FINAL DRAFT • 02-01-19
Bicycle & Pedestrian
MASTER PLAN UPDATE 2018
ACKNOWLEDGEMENTS
City of Santa Rosa
Community Advisory Board
Nancy Adams, Transportation Planner
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
Rob Sprinkle, Deputy Director of Traffic Engineering Steve Brady, Senior Environmental Specialist Jaime Smedes, Marketing & Outreach Coordinator
Consultant Team ALTA PLANNING + DESIGN
Santa Rosa City Council
Hugh Louch, Principal
Chris Coursey, Mayor
Jeff Knowles, Project Manager
Chris Rogers, Vice Mayor
Paul Klassen, Senior Engineering Associate
Julie Combs
Emily Shandy, Senior Planner
Ernesto Olivares
Lisa Schroer, GIS Analyst
John Sawyer
Ben Frazier, Planner
Tom Schwedhelm Jack Tibbetts
W-TRANS Steve Weinberger, Principal
Bicycle & Pedestrian Advisory Board
Mary Jo Young, Senior Engineer
Beth Dadko, Chair
FISHER TOWN DESIGN
Shaun Ralston, Vice Chair
Lois Fisher, President
Adam Brown Kim O. Badenfort Christine Dektor Mike Lopez Doug McKenzie Barbara Moulton Jim Pedgrift
ii
Waterways Advisory Committee
Kevin Rangel, Assistant Engineer
TABLE OF CONTENTS
01
INTRODUCTION
4
04
OUTREACH
68
Why Develop a Master Plan?
Online Survey
Purpose of the Plan
Online Mapping Tool
Benefits of Bicycling and Walking
City Website and Social Media
Relationship to Other Documents
Public Open Houses
Plan Organization
Stakeholder Interviews
Summary
Pop Up Events

02
VISION & GOALS
12
Overview Vision
Table of Contents
Partner Agency Meetings
05
PROJECTS, PROGRAMS, & POLICIES 82 Projects
Goals
Citywide Projects
Policies and Actions
Programs Policy Changes
03
SANTA ROSA TODAY Local Context Equity Biking and Walking Today Safety User Experience and Perceived Comfort
22
06
IMPLEMENTATION PLAN 130 Project Evaluation Funding Strategies Environmental Impact
Appendix A.
RECOMMENDATION TABLES
Appendix B.
BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
152
175
iii
01
INTRODUCTION
iv
WHY DEVELOP A MASTER PLAN?
The Bicycle and Pedestrian Master Plan is a critical tool for guiding city staff and the development community in building a balanced transportation system that is pedestrian and bicycle friendly and encourages residents to use these modes of transportation. The ultimate goal is a shift from driving single occupancy vehicles to more walking and bicycling as a normal part of daily life.
Purpose of the Plan This Bicycle and Pedestrian Master Plan Update 2018 establishes a long term vision for improving walking and bicycling in Santa Rosa by updating the previous plan adopted by the City Council in 2010. The Plan Update 2018 provides a strategy to develop a comprehensive bicycling and walking network to provide access to transit, schools, and downtown
alongside support facilities like bicycle parking and pedestrian amenities. These network improvements are paired with education, encouragement, enforcement, and evaluation programs. This document also identifies a plan to implement these projects and programs through prioritization and phasing to ensure implementation is manageable and fundable. This Plan Update 2018 represents a long-term, aspirational vision for walking and bicycling in Santa Rosa, and recognizes that limited funding and resources will require phased implementation of the proposed improvements over many years.
01 Introduction
Santa Rosa is a vibrant city committed to improving the quality of life for residents and visitors by providing walking and bicycling as convenient, comfortable, and healthy modes of transportation and recreation. The largest city in Sonoma County, Santa Rosa is a gateway to the Redwood Empire and to Sonoma Valley wine country, drawing visitors from across the country and around the world.
The Plan Update 2018 process provided opportunities for elected and appointed members of the City’s Boards, Commissions, and the public to participate in the development process of the Plan Update 2018 by evaluating, commenting, and suggesting ideas for walking and bicycling. Updates to the Plan are necessary as a progressive city is rarely static and the needs of a viable city are dynamic. Ideally, the Plan Update 2018 should be reviewed every two years to update maps, project lists, and priorities as facilities are completed and to keep pace with the development landscape.
5
BENEFITS OF BICYCLING AND WALKING Public Health
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
01
In A Portrait of Sonoma County (2014), the Sonoma County Department of Health Services found the Sheppard neighborhood near downtown Santa Rosa to have one of the lowest life expectancies in the county at 76.6 years – nearly a decade less than Central Bennett Valley in eastern Santa Rosa, where the average life expectancy is 85.7 years. This wide variation between Census tracts in the same city suggests neighborhood amenities and characteristics can have a striking impact on health. Central Bennett Valley is adjacent to hundreds of acres of state parkland and includes Strawberry Park, with nearly six acres of open space and sports facilities. Sheppard is between two state highways and has only one acre of developed park within the neighborhood—and while the park provides walking areas, it lacks sports facilities or other active recreation opportunities. Among the 99 Sonoma County Census tracts evaluated, 13 of the bottom 20 are located in Santa Rosa. Physical inactivity is now widely understood to play a significant role in the most common chronic diseases in the United States, including heart disease, stroke, and diabetes and each year approximately 280,000 adults in the United States die prematurely due to obesity-related illnesses. A 2004 study published in the American Journal of Preventive Medicine by Frank et al.
6
reported that for each additional 60 minutes spent in a car daily, there is a six percent increase in the chances of being obese. Creating a physical environment that encourages bicycling and walking, and improves access to parks and active recreation opportunities in other neighborhoods, is a key strategy to fight obesity and inactivity and has been shown to have substantial impacts on health with a relatively small public investment. A Portrait of Sonoma County identifies interventions that support safe walking, bicycling, and recreation opportunities as effective strategies to address public health concerns in the County and Santa Rosa, including a focus on sidewalks, street lights, and access to parks.
Collision Reduction Conflicts between people walking, bicycling, and driving can result from poor behavior as well as insufficient or ineffective design. Encouraging development and redevelopment in which bicycling and walking are supported can enhance safety and comfort levels for all users. Designated bicycling and walking facilities, well designed crossings, and continued education and enforcement can reduce the risk of crashes and injuries.
Equity
Quality of Life Creating conditions where walking and bicycling are accepted and encouraged increases a community’s livability in ways that are difficult to measure but should not be overlooked. The design, land use patterns, and transportation systems that comprise the built environment have a profound impact on quality of life issues. The aesthetic quality of a community improves when visual and noise pollution caused by automobiles is reduced and when green space is reserved for facilities that allow people of all ages to recreate and travel in pleasant settings.
Active transportation programs and projects encourage more bicycling and walking, which leads to a better quality of life. This higher quality of life can attract more diverse and creative people, leading to higher economic growth for a city and region.1 Additionally, people who commute using active modes of transportation save money on annual automobile operating costs, and may see additional savings in health care costs. On a community-wide scale, bicycle and pedestrian infrastructure projects are generally far less expensive than automobile-related infrastructure.
01 Introduction
Bicycling and walking are inexpensive and broadly accessible forms of transportation. The average annual operating cost of a bicycle is $308, compared to $8,220 for the average car. Bicycling and walking are affordable means of transportation for low-income and disadvantaged residents. Access to active transportation provides added freedom and independence for youth and parents (who may otherwise be transporting their children) as well as for some people who cannot drive and those who have chosen not to drive.
Economy
Environmental Replacing driving trips with bicycling or walking trips has a measurable impact on reducing greenhouse gases in the atmosphere that contribute to climate change. Fewer vehicle trips and vehicle miles traveled translate into fewer pollutants released into the air, including carbon dioxide, nitrogen oxides, and hydrocarbons. This not only reduces our contribution to climate change, but also improves the health and quality of life for residents who are vulnerable to asthma or other chronic respiratory diseases.
1 Florida, Richard. Rise of the Creative Class: And How It’s Transforming Work, Leisure, Community, and Everyday Life. New York, NY: Basic Books, 2004.
7
RELATIONSHIP TO OTHER DOCUMENTS Santa Rosa’s General Plan 2035 guides the physical development of the City and sets out a vision for Santa Rosa where:
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
01
Complete streets provide safe access for pedestrians, bicyclists, motorists, and transit users of all ages and abilities. Neighborhood-scale retail and service uses, schools, and recreational facilities are connected by bicycle and pedestrian paths and transportation management programs and bicycle/ pedestrian improvements have reduced the number of single-occupancy cars on regional/arterial streets. The Bicycle and Pedestrian Master Plan Update 2018 helps the City realize this ambitious vision along with implementing goals, policies, and recommendations adopted through complementary City planning efforts such as the City’s Creek Master Plan, Climate Action Plan, Downtown Station Area Specific Plan, North Santa Rosa Specific Plan, Roseland/Sebastopol Avenue Specific Plan, and corridor plans for Mendocino Avenue, Santa Rosa Avenue, and Sebastopol Avenue. The Bicycle and Pedestrian Master Plan Update 2018 also helps the City do its part to achieve larger regional and state goals embraced in Sonoma County’s General Plan 2040, Countywide Bicycle and Pedestrian Master Plan, Plan Bay Area 2040, Caltrans District 4 Bicycle Plan, and Toward an Active California: State Bicycle and Pedestrian Plan. This Plan Update 2018 will help Santa Rosa continue to meet the following goals.
8
Santa Rosa GENERAL PLAN 2035 • Provide attractive and safe streets for pedestrians and bicyclists • Develop a citywide system of designated bikeways that serves both experienced and casual bicyclists, and which maximizes bicycle use for commuting, recreation, and local transport • Develop a safe, convenient, and continuous network of pedestrian sidewalks and pathways that link neighborhoods with schools, parks, shopping areas, and employment centers • Reduce traffic volumes and speeds in neighborhoods CLIMATE ACTION PLAN • Reduce greenhouse gas emissions by 25% below 1990 levels by 2020
REDUCE GREENHOUSE EMISSIONS BY
25%
Sonoma County
California
GENERAL PLAN 2040
TOWARD ACTIVE CALIFORNIA: REDUCE AN GREENHOUSE STATE BICYCLE ANDBYPEDESTRIAN PLAN EMISSIONS
25%
• Triple bicycling trips and double walking and transit trips statewide by 2020 (relative to 2010).
COUNTYWIDE BICYCLE AND PEDESTRIAN PLAN • Develop and maintain a comprehensive countywide bicycle and pedestrian transportation system, which includes projects, programs, and policies that work together to provide safe and efficient transportation opportunities for bicyclists and pedestrians
TRIPLE BIKE TRIPS
01 Introduction
• Reduce Sonoma County’s greenhouse gas emissions by achieving a nonmotorized trips mode share of five percent for all trips and ten percent for trips under five miles long by 2020
DOUBLE
WALKING & TRANSIT TRIPS
COMPREHENSIVE TRANSPORTATION PLAN • Shift transportation mode four percent from single occupant vehicle trips to bicycle and pedestrian trips due to changing attitudes, improved safety, improved nonauto infrastructure, pedestrian/bike/ transit friendly land use changes
9
PLAN UPDATE 2018 ORGANIZATION
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
01
10
CHAPTER 01: Introduction outlines the Plan Update 2018’s purpose and explains its place in the context of other planning efforts and initiatives. CHAPTER 02: Vision & Goals captures the vision and policy framework for Santa Rosa’s Bicycle and Pedestrian Plan Update 2018. The chapter includes performance metrics because what fails to be measured fails to get done. CHAPTER 03: Santa Rosa Today provides an inventory of present-day walking and bicycling in Santa Rosa, including physical conditions of facilities as well as education, enforcement, and encouragement programs. CHAPTER 04: Outreach chronicles how stakeholders, businesses, and thousands of community members shaped the Plan Update 2018 through a comprehensive engagement process.
CHAPTER 05: Projects, Programs & Policies describes and maps the specific projects, programs, and policy changes recommended to meet the active transportation needs of Santa Rosa’s residents and visitors. CHAPTER 06: Implementation Plan presents a strategy to evaluate and prioritize projects and provides details on funding opportunities to advance the Plan Update 2018 through phased implementation. APPENDIX A: Recommendation Tables APPENDIX B: Bicycle and Pedestrian Facility Guidelines
SUMMARY
These investments and natural assets provide a foundation upon which the City can continue to build a high-quality citywide network for bicycling and walking—one that is accessible and comfortable for everyday use by residents and visitors of all ages and abilities.
01 Introduction
Santa Rosa is well poised to increase walking and bicycling for transportation. It has a mild climate most of the year, is relatively flat, and has a large network of existing sidewalks and growing network of on-street bikeways and offstreet shared- use paths. The City has installed bicycle parking in much of the downtown and transit services connect destinations in the region and beyond.
11
02
VISION & GOALS
12
OVERVIEW
All of the following goals, strategies, and policies support the larger citywide “Complete Streets� policy, which instructs staff to consider the needs of all modes of travel when developing any transportation facility. The goals, strategies, and policies are designed to guide the work of City staff and elected officials, partner agencies, and private developers to improve the livability, economic vitality, and non-motorized accessibility for residents and visitors throughout Santa Rosa. Reducing the amount of driving and automobile ownership is an overarching vision embodied in the Plan Update 2018.
The Plan Update 2018 is organized around a vision statement, three overarching goals tied to relevant performance measures, and a series of specific policies and actions. BICYCLE AND WALK FRIENDLY COMMUNITY DESIGNATION Santa Rosa is currently recognized as a Bicycle Friendly Community at the Bronze level by the League of American Bicyclists. This voluntary assessment and award program evaluates communities on ten criteria that they believe affect three key outcomes: ridership, crashes, and fatalities. These goals, policies, and actions are designed specifically to help elevate the city to a Silver or higher designation (Gold, Platinum, and Diamond) in the near future. Santa Rosa is not currently recognized as a Walk Friendly Community by the UNC Highway Safety Research Center. Taking the actions listed in this chapter can position the City for recognition through this national program as well.
02 Vision & goals
The goals of the Plan Update 2018 reflect the priorities expressed by the community throughout the public outreach phase of this Plan Update 2018. Discussions with City departments, best practices across the nation, and input from community stakeholders have shaped the proposed strategies and policies intended to help the City achieve these goals.
GLOSSARY OF TERMS
VISION
GOALS
A strong statement that serves as an aspirational guide
Broad, long-range targets for making the vision a reality
PERFORMANCE MEASURES How we mark progress in meeting the goals and policies
POLICIES
ACTIONS
What we want to achieve in terms of outcomes
Specific strategies for how to achieve the goals and policies
13
VISION
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
02
Santa Rosa is a community where walking and bicycling are comfortable, convenient, and common for people of all ages and abilities.
GOALS GOAL 1
Increase Access and Comfort Design bicycle and pedestrian facilities that are accessible and comfortable for people of all ages and abilities to use. PERFORMANCE MEASURES: • Increase the share of people walking and bicycling to work to five percent by 2025 and ten percent by 2040. • Increase the share of students walking or bicycling to school to ten percent by 2025 and 20% by 2040. • Reduce the number of severe and fatal collisions to zero by 2040.1 • Reduce the percent of arterial streets that are Level of Traffic Stress (LTS) 4 from 57% to 40% by 2040 (see Chapter 3 for information about LTS). • Complete Short Term projects recommended in this Plan Update 2018 by 2030 and High Priority projects by 2040.
1 There are many factors that contribute to severe and fatal collisions that are not within the control of the City. This measure recognizes that the City will continue to monitor severe and fatal collisions, respond if necessary with appropriate solutions when these collisions occur, and act proactively to create an environment where the safety of the most vulnerable road users is prioritized.
14
GOAL 2
GOAL 3
Support a Culture of Walking and Biking
Identify, develop, and maintain a complete and convenient bicycle and pedestrian network.
Increase awareness and support of bicycling and walking through programs and citywide initiatives.
PERFORMANCE MEASURES:
PERFORMANCE MEASURES:
• Complete Studies recommended in this Plan Update 2018 by 2040.
• Increase the share of people walking and bicycling to work to five percent by 2025 and ten percent by 2040.
• Double the number of short-term and secure long-term bicycle parking locations by 2040. • Maintain adequate pavement quality, striping, and sign visibility and signal/beacon functionality on all bicycle and pedestrian facilities. • Start tracking and begin publishing annual bicycle and pedestrian counts by 2021.
02 Vision & goals
Maintain and Expand the Network
• Increase the share of students walking or bicycling to school to ten percent by 2025 and 20% by 2040. • Increase the number of Bicycle Friendly Businesses to include all of the top ten largest employers in Santa Rosa by 2025.
Sutter Santa Rosa Regional Hospital was recognized with Bronze-level Bicycle Friendly Business award by the League of American Bicyclists in 2018. Sutter is the first business in Sonoma County to be awarded a Bicycle Friendly Business award and joins over 1,250 local businesses, government agencies, and Fortune 500 companies across the United States that are transforming the American workplace.
15
POLICIES AND ACTIONS Planning
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
02
Policy 1: Integrate bicycle and pedestrian network and facility needs into all city planning documents and capital improvement projects. • Action 1.1: Review the City’s Capital Improvement Program (CIP) list on an annual basis to ensure that recommended projects from this Plan Update 2018 are incorporated at the earliest possible stage of both new capital projects and maintenance of existing facilities. • Action 1.2: Follow a multi-disciplinary project scoping process that incorporates the needs of all modes and stakeholders, both internal and external. The design process should include the City divisions, departments, and staff responsible for emergency response, parking, law enforcement, maintenance, and other affected areas. • Action 1.3: Utilize the Regional Complete Streets (Routine Accommodation) Checklist to assure consideration of pedestrian and bicycle facility needs in City transportation projects and roadway improvements. • Action 1.4: Evaluate all streets during pavement resurfacing to determine if bicycle facilities can be provided (e.g. bike lanes, wider curb lanes or shoulders) when the striping is reapplied.
16
• Action 1.5: Ensure that all traffic impact studies, analyses of proposed street changes, and development projects address impacts on bicycling and walking facilities. Specifically, the following should be considered: »» Consistency with General Plan, Area Plan, and Bicycle and Pedestrian Master Plan Update 2018 policies and recommendations »» Impact on the existing bikeway and pedestrian network »» Degree to which bicycle and walking travel patterns are altered or restricted by the projects »» Safety of future bicycle and pedestrian operations (based on conformity to Plan Update 2018 Bicycle and Pedestrian Facility Guidelines and City, State, and Federal design standards) • Action 1.6: Require new development, or reconstruction if applicable, to address the pedestrian and bicycle circulation element based on the above considerations. • Action 1.7: Conduct regular pedestrian and bicycle counts pursuant to regional methodology as part of before and after project implementation. • Action 1.8: Continue to implement the City's Bicycle and Pedestrian Facility Guidelines for all new development projects to support integration of transportation into land use planning decisions.
Design Policy 3: Design a Low Stress Bikeway Network suitable for the “Interested but Concerned,” to include people of all ages and ability levels riding bicycles.
• Action 2.1: Work with adjacent governmental entities, public service companies, coordinating agencies, transit agencies, and the Santa Rosa Junior College to ensure that Plan Update 2018 recommendations are incorporated into their planning and areas of responsibility, and vice versa.
• Action 3.1: Design a network of continuous Low Stress Bikeways as identified in this Plan Update 2018. Projects that improve comfort at intersections and along corridors with high stress should be prioritized.
• Action 2.2: Work with transit providers to improve bicycle and pedestrian access (first/last mile connections) to transit stations and the comfort of transit stops and onboard transit vehicles, especially during peak commute hours, and to provide secure bike parking, benches, and covered waiting areas at stations and stops. • Action 2.3: Establish an ad-hoc Bicycle and Pedestrian Advisory Board Sub-Committee to monitor the launch of the one-year bikeshare pilot program funded by MTC. The Sub-Committee may evaluate the program and report to City Council the successes and opportunities to expand the program to other areas of the city. A bikeshare business plan may be needed as a next step.
02 Vision & goals
Policy 2: Coordinate with other agencies and stakeholders to incorporate Santa Rosa Bicycle and Pedestrian Plan Update 2018 elements.
• Action 3.2: Utilize the bicycle and pedestrian facility guidelines in this Plan Update 2018, guidance from North American City Transportation Officials (NACTO), and most recent State and Federal design standards and guidelines to develop plans for on-street bicycle facilities along corridors and at intersections. • Action 3.3: Follow a multi-disciplinary design process that incorporates and balances the needs of all modes and stakeholders, both internal and external; the design process should include the City divisions, departments, and staff responsible for emergency response, parking, law enforcement, maintenance, and other affected areas as well as other responsible external stakeholder agencies. • Action 3.4: Continue to install bicyclesensitive loop detectors at all signalized intersections with accurately-placed pavement markings placed such that the bicycle detection symbol is off-center of the travel lane and not on the right edge of the travel lane. Consider benefits and costs of infrared, video, and microwave detection.
17
Policy 4: Design a connected, convenient, and comfortable pedestrian network to serve people of all ages and abilities.
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
02
• Action 4.1: Include sidewalks on all new or retrofitted roadways. • Action 4.2: Identify and construct sidewalks in areas where they are incomplete. • Action 4.3: Continue to enforce the sidewalk maintenance program to ensure that adjacent property owners maintain the sidewalk properly. • Action 4.4: Plan and develop wellconnected streets, sidewalks, and pathways that provide the most direct paths of travel for pedestrians. Provide connections between or through cul-de-sacs and remove barriers to walking where feasible. • Action 4.5: Continue to install lead pedestrian interval phases in traffic signal timing in the urban core and outside the urban core, as warranted, to encourage walking and facilitate crossing busy regional or high-volume transitional streets.
Policy 5: Design accessible, comfortable, and continuous off-street paths that contribute to the framework of Santa Rosa’s active transportation network. • Action 5.1: Utilize the bicycle and pedestrian facility guidelines in this Plan Update 2018 and most recent State and Federal design standards and guidelines to develop plans for ADA-compliant offstreet trails (Class I shared-use paths). • Action 5.2: Utilize Crime Prevention Through Environmental Design (CPTED) principles in the design of trails.1 • Action 5.3: Identify opportunities for trailhead enhancements to include gateway treatments, public art, wayfinding, and placemaking. Policy 6: Develop an easy to read, unified, and comprehensive wayfinding system for bicyclists, pedestrians, and trail users. • Action 6.1: Pursue grant funding to develop a consistent citywide wayfinding program and replace all prior wayfinding signs.
• Action 4.6: Review signal locations on an annual basis to identify and adjust for increased pedestrian clearance time where needed. • Action 4.7: Routinely evaluate locations for enhancing crosswalks.
1 CPTED is a multidisciplinary approach to reducing criminal behavior that includes designing public spaces and pathways to promote visibility, reduce or eliminate hiding places, and promote desired activity and natural surveillance, among other tools.
18
Funding
Project Delivery
Policy 7: Leverage existing funding to maximize project delivery.
Policy 9: Construct projects within the Plan Update 2018 utilizing all available internal and external resources.
• Action 7.2: Actively develop projects from the Plan Update 2018 to position the City to best compete for grant funding. • Action 7.3: Follow the Plan Update 2018’s prioritization recommendations, which include equity and other fundingagency-determined factors in scoring. • Action 7.4: Seek to submit grant applications for projects that most competitively match with funding agency criteria. Policy 8: Continue and enhance the City’s annual commitment of local funds for bicycle and pedestrian project implementation. • Action 8.1: Continue preparing an annual Work Plan including the status of pedestrian and bicycle projects in this Plan Update 2018 that have been completed, are in progress, and are proposed for the budget year showing scope, schedule, and budget by fund source.
• Action 9.1: If additional internal support is required, establish a full-time pedestrian and bicycle coordinator position to assist in the planning and implementation of bicycle and pedestrian projects and programs. • Action 9.2: Continue to support a representative Bicycle and Pedestrian Advisory Board to assist City staff in the planning, design, and implementation of projects that positively impact bicycle and pedestrian travel and safety.
02 Vision & goals
• Action 7.1: Utilizing funds as a local match, aggressively pursue funding from available grant sources.
Policy 10: Ensure that bicyclists and pedestrians have accommodation in work zones. • Action 10.1: Incorporate routine accommodation for pedestrian and bicycle facilities when developing priority lists for overlay and construction projects, maintenance, and in the City’s guidelines.
• Action 8.2: Through the CIP process, assess and prepare for upcoming staffing, consultant, and capital funding needs as projects arise. 2
2 The average Bronze Bicycle Friendly Community invests nine percent of its transportation budget in bicycle projects annually.
19
Operations & Maintenance Policy 11: Maintain designated facilities to be comfortable and free of hazards to bicycling and walking.
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
02
• Action 11.1: Sweep streets regularly, with priority given to those with higher pedestrian and bicycle traffic. • Action 11.2: Trim overhanging and encroaching vegetation to maintain a clear path of travel along pedestrian and bicycle facilities. • Action 11.3: Develop and implement an appropriate minimum paving surface standard for bicycle boulevards and other low stress bikeways. • Action 11.4: Update repaving project selection methodology to prioritize bicycle boulevards and other low stress bikeways to ensure that the minimum paving surface standard is maintained. • Action 11.5: Incorporate maintenance needs into design of separated bikeways to ensure proper maintenance after construction. • Action 11.6: Work with homelessness navigation centers, the Police Department, and the Department of Housing and Community Services to provide services to unhoused residents encamped on trails. Policy 12: Maintain bicycle parking. • Action 12.1: Develop a procedure for inspection and prompt replacement of damaged bicycle racks.
• Action 12.2: Remove abandoned bicycles from bicycle racks and donate to local non-profit community bicycle shops for use in youth education programs. • Action 12.3: Encourage event organizers to provide and publicize valet bicycle parking. Amend Santa Rosa event permitting process to require secure valet bicycle parking at events over a certain size.
Programs Policy 13: Educate pedestrians, bicyclists, motorists, and the public about roadway safety and the benefits of bicycling and walking. • Action 13.1: Develop a comprehensive Vision Zero strategy that outlines engineering, enforcement, education and encouragement actions. • Action 13.2: Support the continuation and expansion of bicycle safety education programs such as those taught by Sonoma County Bicycle Coalition. Policy 14: Encourage Santa Rosa Public Schools to participate in the Safe Routes to School program. • Action 14.1: Continue to support walk audits at Santa Rosa public schools and utilize improvement plans to pursue grant funding for implementation. • Action 14.2: Continue City staff participation in countywide Safe Routes to School task forces.
20
Policy 15: Support police enforcement activities targeted at both bicyclists and motorists that educate and reinforce proper and safe behaviors.
• Action 15.2: Focus data-driven enforcement efforts on behaviors with greatest crash risk and/or injury severity such as vehicle speeding or bicyclist wrong-way riding. Policy 16: Increase bicycling and walking through targeted marketing and promotion. • Action 16.1: Provide current and easily accessible information about the Santa Rosa bicycle network, bicycle programs, and bicycle parking. This includes distribution of online bicycle maps, maintaining up-to-date City web pages, and providing opportunities for continued public feedback. • Action 16.2: Encourage major employers to continue, develop, or expand bicycle promotion programs for their employees and recognize those companies designated a Bicycle Friendly Business by the League of American Bicyclists
• Action 16.5: Continue to offer and expand, if possible, the City’s Free Ride Program.
02 Vision & goals
• Action 15.1: Establish a bicycle ticket diversion program per the Bicycle Traffic School bill (AB 902) that allows bicyclists who are ticketed for certain infractions to attend a class on safe bicycle riding to reduce or eliminate their fines.
• Action 16.4: Continue to sponsor the annual Bicycle and Walk to Work Week in May to receive input on the pedestrian and bicycle program as well as to educate the public as to the benefits of walking and bicycling and the Transportation Demand Management program.
Evaluation Policy 17: Measure bicycling and walking activity through an annual count program. • Action 17.1: Establish an annual count program at key locations around the city. • Action 17.2: Make the data publicly available on an ongoing or at least annual basis. Policy 18: Report annually on the implementation of this Plan Update 2018. • Action 18.1: Prepare and present a report to the Bicycle and Pedestrian Advisory Board describing the progress in: »» Achieving the three Goals of the Plan Update 2018 in terms of their specific performance measures »» Implementing the Policies and Actions of this Plan Update 2018
• Action 16.3: Encourage the use of bicycles for City employee commute and work travel purposes so that the City is seen as a model employer.
21
03
SANTA ROSA TODAY
22
This chapter describes the active transportation landscape in Santa Rosa, including a discussion of related themes that inform the recommended infrastructure projects, programs, and policies in the community.
03 Santa Rosa Today
Local Context DEMOGRAPHICS Santa Rosa is home to 173,165 residents, according to 2016 American Community Survey five-year estimates. This represents more than one third of the Sonoma County population of 497,776. When compared to the county population, Santa Rosa is slightly younger, with more residents under 10 years old and between 2034 years old, as shown in Figure 3-1. Santa Rosa families participate in a Kidical Mass ride
Figure 3-1: Population by Age in Santa Rosa and Sonoma County 30% 25% 20% 15% 10% 5% 0% < 10
10-19
20-34
35-54
55-74
75+
AGE Santa Rosa
Sonoma County
23
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
03
24
LAND USE & MAJOR DESTINATIONS
TRANSIT ACCESS
This Plan Update 2018 will support Santa Rosaâ&#x20AC;&#x2122;s Priority Development Areas (PDAs), the areas where the City plans to focus development in denser, mixed-use areas along transit routes shown in Figure 3-2. In conjunction with this development and transit service, high-quality bicycling and walking infrastructure within PDAs is intended to offer improved alternatives to driving. The existing and planned land uses in Santa Rosa will inform the recommendations in this Plan Update 2018 in an effort to maximize the number of people who will have access to walking and bicycling networks.
Santa Rosa is served by several transit providers and routes that offer connections to local and regional destinations. Santa Rosa CityBus and Sonoma County Transit both offer local bus service, and two Sonoma-Marin Area Rail Transit (SMART) stations have service to the Sonoma County Airport as well as Rohnert Park, Petaluma, Cotati, Novato, and San Rafael. Future stations are planned for Larkspur, Windsor, Healdsburg, and Cloverdale. Golden Gate Transit also offers bus service between Santa Rosa and San Francisco. See Figure 3-4 for a map of frequently used transit routes in the city.
Major destinations in Santa Rosa include schools, parks, healthcare facilities, shopping centers, city hall, county administration, and transit stations, mapped in Figure 3-3. These destinations are dispersed throughout the four quadrants of the city, and will require a comprehensive network of active transportation facilities to allow people to walk or bicycle instead of driving. Employment density is highest in the downtown area and in northern Santa Rosa along Highway 101 where Kaiser Permanente Medical Center and several federal and county offices are located.
Many bicyclists use transit for a portion of their trip, making bicycling access to transit stops and stations an important part of the active transportation network. Between 2013 and 2018, approximately 30,000 bicycles were brought on CityBus trips each year. From August 2017 to August 2018, SMART carried nearly 723,000 passengers and nearly 65,500 bicycles. This means approximately one in nine passengers brought a bicycle aboard.
PRIORITY DEVELOPMENT AREAS yf Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
m ar in
W 8th St
er y
Bru
G re
Chan nel Dr
e Ho
N
Taylor Mountain Regional Park
E AV TTON DU
CityTransit Hall Station SMART Station
SMART Station LAND USE INTENSITY
LINK LN
Hospital
ParkDensity Low Shopping Center yf Sk
¹¹
ro ve
in g
un
ta
MILES 2 1.5
sR
Fo
Industrial
L
WEST AVE
e rn
0.75 Hopper Ave
O PO AST
AV E BURBANK
1
Ba
Priority Development Area
DR LEO
HEARN AV
d
San Miguel Rd
Fulton Rd
Amy's Kitche
Peterson Ln
yf Sk
Low Density
m ar Pkw y
W College Ave
ro ve in g ta un Fo
sh Cr eek Rd
Range Ave
Bru
d
d
MILES 2
1
¹
25
G re
a
a Hill lu m
£ 101
0
ta lta V is
Av e
Occid ental
ta
Marlow Rd
le M ap
R
d UrbanRdGrowth Boundary
Pe
n Ln
te Rd
d aR
d
Fulton Rd
og list
sR
C hana
W Steele Ln
Pkwy
e rn
LAND USE INTENSITY
W 8th St
Glenbrook D r
Current City Limts
San Miguel Rd
Industrial Piner Rd
con Middle Rin
Park
W 3rd St
Benton St
Ca
ve Gro
Ba
Hopper Ave
Commercial + High Mix Use
SMART Station
in
High Density
City Hall
nta F ou
Dr
Medium Density
101 £ Cleveland Ave
DESTINATIONS + W Steele Ln BOUNDARIES
LAND USE INTENSITY
Priority Development Area
Marlow Rd
Map produced February 2018. Piner Rd
King St
Map produced January 2019.
Range Ave
Figure 3-2
PRIORITY DEVELOPMENT FIGURE 3-2 AREAS
Commercial + HighMILES Mix Use 0
ST
Dr
Urban Growth Boundary
SE B
m ar
CityGrowth Limts Urban High Density Boundary
0
W 9TH ST
RD W3
Current City Limts Park Density Medium
FIGURE 3-2
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ELAND AVE
Priority Development Area School DESTINATIONS + BOUNDARIES Major Employer
PRIORITY DEVELOPMENT AREAS
PRIORITY DEVELOPMENT AREAS
EV
DESTINATIONS + BOUNDARIES
CL
Class III Bike Route
a Hill Rd lu m
Corby Ave
Class II Bike Lane Industrial
FIGURE 3-2Class IIIB Bicycle Boulevard
ta
Stony P o in t Rd
r D
Park
Rd
Pe
S Wright Rd
f
Dr
erfield
Rd
ea
SANTA ROSA BICYCLE O MASTER EXISTING & PEDESTRIAN a k + High Mix Use Commercial Class I Shared-Use Path Annadel StateUPDATE PLAN 2018
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
¹
ne
High Density
Occid ental Rd
Bellevue Ave
Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Br idg eClass IIIB Bicycle Boulevard Rd Class IV Separated Bikeway Study Oa k L ite
tt Va lley
PRIORITY Low Density DEVELOPMENT Medium Density AREAS 12 ¨ Wh
Ben ne
ve nA
Su mm
e le Av M ap
PROPOSED Class I Shared-Use Path LAND USE INTENSITY St o
Spring Lake Park
Dr
Valle jo St
Glenbrook D r
n ro at H e
RANGE AVE
M
g om on t
Dr
sh Cr eek Rd
Av e
ista Alta V
King St
Cleveland Ave
Benton St
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Pkw y
un Fo
Range Ave
Marlow Rd
101 £
NORTHEAST
Rd
¨
in g
ro ve Fulton Rd
Peterson Ln
W Steele Ln
W College Ave
W 3rd St
te Rd
BIKEWAYS
d aR
d
Piner Rd
og list
sR
con Middle Rin
Pkwy
ta
Ca
ve Gro
e rn
San Miguel Rd
C hana
RECOMMENDED FIGURE 3-2
Oakm on t Dr
Pkw y
nta F ou
Dr
Ba
Hopper Ave
PRIORITY DEVELOPMENT AREAS Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ar yf
ve ro
ld
Rd
High Density
t
ar yf N
m
e dw ld R O
SMART Station
Santa Rosa Ave
d
ng ai
Hw
sR
Shopping Center
un t o F
Hopper Ave
LINK LN
e rn
Meldotronic
DESTINATIONS + BOUNDARIES
City Limts
0
1
Dutton Ave
e Burbank Av
Rd Sto ny Point
S Wright Rd
Hospital
Rd
Urban Growth Boundary
ill aH
y No rthpoint Pkw
lum
Park
ve le A
nd He
SMART Station
School
M ap
ta Pe
School
4t t
t
Ã
Sebastopol Rd
Transit Station
Shopping Center
Rosa Plaza
Shopping Center Occident al Rd 12
City Limts
26
W 9th St
Hospital
Major Employer
15th Amy's Kitche
City of dS St Santa 3r 7t h SantaRosa
W 3rd St
Santa Rosa Junior College
HEARN AV Se Pacific Ave
Benton St Colle ge Ave
Map produced January 2019.
