BCH EJC Reviewed 7-20-15

Page 1

Bothell City Hall 18415-101st Avenue NE Bothell, WA 98011

REVIEWED

REVIEWED AS NOTED

REJECTED

REVISE/RESUBMIT

NOT REVIEWED

Comments made on shop drawings or submittals during this review do not relieve contractor from compliance with requirements of drawings and specifications. This review is only a check for general conformance with design concept of project and general compliance with information given within the contract documents. This review does not constitute approval or acceptance of deviations from contract documents. Any deviations must be requested in writing in accordance with the contract documents. The contractor is responsible for confirming and correlating quantities and dimensions; selecting fabrication processes and the techniques of construction; coordinating work with all other trades; and performing work in a safe and satisfactory manner.

MARIA T. DO, AIA THE MILLER|HULL PARTNERSHIP, LLP

COMMENTS: A-Reviewed, No Exceptions Taken RN-Reviewed as Noted R-Rejected R&R-Revise & Resubmit SSI- Submit Specific Item Section Paragraph Description Comments Action 07 95 13 1.2 B Product Data: CS ASM-300X See comments on product data RN CS SF-300 CS SRJW-300 Pecora 890NST 1.2 C Shop Drawings Refer to Comments and Markups on Shop Drawings. Submitted 6/23/15. Re-Reviewed per GLY’s RN request. 7/1/15 1.2 D Samples Cover Plate and joint gaskets (SRJW- SSI |


1.2 E

LEED Submittals

300, ASM-300X, SF-300) Submit under Section 018113

END OF REVIEW

|

--


VIA ACTION

Hiroki Ota Email Reviewed as Noted (revised June 30, 2015)

B5115.00 Bothell City Hall New Construction, Phase II DATE

TO

Mike Jobes

CC

Raymond Burdick Vulcan Inc. 505 5th Avenue S, Ste 900 Seattle WA 98104

REGARDING

Miller Hull Polson Building, 71 Columbia - 6th Floor Seattle WA 98104

EMAIL

June 30, 2015 mjobes@millerhull.com

raymondb@vulcan.com

Submittal 139-079513-2 Expansion Joint Cover Assemblies

COPIES

ORIGINALS

1

0

DESCRIPTION OF DOCUMENT

DATE OF DOCUMENT

Submittal 139-079513-2 Expansion Joint Cover Assemblies

June 19, 2015

Dear Mr. Jobes, We have reviewed the above noted submittal per the Specification Sections. We have summarized our comments and recommendations below: ITEM

SPEC SECTION

DESCRIPTION

COMMENTS/RECOMMENDATIONS Reviewed as Noted.

Construction Specialties System

Comments included on shop drawing sheets. 079513/1.2/C

Shop Drawings

079200/2.1/A/2

Type S Silicone Sealant Product Data

Coordinated interface detailing with roofing, framing, weather barrier transitions, curtain wall, parapet coping cap required. Include details in resubmittal for review. Reviewed as Noted.

Pecora 890 NST Silicone Sealant

Contractor to provide compatibility test results per 079200/1.3/D/2 for adhesion to components of expansion joint assembly.

The above-noted submittal has been Reviewed as Noted . Summary of general comments included on the shop drawing sheets are provided below: This transmittal may contain confidential and/or privileged information. If you are not the intended recipient or have received this transmittal in error, please notify the sender immediately and destroy this transmittal. Any unauthorized copying, disclosure or distribution of the information contained herein is prohibited.

B5115.00 2015 06 30 HO TRANS Submittal 139-079513-2 Expansion Joint Cover.docm

Page 1 of 2

transmittal

FROM


Coordinated details are required where expansion joint interfaces the roof parapet (framing, curtain wall/blanked-off louver and coping caps), framed wall (air and weather barrier tie-ins/transitions), TPO membrane roofing, and curtain wall. Contractor coordination between expansion joint assembly and attachment to curtain wall jamb is required – continuity of curtain wall primary seal with expansion joint inner seal plane is critical in ensuring air and weather-tight transitions. Contractor coordination at parapet transition (SRJW-300 to SF-300) is required – integration of expansion joint assembly to air and weather barrier planes as well as counter-flashing strategies at framed wall and parapet is unclear. Contractor coordination at roof assembly with expansion joint assembly is required - roof-side inside corner of parapet meeting SRJW-300 is unclear. Slope of ¼-inch per lineal foot equates to approximately 1 foot drop in elevation at parapet. It is unclear from details whether this is accounted for. Regards, Hiroki Ota | E.I.T. Building Science Engineer (E.I.T.) hota@rdh.com RDH Building Sciences Inc.

B5115.00 2015 06 30 HO TRANS Submittal 139-079513-2 Expansion Joint Cover.docm

Page 2 of 2


GLY CONSTRUCTION

RDH

DEADLINE COVER SHEET | GLY CONSTRUCTION RECEIVED *OWNER RESPONSE REQUIRED* ENTERED 6/22/15

ON:___/___/______

BY: HO

Project Information GLY Job #

1618

Job Name

Bothell City Hall Project

PIC / PM

Bill DeJarlais / Jon Friedrichsen

Document Information Name of Document Date Submitted by GLY Attention

CC

Owner Response Deadline(s)

Submittal 139-079513-2 - Expansion Joint Cover Assemblies - Revised 6/19/2015 Erin Birkenkopf and Jim Corning / C.O.B. Properties

Raymond Burdick; John Finke; Mike Jobes; Maria Do; Ka-Chung Kwok; Matt Kikosicki; Jon Friedrichsen; Tom Gass; Evan Dunagan; Hiroki Ota

6/24/2015

Comment ***Expedited Review Requested*** Erin and Jim, this is for your information only. Reviews and Responses required from Miller/Hull and RDH.

