Social Ecological Urbanism Design Studio 2021. Volume 2. Mölndal.

Page 34

KEY PROJECTS

As a continuation of the masterplan, five key projects have been identified. These five are all important in the realisation of the masterplan and focus on different aspects. st

The 1 is located along Frölundagatan, the street connecting Mölndal centre to Eklanda. This key project works with the agricultural land as a connector between two neighbourhoods and the green street for food production. nd

The 2 key project details a section of Bifrostgatan which, accompanied by the new park and housing, is turned into a lively urban green street. The main focus of the project is the park and the zones within it, creating affordances for humans and other species. rd

The 3 key project develops the densification area and new urban park between Mölndalsån and the E6 highway. This project tackles a difficult but important location in the city, making it into an accessible and attractive public space. th

The 4 key project is situated in the old industrial area of Forsåker. The project focuses on densification and connecting east and west Mölndal to each other. th

The 5 key project focuses on green typologies. The project maps and elaborates greenery on different scales, both in general but also how it relates to the context of Mölndal.

34

Social-ecological Urbanism 2021

Breaching Barriers


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.