DR LEO Oc
Carr Ave
ES
MAJOR DESTINATIONS
SMART Station W College Ave Map produced February 2018.
m xe He
King St S Wright Rd Nort h St
101 £
Mendocino Ave
Transit Station
Guerneville Rd
Figure 3-3
¹¹
L
Rd W 3rd te
Santa Rosa Ave
0
O PO AST
AV E BURBANK
Major Employer
an a
Hum boldt St
Range Ave
Marlow Rd
n ey L
Fulton Rd
y
Coff
0
Ch Sonoma Urban Growth Boundary County MILESOffices Steele Ln MILES Coddingtown 1 0.75 2 1.5 Mall
ST
W Co
SE B
CityGrowth Limts Urban Boundary Santa Rosa Junior College
Guern Tech
RD W3
CardioVascular DESTINATIONS + San Miguel Ave Current Park City Limts Kaiser Permanente Santa Rosa BOUNDARIES Medical Center
Piner Rd
W 9TH Key ST
WEST AVE
¹
oo d
Ba
Hospital
ro
SMART Station Park
E AV TTON DU
Dr
CityTransit Hall Station
101 £
San M
Piner
Sk
School DESTINATIONS + BOUNDARIES Major Employer
Taylor Mountain Regional Park
ELAND AVE
DESTINATIONS + BOUNDARIES
EV
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
CL
Ave
Dutton Ave
Dr
pa
Rd
e Burbank Av
e hi t
lu Yu
Class II Bike Lane Industrial
Class III Bike Route Class IIIB Bicycle Boulevard
Amy's Kitchen
Bellevue Ave
Class I Shared-Use Path
Annadel State Park
Rd
St
ill aH
Rd Sto ny Point
W
O EXISTING a k + High Mix Use Commercial
MAJOR DESTINATIONS
ley
lum
Santa Rosa Marketplace
Hearn Ave
ve dA oo o kw Bro
nd He
y No rthpoint Pkw
ta Pe
Sebastopol Rd
M ap
Farmer's Be nn e tt V Lane all ey Plaza
RANGE AVE
f ie er
ES
12 Ã
ve le A
Fulton Rd
mm
Farm ers Ln
Su
ve aA
Spring Lake Park
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane S Density to Low SANTA ROSA BICYCLE ne Class III Bicycle Route Br id & PEDESTRIANgeClass MASTER IIIB Bicycle Boulevard Rd Medium Density Class IV Separated Bikeway PLAN UPDATE 2018 Study
Pk wy
o
lp Yu
W 9th St
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
MAJOR PROPOSED 12 Ã LAND USE INTENSITY DESTINATIONS
15th St Howarth St h 4t Santa Rosa Park Memorial Hospital t e e City of r d S v A e Av e Montgomery t tt a 3 e S y o m Ho Ma Santa Av 7t h Village en Son en Ave Ho SantaRosa Rosa Plaza
W 3rd St
NORTHEAST
Chann el Dr
n
m no So
r
Mo
Rd
in
h Cre ek Rd
livos
am
King St Nort h St
Pacific Ave
Bru s
Lo s O
El C
yD er y H w go m t a
BIKEWAYS
St F ran c is R d
ng ai un t o F
Hum boldt St
Mendocino Ave
Range Ave
Marlow Rd
e Av
Carr Ave
Benton St Colle ge Ave
W College Ave
S Wright Rd
m xe He
Calistoga Rd
a
nyo
Dr
101 £
Guerneville Rd
Occident al Rd
n
Dr
ia
Coddingtown Mall
Ch Sonoma County Offices
d eR n at
Ca
n ic Be
n ey L
Steele Ln
Kaiser Permanente Santa Rosa Medical Center
cit nte
Rd
y
Coff
Fulton Rd
Mo
Meldotronic CardioVascular
o er
Hw
d
Piner Rd
RECOMMENDED FIGURE 3-2 l ca
od
sR
San Miguel Ave
o
vd Bl
Es
e rn
Keysight Technologies
ve
Dr
Pk wy
m
e dw o ld R O
Ba
Hopper Ave
Santa Rosa Marketplace
Hearn Ave
MILES 2 Bellevue Ave
¹
Amy's Kitchen
101 £
PRIORITY DEVELOPMENT AREAS yf Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
m ar in Bru
Chan nel Dr
Spring Lake Park
Dr
e Ho
Valle jo St
Glenbrook D r
Class I Shared-Use Path Class II Bicycle Lane SANTA ROSA BICYCLE Class IIB Buffered Bicycle Lane St on Low Density e Class III Bicycle Route & PEDESTRIAN MASTER Br idg eClass IIIB Bicycle Boulevard Rd PLAN UPDATE 2018 Medium Density Class IV Separated Bikeway Study Oa k L
High Density
Class I Shared-Use Path Dr
Trione-Annadel State Park
Class II Bike Lane SMART Station Industrial
School DESTINATIONS + CITYBUS ROUTES BOUNDARIES Major Employer
1
2, 2B SMART Station 10, 10W SMART Station
Fulton Rd
Pkw y
ree k Rd
in g
ta
un
Fo
Range Ave
King St
Cleveland Ave
oin t Rd
ro ve in g Fo
un
ght Rd
nge Ave
27
lu m
Rd
¹
ta
te Rd
MILES 2
l M ap
Pe
C hana
1
d aR
d
8
Occid ental Rd
0
og list
sR
San Miguel Rd
W 8th St
Urban Growth Boundary con Middle Rin
e rn
19
Benton St
Glenbrook D r
Pkwy
Ba
Hopper Ave
Marlow Rd
Peterson Ln
Current City Limts
ta
18
Park W College Ave
Ca
6
Santa Rosa Junior College
W 3rd St
DR LEO
101 £
W Steele Ln
ve Gro
16
L
Amy's Kitche
in
5
Rd
d
15
Fulton Rd
sR
CONNECTIONS + SUPPORT FACILITIES
4, 4B
City Hall
nta F ou
12
¹¹
O PO AST
WEST AVE
e rn
3
MILES
MILES 2 1.5
ST
HEARN AV
Piner Rd DESTINATIONS + Map produced February 2018. BOUNDARIES
Dr
10, 10W
DESTINATIONS + Piner Rd
19
0.75
8
m ar
2, 2B
CITYBUS ROUTES
Hopper Ave
1
San Miguel Rd
yf Sk
9, 9E
Transfer Station
7
Map produced January 2019.
1
7
0
SE B
AV E BURBANK
Ba
0
CITYBUS ROUTES
Park and Ride
18 Boundary Urban Growth
Dr
6
Transfer Station
SMART Station
16 CityGrowth Limts Urban Boundary
W 9TH ST
RD W3
m ar
5
Park and Ride
TRANSIT SANTA ROSA BICYCLE & PEDESTRIAN MASTER CONNECTIONS PLAN UPDATE 2018
yf Sk
Shopping Center
4, 4B 15 Current Park City Limts
SMART Station
TRANSIT Figure 3-4 CONNECTIONS
12
Hospital
Park
LINK LN
3
CONNECTIONS + SUPPORT FACILITIES
¹
9, 9E CityTransit Hall Station
E AV TTON DU
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
N
Taylor Mountain Regional Park
Av e
Corby Ave
Stony P o in t Rd
S Wright Rd
TRANSIT CONNECTIONS
ELAND AVE
a Hill Rd lu m
Park and Ride
DESTINATIONS + Transfer Station BOUNDARIES
EV
ta
Class III Bike Route Class IIIB Bicycle Boulevard
CL
Rd
Pe
Bellevue Ave
f
r D
erfield
Rd
Occid ental Rd
ea
CONNECTIONS + 12 ¨ O EXISTING a k + High Mix Use SUPPORT FACILITIES Commercial ite
tt Va lley
TRANSIT PROPOSED CONNECTIONS LAND USE INTENSITY
Wh
Ben ne
ve nA
Su mm
e le Av M ap
n ro at H e
RANGE AVE
W 8th St
er y
G re
Pkw y
M
g om on t
Dr
sh Cr eek Rd
Av e
ista Alta V
King St
Cleveland Ave
Benton St
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ro ve
un Fo
Range Ave
Marlow Rd
101 £
NORTHEAST
Rd
¨
in g
ro ve Fulton Rd
Peterson Ln
W Steele Ln
W College Ave
W 3rd St
te Rd
BIKEWAYS
d aR
d
Piner Rd
og list
sR
con Middle Rin
Pkwy
ta
Ca
ve Gro
e rn
San Miguel Rd C hana
RECOMMENDED FIGURE 3-2
Oakm on t Dr
Pkw y
nta F ou
Dr
Ba
Hopper Ave
EQUITY
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Equity issues are an important part of all planning processes, including development of this Plan Update 2018. Historically, communities with large populations of people of non-white races or ethnicities and low income households have received less investment from their local governments, including an uneven spatial distribution of facilities and safety improvements for people walking and bicycling. A review of citywide factors related to walking, bicycling, and equity identified neighborhoods that are disproportionately burdened by pollution or other negative impacts. These and other considerations informed the projects and prioritization recommended in this Plan Update 2018.
Income and Vehicle Access While Sonoma County has a higher median household income at $66,833 than the state of California at $63,783, Santa Rosa is slightly less affluent than both the county and state with a median household income of $62,705. Median income varies widely between cities in Sonoma County, as shown in Figure 3-5. The other two large cities— Rohnert Park and Petaluma—have median household incomes of $60,333 and $80,907 respectively. All median income figures are from the American Community Survey 2016 5-year estimates.
Figure 3-5: Median Household Income $90,000 $80,000 $70,000
INCOME
$60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $0 Santa Rosa $62,705
28
Sonoma County $66,833
California $63,783
Petaluma $80,907
Rohnert Park $60,333
With such widespread vehicle access, few households rely on walking or bicycling out of necessity. To create significant shifts in trips away from driving, walking and bicycling must be convenient and comfortable options to attract more people.
03 Santa Rosa Today
Just two percent of households in Santa Rosa lack access to a vehicle, as shown in Figure 3-6. Nearly 80% of households have access to two or more vehicles. These rates are nearly identical to countywide vehicle access.
Figure 3-6: Vehicles Available
No vehicle available
1 vehicle available
2 vehicles available
3+ vehicles available
29
Communities of Concern
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
In the City of Santa Rosa, the three Communities of Concern include the Roseland neighborhood southwest of the Highway 101 and SR 12 interchange, an area north of College Avenue and west of Highway 101, and the downtown area east of Highway 101 between College Avenue and Sonoma Avenue. See Figure 3-7 for a map of Communities of Concern. The walking and bicycling improvements recommended in this Plan Update 2018 will consider the benefits and burdens of those projects on these communities.
As part of the San Francisco Bay Area’s long-range integrated transportation and land use/housing strategy, Plan Bay Area, the Association of Bay Area Governments (ABAG), and the Metropolitan Transportation Commission (MTC) analyzed the distribution of benefits and burdens that would result from implementation of the region’s preferred planning scenario. To conduct this analysis, ABAG and MTC, along with extensive input from an Equity Working Group and other stakeholders, identified “Communities of Concern” throughout the Bay Area region that meet at least four thresholds listed in Table 3-1.
Table 3-1: Community of Concern Factors and Thresholds FACTOR
% OF REGIONAL POP.
COMMUNITY OF CONCERN THRESHOLD
Minority Population
54%
70%
Low Income (<200% of poverty) Population
23%
30%
Limited English Proficiency Population
9%
20%
Zero-Vehicle Households
9%
10%
Seniors 75 and Older
6%
10%
Population with a Disability
18%
25%
Single-Parent Families
14%
20%
Cost-Burdened Renters
10%
15%
Source: Appendix A: Detailed Methodology, Plan Bay Area (2013). planbayarea.org/pdf/Draft_Plan_Bay_Area/Appendices_to_Draft_Equity_Analysis_Report.pdf
30
CalEnviroScreen 03 Santa Rosa Today
The California Office of Environmental Health Hazard Assessment developed the CalEnviroScreen tool to help identify communities that are disproportionately burdened by multiple sources of pollution. It combines pollution data (such as ozone concentrations and drinking water contaminants) with population indicators (such as birth weight and educational attainment). This is also a tool used in Californiaâ&#x20AC;&#x2122;s Active Transportation Program grant application scoring. Communities that score in the most burdened 25% of the state are considered to be disadvantaged and receive a small advantage in the competitive funding process. Areas in Santa Rosa that meet this threshold are mapped in Figure 3-8.
31
PRIORITY DEVELOPMENT AREAS yf Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
m ar in Bru
G re
Spring Lake Park ve nA
High Density
O EXISTING a k + High Mix Use Commercial ite
Class I Shared-Use Path Dr
Trione-Annadel State Park
DESTINATIONS + BOUNDARIES
School DESTINATIONS + BOUNDARIES Major Employer
m ar
E AV TTON DU
CityTransit Hall Station
ro ve
SMART Station
SMART Station e rn
Fo
sR
d
Shopping Center
Fulton Rd
San Miguel Rd
Marlow Rd
Cleveland Ave
Peterson Ln
AV E BURBANK
W College Ave
O PO AST
L
W 3rd
DR LEO
HEARN AV
Benton St
Amy's Kitche
Map produced January 2019.
Hospital
m ar
sh Cr eek Rd
Bru
Av e
ista Alta V
¹
Bellevue Ave
MILES 2
Corby Ave
Stony P o in t Rd
Pkw y ro ve in g ta un Fo
Range Ave
Marlow Rd
lu m
n Ln
ta
Fulton Rd
Pe
1
d aR
W Steele Ln
0
M ap
og list
te Rd Urban C hana Growth Boundary Rd
Santa Rosa Junior College City Limts
con Middle Rin
Park
Ca
City Limts
Pkwy
d
SMART Station
ve Gro
sR
San Miguel Rd
Santa Rosa Junior College in
e rn
Shopping Center
nta F ou
Ba
Hopper Ave
101 £
Occid ental Rd
Dr
Hospital
Piner Rd
Glenbrook D r
SMART Station
S Wright Rd
Transit Station
Community of Concern
W 8th St
W 3rd St
Shopping Center
S Wright Rd
Map produced February 2018.
DESTINATIONS + BOUNDARIES Major Employer
32
2 1.5
0.75
Major Employer
yf Sk
COMMUNITIES OF CONCERN
1
0
Transit Station
Figure 3-7
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
¹¹
DESTINATIONSUrban + Growth Boundary MILES W Steele Ln BOUNDARIES MILES
ST
WEST AVE
Range Ave
SE B
CityGrowth Limts Urban Boundary
0
W 9TH ST
RD W3
Current Park City Limts Piner Rd
COMMUNITIES OF CONCERN
LINK LN
Ba
Hospital Hopper Ave
Park
¹
P
Pkw y
Community of Concern
N
Dr
Taylor Mountain Regional Park
yf Sk
Corby Ave
Stony P o in t Rd
S Wright Rd
Community of Concern
ELAND AVE
a Hill Rd lu m
Bellevue Ave
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
EV
ta
Class III Bike Route Class IIIB Bicycle Boulevard
CL
Rd
Pe
Class II Bike Lane Industrial
RANGE AVE
Rd
f
r D
Wh
tt Va lley
ea
PLAN UPDATE 2018
COMMUNITIES OF CONCERN Ben ne
Ã
Fulton Rd
e Ho
King St
Dr
erfield
Occid ental Rd
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane St on e Class III Bicycle Route Br idg eClass IIIB Bicycle Boulevard Rd Density SANTA ROSAMedium BICYCLE Class IV Separated Bikeway 12 Study Oa k & PEDESTRIAN MASTER L
Su mm
101 £
e le Av M ap
PROPOSED
COMMUNITIES OF LAND USE INTENSITY CONCERN Low Density
Chan nel Dr
Valle jo St
Glenbrook D r
n ro at H e
Oakm on t Dr
W 8th St
er y
Dr
sh Cr eek Rd
Av e
ista Alta V
King St
M
g om on t
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
in g
un Fo Cleveland Ave
Marlow Rd
Range Ave
Benton St
NORTHEAST
Rd
ta
in g
ro ve Fulton Rd
Peterson Ln
W Steele Ln
W College Ave
W 3rd St
te Rd
BIKEWAYS
d aR
d
Piner Rd
og list
sR
con Middle Rin
Pkwy
ta
Ca
ve Gro
e rn
San Miguel Rd C hana
RECOMMENDED FIGURE 3-2
un
Pkw y
nta F ou
Dr
Ba
Hopper Ave
G re
C
PRIORITY DEVELOPMENT AREAS
ss ro An
Fo
os la m
Rd
ia n
th
Py
RANGE AVE
St
DESTINATIONS + 51 - School 75% BOUNDARIES Major Employer
N
76 - 100% (Highest Scores) CityTransit Hall Station 101 *Scoring is based on environmental, SMART Station SMART Station health, and socioeconomic Ba rn nt Hopper Ave CirW 9THouST conditions. Areas with higher scores Hospital F are facedPark with more adverse Shopping Center T RD S conditions and areas with Rd lower W3 Sa n Miguel scores are faced with less adverse L Current City Limts Park Russell Ave O PO AST SE B conditions. Piner Rd E AV TTON DU
1 y 10
Me
nd
33
Dutton Ave
¹
Bellevue Ave
Slate r St Hum
Corby Ave
Dutton Meadow
Stony P o in t Rd
sh Cre ek Rd
Bru
Valle y Dr de n
H id
S Wright Rd
nd
Rou
Armory Dr
Marlow Rd
Dr
Pkw y
t
r St Humboldt St
Du
t
N
Armory Dr
MILES 2
Dr
at
Av e
1
a Hwy om So n
Hearn Ave
Mon te Ve r de
Gre
Hardi es Ln Range Ave
Rd
Urban Growth Boundary
V ista
e Av
n y L
d
Ol ive St ro le ca Es
Rd
Calistog a Rd
Francisco Ave
e Av
Dr
Fulton Rd
WE veST AVE A
AV E BURBANK
n tto
City Limts
te Rd
Alta
i no oc
Redw ood Hwy
C off e
Santa Rosa Junior College *Scoring is based on environmental, *Scoring based on environmental, health, and socioeconomic conditions. Areas with higher scores are 0 health,isand socioeconomic faced with more adverse conditions and areas with lower scores are faced with less adverse conditions. conditions. Areas with higher scores Park Pacifi c Ave are faced with more adverse C
C ha na
Park
Blvd Mission
nd
SMART Station
Du
Me
Peterson Ln
Russell Ave
Piner Rd
l Rd
con
1 y 10
Shopping Center
Sa n Miguel Rd
N
ta
Redw ood Hwy
n y L
n ou
C off e
Rd
Hw
F
W 3rd St
Badger Rd Middle Rin
Cir
i no oc
Hardi es Ln Range Ave
Francisco Ave
Hw
Rd
Fulton Rd
s
Peterson Ln
s
US
ne
Ba rn
W 8th St
Joe Ro dota Trl
Pkwy
Hopper Ave
Hospital
Colleg e Ave Amy's Kitche
po Sebasto Santa Rosa Junior College
ve ro
Hill Rd Parker
r Ba
26 - 50%
g in
HEARN AV
k Dr Glenbroo
t es W
ve Gro
101 Major Employer
DR LEO
Rd SMART Occid entalStation
a in
£
1 - 25% (Lowest Scores)
W 9th St
Shopping Center Valley
r
W College Ave
Hospital
unt
Transit Station
Cl ov e
Map produced February 2018.
Fo
SCORE (PERCENTILE)
2 1.5
0.75
Transit Station
Map produced January 2019.
St
DESTINATIONS + BOUNDARIES
1
0
Major Employer
d Dr r Cree k R ws D ss d re rm ro An yf a C Sk
CALENVIROSCREEN
¹¹
DESTINATIONS + Boundary Urban Growth MILES BOUNDARIES MILES
0
LINK LN
ne
US
r Ba
CityGrowth Limts Urban Boundary
*Scoring is based on environmental, health, and socioeconomic conditions. Areas with higher scores are faced with more adverse conditions and areas with lower scores are faced with less adverse conditions.
nd Rou
£
1 - 25% (Lowest Scores)
O Los liv os R d
Ave
nt a Rosa
A
sh Cre ek Rd Bru
de n H id
Beaver St King St
Slate r St Humboldt St Orchard St
Sa
Corby Ave
d Dr r Cree k R ws D ELANDssAVE EV d re rm CL ro An yf a C Sk
DESTINATIONS + 26 - 50% BOUNDARIES
SCORE (PERCENTILE)
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Figure PLAN3-8 UPDATE 2018
76 - 100% (Highest Scores)
Class III Bike Route Class(Lowest IIIB Bicycle Boulevard 25% Scores) Dr
1-
Taylor Mountain Regional Park
CalEnviroScreen 3.0
51 - 75%
Dr
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
76 - 100% (Highest Scores)
116
k
m on Class II Bike Lane SCOREIndustrial (PERCENTILE) t
51 - 75%
¨¨
af
O Path Class I Shared-Use a
Annadel State Park
r sD
26 - 50%
¹
Le
Dr
Dr
rd
ld
Oa EXISTING k + High Mix Use Commercial
Rd
a eth
irfie
e h it W
e ks id e
ne tt
B Rd
Tokay St
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route St on SANTA e B ROSA BICYCLE rid Class IIIB Bicycle Boulevard ge Medium Density R & PEDESTRIAN MASTER Class IV 12 Separated Bikeway d Study 2018 Fa Oak PLAN UPDATE
High Density
CalEnviroScreen 3.0 Be n
PROPOSED CalEnviroScreen LAND USE INTENSITY 3.0 Low Density
Ã
y
Dutton Ave
O Los liv os R d
Valle y Dr
Hardi es Ln Range Ave
Armory Dr
s Lo
Spring Lake Park
ve t te A e Av en o H
lle Va
Dutton Meadow
M aye
C re
Hill Rd
Stony P o in t Rd
Dr
d
Pkw y
nd Rou
Francisco Ave
Fulton Rd
Marlow Rd
er y
Rd
Rd
Dr
at
om
He ron D r
e ld rf i
n tg
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Gre
Ch ann el Dr
ve aA no m
Ave ton As
ma
S Wright Rd
Rd
M el ita
me
Mo
NORTHEAST
e Dr
a Hwy om So n
m Su
St
Rte 12 Sta te Ave le Ma p
ta lu
Hearn Ave
Bellevue Ave
Mon te Ve r d
Av e
So
Pe
Ol ive St
Rd
V ista
e Av
Occid ental Rd Joe Ro dota Trl Sebasto po l
h 4t
BIKEWAYS
ro le ca Es
e Av
n tto
Dr
W 3rd St
Rd
Pacifi c Ave
W 8th St
k Dr Glenbroo
t es W
Alta
i no oc
Du
W 9th St
Colleg e Ave
te Rd
Blvd Mission
nd
N
r
W College Ave
Calistog a Rd
Me
n y L
Redw ood Hwy
C off e
Cl ov e
con
1 y 10
Peterson Ln
Russell Ave
Piner Rd
C ha na
RECOMMENDED FIGURE 3-2
Badger Rd Middle Rin
t
Pkwy
Rd
Hw
F
n ou
e ov
ve Gro
Cir
gr
a in
s
US
ne
Ba rn
n ai
Hill Rd Parker
r Ba
Sa n Miguel Rd
Valley
unt
101 £ Hopper Ave
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
R
d Dr r Cree k R ws D d re f a rm y Sk
St
H
M el ita
Ch ann el Dr
Rd
BICYCLING AND WALKING TODAY
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Existing Bicycle Network
CLASS I SHARED USE PATHS
The California Department of Transportation (Caltrans) designates four classes of bicycle facilities: Class I shared use paths, Class II bicycle lanes, Class III bicycle routes, and Class IV separated bikeways. The City’s current bicycle network has approximately 115 miles of bikeways, and has grown by 40% since the last Bicycle and Pedestrian Master Plan Update 2018 in 2010 (see Table 3-2). Descriptions of each bikeway class are included in the following section, and bikeways are mapped in Figure 3-9 through Figure 3-14 to show where they currently exist in Santa Rosa.
Class I shared use paths are paved trails completely separated from the street. They allow two-way travel by people bicycling and walking, and are often considered the most comfortable facilities for children and inexperienced riders as there are few potential conflicts between people bicycling and people driving.
CLASS II BICYCLE LANES
Table 3-2: Bikeway Mileage in 2010 and 2018 BIKEWAY TYPE
2010 MILES
2018 MILES
Class I Shared Use Paths
13
30.9
Class II Bicycle Lanes
46
67.1
Class II Buffered Bicycle Lanes
0
0.2
Class III Bicycle Routes
18
Class III Bicycle Boulevards
1
1.6
0
0
78
112.6
Class IV Separated Bikeways Total
*Several miles of Class III bicycle routes were upgraded to Class II bicycle lanes
34
There are currently 30.9 miles of Class I shared use paths in Santa Rosa.
12.8*
Class II bicycle lanes are striped preferential lanes on the roadway for one-way bicycle travel. Some bicycle lanes include a striped buffer on one or both sides to increase separation from the traffic lane or from parked cars, where people may open doors into the bicycle lane. Buffered Class II bicycle lanes were recently installed on 3rd Street from Morgan Street to B Street, where 3rd Street passes underneath Santa Rosa Plaza. There are currently 67.1 miles of Class II bicycle lanes and 0.2 miles of buffered bicycle lanes in Santa Rosa.
CLASS III BICYCLE ROUTES Class I Shared Use Path
03 Santa Rosa Today
Class III bicycle routes are signed routes where people bicycling share a travel lane with people driving. Because they are shared facilities, bicycle routes are only appropriate on quiet, low-speed streets with relatively low traffic volumes. Some Class III bicycle routes include shared lane markings or “sharrows” that recommend proper bicycle positioning in the center of the travel lane and alert drivers that bicyclists may be present. Others include more robust traffic calming features to promote bicyclist comfort and are known as “bicycle boulevards.” The Santa Rosa Fire Department should be included in discussions about new or altered features on bicycle boulevards, to ensure access for emergency responders is maintained.
Class II Bicycle Lanes
There are currently 12.8 miles of Class III bicycle routes in Santa Rosa and 1.6 miles of bicycle boulevards on Jennings Avenue and Humboldt Street. CLASS IV SEPARATED BIKEWAYS Class IV separated bikeways are onstreet bicycle facilities that are physically separated from motor vehicle traffic by a vertical element or barrier, such as a curb, bollards, or vehicle parking aisle. They can allow for one- or two-way travel on one or both sides of the roadway.
Class III Bicycle Lanes
No Class IV separated bikeways exist in Santa Rosa.
Class IV Separated Bikeways
35
Existing Support Facilities
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Support facilities are also needed to attract and maintain bicyclists by considering their needs throughout their journey. People are less likely to ride their bicycles to destinations without secure bicycle parking. Other support facilities include showers or lockers at destinations, repair stations with basic tools, and wayfinding or guide signs to help bicyclists navigate along the way. A complete bicycle network must include secure bicycle parking at each end of every trip. Bicycle parking can generally be divided into two categories: short-term bicycle racks and long-term higher-security parking. The City has installed short-term bicycle parking throughout downtown on
Long-term bicycle parking is available in the form of on-demand bike lockers. BikeLink, a private vendor, has installed 80 lockers at 12 locations across the city listed in Table 3-3, including seven locations on the Santa Rosa Junior College campus. To use the lockers, bicyclists purchase a BikeLink card online or at one of three vendors in the city. Once activated, the card can be loaded with funds to purchase time at 3-5 cents per hour. BikeLink has also been testing the use of Clipper Cards for lockers, which would integrate rentals with the existing transit fare card.
Table 3-3: Bicycle Locker Locations LOCKER LOCATION Santa Rosa Junior College
36
sidewalks, plazas, and in parking garages. These racks have been funded primarily through the Transportation Fund for Clean Air, provided by the Bay Area Air Quality Management District. Currently, 62 bicycle racks are installed through downtown Santa Rosa, as shown in Figure 3-15.
SPACES 36
Bailey Field
4
Tauzer Gym
4
Pioneer Hall
4
Quinn Swim Center
4
Doyle Library
8
Plover Hall
8
Analy Village
4
SMART – Santa Rosa Downtown
12
SMART – Santa Rosa North
4
Sonoma County Permit Resource Management
12
Sonoma County La Plaza
8
Sonoma County Hall of Justice
8
03 Santa Rosa Today
From September 2017 to October 2018, the 12 bicycle lockers at the Santa Rosa Downtown SMART station combined averaged more than 100 rentals per month (each locker is rented an average of 9.14 times per month). At the Santa Rosa North station, the four lockers combined averaged just over 20 rentals per month (each locker rented an average of 5.08 times per month).
The average rental length at Santa Rosa Downtown is just over 11 hours, while lockers at the Santa Rosa North station are rented for an average of 15 hours. At both locations, nearly all rentals occur on weekdaysâ&#x20AC;&#x201D;93% at Santa Rosa Downtown and 98% at Santa Rosa North.
37
AN
D W RE
F
KM
S LAKE MA TH O
RUSSEL
FULTON RD
SMART TRAIL
DOWD DR
CREEK T LISCUM ST R
Amy's Kitchen YERBA BU
E
N
AIL
A R
VE
ME L
LAND AVE
R BELLEVUE AVE DUPONT D
LGAN
MO
SH CRE EK RD
BR U
S WRIGHT RD
MARLO W RD
S WRIGHT RD
DR
RANGE AVE
WALTZER RD
FULTON RD
P
R
IN G
R OVE
S LAKE MA TH O
TA
A
I TO
TE C ON
RANGE AVE
M
AIRWAY DR
RUSSEL
O W RD
¹
RD
MILES 2
GA
WALTZER RD
E AV WEST AVE
IS TO
1
LUDWIG AVE
E DU TTO N AV WEST AVE
C AL
0
Franklin STEE L E LN Community Park
LV D OB YUBAITDR C TE
N Urban Growth Boundary
VD N MI S SIO B L
E AV
Park Northwest
City Limts TE RD C H A NA VE
NO CI
Shopping Center
ICE AVE
PR Park
LAZZINI AV E Junior College Southwest Branch AVE GIFF EN R RD BA DPGKEW Y NORTH POI NT
AV E BURBANK
N D
CO AV E Shopping Center HI Santa Rosa
E RD AC
E
TRAIL E RO DOTA JO LL WA
M
O
PINER RD MARSH RD
L AVE
Meldotronic CardioVascular
ND AVE E LA
Youth Community Park
Hospital
EV CL
SAN MIGUEL A V E
N COFF E Y L
SMART Station
UN FO
W 3R D ST
L RD OCCID ENTA
C
L RD ER H IL RK PA
H O PP ER AVE
D
IS
S DR
Transit Station
IS
DENNIS LN
H ARR
E JO
Amy's Kitche ICO AV E S CH T 9TH S Ju S E AV ICE PR 7T
RCO P
W RE
£
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
Hospital KWY
AV E BURBANK
D
School
101 Major Employer
E K
SMART Station
AN
SAINT
IN T RD STONY PO
DESTINATIONS + BOUNDARIES
TRA I L
¹¹
AP HALL RD LN To C P STEE L E
HEARN AV
W 9TH ST
E CR
Transit Station
SAN
AV E LINK LN ON TT
W COLLEGE AVE Major Employer Map produced SANTJanuary A RO 2019. SA Map produced February 2018. A Place HALL RD To Play
L O PO AST W
DU
JE NNINGS AV E
T RD S
Santa Ros JuniorLEColle O DR
GUERNEVILLE R D
School
SE B
N
6
Ã
11
EXISTING BIKEWAYS
N W3 D
NO CI
MARSH RD
E
U FO Meld Card
W 9TH ST
O
CityGrowth Limts Urban Boundary
M
ND AVE E LA
PINER RD
L AVE
Boundary Northwest DESTINATIONSUrban + GrowthCommunity MILES Park MILES BOUNDARIES 0 1 0.75 2 0 1.5
SANTA ROSA BICYCLE EXISTING BIKEWAYS & PEDESTRIAN MASTER (CITYWIDE) PLAN UPDATE 2018
RANGE AVE
R
SANTA ROSA AVE
N
E AV TTON DU
Center
Current Park City Limts
EV CL
N COFF E Y L
Park
LINK LN
H O PP ER AVE
Shopping SAN MIGUEL A VE
A ELAND AVE
N
LN DENNIS SMART Station
SMART Station
E TODD RD
EV
H ARR
Youth Community Park
CityTransit Hall Station
Hospital
D
SAN MIGUE
£
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
CL
DR
School DESTINATIONS + BOUNDARIES Major Employer 101
Regional Park
CITYWIDE Figure 3-9
38
SAINT
BOUNDARIES
Youth Community Park
Class Class Class Class
T N
Galvin
O
Class Class State Park Class III Bike Route DESTINATIONS + Class IIIB Bicycle Boulevard
AIRWAY DR
YD R
M O
BR U
GR
LA
SH CRE EK RD
A
I TO
TE C ON
DR
M
AH
N
MO
R
R OVE
ING
NORTH ST
A
LE A
R
O APath R Class I Shared-Use Class II Bike Lane Industrial Path I Shared-Use Class III Bike Route IITrione-Annadel BikeClass Lane IIIB Bicycle Boulevard
DR
SANTA ROSACommunity BICYCLE Park & PEDESTRIAN MASTER Taylor Mountain PLAN UPDATE 2018 Class Class Class Class
Class I Shared-Use Path Class II Bicycle Lane 12 Class IIB Buffered Bicycle Lane NE B RID Class III Bicycle Route G E Class IIIB Bicycle Boulevard R Medium D Density Class IV Separated Bikeway Study ROSA BICYCLE
D
D
CORBY AVE
D
D
DOWD DR
DR
SMART TRAIL
IEL S
PROPOSED
STO
E
MOORLAND AVE
S LO
E
STANDISH AVE
R D
SANTA High Density OA K & PEDESTRIAN MASTER EXISTING PLAN UPDATE 2018 Commercial + High Mix Use
E AV
BE T H CITYWIDE Y R
D AR
S
CITYWIDE
EE KS IDE V R HE A H C TA
LL VA
NGS RD PR I KAWANA S YOLANDA AVE
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER DPLAN UPDATE 2018
A RD
EXISTING LAND USE INTENSITY BIKEWAYS Ã Density Low
A UP
CREEK T LISCUM ST R
ER
I TA
EXISTING BIKEWAYS BEN N
N
Skyhawk Park
CR
T ET
O LGAN
NORTHEAST E
Howarth Spring Lake County Memorial Park Park RF
L YU
HUMBOLDT ST
RANGE AVE
TA
S LAKE MA TH O AIRWAY DR
RUSSEL
MARLO W RD
RD
WALTZER RD
GA
ME L
GO NT VE MO AA OM N SO
ST
YERBA B U
MM
FULTON RD
IS TO
BIKEWAYS
R DUPONT D
S LN VE DA
S WRIGHT RD
RECOMMENDED FIGURE 3-2
C AL
E NT
SU
M
FARM ER
E AV
RD
BELLEVUE AVE
RD
LV D OB C IT
D
LL
¹
AIL
OO KW
C
OO
LUDWIG AVE
HI
Amy's Kitchen
A
E N AV STO
A
YUBA DR
UM AL PE T
PRICE AVE
LAZZINI AV E Santa Rosa Junior College Southwest Branch E GIFF EN AV PKW Y NORTH POI NT
E DU TTO N AV WEST AVE
ICO AV E
AV E BURBANK
CH
RCO P
OC
TRAIL E RO DOTA JO
BR
T ES
W 3R D ST
CID ENTAL RD
T O LB
ST ST ST 7 TH 5T H D 2N
S
IN T RD STONY PO
RA I L E K T
4 TH
TA
AV E LINK LN ON TT
T 9 TH S
W 9TH ST
E CR
HALL RD
Franklin STEE L E LN Community Park Santa Rosa Junior College Santa Rosa Rural Cemetery
DU
W COLLEGE AVE SANTA R OSA A Place To Play
BA DG E R
VD N MI S SIO B L
N
JE NNINGS AV E
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
E RD AC
GUERNEVILLE R D
ATE RD CHA N VE
E AV
Northwest Community Park
N D NO CI
PINER RD MARSH RD
E
UN FO Meldotronic CardioVascular
O
L AVE
M
ND AVE E LA
Youth Community Park
EV CL
N COFF E Y L
SAN MIGUEL A V E
L RD ER H IL RK PA
H O PP ER AVE
IS
DENNIS LN
D
KWY
LL WA
H ARR
P
S DR
£ 101
R
SAINT
PRIORITY DEVELOPMENT AREAS
I TA
R
S
SPRING ST
RECOMMENDED BIKEWAYS
AV E
NORTH ST
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 O LB
CARRIL LO ST
NORTHEAST
TA
MEN DOCINO AVE
DR
AY RI DGW
DR
Y ARM OR
SPENCER AVE
PROCTOR
T
SE
WALTZER RD
RUSSEL
CREEK T LISCUM ST R
¹
RANGE AVE
S WRIGHT RD SMART TRAIL
DOWD DR
MARLO W RD
MO
ERBA Amy'sYKitchenBU
E
N
A RD
AIL R DUPONT D BELLEVUE AVE
D
GAN
S WRIGHT RD
SH CRE EK RD
BR U
A
S LAKE MA TH O
PL
Z
FULTON RD
P
R
R OVE
IN G
S LAKE MA TH O
TA
I TO
TE C ON
DR
M
RANGE AVE
E ST AVE AVWE
AIRWAY DR
NO CI
RUSSEL
IS
O W RD
AN
E DU TTO N AV WEST AVE
MILES 2
RD
LUDWIG AVE
GA
WALTZER RD
ELAND AVE
SMART TRAIL
EV
O
IS TO
D BLV ITO E C DR T YUBA N
Urban Growth Boundary 1
E JO
Amy's Kitch
CO AV E HI
RCO P
C AL
City Limts
V MI S SION B L
E AV
0
Franklin STEE L E LN Community Park
Junior Coll
S T 9 TH S J S E AV ICE PR 7 C
AV E BURBANK
AVE
ATE RD CHA N VE
NO CI
Community
PRICE Park
AV E BURBANK
AV E LINK LN ON TT
N D O
Northwest Park
C
UN FO Meldotronic CardioVascular
LAZZINI AV E Junior College Southwest Branch D ER R E DG BAGI FF EN AV KW Y P NT POI NORTH E RD AC
E
Shopping Center
PINER RD MARSH RD
ND AVE E LA
L AVE
EV CL
Youth Community Park
Hospital
M
OC
TRAIL E RO DOTA JO LL WA
N COFF E Y L
SMART Station
SAN MIGUEL A V E
Hospital
W
SAN
W 3R D ST
CID ENTAL RD
Shopping Center CO AV E HI Santa Rosa L RD ER H IL RK PA
Transit Station
H O PP ER AVE
D
KWY
IN T RD STONY PO
S DR
DENNIS LN
SMART Station
W RE
Major Employer
IS
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
H ARR
E CR
AN
School
£ 101
O PO AST
HEARN A
SANT A RO January 2019. Map produced SA W 9TH ST A Place HALL RD To Play IL RA T E K
D
SE B
DU
JE NNINGS AV E
Transit Station SAINT
¹
S
MILES SantaERos D L O 1.5
W COLLEGE AVE Major Employer Map produced January 2019.