Please take note of the above referenced deadline(s) which are provided in an effort to minimize delays as outlined in the Agreement Between Owner and Contractor effective July 1, 2014 I:\PROJECTS\In Progress\1618 - Bothell City Hall\7.2 Submittals\139-079513-2 - Expansion Joint Cover Assemblies - Revised\For Review\Deadline Cover Sheet 139-2.xlsx


SUBMITTAL TRANSMITTAL |

1618 Bothell City Hall

GLY CONSTRUCTION

Project: Project #:

Bothell City Hall 1618

Date:

6/19/2015 First & Last Name

Company

Maria Do Erin Birkenkopf Jim Corning Hiroki Ota

Miller/Hull C.O.B. Properties C.O.B. Properties RDH

Copy to:

Raymond Burdick Mike Jobes Ka-Chung Kwok Matt Kikosicki

C.I.D. Miller Hull Miller Hull Miller Hull

Submittal Package No.

Description

Due Date

Package Action

Expansion Joint Cover Assemblies - Revised

6/24/2015

For Review

Notes

Item Action

Transmitted To:

139-2

07 95 13

2

Transmitted For Approval Item 1

Transmitted By:

Brian Arnold

Subcontractor:

Spectrum/Const.Spec.

Delivered Via SharePoint

Spec Section 79513

Qty 1

Description Product Data and Details for CS Model Joint Covers

Remarks Please note, this package is submitted for approval of the Cover Assembly Models only. Preconstruction meeting to follow in order to finalize waterproofing details at this area. Please return all comments to my attention by Wednesday, June 24, 2015.

Brian Arnold

6/19/2015

Signature

Signed Date

GLY Note: The product data and details included herein are submitted for approval of the cover assemblies only. This material has a sizable lead time, and GLY is not aware of any concern about the assemblies themselves, only that waterproofing details need to be reviewed and possibly revised due to complexity of conditions, with multiple installers involved, and the forthcoming revisions to the storefront system below and at each end of the lobby. We ask for your approval of these assemblies, with the intention to hold a preconstruction meeting to review associated waterproofing details with all installers, GLY, RDH, and M|H present. Any details revised as a result will be captured in confirming RFIs. RDH

BUILDING SCIENCES INC.

X REVIEWED AS NOTED SUBMITTAL NAME: _________________________ SUBMITTAL #: _____________________________

See above

THESE [ ] Drawings [ ] Cut Sheets [ ] Samples [ ] Product Data

REVISE AND RESUBMIT

NOT REVIEWED REVIEWED

REJECTED

REVIEWED BY:

HO RDH 2015 06 22

X

ARE [ ] No Exception Taken [ ] Revised as Noted [ ] Not Approved - Revise + Resubmit This does not relieve the supplier from responsibility for error, accuracy or details, dimensions, quantities, or conformance with the contract documents.

Brian Arnold

6/19/15

By____________________________ Date____________________

RDH REVISED ON 2015 06 30 REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS ONLY. ANY ACTION SHOWN IS SUBJECT TO THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, AND COORDINATING ITS WORK WITH THAT OF ALL OTHER TRADES.


Submittal From:

Spectrum Specialty Builders

To:

GLY Construction

Date:

6-14-15

Project: Bothell City Hall Submittal – 079513 Expansion Joint Covers

1. Manufacturer: Construction Specialties 2. Materials A. Extruded Aluminum: ASTM B 221 (ASTM B 221M)

WHERE USED? SHOP DRAWING SHEETS INDICATE PVC AND/OR POLYETHYLENE SHEETS (RDH)

B. Resilient Filler: Extruded vinyl, Shore A hardness of 40 to 50 Durometer. C. Threaded Fasteners: Mild steel. D. Accessories: Standard anchors, clips, fasteners, set screws, spacers, and other accessories compatible with substrate attachments. WHERE USED? SPEC REQUIRES STAINLESS STEEL IF EXPOSED TO WEATHER OR WHERE FASTENING TO CURTAIN WALL. SHOP DRAWING SHEETS SHOW MASONRY ANCHORS AS FASTENERS FOR SF-300, AND GASKETED STAINLESS STEEL FASTENERS FOR SRJW-300, MASONRY SUBSTRATE DOES NOT TAKE PLACE WHERE EXPANSION JOINT DETAILING OCCURS (RDH) SEALANTS AND/OR SELF-ADHERED MEMBRANE ADHESION COMPATIBILITY TO EXTRUDED SHEETS? PROVIDE THIS INFORMATION (RDH)

Cont’d


Schedule of Joint Covers Joint Type

Model

Manufacturer

Color/Finish

Notes

1

Interior: Wall

ASM-300X

Construction Specialties

Anodized Aluminum

With Polyethylene membrane

2

Exterior Wall

SF-300

Construction Specialties

Santoprene Rubber

Four color selections Black, Gray, Greige, & White

3

Roof to Wall

SRJW-300

Construction Specialties

Mill Finish Aluminum

A

Caulking & Sealant

890 Silicone

Pecora

ď Ź Page 2

Installed at all intersecting edges and substrates of joint covers.


CONTINUOUS ALUMINUM COVER PLATE (12A545001) DUROFLEX GASKET SHOP INSTALLED (12V029136)

7 5/8"

WALL (NOT BY C/S)

1/4" x 1 1/4" WALL DOG ANCHOR 18"O.C. (90H209004) 24GA x 3/4"x 1" GALV. ATTACHMENT 3/4" ANGLE (12F002001)

CONT. ALUMINUM BACK CLIP, (90A010000) 3/4"

3"

12" WIDE POLYETHYLENE VAPOR BARRIER (12V134000)

ASM-300X

INTERIOR COMPONENTS NOT REVIEWED BY RDH (RDH)

PROJECT:

SCALE:

CUSTOMER:

DATE:

LOCATION:

JOB NO.:

DRAWN BY:

SHEET NO.:

SCALED TO FIT


MASONRY SUBSTRATES DO NOT EXIST WHERE THIS IS TO BE INSTALLED. ATTACHMENT TO CURTAIN WALL MUST BE COORDINATED BY CONTRACTOR (RDH)

SHOWN AS T-105 IN SHOP DRAWING SHEETS (RDH)

