Submittal Transmittal Detailed, Grouped by Each Number
VMMC - H6 Surgery Waiting and Induction
Date:
Project # 4212011-000 Skanska USA Building Inc. Tel: 206-903-0131 Fax: 206-903-0979
3/27/2012
Transmitted To:
Reference Number: 0016 Lee Hall TGB Architect 21911 76th Ave. W. Suite 210 Edmonds, WA 98028 Tel: 425-778-1530 Fax: 425-774-7803
Transmitted By:
Brad Rock Skanska USA Building Inc. 1000 Seneca St, Suite 321 Delivery Only - No USPS Seattle, WA 98101 Tel: 206-903-0131 Fax: 206-903-0979
Qty
Submittal Package No
Description
Due Date
1
0014 - 07 9500 - 0
Expansion Joint Covers
4/4/2012
Transmitted For
Delivered Via
Tracking Number
Items
Qty
Description
0001
1
Expansion Control-Submit A03200 Sheet Metal Flashing and Trim; and Joint Sealants Product Data
Cc:
Notes
Company Name
Contact Name
Virginia Mason Virginia Mason TGB Architect AHBL
Greg Andrews Kim Szegiet Lee Hall Steven Sandhorst
Package Action
Item Action
Copies Notes 1 1 1 1
Remarks APPROVED
X
APPROVED AS CORRECTED REVISE & RESUBMIT REJECTED
Fabrication / Installation may be undertaken. Approval does not authorize changes in the Contract Sum or Contract Time unless stated by Change Order or Construction Change Directive. Fabrication / Installation MAY NOT be undertaken. In resubmitting, limit corrections to the items marked.
Review and approval are only for general conformance with the information given and the design concept of the Project as expressed in the Contract Documents. Review and approval of submittals are not conducted for the purpose of determining the accuracy and completeness of other details, such as dimensions and quantities or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect's review and approval of the Contractor's submittals shall not relieve the Contractor from any obligation contained in the Contract Documents. The Architect's techniques, sequences, or any safety precautions or procedures. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is a component. TGB ARCHITECTS
By
Lee Hall
Date
12/21/2011 3-27-12
Signature Prolog Manager
Printed on: 3/27/2012
Building expansion joint by Door 617, along corridor 696, must be finished to match wall paint color, due to visibility behind 3form panel.
6West
Signed Date Page 1
Virginia Mason - 2011 Sustaining Virginia MasonHospital Hospital - 2011 Sustaining Good Samaritan Patient Care Tower Project
Reviewed with Comments
Reviewed By Reviewed, No Comments
SKANSKA
6XEPLWWDO )URP
'DQ 3ULGHPRUH
7R
%UDG 5RFN 6NDQVND
'DWH
3URMHFW
9LUJLQLD 0DVRQ 0HGLFDO &HQWHU + 3HUL 2SV 6XUJHU\ :DLWLQJ
This submittal ttal REVIEW shall not be construed as a eck and indicates only that information complete check onforms generally with Contract Document presented conforms Documents. In no case is Subcontractor or Supplier relieved of full responsibility for adherence to the Contract Documents and satisfactory construction of all work. Submittal to Owner, Architect-Engineer for final approval.
By Brad Rock at 9:08 am, Mar 27, 2012
Submittal b Number
0014 - 07 9500 - 0
4212011-000 Skanska Project Number: 4211003Skanska Job Number - 427005
6XEPLWWDO Âą ([SDQVLRQ &RQWURO 0DQXIDFWXUHU 1\VWURP 0DWHULDOV $ ([WUXGHG $OXPLQXP $670 % $670 % 0 % 5HVLOLHQW )LOOHU ([WUXGHG YLQ\O 6KRUH $ KDUGQHVV RI WR 'XURPHWHU & 7KUHDGHG )DVWHQHUV 6WDLQOHVV VWHHO ' %DFNLQJ 3DLQW $VSKDOWLF W\SH ( $FFHVVRULHV 1\VWURPV VWDQGDUG DQFKRUV FOLSV IDVWHQHUV VHW VFUHZV VSDFHUV DQG RWKHU DFFHVVRULHV FRPSDWLEOH ZLWK VXEVWUDWH DWWDFKPHQWV
)LQLVKHV $ )ORRU MRLQW FRYHUV DUH EUXVKHG ILQLVKHG $OXPLQXP URRI MRLQW FRYHUV DUH PLOO ILQLVKHG 1RWH 7KHUH DUH QR H[WHULRU MRLQWV LQ WKH VFRSH RI ZRUN 6FKHGXOH RI -RLQW &RYHUV
$OORZDEOH PRYHPHQW
7\SH
0RGHO
0DQXIDFWXUHU
&RORU )LQLVK
)LUH %DUULHU 1RWH
)ORRU WR )ORRU
(- )/5
1\VWURP
%UXVKHG $OXPLQXP
([LVWLQJ
)ORRU WR :DOO
(- )/6
1\VWURP
%UXVKHG $OXPLQXP
([LVWLQJ
,QWHULRU :DOO WR :DOO &HLOLQJ
(- )&7
1\VWURP
%UXVKHG $OXPLQXP
1R
,QWHULRU :DOO WR :DOO &HLOLQJ &RUQHU
(- )&7
1\VWURP
%UXVKHG $OXPLQXP
1R
z 3DJH
Preferred method of installation. Coordinate termination strip and flooring ramp leveling system.