DESTINATIONS + BOUNDARIES
RD W3
N D
AP HALL RD To STEE L E LN
Northwest Community MILES 0.75 1.5 Park
GUERNEVILLE R D
School
SANTA ROSA BICYCLE EXISTING BIKEWAYS & PEDESTRIAN MASTER (DOWNTOWN) PLAN UPDATE 2018
E
F Meld Card
Urban Growth Boundary
MARSH RD
Urban Growth Boundary
DESTINATIONS + 0 0 0.75 BOUNDARIES
N BEN
ND AVE E LA
City Limts PINER RD
Youth Community RD EY Park AL L V T
L AVE
W 9TH O S
LINK LN
City Limts
E AV TTON DU
E AV
Park
E AV
CITYWIDE Figure 3-10
Class Class Class Class
D
ET
LE
EV CL
P MA
M
N
EXISTING BIKEWAYS
Shopping Center Park
12 Ã
N
Shopping Center P ER AVE
SAN MIGUEL A V E
E L AV
OO KW
Hospital
DENNIS LN H OP
H ARR
Youth Community Park
SMART Station Hospital
CL
£
SMART 101 Station
Transit Station
D
SAN MIGU
OO
AV E TON
RCOP
SE B
L RD
BR
S
O PO AST
SAINT
Major Employer
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
E ST
D UT
¹
PO STO EBA
Station
N COFF E Y L
OLIV
Class Class Class Class
SchoolTransit
AV E
Luther Burbank Elementary School
SA SANTA RO
W
ST 3 RD
RAILR OA D ST
D 3R
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ST
FULTON RD
ST
Class III Bike Route Class I Shared-Use Path IIIB Bicycle Boulevard School Class II BikeClass Lane T ClassDESTINATIONS III Bike Route +EJO S LL Major VA Employer ClassBOUNDARIES IIIB Bicycle Boulevard
T TS
1S CITYWIDE
39
ME L
AND AVE
ST
ST
Class I Shared-Use Path
Class II Bike Lane BOUNDARIES
RANGE AVE
ST
E
ST
ON
SANTA ROSA BICYCLE Class IIIB Bicycle Boulevard & PEDESTRIAN MASTER E AVEXISTING A M O PLAN UPDATE 2018 SON DESTINATIONS +
D
ST
ILS
D
EXISTING BIKEWAYS 3R
ST
CITYWIDE
B
SA
W
101 £
RO
H
H 4T
D
AIRWAY DR
TA
H 5T
2N
ST
E ST
N SA
6T
ST
ST
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route M OYO
ST
ST 9T H
SOT
A
EXISTING EXISTING BIKEWAYS
ST
E
BEAVER ST
E AV
HE AL DSB U RG AVE
D OO
RIPLEY ST
W
ST
H
Class IIB Buffered Bicycle La SANTA ROSA BICYCLE ST H Class III Bicycle Route &4 TPEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard R Class IV Separated DBikeway E RY PROPOSEDStudy MONTGOM
OK
ST
7T
NORTHEAST Class II Bicycle Lane
BRO
AN
ST
9TH ST W
HUMBO LDT
RG
SC OTT
Santa Rosa Middle School
CHERRY ST
YLE PARK D R DO
COLLE GE AVE
LINCOLN ST MO
CLEVELAND AVE
E AV
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
COLL EGE AVE
I TA
R
S
HI
WY
PK GR OV E
PARKER HILL RD
ARMORY DR
AY
E
A C SPRING ST
E AV
ST
N BE
E AV
D EY R AL L TV N ET
AH RD
AS
101 £
N TO
FULTON RD
I LL
SMART TRAIL
D O
SE
LE
E AV Piner High School
OLD
LN
HOPPER AVE GUERNEVIL
COFFEY
INDUSTRIAL DR TER NCHES
W
DH OO
WI
AIRWAY DR
WALTZER RD
0.5
1
RUSSE
Urban Growth Boundary MILES
¹
W COLL
BICE SANTA ROS
LL AVE
HALL RD RD
CLARE
SEQUOIA
City Limts
C
ON LN
WY
E V AKSHIR R E DR OPAL
0 PINER RD
SAN MIGUEL RD
CIR
PINERCREST DR
Park
YO
Shopping Center
FRANCISCO AVE
RD
Hospital
Shopping Center
HARDI E S LN
ES
RE D
RN
SAN MIGUEL AVE
PI
LU M ETA
E CO RBY AV
BA
Transit Station
ST
SAN MIGU
SMART Station Hospital
Major Employer
Park
JO
DENNIS LN
Jack London Elementary School
SMART Station
LE
NGE AVE
CLARE
RANGE AVE
HARDI E S LN
RIPLEY ST
O
VE ST O LI
N AVE
EXISTING BIKEWAYS (NORTHWEST) I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
L VA
Youth Community Park
Transit Station
Class Class Class Class
ST
P
EA RL E ST
School
DESTINATIONS + BOUNDARIES
BR
ST
D UTTO
RCO P WEST AVE
AV E BURBANK
AV
Jack London ST H School 5T O STElementary KW D O 3R ST D 2N VE AA OM SON
M AP
DESTINATIONS + BOUNDARIES E
ES HU GH
NORTH ST
AIRWAY DR
RUSSE
WALTZER RD
VENTURA AVE
LN COFFEY
FRANCISCO AVE
MARLOW RD
M OW
E AV
T E S ST D
ST
ON
LN
Roseland Elementary School
ST
H 4T
Santa Rosa Middle School
Luther Burbank Elementary School
Major Employer
School
IN
B
ILS
1ST
NORTHWEST Figure 3-11 SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
KL
ST
W
LINK LN
BRITTAIN
FU LTO N RD
Lawrence Cook Middle School
N
H ST 7T
W 3RD ST
12 Ã
R TE R
SPENC E R AVE
A
T 9 TH S
Lincoln IAbraham Shared-Use Path Elementary II Bike School Lane III Bike Route IIIB Bicycle Boulevard
TRAIL
A FR
GAMAY ST
E AV
VE TT A
EL L IO
ST
W 9TH ST
J X Wilson Elementary School
RD
Franklin Community Park
MOR G AN
PUTNEY DR
NO CI
PETERSON LN
DO
IN
RD SEBASTOP OL
N ME
FULTON RD
D BLV
WI
N
E
PO
L RD
JO E RO DOTA
EXISTING BIKEWAYS
Y
T RD Class Class Class Class
W 3RD ST
OCCID ENTA
ELAND AVE
E K TR AIL
A Place To Play
HALL RD
AV
School BICYCLE SANTA ROSA & PEDESTRIAN MASTER PLAN UPDATE 2018 S
TO N
LE LN
Santa Rosa
N
SANTA ROSA CR E
IS
High School Class I Shared-Use Path AV E WAY ClassRIDIIGBike Lane Class III Bike Route Class IIIB Bicycle Boulevard COLL EGE AVE
TO
CIR
W COLLEGE AVE
G
N
UT ND
SEQUOIA
Helen Lehman Elementary
N IN
EARDLEY AVE
Albert F Biella Elementary School
S TE E
W LE
GT D DIN SANTA ROSA BICYCLE Santa Rosa Junior CARR AVE College & PEDESTRIAN MASTER MCCO NNEL L AVE PACIF IC AVE R C UB WAY PLAN UPDATE 2018 BEA
VE SA
CLOVER DR
YO
R KSHIRE DR
RIDL EY AV E
NORTHWEST
TER DR NCHES
EV
Steele Lane Elementary School
Hilliard Comstock Middle School
JEN
C H A N ATE RD
EXISTING BIKEWAYS NORTHWEST
EXISTING BIKEWAYS
Hidden Valley Elementary Satelite School
U
CL
GUERNEVILLE RD
¹
WY
James Monroe Elementary School
ADF
Sonoma County Offices
CO
Northwest Community Park
BICE NT E NNI AL WAY
LL AVE
W STEELE LN
U
Meldotronic CardioVascular
ND B
MARSH RD
Keysight Technologies
AR
E
OPAL
Piner High School
DH OO
PINER RD
Youth Community Park
W
RD
INDUSTRIAL DR
V A
Nagasawa Community Park
FO
RE D
ES
PINERCREST DR
IS D
NT A IN
Taylor Mountain Regional Park
HOPPER AVE
SAN MIGUEL RD
HAR R
HUM BOL DT ST
TA
101
OLD
RN
SAN MIGUEL AVE
OMAS LA KE TH
UN
£
TAY LOR MO
PY T
GI O NAL PARK T R IL A
E
SANTA ROSA
GI O NAL PARK T R IL A
E
AV E
SANTA ROSA
SMART TRAIL
SMART
DOWD DR
Taylor Mountain T ST Regional B UR Park
OA
Galvin Community Park
Galvin Community R IN Park
R
D
R
BA
Jack London Elementary School
S
W
DOWD DR
D BETH A R
DENNIS LN
Map produced January 2019.
40
T
RO
UN
RD
S RIN G KAWANA SP
IN YOLANDA AVE TA
TAY LOR MO
S
R
D NT O
D BETH A R
D
KM
T ST B UR
D
H
R
HEARN AVE
A
RD
101
YOLANDA AVE
Amy's Kitchen
Map produced January 2019.
£ RD
YR
D N EV E TO H A V AS TAC
L IL
S RIN G SP
AH
R EO D LKAWANA
TT VAL LE
UM TAL
Amy's Kitchen
V E AV E ORABY
101 £
HEARN AVE
E N TO A V AS
AV E
DR LEO
AV E
MILES 1.5
MILES 1.5
V ERB ANK A BU
0.75
DU TTO N AVE
0.75
AV E BURBANK
0
WEST AVE
¹ ¹
Urban Growth Boundary
Urban Growth Boundary 0
L
OD
City Limts
O PO AST
DU TTO N RD L IL AH E UM WE AL ST AV PE T
SE B
CO RBY
City Limts
E ST
Park
A To
W
Park
City Limts
SE B
O PO AST
L
City Limts
¹
MILES 1.5
MILES 1.5
0.75
0.75
AV E BURBANK
0
0
WEST AVE
Urban Growth Boundary
Urban Growth Boundary
DR LEO
HEARN AV
Amy's Kitchen Map produced January 2019.
Map produced January 2019.
SA T IN
A RE ND
R
R
NORTHEAST
Ã
D R
PKWY
RANGE AVE
AH
W AY
GR
COFFEY
ARMORY DR
AV E
N
LN
ARMORY DR
DR
RANGE AVE
C IT O
I A L WA Y
RS
RO GE
CLARE
S LN
RUSSE
HARDI E
RD IL
E
ST
BR
E
P
NGE AVE
AIRWAY DR
S
ST
OLIVE ST
41
WY
D
T
ST
¹
AV E V BURBANK DA OO KW OO
ES
B
LINK LN
Urban Growth Boundary
E DU TTO N AV LN FA RM ERS WEST AVE OPAL
T
WALTZER RD
DH OO
City Limts
E AV
FRANCISCO AVE
9
W
T O LB
E AV TTON
MORGA N S
DU
TA
N
ON LN
T
D DER E OL AV TTON
W 9TH ST
HOPPER AVE Santa Rosa Rural Cemetery
Santa Rosa
MORGA N S
DU
V
H
PACIF IC AVE INDUSTRIAL 3 RD ST DR College W Santa Rosa SPENC E R AVE High School L RD Santa O PO AST E Rosa Middle SEB AV COLLE SAN MIGUEL RD GE AVE School ST H VE ST ST H 4T T AA 7 H OM T 5 SON TH S T 9 T S W 9TH ST BIC Doyle D 2N Community Brook Park L AVE L Hill Elem ST D School 3R DR T MILES Luther Burbank LEO RD S 1 3 W Elementary BE E A V NN E School LE TT MAP L RD HEARN AVEVA O PO AST
Park
0 PINER RD 0.5
N
RD
Shopping Center
PINERCREST DR
EN
LINK LN
ES
Hospital
HILL RD
S WI LE Franklin Community LN ST E E L E Park
Junior Shopping Center
So O
TE RD C H A NA
101 £
OC INO AVE ND
RN
SAN MIGUEL AVE
BI C EN T E
Hidden ST E Valley Elementary School
RD
SMART Station Hospital
Transit Station SMART Station
EN T Sonoma County Offices ME
BA
Jack London Elementary School
PARKE R
AS TH OM
NG RO VE
LAKE H A
RD
I NTA U
DENNIS LN
Major Employer
Park
R
Keysight Technologies
Transit Station
DESTINATIONS + BOUNDARIES School
Meldotronic CardioVascular
D
LL
Nagasawa Community Park
N Major BIEmployer EN C
NORTHWEST Figure 3-12
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
NT O
HI
School
Amy's Kitchen
Class Class Class Class
IS RR DR
Meldotronic DESTINATIONS +F O CardioVascular Hidden Valley Elementary BOUNDARIES Satelite School
Taylor Mountain Regional Park
EXISTING BIKEWAYS (NORTHEAST)
KM
MA
Galvin Community Park
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
OA
R WS D
LU
T ST B UR
HIA N
A
RD
YOLANDA AVE
DR RD
SA
D RE N
VE DA
I Shared-Use Path Trione-Annadel State Park II Bike Lane III Bike Route IIIB Bicycle Boulevard
AKE H A S L
OA LE AF K T IN
OO KW
A PE T
SANTA ROSA AV E
E G
RD
R
E AV
Class Class Class Class
OO
ST
BR
E
AVE
DOWD DR
D
A UP
LN
S
ST
CORBY OLIVE ST
E DU TTO N AV
WEST AVE
AV E BURBANK
SMART TRAIL
EL
L YU
E AV
D
T
ST
ES
B
LINK LN
S RI N G KAWANA SP
101 £
EXISTING BIKEWAYS
Meadow View Elementary School
FA RM ERS
T O LB
T
E AV TTON
HEARN AVE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
PY T
RO
TA
MORGA N S
DU
DR LEO
E
N SPENC E R AVE RF MO Santa I Rosa Middle COLLEGE AVE Village School T Elementary S H T School VE H S 4T ST AA 7T OM TH Spring Creek N T 5 O S S TH 9 T S Elementary W 9TH ST Doyle Montgomery D School 2N Community High School Brook Park E V T Hill Elementary A S N E D HO School 3R CR T Luther Burbank Strawberry RD S E EK W3 S IDE Elementary Elementary School RD BE E A V N E School N E TT AH D R PL D V A R VA M LLEY E OL P H O RD C AST TA SE B R Yulupa Elementary D S School E N D TO A V BETH A R AS
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
NTE
M
LEY DR
O
MO
TG
AL
DR
Class Class 12 Class S TO NE B RID Class
Y
W AY RS GE
S LO
Spring Lake County Park
H IDD
DR
S
BRU SH
NTE
MO AH GR
SANTA ROSA BICYCLE D & PEDESTRIAN MASTER PLAN UPDATE 2018
M O
CRE EK RD
AV E C IT O
LEY DR
AL H IDD
N
ER
LA
NG RO VE
AS TH OM
I A L WA Y
ARMORY DR
RD
RANGE AVE
RD
EXISTING BIKEWAYS MM
Santa Rosa High School
NORTHEAST
Skyhawk Park Austin Creek Elementary MELI TA School RD
SU
Santa Rosa Junior PACIF IC AVE College
GA
Santa Rosa Rural Cemetery
ISTO
V
C AL
OC INO AVE ND
EN
RD
ME
D SR WI LE Franklin Community LN ST E E L E Park
LVD MISSIO N B
Sonoma County Offices
N
¹
TE RD C H A NA
NN
EXISTING BIKEWAYS
D O BLV C IT NTE Binkley MO Elementary School BA BUE NA Y ER R ND MONTE VERD YO N E CA Sequoia DR Elementary School R D NT DU PO Madrone Elementary Douglas L. Whited School Elementary School ON
BI C EN T E
Hidden Valley Elementary School
HILL RD
Hidden Valley Elementary Satelite School
D ER R B ADG
MIDDLE R I NC
FO
RINCON AVE
Rincon Valley Middle School
Keysight Technologies
I NTA U
PARKE R
Meldotronic CardioVascular
HARVILLE RD
D
Nagasawa Community Park
A
PKWY
CE LA
LAKE H A
L WA
R WS D
IS RR DR
D
SMART TRAIL
E BAKER AV
C IR
B YERBA UEN
R
R
D
HALL RD KAWANA SPRINGS RD
R DUP ONT D R TE 1 2
RD
V ALL
CREEK RD
AV E
E Y DR
CI TO
TAINGR FO UN
LAKE H A
AS TH OM
TAINGR
RD ILL
FO UN
AH
S
TE TA
RD
RANGE AVE
LU M P E TA
ON INC
S
E Q VE N AU O IA
A
LAKE H A
VE LE A
AVE
OR P ORA TE C ENTE R PKWY
AVE
CORBY
LE
AS TH OMC
ROSA
E ST
D
R
M O
LA
A
S
CORBY AVE
N
SANTA ROSA AVE
DOWD DR
WILJAN C T
HIA N
RD
CH ICO AV E
O
101 £
TRAIL
PY T
MOORLAND AVE
L RD
A DOTA JO E RO D N STAR DR
PRICE AVE R
SEBASTOP OL
Galvin DESTINATIONS + Community Santa Rosa CL R Park OV ER D Junior College BOUNDARIES W ROBLES AVE E ROBLES AVE AV E C ST B ST A ST
E
DUTTON AVE
GI O NAL PARK T R IL A
COLGAN CREEK T RA IL
VICTORIA DR
SG A
RI N
SP
DUTTON M EADOW
BURGESS DR
G
RI N
SP
D
R
W AY
RS
RO
CR EE
R
D
CH ICO
Southwest Branch
E
School
W 9TH ST AV E FIN LEY Abraham Lincoln Elementary School
Major Employer PRICE AVE
LINK LN
SMART Station BRITTAIN LN
FU LTO N RD
Major Employer Transit Station
Shopping Center J X Wilson Elementary School
RD W 3
Park
City Limts
TAL RD SMART OCCID ENStation
Urban Growth Boundary TRAIL
SEBASTOP OL
RD
0
Lawrence Cook Middle 0.25School
MILES 0.5
CO MA
Park FRE
N WRIGHT RD
Shopping Center
¹
E HE S AV H UG LUDWIG AVE
E MCMINN AV
JO E RO DOTA
INT RD STONY PO
Transit Station
DESTINATIONS + W 3 RD ST BOUNDARIES
S WRIGHT RD
LISCUM ST
STONY POINT RD
W AY
RS
GE
RO
AV E
GI O NAL PARK T R IL A
E
SANTA ROSA
SMART TRAIL
OCCID ENTA
D
DOWD DR
LC A RE M E O RD
DR
N
AH
GR
GE
BRU SH
BRU SH
NTE
N
MO
H ID
CREEK RD
AV E
E Y DR
CI TO
V ALL
NTE
N
GR
AH
H ID
MO
N HUM BOL DDT ST R
ARMORY DR
HUMBOLDT ST
N WR
Trione-Annadel State Park
R
FRESNO AV
TA Taylor UN MO Mountain CRE E K TR ARegional Park IL
Taylor Mountain TAY LOR T ST Regional Park ROSA B UR SANTA
S
Trione-Ann
OM A V State Pa AL LE Y TR AI L
NT O KM R
Galvin Community R IN Park
D BETH A R
D
S ON
OA LE AF K BELLEVU E AVE DR
AR N ST
R
H
D
RD
A
S
R
R
EV
E
D
CH TA
G
S RIN G KAWANA SP
S
RD
D
N WRIGHT RD
D BETH A R
EY
FU LTO N RD ERFIELD RD MM SU
D NE E TO H A V AS TAC
DE RD
School I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
E AV
ERFIELD RD MM SU
AV E
A UP
LN
H
E KSI
A Place To Play HALL RD
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
L YU
FA RM ERS
VE DA
SANTA ROSA
RD
OO KW
DOWD DR
TE TA
ON INC
E AV
ARMORY DR
LE
T
SMART TRAIL
A
DD
SANTA ROSA BICYCLE EXISTING BIKEWAYS & PEDESTRIAN MASTER (SOUTHWEST) PLAN UPDATE 2018
VA
IN YOLANDA AVE TA
UN
S
MI
Amy's Kitchen
YR
DR
RD
IR O TA Y LOR M
E VO O BARA UP
T ST B UR
RD
VAL LE
L IL
Q HEARN AVE IA C
101 £
N ETT
AH
S RIN G SP
C RE
UM AL PE T
AV E
E
O LB
OO
R EO D LKAWANA
T ES
E AVY AV E CO DRB OO OLIVE ST KW
BR
E N TO A V AS
BEN
Class Class Class Class
Class I Shared-Use Path EN RE E G AV Class II Bike Lane ST HO EN EA TH U O S C RE Class III Bike Route E KSI AVE E AVE B LE BELLEVUE DE AV EN MA P RD N ETBoulevard H O E NIIIB Bicycle Class DR T VAL L S
L YU
ST
T
MA
U AVE YOLANDA O
T RMERS LN E SFA
B
ST VE A
O LB
£ 101
TA
A
L RD O PO AST AVE P LE
LVD MISSIO N B
RANGE AVE
ST
E AV
A M
SANTA
O LIV
RD
A LG CO
SANTA ROSA BICYCLE & PEDESTRIAN MASTER E Q UO IA PLAN UPDATE C I R 2018 MEL
Ã
SANTA ROSA BICYCLE Ã & PEDESTRIAN MASTER PLAN UPDATE 2018
A
TT MORGA N S
Figure 3-13 SOUTHWEST
S
S
Amy's Kitchen
ST
DU TTO N RD L IL AH E UM WE AL ST AV PE T
HEARN AVE
ST DT NS
AV E
RD
S WRIGHT RD
T
E AV
ES
O
ST DT
ST
ST
B
A ST
AV E
GA ISTO
BLV ITO
R
DD
D
LVD MISSIO N B
O BLV C IT
RD A TOG ISBU RBANK
TE
C AL
D ER R
MI
D
B ADG
ST
C AL
WE ST AV E
EC NT MO
D LEO D ON SOUTHWEST NY CA
HARVILLE RD
TE RD C H A NARINCON AVE
SOUTHWEST
Map produced January 2019.
42
AVE RINCON VE TH A D ER R B ADG
EXISTING BIKEWAYS
Roseland Creek Elementary School
E AC LL WARD
KER HI L L
I ST
PA R
BARH AM
N
O
MA P
EA RL E ST
E DU TTO N AV
D
CO MA LL
R
SOU
EXISTING BIKEWAYS
VE SAT A T ST OM ND 1S SO 3RDoyle Community Park
T ES
¹
T
DR LEO
Map produced January 2019.
Class Class Class Class
ON
RCO P
E AC LL WA E MCMINN AV
S DR EW
ELAND AVE
¹
MILES 1.5
Robert L Stevens Elementary School
KER HI L L
EV
MILES 1.5
1ST
SE B
AV E
0.75
EXISTING BIKEWAYS 0.75
DU TTO N AVE
0
WEST AVE
0
AV E BURBANK
Urban Growth Boundary
4
2 RD W3
V ERB ANK RBY A BU
City Limts
Urban Growth Boundary
ST
1ST
Luther Burbank Elementary School
AV E AM A RH W BHARVILLE RD
Roseland Accelerated Middle School
PA
SE
RD PO L
ES
City Limts
TO B AS
D 3R
ST
ST
CO OLIVE ST
RD W3
ST
T H S ST 7T H 5T
ST
LINK LN
Shopping Center Park
W 9TH ST 9TH
ST LINK LN B
Shopping Center
A
T MORGA N S
E AV TTON DU
LUDWIG AVE
Hospital
E AV TTON DU
N
Hospital
E HE S AV H UG
VE L AZZI N I A
R
N
SMART Station
Transit Station
R Keysight Technologies Meldotronic CardioVascular
GIFFEN AVE Sonoma County Keysight Technologies Offices WY PK T OIN NO RT HP Meldotronic CL
ELAND AVE
Station
Major Employer
¹
S DR EW
EV
DESTINATIONS + Major Employer BOUNDARIES
Roseland Elementary School
PKWY
E OV
D
Skyhawk N D S MO SR Park WI B LE YERBA UEN E DR D R D I Franklin E N R OM ALOISE AVE D TA T OSS RBL YO R C PEA H A NA SANTA RRDOSA CYOLANDA AVE AN D Community LN ARV E C RE E KLO ST E E L E RN TR AIL Park HEA Sonoma County SMeadow ViewR 12 ONT D DUP E Offices Santa Rosa Elementary V TT A 12 E L IO T I R R L A Spring Lake EL School Santa Rosa Rural Cemetery KT A Place HEARN AV E Skyhawk County Park S Junior College RD W Southwest To Play Park W IS LE Community Park PACIF IC AVE ST E MELI Franklin D TA Y BU R T RRD HALL RD Community LN E E ST E E L LO M SPENCER AVE Park O 12CH RN E TG Santa Rosa W 3 BELLEV UE TT AV L RD ON EL L IO Santa Rosa Rural Cemetery TR A I SpringMLake ST AY K ST County Park W H Junior College YUBA DR T N 4 E L PACIFIC AVE E R Y R P EA T VE GAmy's H S ER ST AA M 7T SPENCER AVE H O M Allen O ST NElsie 5T A Kitchen TG SO ST H T N T High School E 9 S O Doyle W 9TH ST S TO TH AY ST D M NE B W RI SO U Community Park 2N TH
CL
Class III Bike Route Class IIIB Bicycle Boulevard School
Park
Nagasawa Community Park
CardioVascular
DESTINATIONS Class I Shared-Use Path+ Class II Bike Lane BOUNDARIES
SMART Station
R ND
IS RR DR
W VE PK Y O
ST
12 Ã
R ND
A
Class IIIB Bicycle Boulevard
SchoolTransit
IS RR DR Lawrence Cook Middle School Nagasawa Community Park
T IN
E FRESNO AV
N WRIGHT RD
Junior College Class I Shared-Use PathSouthwest Branch Class II Bicycle Lane Class IIB Buffered Bicycle Lane LEY AV E Class III Bicycle FINRoute E Class I Shared-Use Path PRICE AVClass IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
EXISTING
ST
T IN
TRAIL JO E RO DOTA
EXISTING
RD W 3
A
Class IIB Buffered Bicycle Lane SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER RD PLAN UPDATE 2018 SEBASTOP OL Class IIIB Bicycle Boulevard Class IV Separated Bikeway PROPOSEDStudy SA Santa Rosa
2N
SO
SA
TAL RD NORTHEAST OCCID EN Class II Bicycle Lane
CH ICO AV E
D 3R
LN
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
J X Wilson Elementary School
ST
ST H 5T ST H T 4
ILS
INT RD STONY PO
FU LTO N RD
BRITTAIN
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ST
7 TH
CHERRY ST
W
HALL RD
W 3 RD
N DUT TON AVE
LINK LN
NORTHEAST
T 9 TH S
Abraham Lincoln Elementary School
A Place To Play
OC
W 9TH ST
ST
SANTA ROSA CRE E K TR A IL
AN
RECOMMENDED BIKEWAYS
R OV ER D
IN
RIPLEY ST
CL
C IR
OL
IA
HU M B
UO
ND ME
Q
RG MO
S
E
Ros Ele Sch
CR EE
K RD
Strawberry Elementary School
E
OWLS
RD
S O M LA A
S DR
VA L L EY
N AH GR
MORAGA DR
MO U
SPENC E R AVE
Shopping Center Park Park
City Limts
YD
EN
LN
RD W3
A
SE B
O PO AST
TO
EE K RD
AV E TEC I
CR
SH
MO N
BRU
IE RF
BROOKWOO D AVE
G CR MORAGA E E DR K
W AY RS
RO GE LN
Creek Elementary School
43 ND AVE
1
WILJAN C T
YOLANDAMILES AVE Spring
RD
AVE
0.5
OSA AVE
LD
¹
AIL TR Spri E H EA R N AV Cou
CORBY AVE
E
Herbert Slater Village KAWANA Middle School R D SPRINGS Elementary E V A A H E R N School T TE
0
FA RM ERS
MO
DR
S
DOWD DR SMART TRAIL
AV E
RD LL HI SU
DR
Q UE
OM N TG
ERY
SMART TRAIL
DR N AH GR
CE
VE NA TO AS Howarth E Memorial AV Park N GA C OL
SP RI N
DR VA L L EY
Y
WA
BL VD
A M LU TA
SPRING ST
N
PE
NORTH ST
RD
ST
LN
HUM BOL DT ST
C ON RIN
A
EY
N FRA
MEN DOCINO AVE
ST AVE
DU T
E
E DL
SE
CI
LEY RD V AL
E TT
M RTL MA Urban GrowthOBoundary M NO
DR
ST
City Limts HA
K
Park
Park
A
RO O
4
O
R
Elementary School
Shopping Center TH
12 Ã
N BE N
Shopping Center
RB LDE
ST
E AV
I
D
N
SS
FO OT H
EN SMART Station L
Hospital
A AC
EA RL E Hospital
LE
MI
BR YD
E AV OT LB TA D ARK DOY LE P
T
B
ST
ST H T 5T S D 3R
R
ST
TE
SPENC E R AVE
COLL EGE AVE Santa Rosa Middle School
ST
E
TransitR AStationProctor Terrace
PACIF IC AVE
ES
A
ST 7 TH
Rosa Rural Cemetery
D
Santa Rosa High School
School Santa
M AP
SMART Station
ILL
CARR AVE Santa Rosa Junior College
T
ST
LN EELE
T 9 TH S
D
Transit Station
E AV
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
ID
DESTINATIONS + BOUNDARIES
Franklin Community Park
TT AVE E LL IO
Class Class Class Class
H
N
N
ST
IS
E
School VE ST OL I
W LE
I KL AN FR
SANTA ROSA BICYCLE EXISTING BIKEWAYS & PEDESTRIAN MASTER (SOUTHEAST) PLAN UPDATE 2018
RD
B
ST
Figure 3-14 SOUTHEAST
K
A
HANAT E RD
¹
ES
DESTINATIONS + BOUNDARIES
N STAR DR
WER D
DOY LE P
ST K AV VERB AN E O L I BUV A OT LB TA DR ARK
COLL EGE AVE H City Limts 4T Santa Rosa Middle SchoolGrowth Urban T ST Boundary 9 TH S H T 5T ST S MILES D 7 TH R MILES 3 DR LEO 0 0.75 ST1.5 1.5 0 0.75 D 2N DR M ID Doyle EA RL E ST A VE A D HEARN AVE A A Communit OM ON SON RI N CT Douglas Park S T L. Whited S 1 Madrone Brook Hill ST School Amy's Kitchen J OElementary Elementary Elementary LLE Luther Burbank School VA Map produced January 2019. School Elementary School Map produced January 2019.
101 £
C
LR
Lu Ele
RO O
ST
Urban Growth Boundary
EXISTING BIKEWAYS
ST
RB LDE
MEN DOCINO AVE
SANTA ROSA AVE
H ST Terrace 9TProctor ST Scho9 Elementary 7 THW 9TH ST
A RR
E Shopping TCenter BR
Hospital
ST
APPLE LN
PACIF IC AVE
FO OT H COLL San
B
CORBY AVE
Hospital
SMART Station
Santa Rosa High School
LINK LN
DOWD DR SMART TRAIL
Santa Rosa Rural Cemetery
ST
Taylor Mountain Regional Park
Station
SS
E AV TTON DU
BURT ST
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
E
SMART Station
CARR AVE Santa Rosa Transit Junior College
A
Class Class Class Class
Park
Major Employer
TT AVE E LL IO
N
YOLANDA AVE
S
E AV
WILJAN C T
L
LE SANTA ROSA BICYCLE Y RD & PEDESTRIAN MASTER Galvin PLAN UPDATE 2018Community Park
KAWANA SPRINGS R D
Santa Rosa High School
N
RD
BROOKWOO D AVE
LL
MOORLAND AVE
V A
CAR Santa Rosa Junior College ELAND AVE
HI
¹
Class I Class II Bike Lane DESTINATIONS + Major EmployerEN Class III Bike RDRoute BOUNDARIES D IS W ID LE H Class IIIB Bicycle Franklin Boulevard SchoolTransit Station N L Community E TE E L
BE NN SOUTHEAST ET T
E LL IO
Class III Bike Route Class IIIB Bicycle School Shared-Use Path Boulevard I KL AN FR
A M LU TA
E H EA R N AV
BOUNDARIES
R
EV
PE
VE NA
BETHARDS D
CL
TO
RMORY DR
R
AS
MO DR N TRANGE AVE MEN DOCINO AVE ECI T O AV E HUM BOL DT ST
R
D
R
S LL
EXISTING BIKEWAYS
WA
O
IS
W Class IIIB Bicycle Boulevard LE SANTA ROSA BICYCLE EXISTING N L Co E L & PEDESTRIAN MASTER S TE E DESTINATIONS Class I Shared-Use Path+ ANAT RD PLAN UPDATE Class 2018 CIIH BikeELane TT AVE
D
Yulupa Elementary School
VE NA
S AINT FRANCIS RD
SOUTHEAST
KSI D
CE
EE
CHE V AH D TA
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Trione-Annadel Class II Bike Lane Class IV Separated Bikeway State Park Study Class III Bike Route
SPRING ST
RO
KN
CR
TR
EXISTING EXISTING BIKEWAYS Class I Shared-Use Path
NORTH ST
WAY
EL
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard Class IV Separated Bikeway PROPOSEDStudy
HUM BOL DT ST
RS
SP RI N
W AY
G
DR N AH
GE
E LD
Matanzas Elementary School
AN N
L NORTHEAST Class II Bicycle Lane
E AV
SS
NEOTOM AS AV E
LLEY RD
CH
A UP
E
LO
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
Spring Creek Elementary School
EA RL E ST
GA C OL
R
BRU
SH
MO N
CR
TEC
I TO
EE K RD
AV E
DR VA L L EY
GR
WA
CE
SPRING ST
NORTH ST
Spring Lake County Park
L YU
Brook Hill Elementary School
M M
Herbert Slater Middle School
Village Elementary School
AVE
VA E TT
VE A A OM
Montgomery High School H O EN AV E
ST
N BE N
AIL TR
IE RF
DR
SE
VE ST OL I
E AV P LE
BL VD
IT
A RD BICYCLE MO SANTA ROSA N TG OMERY DR & PEDESTRIAN MASTER PLAN UPDATE 2018
SU
RY
SON
PR CY
ST
ME
T TE
JO
Doyle Community Park
TGO
Q UE
LE
N MO
LN
ST
VE A A
L VA
Luther Burbank Elementary School
ST
H
DR
Y TLE AR
FA RM ERS
D
OM
A
DR
T
ST
SON
ST 1 ST
LN
K
ES
B
ST
ST H T 5T S D R 3 ST D 2N
EN
N
Howarth Memorial Park
N FRA
HUM BOL DT ST
NORTHEAST
R
Proctor Terrace Elementary School
RO O
H 4T
BR YD
E AV OT LB TA DR ARK DOY LE P
COLL EGE AVE Santa Rosa Middle School
A RR
D
RB LDE
MEN DOCINO AVE
12 Ã
K IN HAW NTA Skyhawk Park Austin Creek Elementary School
Y
Y
TE
SPENC E R AVE
MA
RD
PACIF IC AVE
A
T 9 TH S ST 7 TH
Santa Rosa Rural Cemetery
FO OT H
YE R BA BU E NA RD TE VE R DE DR NEST D R
ME L
ILL
CARR AVE Santa Rosa Junior College
O
N
RECOMMENDED BIKEWAYS
I
TT AVE E LL IO
SS
E
Santa Rosa High School
D DU PON T
MI
E AV
LE LN
CALISTOGA
N
RD
E
LN
D
A
ID
CI
H
A AC
RD
Franklin Community Park
N
S TE E
IS
I KL AN FR
W LE
Douglas L. Whited Elementary School
C ON RIN
RI N
Madrone Elementary School
M O
DR M ID
E DL
ANAT E RD CH
DA NA CO
APP
McDon
St Helena Ave
Spring St
Wright St
Stewart St
Orchard St
MorganStSt
Ave Heald sb urg
Ripley St
RANGE AVE
Wright St
e
Slater St
Dr
Beaver St
Glenn St
t we He
tS
Amy's Kitche
t pl Ap
Royal C rSt eek e
Morgan St
HEARN AV
St
t
d Ma
St 6th
iso
Ln
nS
Heald sb urg
Ave
t
Santa Rosa Junior High School
Park
e
h
MILES 0.2 St
5th
t
t ird S W Th
0.1
t
Ln
0 7t
W
¹
Freemont Park
ES
ek
St
S ey Ril
pl Ap
Ripley St
WEST AVE
Roberts A v
E AV TTON DU
£
DR LEO
vis Da
S on ils
W
Prince St
eS hu na Do
Santa Rosa Junior College 101 Howard St St r ke ec D Map produced January 2019. SMART Station Map produced January 2019.
C re
LINK LN
¹
MILES 1.5
Nason St
Coulter St
10th St
O PO AST
10th St
Urban Growth Boundary
St Shopping Center 7th St tt ege Ave W Coll e w t He School hS 6t W Cherry St Hospital
Klute St
SE B
l Urban NGrowth Boundary ea
e Av
Park and Ride
N
e
W 9TH ST
Lincoln St W 3RD ST Klute St L
Spencer Ave DESTINATIONS St + MILES Scott 0.75 0 0 0.75 BOUNDARIES 9th S1.5t
k Tur de
Class II Bike Lane
Wa shington St
SMART StationLincoln St
Ma xwell
AV E BURBANK
e o sa Av Santa R
City Limts
Benton St
Class I Shared-Use Path
Shopping Center St Scott t 9th S School
City Limts
Park and Ride St Luke Lutheran Elementary John Fremont School Transfer Station Elementary School
Santa Rosa Junior College
Transfer Station
Park
Santa Rosa xwell C t High SchoolMa
Bicycle Rack
Ma xwell C t
g or Ge e Shopping AvCenter Park Maple
Wa shington St
Oak St
Denton Way Denton Ct
DESTINATIONS + Carrillo St BOUNDARIES
Glenn St
St
St Bos ley
Ave
St
SMART Station ven
Orchard St
Glenn St
Morgan St Ripley St
r
SE
St Brown
S A St
Ã
way Ridge
Class III Bike Route
St Class Bike MajorIIEmployer sh Lane Bu SMART Station
Ste Bicycle Boulevard Class IIIB Shopping Center ia Hospital
Ridgeway Class IIIB Cont Bicycle Boulevard High School 12
Frances St
BICYCLE PARKING
Class IIIB Bicycle Boulevard
ve tA
St
Dr
Denton Way
Denton Ct Class I Shared-Use Path SchoolTransit Station
Transit Class III Station Bike Car Route St t Srillo Hospital so n
Class III Bike Route
SANTA ROSA BICYCLE Figure 3-15 & PEDESTRIAN MASTER PLAN UPDATE 2018
44
Juil
Mill St
Ave
BOUNDARIES
Class I Shared-Use Path Pine St
St
Timothy Rd
DOWNTOWN
ark Bicycle rd P liaRack
eway
idg Bicycle RRack DESTINATIONS + Major Employer
s St
Julliard Park
r
Av no ELAND AVE rl a EV CL Co e Av ury hb As e Av ood okw Bro
Cla
Charle
High Schoo
Class III Bike Route St Bicycle Boulevard Class kIIIB School
1st DOWNTOWN
Class II Bike Lane
BICYCLE PARKING
D o lb Ta
St
DESTINATIONS Class I Shared-Use Path+ Ridgeway Class II Bike Lane Cont BOUNDARIES High School
Frances St
Ct lnut Wa
SANTA ROSA ve BICYCLE aA om Class IIIB Bicycle Boulevard & PEDESTRIAN MASTER Son EXISTING PLAN UPDATE 2018 Santa Rosa
D
A
t
n ge Ora
el S Haz
St
St
Ln
St
me oyo Sot
St
St
St
ek
St
St
3rd
BICYCLE PARKING
Santa Rosa Plaza
Luther Burbank Elementary School
¹
ce er Pi
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Frances Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
t
t
St 5th
SANTA ROSA BICYCLE St Tupper & PEDESTRIAN MASTER PLAN UPDATE 2018
ird W Th
Class IIB Buffered Bicycle La F SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER Santa Boulevard Rosa PLAN UPDATE 2018 Class IIIB Bicycle Memorial Class IV Separated HospitalBikeway PROPOSEDStudy
t BICYCLE dS 2n PARKING EXISTING
ES
S ey Ril
Freemont Park
B
St
t
h 6t
A
rO ai
DOWNTOWN
t
nS
W
St
vis Da
S on ils
W
iso
W
t
d Ma
C re
St
eS hu na Do
Prince St
Coulter St
tt we He
7th
St
Santa Rosa Junior High School
Courthouse Square
St 6th
e
s NORTHEAST Class II Bicyclea kLane
nd la Le
Cherry St
h 7t
101 £
12th St RECOMMENDED PROPOSED St h BIKEWAYS 4t Class I Shared-Usev ePath A
t 9th S
Decker St
SANTA ROSA BICYCLE & PEDESTRIAN MASTER 13th St PLAN UPDATE 2018
St
10th St
NORTHEAST
14th St
C hinn
Klute St
Cl yd
16th St RECOMMENDED 15th StBIKEWAYS
Royal St
College Ave
Lincoln St Wa shington St
St Scott
Benton St St Luke Lutheran Elementary John Fremont School Elementary School
Ln
r to
Carrillo St
Howard St
n
oc Pr
Denton Way Denton Ct
Beaver St
Nason St
ve way A Ridge
Ma xwell C t
North St
Dr
Slater
Ne Spencer Ave
Santa Rosa High School
Ridgeway Cont High School
Frances St
a le
Br yd e
tS 3rl dS aze
Existing Pedestrian Network
FUNDING COMMITMENTS In the 2017-2018 Capital Improvement Program (CIP), Traffic Safety and Transportation projects focus on street rehabilitation, traffic safety, bicycle and pedestrian safety, and street lighting. Projects related to improving circulation and safety for all users were funded at almost $3 million, representing approximately 24% of the total budget request for transportation projects. These projects include traffic signal improvements, sidewalk installations, pedestrian signal installations, traffic calming, and bikeway improvements.