PECORA 890 SILICONE SUBMITTED IN THIS SUBMITTAL PACKAGE (RDH)


GLAZED-IN CURTAIN WALL SILL FLASHING FOR COUNTER FLASHING, CONTRACTOR TO COORDINATE (RDH)

REGLET AND FLASHING AS REQUIRED (NOT BY C/S)

SEALANT (NOT BY C/S) 1/4"x1 3/4" S/S WEDGE BOLT + 18" O.C. (90H169004) (FIN: S/S) ICC-ES#-ESR-1678 (MASONRY) ICC-ES#-ESR-2526 (CONCRETE)

7"

ATTACHMENT TO FRAMED WALL, UPDATE FASTENER (RDH)

.090 FORMED ALUMINUM COVER PLATE (80S016001) CONTINUOUS MOISTURE SEAL (12V051108) 3 11/16" 1/4"x1" S/S LAG SCREW (90H196002) W/ SEALING WASHER (90H025003) 18" O.C. (FIN: S/S)

16" WIDE POLYETHYLENE VAPOR BARRIER (12V142000)

2 7/8" 3" MIN.

CONTINUOUS EXTRUDED ALUMINUM FRAME (12A102008)

3"

WITH DIAGONAL LEG ON FRAME

Model: SRJW-300 DISCLAIMER:

PROJECT:

SCALE:

CUSTOMER:

DATE:

LOCATION:

JOB NO.:

DRAWN BY:

SHEET NO.:

www.c-sgroup.com 6696 Route 405 Highway, Muncy, PA 17756 Phone: (800) 233-8493 / Fax: (570) 546-8022 895 Lakefront Promenade, Mississauga, Ontario L5E 2C2 Canada Phone: (888) 895-8955 / Fax: (905) 274-6241 C:\Users\zparrish.C-SGROUP\Documents\Staging\Models SRJ-SRJW and SRJ-V and SRJW-V\SRJ-SRJW 6-27-13\srjw3b.dwg , 7/9/2013 8:37 AM, Zachary Parrish

3" = 1'-0"


Pecora

Specification Data Sheet

Non-Staining, Ultra-Low Modulus Silicone Sealant

1. BASIC USES • Pecora 890NST is designed primarily for sealing expansion and control joints in precast concrete panels, architechtural and natural stone, metal curtainwalls, perimeter sealing of doors and windows, Exterior Insulation Finish Systems (EIFS) and numerous other areas requiring a high-performance sealant. It adheres tenaciously to concrete, natural stones, masonry, steel, fluoropolymer painted and powder coated aluminum, wood, vinyl and many other plastics, generally without need for a primer, and performs equally well in new or remedial construction.

2. MANUFACTURER Pecora Corporation 165 Wambold Road Harleysville, PA 19438 Phone: 215-723-6051 800-523-6688 Fax: 215-721-0286 Website: www.pecora.com

Pecora 890NST is particularly well suited for use in Exterior Insulation Finish Systems (EIFS) because of its proven strong adhesion to all base and top coats and because its ultra-low modulus formulation places minimal stress on the bond line. Additionally, Pecora 890NST is available in many of the more popular EIFS colors. Limitations: Pecora 890NST should not be used in the following applications: • Sealing horizontal decks, patios, driveway or terrace joints where abrasion or physical abuse is encountered. • Below grade or sealing submerged joints or below the waterline in marine uses. • In totally confined or air-free spaces since moisture is necessary for cure. • In designs that will be painted after application of the sealant. Sealant should be applied after painting is completed. • In structural glazing applications. • On surfaces with special protective or decorative coatings without prior consultation with Technical Services.

Architectural Weatherproofing Products U.S.A. • since 1862

• With building materials that bleed oils, plasticizers or solvents, i.e. impregnated wood, oil-based caulks, some vulcanized rubber gaskets or tapes, etc. • In interior penetration firestop systems. • On surfaces in direct contact with food. For such applications, use of Pecora 860 silicone with FDA approval is recommended.

PACKAGING • 10.1 fl. oz. (300 ml) plastic cartridges • 20 fl. oz. (592 ml) sausages • 2-gallon (7.57 L) pails COLOR • Black, Limestone, Precast, Charcoal Gray, Sandstone, Red Rock, Hartford Green, Tru-White, Aluminum Stone, Beige, Classic Bronze, Natural Stone, Anodized Aluminum. • Unlimited range of custom colors. (certain restrictions may apply).

3. PRODUCT DESCRIPTION Pecora 890NST is a one-part, neutral-curing, ultra low-modulus silicone sealant that will not stain natural stone such as marble and granite and that reacts with atmospheric moisture to form a durable, flexible building sealant. Pecora 890NST performs exceptionally well under dynamic conditions due to its ultra-low modulus, high extension/ compression, recovery properties and strong adhesion to most building materials and accommodates long-term movement of +100-50% in properly designed joints. Harsh weather conditions, rain, sleet, snow, sunlight and extreme temperatures, high ozone concentrations and/or exposure to intense ultra violet rays have very little effect on the ultimate performance of 890NST even after years of such exposure.

TABLE 1: TYPICAL UNCURED PROPERTIES at 77°F (25°C), 50% R.H. Test Property

Value

Test Procedure

Flow, Sag, Slump (in.) Tool/Work Time (minutes) Tack Free Time (hours) Cure Time (days) Full Adhesion (days) VOC Content (g/l)

<0.1 15-25 1-2 7-14 7-14 98

ASTM C639 Pecora Corporation ASTM C679 Pecora Corporation Pecora Corporation ASTM D3960

TABLE 2: TYPICAL CURED PROPERTIES After 7 days cure at 77°F (25°C), 50% R.H. Test Property

Value

Hardness (Shore A) 20 Elongation (%) 1000 Modulus @ 100% Elongation (psi) 30 Ultimate Tensile Strength (psi) 120 Tear Strength (ppi) 30 Peel Strength (pli) on aluminum, glass, and concrete 25 Dynamic Movement Capability (%) +100-50 Ozone/UV Resistance Excellent Staining of porous substrates such as white marble Pass Service Temperature Range (°F) -60 to +300

Test Procedure ASTM C661 ASTM D412 ASTM D412 ASTM D412 ASTM D624 ASTM C794 ASTM C719 Weatherometer ASTM C1248 Pecora Corporation

Since Pecora architectural sealants are applied to varied substrates under diverse environmental conditions and construction situations it is recommended that substrate testing be conducted prior to application.


