MSCM QA Plan and Check List - Parking Garage 79 50 00 Joint Covers

Page 1

List of chemicals/products used on site PRODUCT NAME: Wabo FlameGuard II Blanket Chemical Family: Refractory Fiber Link to MSDS:https://wbacorp.com/public/userfiles/WaboFlameGuardIIBlanket_MSDS.pdf

QA/QC PLAN

Product name: Sikaflex® ‐ 1A

REVISED 10-6-20

Link to MSDS: https://usa.sarnafil.sika.com/downloads/repository/submittal/productdata/Sikaflex%C2%AE1A.pdf

Skanska/Balfour Beatty Project: Microsoft Parking Garage 079 50 00 – Expansion / Seismic Joint Covers


3902 West Valley Hwy. N. Suite 500, Auburn, WA 98001 ~ PH: 253-334-2740 ~ FAX: 888-229-8042

Microsoft Campus Modernization Parking Facility Redmond, WA

Section 079500 Expansion and Seismic Joint Cover Systems

QA/QC Plan A. Manufacturers: Obtain each type of seismic joint assembly from a single manufacturer. One manufacturer may be used for exterior joints and a different manufacturer may be used for interior joints. B.

Installer: A firm which is acceptable to manufacturer of seismic joint units, and has experience in installation of units similar to units indicated.

C.

Single Source: Provide materials from a single manufacturer for exterior expansion joint assemblies.

D.

Fire Performance: Where indicated, provide seismic joint assemblies with joint cycling requirements per ASTM F1399. 1.

Surface Burning Characteristics for Fiberglass Composites (Interior Applications): UL Class 1 per UL 723 (ASTM E84).

E.

Pre-Installation Conference: Schedule a job conference to review the work prior to scheduled commencement of work on the actual building in accordance with Section 013100 – Project management and Coordination. Conference shall be attended by Installer; manufacturer’s representative; Owner’s Representative, Architect and other representatives directly concerned with performance of the Work. The following major considerations shall be reviewed at conference: 1.

Review system requirements, including shop drawings, specifications, installation instructions and warranty requirements. Should any discrepancies arise, they shall be reviewed and resolved.

2.

Review trade related schedules.


3902 West Valley Hwy. N. Suite 500, Auburn, WA 98001 ~ PH: 253-334-2740 ~ FAX: 888-229-8042

F. Prior to installation; 1. Before beginning installation of these joint covers, review the architectural drawings and approved CS shop drawings to familiarize yourself with the joint cover models and locations. 2. Check all of the joint cover components to confirm that the correct joint cover model and size have been received. Also check for materials that may have been damaged during shipping. Report all incorrect and/or damaged components to CS at 800-233-8493. 3. Joint covers must be securely mounted to structurally sound substrates. Repair all cracks (By SBB) or spalled areas of the concrete deck. The mounting surface must be clean and free from any loose dust, dirt, debris and oils. 4. All materials should be arranged in the order that they are to be installed. All hardware required for each portion of the work should be placed with the appropriate materials .Review all Approved Shop Drawings and this Document to familiarize yourself with all the details and components of this assembly .Prior to the commencement of Installation, all materials MUST be inspected for Damage. Any damage must be reported to CONSTRUCTION SPECIALTIES, INC., as soon as possible, so that replacement materials may be furnished without delay. All work must be completed as per Architect's Approved "Shop Drawings", and in accordance with these Installation Instructions. When installation is complete, all materials must be protected from damage until the Architect's FINAL INSPECTION G. Post Installation QAQC Checklist; 1. Ensure all installation requirements were met and are satisfactory. In order to ensure all installed products, meet quality guidelines, foreman must perform QAQC Checklist found on page 4 and 5 of the Quality Plan. 2. QAQC Checklist must be submitted to General Contractor after every shift. The QAQC must include all models installed.


3902 West Valley Hwy. N. Suite 500, Auburn, WA 98001 ~ PH: 253-334-2740 ~ FAX: 888-229-8042

Model

Type

Floor Fastener

Wall Fastener

Centers

Max Butt-seam Width

Wall Flange Caulk (Y/N)

Notes

SMPW

floor to wall

1/4" x 2" Flat head 3/16"x1-1/2" Split drive dowel

3/8"x2-1/2" screw bolt

18" O.C.

3/16"

Y

SMP

floor to floor

1/4"x2" Flat head

NA

18" O.C.

3/16"

N

PCW

floor to wall

NA

3/8"x2-1/2" screw bolt

18" O.C.

3/16"

Y

PCW 17" or greater

floor to wall

NA

1/4"x2" Hilti KB3

18" O.C.

3/16"

N

SFW

wall to wall

NA

3/16"x1-3/4" self tapping flat head

18" O.C.

3/16"

N

SCW

wall to wall

NA

3/16"x1-3/4" self tapping flat head

18" O.C.

3/16"

N

5/16- 8x3-1/2" bolt to attached cover plate to turnbar

VF

wall to wall

NA

NA

NA

3/16"

Y

Pre-compressed expanding foam installed with silicone caulking

FB17

floor to floor

3/16"x1-1/2" self tapping flat head

3/8"x2" screw bolt

18" O.C.

3/16"

N

3/8- 16x6" bolt to attachcover plate to turnbar (12" O.C.)


3902 West Valley Hwy. N. Suite 500, Auburn, WA 98001 ~ PH: 253-334-2740 ~ FAX: 888-229-8042


3902 West Valley Hwy. N. Suite 500, Auburn, WA 98001 ~ PH: 253-334-2740 ~ FAX: 888-229-8042