The City has also committed $1.2 million from the General Fund in an ongoing effort to implement facility improvements for people with disabilities, in compliance with the Americans with Disabilities Act (ADA). These improvements often include sidewalk gap closures, pavement repairs, or curb ramps.
03 Santa Rosa Today
There are many features that contribute to a convenient and comfortable walking environment. Significant investments and commitments to future improvements have been made that continue to enhance the pedestrian experience in Santa Rosa.
$1,500,000 has been committed to date for LED streetlight replacements, which last longer and require less maintenance than alternatives. This will allow the city to improve and expand lighting, creating a more comfortable walking environment.
SIDEWALKS Sidewalks form the backbone of the pedestrian transportation network. Most streets in the City have sidewalks or pathways on at least one side. Within the City limits, sidewalk maintenance is the responsibility of the property owner. Some parts of the City are not required to provide sidewalks. These include rural hillside developments, such as portions of the Fountaingrove area, or areas previously built out while under County jurisdiction and subsequently annexed into the City, such as the Castlerock subdivision and Roseland community.
45
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
46
HIGH VISIBILITY CROSSWALKS Crosswalks are a legal extension of the sidewalk and provide guidance for pedestrians who are crossing roadways by defining and delineating their path of travel. Crosswalks are not required to be marked, however marked crosswalks alert drivers of a pedestrian crossing point and increase yielding to pedestrians. Markings can be standard parallel lines or the “continental” high visibility pattern shown in the image above, which enhances visibility of the crossing and is becoming best practice. Crosswalks in school zones are yellow.
The City conducted a review of uncontrolled crossings in 2014, which evaluated 185 crossing locations. The study included a robust data collection effort, and made detailed recommendations for each location to improve accessibility and comfort, including additional pavement markings for visibility, beacons or traffic controls, and visibility improvements such as parking removal or vegetation maintenance. The City was recently awarded a Highway Safety Improvement Program (HSIP) grant to implement the recommended improvements at approximately 100 of the uncontrolled crossings. Unfunded locations will be carried forward in this Bicycle & Pedestrian Master Plan Update 2018.
PEDESTRIAN HYBRID BEACONS
DRIVERS
Slow Down (Pedestrian has activated the push button)
Rectangular Rapid Flashing Beacons or RRFBs increase visibility of uncontrolled or midblock crosswalks with bright LED lights activated by a pedestrian push button. Santa Rosa has multiple RRFBs throughout the City, including at 3rd Street and Courthouse Square.
Push the Button to Cross
Wait
Prepare to Stop
Continue to Wait
STOP!
Start Crossing
(Pedestrian in Crosswalk) FLASHING
03
PEDESTRIANS
Proceed with Caution FLASHING
RECTANGULAR RAPID FLASHING BEACONS
Santa Rosa Today
Pedestrian hybrid beacons are used to enforce motorist yielding to pedestrians at uncontrolled crosswalk locations. The beacon, when activated by a person wishing to cross, flashes yellow before displaying a solid red signal to motorists, requiring them to stop. Pedestrians are then shown a WALK signal, and may cross the road. When the WALK phase is complete, the beacon flashes yellow before returning to a dark inactive state. Operation of the beacon is illustrated in the graphic below.
Santa Rosa recently installed a hybrid beacon at this crossing on Montgomery Drive at Spring Lake Village.
STOP! Proceed with Caution if Clear
Proceed if Clear
Continue Crossing (Countdown Signal)
Push the Button to Cross
47
Barriers to Active Transportation
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Two freeways cross the City, dividing it into four quadrants. Highway 101 runs north-south through Santa Rosa, and State Route (SR) 12 runs eastwest. The SMART rail line also runs north-south through the City, west of Highway 101. These transportation features create challenges for people walking and bicycling in some places, as crossings are limited.
Bicycle and Pedestrian Trips The most consistent bicycling and walking data comes from American Community Survey 5-year estimates, which record the mode of transportation people use to commute to work. Over the most recent five years of available data, shown in Table 3-4, bicycling in Santa Rosa has remained steady just above one percent while walking has decreased slightly from 3.3% to 2.6%.
In addition to reviewing data on mode of transportation to work, the City of Santa Rosa also conducts bicycle and pedestrian counts at locations around the city. In 2018, counts conducted on the SMART Trail at 9th Street and at Sebastopol Road reported an average of 576 pedestrians and 53 bicyclists using the trail each day. Active transportation use was highest on weekdays, and peaked from approximately 7 – 10 a.m. and from 3 – 6 p.m., suggesting residents may be using the path to commute to work. By comparison, counts conducted in 2016 on the nearby Joe Rodota Trail showed a daily average of 265 people bicycling along that trail. These counts showed consistent use during both weekdays and weekends, with weekend days showing peak hours similar to the SMART trail. This suggests the Joe Rodota Trail is used for both commuting to work and for weekend recreational use.
Table 3-4: Santa Rosa Bicycling and Walking to Work Mode Share YEAR
48
BICYCLE MODE SHARE
WALKING MODE SHARE
2012
1.2%
3.3%
2013
1.0%
3.0%
2014
1.0%
2.7%
2015
1.2%
2.8%
2016
1.3%
2.6%
Between 2009 and 2014, hourly counts of people walking and bicycling in Santa Rosa were also gathered by multiple agencies, including the Sonoma County Transportation Authority (SCTA), and the Metropolitan Transportation Commission (MTC). From these hourly counts, average daily walking and bicycling trips were extrapolated and compared to identify cross streets that currently have the most people walking and bicycling in the City.
Locations with high bicycling activity are listed in Table 3-5 and locations with high walking activity are listed in Table 3-6. Four locations are popular for both bicycling and walking:
Table 3-5: Top Ten Bicycle Count Locations
Table 3-6: Top Ten Pedestrian Count Locations
CROSS STREET
Sanda Rosa Creek
Stony Point Rd.
Joe Rodota Trail
Prince Memorial Greenway
Joe Rodota Trail
Dutton Ave.
Humboldt St.
DAILY TRIPS
• Mendocino Avenue and Pacific Avenue • Sonoma Avenue and Brookwood Avenue • Mendocino Avenue and Steele Lane • Santa Rosa Avenue and 2nd Street
Santa Rosa Today
STREET
03
DAILY TRIPS
STREET
CROSS STREET
807
Santa Rosa Ave.
2nd St.
711
Mendocino Ave.
Pacific Ave.
2,432
629
B St.
4th St.
1,964
College Ave.
561
Davis St.
4th St.
1,071
Mendocino Ave.
Pacific Ave.
546
Middle Rincon Rd.
Badger Rd.
1,032
Sonoma Ave.
Brookwood Ave.
546
Sonoma Ave.
Brookwood Ave.
825
Joe Rodota Trail
South Wright Rd.
386
Morgan St.
4th St.
767
Santa Rosa Ave.
2nd St.
379
Mendocino Ave.
Steele Lane
679
Mendocino Ave.
Steele Lane
350
Yulupa Ave.
Bethards Dr.
639
Stony Point Rd.
Sebastopol Rd.
307
Davis St.
6th St.
567
2,511
49
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Programs
SAFE ROUTES TO SCHOOL
Programs help support walking and bicycling by sharing information, promoting comfort, and creating a vibrant active transportation culture. Communities that have the highest rates of walking and bicycling consistently use a “5Es” approach, with four types of programs complementing Engineering improvements:
The City participates in the Sonoma County Safe Routes to School (SRTS) program, led by the Sonoma County Bicycle Coalition with support from Sonoma County Department of Health Services and SCTA. Many schools participate in program activities, including in-school bicycling and walking safety education, student and family bicycle rodeos, and Walk and Bike to School Days. The SRTS program also includes evaluation components to measure changes in walking and bicycling rates along with program activity effectiveness. Over the last four years, the City and its partners have conducted walking audits or other program activities at 20 elementary and middle schools in Santa Rosa. During the 2017-2018 school year, all five public high schools were reviewed for bicycle and pedestrian access. The City has implemented several pedestrian and bicycle enhancements at the various schools based on the results of these assessments.
Education Providing safety education for people walking, riding bicycles, and driving, as well as education about the environmental and health benefits of active transportation and the facilities available in the community Encouragement Promoting bicycling and walking as fun and efficient modes of transportation and recreation Enforcement Enforcing laws and good behavior for people walking, bicycling, and driving Evaluation Monitoring the success of the effort through counts, surveys, and review of relevant data The City and its partners have been carrying out the following programs in recent years to support bicycling and walking.
50
EMERGENCY RIDE HOME
Bike to Work Day, celebrated in May each year, is a day when people are encouraged to try bicycling to work. Coordinated by the Sonoma County Bicycle Coalition, civic organizations and local business partners host “energizer stations” along popular commute routes to offer snacks and other giveaways to people who participate. In 2017, nearly 1,000 people visited 12 energizer stations in Santa Rosa as part of Bike to Work Day.
The SCTA recently launched a program offering employees anywhere in the county a free ride home to encourage active transportation commuting in addition to carpooling and transit. If a family emergency arises, the carpool driver must leave unexpectedly, or your bike is stolen, for example, you can take a taxi or app-based rideshare home and be reimbursed up to $125.
03 Santa Rosa Today
BIKE TO WORK DAY
TARGETED ENFORCEMENT FREE RIDE TRIP REDUCTION INCENTIVE PROGRAM The City sponsors a “Free Ride – Trip Reduction Incentive Program” for employers in the city to encourage commute alternatives such as bicycling, walking, transit, and carpooling. Incentives include discounted transit passes and a chance to win a $50 gift card. Approximately 1,532 people are signed up for the program. To date, more than 263,536 one-way bicycle commute trips and more than 74,150 one-way walking commute trips have been recorded. There is also a guaranteed ride home component, where a registered participant may get a free taxi ride home in an emergency. This reduces the need to commute by car because a person is worried they might need to pick up a sick child from school or for some other emergency.
The Santa Rosa Police Department conducts targeted enforcement to address behaviors that contribute to bicycle or pedestrian crashes on an ongoing basis, as funding and resources are available. The Department recently secured a grant from the Office of Traffic Safety to fund education and enforcement activities, including: • Traffic safety education presentations on bicycle and pedestrian safety • Additional patrols at intersections with increased incidents of bicycle or pedestrian collisions • Speed limit, red light, and stop sign enforcement Similar targeted enforcement efforts in the past have focused on reducing illegal turns by drivers, failures to yield to pedestrians in crosswalks, and bicyclist helmet laws.
These incentives are part of the City’s Transportation Demand Management (TDM) program and administered by the Santa Rosa Transit Division through a Transportation Fund for Clean Air grant.
51
Collisions
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
03
A total of 9,706 collisions were reported in Santa Rosa during the study period, 6.5% of which involved people bicycling and 5.9% of which involved people walking.
Data on bicycle- and pedestrianrelated collisions can provide insight into locations or roadway features that tend to have higher collision rates, as well as behaviors and other factors that contribute to collisions. These insights will inform the recommendations in this Plan Update 2018 to address challenges facing people bicycling and walking.
BICYCLE-RELATED COLLISIONS During the study period, 628 collisions in Santa Rosa involved a person riding a bicycle. Only four of these were fatal, but nearly 600 resulted in an injury. See Table 3-7 and Figure 3-17.
Collision data involving people walking and bicycling was acquired from the Statewide Integrated Traffic Records System (SWITRS), where the California Highway Patrol and local law enforcement agencies upload collision reports. Ten years of data were evaluated, from September 1, 2007 through August 31, 2017.
Overall during the study period, fewer than one percent of bicycle collisions were fatal. Over seven percent resulted in severe injury, and approximately five percent did not result in any injury. Figure 3-16 shows collision severity for the study period.
Table 3-7: Annual Bicycle Collisions in Santa Rosa YEAR
BICYCLE COLLISIONS
Figure 3-16: Bicycle Collision Severity 0.6%
INJURIES
FATALITIES
2007*
18
17
2008
65
55
2009
76
71
2010
70
67
5.4%
2
2011
64
62
1
2012
75
71
1
2013
59
58
2014
47
44
2015
63
62
2016
56
54
2017*
35
30
Total
628
591
36.8%
52
49.7 %
4 Fatal
*2007 data reflects September 1 through December 31. 2017 data reflects January 1 through August 31.
7.5%
Severe Injury
Complaint of Pain
No Injury
Other Visible Injury
D
RD
S O M A N
N
EL
RD
OAPath Class I Shared-Use Class II Bike Lane Industrial Class III Bike Route Class IIIB Bicycle Boulevard
S LAKE M A FULTON RD TH O
MARLO W RD
PUTNEY
S WRIGHT RD
PETERSON LN
P
R
R OVE
TA
IN G
S LAKE MA TH O
M
DOWD DR
LAND AVE
DR
Y
M
BR U
A
I TO
TE C
ON
M
STONY P O INT RD LISCUM ST
S WRIGHT RD
SH CREEK RD
A
I TO
TE C
53
SU
ON
SH CREEK RD
P
HA RDIES LN RANGE AVE
R OVE
IN G
AIRWAY DR
PETERSON LN
AIRWAY DR
HA RDIES LN RANGE AVE
FULTON RD
RD
RD R
TA
S LAKE MA TH O
FULTON RD
MARLO W RD
LN
ER M
HA RDIES LN EY RANGE AVE
A
PETERSONAIRWAY LN DR
CI
AVE
PL PL BLV D EN ER ED LD A
FA
T O LB
LN
LO W RD
CORBY
A AC
RD
A
TA
N LN
D 3R
E DU TTO N AV RCO P WEST AVE
GA
CI
MOR
ON TT
BLV D EN ED LD A
DU
¹
A AC
MISSI O N
FULTON RD
ST
FIN LE 7T
RINCON
MISSI O N
IS TO
E AV
Urban Growth Boundary
AV E BURBANK
C AL
Current City Limts
BR U
C ST
IS
SANTA ROSA AVE
S D REW
MORG AN
E RD AC
LN
O IN
N
RD IES JE NNINGS EAW V0 L E LE LN STE DR Santa Rosa
Park
OC
E AV
GUERNEVILLE RD
Park W STEELE LN
SEQ
O IN
ND AVE E LA
Shopping Center
W STEELE LN
OC
EV CL
RD
N COFF E Y L
LTZER WA
MARSHMRD E N D
Hospital
PINER RD MARSH RD
PINER RD
UN FO Meldotronic CardioVascular
W 3R D S T
Shopping Center
ND AVE E LA
RD
HOPPER AVE
C PRICE AVE
E RD RRL BADGE EA RD RD FO P OL OC CIDENTAL SE BASTO Meldotronic Santa Rosa BL CardioVascular ITO Junior College EC NT ICO AV E Southwest Branch LAZZINI AV E H O M RINCON AVE C E N AVE PRICE D E FIN LEY AV DTE RD RA BADGE R N CHA DR VEE GIFF EN AV LEO P KW Y D NORTH POI NT BLV AVE N O IT AR EC HE D NT SR O WI YERBA LE Amy's KitchenBU LN E E YUBA DR STEE L N A RD TE RD A C H A N Santa Rosa E V R Junior College D DUP ONT LUDWIG AVE BELLEVUE AVER MILES E PACIF IC AVE M 4 TH 1 2 ST GO M E V E SPENCER A M NT V EL ITA O A M A R OM COLLEGE AVE D ON
EV CL
101Employer Major
L RD ER H IL RK PA
£
VE SAN MIGUE L A
IS N COFF E Y L
LTZER WA
Transit Station
Hospital UN
HOPPER AVEKWY H ARR D
RD L ERD ER H ILAC RK LL PA WA
R S D REW
101 £
BRITTAIN
School
D
S Sa Amy's Kitche Ju COLL E AV CO So HI
LL WA AV E LINK LN ON TT
Major Employer IS
T
DR Santa LEO Junior C
P
DU
R WS D RE IR
SAIN
L
HEARN AV
D SEQU OIA MapC produced January 2019. W COLLEGE AV E Map produced February 2018. W 9TH ST Y KW HALLHRD ARR D
LI
SMART Station DENNIS LN
School
¹¹
N
AN
RIE B
AN
DESTINATIONS + BOUNDARIES
O PO AST
HALL RD L STEE LE LN
MILES 2 1.5
JE NNINGS AV E
T Station D R Transit SAIN
ELAND AVE
0.75
SE B
V EST AVE AWE
1
ST
O INIR
0
RIE B L Station SMART I GUERNEVILLE RD
FO Meld Card
RD W3
N D
AV E BURBANK
0
U W 9TH ST
SEQU OIA C
DESTINATIONS MARSH + RD Urban Growth Boundary W STEELE LN BOUNDARIES MILES
26 - 47
H ARR
OC
CityGrowth Limts Urban Boundary PINER RD
M E
ND AVE E LA
RD
9 - 25
D
E AV TTON DU
3-8
EV CL
N COFF E Y L
LTZER WA
Shopping Center
Current Park City Limts
T
AN
HOPPER AVE
VE SAN MIGUE L A
EV
Hospital
Park
1-2
VE SAN MIGUE L A
101 £
SMART Station
SMART Station DENNIS LN
CL
26 - 47
LINK LN
from September 2007 to August 2017
LI
SAN MIG
N
Hall Station 9 - 25 CityTransit
DENNIS LN
SAIN
BOUNDARIES 3-8 Major Employer
BICYCLE COLLISIONS
E TODD RD
9 - 25
DR
R STAR
T N
D
RIE B
DESTINATIONS + 2017 2007 to August SANTA ROSA BICYCLE & from September BOUNDARIES PEDESTRIAN MASTER PLAN 1-2 School DESTINATIONS + UPDATE 2018
RD
O
BICYCLE COLLISIONS
RANGE AVE
R D
KM
RD
RD
HIA N
DR
BE TH A
S
DR
Trione-Annadel State Park
D
R
Class II Bicycle Lane Class IIB Buffered Bicycle Lane NE B RID Class III Bicycle Route G E Class IIIB Bicycle Boulevard R Medium D Density Class IV Separated Bikeway OAK Study ROSA BICYCLE & TR L
PY T
M
SH CREEK RD
A
I TO
TE C
M
Y
H
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
26 - 47
PROPOSED
Class I Shared-Use Path 12 LAND USE INTENSITY Ã
LD
DOWD DR
A
SANTA LE High Density AF PEDESTRIAN MASTER PLAN EXISTING UPDATE 2018 Commercial + High Mix Use
E AV
MOORLAND AVE
Spring Lake Park
F IE ER M
ST
N
STANDISH AVE
S
STO
SU
BICYCLE SAFETY D
RD
STONY P O INT RD LISCUM ST
LA
IN G TA
ON
BR U
DR
P
R
R OVE
S LAKE MA TH O
AIRWAY DR
HA RDIES LN RANGE AVE
MARLO W RD
LO
BICYCLE Low Density SAFETY
M
A UP
PUTNEY
RD
FULTON RD
GA
PETERSON LN
IS TO
LN
R D
LL
S WRIGHT RD
C AL
A
ITA
Taylor Mountain Regional Park
TODD RD
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
A RD
CI
ME L
EY
HI
AVE
B U RT
3 - 82017 from September 2007 to August
26 - 47
N
DR
EE KS ID EV H E R CH A A T
VA LL
1-2 BICYCLE COLLISIONS
9 - 25
NORTHEAST E
C
L YU
N NE TT
BICYCLE INVOLVED COLLISIONS from September 2007 to August 2017
3-8
YERBA BU
DUP ONT
S LN VE DA
A
NGS RD PR I KAWANA S YOLANDA AVE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN BICYCLE COLLISIONS UPDATE 2018
1-2
BIKEWAYS
A AC
FARM ER
E AV
OO KW
BE
VE TON A AS
CORBY
Figure 3-17
RECOMMENDED FIGURE 3-2
CR
BICYCLE SAFETY BICYCLE SAFETY
D BLV ITO
ER M O TG N VE MO AA OM SON
ST
OO
T ES
E AV E
UM AL PE T
E DU TTO N AV RCO P WEST AVE
AV E BURBANK
ARN AVE
Amy's Kitchen
BELLEVUE AVE
¹
BR
S
LN
EA RL E ST
DR LEO
HE
T O LB
ST
BRITTAIN
E GIFF EN AV P KW Y NORTH POI NT
ST ST ST 7TH 5T H D 2N ST ST D 3R 1ST
L MA P
4 TH
TA
MORG AN
IR
AV E LINK LN ON TT
COLLEGE AVE
W 3R D S T
RD RD P OL OC CIDENTAL SE BASTO Santa Rosa Junior College Southwest Branch LAZZINI AV E
LUDWIG AVE
E RD AC
E AV
DU
SPENCER AVE
W COLLEGE AV E W 9TH ST
YUBA DR
RD
PACIF IC AVE
N
JE NNINGS AV E
E FIN LEY AV
IS
EC NT O
PL PL BLV D MISSI O N EN ER ED LD A
O IN
W LE STEE LE LN
GUERNEVILLE RD
HALL RD
ICO AV E CH PRICE AVE
ATE RD CHA N VE
Santa Rosa Junior College
DR
SEQU OIA C
N D
RINCON AVE
BADGE R RD
OC
W STEELE LN
M E
ND AVE E LA
RD
PINER RD MARSH RD
UN FO
Meldotronic CardioVascular EV CL
N COFF E Y L
LTZER WA
SAN MIGUE L
E AV
L RD ER H IL RK PA
HOPPER AVE
IS
101 £
DENNIS LN
D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LL WA
R S D REW
H ARR
KWY
M
T
AN
SAIN
LI
RD
RIE B
PRIORITY DEVELOPMENT AREAS
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
As shown in Figure 3-18, no bicyclists under 10 years old were involved in collisions during the study period. Bicyclists between 10 and 54 years old are overrepresented among collision victims compared to the general population, with 10-19 showing the largest discrepancy.
The majority of the bicycle-involved collisions during the study period were attributed to three violations that lend insight into behaviors that contribute to collisions:
Nearly 80% of collisions occurred during daylight hours, and an additional 15% occurred at night where street lights were present and functioning.
• Wrong side of the road (24%)
Examining only those bicycle collisions that occurred within 500 feet of a school, 74 of 146 collisions occurred during school hours between 7 am and 4 pm, and 19 of those school-hour collisions involved bicyclists under 18 years old. Figure 3-18: Collisions by Bicyclist Age Range
• Improper turning (18%) When evaluating the locations where bicycle-involved collisions are more likely to occur, six locations approach an average of one collision every two years, as shown in Table 3-8.
Table 3-8: Top Bicycle Collision Intersections LOCATION
AGE
< 10
Corby Ave & Hearn Ave
BICYCLE-INVOLVED COLLISIONS 12
10-19
College Ave & Mendocino Ave
8
20-34
Mendocino Ave & Pacific Ave
6
Sonoma Ave & South E St
6
1st St & Santa Rosa Ave
5
3rd St & Santa Rosa Ave
5
35-54 55-74 75+ 0%
5%
10%
15% 20% 25% 30% 35%
Bicyclist Collision Victims Santa Rosa Population
54
• Violating the right of way of a driver (25%)
Pedestrian-Related Collisions During the study period, 573 collisions in Santa Rosa involved a person walking. Thirty-three of these were fatal collisions, and over 500 resulted in an injury. See Table 3-9 and Figure 3-21.
03 Santa Rosa Today
Overall during the study period, just under six percent of pedestrian collisions were fatal. Nearly 15% resulted in severe injury, and only about three percent did not result in any injury. Figure 3-19 shows collision severity for the study period.
Table 3-9: Annual Pedestrian Collisions YEAR 2007*
PEDESTRIAN COLLISIONS 23
INJURIES
Figure 3-19: Pedestrian Collision Severity
FATALITIES
2.6%
5.8%
22
2008
45
43
1
2009
54
49
4
2010
49
46
1
2011
66
56
8
2012
74
69
4
2013
51
47
3
2014
48
45
3
2015
49
44
4
2016
69
66
4
2017*
45
41
1
Total
573
528
33
*2007 data reflects September 1 through December 31. 2017 data reflects January 1 through August 31.
39.1%
14.8%
37.7 % Fatal
Severe Injury
Complaint of Pain
No Injury
Other Visible Injury
55
As shown in Figure 3-20, pedestrians between 10 and 54 years old are overrepresented among collision victims compared to the general population.
Examining only those pedestrian collisions that occurred within 500 feet of a school, 49 of 138 collisions occurred during school hours between 7 am and 4 pm, and 16 of those school-hour collisions involved pedestrians under 18 years old. Over 80% of the pedestrian-involved collisions during the study period were attributed to two violations that lend insight into behaviors that contribute to collisions: • Violating the right-of-way of a pedestrian (44%) • Pedestrian violation (37%) When evaluating the locations where pedestrian-involved collisions are more likely to occur, two locations average more than one collision every two years, as shown in Table 3-10.
56
< 10
Just under 60% of collisions occurred during daylight hours, and an additional 38% occurred at night where street lights were present and functioning.
10-19
AGE
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Figure 3-20: Collisions by Pedestrian Age Range
20-34 35-54 55-74 75+ 0%
5%
10%
15% 20% 25% 30% 35%
Pedestrian Collision Victims Santa Rosa Population
Table 3-10: Top Pedestrian Collision Intersections LOCATION 3rd St & D St McConnell Ave & Mendocino Ave
PEDESTRIAN-INVOLVED COLLISIONS 10 7
D
RD
S R D
LO
Y
RD
Class II Bicycle Lane Class IIB Buffered Bicycle Lane NE B RID Class III Bicycle Route G E Class IIIB Bicycle Boulevard R Medium D Density Class IV Separated Bikeway StudyBICYCLE OAK SANTA ROSA N
EL
TR L
O
T N
SMART StationDENNIS LN 18 - 47
RANGE AVE
AIRWAY DR
HA RDIES LN RANGE AVE
FULTON RD
MARLO W RD
PUTNEY
RD
P
R
R OVE
IN G
TA
S LAKE MA TH O
P
A
SH CREEK RD S WRIGHT RD
BR U
I TO
TE C
ON
M
A
M
R OVE
IN G
AIRWAY DR
I TO
TE C
Y
ER M
FA
T O LB
LN
SU
A
TA
ON
DR
RD R
TA
S LAKE MA TH O
HA RDIES LN RANGE AVE
LN
MARLO W RD
A
57
CI
HA RDIES LN EY RANGE AVE
CI
PL PL BLV D EN ER ED LD A
FULTON RD
RD
A AC
GA
MISSI O N
IS TO
A AC
BLV D EN ED LD A
¹
RCO P WEST AVE
AV E BURBANK
C AL
Urban Growth Boundary MISSI O N
PETERSONAIRWAY LN DR
E RD AC
W 3R D RINCON ST
LN
Park
Current City Limts
MOR
LO W RD
LL WA
BRITTAIN
Hospital UN
E AV
0
ON TT
Santa Rosa
School
O IN
D SR JE NNINGS EA VIE W L E LN E L STE DR
DU
Park
OC
GUERNEVILLE RD
N
SEQ
E AV
Shopping Center W STEELE LN
ND AVE E LA
O IN
ND AVE E LA
OC
EV CL
W STEELE LN
ICO CH PRICE A
R RD BADGE RD RD FO P OL OC CIDENTAL SE BASTO Meldotronic Santa Rosa BL CardioVascular Junior College ITO EC ICO AV E Southwest Branch LAZZINI AV E ONT H M RINCON AVE C E N PRICE AVE D E FIN LEY AV DTE RD R RA BADGE CHA N DR E FF EN AVE VGI LEO NT P KW Y NORTHLPOI D B V AVE N O IT AR HE EC D NT SR O A WI YERBAmy's BU Kitche LE LN E YUBA DR E STEE L N A RD ATE RD C H A N Santa Rosa VE R Junior College D LUDWIG AVE DUP ONT BELLEVUE AVE MILES ER PACIF IC AVE M 1 24 TH ST GO M E T V SPENCER A M E N V EL ITA MO AA R OM COLLEGE AVE D ON
EV CL
RD
MARSH RD M E N D
Amy's Kitche
W COLLEGE AV E W 9TH ST
Shopping Center
L RD ER H IL RK PA
IS N COFF E Y L
LTZER WA
RD
N COFF E Y L
LTZER WA
UN FO Meldotronic CardioVascular
HEARN AV
JE NNINGS AV E
RD L ERD ER H ILAC RK LL PA WA
HOPPER AVEKWY H ARR D
School PINER RD Hospital
101
IS
R S D REW
£
101Major Employer £
HOPPER AVE
IR
R S D REW
D
DR LEO
AV E LINK LN ON TT
D
KWY H ARRHALL RD D
SMART DENNIS Station LN
PINER RD
¹¹
HALL STE
DU
Transit Station DR
AN
T
L
N
PETERSON LN
0.75
Major Employer
AN
S
VE SAN MIGUE L A
N LN
1
SMART Station GUERNEVILLE RD
LI
Map produced February 2018.
IEB L+ I DESTINATIONS BOUNDARIESAINT
Transit Station
FULTON RD
0 RIE B
E
O PO AST
SEQU O
AV E BURBANK
0
MILES 2 1.5
OIA C Map SEQU produced January 2019.
MARSH RD
SE B
DESTINATIONS MARSH + RD Urban Growth Boundary W STEELE LN BOUNDARIES MILES
SAIN
VE SAN MIGUE L A
T RD S W3 M
AVE ST AVE NDWE E LA
CityGrowth Limts Urban Boundary PINER RD
W 9TH ST
EV CL
VE SAN MIGUE L A
RD
SANTA ROSA AVE
Shopping Center
18 - 47
DENNIS LN
N COFF E Y L
3-7
Current Park City Limts
LTZER WA
1-2
R
8 - 17
HOPPER AVE
Park
8 - 17
1-2 PEDESTRIAN COLLISIONS
101 £
SMART Station
BR U SH CR EEK RD STONY P O INT RD LISCUM ST M
C ST
from September 2007 to August 2017
E AV TTON DU
Hall Station 8City - 17Transit
LINK LN
PEDESTRIAN COLLISIONS
E TODD RD
3 - 7 2017 from September 2007 to August
ELAND AVE
BOUNDARIES 3 - 7 Major Employer
Hospital
SANTA ROSA BICYCLE
S
N
D R STAR
EV
from September 2007 to+August 2017 DESTINATIONS SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN BOUNDARIES 1-2 School DESTINATIONS + UPDATE 2018
ST
CL
PEDESTRIAN COLLISIONS DR
RD
B U RT
RD
HIA N
OAPath Class I Shared-Use Class II Bike Lane Industrial Class III Bike Route Class IIIB Bicycle Boulevard
R D
KM
D
RD
S
DR
DR
D
EY
VE DA
BE TH A
LE A
F & PEDESTRIAN MASTER PLAN EXISTING UPDATE 2018 Commercial + High Mix Use
Trione-Annadel State Park
LL
DOWD DR
LD
E AV
OO KW
HI
MOORLAND AVE
F IE ER M
PEDESTRIAN Low Density SAFETY
A N
STO
SU
Spring Lake Park
Class I Shared-Use Path 12 LAND USE INTENSITY Ã
High Density
R
N
STANDISH AVE
H
PEDESTRIAN SAFETY
A
STONY P O INT RD LISCUM ST
PROPOSED
A
Taylor Mountain Regional Park
TODD RD
18 - 47
S
PY T
BR U
O
M
SH CREEK RD
A
I TO
TE C ON
M
IN G TA
M
LA
P
R
R OVE
S LAKE MA TH O
AIRWAY DR
HA RDIES LN RANGE AVE
FULTON RD
MARLO W RD
LN
PUTNEY
A
ITA
M
EE KS ID EV H E R CH A A T
VA LL
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
A RD
CI
PETERSON LN
RD
N
DR
ME L
A UP
S LN
OO
N NE TT
NGS RD PR I KAWANA S YOLANDA AVE
AVE
S WRIGHT RD
GA
NORTHEAST E
C
L YU
E AV
BR
T ES
BE
VE TON A AS
CORBY
Amy's Kitchen
UM AL PE T
E DU TTO N AV RCO P WEST AVE
AV E BURBANK
RN AVE EA
E AV E
PEDESTRIAN INVOLVED & PEDESTRIAN MASTER PLAN PEDESTRIAN COLLISIONS UPDATE 2018 COLLISIONS from September 2007 to August 2017
18 - 47
IS TO
DUP ONT
CR
Figure 3-21
8 - 17
BIKEWAYS
YERBA BU
PEDESTRIAN SAFETY PEDESTRIAN SANTA ROSA BICYCLE PEDESTRIAN MASTER PLAN SAFETY &UPDATE 2018
3-7
C AL
D BLV ITO
ER M O TG N VE MO AA OM SON
ST FARM ER
T O LB
S
LN
H
L MA P
EA RL E ST
4 TH
TA
ST
BRITTAIN
ST ST ST 7TH 5T H D 2N ST ST D 3R 1ST
DR LEO
E GIFF EN AV P KW Y NORTH POI NT
1-2
RECOMMENDED FIGURE 3-2
A AC
E AV
MORG AN
IR
AV E LINK LN ON TT
COLLEGE AVE
BELLEVUE AVE
¹
E RD AC
O IN
DU
SPENCER AVE
W 3R D S T
RD RD P OL OC CIDENTAL SE BASTO Santa Rosa Junior College Southwest Branch LAZZINI AV E
LUDWIG AVE
EC NT O
PL PL BLV D MISSI O N EN ER ED LD A
OC
N
PACIF IC AVE
W COLLEGE AV E W 9TH ST
YUBA DR
RD
Santa Rosa Junior College
JE NNINGS AV E
E FIN LEY AV
IS
RINCON AVE
BADGE R RD
ATE RD CHA N VE
GUERNEVILLE RD
HALL RD
ICO AV E CH PRICE AVE
N D
W LE STEE LE LN
W STEELE LN
DR
SEQU OIA C
M E
ND AVE E LA
RD
PINER RD MARSH RD
UN FO
Meldotronic CardioVascular EV CL
N COFF E Y L
LTZER WA
SAN MIGUE L
E AV
L RD ER H IL RK PA
HOPPER AVE
IS
101 £
DENNIS LN
D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LL WA
R S D REW
H ARR
KWY
M
T
DR
SAIN
AN
N
LI
RD
RIE B
PRIORITY DEVELOPMENT AREAS
High-Injury Network
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
03
58
To identify street segments in the City where serious collisions are occurring at a greater frequency, a high-injury network was developed based on the number and proximity of collisions that resulted either in death or severe injury to a person bicycling or walking. The Cityâ&#x20AC;&#x2122;s street network was evaluated for segments where three or more fatal or severe injury collisions occurred that met a threshold for concentration. For bicycle-involved collisions, this threshold was set at 0.5 fatal or severe-injury collisions per 1,000 feet. For pedestrian-involved collisions, the threshold is one fatal or severeinjury collision per 1,000 feet. These high-injury network segments are listed in Table 3-11 and Table 3-12, and mapped in Figure 3-22.
Table 3-11: High Injury Bicycle Corridors FATAL & SEVERE INJURY COLLISIONS
COLLISIONS /1000 FT.
START/END
Mendocino Ave
Elliott Ave to 10th St
5
1.0
Santa Rosa Ave
Petaluma Hill Rd to Colgan Ave
3
0.9
Guerneville Rd/ Steele Ln
Dutton Ave to Rowe Dr
5
0.8
Sebastopol Rd
Mattson Rd to Dutton Ave
6
0.6
Stony Point Rd
College Ave to Campbell Dr
5
0.5
Montgomery Dr
Farmers Ln to Mission Blvd
3
0.5
03 Santa Rosa Today
STREET
Table 3-11: High Injury Pedestrian Corridors FATAL & SEVERE INJURY COLLISIONS
COLLISIONS /1000 FT.
STREET
START/END
Santa Rosa Ave
Charles St to Mill St
3
4.7
3rd St
Gate Way to Stony Point Rd
3
2.6
Santa Rosa Ave
Court Rd to Bellevue Ave
4
2.2
Piner Rd
Bay Village Cir to Coffey Ln
3
2.1
Mendocino Ave
McConnell Ave to 4th St
9
1.6
Farmers Ln
Long Dr to Sonoma Ave
3
1.4
Guerneville Rd/ Steele Ln
Coffey Ln to Mendocino Ave
8
1.3
Stony Point Rd
Glenbrook Dr to Sebastopol Rd
5
1.3
4th St
Mendocino Ave to College Ave
4
1.2
3rd St
Hwy 101 to E St
3
1.2
Range Ave
Bicentennial Way to Guerneville Rd
5
1.1
College Ave
Link Ln to Mendocino Ave
5
1.0
59
D
RD
S O R D
LO
Y
C
RD
PY T
RANGE AVE
HA RDIES LN RANGE AVE
AIRWAY DR
MARLO W RD
PUTNEY
SU
DR
Y
DR
STONY P O INT RD LISCUM ST
M
DOWD DR
HIA N
FULTON RD
M
B U SH CR SH CRREEK RD EEK RD S WRIGHT RD
TE C ON TE CI I TO TO A A
IN R OVE G R OVE P P
IN G
M
ON
LN
IES LN RANGE AVE RANGE AVE
PETERSON LN
RD
RD R
R
TA
TA
S LAKE S LAKE MA MA TH O TH O
AIRWAYAIRWAY DR DR
HA RDIESHA LN RD
A
MARLO WMA RLO RD
W RD
FULTONFULTON RD RD
RCO P WEST AVE
CI
M
L
M
TT
ERSON LN PETERSON LN
ND AVE ST AVE E LA WE
LN
A AC
¹
AV E BURBANK
Urban Growth Boundary BR U
C ST
MOORLAND AVE
ELAND AVE
SANTA ROSA AVE
EV
AV E LINK LN ON TT
Current City Limts A
0
TA
DU
SantaPACIF Rosa IC AVE Junior College SPENCER AVE
W 3R D S T
RD RD GA GA IS TO L IS TO CA
Park
CI
E AV
D
L STEE LE LN
LN
Shopping Center
A AC
RD
RINCON AVE
RD ENTAL R D P OL OC CID R RD BADGE SE BASTO Santa Rosa AVE RINCON Junior College -D BLV ICO AV E SouthwestOBranch LAZZINI AV E IT D BADGE CH EC R R NT PRICE AVE E O YERBA BU FIN LEY AV E DR LV D E N OB GIFF EN AV LEOA RD C IT ATE RD E K W P N CHA Y NT NORTH POI NT VE O RA B N AVE YTERB D U AR DUP ON E HE N A RD ATE RD CHA N Amy's Kitche VE YUBA DR R D ME DUP ONT L IT A R D LUDWIG AVE L BELLEVUE AVE MILES ME L IT A 1 2 R D ER M LO 4 TH O ST TG M VE ON PL PL BLV PL L D MISSI O NMISSID OENNBLV N P ER D E ER ED LD E LD A A
O IN
IS
E RD RD CE AC LL A WA
L RD ER H IL KER H ILL RD RK R PA PA
IS
OC
E AV
W LE STEE LE LN
EV CL
Hospital
ICO CH PRICE A
C AL
KWY
DR LEO
Amy's Kitche
BRITTAIN
School
D UN FO Meldotronic CardioVascular UN FO Meldotronic CardioVascular
O IN
N D
HALL RD
KWY
SEQU O
HEARN AV
JE NNINGS AV E
LL WA
S DR SS DR I REW REW
D
OC
Park N
JE NNINGS AV E
¹¹
E
L
HALL STE
W COLLEGE AV E W 9TH ST
Major Employer
Map produced February 2018.