4.TECHNICAL DATA Applicable Standards: Pecora 890NST Silicone meets or exceeds the requirements of the following industry specifications; TT-S-230C, Class A, ASTM C-920, Class 100, Type S, Grade NS, Use G,A,M,O and CGSB-19GP-9, ASTM C-1248. Joint Design: A thin bead of silicone will accommodate more movement than a thick bead. Pecora 890NST Silicone sealant should be no thicker than 3/8" (9 mm) and no thinner than 1/8" (3 mm) for joints where excessive movement is expected. Ideally, the ratio of joint width to the sealant depth should be about 2:1 when appropriate. The width of building expansion joints varies because of seasonal and daily changes in temperature. If Pecora 890NST cannot be installed when the design width is approximately halfway between the dimensional extremes, the designed joint must be at least twice the total anticipated joint movement. Good architectural practice calls for joint design of four times the anticipated movement due to construction tolerances and material variations.

5. INSTALLATION Surface Preparation: Clean all joints and glazing areas by removal of foreign matter and contaminants such as oil, dust, grease, frost, water, surface dirt, old sealants or glazing compounds and any protective coating. Porous substrates and precast concrete panels using form release agents other than polyethylene film should be cleaned by grinding, saw cutting, blast cleaning (water or sand), mechanical abrading or a combination of these methods which will provide a sound, clean and dry surface for sealant application. Dust, loose particles, etc. should be blown out of joints with oil-free compressed air or vacuum cleaned. Metal, glass and plastic surfaces should be cleaned by solvent procedure or by mechanical means. Soap or detergent and water cleaning treatments are not recommended. Cleaning of all surfaces should be done on the same day on which the sealant is applied.

CAUTION: Solvents may be toxic and/or flammable. Refer to solvent manufacturer’s instructions or Material Safety Data Sheets. Priming: Pecora 890NST does not require priming on most common substrates. However, Pecora strongly suggests adhesion pretesting, either in the field or in Pecora’s laboratory on all porous substrates, particularly brick, as well as unusual building materials and other substrates where special coatings or surface treatments may impair optimum adhesion. Where primer is indicated, P-150 should be used on porous substrates and P-120 on special metal and plastic surfaces. All EIFS substrates require priming with P-64 primer. Contact Technical Services for primer use on other substrates. To assist in this determination Pecora has a list of adhesion-in-peel test results on a wide variety of substrates and building materials which is available on request from Technical Services. Pecora routinely conducts project specific adhesion and compatibility tests in its laboratory on representative substrate samples. Consult Technical Services for details.

Joint Backing: Backer rod controls the depth of the sealant and allows it to be applied under pressure. Use a size that will compress 25%. Denver Foam open-cell polyurethane or reticulated (soft) polyethylene rod is recommended. Closed-cell polyethylene may be used but care must be taken not to puncture the rod which can cause outgassing or bubbling/blistering in the sealant. Open-cell polyurethane is required with non-porous substrates to allow proper curing from both sides of the sealant. In joints too shallow for backer rod, use a polyethylene bond-breaker tape to prevent three-sided adhesion. Application: All joints should be masked to ensure a neat appearance and prevent sealant applied outside the joint confines from imparting a discoloration to the substrate.


Specification Data Sheet

Typical Applications for Pecora 890NST Ultra-Low Modulus Silicone Sealant MASONRY

EXPANSION JOINT

Pecora 890NST

Backer Rod

Pecora 890NST Weatherseal

Backer Rod EIFS

Concrete

WINDOW FRAME EXPANSION JOINT Pecora 890NST

Natural Stone


Specification Data Sheet

Sealant should be applied in a continuous operation using sufficient pressure to fill the joint and make complete contact to the joint sides. Tool the sealant slightly concave using solvent or dry-tooling techniques. Contact Technical Services prior to tooling with solvent. Do not tool with soap or detergent and water solutions. Tool Time: (Initial Skin): 15-25 minutes at 77° F (25° C), 50% RH. Higher temperatures and/or humidity will shorten this time. Clean Up: Immediately remove all excess sealant and smears adjacent to joints with mineral spirits. For equipment cleanup, also use mineral spirits. Consult manufacturer’s Material Safety Data Sheet for handling and safety precautions. Shelf Life: Pecora 890NST has a shelf life of 12 months from date of manufacture when stored at temperatures lower than 80° F (27° C). Precautions: Use with adequate ventilation or wear an appropriate NIOSHapproved respirator. Contact with uncured sealant or with vapors generated during curing may cause respiratory tract irritation. Contact with skin or eyes may cause irritation or allergic reaction. Avoid contact and wash thoroughly after handling. May be harmful if swallowed. Refer to Material Safety Data Sheet (MSDS) for more information. FOR PROFESSIONAL USE ONLY. KEEP OUT OF THE REACH OF CHILDREN.

6. AVAILABILITY AND COST

9.TECHNICAL SERVICES

Pecora products are available from stocking distributors nationwide. For the name and telephone number of your nearest representative, call the number below or visit our website at www.pecora.com.

Pecora representatives are available to assist you in selecting an appropriate product and to provide on-site application instructions or to conduct jobsite inspections. For further assistance call our Technical Service Department at 800-523-6688.

