R.P.64
AP/2; AP/3
PROJEKTIM
Tirane
-
54 Olta Luan Kore
R.P.65
B/1;B/2;B/3
PROJEKTIM-ZBATIM
Tirane
-
55 Ervin Tomi Panidha
R.P.66
AP/1AP/2,AP/3, AP/4
PROJEKTIM
Tirane
0692090009
56 Ervin Tomi Panidha
R.P.67
AZ/2, AZ/3
ZBATIM
Tirane
0692090009
57 Florenc Milo Gjikuria
R.P.68
AZ/2, AZ/3
ZBATIM
Tirane
-
58 Pellajia Dhimitri Basha
R.P.69
AZ/1,AZ/2, AZ/3, AZ/4
ZBATIM
Tirane
0692092152
59 Adrian Isuf Çene
R.P.70
B/2 B/3 projektim zbatim
PROJEKTIM-ZBATIM
Tirane
0682120757
60 Bledar Malo Mane
R.P.72
AZ/1,AZ/2, AZ/3, AZ/4
ZBATIM
Tirane
0694337232
61 Genc Vasfi Samimi
R.P.73/74
AP/1 dhe AZ/1
PROJEKTIM-ZBATIM
Tirane
0692054802
62 Genc Hajdari
R.P.74
B/1 B/2 projektim zbatim
PROJEKTIM-ZBATIM
Tirane
-
63 Zamir Ibrahim Marika
R.P.75
B/2, B/3, Projektim e Zbatim
PROJEKTIM-ZBATIM
Tirane
0672058878
64 Enkelejda Sali Murtaj(Alla)
R.P.84
AP/1, AP/2, AP/3, AP/4
PROJEKTIM
Tirane
0674019246
R.P.76/ 77
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM -ZBATIM
Tirane
0699338855
R.P.78/79
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
0674080966
R.P.80/81
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
0682094523
R.P.82/83
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
0684025620
R.P.85/86
AP/1, AP/4 ; AZ/1, AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
-
R.P.87/88
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
0682088097
R.P.89/90
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Tirane
0692094658
R.P.93/ 94
AP/1, AP/2, AP/3, AP/4 ; AZ/1,AZ/2, AZ/3, AZ/4
PROJEKTIM-ZBATIM
Shkoder
0688058495
R.P.91/ 92
AP/1, AP/2 ; AZ/1,AZ/2
PROJEKTIM-ZBATIM
Tirane
0682366418
65 66 67 68 69 70 71 72 73
20
Mario Raqi Tashi Ogri Bujar Mane Daniel Hajri Pirushi Liri Petrit Shehaj Odhise Taqo Zoto Mirela Anastas Mecollari (Jano) Arben Petrit Spaho Zef Nikoll Çuni Neritan Hasan Ceka
WHO TO CONTACT
Institutions: (As of 13.06.2018)
• DRKK Office (Regional Dire) Address: Lagjia “Hajro Cakerri” Rr. “Sulejman Delvina” Nr,56, Vlorë, Albania Email: drkkvlore@yahoo.com Tel: +355 33 30 665
• Institute of Culture Monuments Address: Str. “Aleksander Moisiu” Nr.76, ish-Kinostudio, Tiranë, Albania Tel: +355 42455706 Fax: +355 42456169 Email: info@imk.gov.al
• Municipality of Himara Address: Spile, Himare 9425 Himara, Vlorë, Albania Tel: +355 393-2355 Email: info@himara.gov.al Major: Jorgo Goro Vice Mayor: Ferdinand Dhrami Director of Urban Planning: Gentian Stratoberdha
• Village Heads Palasë Dhërmi Ilias Vuno Himara village Pilur Kudhës Qeparo Borsh Qazim Pali Piqeras Sasaj Lukovë Shën Vasil Nivicë
Odhiese Dhimolea Aleks Marko Jorgo Gjomemo Artan Bala Jorgo Goro Jorgo Bala Niko Jovani Stefan Kokëdhima Ridvan Hajdini Stavri Boci Niko Nini Andi Ahmati Niqiforo Butci Kico Vlashi Stefan Llambri
WHO TO CONTACT
21
Amendments On 27.06.2018, the Law no. 27/2018: “On Cultural Heritage and Museums” came into force. As a result, some terminology undergoes the following changes: “Institute of Culture Monuments changes into: “National Institute of Cultural Heritage” “Regional Directorate of National Culture” changes into: “Regional Directorate of Cultural Heritage” “National Restoration Council” changes into: “National Council of Tangible Cultural Heritage” “Culture Monument” changes into: “Immovable Cultural Property”
Imprint Coordinator “Integrated Sustainable Development of the Southern Coastal Region” programme GIZ Albania Hans-Jürgen Cassens / GIZ Country Director; Valbona Koçi, Dhurata Gazulli/ ISDSCR Programme Coordinators Coordinator for the “Practical Conservation Guidelines for Traditional Buildings in Himara Coastal Villages”: Valbona Koçi Experts: Iris Gleichmann, Frida Pashako Authors Frida Pashako Iris Gleichmann Erisa Nesimi (assistant to the Experts) Jona Osmani (assistant to the Experts) Editing Ben Kern (EN) Iris Gleichmann (EN) Saemira Pino (AL) Erisa Nesimi & Eneida Berisha (Translation) Layout Erisa Nesimi Jona Osmani Graphical Materials Jona Osmani Erisa Nesimi Mirjana Pali Arjon Kadillari Eneida Berisha Source: Archive of Institute of Cultural Monuments and Literature Photography Armand Habazaj Erisa Nesimi Jona Osmani Joerg Daiber (Spoonfilm Medienproduktion GmbH) Printed by Gent Grafik, in July 2018 Rr. “Ismet Gusia”, Nd. 33, H.1, Njësia administrative Nr. 1, 1004, Tiranë GIZ is responsible for the content of this publication Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Registered offices Bonn and Eschborn, Germany Integrated Sustainable Development of the Southern Coastal Region programme Rr. Skënderbej 21/1, Tirana, Albania T +355 42 230 414 https://www.giz.de/en/worldwide/39273.html
imprint
23
On behalf of the: German Federal Ministry for Economic Cooperation and Development (BMZ) In Collaboration with: Ministry of Infrastructure and Energy (MIE) Ministry of Culture Institute of Cultural Monuments (ICM) Regional Directorate of National Culture (RDNC) Municipality of Himara Š Copyright with GIZ, June 2018
24
imprint