R Santa Rosa IS Shopping Center EW Junior College
W STEELE LN GUERNEVILLE RD
O PO AST
DU
IR
D
AN
Hospital
W STEELE LN
MARSH RD
M E
SE B
N
AN
PINER RD
School
T RD S W3 M
AV E BURBANK
OIA C Map SEQU produced January 2019.
Major Employer M E ND AVE ND AVE E LA LA E VE CL
RD
MARSH RD
RD
Transit Station DR
£ Transit Station 101 £ EV CL
LN N COFF E YCOFF EY L
LTZER ALTZER RD WA W
PINER RD
0.75
LI
SMART Station H ARR 101
N D
1
0
MILES 2 1.5
SMART Station GUERNEVILLE RD
DESTINATIONS + T SAIN BOUNDARIES HARDR
HOPPER AVE
E AV TTON DU
VE SAN MIGUE L A
W 9TH ST
DESTINATIONS MARSH + RD Urban Growth Boundary W STEELE LN BOUNDARIES MILES
RIE T SAINB LI
VE SAN MIGUE L A
N COFF E Y L
Shopping Center
CityGrowth Limts Urban Boundary PINER RD
RIE B
HOPPER AVE
HOPPER AVE
Current Park City Limts
0
VE SAN MIGUE L A
101 £
LINK LN
Hospital
Park
Pedestrian
DENNIS LN
N
SMART Station
Bicycle and Pedestrian
DENNIS LN
S
Bicycle CityTransit Hall Station Pedestrian SMART StationDENNIS LN
Bicycle
CL
DR
School DESTINATIONS + Bicycle and Pedestrian BOUNDARIES Major Employer
LTZER WA
E TODD RD
DR
T N
RD
OAPath Class I Shared-Use Class II Bike Lane Industrial Class III Bike Route Class IIIB Bicycle Boulevard O
BE TH A
R D
S
KM
RD
STANDISH AVE
RD
DR
D
LL
STONY P O INT RD LISCUM ST
LD
E AV
As determined by the rate of roadway collisions resulting DESTINATIONS + in severeBOUNDARIES injury between 2007 and 2017
EXISTING Commercial + High Mix Use
As determined by the rate of roadway collisions resulting in severe injury between 2007 and 2017
N
TODD RD
LE AF
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
D
HI R STAR
TR L
& PEDESTRIAN MASTER High Density PLAN UPDATE 2018
COLLISION CORRIDORS
D
EL
COLLISION CORRIDORS
R
ST
N
STO
F IE ER M
Spring Lake Park
NETWORK Low Density
HIGH INJURY NETWORK
VA LL
NGS RD
Class II Bicycle Lane Class IIB Buffered Bicycle Lane NE B RID Class III Bicycle Route G E Class IIIB Bicycle Boulevard R Medium D Density Class BICYCLE IV Separated Bikeway SANTA ROSA OAK Study
A N
Taylor Mountain Regional Park
As determined by the rate of COLLISION CORRIDORS roadway collisions resulting in As determined by the rate of roadway severe injury between As determined by the rate of collisions resulting in severe injury between 2007 and 2017 roadway collisions resulting in September 2007 and August 2017. severe injury between 2007 andBicycle 2017 and Pedestrian
Pedestrian Bicycle
H
PROPOSED
Class I Shared-Use Path 12 LAND USE INTENSITY HIGH INJURY Ã
Trione-Annadel State Park
EY
VE DA
NE TT
HIGH INJURY NETWORK COLLISION CORRIDORS
Bicycle and Pedestrian Bicycle
A
M
EE KS ID EV H E R CH A A T
A
B U RT
S
SU
OO KW
BE N
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
M
M
SH CREEK RD
A
I TO
TE C
BR U
ITA
LA
IN G
ON
A RD
DR
P
R
R OVE
S LAKE MA TH O
AIRWAY DR
TA
M
LN
HA RDIES LN RANGE AVE
A
MARLO W RD
N
DR
ME L
A UP
PUTNEY
RD
FULTON RD
GA
NORTHEAST E
CI
PETERSON LN
IS TO
YERBA B U
L YU
S LN
OO
E AV E
UM AL PE T
S WRIGHT RD
C AL
BIKEWAYS
CR
& PEDESTRIAN MASTER SANTA ROSA BICYCLE PLAN UPDATE 2018 Figure 3-21 & PEDESTRIAN MASTER PLAN UPDATE 2018
Pedestrian
D BLV ITO
A AC
FARM ER
E AV BR
T ES
L MA P
PR I KAWANA S YOLANDA AVE
AVE
HIGH INJURY NETWORK HIGH INJURY NETWORK SANTA ROSA BICYCLE
60
RECOMMENDED FIGURE 3-2
DUP ONT
ER M O TG N VE MO AA OM SON
ST
VE TON A AS
CORBY
E DU TTO N AV RCO P WEST AVE
AV E BURBANK
ARN AVE
Amy's Kitchen
BELLEVUE AVE
¹
ST ST ST 7TH 5T H D 2N ST ST D 3R 1ST
S
LN
DR LEO
HE
T O LB
ST
BRITTAIN
E GIFF EN AV P KW Y NORTH POI NT
COLLEGE AVE
EA RL E ST
4 TH
TA
MORG AN
AV E LINK LN ON TT
IR
W 3R D S T
RD RD P OL OC CIDENTAL SE BASTO Santa Rosa Junior College Southwest Branch LAZZINI AV E
LUDWIG AVE
E RD AC
E AV
DU
SPENCER AVE
W COLLEGE AV E W 9TH ST
YUBA DR
RD
PACIF IC AVE
N
JE NNINGS AV E
E FIN LEY AV
IS
EC NT O
PL PL BLV D MISSI O N EN ER ED LD A
O IN
W LE STEE LE LN
GUERNEVILLE RD
HALL RD
ICO AV E CH PRICE AVE
ATE RD CHA N VE
Santa Rosa Junior College
DR
SEQU OIA C
N D
RINCON AVE
BADGE R RD
OC
W STEELE LN
M E
ND AVE E LA
RD
PINER RD MARSH RD
UN FO
Meldotronic CardioVascular EV CL
N COFF E Y L
LTZER WA
SAN MIGUE L
E AV
L RD ER H IL RK PA
HOPPER AVE
IS
101 £
DENNIS LN
D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LL WA
R S D REW
H ARR
KWY
M
T
AN
SAIN
LI
RD
RIE B
PRIORITY DEVELOPMENT AREAS
USER EXPERIENCE & PERCEIVED COMFORT
03 Santa Rosa Today
Traffic stress is the perceived sense of danger associated with riding in or adjacent to vehicle traffic. Studies have shown that traffic stress is one of the greatest deterrents to bicycling. The less stressful—and therefore more comfortable—a bicycle facility is, the wider its appeal to a broader segment of the population. A bicycle network will attract a large portion of the population if it is designed to reduce stress associated with potential motor vehicle conflicts and if it connects people bicycling with where they want to go. Bikeways are considered low stress if they involve very little traffic interaction by nature of the roadway’s vehicle speeds and volumes (e.g., a shared, low-traffic neighborhood street) or if greater degrees of physical separation are placed between the bikeway and traffic lane on roadways with higher traffic volumes and speeds (e.g., a separated bikeway on a major street).
61
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
Types of Bicyclists
Bicycle Level of Traffic Stress
Research indicates that the majority of people in the United States (56-73%) would bicycle if dedicated bicycle facilities were provided. However, only a small percentage of Americans (1-3%) are willing to ride if no facilities are provided.1 This research into how people perceive bicycling as a transportation choice has indicated that most people fall into one of four categories, illustrated below.
To better meet the needs of the “Interested, But Concerned” cyclist, planners developed the Bicycle Level of Traffic Stress (Bicycle LTS) analysis as an objective, data-driven evaluation model to help identify streets with high levels of traffic stress. The analysis uses roadway network data (i.e. posted speed limit, street width, number of travel lanes, intersection conditions, presence and character of bikeway facilities, and land use context) to determine bicyclist comfort level.
1-3%
STRONG & FEARLESS
Very comfortable and willing to ride on streets without designated facilities
5-10%
ENTHUSIASTIC & CONFIDENT
Very comfortable, but prefer streets with designated bike lanes
50-60%
INTERESTED, BUT CONCERNED
Comfortable on trails and streets with buffered or separated bike lanes and interested in biking more
30% NOT CURRENTLY INTERESTED
Physically unable or very uncomfortable even on streets with separated bike lanes
1 Roger Geller, City of Portland Bureau of Transportation. Four Types of Cyclists. http://www.portlandonline.com/ transportation/ index.cfm?&a=237507. 2009; 2 Dill, J., McNeil, N. Four Types of Cyclists? Testing a Typology to Better Understand Bicycling Behavior and Potential. 2012.
62
The combination of these criteria creates four levels of traffic stress for the existing roadway network. The lower the number, the lower the stress and the higher the level of comfort for people on bicycles. LTS 1 & 2 roads are typically the roadways that appeal to the “Interested, but Concerned” cyclists.
LEVEL 1: ALL AGES AND ABILITIES Level 1 includes off-street shared use paths and some very low-stress roadways suitable for all ages and abilities. Level 1 makes up six percent of the entire network in Santa Rosa. The Joe Rodota Trail is an example of a Level 1 facility.
LEVEL 2: AVERAGE ADULT
Level 2 makes up 68% of the entire network in Santa Rosa. Humboldt Street from College Ave to Lewis Road is an example of a Level 2 street.
03 Santa Rosa Today
Level 2 includes roadways that are comfortable enough that the mainstream adult population would ride a bicycle on them.
LEVEL 3: CONFIDENT ADULT Level 3 includes arterial roadways with bicycle facilities that are probably only comfortable for an experienced, confident bicyclist. Level 3 makes up 11% of the entire roadway network in Santa Rosa and 43% of arterial streets. Yulupa Avenue from Creekside Road to Montgomery Drive is an example of a Level 3 street. Note that having standard Class II bicycle lanes does not outweigh other factors such as traffic volume and speeds for this road to be considered low-stress.
LEVEL 4: FEARLESS ADULT Level 4 includes arterial roadways with no bicycle facilities ridden only by strong or fearless bicyclists. Level 4 makes up 15% of the entire roadway network and 57% of arterial streets. Santa Rosa Avenue from Maple Ave to W Third Street is an example of a Level 4 street
63
RESULTS
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
03
The level of traffic stress scores shown in Figure 3-24 illustrate the low stress connections and gaps throughout Santa Rosa. The Bicycle LTS results map approximates the user experience for the majority of Santa Rosa residents, however people may have differing opinions of traffic stress depending on their own experiences. While a majority of Santa Rosa’s entire network scored a Level 1 and 2 (74% total), these facilities are minor local roads or off-street paths typically surrounded by higher stress arterials where most average adults would not feel comfortable riding. When only arterial roadways are examined, which serve as the direct connections to most destinations, nearly 57% are Level 4. See Figure 3-23. Multi-use trails offer a low stress route that helps cut across these barriers, however the majority of residents may not feel comfortable bicycling outside their immediate neighborhood using local streets. This means that getting from residential areas to major destinations may not be possible given most people’s tolerance for mixing with traffic—even on streets that have bicycle lanes.
Figure 3-23: Bicyclist Level of Traffic Stress on All Roads vs Arterials
Level 1: All Ages & Abilities
Average Adult
Level 3: Confident Adult
Fearless Adult
ALL ROADS
DESTINATIONS + BOUNDARIES 14.7% 6%
11.1
%
City Hall SMART Station Park
68.2 City Limts
Urban Growth Boundary
0
1
MILES 2
ARTERIALS ONLY Map produced February 2018.
56.9% 43.1%
64
%
¹
PRIORITY DEVELOPMENT AREAS Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ar yf m
Pk wy
Dr
ro
n
Mo
Class II Bicycle Lane IIB Buffered Bicycle Lane LowClass Density ne Class III Bicycle Route Br id ge Class IIIB Bicycle Boulevard Rd SANTA ROSA BICYCLE Medium Density Class IV Separated Bikeway & PEDESTRIAN MASTER Study
mm
Rd
h Cre ek Rd
livos
Bru s
Lo s O Farm ers Ln
TRAFFIC STRESS
Su f ie er ld Rd
High Density 2018 PLAN UPDATE
San Miguel Ave Current Park City Limts
Ba e rn sR n ey L
SE B
CityGrowth Limts Piner Rd Urban Boundary
Sk
ar yf
Dr
El C
a
1
om on
a
y Hw n
Carr Ave
0
Mo
om tg
yD er
r
MILES 2
Rd Sto ny Point
St F ran c is R d
livos Lo s O
He
oldt St
ocino Ave
Park
S Wright Rd
Rd
Range Ave
Marlow Rd
e
Av Santa Rosa Junior College m xe
Rd
Rd te
Dr
an a
ia
Urban Growth Boundary
SMART Station Ch
n ic Be
Steele Ln
Shopping Center
Calistoga Rd
City Limts
y
n ey L
Piner Rd
Coff
San Miguel Ave
lvd cit o B nte Mo y Pkw int No rthpo r nD yo n Ca
o er
F
o
Park
l ca
Dutton Ave
d
w dH
un ta in g
ro
ve
opol Rd College Sebast Santa Rosa Junior
e Burbank Av
Pk wy
Occident al Rd
Es
Hospital oo
sR
Fulton Rd
SMART Station
m
dw ld R e
e rn
Hopper Ave
W 9th St
Shopping Center
O
Ba
Level 2 Average Adult
Amy's Kitche
W 3rd St
Major Employer Transit Station
DR LEO
College Ave
Hospital
DESTINATIONS + BOUNDARIES
WEST AVE
AV E BURBANK
Transit Station Map produced February 2018.
L
HEARN AV
Guerneville Rd
Map produced January 2019.W
ST
O PO AST
¹¹
Urban Growth Boundary DESTINATIONS + MILES Steele Ln MILES BOUNDARIES 1 0.75 2 0 1.5
Major Employer
Level 1 All Ages and Abilities
RANGE AVE
RD W3
Coff
Fulton Rd
d
Shopping Center
W 9TH ST
Hopper Ave
w dH
Level 3 Confident Adult
Hospital
oo
Park
LINK LN
Level 2 Average Adult
R ed w
ld E O AV TTON DU
SMART Station
0
BICYCLE LEVEL OF TRAFFIC ROADWAYS (CITYWIDE) AND STRESS PAVED TRAILS
Level 4 Fearless Adult
SMART Station
Level 1 All Ages and Abilities
LEVEL OF TRAFFIC STRESS
N
Fearless Adult Transit Station CityLevel Hall 4
Range Ave
ROADWAYS AND PAVED TRAILS
h Cre ek Rd
Santa Rosa Ave
Level 2 Average Adult
School DESTINATIONS + Level 3 Confident Adult BOUNDARIES Major Employer
Level 4 Fearless Adult
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Figure 3-24 PLAN UPDATE 2018
ELAND AVE
Level 1 All Ages and Abilities
DESTINATIONS + BOUNDARIES
EV
Ave
Taylor Mountain Regional Park
ak
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
CL
pa
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Bellevue Ave
Level 3 Confident Adult
Class Class Class Class
Trione-Annadel State Park
Rd
lu Yu
e Burbank Av
EXISTING 12 Commercial + High Mix Use à LEVEL OF ROADWAYS AND Industrial TRAFFIC STRESSPAVED TRAILS O
y
Dr
tt V all e
e hi t
Be nn e
Rd
Rd Sto ny Point
W
ve dA oo o kw Bro St ley
ill aH
Hearn Ave
lum
y No rthpoint Pkw
101 £
ta Pe
Sebastopol Rd
ve le A
Marlow Rd
King St Nort h St
St F ran c is R d
un ta in g o F
Hum boldt St
Marlow Rd
Fulton Rd
Range Ave
Mendocino Ave
PROPOSED
Class I Shared-Use Path LAND USE INTENSITY LEVEL OF
Chann el Dr
St o
ve tte A ve M aye A en o H
nA ve
nd He
M ap
Occident al Rd
S Wright Rd
r
t
W 3rd St
ve aA
St
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
o
15th St St h 4t t ve dS aA 3r o m Ho e Son
ES
7t h
in
m no So
NORTHEAST
Rd
Pacific Ave
am
lp Yu
W 9th St
El C
yD er y H w go m t a
Calistoga Rd
Carr Ave
Benton St Colle ge Ave
W College Ave
e Av
Dr
Guerneville Rd
m xe He
nyo
ia
n ey L
Steele Ln
a
n ic Be
Coff
Ch
d eR n at
Ca
BIKEWAYS
o er
n
Dr
y
o
l ca
w dH
d
Piner Rd
¹
cit nte
Es
oo
sR
San Miguel Ave
RECOMMENDED FIGURE 3-2
ve
dw ld R e
e rn
Mo
vd Bl
Bru s
O
Ba
Hopper Ave
¹
H
Bellevue Ave
65
Chann el Dr
PRIORITY DEVELOPMENT AREAS Sk
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ar yf m
Pk wy
Dr
ro
n
Mo
Rd
h Cre ek Rd
livos Lo s O
Bru s
PROPOSED
Chann el Dr
Class I Shared-Use Path LAND USE INTENSITY LEVEL OF
Class II Bicycle Lane IIB Buffered Bicycle Lane LowClass Density ne Class III Bicycle Route Br id ge Class IIIB Bicycle Boulevard Rd Density SANTAMedium ROSA Class IVBICYCLE Separated Bikeway Study & PEDESTRIAN MASTER
f ie er ld Rd
nA ve
TRAFFIC STRESS
mm
High Density
Ba e rn sR
RANGE AVE
RD W3
n ey L
SE B
CityGrowth Limts Piner Rd Urban Boundary
ST
O PO AST
AV E BURBANK
WEST AVE
¹¹
L
Range Ave
Coff
Fulton Rd
d
Shopping Center
y
San Miguel Current LimtsAve Park City
W 9TH ST
Hopper Ave
Hw
Level 3 Confident Adult
Hospital
od
Park
d wo
Level 2 Average Adult
LINK LN
SMART Station
DR LEO
HEARN AV
Transit Station
Amy's Kitche
Map produced January 2019.
W College Ave
Map produced February 2018.
Hospital
DESTINATIONS + BOUNDARIES Sk
Shopping Center
ar yf
m
Major Employer
Carr Ave
0
1 El C
a
om on
a
y Hw n
He
oldt St
Park
ocino Ave
Santa Rosa Junior College m xe
Mo
livos
Lo s O
e Av
om tg
Dr yMILES er
2
Rd Sto ny Point
e Burbank Av
He
St F ran c is R d
Pk wy
ve ro
un ta in g o
Rd
Range Ave
Marlow Rd
Fulton Rd
Urban Growth Boundary
t
Rd
an a
Dr
Ch
ia
n ey L
SMART Station e Rd
o er
City Limts
Calistoga Rd
Shopping Center
vd Bl te cit o M on y Pkw No rthpoint r nD yo n Ca
l ca
Park
n ic Be
Coff
Steele Ln
l Rd
Sebastopo Santa Rosa Junior College
Es
d
Piner Rd
wy dH
sR
San Miguel Ave
Hospital oo
e rn
Hopper Ave
Occid
F
dw ld R e
Ba
Level 2 Average Adult
SMART Station ental Rd
Dr
O
Transit Station
Level 1 All Ages and Abilities
W 9th St
W 3rd St
h Cre ek Rd S Wright Rd
Santa Rosa Ave
ELAND AVE
Ee ldVR O A TTON DU
SMART Station
Level 1 All Ages and Abilities
Major Employer Guerneville Rd
BICYCLE LEVEL OF TRAFFIC STRESS (ARTERIALS ONLY) ARTERIAL ROADWAYS
66
N
Transit Station Adult City Hall Level 4 Fearless
Urban Growth Boundary DESTINATIONS + MILES Steele Ln MILES BOUNDARIES 0 1 2 0 0.75 1.5
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Figure 3-24 PLAN UPDATE 2018
EV
Level 2 Average Adult
School DESTINATIONS + Level 3 Confident BOUNDARIES Major Employer Adult
ARTERIAL ROADWAYS
LEVEL OF TRAFFIC STRESS
CL
Ave
Level 1 All Ages DESTINATIONS + and Abilities BOUNDARIES
Level 4 Fearless Adult
Level 4 Fearless Adult
ak
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard Dr
pa
Taylor Mountain Regional Park
Bellevue Ave
Level 3 Confident Adult
Class Class Class Class
Trione-Annadel State Park
Rd
lu Yu
Dutton Ave
O
y
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Rd
e Burbank Av
EXISTING 12 Commercial + High Mix Use à LEVEL OF Industrial TRAFFIC STRESS ARTERIAL ROADWAYS e hi t
tt V all e
St
ill aH
Rd Sto ny Point
W
ve dA oo o kw Bro
PLAN UPDATE 2018
Be nn e
Marlow Rd
King St Nort h St
r
Su
Farm ers Ln
Hum boldt St
Mendocino Ave
St F ran c is R d
un ta in g o F
Range Ave
Marlow Rd
Fulton Rd
Rd
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
St o
ve tte A ve M aye A en o H
ley
lum
Hearn Ave
nd He
y No rthpoint Pkw
101 £
ve le A
ta Pe
Sebastopol Rd
S Wright Rd
o er
NORTHEAST
t
M ap
Occident al Rd
¹
ve aA
St
W 3rd St
BIKEWAYS
o
15th St St h 4t t ve dS aA 3r o m Ho e Son
ES
7t h
in
m no So
Calistoga Rd
Pacific Ave
am
yD er y H w go m t a
lp Yu
W 9th St
El C
n
Dr
Carr Ave
Benton St Colle ge Ave
W College Ave
e Av
nyo
Dr
ia
n ey L
Guerneville Rd
m xe He
n ic Be
Coff
Steele Ln
a
Ca
o
l ca
wy dH
d
Ch
d eR n at
cit nte
Es
oo
sR
Piner Rd
RECOMMENDED FIGURE 3-2
ve
dw ld R e
e rn
San Miguel Ave
Mo
vd Bl
Bru s
O
Ba
Hopper Ave
¹
Bellevue Ave
Chann el Dr
This page intentionally left blank
03 Santa Rosa Today
67
04 OUTREACH
68
This chapter presents an overview of the format and approach for each outreach opportunity, along with a summary of feedback received.
04 Outreach
Engaging the Santa Rosa community has been a priority throughout the Plan Update 2018 process. A variety of outreach opportunities were used to seek input from diverse Santa Rosa residents and community members. The plan development process also included extensive coordination with partner agencies and other City departments to ensure this Plan Update 2018 meets community needs, advances initiatives of local and regional partners, and includes projects and programs that can feasibly be implemented. Ongoing outreach ensured a continuous feedback loop that informed the final project list and Plan Update 2018. Specific events and opportunities included:
COMMUNITY MEETINGS
CITY BOARD, COMMISSION AND COUNCIL MEETINGS
ONLINE
• Public Open Houses
• Bicycle and Pedestrian Advisory Board
• Interactive Mapping Tool
• Pop Up Events • Stakeholder Interviews
• Waterways Advisory Committee • Community Advisory Board
• Community Survey • City Website and Social Media • City Newsletter
• Planning Commission • City Council
69
ONLINE SURVEY
A community survey was developed to gather input on walking and bicycling challenges, preferences, and opportunities throughout Santa Rosa. The survey was made available online in both Spanish and English from February through June 2018, and advertised at all outreach events, through City newsletter and email notifications, and distributed by community groups. Participation in the survey was also encouraged by awarding a gift card to a randomly selected respondent. More than 1,300 people responded to the survey.
City of Santa Rosa โ ข BICYCLE & PEDESTRIAN MASTER PLAN
04
A summary of responses is provided below. When asked about their comfort on a variety of bikeways, respondents expressed a clear preference for facilities that separate bicyclists from motorists. Shared use paths and separated bikeways were ranked most comfortable, while bicycle routes and streets with no bicycle facility were Bellevue Ave ranked least comfortable. See Figure 4-1.
Survey respondents stated a clear desire for walking and bicycling improvements in the community. Nearly 90 percent strongly or somewhat agreed they would like to travel by bicycle more than they currently do, and nearly 95 percent strongly or somewhat agreed they would like to walk more. Health or recreation was the most common purpose for both bicycling and walking trips, with more than 40 percent of respondents bicycling and over 80 percent walking for health once a week or more. Survey respondents overwhelmingly indicated that increased separation between facilities for different modes of transportation would encourage them to walk or bicycle more often. This separation, mentioned in 238 comments, includes buffering bicycle or pedestrian facilities from motor vehicle traffic, grade separation for challenging crossings, and providing dedicated Regional Park space for both bicyclists and for pedestrians on some highly used paths.
Figure 4-1: Comfort on Bikeway Types
COMFORT LEVEL
ยน
100 80 60 40 20 0 Shared Use Path
Separated Bikeway
Buffered Bicycle Lane
Bicycle Lane
BIKEWAY TYPE 70
Bicycle Route
No Facility
An improved sidewalk network was mentioned in responses 118 times, including both filling missing
sidewalk segments and providing wide sidewalks with ample room for passing and walking abreast. Finally, maintenance was mentioned in 111 comments. Specific needs reported included sweeping and debris removal, trimming vegetation, and resurfacing or repairing paved facilities to provide a smooth, level surface.
04 Outreach
One common feature survey respondents said would improve their walking experience was enhanced crosswalks (mentioned in 102 responses). Of these, more than half expressed a desire for inpavement flashing lights at crosswalks. Other crossing improvements mentioned included RRFBs or pedestrian hybrid beacons, curb extensions, refuge islands, high visibility markings, and beacons or stop controls on busy streets.
Topics mentioned in 40 or more survey comments are listed in Table 4-1 with the number of responses they appeared in.
Table 4-1: Top Survey Comment Themes COMMENT THEME Increased separation between road users, including grade separated crossings of highways and busy streets, buffers between streets and sidewalks or bicycle paths, and dedicated bicycling and walking areas on shared use paths Improved sidewalks Improved maintenance of walking and bicycling facilities including sweeping, vegetation trimming, and pavement repairs Enhanced crosswalks
NUMBER OF RESPONSES 238 118 111 102
Better connectivity along existing networks
81
Address concerns about personal security related to homeless encampments
75
Enforcement, including targeting stopping at signals and stop signs; distracted driving, walking, and bicycling; and speeding
72
Bicycle network improvements, including green markings in potential conflict areas, bicycle detection at signals, and eliminating parking in bicycle lanes
58
Traffic calming
57
Secure bicycle parking
57
Increased lighting on sidewalks and at crossings
56
Providing bicycle lanes or other bikeways, especially on busier roads
48
Education for people driving, bicycling, and walking on the rights and responsibilities of all transportation users and on how to safely share space
44
Pedestrian amenities including seating, restrooms, trash receptacles, and water fountains
42
Traffic signal improvements including pedestrian countdown signals, leading pedestrian intervals, and longer â&#x20AC;&#x153;walkâ&#x20AC;? phases
40
71
ONLINE INTERACTIVE MAPPING TOOL
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
04
72
An interactive mapping tool was posted on the City’s website and used throughout development of this Plan Update 2018 to gather input and feedback from the community directly on a map of the city. In early project phases from February through June 2018, community members were encouraged to draw routes or place pins on the map and add comments to identify desired walking or bicycling improvements, challenging locations, and other information about the walking and bicycling environment. Nearly 800 comments were received during this phase. This input informed the recommended bicycling and walking network improvements.
In the second phase of development from July through September 2018, the draft recommended walking and bicycling networks were displayed on the map and community members were invited to “like” or “dislike” projects to show their preferences, in addition to adding comments on specific projects and seeing the feedback left by others. More than 900 votes on projects were recorded along with approximately 420 comments on the draft recommendations. This input helped prioritize projects and refine the networks.
CITY WEBSITE AND SOCIAL MEDIA
Website The City created a section on their website for this Bicycle and Pedestrian Master Plan Update 2018. All online communications and project flyers pointed to this website, where community members were able to learn about the planning process, see upcoming outreach events, and download draft maps and other deliverables at key milestones.
Social Media The City has nearly 16,000 followers on Facebook and over 34,500 subscribers on Nextdoor. Throughout the Plan Update 2018 process, posts on these platforms notified residents of upcoming events, draft documents available for review, online engagement tools, and other project milestones.
Newsletter In addition to their social media presence, the City sent email newsletters to more than 11,000 subscribers. The Cityâ&#x20AC;&#x2122;s Transportation and Public Works Out in the Field newsletter has more than 9,200 subscribers, and the email list for this Plan Update 2018 has more than 1,800. These newsletters were used to announce open houses and other events, encourage participation, and share updates about the project.
04 Outreach
For all community outreach opportunities, including the online survey and interactive mapping tool, the City leveraged their existing website, social media accounts, and newsletter mailing list to share information about the Plan Update 2018 process and encourage Santa Rosa residents to engage with the project team.
Promotional Material An information card was also created in both English and Spanish with the project website and Community Open Houses listed. The cards were available at all outreach events and placed at various businesses, community centers, and libraries throughout the City. The Sonoma County Bicycle Coalition inserted 650 cards into participant goodie bags on Bike to Work Day (May 18, 2018) and members of the Community Advisory Board hand-delivered 350 cards to residents near the Rincon Valley Library to encourage attendance at the second Open House held there.
THE CITY SHARED PROJECT INFORMATION WITH THEIR:
16,000
34,500+
11,000+
Facebook followers
Nextdoor subscribers
Newsletter subscribers
73
PUBLIC OPEN HOUSES
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
04
Three open houses were held at key milestones during the planning process to gather input from the community and refine the Plan Update 2018.
Open House 1 The first open house was held April 18, 2018, at Montgomery High School. Stations at the open house shared findings from Chapter 2 including the existing walking and bicycling networks and programs, a review of collision locations, and the results of the Level of Traffic Stress analysis. A brief presentation described the planning process and an update on progress made since the 2010 Plan was adopted. Input from approximately 20 residents who attended the open house informed the recommended projects and programs in this Plan Update 2018. Key themes included: • Improve crossings along major roads and across Highway 101 • Close gaps in the sidewalk network • Build more shared use paths with improved connections to destinations and on-street networks
74
Open House 2 Midway through the project, a second open house was held on July 25, 2018 at Rincon Valley Library. The open house was attended by nearly 90 residents, who reviewed draft network maps for bicycling and walking improvements in Santa Rosa. Attendees provided feedback on the draft networks, which helped refine and prioritize the project list.
Open House 3 A complete draft of this Plan Update 2018 was presented at a third open house on November 8, 2018. More than 50 attendees had the opportunity to revisit maps and other results from early project phases while also reviewing the evaluation strategy and resulting project implementation categories. Attendees provided feedback on the public draft materials which helped refine this Plan Update 2018.
75
STAKEHOLDER INTERVIEWS
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
04
To gain deeper insights into the needs and priorities of key community stakeholders, interviews were conducted with representatives of eleven groups in the city or region. Interviews were conducted over the phone or in person. Key topics from each interview are summarized below. SANTA ROSA CYCLING CLUB AND SONOMA COUNTY BICYCLE COALITION (APRIL 5, 2018) • Need for secure bicycle parking, including lockers or other longterm parking solutions • Need for valet bicycle parking at all large events • Desire for enhanced bicycle facilities in Santa Rosa including green markings at conflict areas or bike boxes
NEIGHBORHOOD REVITALIZATION PROGRAM (APRIL 19, 2018) • Limited storage space for bicycles at home leads some residents to rely more on walking and transit • Education about wrong-way bicycling was a past focus area • Desire for increased education and encouragement for kids to walk and bicycle VILLAGES AT WILD OAK (APRIL 19, 2018) • Concerns about bicyclists sharing space with seniors walking on paths • Need for education on sharing the road and consensusbuilding between residents and people walking or bicycling
SAFE ROUTES TO SCHOOL PARTNERS (APRIL 12, 2018)
SONOMA COUNTY TRANSIT AND SONOMA COUNTY REGIONAL PARKS (APRIL 25, 2018)
• Highest priority challenges include multi-lane roads and uncontrolled crossings
• Opportunity to align county and city trail and on-street bikeway connections
• Need for better visibility between road users • Need for funding for education and encouragement
• Desire for trail segments from 2010 Plan to be carried forward along with six new trail segments for consideration OAKMONT VILLAGE ASSOCIATION COMMUNITY DEVELOPMENT COMMITTEE (APRIL 30, 2018) • Concerns about high-speed bicycling through Oakmont Village • Desire for connection to TrioneAnnadel State Park • Toured potential access points in the neighborhood
76
SANTA ROSA JUNIOR COLLEGE AND JUNIOR COLLEGE NEIGHBORHOOD ASSOCIATION (APRIL 30, 2018) • Desire for clear, measurable targets for bike infrastructure and mode share • Improved connections to SMART and other transit • Access through the neighborhood and to campus REDWOOD CHAPTER FOR THE BLIND (MAY 2, 2018) • Educate bicyclists about audible signals when approaching or passing pedestrians with vision impairments • Need for longer “walk” phases at some signals COUNCIL ON AGING (MAY 8, 2018) • Concerns about personal security for older adults walking on trails • Need for lighting, seating, shade, and other amenities • Desire to promote community walking events to promote health and foster social connections
• Downtown Safety Unit and Sonoma County Parks working together to address concerns about homeless along trails • Periodically does targeted enforcement based on identified safety needs, including programs funded by the Office of Traffic Safety
04 Outreach
• Need for secure bike parking
SANTA ROSA POLICE DEPARTMENT (MAY 8, 2018)
• Need for education for all transportation users about sharing the road safely and rules of the road for each mode ROSELAND COMMUNITY BUILDING INITIATIVE MEETING (JUNE 21, 2018) • Concerns about speed of traffic on arterial streets • Desire for pedestrian network gaps to be addressed SUTTER HEALTH (JULY 25, 2018) • Improve connections with transit • Need for enforcement to address concerns about aggressive driving • Working to promote bicycling and walking among staff with programs like a safe ride home, providing secure covered bicycle parking, and partnering with the Sonoma County Bicycle Coalition
77
POP-UP EVENTS
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
04
The project team also participated in six pop-up events in Santa Rosa, which provided opportunities for additional input into the Plan Update 2018 and helped raise awareness of the update process. At each event, the project team gathered input about challenges and opportunities to improve walking and bicycling in Santa Rosa. This feedback informed documentation of existing networks along with development of draft network recommendations. The six events are listed below with feedback themes. WELCOME ROSELAND (JANUARY 20, 2018)
A pop up event at the Welcome Roseland event
• Pedestrian priorities include shade, increased lighting, and beacons at uncontrolled crossings • Bicycling priorities include shared use paths, buffered bicycle lanes, and separated bikeways HIGHWAY 101 OVERCROSSING PUBLIC MEETING (MARCH 29, 2018) • Need for bicycle connections and secure bicycle parking at Santa Rosa Junior College • Desire for SMART path to connect further north toward the airport • Split opinions on possible alternatives presented for the Highway 101 Overcrossing
78
A pop up event at a meeting for the Highway 101 Overcrossing project
EARTH DAY ON STAGE (APRIL 21, 2018) • Desire for more creek trails and connections to regional trails • Need for improved crossings, especially at the railroad and highways
04
• Preference for bicycle lanes (with buffers where feasible) on existing streets
Outreach
SONOMA COUNTY HUMAN RACE (APRIL 28, 2018) • Need for education about wrong-way bicycling A pop up event at the Cinco de Mayo Festival
• Concerns about biking on roads that are narrow, higher speed, and do not have dedicated bicycle facilities • Desire for improved SMART trail connections • Desire for improved connections to nearby communities CINCO DE MAYO FESTIVAL (MAY 5, 2018) • Increase lighting on trails • Need for secure bicycle parking • Improve connections to and within the Roseland community SUMMER RESOURCE FAIR AT CODDINGTOWN MALL (JUNE 16, 2018) • Need for wider bicycle lanes
A pop up event at the Coddington Mall Summer Resource Fair
• Desire for separated facilities for active transportation
79
CITY BOARD, COMMISSION, AND COUNCIL MEETINGS Bicycle and Pedestrian Advisory Board
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
04
Draft deliverables were presented to the City’s Bicycle and Pedestrian Advisory Board (BPAB) at seven of their meetings during development of this Plan Update 2018. Meeting dates and presentation topics are outlined below.
In addition to these seven meetings, a survey was sent to BPAB members in September 2018 to gather feedback on draft prioritization criteria. BPAB feedback guided development of this Plan Update 2018 by providing both strategic direction and specific input throughout the planning process.
• February 15, 2018: Draft Bicycle Friendly Community Assessment • March 15, 2018: Draft Existing Conditions and Level of Traffic Stress • April 19, 2018: Draft Bicycle and Pedestrian Facility Guidelines • July 19, 2018: Draft Network Recommendations • August 16, 2018: Draft Program and Policy Recommendations • November 15, 2018: Administrative Draft Plan Update 2018 • January 17, 2019: Final Draft Plan Update 2018
Members of the Santa Rosa BPAB review draft recommendations and share feedback
80
Community Advisory Board
Because Santa Rosa has a robust network of trails along the many creeks in the City, the Waterways Advisory Committee (WAC) was a key partner in developing recommendations to improve and expand the trail network. Staff presented to the WAC three times during the Plan Update 2018 process, in June, August, and November 2018.
The project team presented to the Community Advisory Board on March 28, 2018 to share information about the Plan Update 2018 and encourage them to participate in upcoming public outreach activities.
• June 18, 2018: Introduced the Project • August 23, 2018: Draft Network Recommendations »» Identified additional recommendations from the Citywide Creeks Master Plan to be incorporated »» Closing sidewalk gaps and improving pedestrian access to parks are priorities
Planning Commission
04 Outreach
Waterways Advisory Committee
The Final Draft Plan Update was presented to the Planning Commission on February 14, 2019.
City Council This section will be completed following the City Council meeting on March 12, 2019.
• November 29, 2018: Administrative Draft Plan Update 2018 »» Reviewed recommendations for consistency with the Citywide Creeks Master Plan »» Provided detailed feasibility input on proposed shared use paths and creek trails
81
05
PROJECTS, PROGRAMS, & POLICIES
82
The active transportation network described in this Plan Update 2018 seeks to provide the Santa Rosa community with convenient, comfortable, and healthy transportation choices.
Recommendations are considered planning-level, meaning they should be used as a guide when implementing projects. In some cases, traffic impact analysis and more detailed design analysis will be required to evaluate specific site conditions and develop designs that reflect conditions and constraints.
• Projects describes the proposed bicycling and walking infrastructure improvements, including sections for crossing improvements and for studies at locations where further analysis or community outreach is necessary to determine the most appropriate improvement type for the location • Citywide Projects describes improvements that should be pursued throughout Santa Rosa as opportunities arise, but specific locations for these improvements have not been identified in this Plan Update 2018
05 Projects, Programs, & Policies
Built on the needs and opportunities identified through the evaluation of existing conditions, progress made since the development of the 2010 Plan, extensive community input, and datadriven analyses, this chapter presents the projects, programs, and policy changes for the City of Santa Rosa. Improvements identified during previous planning efforts or studies were also reviewed for this Plan Update 2018, including the Uncontrolled Crossing Study and numerous Safe Routes to School Audit reports.