7. WARRANTY Pecora Corporation warrants its products to be free of defects. Under this warranty, we will provide, at no charge, replacement materials for, or refund the purchase price of, any product proven to be defective when used in strict accordance with our published recommendations and in applications considered by us as suitable for this product. The determination of eligibility for this warranty, or the choice of remedy available under this warranty, shall be made in our sole discretion and any decisions made by Pecora Corporation shall be final. This warranty is in lieu of any and all other warranties, expressed or implied, including but not limited to a warranty of merchantability or fitness for a particular purpose and in no case will Pecora be liable for damages other than those expressly stated in this warranty, including but not limited to incidental or consequential damages.

10. FILING SYSTEMS • Sweet's Catalog File: www. sweets. com • General Building - 07100 Waterproofing - 07920 Sealants • Civil Engineering - 07100 Waterproofing

DON’T STAIN YOUR REPUTATION®

8. MAINTENANCE If the sealant is damaged and the bond is intact, cut out the damaged area and recaulk. No primer is necessary. If the bond has been affected, remove the sealant, clean and prepare the joint in accordance with the instructions under “Installation”.

DON’T STAIN YOUR REPUTATION™ - Pecora NST Non-Staining Technology

www.pecora.com P E O P L E

PEC 110 5/10

P R O D U C T S

165 Wambold Road, Harleysville, PA 19438 Phone: 800-523-6688 • 215-723-6051 • FAX: 215-721-0286

P E R F O R M A N C E


PROJECT: BOTHELL CITY HALL ARCHITECT: MILLER HULL GENERAL CONTRACTOR: GLY CONSTRUCTION SUBCONTRACTOR: SPECTRUM SPECIALTY BUILDERS SECTION: 079513 EXPANSION / SEISMIC COVER ASSEMBLIES

Spectrum Specialty Builders 06/14/2015 6-14-15 REV 1 SHOP.pdf C:\Users\Dan\SkyDrive\2015 Projects\Bothell City

SpectrumHall\Shops Specialty Builders 2\6-14-15 REV 1 SHOP.pdf 06/16/2015 6-16-15 REV 2 SHOP.pdf C:\Users\Dan\SkyDrive\2015 Projects\Bothell City Hall\Shops 3\6-16-15 REV 2 SHOP.pdf

Schedule of Joint Covers

1

COVER SHEET

2

JOINT ISO

3

LEVEL 1 PLAN

4

ROOF JOINT PLAN

5

EXTERIOR WALL JOINT

6

INTERIOR & EXTERIOR MULLION DETAILS

7

EXTERIOR WALL JOINT DETAILS

8

ROOF JOINT DETAILS

9

SECONDARY WATER MEMBRANE AT PARAPET

Joint Type

Model

Manufacturer

Color/Finish

Notes

1

Interior: Wall

ASM-300X

Construction Specialties

Anodized Aluminum

With Polyethylene membrane

2

Exterior Wall

SF-300

Construction Specialties

Santoprene Rubber

Four color selections Black, Gray, Greige, & White

3

Roof to Wall

SRJW-300

Construction Specialties

Mill Finish Aluminum

A

Caulking & Sealant

890 Silicone

Pecora

Installed at all intersecting edges and substrates of joint covers.

Sheet 1


ISO

APPROX. HIGH ELEVATION OF T-105 SECONDARY WATER SEAL

EXTERIOR WALL JOINT

SF-300

INTERIOR WALL JOINT

FWF-300

ROOF TO WALL

SRJW-300

T-105 SECONDARY WATER SEAL SLOPED AT 1/4" PER LINEAL FOOT

12'-0"

12'-0" APPROXIMATELY 1-FOOT ELEVATION DROP FROM MID SPAN, IS THIS ACCOUNTED FOR? (RDH)

89'-1"

12'-0"

12'-0"

12'-0"

D

4'-11 3/4" FROM GRIDLINE "D" 4' - 11 3/4"

6'-8 1/2" FROM GRIDLINE "D"

6' - 8 1/2"

4' - 11 3/4"

D

SEAL BETWEEN COVER PLATE AND CW, TYP. ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM. 2X WD BLOCKING AS REQ'D

MINERAL WOOL INSULATION

3"

5 5/8"

ALUM. INTERIOR 3" EXPANSION JT COVER.

5 5/8"

SELF ADHERED MEMBRANE FLASHING GLAZED INTO CW SYSTEM PLYWOOD

1X WD BLOCKING

WD BLOCKING SEAL BETWEEN SELF ADHERED MEMBRANE FLASHING AND CW MULLION, TYP. EXTERIOR

WEST VESTIBULE 109

REFER TO SHEET 6 FOR DETAILS

ALIGN EDGE OF COVER PLATE WITH EDGE OF MULLION. TYP AT INTERIOR EXPANSION JT.

WEST VESTIBULE 109

LOBBY 142

ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM

SELF ADHERED MEMBRANE FLASHING EXPANSION JT

5 5/8"

WD BLOCKING

GLAZING TRANSITION MEMBRANE

MH: Prev RDH sugg glazing in btwn mull filling exte of cavity w mineral w still an op

DOOR 109B

SEALANT AND BACKER ROD, TYP.

DOOR 109A

SEE ASK-130 FOR THIS ASSEMBLY (RDH)

NOTE: COORDINATE TUBE S PLATE AND MULLION LOCAT 199. RELATIONSHIP OF SEA SYSTEM-TO-KNIFE PLATE TO

EXTERIOR WALL JOINT

INTERIOR WALL JOINT

Sheet 2


D

4'-11 3/4" FROM GRIDLINE "D" 4' - 11 3/4"

6'-8 1/2" FROM GRIDLINE "D"

6' - 8 1/2"

4' - 11 3/4"

FLOOR PLAN-LEVEL 1

D

SEAL BETWEEN COVER PLATE AND CW, TYP. ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM. 2X WD BLOCKING AS REQ'D

MINERAL WOOL INSULATION

3"

5 5/8"

ALUM. INTERIOR 3" EXPANSION JT COVER.

5 5/8"

SELF ADHERED MEMBRANE FLASHING GLAZED INTO CW SYSTEM PLYWOOD

1X WD BLOCKING

WD BLOCKING SEAL BETWEEN SELF ADHERED MEMBRANE FLASHING AND CW MULLION, TYP. EXTERIOR

REFER TO SHEET 6 FOR DETAILS

WEST VESTIBULE 109

ALIGN EDGE OF COVER PLATE WITH EDGE OF MULLION. TYP AT INTERIOR EXPANSION JT.