This chapter includes the following sections:
• Programs includes recommended education, encouragement, enforcement, and evaluation activities to be pursued or expanded by the City and its partners • Policy Changes includes changes to municipal codes, operating procedures, or other policies that will support a more walkable and bikeable Santa Rosa For a table of infrastructure recommendations and studies, see Appendix A.
83
PROJECTS
Bicycle Network Projects
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
• Class III Bicycle Routes: Signed routes for bicyclists on low-speed, low-volume streets where lanes are shared with motorists
Bicycle network projects are categorized based on the four classifications recognized by Caltrans, along with two sub-classifications, described in detail in Chapter 3 and the Bicycle and Pedestrian Facility Guidelines in Appendix B. These include:
»» Class III Bicycle Boulevards: Bicycle routes that are further enhanced with traffic calming features or other treatments to prioritize bicyclist comfort
• Class I Shared Use Paths: Dedicated paths for walking and bicycling completely separate from the roadway
• Class IV Separated Bikeways: Onstreet bicycle facilities with a physical barrier between the bicycle space and motor vehicle lanes, including bollards, curbs, or parking
• Class II Bicycle Lanes: Striped lanes for bicyclists »» Class II Buffered Bicycle Lanes: Bicycle lanes that include a striped “buffer” area either between the bicycle lane and travel lane or between the bicycle lane and parked cars
Nearly 130 miles of new bikeways are proposed in this Plan Update 2018, which would more than double the current 113 miles of bikeways in the City. A summary of existing and proposed bicycle network improvements is provided in Table 5-1 and mapped in Figure 5-1 through Figure 5-6.
Table 5-1: Existing and Proposed Bikeway Mileage
BIKEWAY TYPE
EXISTING MILES
PROPOSED
2018
MILES
TOTAL EXISTING + PROPOSED MILES
30.9
38.9
69
69.8
Class II Bicycle Lanes
67.1
48.5
115
115.6
Class II Buffered Bicycle Lanes
0.2
1.9
4
2.1
12.8*
35.3
116
48.1
1.6
2.5
8
4.1
2.2
3
2.2
129.3
315
241.9
Class I Shared Use Paths
Class III Bicycle Routes Class III Bicycle Boulevards Class IV Separated Bikeways Total
112.6
*Some Class III Bicycle Routes were upgraded to Class II Bicycle Lanes
84
# OF PROJECTS
AN
D W RE
R
M O
LA
KM O
Class II Bike Lane Industrial
T N
AIRWAY DR
RANGE AVE
PETERSON LN
CRE
R
IN G TA
HUMBO LDT ST
L D A IO O RW TK OTO BARR ST SM S E
DOWD DR CORBY AVE
ROSA AVE
L FULTON RD
IL
P
MA
TODD CR EE K
TRA I
A TR
MOORLAND AVE WOO DA CRE SANTA
STANDISH AVE
DESTINATIONS + BOUNDARIES
TR
MILES
Amy's Kitchen
SMART
Urban Growth Boundary
CREEK T R
EK
E
City Limts
AIL
BELLEVUE AVE I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard C O LGAN
S WRIGHT RD
Class Class Class Class
CR
RO
Park
L SE A ND
Youth Community ParkB U RT ST
Southwest Community YUBA DR Park
LUDWIG AVE
HILL RD
Shopping Center
IL TRA
A
EXISTING
TON A AS SAN MIGUEL A V M LU TA
Hospital
HEARN AV
PE
SMART Station
E DU TTO N AV
PRICE AVE
Transit Station
AV E BURBANK
ICO AV E
ENTAL RD OCCID Class II Bicycle Lane A TRAIL E RO DOT Class IIB Buffered Bicycle Lane O J Class III Bicycle Route NI AV E LAZZI Santa Rosa Junior College Class IIIB Bicycle Boulevard Southwest Branch E DR GIFF EN AV Class IV Separated Bikeway LEO NT PKW Y NORTH POI Study WEST AVE RCO P
CH
O LB
AV E LINK LN ON TT
INT RD STONY PO
Major Employer
DR LEO
ST ST ST 7 TH 5T H ND 2Amy's Kitche VA
W 3R Map produced 2018. Class IFebruary Shared-Use PathD ST
School
L
TA
DU
T 9 TH S
AV E BURBANK
N
TRA I L
E K PROPOSED Map produced January 2019.
¹¹
MILES
MILES 2 1.5
W 9TH ST
E CR
SANTA R OSA A Place To Play
O PO AST
WEST AVE
I N
Urban Growth
GUERNEVILLE R D
SE B
Franklin STEE L E LN Community Park Santa Rosa Junior College Santa Boundary Rosa Rura Cemetery
CityGrowth Limts Urban Boundary ER P
SANTA ROSA BICYCLE JE NNINGS AV E 0 1 0.75 0 & PEDESTRIAN MASTER W COLLEGE AVE PLAN UPDATE 2018 WOODA
T RD SC W3
NORTH ST
WALTZER RD
E
N D
E AV
TRAIL
E
NO CI
K EE
M
ND AVE E LA
PINER RD
MARSH RD
UN FO Meldotronic CardioVascularW 9TH ST
O
EV CL
N COFF E Y L
Youth Community Park
R OVE
S LAKE MA TH O
L
Shopping Center
RECOMMENDED Current Park City Limts BIKEWAYS
HALL RD
DESTINATIONS + BOUNDARIES
Hospital
Park
Y KW
AV TTON ER H ILL RD D U A RK P LINK LN
AI
SAN MIGUEL A V E
D
N
TR
SMART Station
IS
T
DENNIS LN
AVE H O PP ER SMART Station
IL CITYWIDE A TR
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
CityTransit Hall Station
P
S DR
H ARR
AR
PROPOSED
D W RE
School DESTINATIONS + 101 BOUNDARIES Major £ Employer
Regional Park
RANGE AVE
AN
T SAIN
ELAND AVE
DESTINATIONS + BOUNDARIES
EV
Galvin
Community SANTA ROSA BICYCLE Park & PEDESTRIAN MASTER Taylor PLAN Mountain UPDATE 2018
CL
DR
Class III Bike Route Bicycle Boulevard
Trione-Annadel Class IIIB State Park
EXISTING
IL
DR
O APath Shared-Use
PETERSON LN
Class I
DR
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study
YT RA
F
BE T H
Y CITYWIDE RD
S
LE
EXISTING Commercial + High Mix Use
CR
YD R
GR
A
BR U
SH CRE EK RD
A
I TO
TE C ON
DR
M
AH
N
MO
R
ING
R OVE
RECOMMENDED BIKEWAYS D AR
VA L
OA K LE A
EE KS IDE V R HE A H C TA
SM
DOWD DR CORBY AVE MOORLAND AVE SANTA ROSA AVE TODD CR EE K TR AI L
High Density
CR
BEN N
Class II Bicycle Lane Class IIB Buffered Bicycle Lane Low 12 Density Class III Bicycle Route BRID GE Class IIIB Bicycle Boulevard RD Medium Density Class IV Separated Bikeway SON OM Study A
Ã
E
VE NA
R
STANDISH AVE
PROPOSED
Class I Shared-Use Path LAND USE INTENSITY
D
CREEK T R
S LO
D
O LGAN
R D
S
N STO
NORTH ST
RANGE AVE
CR
I TA
Howarth Spring Lake County Memorial Park Park RF
D
S WRIGHT RD
Skyhawk Park
DR
EK
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER DPLAN UPDATE 2018
A RD
E
CR E
N
IEL
HUMBOLDT ST
AIRWAY DR
WALTZER RD
PETERSON LN
FULTON RD
CRE
NORTHEAST E
E
WOODA
RD
ME L
LL VA
RO
GA
YERBA B U
MM
H OE
T ET
AIL TR
6
Ã
11
BIKEWAY PROJECTS (CITYWIDE)
BIKEWAYS
R DUPONT D
Class Class Class Class
Figure 5-1
RECOMMENDED FIGURE 3-2
IS TO
E NT
ER M O TG N VE MO AA OM SON
S LN
VE DA
E TODD RD
SMART
¹
E AV
C
Amy's Kitchen
BELLEVUE AVE
FARM ER
T O LB
L SE A ND
AIL
HILL RD
LUDWIG AVE
A
ST B U RT
Southwest Community YUBA DR Park
IL TRA
VE TON A AS
M LU TA
DR LEO
PE
PRICE AVE
LAZZINI AV E Santa Rosa Junior College Southwest Branch E GIFF EN AV PKW Y NORTH POI NT
E DU TTO N AV
ICO AV E
WEST AVE
CH
AV E BURBANK
TRAIL E RO DOTA JO
RCO P
L RD
ST
ST VALLE J O
OO KW OO T ES
W 3R D ST
OCCID ENTA
4 TH
TA
ST ST ST 7 TH 5T H D 2N
S
IN T RD STONY PO
E K
TRA I L
BR
AV E LINK LN ON TT
HALL RD
T 9 TH S
W 9TH ST
E CR
SANTA R OSA A Place To Play
Franklin STEE L E LN Community Park Santa Rosa Junior College Santa Rosa Rural Cemetery
DU
W COLLEGE AVE
RD
LV D OB C IT
SU
N
JE NNINGS AV E
BA DG E R
VD N MI S SIO B L
GUERNEVILLE R D
E AV
R P I NE
NO CI
TRAIL
ATE RD CHA N VE
O
K EE
N D
ND AVE E LA
IL
EV CL
N COFF E Y L
A TR
PINER RD MARSH RD
E
TA
L
Youth Community Park
M
UN FO Meldotronic CardioVascular
C AL
AI
SAN MIGUEL A V E
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
E RD AC
TR
ne
L RD ER H IL RK PA
S LAKE MA TH O
T
H O PP ER AVE
IS
AR
DENNIS LN
D
KWY
LL WA
SM
H ARR
P
S DR
£ 101
FULTON RD
SAINT
PRIORITY DEVELOPMENT AREAS
W COL
SANTA R A Place E TODD RD HALL RD To Play
85
OC
SPRING ST
NORTH ST
NORTHEAST SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 TA
MEN DOCINO AVE
DR
AV E
O LB
CARRIL LO ST
DR
Y ARM OR
T
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
COLL EGE AVE
BEAVER ST
D OO E AV
HE AL DSB U RG AVE
W
ST
ST
D
Class IIIB Bicycle Boulevard
ST
ST
9TH 0.75
CLEVEL AND AVE
SANTA ROSA H ST BICYCLE W 9T & PEDESTRIAN MASTER PLAN UPDATE 2018
MILES 1.5
¹
MILES 1.5 ST
0.75
N SA
TA
Amy's Kitche
6T
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study
CLEVEL AND AVE
Z
RT
LINCOL N ST
IL
D 3R
EXISTING I Shared-Use Path ST RD W3 II Bike Lane III Bike Route IIIB Bicycle Boulevard
E ST
DESTINATIONS +
H W 9T
OLIV
Class Class Class Class
ST RAILR OA D ST
Urban Growth Boundary
TR A
86
ST
101 £
SM A
City Limts
H
SA
PROPOSED
Map produced January 2019.
RO
Map produced January 2019.
ST
Park
DR LEO
HEARN AV
ON
Shopping Center
L
DR
0
A
0
ST Urban Growth Boundary SC OTT
AV E BURBANK
DOWNTOWN
O PO AST
WEST AVE
RD
ST
Y ARM OR
EY
ILS
Hospital
LINK LN
L VAL
SE B
W
SMART Station
ELAND AVE
E AV
BEN
T NE T
E AV
ST
Transit Station
RD W3
AN
School
Park Shopping Center
W 9TH ST
Park City Limts RECOMMENDED City Limts BIKEWAYS Urban Growth Boundary
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
DESTINATIONS + BOUNDARIES
Shopping Center COLL EGE AVE
Hospital
RG
Ã
ST Hospital
SMART Station
LINCOL N ST
E AV TTON DU
D
O
12
N
OO KW
Transit Station CARRILL
MO
Class Class Class Class
OO
E ST
BIKEWAY PROJECTS (DOWNTOWN)
SMART Station
AV E
OLIV
Figure 5-2
Major Employer
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway PLE Study MA
EXISTING
BR
SA SANTA RO
RAILR OA D ST
RCOP
AV E TON
RD PO L
Station
EV
IL
DR
TR A
E L AV
SchoolTransit
CL
RT
Y ARM OR
SM A
D UT
O PO AST
TY AV E
A WS DJGO RIE DESTINATIONS + Major LLEmployer VA BOUNDARIES
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
PROPOSED
Class III Bike Route School Class IIIB Bicycle Boulevard
MENDOCIN O AVE
SE
ST
ST
DOWNTOWN ST
DESTINATIONS + Class I Shared-Use Path Class II Bike Lane BOUNDARIES RANGE AVE
O
RIPLEY ST
PL
ON
SON
EXISTING
AV E MA
HE AL DSB U RG AVE
ST
ST
E
D
ST
ST
ILS
3R
1ST
SE B
O AST
ST
RECOMMENDED BIKEWAYS
ST
SE B
H 4T
B
SA
W
£
RO
ST
ST
SA
TA
H 5T
E ST
N SA
H
101
D 3R
M OYO
ST
EXISTING
Z
A
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane ST D Class III Bicycle Route 2N Class I Shared-Use Path K TRAIL E C RE Class IIIB Bicycle Boulevard SA Class II Bike Lane RO Class IV Separated Bikeway A NT Study Class III Bike Route SOT
H
PL
RIPLEY ST
OK
ST
ST 9T H
RD W3
Class IIB Buffered Bicycle La SANTA ROSA BICYCLE ST Class III Bicycle Route TH &4PEDESTRIAN MASTER Class IIIB Bicycle Boulevard PLAN UPDATE 2018 Class IV Separated DBikeway R E RY M O NTG OM PROPOSEDStudy
BRO
AN
7T
6T
¹
CHERRY ST
ST
9TH ST W
Class II Bicycle Lane NORTHEAST
HUMBO LDT
RG
SC OTT
YLE PARK D R DO
COLLE GE AVE
LINCOLN ST MO
CLEVELAND AVE
E AV
ne
RECOMMENDED BIKEWAYS
SPENCER AVE
AY RI DGW
PROCTOR
ST
AIRWAY DR
W
RANGE AVE
HARDI E S LN
RUS
HI
WY
PK GR OV E
AY
E
A C SPRING ST
SPENC E R AVE NORTH ST
SM
COLL EGE AVE
AR T
H ST 7T
L
K
AI
OO
RD
OM
ES
ST
ON ST
SANTA
VE AA
LE
JO
ST
SE
SAN MIGUEL AVE
ST
M AP
LE
N BE
P
E AV
PINERCRESTDDR
T N ET
R LE Y VAL
PINER RD
LU M ETA AH
A
N STO
MARSH
E AV
I
C
Q
U
O IA
Class Class Class Class
Shopping Center Park City Limts
1
MILES
GAMAY ST
SANTA ROSA CR E
I Shared-Use Path II Bike Lane HALL RD III Bike Route IIIB Bicycle Boulevard
DESTINATIONS + BOUNDARIES
¹
School
E K TR AIL
A Place To Play
W 3RD ST
FULTO N RD
Urban Growth Boundary
W COLLEGE AVE
CI
R
EXISTING
Hospital
R KSHIRE DR
PUTNEY DR
SMART Station
TER DR NCHES
YO
Transit Station
WI
Major Employer
0.5
P IN ER
IL
Class I Shared-Use Path Class II Bicycle Lane T Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study SE
School
0
R
PROPOSED RA
BIKEWAY PROJECTS (NORTHWEST)
DESTINATIONS + BOUNDARIES
WOODACRE
Figure 5-3
E
E
K
TR A
RD
FULTON RD
I LL
E CO RBY AV
N AVE
PETERSON LN
E ROSA AV
VE ST O LI
D UTTO
RCO P WEST AVE
I Shared-Use Path Youth ESANTA ROSA BICYCLE Community II Bike Lane HU GH E S AV & PEDESTRIAN MASTER Park III Bike Route PLAN UPDATE 2018 IIIB Bicycle Boulevard
RN
B
ILS
SON
L VA
NORTHWEST
OD
BA
WO
ST
E AV
ST
W
LINK LN
2
ND
TR
BR
T E S ST D
A
ST H 5T ST D 3R
ST 1ST
EA RL E ST
ST
H 4T
WALTZER RD
HUM BOL DT ST
R TE R
FRANCISCO AVE
ARMORY DR
GAMAY ST
OW
TR A K E E R C P IN ER
CARR AVE
ST
RIPLEY ST
MOR G AN
PUTNEY DR
E
WI
NT A IN
CLARE
PARKER HILL RD
COFFEY WALTZER RD
MARLOW RD
PETERSON LN
IL
RA WOODACRE
E AV
AV
AV E BURBANK
Class Class Class Class
IN
N
LN
EXISTING
Franklin Community Park
RECOMMENDED BIKEWAYS
Ã
RD
VE TT A EL L IO Santa Rosa Junior College
T 9 TH S
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route W 3RD ST Class IIIB Bicycle Boulevard Class IV Separated Bikeway 12 Study
L RD TRAIL
LE LN
E AY AV RIDGW
TO
EARDLEY AVE
RD
PROPOSED
BRITTAIN
FU LTO N RD
SEBASTOP OL
CLOVER DR
NT
KL
G
RD
MCCO NNEL L AVE PACIF IC AVE R C UB WAY BEA
UT ND
N IN
VE SA
IS
N
FULTON RD
A FR
RD
N
GT
ST ON
JO E RO DOTA
E AV
E
D DIN
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Y ST W 9TH PO PLAN UPDATE 2018 I
R
OCCID ENTA
NO CI
LL
NORTHWEST
W 3RD ST
DO
N
I EV
JEN
E K TR AIL
N ME
CO
GU E R
A Place To Play
HALL RD
S TE E
Northwest Community Park
RIDL EY AV E
YO
Q
W COLLEGE AVE CI
SANTA ROSA CR E
¹
Sonoma County Offices
C H A N ATE RD
W LE
RECOMMENDED BIKEWAYS
R KSHIRE DR
O IA
ELAND AVE
IL
TER DR NCHES
U
ADF
W STEELE LN
T
SE
EV
MARSH RD
D BLV
BICE NT E NNI AL WAY
COLLEGE AVE
CL
Youth Community Park
N
FRANCISCO AVE
U
E
SELL AVE
PINER RD
Keysight Technologies
AR
WY
V A
U
Meldotronic CardioVascular
ND B
DH OO
RD
INDUSTRIAL DR
SAN MIGUEL RD
PINERCREST DR
W
ES
LN
RN
SAN MIGUEL AVE
FO
RE D
BA
OLD
L
HOPPER AVE
IS D
Nagasawa Community Park
SMART TRAIL
AI
DENNIS LN
M
TR
ne
MAS LA KE THO
Taylor Mountain Regional Park
VENTURA AVE
E
T
101
PY T
GI O NAL PARK T R I A
Galvin Community Park
Galvin R Community IN A Park
E
SANTA ROS
GI O NAL PARK T R IL A
AV E
SANTA ROSA
SMART TRAIL
SMART
DOWD DR
UN
£
TAY LOR MO
HAR R
W
DOWD DR
Taylor Mountain T ST B UR Park Regional
OA
R
RO
TA
S
D
RD
D BETH A R
NT O
S RIN G KAWANA SP
YOLANDA AVE IN UN
R
KM
S
R
T
Amy's Kitchen
Map produced January 2019.
D BETH A R
D
RD
TAY LOR MO
T ST B UR
AR
Map produced January 2019.
T
R
AVE YOLANDA HEARN AVE
SM
Amy's Kitchen
RD
D
H
Y
AE RD N AVV TO E AS ACH
L IL
101 £
HEARN AVE
101 £
AH
S RIN G KAWANA SP
TT VAL LE
UM AL
DR LEO
V E AV E AY RB
DR LEO
AV E
MILES 1.5
MILES 1.5
0.75
E N TO A V AS
AV E
0.75
AV E BURBANK
0
WEST AVE
Urban Growth Boundary
Urban Growth Boundary
DU TTO N AVE
¹ ¹
City Limts
0
L
OD
O PO AST
DU TTO NRD L IL AH E UM WE AL ST AV PE T
SE B
K AV E CO RBYBURB AN
City Limts
E ST
Park
87 OCCID ENTAL
RD
DOWD DR
Galvin Community Park
E
E
Taylor Mountain T ST Regional B UR Park
TAY LOR MO
U
A NT
OA
R
Galvin Community R IN Park
R
D
S
HI
D BETH A R
PY T
GI O NAL PARK T R IL A
SANTA ROSA
GI O NAL PARK T R IL A
SMART
AV E
SANTA ROSA
SMART TRAIL
DOWD DR
T
D
RD
IN YOLANDA AVE TA
UN
S
R
NT O
D BETH A R
D
KM
£ 101
TAY LOR MO
Amy's Kitchen
Map produced January 2019.
D
H
RD
T ST B UR
A
S RIN G KAWANA SP
RD
YOLANDA AVE
HEARN AVE
YR
D N EV E TO H A V AS TAC
L IL
S RIN G SP
AH
R EO D LKAWANA
TT VAL LE
UM TAL
Amy's Kitchen
V E AV E ORABY
101 £
E N TO A V AS
AV E
HEARN AVE
AV E
DR LEO
V ERB ANK A BU
WEST AVE
MILES 1.5
MILES 1.5
0.75
0.75
AV E BURBANK
0
DU TTO N AVE
¹ ¹
Urban Growth Boundary
Urban Growth Boundary 0
L
OD
O PO AST
DU TTO N RD L IL AH E UM WE AL ST AV PE T
City Limts
Taylor Mountain Regional Park
Map produced January 2019.
SA T IN
A R ND
D
MI
M O
LAKE H A
RD HIA N
FO UN
AS TH OM
CREEK RD
AV E
E Y DR
BRU SH
DR
N
W AY RS
GR
LAKE H A
GE RO
K T R IL I O NAL PARRANGE A AVE
AV E
SANTA ROSA
SMART TRAIL
AS TH OM
A UP
RD
RD
VAL LE ELAND AVE
L IL
S RIN G SP
N ETT
EV
N A VE STO
BEN
CL
VE DA
AH
A
OO KW
UM AL PE T
R EO D
E DU TTO N AV
WEST AVE
MILES
DESTINATIONS + BOUNDARIES BURBANK
Urban Growth Boundary
RBY AV E
D
G RI N SP
City Limts
T ES
Park
CO OLIVE ST
RD W3
M Ca
HO EN
OO
Class I Shared-Use Path ST E Class II Bike LaneMAPLE AV RD L O P O Class III Bike Route AST SE B Class IIIB Bicycle Boulevard
Shopping Center
LN
D
S
L YU
E AV
2N
VE AA OM SON Doyle Community Park BR
ST 1ST
ST
IS RR D M O TG N MO Nag Com P
FA RM ERS
T
O LB
T
ST
LINK LN
D 3R
ST
ES
B
EXISTING
Hospital
T H S ST 7T H 5T
ST
ST W 9TH ST 9TH
TA
A
T MORGA N S
E AV TTON DU
Transit Station
HUMBOLDT ST
Major Employer
SA
1 Ã
AH
H ID
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Junior College Class III Bicycle Route PACIF IC AVE E Class IIIB Bicycle Boulevard SPENCER AV Class IV Separated Bikeway ST H 4T Study ARMORY DR
School
CI TO
V ALL
N
RD W IS LE E Franklin D Community LN ST E E L E Park E Santa Rosa TT AV EL L IO Santa Rosa Rural Cemetery
IN
PROPOSED
NTE
Offices
MO
RANGE AVE
TE RD C H A NA
MISSIO N
DESTINATIONS + BOUNDARIES
R
R
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 Sonoma County ELAND AVE
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
EV
Class Class Class Class
IL
R Keysight Technologies Meldotronic CardioVascular
NORTHEAST
EXISTING
Galvin Community Park
Nagasawa Community Park
TR A
PY T
OA E PKWY OV
RECOMMENDED BIKEWAYS
SMART Station
88
IS RR DR
TAINGR
CR EE
R
W AY RS GE RO
LA
BRU SH
DR
A
CREEK RD
AV E
E Y DR
CI TO
V ALL
NTE
N
N
HUM BOL DT ST
MO
GI O NAL PARK T R IL A
R
Y
D
E
D
LE
D NT O
S
DR
A
E AC LL WA
AV E
DE RD
Class I Shared-Use Path Trione-Annadel State Park Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study
OM AV AL
OA LE AF K
SA
KM
SANTA ROSA
S ON
PROPOSED
N
BIKEWAY PROJECTS (NORTHEAST)
NE B RID
RD
DOWD DR
EA
S TO
CL
Figure 5-4
NORTHEAST
SANTA ROSA BICYCLE AY W &EENPEDESTRIAN MASTER R GPLAN UPDATE 2018 T S
TH
D BETH A R
R A I L Spring Lake KT County Park
KER HI L L
Taylor Mountain Regional Park
DR
LO
PA
R
H
RD
S DR EW
RD
U
IN
VA
TA
R ND
E CH TA
RECOMMENDED BIKEWAYS
T IN
D
E KSI
S
D
L IL
TAY LOR MO
A NT
Skyhawk Park
R
YR
D
E
VAL LE
R
G
SO U
C RE
N ETT
B YERBA UEN
R DUP ONT D R TE 1 2
ERFIELD RD MM SU
AH
SMART TRAIL
AH
GR
ARMORY DR
H ID
RANGE AVE
RD
E AV
VE DA
UM AL PE T
RD
YOLANDA AVE
T ST B UR
Y ER
A UP
OO KW
BEN
N A VE STO
S RIN G KAWANA SP
M
L YU
OO
T ES
A
O TG
E AV HO EN
BR
S
N
LN
OM SON Doyle Community Park
MO
FA RM ERS
E AV
ST
VE LE A MA P
101 £
T
O LB
2
ND
TE TA
TA
T
1ST
ST
ST
DR
MELI
Ã
VE AA
ES
Amy's Kitchen
RBY AV E
HEARN AVE
ST
CO OLIVE ST
E DU TTO N AV
WEST AVE
AV E BURBANK
DR LEO
ST
L RD
B
D 3R
ST 3 RD
O PO AST
ST
LINK LN
SE B
ST
H 4T
S
12
PACIF IC AVE
SPENCER AVE
T H S ST 7T H 5T
A
T MORGA N S
E AV TTON DU
W
Junior College
ON INC
ELAND AVE
N
W 9TH ST 9TH
LE
EV
D SR WI LE E Franklin D Community LN ST E E L E Park E Santa Rosa TT AV EL L IO Santa Rosa Rural Cemetery
LVD MISSIO N B
CL
Sonoma County Offices
C
R
N YO AN
A
DD
TE RD C H A NA
RD
BLV ITO
RD
EC NT MO
D ER R
S
TAINGR FO UN
B ADG
GA ISTO
R Keysight Technologies Meldotronic CardioVascular
C AL
S MA
HARVILLE RD RINCON AVE
RD KER HI L L
TH O
R
PA
Nagasawa Community Park
PKWY
E OV
D
LAKE H A
I RR S DR
E AC LL WA
S DR EW
ne
¹
SE B
CO RBY
City Limts
E ST
Park
YR
D EV Sonoma CH TA Offices
ST E E L E
L
ST D
SMART TRAIL
E BAKER AV
VE NA
B YERBA UEN
DR
R
DUP ONT D R TE 1 2
D
KAWANA SPRINGS RD
R
RD
AV E
E Y DR
CI TO
S
TE TA
EQ
N YO
RD
V ALL
R
S
CREEK RD
TAINGR FO UN
LAKE H A
AS TH OM
RD
TAINGR
ILL AH
FO UN
LU M
P OR AT E C ENTE R PK WY
P E TA
D
A LG CO
A
N CA
ON INC
RANGE AVE
AV E
VE LE A
AV E
LE
LAKE H A
ROSA
CORBY
DD
C OR
ST
SANTA
E ST
RD
BLV ITO
MI LVD MISSIO N B
RD A OG E
AS TH OM
T
B
ES
E AV
O LIV
AV E
GA ISTO
KT AV AL IS BURBCAN
D
M O
A
S
WILJAN C T
RD
HIA N
PY T
IL
TR A
P OR AT E C ENTE R PK WY
C RE
EK
R
TO DD
MOORLAND AVE
SMART TRAIL
N
SANTA ROSA AVE
CORBY AVE
SG A
RI N
DOWD DR
VICTORIA DR
CREEK
LC A RE M E O RD
R
D
HALL RD
E ROBLES AVE
C OR
C ST B ST A ST
FU LTO N RD
PROPOSED
N
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study
EXISTING I Shared-Use Path II Bike Lane LUDWIG III Bike Route IIIB Bicycle Boulevard
DESTINATIONS + BOUNDARIES
CH ICO AV E
AVE
K ND CR EE E LA RO S
PRICE AVE AI L
Class Class Class Class
R
E
E
DUTTON AVE
BURGESS DR
DUTTON MEADOW
W AY
RS
RO
CR EE
G
RI N
SP
GI O NAL PARK T R IL A
AV E
GI O NAL PARK T R IL A
SANTA ROSA
R
S WRIGHT RD
DOWD DR
COLGAN CR E EK TRAIL SP
DR
N
R
D
LISCUM ST
STONY POINT RD
RO
LA
BRU SH
NTE
AH
GR
GE
BRU SH
W AY
GE
RS
AH
GR
SOUTHWEST COMMUNIT Y TRAIL
H ID
CREEK RD
AV E
E Y DR
CI TO
V ALL
NTE
MO
N
H ID
SMART TRAIL
AV E
SANTA ROSA
N HUM BOL DDT ST R
ARMORY DR
HUMBOLDT ST
ARMORY DR
DOWD DR
LN
IA C IR L RD
D R NTA O ST
Urban Growth Boundary
N STAR DR
Santa Rosa Junior College Southwest Branch
Galvin SANTAWCommunity ROSA BICYCLE ROBLES AVE E Park FIN LEY AV & PEDESTRIAN MASTER ICE AVE PLANPRUPDATE 2018
UO
OASTO PO SEBA KNM
City Limts
EQ
S
Park
JO
E
Shopping Center
101
OA LE AF K
FRESN O AV
SMART Station
CH ICO AV E
OM A V State Pa AL LE Y TR BELLE V U E AVE DR AI IL L E RO DOTA TRA
RD
D
Transit Station
D
Major Employer
R
School
E
DESTINATIONS + BOUNDARIES
G
I Shared-Use Path Galvin Community R R Class II Bike Lane IN IN Park YOLANDA AVE A A T T Taylor UN Class III Bike Taylor U N Route MO O Mountain TAY LOR M Mountain T ST Regional Boulevard B UR Park Class IIIB Bicycle Regional Park
Trione-Annadel State Park
SOUTHWEST
Trione-Ann
S ON
OCCID ENTAL
£ RECOMMENDED BIKEWAYS N WRIGHT RD
S KAWANAClass
ERFIELD RD
RD IN G S PR
D
S BRITTAIN
SU
E AV
D
MRD FU LTO MN
A UP
ERFIELD RD MM SU
TAY LOR
N
L YU
LN
S
RD
101 £ RD
FA RM ERS
VE DA
D BETH A R
L IL
SMART TRAIL
RD
OO KW
AI L
TE TA
ON INC
E AV
E VO O BARA UP
R
LE
T
L YU
T
AH
S RIN G SP
A
DD
MO
N
MI
O LB
UM AL PE T
AV E
HEARN AVE
EE
EXISTING
AV E
R EO D LKAWANA
Ã
R E Class II BicycleT GLane AV S HO EN EA TH Class IIB SBuffered Bicycle Lane C OU RE E VE AVE KSI D LE ABELLEVUE V E Bicycle BEN Route ER AIII MA P Class N ETT HO EN D DR VAL LE H YR Class IIIB C RE Bicycle Boulevard A V D E KSI E DE BEN H R C R N ETT D D Separated IV Bikeway R VAL LE Class H TA D YR S D N EVA E D Study TO H A V BETH A R R AS AC
S
T ES
E
AVY CODRB
ST OO KW
E N TO A V AS
Amy's Kitchen
T RMERS LN E SFA
OO
OLIVE
BR
M
T ST B UR
ST
E AV
S
YOLANDA AVE
BIKEWAY PROJECTS (SOUTHWEST)
B
T
£
ST
O LB
ST DT NS
L RD O PO E AST E AV A PL
101
TA
A
ST
LVD MISSIO N B
RANGE AVE
O
ST
E AV
A M
C AL
WE ST AV E
I ST
E AC LL WARD
D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Ã PLAN UPDATE 2018
PROPOSED
A
¹
TT MORGA N S
S WRIGHT RD
ST DT
OC
ST ON
E DU TTO N AV
D
CO MA LL
KER HI L L
RD
Amy's Kitchen
Figure 5-5 Map produced January 2019.
KER HI L L
DR LEO
HEARN AVE
Map produced January 2019.
O BLV C IT
SOUTHWEST
VE SAT A T ST OM ND 1S SO 3RDoyle Community Park
DU TTO N RD L IL AH E UM WE AL ST AV PE T
¹
MILES 1.5
4
T ES
MILES 1.5
SE B
T
0.75
1ST
AV E
0.75
ST
ES
0
DU TTO N AVE
0
AV E BURBANK
Urban Growth Boundary
WEST AVE
Urban Growth Boundary
RECOMMENDED BIKEWAYS
2 RD W3
V ERB ANK RBY A BU
City Limts
ST LINK LN B
SE
TO B AS
PO L
D 3R
CO OLIVE ST
K T D ST ND CR EEW 3R E LA RO S RD
ST
T H S ST 7T H 5T
ST
City Limts
LINK LN
¹
Park
W 9TH ST 9TH
A
Shopping Center
T MORGA N S
E AV TTON DU
LUDWIG AVE
Hospital
Shopping Center Park
ELAND AVE
N
Hospital
SMART Station
D ER R
ST
D
UO E Skyhawk NT IA D S MO C IR SR Park WI LE ERBA BUEN ALOISE D Y M R SANTA SO AVE RLOSA LOS E ME DR PE ARB C I E RDFranklin N R D T E T O AVE A R E K TRYOLANDA R C H A NA AV E N Y AIL D D Community LN R N R CA ST E E L E LO HEA Park Sonoma County S 12 R DUP ONT D E Offices Santa Rosa A Place TT AV R TE 1 2 R IL EL L IOHEARN AV E Rural Cemetery N T A Spring Lake To Play Santa Rosa Southwest A K W Skyhawk County Park G D S Junior College R Community O LRD HALL W IS ST CPark LE Park PACIF IC AVE BU R T E MELI Franklin D TA Y W 3 RRD Community LN E E R L DS ST E E LO M SPENCER AVE Park T RNC H O BELLEV U E 12 E TG Santa Rosa TT AV R A I L SpringMLake ON Y EL L IO Santa Rosa Rural Cemetery T T A K S YUBA DR County Park W H Junior College L N 4T P E AR PACIFIC AVE EE Y RAmy's T VE G H S ER ST AA M 7T Kitchen T M SPENCER AVE H O S NO 5T TG SO ST EA ST O N Doyle W 9TH ST 9THST S TO TH AY D M NE B W Path Class I Shared-Use RI SO U Community Park 2N TH
E AV TTON DU
SMART Station
B ADG
RD
ER B ADG
R LEO D
HARVILLE RD
GIFFEN AVE
BARH AM AV E H AM
SO
TE RD C H A NARINCON AVE
O N
MA P
EA RL E ST
AR WB HARVILLE RD E AVE V A RINCON UTH
R
EC NT MO
Sonoma County Keysight OIN T PK WY Technologies NO RT HPOffices
N
Major Employer
E HE S AV HUG
VE L AZZI N I A
R
EV
ELAND AVE
Station
Transit Station
Keysight Technologies Meldotronic CardioVascular
PA
EV
DESTINATIONS + Major Employer BOUNDARIES
CL
Class III Bike Route Class IIIB Bicycle Boulevard School
R
R
Meldotronic CardioVascular
DESTINATIONS Class I Shared-Use Path+ Class II Bike Lane BOUNDARIES
PKWY
VE O
CL
Class IIIB Bicycle Boulevard
SchoolTransit
S DR EW
IS RR DR
PA
R ND
EXISTING
A
Nagasawa Community Park
Nagasawa Community Park
PKWY
E OV
E AC LL WA E MCMINN AV
S DR EW
T IN
EXISTING
I RR S DR
ST H 5T ST H T 4
2N
SO
12 Ã
R ND
E FRESNO AV
N WRIGHT RD
I Shared-Use Path Southwest Branch Class II Bicycle Lane Class IIB Buffered Bicycle Lane E FIN LEY AV Class III Bicycle Route PRICE AVE Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
ST
RCO P
T IN
TRAIL JO E RO DOTA
Class IIB Buffered Bicycle Lane SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER RD SEBASTOP OL PLAN UPDATE 2018 Class IIIB Bicycle Boulevard Class IV Separated Bikeway PROPOSEDStudy Santa Rosa SA
ST 1ST
LN
A
ENTAL RD
Junior College -
D 3R
ST
SA
OCCID NORTHEAST Class II Bicycle Lane
E Class CH ICO AV
RD W 3
ILS
BRITTAIN
FU LTO N RD
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
W
ST
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ne
INT RD STONY PO
W 3 RD
N DUT TON AVE
LINK LN
HALL RD
ST
7 TH
A
T 9 TH S
A Place To Play
NORTHEAST
ST
W 9TH ST
TRAIL
AN
SANTA ROSA C RE EK
RECOMMENDED BIKEWAYS
CHERRY ST
IN
RIPLEY ST
ER DR
C IR
OL HU M B
IA
ND ME
UO
RG MO
CL
OV
S
EQ
T
89
OWLS
R
RD
MO U
R
LA A S
RANGE AVE
I TO
T EC
MO N
W AY
RS GE RO
RD ISEO DR WL LE Frank Comm L E L N HEARN AV S TE E Par
1.5
TT AVE E LL IO Amy's Kitche CARR AV Santa Rosa Junior College
ORBY AVE
SMART TRAIL
DOWD DR
MENDOCIN O AVE IL L PARK TRA HUMBOLDT ST
BROOKWOO D AVE
NA
E GIO
R
O
UN
IN TA
EA RL E ST
D
OR YL TA
M
VE ST OL I
APPLE LN
ST
I Shared-Use YOLANDA AVE Path II Bike Lane III Bike Route BURT ST IIIB Bicycle Boulevard
DESTINATIONS + BOUNDARIES T
T 9 TH S ST 7 TH SPR A I N GS RD K A WAN B
Class Class Class Class
SPEN
COLL EGE
ST
HEARN A VE
PACI
A
EXISTING
TALUMA HILL RD PE
£ 101
MORAGA DR
SANTA ROSA AV E
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane VE NA TO AS Class III Bicycle Route VE Class IIIB Bicycle Boulevard NA GA C OL Class IV Separated Bikeway Study
F
ST
E AV
ST AVE WELN
SE
VE ST OL I
LE
AV E BURBANK
ST
Doyle MILES Community Park MILES
LL EY RD VA Map produced January 2019. NE TT BEN
M AP
¹
Boundary
VE A A
FA RM ERS
S
DR
D
OM
ST
ER O MO L N TG TO P
MEOBAS
K
C RE E K
RD W3
EA RL E ST
Hospital
Urban Growth Boundary
SON
PROPOSED Map produced January 2019.