WEST VESTIBULE 109

LOBBY 142

ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM

SELF ADHERED MEMBRANE FLASHING EXPANSION JT

5 5/8"

WD BLOCKING

GLAZING TRANSITION MEMBRANE

MH: Prev RDH sugg glazing in btwn mull filling exte of cavity w mineral w still an op

SEE ASK-130 FOR THIS ASSEMBLY (RDH) DOOR 109B

SEALANT AND BACKER ROD, TYP.

DOOR 109A

NOTE: COORDINATE TUBE S PLATE AND MULLION LOCAT 199. RELATIONSHIP OF SEA SYSTEM-TO-KNIFE PLATE TO

EXTERIOR WALL JOINT

INTERIOR WALL JOINT

Sheet 3


FLOOR PLAN-LEVEL 2

EXTERIOR WALL JOINT

SF-300

INTERIOR WALL JOINT

FWF-300

ROOF TO WALL

SRJW-300

89'-1"

Sheet 4


COUNTER FLASHING STRATEGY HERE? MILLER HULL TO COMMENT, GLY TO COORDINATE WITH ASSOCATED TRADES, I.E., SHEET METAL AND CURTAIN WALL (RDH)

PROVIDE END DAM, BEYOND (ROOF-SIDE OF PARAPET) (RDH)

GLY TO COORDINATE: THIS FACE OF PARAPET WITH RESPECT TO TRANSITION OF HORIZONTAL AND VERTICAL EXPANSION JOINTS (RDH)

GLY TO COORDINATE: INTERFACE BETWEEN CURTAIN WALL, FRAMED WALL, PARAPET COPING CAP, EXPANSION JOINT, AND ROOF (RDH)

PARAPET DETAIL HERE IS 9/A-314 (BLANKED-OFF LOUVER IN CW), THEREFORE, SIDE OF PARAPET INTERFACING SF-300 IS CW JAMB CONDITION, GLY TO COORDINATE TRANSITIONS WITH ASSOCIATED TRADES (RDH)

PROVIDE DETAIL WHERE SF-300 INTERFACES FRAMED KNEE WALL AND L2 CW (RDH)

SF-300 EXTERIOR JOINT TOP OF SF SEAL TO BE CAPPED BY SHEET METAL BY OTHERS (NOT SHOWN) COUNTER FLASHING STRATEGY HERE? MILLER HULL TO COMMENT, GLY TO COORDINATE WITH ASSOCATED TRADES, I.E., SHEET METAL AND CURTAIN WALL (RDH)

6'-8 1/2" FROM GRIDLINE "D"

BASE CLOSURE #BC-1 (REFER TO SF DETAIL)

TYPICAL OF EAST AND WEST VESTIBULE LOCATIONS

SF-300 EXTERIOR SEAL WITH ALUMINUM FRAMES. FRAMES TO SEALED/ADHERED WITH PECORA 890 AND FASTENERS; REFER TO FOLLOWING SHEETS. NOTE: DETAIL SHOWS EXPOSED SF-300 SEAL WITHOUT ALUM. BRAKE-SHAPE COVER

Sheet 5


D

4'-11 3/4" FROM GRIDLINE "D"

6'-8 1/2" FROM GRIDLINE "D" 4' - 11 3/4"

6' - 8 1/2"

4' - 11 3/4"

D

SEAL BETWEEN COVER PLATE AND CW, TYP. ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM. MINERAL WOOL INSULATION

2X WD BLOCKING AS REQ'D

3"

PLYWOOD WD BLOCKING

1X WD BLOCKING

ASM-300X

SEAL BETWEEN SELF ADHERED MEMBRANE FLASHING AND CW MULLION, TYP. EXTERIOR

SUBSTRATES OF MULLIONS AND BLOCKING WILL BE FIELD VERIFIED BY SPECTRUM; INSTALLATION OF JOINT SEAL TO BE CONFIRMED BY GLY/MILLER HULL/ RDH PRIOR TO SPECTRUM STARTING WORK

5 5/8"

ALUM. INTERIOR 3" EXPANSION JT COVER.

5 5/8"

SELF ADHERED MEMBRANE FLASHING GLAZED INTO CW SYSTEM

WEST VESTIBULE 109

THIS IS CURTAIN WALL'S PRIMARY SEAL PLANE, ENSURE CONNECTIVITY/CONTINUITY OF THIS PLANE WITH T-105 PLANE AT EXPANSION JOINT (RDH)

ALUM. BRAKE MTL COVER PLATE TO MATCH CW SYSTEM

SELF ADHERED MEMBRANE FLASHING EXPANSION JT

5 5/8"

WD BLOCKING

GLAZING TRANSITION MEMBRANE

ALIGN EDGE OF COVER PLATE WITH EDGE OF MULLION. TYP AT INTERIOR EXPANSION JT.

ASM-300X

WEST VESTIBULE 109

LOBBY 142

ASM-300X JOINT COVER WITH POLYETHYLENE MEMBRANE TO BE SUPPLIED & INSTALLED BY SPECTRUM

MH: Prev RDH sugg glazing in btwn mull THIS AREA SHOWN IN ASK-130 (RDH) filling exte of cavity w mineral w still an op

SEALANT AND BACKER ROD, TYP. DOOR 109B

NOTE: COORDINATE TUBE S PLATE AND MULLION LOCAT 199. RELATIONSHIP OF SEA SYSTEM-TO-KNIFE PLATE TO

DOOR 109A

SELF ADHERED MEMBRANES SHOULD NOT SPAN VOID SPACES OR MOVING JOINTS (RDH)

SPECTRUM'S SUBCONTRACT SCOPE OF WORK IS DENOTED AS FOLLOWS SELF ADHERED MEMBRANE BY OTHERS

INTERIOR CONDITION NOT REVIEWED BY RDH

EXTERIOR MULLION WITH JOINT SEAL T-105 SECONDARY WATER SEAL BY SPECTRUM

INTERIOR MULLION WITH JOINT SEAL CONTINUOUS ALUMINUM COVER PLATE (12A545001)

RDH VIEWS THIS T-105 AS SYSTEM'S PRIMARY WEATHER AND AIR BARRIER PLANE, THIS PLANE MUST BE MADE CONTINUOUS WITH BUILDING'S WRB (HENRY AIRBLOC33 SYSTEM) AND CURTAIN WALL PRIMARY SEAL.

DUROFLEX GASKET SHOP INSTALLED (12V029136)

7 5/8"

GLY TO COORDINATE WITH ASSOCIATED SUB-CONTRACTORS (RDH)

WALL (NOT BY C/S)

EMSEAL BACKERSEAL BY SPECTRUM 1/4" x 1 1/4" WALL DOG ANCHOR 18"O.C. (90H209004) CONT. ALUMINUM BACK CLIP, (90A010000) 3/4"

SF-300 BY SPECTRUM WRB TO WRAP WOOD BLOCKING, RECOMMEND FFSAM WHERE INTERFACING EXPANSION JOINT ASSEMBLY'S T-105 PLANE FOR SEALANT ADHESION (RDH)

3"

24GA x 3/4"x 1" GALV. ATTACHMENT 3/4" ANGLE (12F002001)

12" WIDE POLYETHYLENE VAPOR BARRIER (12V134000)

BLOCKING BY OTHERS

ASM-300X STANDARD DETAIL BY CONSTRUCTION SPECAILTIES Sheet 6


RECOMMEND FFSAM TO COUNTER FLASH STAINLESS STEEL PAN'S END DAMS TO INTEGRATE WITH WEATHER AND AIR BARRIER (RDH)

T-105 SEONDARY WATER MEMEBRANE

T-105 MEMBRANE TO BE ADHERED OR VYCOR TAPED TO INSDIE OF SS BASE CLOSURE FOR COMPLETE AIR BARRIER.

SUBMIT FOR REVIEW, PROVIDE ADHESION COMPATIBILITY INFORMATION PER JOINT SEALANTS SPEC, SUBMIT SUBSTRATE PRIMER AS REQUIRED (RDH)

CONFIRM ADHESION APPLICATION: __________________________________________ SHOW INTERFACE DETAIL WITH L2 CW AND FRAMED KNEE WALL IN EAST-WEST DIRECTION (RDH)

__________________________________________

GLY TO COORDINATE: FFSAM IF INTERFACING SEALANT (RDH) 22 OR 24 ga.? SPEC REQ'S 24 ga. SS FLASHING (RDH)

BUILDING MEMBRANE RETURN (BY OTHERS)

SF-300

BUILDING MEMBRANE RETURN (BY OTHERS)

EMSEAL BACKERSEAL PRECOMPRESSED

CONTINUE FFSAM UNDER SS PAN TO TIE-IN WITH "BUILDING MEMBRANE" (AIRBLOC33) (RDH)

2''

BOTTOM OF FACE SEAL OPEN 1/8" FOR WEEP

224 GA STAINLESS STEEL WITH SOLDERED SEAMS TYPE? SPEC REQ'S 302 OR 304 (RDH) HOW TRANSITIONED TO CURTAIN WALL JAMB PRIMARY SEAL? (RDH)

RDH VIEWS THIS PLANE OF EXPANSION JOINT AS PRIMARY AIR AND WEATHER BARRIER PLANE FOR THIS SYSTEM, ENSURE CONTINUITY WITH CURTAIN WALL PRIMARY SEAL AND WRB (HENRY AIRBLOC33 AND FFSAM) (RDH)

BASE CLOSURE #BC-1

MATERIAL? POLYETHYLENE? PROVIDE COMPATIBILITY INFORMATION WITH PECORA 890 SILICONE (RDH)

EMSEAL BACKERSEAL PRECOMPRESSED

ANTICIPATED PRIMARY SEAL PLANE AT CURTAIN WALL, MUST ESTABLISH CONNECTION WITH INNER SEAL OF EXPANSION JOINT (RDH)

THIS INNER PROFILE NOW REPLACED WITH T-105 (RDH)

T-105 MEMBRANE IN-PLACE OF PVC SEONDARY SEAL RDH VIEWS THIS AS PRIMARY AIR AND WATER BARRIER PLANE, ENSURE CONTINUITY WITH BUILDING AIR AND WEATHER BARRIER PLANE (RDH)

PECORA 890 SILICONE - CONTINOUS BEAD (HIGHLIGHTED IN ORANGE)

PROVIDE FASTENER PRODUCT DATA, ATTACHMENT TO CURTAIN WALL? GLY TO COORDINATE WITH GLAZIERS AND EXPANSION JOINT CONTRACTOR FOR INSTALLATION (RDH)

RDH VIEWS THIS AS EXTERIOR WEATHER SEAL/CLADDING ELEMENT (RDH)

GLY TO COORDINATE: INTERFACE BETWEEN CURTAIN WALL AND EXPANSION JOINT, FASTENER MAY RISK PENETRATING WATER BARRIER PLANE OF CURTAIN WALL, MUST PROVIDE CONTINUITY OF CURTAIN WALL PRIMARY SEAL AND EXPANSION JOINT PRIMARY AIR AND WEATHER BARRIER PLANES (RDH)

FFSAM AT FRAMING TO SEAL/SET RECEIVER WITH SILICONE SEALANT FOR KNOWN ADHESION TO FOIL FACER (RDH)

RECOMMEND SILICONE SEALANT FOR LONGEVITY, CONFIRM COMPATIBILITY WITH "FLEXIBLE PRIMARY SEAL (12V074xxx)" SHEET 1 INDICATES SANTOPRENE (RDH)

SPECTRUM TO VERIFY CONDTIONS OF JOINT SUBSTRATES OF SF-300 SEAL PRIOR TO INSTALLATION. SPECTRUM WILL TRANSMIT A CONDTION REPORT TO GLY TO INCLUDE THE FOLLOING ITEMS FOR REVIEW TO RDH 1.