SMART Station
City Limts
W 9TH ST
Urban Growth Boundary
T
Transit Station
Park
AIL TR
S 0 1STBICYCLE 0.75 1.5 0 0.75 SANTA ROSA ST JO LLE VA & PEDESTRIAN MASTER PLAN UPDATE 2018
School
Shopping Center
ST H T 5T S D T 3R D S ROS A 2N TA N Urban S A Growth T
ST
DESTINATIONS + BOUNDARIES
DR
N
CE
SPRING ST
NORT H ST
ST
E AV OT LB DR TA AR K DOY L E P
ST
H 4T
LINK LN
A
RO O
MENDOCIN O AVE
E
Shopping Center Park
COLL EGE AVE
B
ST
BIKEWAY PROJECTS (SOUTHEAST)
I Shared-Use Path II Bike Lane III Bike Route IIIB Bicycle Boulevard
E AV TTON DU
BR YD
N LN Shopping Center Hospital
SPENC ER AVE
ES
A
Figure 5-6
Class Class Class Class
DR
Hospital RA ER
T SMART Station
SOUTHEAST
EXISTING N STAR DR
7 TH
FO OT H N
Rosa Rural
Cemetery Transit Station
Park RECOMMENDED City Limts City Limts BIKEWAYS T 9 TH S
AV E
DR
VA LLEY
Santa SMART Station
PACIF IC AVE
HUMBOLDT ST
L PARK TRAIL
MORAGA DR
BROOKWOO D AVE
NA E GIO
R
Major Employer
ILL
DOWD DR
E
CARR AVE Santa Rosa Junior College
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class IIIB Bicycle Boulevard Class IV Separated Bikeway Study
Transit Station
RB LDE
APPLE LN
Taylor Mountain Regional Park
Community ParkSchool
TT AVE E LL IO
PROPOSED
BURT ST
LE LN
E AV
UN
S TE E
Park
IN TA
DESTINATIONS + N E RD Major Employer D W IS ID BOUNDARIES LE H Franklin N
O
TT
ELAND AVE
NN E
VA BICYCLE SANTA ROSA LL E Y MASTER & PEDESTRIAN RD Galvin PLAN UPDATE 2018Community
EV
SOUTHEAST BE
LI NK
M
C H A ATE R D N
Class III Bike Route Class IIIB Bicycle Boulevard School
A FR
OR YL TA
DESTINATIONS Class I Shared-Use Path+ Class II Bike Lane BOUNDARIES
R
CL
SANTA ROSA AV E
R
Class IIIB Bicycle Boulevard
EXISTING
AH
GE
E
D
D
RECOMMENDED BIKEWAYS BETHARDS D
A SPRI N GS K A WAN RD
M O
S K CR EE
W AY
G
D
GR
DR N AH
RS
RI N
KS I
WA
BR U
MO N
SP
EE
CHE V AH D TA
R
S LL
YOLANDA AVE
TALUMA HILL RD PE
HEARN A VE
90
S AINT FRANCIS RD
I TO T EC
C SPE T
S H CR EEK RD
AV E
DR
VA EY LL
GR
WA
CE
SPRING ST
NORTH ST
PRO
EXISTING
WAY
O
VE NA
TR L
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Trione-Annadel State II Park Class Bike Lane Class IV Separated Bikeway Study Class III Bike Route
Y
Y
HUM BOL DT ST
RO
RD
C RE E K
D
AY EN W
CR
EL
Class IIB Buffered Bicycle La SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard Class IV Separated Bikeway PROPOSEDStudy
E AV
SS
AN N
NORTHEAST Class II Bicycle Lane
E EL
MEN DOCINO AVE
CH
I RF
GR E
KN
TO
£
CORBY AVE
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
A UP
PR
AS
101
SMART TRAIL
Spring Lake County Park
L YU
A ST T HE
CY
LL EY RD VA E TT
VE NA GA C OL
WILJAN C T
RD
AIL TR
AVE
E
EA RL E ST
MOORLAND AVE
CALISTOGA
RD
SU
M
T TE
N BEN
M
Q UE
E AV
VE A A OM
ST
LE
SOU
H O EN AV E
T OS
SE
VE ST OL I
M AP
DR
N FRA
J
RY
LN
Doyle Community Park
LE
ME
FA RM ERS
DR
ST
L VA
K
D
ST
O
SON
ST 1ST
AV E MA
RO O
T
B
ST
ST H T 5T S D ST R 3 D ROS A 2N TA N SA
TGO
SON
LO
IT A
RD SANTA ROSA BICYCLE OMERY DR & PEDESTRIAN MASTER PLAN UPDATE 2018
MO N TG
Howarth Memorial Park
RB LDE
A
ES
T 9 TH S ST 7 TH
AIL TR
N MO
WK I N HA NTA Skyhawk Park
ME L
LV D
A
ST
H 4T
YE R BA BU E NA RD TE VE R DE DR NEST D R
N
NORTHEAST
DR
LN
E AV OT LB DR TA AR K DOY L E P
COLL EGE AVE
EN
CON
SPENC ER AVE
BR YD
RIN
A RR TE
LN
PACIF IC AVE
A
Santa Rosa Rural Cemetery
FO OT H
O
RECOMMENDED Ã BIKEWAYS 12
ILL
CARR AVE Santa Rosa Junior College
D DU PON T
B
TT AVE E LL IO
ON
E AV
E
E AV
CI
D
O
M
DR M ID
A AC
ID
N
M IS S I
H
E
N
Franklin Community Park
LN EELE
ne
¹
LI NK
ST
A FR
W LE
RD IS
RI N C
DA NA
E DL
C H A ATE R D N
1S
Tay Re
Pedestrian Network Projects
Sidewalks and pathways should provide a smooth surface free of obstructions at least five feet wide. In some areas, where high pedestrian activity is expected, wider sidewalks may be desirable. Sidewalks and pathways can either be adjacent to the curb or separated by a planted landscaping strip, as shown below.
This Plan Update 2018 includes 21.2 miles of proposed sidewalks, mapped in Figure 5-7 through Figure 5-12 along with existing and proposed Class I shared use paths.
SIDEWALK
2'â&#x20AC;&#x201C;5'
5' minimum
Property Line
PLANTER STRIP
05 Projects, Programs, & Policies
The pedestrian network includes Class I Shared Use Paths, discussed in the previous section, along with sidewalks. Sidewalks and pathways are an essential element of a pedestrian network. They not only provide a comfortable walking space separate from the roadway, but are also a foundational element of Americans with Disabilities Act (ADA) compliance.
There are many streets in Santa Rosa with sidewalks or pathways, but the network is inconsistent. Not every street without a sidewalk or pathway is recommended for improvement in this Plan Update 2018 due to limited available public right of way. Instead, sidewalk and pathway recommendations are focused on those corridors where they are likely to serve large numbers or pedestrians or address a priority community concern.
91
AN
D W RE
M O
T
E AV TTON DU
L
K TR AI
AI
L
TR
MA RLOW R D
R OVE
P PETERSON LN
FULTON RD R
AKE S LAKE S LWOO DA MA MA TH O TH O CRE A L WA Y
IN G
TA
P
R
R OVE
AIRWAY DR
IN G
TA
WALTZER RD
W
RA I L E K T
SMART Station
M G ON TE C RA TE C I TO H N I TO A D A R ON
DR
FARM E
L WA Y
A
MENDO CINO AVE MENDO CINO AVE
S LN
HUMBOLDT ST HUMBOLDT ST S WRIGHT RD ND NORTH NORTH ST C R ST
N
AH
GR
A IL
E AV
FARM ER
T O LB
Urban Growth Boundary
E AV T O LB WO TAOO K B R ST E S
STONY P
ARMORY DR ARMORY DR CLEV ELAND AVCLEV ELAND AV E E
City Limts
TA
MA RLOW R D
Shopping Center
M
RANGE AVE
RUSSEL AIRWAY DR
RANGE AVE
MA RLOW R D
RUSSEL
WALTZER RD
Park
AV E AV LINK LN ON ON TT TT DU
PETERSON LN PETERSON LN
Hospital
DU
N
E CR
Shopping Center Park
N
FULTON RD
HALL H R RD To Play Meldotronic D CardioVascular
STON
N COFF E Y L
Hospital FULTON RD
GU
HEARN AV
E CR
L
CRE
D LEO
SANTA R OSA
N
IS
AI
WOODA
KWY
Northw Commu ParR
S DR
TR
CRE
W RE
T
WOODA
¹¹
MARSH RD
U A Place O Transit KWY FStation AR
AVE H O PP ER AVE L
SMART Station
HALL RD
D D
Map produced January 2019.
N COFF E Y L
AR
DENNIS LN
Transit Station
IL
L
L RD UN OCCID ENTA ATE RD O CHA N BICE NTE N N I F VE DOTA TRAIL RO Meldotronic E O J Sonoma CardioVascular RD PINER RD OL County OP ST SEBA Offices ICO AV E S RD LAZZINI MARSH RD MIGUEL A VE CH WI LE Y AV E Northwest LE FIN D ATE RD R PRICE AVE CHA N Community L AVE LE BICE NTE N N I E EN FF GIV IL Park Sonoma V NT PKW Y Santa POI E RTH NO N PINER RD County R Rosa Rural G UE D Offices S R Cemetery MARSH RD WI 4 TH LE ST YUBA DR Northwest RD Community E L W COLLEGE AVE L I Park LUDWIG AVE Santa EV RN T SANTA R Rosa Rural 9 TH S OSA GWU E 9TH ST T ST MILES S Cemetery R A Place STK T 7 TH 5T H 4 TH 0 1 ST DE E 2 ST To Play 2N RA I L VALLE J O E K T R OSE A W COLLEGE AVE L W 3R D ST
School
A TR
O PO AST
WEST AVE
IS AN
L SM
BOUNDARIES SAN MIGUEL A V E
IL A TR Youth Community Park
S DR
SAH ARR
DENNIS LN Map produced February 2018. H O PP ER AVE
101 £ DESTINATIONS +
Youth Community ParkSAN
ST
W COLLEGE AVE Major Employer Amy's Kitche
AI
DESTINATIONS + BOUNDARIES
W RE
£
1.5
School INT
TR
Class I Shared-Use Path
0.75
T
EXISTING
0
SE B
AV E BURBANK
AN
0
Class I Shared-Use Path 101
Major Employer
Class I Shared-Use Path
Urban Growth Boundary DESTINATIONS + D I L MILES A R BOUNDARIES MILES T 1 2
AR
Class I Shared-Use Path Sidewalk Study
Park SAINT
EXISTING
RD W3
PINER RD
CityGrowth Limts Community Urban Boundary
SM
Sidewalk Study PROPOSED
WALTZER RD
Youth
N COFF E Y L
Current Park City Limts
AIL TR
6
Ã
11
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PROPOSED PLAN UPDATE 2018 Path Class I Shared-Use
LINK LN
TODD CR EE
AR
Shopping Center SAN MIGUEL A V E
PEDESTRIAN CITYWIDE RECOMMENDATIONS SANTA ROSA BICYCLE
EXISTING
92
101 £
CityTransit Hall Station Class I Shared-Use Path DENNIS LN SMART Station Sidewalk SMART Station ER9TH AVE ST EXISTING H O PPW Study Hospital Park Class I Shared-Use Path
E TODD RD
& PEDESTRIAN MASTER PLAN UPDATE 2018
PEDESTRIAN PROJECTS (CITYWIDE)
RANGE AVE
YD R
LA
BR U
SH CRE EK RD
A
I TO
TE C ON
DR
M
N AH
GR
NORTH ST
MENDO CINO AVE
A
BOUNDARIES Major Employer
ELAND AVE
SANTA ROSA & PEDESTRIAN MASTER School PLAN UPDATE 2018 DESTINATIONS +
PROPOSED
CITYWIDE
Figure 5-7
Path
Sidewalk + BICYCLEDESTINATIONS Study BOUNDARIES
EV
State Park
Galvin Community Park
CL
DOWD DR CORBY AVE
PROPOSED
N
SANTA ROSA AVE
Class II Bike Lane Industrial Class III Bike Route Trione-Annadel Class Class IIIB Bicycle Boulevard I Shared-Use
CITYWIDE
Taylor Mountain Regional Park
DR
OA
DR
SM
MOORLAND AVE
S
DR
D AR
T N
STANDISH AVE
PEDESTRIAN Commercial + High Mix Use Class I Shared-Use Path RECOMMENDATIONS O
CREEK T LISCUM ST R
Medium Density Class IV Separated Bikeway
SON OM SANTA Study ROSA BICYCLE A VA High Density LL O AK & PEDESTRIAN MASTER EY TR AI L PLAN UPDATE 2018 EXISTING KM
RD
III Bicycle Route
CITYWIDE IIIB Bicycle Boulevard
F
NGS RD PR I KAWANA S YOLANDA AVE
BE T H
Ã
IIB Buffered Bicycle Lane 12 Class Low Density
NE B RID Class G E Class R D
LE A
R
O LGAN
MO
R
R OVE
L WA Y
A
HUMBOLDT ST
RUSSEL
MA RLOW R D
PEDESTRIAN Class II Bicycle Lane RECOMMENDATIONS
PROPOSED
Class I Shared-Use Path LAND USE INTENSITY
D
A IL
S LO
STO
ARMORY DR CLEV ELAND AV E
RANGE AVE
AIRWAY DR
WALTZER RD
PETERSON LN
R D
S
D
D
CR
I TA
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER DPLAN UPDATE 2018
DR
S WRIGHT RD
Skyhawk Park
IEL
Y
E
ND
A RD
E
FULTON RD
CRE
RD
N
MM
WOODA
GA
NORTHEAST E
Howarth Spring Lake County Memorial Park Park RF
PEDESTRIAN RECOMMENDATIONS
SMART
¹
SU
C
YERBA B U
EE KS IDE V R HE A H C TA
LL VA
LA
T ET
R OSE
BELLEVUE AVE
S LN
TR
FARM ER
EEK
AIL
BEN N
RD
LUDWIG AVE
BIKEWAYS
E AV
LL
Amy's Kitchen
LV D OB C IT
CR
VE DA
YUBA DR
RECOMMENDED FIGURE 3-2
ME L
N H OE
HI
E GIFF EN AV PKW Y NORTH POI NT
E NT
ER M O TG N VE MO AA OM SON
A
E FIN LEY AV
ST VALLE J O
UM AL PE T
PRICE AVE
LAZZINI AV E
E AV
S
ICO AV E
E DU TTO N AV WEST AVE
CH
TA TRAIL JOE RO DO RD SEBASTOP OL
RCO P
OC
ST
T O LB
ST ST ST 7 TH 5T H D 2N
W 3R D ST
CID ENTAL RD
4 TH
OO KW OO B R ST E
AV E LINK LN ON TT
IN T RD STONY PO
E K
TRA I L
Santa Rosa Rural Cemetery TA
DU
T 9 TH S
W 9TH ST
E CR
HALL RD
SANTA R OSA A Place To Play
RD
VD N MI S SIO B L
N
W COLLEGE AVE
ATE RD CHA N VE
BICE NTE N N I Sonoma County D Offices SR WI LE
Northwest RD Community LE IL Park V E RN G UE
BA DG E R
IS TO
N COFF E Y L
IL
ING
L
A TR
PINER RD MARSH RD
UN FO Meldotronic CardioVascular
C AL
AI
Youth Community Park
L AVE
TA
TR
SAN MIGUEL A V E
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
E RD AC
S LAKE MA TH O
T
H O PP ER AVE
IS
AR
DENNIS LN
D
KWY
LL WA
SM
H ARR
P
S DR
£ 101
R
SAINT
PRIORITY DEVELOPMENT AREAS
¹
SPRING ST
RECOMMENDED BIKEWAYS NORTH ST
NORTHEAST SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 TA
MEN DOCINO AVE
DR
E AY AV RID GW
O LB
CARRIL LO ST
DR
SPENCER AVE
Y ARM O R
S
P ROCTOR
T
COLLEGE AVE
BEAVER ST
E AV
ST
Class I Shared-Use Path
N SA ST
VE A A
RAE STREET PARK
ELAND AVE
CLEVELAND AVE
MILES 1.5
School
CLEVELAND AVE CLEVELAND AVE
Map produced January 2019.
DESTINATIONS + LINCOLN ST BOUNDARIES
Transit Station
Map produced January 2019. COLL EGE AVE
CARRIL LO ST
School RIPLEY ST
ST ST
9TH ST
City Limts A
RIPLEY ST
AN
ST
ST
Amy's Kitchen
7T
TA
H
ST
ST
S
O
N SA
ILS
MILES 0.2
H
ST
B
93
RD W3
ST
SA
W
0.1
H
RO
6T
0
7T
N SA
ST
ST
City Limts
HEARN AV
Urban Growth Boundary 9TH ST
A
H W 9T
ST
DR LEO
Shopping Center Park
RG
Park
Hospital
COLL EGE AVE
MO
SC OTT Shopping Center
SC OTT
SMART Station
AN
SMART StationSC OTT ST ST
ST
WEST AVE
CARRIL LO ST
¹
MILES 1.5
DESTINATIONS + 0.75 BOUNDARIES W 9TH ST 0.75
RG
Z
DESTINATIONS + BOUNDARIES
EV
E AY AV RID GW
0
AV E BURBANK
0
H W 9T
LINK LN
Urban Growth Boundary
Class I Shared-Use Path
Hospital
E AV
Urban Growth Boundary
RD
MO
Class I Shared-Use Path
D
EXISTING
ET
W 9TH ST
RD W3
City Limts EY
DR
N BEN
LINCOLN ST
Class I Shared-Use Path OPOL R Park AST Y AV E Limts SE B ACity RID GW
E AV
AL L TV
CARRIL L
E AV TTON DU
12 Ã
PLE
Y ARM O R
MA
EXISTING Shopping Center Park
N
Class I Shared-Use Path Hospital SMART Station Sidewalk Shopping Center Study Hospital
DR
EXISTING
OO KW
SMART Station
Transit Station
Y ARM O R
Class I Shared-Use Path
CL
Major Employer
PROPOSED
LINCOLN ST Transit Station
EXISTING
OO
AV E
E ST
Class I Shared-Use Path Sidewalk Study
S
BR
SA SANTA RO
OLIV
Class I Shared-Use Path Sidewalk PROPOSED Study
PROPOSED
ST JO SANTA ROSA BICYCLE DESTINATIONS +LLIEShared-Use Class Path Major VA Employer BOUNDARIES & PEDESTRIAN MASTER Sidewalk SchoolTransit PLAN UPDATE 2018 Study Station
PEDESTRIAN RECOMMENDATIONS PEDESTRIAN DOWNTOWN RECOMMENDATIONS SANTA ROSA BICYCLE & PEDESTRIAN MASTER DOWNTOWN PLAN UPDATE 2018 SANTA ROSA BICYCLE & PEDESTRIAN MASTER PROPOSED PLAN UPDATE 2018
Class III Bike Route Class IIIB Bicycle Boulevard School DR
ST
Y ARM O R
ST
Class II Bike Lane BOUNDARIES
DOWNTOWN
ST 1ST
RAIL R O D ST A
PEDESTRIAN PROJECTS (DOWNTOWN)
OM
SE
E
Figure 5-6
DOWNTOWN
RANGE AVE
PL
ST
IL
LIN
TR A
RAIL
RT
RT
SM A
SM A
L RD
AV E
Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
E
ST
RCOP
AV E TON DU T
L O PO AST
C REEK TRAIL
D
ST
SA
B
RO
ON
D
ROSA
IIIB Bicycle Boulevard SANTAClass ROSA BICYCLE PEDESTRIAN EXISTING & PEDESTRIAN MASTER DESTINATIONS RECOMMENDATIONS Class I Shared-Use Path+ PLAN UPDATE 2018
ILS
3R
TA
MEN DOCINO MEN AVE DOCINO AVE RIPLEY ST
TA
W
101 £
SE B
SE B
ST
E ST
N SA
ST
D
M OYO
ST
H
H 4T
2N
ST
Class II Bicycle Lane PEDESTRIAN Class IIB Buffered Bicycle Lane EXISTING Class III Bicycle Route RECOMMENDATIONS Class I Shared-Use Path
HE ALDSB HE ALDSB U RG AVE U RG AVE
A
H 5T
ST
SON
ST 3 RD
O PO AST
ST
D 3R
SOT
H
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE ST TH Class III Bicycle Route & 4PEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard Class IV SeparatedRYBikeway DR E M O NTG O M PROPOSEDStudy
Z
HE ALDSB U RG AVE
D OO
ST
RIPLEY ST
W
ST
7T
6T
¹
OK BRO
AN
ST 9T H
W
NORTHEAST Class II Bicycle Lane
ST
9TH ST W
T HUMBO LD
RG
SC OTT
CHERRY ST
PL
LINCOLN ST MO
CLEVELAND AVE
E AV
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
COLL EGE AVE
OL D
ARMORY DR
CLARE
LN HARDI E S
HI
RIPLEY ST
WY
PK
SPRING ST
HUM BOL DT ST
NORTH ST
KW O E AV
ST
ON
ST
SE
ST
AR T
E AV
TR
LE
AI L
E
NE
ALL TT V
L AI D TR L L R T A HI ARM ALU SM
T
BE N
PINE R CREST DR
SAN MIGUEL AVE
Major Employer
Shopping Center
Transit Station
Park
PETERSON LN PETERSON LN
FULTON RD
TR
IL
R
E
E
K
MARSH RD MILES
1
C T
0.5
A
Urban Growth Boundary
P IN ER
Park
Youth 0Community Park
RD PINER MARSH RD
IL
CTOR ST COUNTY CONN E
Shopping Center
PINE R CREST DR
City Limts
SAN
E
Hospital
T
PINER RD
Youth Community Park
SAN
SANTA ROSA W
SMART Station
RD
Hospital
ES
School
TRAIL
SMART Station
RN
FRANCISCO AV EAVE SAN MIGUEL
DENNI BA
TRAIL
Transit Station
FRANCISCO AVEFRANCISCO AVE
AV E
N TO
RD
AS
Major Employer
DESTINATIONS + BOUNDARIES
E AV
ES
SMART TRAIL
RN
FRANCISCO
DENNI BA
E CO RBY AV
School
D EY R
WOODA E WALTZER RDCRWALTZER RD R A IL
RO SA AV
PE
EA RL E ST
ClassE SI AShared-Use Path VE HU GH
SM
SANTA
VE ST O LI
EXISTING
M AP
DESTINATIONS + BOUNDARIES
LTON RD
GAMAY ST
PUTNEY DR
OW
A TR K E E R C P IN ER
IL RA
RO VE
ST
D O
B
ST
ILS
2
ND
O
O
ST H 5T ST D 3R
BR
T E S ST D
A
Class I Shared-Use Path
W
EXISTING
ST
Class I Shared-Use Path
12 Ã
N AV E DUTTO
EXISTING
MORG AN
W 3RD ST
RCO P WEST AVE
Class I Shared-Use Path Sidewalk Study
DESTINATIONS + BOUNDARIES
E
Sidewalk Study PROPOSED
ST
H 4T
H ST 7T
VE Class I Shared-Use Path AA OM SON T S Sidewalk T ST OS EJ EXISTING 1 LL Study VA Class I Shared-Use Path
AV E BURBANK
RD
SANTA ROSA BICYCLE PROPOSED & PEDESTRIAN MASTER PLAN UPDATE 2018 Path Class I Shared-Use
T 9 TH S
LINK LN
PEDESTRIAN PROJECTS (NORTHWEST)
Class I Shared-Use Path Sidewalk Study COLL EGE AVE
AV
WI
EARDLEY AVE
LN
Figure 5-7
N O TT
BRITTAIN
FU LTO N RD
SEBASTOP OL
SPENC E R AVE PROPOSED
E AY AV RIDGW
PROPOSED
RECOMMENDATIONS SANTA ROSA BICYCLE AIL & PEDESTRIAN MASTER E RO DOTA TR
E AV
N IN
PEDESTRIAN RECOMMENDATIONS L RD
IN
BEAR
W 3RD ST
OCCID ENTA
VE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
NORTHWEST PEDESTRIAN
Franklin Community
TT A SANTA ROSA CARR AVEBICYCLE Santa & PEDESTRIAN MASTER Rosa Rural MCCO NNEL L AVE Cemetery PLAN UPDATE 2018 Santa PACIF IC AVE C UB WAY
EL L IO
E AV GS
SMART TRA IL NORTHWEST
RD
KL
E
W 9TH ST
T
RD
N
MARLOW RD
PARKER HILL RD
AIRWAY DR
RUSSE
W
WALTZER RD
A FR
LL
DU
PO
IN
A Place To Play
HALL RD
VI
N
Y
N
GT D DIN
RD
CLOVER DR
ST ON
IS
PEDESTRIAN Rosa RECOMMENDATIONS Junior College
NE ER
JEN
EK T R AIL
PEDESTRIAN RECOMMENDATIONS N
CO
GU
RID L EY AV E
CTOR ST COUNTY CONN E
SANTA ROSA CRE
E AV
IL
E
CIR
W COLLEGE AVE
NO CI
A TR
R KSHIRE DR
SEQUOIA
C HA ATE RD N
DO
ELAND AVE
EK
Sonoma County Offices
N ME
EV
M
LN COFFEY
FRANCISCO AVE
D B LV
CL
PETERSON LN
N
CR E
FULTON RD
ND B
ADF
LE L S TE E Park NORTHWEST
Northwest Community Park
ER DR NCHEST
YO
SANTA ROSA W
WOODACRE
U
WY
NNI AL WAY
LL AVE
W LE
JO NORTHWEST PLAN UPDATE 2018
94
BIC ENTE
COLLEGE AVE
EY
IL
Keysight Technologies
U
Meldotronic CardioVascular
W STEELE LN
T
¹
E
OPAL
FF
MARSH RD
AV
Nagasawa Community Park
A R
R
CO
PINER RD
DH OO
RD
INDUSTRIAL D
SAN MIGUEL RD
REST DR PINE R C
Youth Community Park
HOPPER AVE
W
ES
TRAIL
SAN MIGUEL AVE
IS D
FO
RE D
RN
AV E
HARR
NT AI N G
Taylor Mountain Regional Park
BA
FRANCISCO
O MAS LAKE TH
TA
101
VENTURA AVE
UN
£
TAY LOR MO
PY T
GI O NAL PARK T R IL A
E
SANTA ROSA
GI O NAL PARK T R IL A
Taylor Mountain T ST Regional B UR Park
OA
Galvin Community Park
RANGE AVE
DOWD DR
R
D
R
DENNIS LN
Map produced January 2019.
S
Galvin Community R IN Park
E
SMART
AV E
SMART TRAIL
SANTA ROSA
RD
D BETH A R
RO
DOWD DR
T
D NT O
S RIN G KAWANA SP
IN YOLANDA AVE TA
UN
R
KM
TAY LOR MO
S
D
R
L
T ST B UR
D
H
RD
101
A
D BETH A R
L IL
HEARN AVE
Amy's Kitchen
Map produced January 2019.
£ RD
YR
D N EV E TO H A V AS TAC
AH
S RIN G SP
TT VAL LE
M LU TA
R EO D LKAWANA
YOLANDA AVE
AI
Amy's Kitchen
V E AV E ORABY
TR
HEARN AVE
E N TO A V AS
AV E
T
AV E
101 £
AR
DR LEO
M
MILES 1.5
MILES 1.5
0.75
V ERB ANK A BU
0.75
WEST AVE
0
AV E BURBANK
0
S DU TTO N AVE
¹ ¹
Urban Growth Boundary
Urban Growth Boundary
L
OD
City Limts
O PO AST
DU TTO N RD L IL AH E UM WE AL ST AV PE T
SE B
CO RBY
City Limts
E ST
Park
¹
Park
City Limts
SE B
O PO AST
L
City Limts
0
0
¹
MILES 1.5
MILES 1.5
0.75
0.75
AV E BURBANK
S
WEST AVE
Urban Growth Boundary
Urban Growth Boundary
DR LEO
HEARN AV
Amy's Kitchen Map produced January 2019.
Map produced January 2019.
SA T IN
A RE ND
LA
PROPOSEDTrione-Annadel
Galvin Community Park
EXISTING
Class I Shared-Use Path SA
RANGE AVE
OU
GROVE
ARMORY DR
GROVE
LAKE H A
AS TH OM
D
Rosa HARV Sant Junior College RINCON RA
ST D A E AC LL WA T MORGA N S
Park
Nagasawa CardioVascular Community Park
RD
Franklin Community Park
LN ST E E LE E TT AV EL L IO R Santa
Shopping Center
Keysight Technologies WY PK
DU
LAKE H A
E AC LL WA
Hospital
IS
R
Cem PACIF IC AVE ER B ADG SPENCER AVE
HARV
NT AI N
E AV TTON
AV E
NTE CI TO
LEY DR
AL
BRU SH CREEK RD D
C IN
ET LE P
D
DD
¹
TRD ENS CO IN
95
MI
LVD IS MISSIO N B M CO OLIVE ST
E AV
Park
ST
E AV
ELAND AVE V E CL
Shopping Center
MO
OU
Urban Growth Boundary
LTE D DS MI E
Hospital
B
City Limts LINK LN
SMART Station
EV
DESTINATIONS + BOUNDARIES
W LE
OB RINCON C IT A TE 4T ON M ME Keysight Technologies T S ND TH R E 7 G F O B AD C ST IN TE RD W 9TH ST 9TH ST O D C H A NA 2N C A Meldotronic R OB CardioVascular S IT ST T ST TE C S N D 1 O Sonoma County R M ME 3 MILES ND T Offices RD S 0 0.5 O W 13 C LE A IN RD E MA P T O C H A NA RD RD IS CA OL V P W R O LE N AST Franklin E SE B CL
Class I Shared-Use Path
Sonoma County
SMART Station
WY PK
N
Transit Station Meldotronic
Class I Shared-Use Path
EXISTING
F
E AV
R WS D
Major Employer
EXISTING
Meldotronic CardioVascular
O
ELAND AVE
RE ND
Nagasawa Community Park
IS RR DR
IN
Keys
F
Transit StationOffices
R WS D
R
R
O C
EV
RE ND
DESTINATIONS + SA BOUNDARIES A RIS D School
ND
WY PK
Major Employer
A
T IN
Class I Shared-Use Path Sidewalk Study
ME
School
CL
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PROPOSED PLAN UPDATE 2018 Path Class I Shared-Use Sidewalk Study PROPOSED
DESTINATIONS + BOUNDARIES
NT AI N
& PEDESTRIAN MASTER PLAN UPDATE 2018
Nagasawa Community Park
AS TH OM
RECOMMENDATIONS SANTA ROSA BICYCLE
RIS RR DR
GROVE
PEDESTRIAN NORTHEAST NORTHEAST
RD
HIA N
R
Taylor Mountain Regional Park
IL
NT AI N
D
TR A
OU
S
Y
VE
D
LE
State Park A Class I Shared-Use Path Sidewalk OA EXISTING Study Class I Shared-Use Path LAKE H A
BETH A R
DSRA
PY T
SP H
OM AV AL
K LEAF
HUM BOL DT ST
G
D
RI N
S ON OA
AIL
CR EE
R
W AY RS GE G I O NAL PARK T R IL A
E
A D EV CH TA
RD
M O
DR N
A
BRU SH
MO
AH GR
MORAGA DR
S
CREEK RD
AV E
LEY DR
NTE CI TO
AL H IDD
RO
HUM BOL DT ST
SANTA ROSA BICYCLE S TO NE B RID & PEDESTRIAN MASTER PLAN UPDATE 2018
R WS D
AV E
AY W
RE ND
E KSID ER D DR
G
N
Class I Shared-Use Path Sidewalk Study
12 Ã
T IN
SANTA ROSA
ST A
E RE
PEDESTRIAN RECOMMENDATIONS YR
PROPOSED
NORTHEAST
T IN
PEDESTRIAN PROJECTS (NORTHEAST)
LO
D NT O
RD
Figure 5-8
TA
R
RD
KM
L
UN YOLANDA AVE TAY LOR M O T ST B UR
IN
L TR A I Spring Lake County Park
TA
D
IL
RD
VAL LE
PEDESTRIAN RECOMMENDATIONS
R
HE
C RE
N ETT
K
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
S
E
VE DA
AH
DOWD DR
Skyhawk Park
G
BEN
NORTHEAST
R TE 1 2
ERFIELD R D MM SU
OO KW
UM
SMART TRAIL
BA BUE N A Y ER
AS TH OM
TH O
ARMORY DR
TE TA
E
E AV HO EN
OO
AL PE T
AV E
S RIN G KAWANA SP
M
T SO U
BR
S
GO NT
RY
LN
VE AA OM SON Doyle Community Park
VE LE A MA P
101 £
DR
MELI
MO
FA RM ERS
E AV
ST
T
2
O LB
ST
ND
ST
T ES
1ST
T
ST
CO RBY OLIVE ST
Amy's Kitchen
H 4T
ES
ST
E DU TTO N AV
WEST AVE
AV E BURBANK
HEARN AVE
SPENCER AVE
B
ST
LINK LN
DR LEO
N
Cemetery PACIF IC AVE
T H S 7T
D 3R
L RD
E
PEDESTRIAN RECOMMENDATIONS
S
RD
Franklin Community Park
V
TA
A
T MORGA N S
E AV TTON
O PO AST
RD
Santa Rosa Santa Rosa Junior College Rural
ST W 9TH ST 9TH
ST 3 RD
IS
C
R
N YO AN
ON INC
W LE
LVD MISSIO N B
E AV
ELAND AVE
Sonoma County Offices
DU
¹
LE
TE RD C H A NA
O
EV
N SE B
D
RD
IN
LN ST E E LE E TT AV EL L IO
W
BLV ITO
DD
O C
EC NT MO MI
ND
CL
RANGE AVE
ME
RD
Meldotronic CardioVascular
D ER R
RANGE AVE
NT AI N
B ADG
GA ISTO
Keysight Technologies
F
E
GROVE
HARVILLE RD RINCON AVE
OU
LAKE H A
R
C AL
S MA
WY PK
D
Nagasawa Community Park
E AC LL WA
R WS D
IS RR DR
D
RD
M O
LA
A
N
SANTA ROSA AVE
CORBY AVE
Trione-An
OM A V State P AL LE Y TR DR A
BELLEVU E AVE
SMART TRAIL
Trione-Annadel
EXISTING
RD HIA N
Class I Shared-Use OPath A
O
PY T
RI N
N STAR DR
AIL
SP
S
S ON
OA LE AF K
R
R
TR
RD
HALL RD
DOWD DR
SG A
D
R
C IR
RL P EA
EK
IA
T
W 3 RD S
CRE
UO
NE B RID
MOORLAND AVE
Q
S TO
SMART TRAIL
R
A To
HALL RD
SANTA RState OSA Park CRE E K TR A IL R D S D R A ETH B A Place To Play SANTA ROSA CRE E K TR A IL DUTTON AVE
D
COLGAN CRE EK TRAIL
DUTTON M EADOW
BURGESS DR
GI O NAL PARK T R IL A
L IL
RD
S
VICTORIA DR
BRU SH SOUTHWEST COMMUNITY TRAIL
RO
G
RI N
SP
D BETH A R
H
SANTA
YOLANDA LO AVE
S T Class I Shared-Use BU RPath Sidewalk Study
WILJAN C T
N
AH
GR
D
R
CR EE
LISCUM ST
STONY POINT RD
RS
GE
RO
AV E
GI O NAL PARK T R IL A
VA
RD
D
SANTA ROSA
LC A RE CREEK M E O RD
DR
RS
BRU SH
W AY
AH
GR
SMART TRAIL
W AY
H ID
CREEK RD
AV E
E Y DR
CI TO
NTE
V ALL
H ID
MO
N
N HUM BOL DDT ST R
ARMORY DR
CREEK RD
AV E
E Y DR
CI TO
V ALL
NTE
N
MO
RANGE AVE
HUMBOLDT ST
AV E
E CH TA
S
NT
SANTA ROSA
GE
TAINGR
FO UN
TAINGR
FO UN
LAKE H A
AS TH OM
P ORA TE C ENTE R PKWY
LAKE H A AS MO TH OC R
RD ILL
D
TA
Skyhawk Park
C IR
O AR KM ST N D N WRIGHT RD
E
YR
IA
FU LTO N RD
DE RD
TH
AY W N E RE G ST Amy's A Kitchen E
Class I Shared-Use Path Sidewalk C R EE S UO K ID ER IA Study C IR D DR
Q
KAWANA SPRINGS RD
UO
D
E KSI
SO U
Q
R
E
LO
E
G
E AV HO EN
S
AH
AV E
SMART TRAIL
AH
Santa Ros
E
Taylor Mountain Regional Park
SMART Station
OCCID ENTA
Major Employer
Santa Rosa AV E FIN LEY
Junior College Shopping Center PRICE AVE CH ICO AV E
Southwest Branch
Park City Limts
PRICE AVE
SEBASTOP OL
City Limts
E FIN LEY AV
0
RD
Urban Growth Boundary E
DESTINATIONS + BOUNDARIES
Southwest Branch
TRAIL
Park
FRESNO AV
Class I Shared-Use Path
CH ICO AV E
JO E RO DOTA
SMART Station
RD
Shopping Center
E
EXISTING
Santa Rosa
Transit StationJunior College -
L RD SEBASTOP OL
FRESNO AV
Class I Shared-Use Path
Transit Station
L RD
TRAIL JO E RO DOTA
LN
School
OCCID ENTA
BRITTAIN
Major Employer
DESTINATIONS + BOUNDARIES FU LTO N RDN WRIGHT RD N WRIGHT RD
Class I Shared-Use Path Sidewalk Study
LN
Sidewalk
Study PROPOSED
TOD D
IN
S WRIGHT RD
TA
CO RP O RATE RATEY C ENTE R PKW C ENTE R PKWY
UN
C ST B ST A ST
TAY LOR MO
Galvin Community Park
BRITTAIN
T ST B UR
R
FU LTO N RD
DOWD DR
YOLANDA AVE
E
Galvin T Junior Col A Place EXISTING Community R Southwest To Play PLAN UPDATE YOLANDA 2018 AVE E AV IN Park ICO DESTINATIONS + CH A HEARN AVE NT Class Taylor HALL RD I Shared-Use Path W ROBLES AVE U E ROBLES AVE SANTA ROSA BICYCLE TAY LOR MO Mountain BOUNDARIES T ST B UR W 3 Regional Park RD & PEDESTRIAN MASTER PROPOSED FIN LEY A S Amy's Kitchen SchoolPRTICE AVE PLAN UPDATE 2018 Class I Shared-Use Path DOWD DR
ARMORY DR
LU M P E TA
A
D
L TR A I Spring Lake
S
G
ST EA
E
S
RANGE AVE
AVE
VE NA
K County Park PROPOSED
ERFIELD RD MM SU
AI L
ROSA
AVE
R DUP ONT D R TE 1 2
MELI
Skyhawk N ParkA
RD
E AV
R
ST
SANTA
CORBY
TE TA
S WRIGHT RD
T
E ST
RD
R
SOUTHWEST S
RD
TA
A UP
TH
D NE E TO H A V AS TAC
IN G S PR
ON INC
MELI
L YU
SO U
E RE
SMMERFIELD RD SU
E
AV E
RD
ES
ST DT
E AV ST B
O LIV
LE
12
Park
LN
DR
VE LE A
B YERBA UEN
DR
R ALOISE AVE D
DUP R TE 1 2
FA RM ERS
H
A LG CO
E BAKER AV
B YERBA UEN
S Southwest ONT D R
RD
VA
N YO AN
LG SANTA ROSA BICYCLE CO RY & PEDESTRIAN MASTER PLAN UPDATE 2018
VE DA
YR
AV E
GA ISTO
DD
O NY
R ND
TE TA
OO KW
VAL LE
MA P
C AL
MI
ON INC
E AV
E VO O BARA UP
UM AL PE T
N ETT
C RE
C
E AV
A M
PEDESTRIAN RECOMMENDATIONS
BLV D
A
LE
T
L YU
T ES
AVY CODRB
ST OO KW
BEN
£
O
ST
E DU TTO N AV
LVD MISSIO N B
D
PROPOSED
& PEDESTRIAN MASTERS LEO SOUTHWEST 101 KAWANA 101 £ S DR RIN G KAWANA SP
CA
RD
DD
O LB
S
R LEO D R
à SOUTHWEST Community
RECOMMENDATIONS SANTA ROSA BICYCLE A
A OG L IST
BLV ITO
VE E LE A B AV MA P BELLEVUE AVE EN N ET HO EN T VAL L E
OO
DU TTO N RD L IL AH E UM WE AL ST AV PE T
N A VE STO
RD
MI
LVD MISSIO N B
TA
ST
OLIVE
BR
M
CA AV E BURBANK
D
ST
E AV
T RMERS LN E SFA
B
T
ST
O LB
T ES
L RD O PO E AST E AV A PL
WE ST AV E
IL K TR A
E AC
LL WARD
A
A
S OM ND 1ST SO 3RDoyle Community Park
S
D
CR E E
I ST
KER HI L L
TT MORGA N S
T
ST 1ST
E AC LL WA
CO MA LL
PA
RD
T AV E A
ST DT NS
101 £
BARH AM
ITO
O
SANTA ROSA BICYCLE PEDESTRIAN & PEDESTRIAN MASTER RECOMMENDATIONS PLAN UPDATE 2018
EC NT MO
Ã
EXISTING
96
L A ND ROSE E MCMINN AV
S DR EW
KER HI L L
ELAND AVE
PEDESTRIAN PROJECTS (SOUTHWEST)
H 4T
EC NT MO
N
EA RL E ST
WB RINCON AVE VE TH A SOU D ER R B ADG
E VE M RANCH TRAIL SPENCER ABELLEVUE O 12 TG RNCH R A I L SpringMLake ON BELLEV UE T T K S County Park H 4T Y T E T AV H S ER S T A M 7 M H O NO 5T TG SO ST O N Doyle AY D M W Community Park 2N N
PEDESTRIAN SOUTHWEST AV E
Figure 5-9
Map produced January 2019.