SUBSTRATES HAVE 3-1/4" OF DEPTH FOR ALUMINUM FRAMES

2.

JOINT MAY REQUIRE ADDITIONAL BLOCKING FOR A 3" WIDTH?

3.

JOINT SUBSTRATES MAY REQUIRE 3-1/4" SHEEET METAL STRIP FOR A IN-PLANE SURFACE?

Sheet 7


TOP EDGE OF COVERPLATE SEALANT: PECORA 890

#12 HH WITH NEOPRENE SS BACKED WASHER

PROVIDE END DAM (RDH)

T-105 SECONDARY WATER MEMBRANE

RECOMMEND TPO CLAD METAL SADDLE FOR TPO ROOF MEMBRANE TRANSITION/TERMINATION AT THIS CORNER. GLY TO COORDINATE. (RDH)

FRAME SEALANT: PECORA 890

GLAZED-IN CURTAIN WALL SILL FLASHING TO COUNTER FLASH THIS ATTACHMENT PER ARCHITECTURAL DETAILS (RDH)

FRAME SEALANT: PECORA 890 (HIGHLIGHTED IN ORANGE)

REGLET AND FLASHING AS REQUIRED (NOT BY C/S)

SILL FLASHING BY CW SUBCONTRACTOR COVERS VERTICAL LEG OF ROOF JOINT COVER. SRJW-300 MUST BE INSTALLED PRIOR TO SILL FLASHING

GLY TO COORDINATE (RDH)

FFSAM FOR ATTACHMENT AND SEALING EXPANSION JOINT ASSEMBLY, ALSO CURTAIN WALL SILL R.O. FLASHING. GLY TO COORDINATE (RDH)

SEALANT (NOT BY C/S) 1/4"x1 3/4" S/S WEDGE BOLT + 18" O.C. (90H169004) (FIN: S/S) ICC-ES#-ESR-1678 (MASONRY) ICC-ES#-ESR-2526 (CONCRETE)

7"

SEE RDH COMMENT FROM SUBMITTAL 139-0, MUST INTERFACE WITH TPO ROOF MEMBRANE AND HTSAM (RDH)

T-105 SECONDARY WATER SEAL SLOPED AT 1/4" PER LINEAL FOOT

.090 FORMED ALUMINUM COVER PLATE (80S016001) CONTINUOUS MOISTURE SEAL (12V051108) 3 11/16" 1/4"x1" S/S LAG SCREW (90H196002) W/ SEALING WASHER (90H025003) 18" O.C. (FIN: S/S)

16" WIDE POLYETHYLENE VAPOR BARRIER (12V142000)

2 7/8" CONTINUOUS EXTRUDED ALUMINUM FRAME (12A102008)

ROOF TO WALL JOINT COVER

LIGHT GAUGE STEEL STUD FRAMED WALL (RDH)

3" MIN.

HTSAM, NOT TO EXTEND BEYOND FOOTPRINT OF ALUMINUM FRAME 12A102008 (RDH)

3"

TPO ROOF MEMBRANE (RDH)

T-105 POLYETHYLENE SHEET, SANDWICHED (RDH)

Model: SRJW-300 SRJW-300 WITH DIAGONAL LEG

Sheet 8


HOW JOINED? PROVIDE DESCRIPTION OR DETAIL (RDH)

T-105 SECONDARY WATER SEAL FROM ROOF JOINT TO TRANSITION TO VERTICAL SECONDARY WATER SEAL OF SF-300. BOTH HORIZONTAL AND VERTICAL SECONDARYS ARE T-105.

COUNTER FLASHING STRATEGY BETWEEN PARAPET AND CURTAIN WALL/FRAMED WALL? MILLER HULL TO COMMENT, GLY TO COORDINATE WITH ASSOCIATED TRADES (RDH)

SF-300 AT EXTERIOR WALL; SECONDARY WATER MEMEBRANE IS T-105

TERMINATION BAR? (RDH) SHOW CUT DETAIL, MUST MAINTAIN CONTINUITY OF AIR AND WEATHER BARRIER FROM PARAPET FRAMING TO CW JAMB FRAMING (RDH)

24 GA GALV. TURNBAR AT TOP EDGE OF T-105 SEALED WITH PECORA #890 SILICONE

END DAM (RDH)

HOW IS THIS SIDE-EDGE SEALED/TERMINATED? (RDH)

T-105 MEMEBRANE AT PARAPET GAP

SHOW CUT DETAIL, HOW IS GALV ANGLE FOR T-105 TIED IN WITH AIR AND WEATHER BARRIER AT PARAPET FRAMING? (RDH)

SUBMIT FOR REVIEW, PROVIDE ADHESION COMPATIBILITY INFORMATION (RDH)

T-105 TAPED TO GALV ANGLE WITH VYVOR-PLUS TAPE; TAPE EXTENED ONTO HORIZ. LEG

HOW IS AIR AND WEATHER BARRIER CONTINUITY ESTABLISHED AT THIS CORNER TRANSITION? PROVIDE DETAIL (RDH)

2" X 2" GALV ANGLE FOR T-105 ATTACHMENT TO PARAPET

SUGGEST TABBED HORIZONTAL LEG TO LAP UNDER ALUMINUM FRAME 12A102008 (RDH)

T-105 ROOF SECONDARY MEMBRANE WILL CONTINUE TO RUN THROUGH THE WIDTH OF THE PARAPET.

GLY: COORDINATE INTERFACES AT PARAPET ROOFING, FRAMED PARAPET, CURTAIN WALL, COPING CAP, EXPANSION JOINT. COORDINATED DETAIL REQUIRED (RDH)

SHEET METAL FLASHING AT PARAPET GAP IS BY OTHERS AND NOT SHOWN.

Sheet 9


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.