ES
Amy's Kitchen Map produced January 2019.
ST W 9TH ST 9THST
2 RD W3
SE B
V ERB ANK RBY A BU
HEARN AVE
SPENCER AVE
ST LINK LN B
DR LEO
DU TTO N AVE
¹ ¹
MILES 1.5
ST
CO OLIVE ST
MILES 1.5
WEST AVE
0.75
AV E BURBANK
0.75
L RD
ER B ADG
PEDESTRIAN RECOMMENDATIONS ST
SE B
ST
YUBA DR PACIFI C AVE
T H S ST 7T H 5T
D 3R
ST
O PO AST
Urban Growth Boundary
Urban Growth Boundary 0
3 RD
A
LINK LN
ROS
City Limts
0
T MORGA N S
E AV TTON DU
¹
City Limts
W 9TH ST 9TH
W K T ND CREE EL A
RD
E Santa Rosa TT AV EL L IO Santa Rosa Rural Cemetery Junior College
R
HARVILLE RD
S WI LE E D TE RDFranklin A N C H A RBLOSSOM DR PEA Community LN R ST E E L E AV E Park RN HEA E Santa Rosa T AV T IO EL L Santa Rosa Rural Cemetery E N AVCollege HEAR Junior W PACIF IC AVE E D
E AV TTON DU
N
LUDWIG AVE
Shopping Center
Hospital
Franklin Community Park
LN
N
SMART Station
Park
EV
ELAND AVE
Major Employer
RD
ST
1ST
12 Ã
E M AV RD RH A AHARVILLE
TE RD C H A NARINCON AVE
PA
EV
LE
W IS
E HE S AV H UG
VE L AZZI N I A
R
Sonoma County Offices
Station
Hospital
R Keysight Technologies Meldotronic CardioVascular
GIFFEN AVE Sonoma County Keysight Technologies Offices WY PK T OIN Meldotronic NO RT HP
ST E E L E
Transit Station
E PKWY OV
R
CL
CL
DESTINATIONS + Major Employer BOUNDARIES
Nagasawa Community Park
PKWY
VE O
CardioVascular
Class III Bike Route Class IIIB Bicycle Boulevard School
Shopping Center Park
S DR EW
Nagasawa Community Park
DESTINATIONS Class I Shared-Use Path+ Class II Bike Lane BOUNDARIES
SMART Station
A
IS RR DR
Class IIIB Bicycle Boulevard
SchoolTransit
SA
T IN
EXISTING
IS RR DR
RD
R ND
E FRESNO AV
N WRIGHT RD
Class I Shared-Use Path Southwest Branch II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle LE Route Y AV E ClassFIN I Shared-Use Path PRICE AVEClass IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
EXISTING
ST
R ND
Class IIB Buffered Bicycle Lane SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard SEBASTOP OL Class IV Separated Bikeway Santa Rosa PROPOSEDStudy Junior College -
ON
T IN
A
TRAIL JO E RO DOTA
ST
RCO P
SA
NORTHEAST TAL RD Class II Bicycle Lane OCCID EN
E CH ICO AV Class
ST
LN
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
D 3R
SO
RD W 3
ST
D
ILS
INT RD STONY PO
FU LTO N RD
BRITTAIN
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ST
ST H 5T ST H T 4
2N
W
HALL RD
W 3 RD
N DUT TON AVE
NORTHEAST
LINK LN
A Place To Play
ST
7 TH
A
T 9 TH S
CHERRY ST
OC
W 9TH ST
ST
SANTA ROSA CRE E K TR A IL
AN
RECOMMENDED BIKEWAYS
R OV ER D
IN
RIPLEY ST
CL
C IR
OL
IA
HU M B
UO
ND ME
Q
RG MO
S
E
0.25
MILES 0.5
NO RT HP OIN
¹
T PK W
M O
RD S M O LA A
CR
BRU SH
MO N
Skyhawk Park
DR N AH
K
R
EE CR
W AY RS
RI NG
GR
CE
RO
SP
GE
EL D RD
R
AY EN W
A UP
EXISTING PEDESTRIAN
E AV
RECOMMENDATIONS
WAY
KN
CR
O
EE
SOUTHEAST
KSI D
Class IIIB Bicycle Boulevard
E
D
R
D
R
S LL
EA RL E ST
CHE V AH D TA
EL
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Trione-Annadel Class II Bike Lane Class IV Separated Bikeway State Park Study Class III Bike Route
L YU
SS
AN N
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER PLAN UPDATE 2018 Class IIIB Bicycle Boulevard Class IV Separated Bikeway PROPOSEDStudy
I RF
D
GR E
S
CH
E
O
A ST T HE
NEOTOMAS AVE
LE Y RD AL T V NE T
M
H
C RE EK
M
A ID
PR CY E
ST
BE N
SOU
H O EN AV E
SE
VE ST OL I
AV E PLE
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
AVE
ST
Spring Lake County Park
AIL TR
O
L IT A SANTA ROSA BICYCLE RD MO N TG DR & OMERY PEDESTRIAN MASTER PLAN UPDATE 2018
TR NORTHEAST Class II Bicycle Lane L
T TE
JO
Doyle Community Park
VE A A OM
Q UE
LE
DR
SON
LN
ST
ST
D
B
L VA
TGO
RY ME
FA RM ERS
T
ST
AV E MA
N MO
DR
AIL TR
OK
ES
A
O
LN
A
ST H T 5T S D ST R 3 D ROS A 2N TA N SA SON
EN
ST
H 4T
Howarth Memorial Park
SU
NORTH ST
BR YD
AV E OT LB R TA KD AR DOY LE P
COLL EGE AVE
A RR SPRING ST
TE
SPENC ER AVE
MA
RECOMMENDED BIKEWAYS OWLS
EEK RD
AV E T EC
I TO
VA LEY L
Y
WA
DR
N FRA
HUM BOL DT ST
DR
FO OT H
RO E RB LD
MEN DOCINO AVE
RD
RD
LN
PACIF IC AVE
1S
Y JA
Santa Rosa Rural Cemetery
T TS
YE R BA BU E N A RD TE VE RD E DR NEST D R
NORTHEAST
ILL
CARR AVE
Santa Rosa Junior College
N
ME L
E
T 9 TH S ST 7 TH
12 Ã
A
TT AVE E LL IO
D DU PO N T
E AV
LE LN
E
EN
CI
D
A AC
Franklin Community Park
D HI
SION BLV D MIS
RD
N
S TE E
IS
I KL AN FR
W LE
BLU
CON
DR
RIN
S
CALISTOGA
E DL
ANAT E RD CH
SAINT FRANCIS RD
MID
R
SANTA ROSA BICYCLE PEDESTRIAN EXISTING DESTINATIONS Class I Shared-Use Path+ & PEDESTRIAN MASTER RECOMMENDATIONS Class II Bike Lane BOUNDARIES PLAN UPDATE 2018
CR
BRU SH
W AY
RS
RO GE
W AY
RS
T TE
AVE
ST
1
PR CY
97
PR CY
SE
0.5
TA ROSA AVE
NA E GIO
R
ARMORY DR
EEK RD
CR
EEK RD
BRU SH
AV E
RO GE
Q UE
ST
ST
SE
D
ST
D DR SMART TRAIL
L PARK TRAIL
BROOKWOO D AVE
RANGE AVE
NORTH ST
HUM BOL DT ST
I TO
T EC
MO N
NM DO R N TE
AH
DR
N
AH
GR
WA
CE
SPRING ST CE WA
NORTH ST
GR
N FRA
T
101 Urban Growth Boundary LN
ES
£
FA RM ERS
City Limts
AVE
C RE E K SPRING ST
T TE
Shopping Center
LN
C RE E K
Q UE
Hospital
N FRA
HUM BOL DT ST HUM BOL DT ST
SMART Station
FA RM ERS
MEN DOCINO AVE MEN DOCINO AVE
S
ILL
ST
B
OL
0
ST
ILL
D
ST
VE ST OL I
Park
D
ST
T
B
Hospital
City Limts
VE ST OL I
ES
NORTH ST
SANTA ROSA AVE
AV E MEN DOCINO AVE
DR
VA LEY L
DR
CI T O
MILES 2ND TA ROS N DR S ALEO 1.5 T
VA LEY L
¹
DU TTO N AV
WEST AVE
H T 5T S D ST 3R
AV E BURBANK
¹
L RD
Transit Station
Park
SMART Station
Shopping Center
School
DR DR K K RO O RO O E RB E RB LD LD AV E AV E OT OT LB LB R TA TAR KD KD AR AR DOY LE P DOY LE P
School
ST
DESTINATIONS + BOUNDARIES
7T
B
E AV
DESTINATIONS + BOUNDARIES
A
Class I Shared-Use Path
UrbanTHGrowth BoundaryST ST
DESTINATIONS + Class I Shared-Use Path BOUNDARIES
ST
EXISTING
O TO P
MILES 0 0.75 1.5 0 0.75 E VE F NO A T OO T SO AVE HEARN EN RD TH E LL IO D IS R AVE ST CAR D W 1ST LE Santa H I Franklin Santa Rosa Rosa Rural DR Community LE LN Amy's Kitchen Cemetery STEE Junior College Park 2019. PACIF IC AVE Map produced January E RA R FO TEproduced January 2019. Map TT AVE OT BR E LL IO H AV E CARR AVE YD Santa PLE EN MA SPENC ER AVE Rosa Rural Santa Rosa LN DR N BE N Junior College Cemetery A ST PACIF IC AVE EA RL E A RR TE BR YD T DR S EN RY COLL H SPENC ME EGE AVE ER AVE LN 4T TGO N MO AIL TR N A TO AS T T S S 9 TH H T T T 5 S S T D E 7 TH 3R D S ROS A ST DARV RYN COLL EGE AVE 2N TA MLEGA OO TH N C G 4 T N SA VAEIL MO A A TR Doyle OM H O EN AV SON Community T E T S ST 9 TH S H T Park 1ST 5T ST S ST D ST O 7 TH R J 3 D ROS A LLE 2N TA VA N E SA S VE AV E A A RN Doyle OM HEA H O E N A V SON Community NEOTOMEAS A ST AV E Park YOLANDA AVE 1ST LE Y RD PLE AL T MA T VEJ O S T E N L BE N VAL E MILES S BURT ST EA RL E ST
EXISTING
A
Class I Shared-Use Path
EN
ST
LN
Transit Station
EXISTING
D
9 T ID Urban Growth Boundary H HS A
Franklin Community Park
E AV
Class I Shared-Use Path Sidewalk Study
City Limts
ANAT E RD CH
N
PEDESTRIAN PROJECTS (SOUTHEAST)
Sidewalk
Study PROPOSED
LE S TE E
RD
N
Figure 5-10
LE
S WI
AS SE B City ClassLimts I Shared-Use Path COLL EGE AVE
ES
RECOMMENDATIONS SANTA ROSA BICYCLE
Y
CORBY AVE
Park
Y
DOWD DR SMART TRAIL
EXISTING
LINK LN
Taylor Mountain Regional Park
PEDESTRIAN SOUTHEAST
N STAR DR
Sa Rosa Cem
Hospital PACIF IC AVE Class I Shared-Use Path SMART Station W 9TH ST 9T Shopping Center Sidewalk SPENC ER AVE Hospital N Study A AT E RD CH Shopping Center T Park RD S W3
PEDESTRIAN RECOMMENDATIONS
& PEDESTRIAN MASTER SOUTHEAST PLAN UPDATE 2018 SANTA ROSA BICYCLE & PEDESTRIAN MASTER PROPOSED PLAN UPDATE 2018 Path Class I Shared-Use
Santa Rosa Junior College
MORGA N
PROPOSED
I KL AN FR
WILJAN CT MOORLAND AVE
CARR AVE SMART Station
Transit Station
E AV TTON DU
M
ST
Major Employer E LL IO
Community Park
IN
N
APPLE LN
OR YL TA
O
N U
TA
D SR
E AV
BURT ST
A SP RI GS N RD K A WAN
PROPOSED DESTINATIONS +
Major Employer WI LE SANTA ROSA BICYCLE BOUNDARIES Franklin Class I Shared-Use Path N Community LE L &R PEDESTRIAN MASTER SchoolTransit S TE E Sidewalk Park Station D PLANGalvin UPDATE 2018 Study TT AVE
VA LL EY
S O
N
YOLANDA AVE
NN ET T
Class III Bike Route Class IIIB Bicycle Boulevard School
SOUTHEAST
I KL AN FR
¹
R HEA
E N AV
PETALUMA HILL R D
101 £
BE
R
ELAND AVE
VE NA
BETHARDS D
EV
LGA
E AV
I KL AN FR
CO
N TO
CL
AS
MORAGA DR
ANAT E RD CH
Crossings
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
98
In addition to network projects for bicycling and walking, locations for new or improved crossings have been gathered and consolidated through this Plan Update 2018 from the numerous public outreach events and a review of past plans including the Uncontrolled Crosswalk Analysis and multiple Safe Routes to School assessment reports. Specific facility recommendations and designs for these locations will be developed by the City on a case-by-case basis due to the highly varied context at each intersection or midblock crossing location. Some locations represent multiple alternatives identified for possible crossings, and improvements may not ultimately be recommended at all locations. Some typical crosswalk markings and enhancements are described on the following pages, as well as in the Bicycle and Pedestrian Facility Guidelines in Appendix B.
Crossing locations were also identified where a trail crossing of a creek may be developed. These locations are identified as trail bridges and will be considered separately from crossings of the roadway network. Crossing locations and trail bridges are mapped in Figure 5-13 through Figure 5-18. CROSSWALK MARKINGS While legal crosswalks exist at all intersections, crosswalk markings highlight crossings to motorists, increasing awareness that people may be crossing the street. Crosswalk markings can also be used to guide people walking to desired crossing locations, or to designate legal midblock crosswalks. Standard “transverse” markings consist of two parallel lines that mark the edges of the crosswalk, shown at left and right in the illustration top right.
05
These markings are more noticeable to drivers and are typically used at uncontrolled crossings, where slower walkers are expected (near schools and senior centers), and where high numbers of pedestrian related crashes have occurred. In school areas, crosswalk markings are yellow.
CURB EXTENSIONS Curb extensions improve visibility of pedestrians and reduce crossing times by shortening the length of the crossing. This may reduce pedestrian collisions by reducing the length of time that pedestrians are exposed to potential conflicts with motorists. Curb extensions also narrow the perceived roadway width for drivers, which may reduce speeds. At signalized intersections, curb extensions can reduce delays by allowing for shorter pedestrian “walk” phases due to the reduced crossing distance.
Projects, Programs, & Policies
High visibility crosswalk markings can include “continental” crosswalks with bold white bars that run perpendicular to the pedestrian path of travel (shown top and bottom in the illustration top right), and “ladder” crosswalks which combine continental markings with the traditional transverse lines.
Curb extensions extend the sidewalk or curb line out into the parking lane on a street, reducing the effective street width. They can only be used where there is on-street parking, and should not encroach into bicycle lanes.
99
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
05
ADVANCE STOP OR YIELD LINE Advance stop bars are placed six to ten feet before a marked crosswalk to indicate to motorists where they should stop. At uncontrolled or midblock crossings, yield lines are used instead of stop bars. Advance stop bars or yield lines improve visibility of pedestrians by discouraging drivers from encroaching into the crosswalk. This is especially important at uncontrolled crossings on multi-lane streets, where a vehicle stopped too close to a crosswalk may hide a pedestrian from view of an approaching driver in the second lane. PEDESTRIAN REFUGE ISLAND Pedestrian refuge islands can improve pedestrian comfort and reduce collisions by providing a safe waiting area in the median on wide or busy streets. This allows people walking to cross the roadway in two stages, waiting for a gap in one direction of oncoming traffic at a time.
100
The waiting area should be protected by a physical barrier on either side, such as raised median islands or planters. The crossing surface should remain level through the waiting area, and may be angled to encourage pedestrians to face oncoming traffic as they approach the second crossing leg. Refuge islands may be combined with beacons or other treatments to further improve challenging crossings. RECTANGULAR RAPID FLASHING BEACON Rectangular Rapid Flashing Beacons (RRFBs) are used to increase visibility of pedestrians at marked crosswalks where traffic signals or stop signs are not warranted. They consist of a pedestrian crossing sign supplemented by a pair of bright rectangular lights that flash in a rapid alternating pattern when a pedestrian presses a button. Many assemblies are solar powered stand-alone units that can be installed without costly wiring work.
05
LEAD PEDESTRIAN INTERVAL
Pedestrian hybrid beacons, sometimes referred to as HAWK beacons, are a traffic control device that can be activated by a pedestrian to stop cross traffic. The beacon consists of three lights on an overhead mast arm that remain dark until a pedestrian presses a button to request a walk phase. Yellow lights flash in an alternating pattern to alert motorists that a red phase will be starting, followed by a solid red light that requires motorists to stop. A pedestrian signal shows a “walk” phase during this red signal, followed by a flashing hand and then “do not walk” phase. After the pedestrian phase concludes, the red signal goes dark and motorists may proceed.
Lead pedestrian intervals improve visibility of pedestrians at signalized intersections by beginning the “walk” phase a few seconds before the complementary green signal for drivers. This allows pedestrians to get a head start across the street, bringing them forward into the field of view of drivers who may be turning across the crosswalk.
Projects, Programs, & Policies
PEDESTRIAN HYBRID BEACON
101
AN
D W RE
MO
A
I TO
A
DR D
D
EXISTING
Commercial + High Mix DUse SANTA ROSA BICYCLE O APath R Class I Shared-Use & PEDESTRIAN Class II Bike MASTER Lane Industrial Class III Bike Route PLAN UPDATE 2018 F
DR
RANGE AVE
Preferred Crossing School DESTINATIONS + Enhancement Location BOUNDARIES Major Employer 101 Trail Bridge
£
CityTransit Hall Station SMART StationDENNIS LN
PINER RD
Limts Urban Growth Boundary
P
R
R OVE
S LAKE MA TH O
IN G TA
A
I TO
TE C ON
M
RANGE AVE
YUBA DR
Urban Growth Boundary LUDWIG AVE
MILES
1
LISCUM ST
AIRWAY DR
YERBA BU DR LEE O N A R
City Limts
2 Spring Lake Howarth County Memorial Park Park RF
MM
E
Park
0
TA
ARMORY DR
FULTON RD
RUSSEL
Shopping Center GUERNEVILLE R D
Franklin Community Park
SU
PETERSON LN
SMART Station Hospital
LINK LN
TE RD C H A NA VE
D E BLV FIN LEY AVC ITO E NT
RD
Park
GA
Transit Station
CardioVascular
L RD
RD RD ST E R OL BAD SEBA GOP
IS TO
UN FO
OCCID ENTA
Shopping Center
L AVE
E TON AV DU T
Hospital
C AL
PINER RD
DR LEO
SMART Station
Major Employer Meldotronic
ND AVE E LA
Youth Community Park
Transit Station
E RD AC
SAN MIGUEL A V E
N COFF E Y L
D
H
Amy's Kitche
W 9TH ST
Map produced February 2018. A Place HALL RD To Play W 3RD S T KWY
EV CL
R ES RN WALTZER RD BA
H O PP ER AVE
IS
School
DENNIS LN
D
L
LL WA
£
CROSSING LOCATIONS (CITYWIDE)
O PO AST
HEARN AV
Map produced January 2019.
S DR
DESTINATIONS + 101 AR BOUNDARIES H R
¹¹
ST
N
D W RE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
1.5 GUERNEVILLE R D
Major Employer
AN
CITYWIDE
HUMBOLDT ST
6
Ã
11
SAINT
PETERSON LN
0.75
School
SE B
AV E BURBANK
Urban Growth+ Boundary DESTINATIONS MILES BOUNDARIES MILES 0 1 2 0
AIRWAY DR
RUSSEL
FULTON RD
Youth City Community Park
L AVE
RD W3
ND AVE WEST AVE E LA
Current Park City Limts
EV CL
Shopping MIGUEL Center SAN A VE
W 9TH ST
LINK LN
N COFF E Y L
Park
Preferred Crossing Enhancement Location Trail Bridge
E TODD RD
H O PP ER AVE
D
ARMORY DR
SMART Station Hospital
Y Com P
E AV TTON DU
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
N
SANTA ROSA AVE
Taylor Mountain Regional Park
ELAND AVE
DESTINATIONS + BOUNDARIES
CITYWIDE
EV
Bicycle Boulevard
CL
DR
Trione-Annadel Class IIIB State Park
Galvin Community Park
RANGE AVE
S
T N
RD
D AR
O
BE T H
LE A
D
OA K
KM
DOWD DR CORBY AVE
R
R ES RN WALTZER RD BA
MOORLAND AVE
E
High Density CITYWIDE
R
Y
E
STANDISH AVE
PROPOSED PROPOSED Class II Bicycle Lane CROSSING IIB Buffered Bicycle Lane 12 Ã LowClass Density ENHANCEMENT Class III Bicycle Route Class IIIB Bicycle Boulevard Medium Density LOCATIONS Class IV Separated Bikeway
Class I Shared-Use Path LAND USE INTENSITY
IEL EE KS IDE
PROPOSED CROSSING ENHANCEMENT LOCATIONS
Preferred Crossing Enhancement Location Trail Bridge
R
LA
M O
TE C ON
M
RANGE AVE
HUMBOLDT ST
S LO
S
STO
ARMORY DR
R D
E
LL VA
LISCUM ST
I TA
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER DPLAN UPDATE 2018
MO
R
R OVE
ING TA
S LAKE MA TH O AIRWAY DR
RUSSEL
FULTON RD
PETERSON LN
RD
Skyhawk Park
MM
BEN N
T ET
Amy's Kitchen
N AV E
CR
VE DA
S WRIGHT RD
GA
A RD
NE B RID G
Figure 5-13
102
N
PROPOSED CROSSING ENHANCEMENT LOCATIONS
OO KW
¹
NORTHEAST E
Study
OO
LUDWIG AVE
E LE AV
TO AS
DR LEO
YUBA DR
YERBA B U
Howarth Spring Lake County Memorial Park Park RF
E AV
T ES
RD
E FIN LEY AV
BIKEWAYS
BR
MAP
L RD
SEBASTOP OL
RECOMMENDED FIGURE 3-2
ME L
T O LB
S
LINK LN
OCCID ENTA
Franklin Community Park
COLLEGE AVE
E TON AV DU T
A Place To Play W 3RD S T
E NT
TA
N
HALL RD
W 9TH ST
RD
LV D OB C IT
SU
GUERNEVILLE R D
BA DG E R
IS TO
PINER RD
ATE RD CHA N VE
ND AVE E LA
Youth Community Park
L AVE
UN FO Meldotronic CardioVascular
C AL
SAN MIGUEL A V E
E RD AC
N COFF E Y L
D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LL WA
H O PP ER AVE
D
KWY
EV CL
R ES RN WALTZER RD BA
DENNIS LN
IS
H ARR
P
S DR
£ 101
S WRIGHT RD
SAINT
PRIORITY DEVELOPMENT AREAS
¹
MEAmy's Ki LIT A R D
IE
LB
N
DR
SPRING ST
NORTHEAST SANTA ROSA BICYCLE & PEDESTRIAN MASTER ST H PLAN UPDATE 20184T TA
MENDOCINO AVE
NORTH ST
Y ARM O R
Y AV E D GWA
O LB
CARRIL LO ST
T
E AV
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
COLL EGE AVE
BEAVER ST
E AV
HE ALDSB U RG AVE
D OO
ST
A
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route SOT
H
ST
M OYO
PROPOSED EXISTING CROSSING ENHANCEMENT LOCATIONS Class IIIB Bicycle Boulevard
H 5T
TA
2N
ST
D
ST
SA
B
RO
D
ST
ST
Z
ILS
3R
ON
Y ARM O R
Station BR OO E AV
RIPLEY ST
0.75
SC OTT MILES 1.5
AVE
ST
¹
AV E BURBANK
0
MILES 1.5
ST 9 TH
DR LEO
HEARN AV
School
DOWNTOWN
Amy's Kitchen
Map produced January 2019.
Hospital
COLL EGE AVE
Park 9 TH
ST
City Limts
D 3R
Urban Growth Boundary 7T
H
ST
RD W3
ST
ST
A
H W 9T
BEAVER ST
ST
Shopping Center
ST
HE ALDSB U RG AVE
AN
SC OTT
CHERRY ST
City Limts ST
RIPLEY ST
RG
E AV
Hospital
Park T HUMBO LD
SMART Station
MO
CLEVEL AN D
Shopping Center
Transit Station LINCOLN ST
ST
School
SMART Station
ON
CROSSING LOCATIONS (DOWNTOWN)
Transit Station
ILS
DESTINATIONS + CARRIL LO ST BOUNDARIES
W
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Map produced January 2019.
MENDOCINO AVE
Figure 5-14
Preferred Crossing Enhancement Location Trail Bridge
Urban Growth Boundary
SPENCER Urban Growth Boundary
0 0.75 DESTINATIONS + T BOUNDARIES HS W 9T
Y AV E D GWA
0
0.1
L
WEST AVE
RD
O PO AST
ST
RI
VA
City Limts
Y LLE
SE B
ST
AN
BEN
T NE T
City Limts
RG
RD PO L
Park
RD W3
MO
MA
LINCOPark LN ST Shopping Center
E AV
STO
E L AV
DR
RCOP
A SE B
O PO AST
Y ARM O R
SE B
E AV
COLL EGE W 9THAV ST
Hospital
LINK LN
E ST
AV E
PROPOSED CROSSING ENHANCEMENT LOCATIONS
CLEVEL AN D
OLIV
TON DU T
¹
PLE
E AV TTON DU
D
Shopping Center
Preferred Crossing Enhancement Location Trail Bridge
N
OO KW
AV E
Major Employer Preferred Crossing SMART Station Enhancement Location CARRIL LO ST Transit Station Trail Bridge Hospital SMART Station
12 Ã
ELAND AVE
VA
SchoolTransit
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
EV
DR
Major LEmployer LE
BOUNDARIES
SA SANTA RO
ST
ST
SANTA Class ROSA BICYCLE III Bike Route AV E School Class IIIB Bicycle Boulevard RIDGWAY & PEDESTRIAN MASTER PLAN UPDATE 2018 DESTINATIONS + J O ST
ST
DOWNTOWN RAIL R O D ST A
D 3R
1ST
ST
101 £
EXISTING VE
A A DESTINATIONS + DOWNTOWN Class I Shared-Use Path Class II Bike Lane BOUNDARIES
OM
SE
ST
ST
D
SON
CL
PROPOSED CROSSING ENHANCEMENT LOCATIONS E
W
PL
ST
H 4T
E ST
N SA
TH
ST
ST
RANGE AVE
ST
ST
RIPLEY ST
W
AN
7T
6
RD W3
CHERRY ST
ST
ST 9 TH
ST
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER Class IIIB Bicycle Boulevard PLAN UPDATE 2018 Class IV Separated Bikeway DR ERY PROPOSEDStudy M O NTG O M
OK BRO
RG
E AV
SC OTT
Class II Bicycle Lane NORTHEAST
T HUMBO LD
MO
CLEVEL AN D
COLLEGE AVE
LINCOLN ST
H W 9T
DR
RECOMMENDED BIKEWAYS
SPENCER AVE
RI
P ROCTOR
ST
MILES 0.2
¹
103
ST
OL D RE D
AIRWAY DR
WALTZER RD
CLARE
HI
WY
PK A FR
NORTH ST
HUM BOL DT ST
KW O
D ST
VE AA
ST
JO
ST
ST
E ROSA AV
M AP P
LE
BE N
E AV
NE
ALL TT V
D EY R
U ETAL
MA H IL
E CO RBY AV
D LR
School
VE Youth NA TO Community AS Park
Major Employer
CLARE WI
SEQUOIA LL AVE
Urban Growth Boundary 1
MILES
¹
HALL RD
RANGE AVE
RUSSE
WALTZER RD
RK
City Limts
HARDI E S
FRANCISCO AVE
NC
CIR
PETERSON LN
E
O OPA YL
RD
AV
Park
0.5 MARSH RD
GU
R
Community Park
0
O
RD
PINER RD
Shopping Center Youth Park
PINE R CREST DR
W
ES
Shopping SAN MIGUEL RDCenter
Transit Station
Hospital
INDUSTRIAL D AIRWAY DR
RN
SAN MIGUEL AVE
HOPPER AVE
SMART Station Hospital
RE D
BA
School
SMART Station
Transit Station
OL D
DENNIS LN
DESTINATIONS + BOUNDARIES
S
SE
SANTA
VE ST O LI
101 £
LE
FULTON RD
ST
ON
RL E ST
E AV
B
ILS
OM
LN
RIDLEY AVE
WI
SPRING ST
ST
D O
T
ST
ST
SON
LN
FULTON RD
GAMAY ST
OW
RIPLEY ST
O
O
ES
A
W
ND
BR
ST
3R
2
EA DESTINATIONS + BOUNDARIES DU TTO N AV E
AVE
WEST AVE
ES HU GH
H 4T
N
PUTNEY DR
MORG A
RCO P
AV E BURBANK
O AST
RD PO L
Major Employer Preferred Crossing Enhancement Location Trail Bridge
E AV
DR
E AV
LINK LN
CROSSING LOCATIONS (NORTHWEST)
COLL EGE AVE
Preferred Crossing ST HLocation Enhancement 7T ST H Trail Bridge 5T ST D
L VA
NORTHWEST Figure 5-15 SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
IN
RID
12 Ã
RD
Santa Rosa Rural Cemetery
L AVE
PACIF IC AVE C UB WAY SANTA ROSA BICYCLE BEAR & PEDESTRIAN MASTER SPENC E R AVE PLAN UPDATE 2018 AV E GWAY
Preferred Crossing Enhancement Location W 3RD ST Trail Bridge
SE B
CARR AVE
Junior College
SANTA ROSA BICYCLE &PO PEDESTRIAN W 9TH ST MASTER IN T PLAN UPDATE 2018 RD
LN
SEBASTOP OL
VE TT A E LL IO
Y
L RD
Franklin Community Park
Santa Rosa NORTHWEST MCCO NNEL
N TO
EARDLEY AVE
BRITTAIN
FU LTO N RD
OCCID ENTA
KL
E AV
LE LN
ARMORY
GS
RD
N
CO
N IN
W 3RD ST
PROPOSED CROSSING ENHANCEMENT LOCATIONS
N
IS
COFFEY
FRANCISCO AVE
COFFEY
LN RANGE AVE
E AV
HARDI E S
NO CI
ELAND AVE
RUSSE
DO
C HA ATE RD N
PROPOSED CROSSING ENHANCEMENT LOCATIONS S TE E
UT ND
JEN
CLOVER DR
CIR
A Place To Play
104
N ME
EV
PETERSON LN
D B LV
Sonoma County Offices
GT D DIN
NORTHWEST ST ON
HALL RD
R D
N
CL
ADF
PROPOSED CROSSING ENHANCEMENT LOCATIONS
LOW RD M AR
YO
W COLLEGE AVE
L
ND B
NNI AL WAY
LL AVE
Northwest Community Park
R KSHIRE DR
IL
U
WY
OPAL
BIC ENTE
W STEELE LN
ER DR NCHEST
¹
E
W LE
SEQUOIA
H
Keysight Technologies
U
Meldotronic CardioVascular
MARSH RD
GUERNEVILLE RD
RKE
A R
R
Youth Community Park
DH OO
RD
PINER RD
W
ES
LN
RN
REST DR PINE R C
FO
INDUSTRIAL D
AV
Nagasawa Community Park
PA
Taylor Mountain Regional Park
HOPPER AVE
SAN MIGUEL RD
IS D
RO VE
TA
HARR
NT AI N G
UN
BA
SAN MIGUEL AVE
O MAS LAKE TH
TAY LOR MO
PY T
GI O NAL PARK T R IL A
E
SANTA ROSA
GI O NAL PARK T R IL A
Taylor Mountain T ST Regional B UR Park
OA
Galvin Community Park
M
DOWD DR
R
D
R
DENNIS LN
Map produced January 2019.
S
Galvin Community R IN Park
E
SMART
AV E
SANTA ROSA
RD
D BETH A R
RO
SMART TRAIL
T
R
DOWD DR
S RIN G KAWANA SP
IN YOLANDA AVE TA
UN
S
R
D NT O
D BETH A R
D
KM
TAY LOR MO
D
H
R
T ST B UR
A
RD
HEARN AVE
YR
D N EV E TO H A V AS TAC
L IL
101
YOLANDA AVE
Amy's Kitchen
Map produced January 2019.
£ RD
AH
Amy's Kitchen
S RIN G SP
TT VAL LE
M LU TA
101 £
HEARN AVE
R EO D LKAWANA
V E AV E ORABY
DR LEO
E N TO A V AS
AV E
MILES 1.5
AV E
MILES 1.5
V ERB ANK A BU
0.75
DU TTO N AVE
0.75
AV E BURBANK
0
WEST AVE
¹ ¹
Urban Growth Boundary
Urban Growth Boundary 0
L
OD
City Limts
O PO AST
DU TTO N RD L IL AH E UM WE AL ST AV PE T
SE B
CO RBY
City Limts
E ST
Park
City Limts
SE B
O PO AST
L
City Limts
0.75
0.75
¹
AV E BURBANK
0
0
MILES 1.5
MILES 1.5
WEST AVE
Urban Growth Boundary
Urban Growth Boundary
DR LEO
HEARN A
Amy's Kitche Map produced January 2019.
Map produced January 2019.
SA T IN
A
S MA
TH O
Galvin Community Park
RD HIA N PY T
U NTAIN G
Nagasawa Community Park
Keysight
DESTINATIONS +Technologies Meldotronic CardioVascular BOUNDARIES B ND
N AR
VD BL
School
ARMORY DR
AV E
LEY DR
NTE C IT O
AL
MO
H IDD
¹
OO
AVE
VE DA
105
RD
E
BA BUE NA Y ER MONTE VERD E
OO KW
DR
LE MAP
BR
N YO
CO R
DL
U RO
C
AN
S T ES
MID
VD BL
TE RD C H A NA
MILES D
T BLV RD S O 0.5 1 W 3TE C IT N MO
O LIVE ST
N AR
Park
0
RD
Shopping Center
AV E BURBANK
Urban Growth Boundary
Keysight Technologies Meldotronic CardioVascular
VE AA OM SON Doyle Community Par
R
U NTAIN G FO
LAKE H A
E AV
T
W 9TH ST D ER R B ADG
RD ES
RINCON AVE
Hospital
T O LB
COLLEGE AVE
CityHARVILLE Limts
GA STISTO CAAL
S MA
SPENC E R AVE
E AV TTON DU
R
SMART Station
Park
TA
N
TH O
Shopping Center
Transit Station
V
D
Major Employer VE P KW Y RO
RD
EN
Hospital
D
ND
B
Nagasawa Community Park
IS
School
CE LA
IS RR DR
EW
L SMART Station
L WA
S DR RE W ND
Preferred Crossing Enhancement Location Trail Bridge
Sonoma County
Transit Offices Station
N
A
ELAND AVE
T IN
CROSSING LOCATIONS (NORTHEAST)
EV
DESTINATIONS + BOUNDARIES SA
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
CL
NORTHEAST
Figure 5-16
TE RD C H A NA
Major Employer
HUM BOL DT ST
R D
RD
VE P KW Y RO R
FO
LAKE H A
IS RR DR
RANGE AVE
Preferred Crossing Enhancement Location Trail Bridge
D
MORAGA DR
OA
R
Taylor Mountain Regional Park
Amy's Kitchen
DR
A
T N O
D
S D
OA LE AF K
SA
State Park
DE RD
BETH A R
PROPOSED 101 £ CROSSING ENHANCEMENT LOCATIONS S RI N G KAWANA SP
E KSI
Preferred Crossing Enhancement Location Trail Bridge
KM S DR RE W ND
DR
AM O
BRU SH
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 Trione-Annadel
T IN
H VA
RID D R
E CH TA
12 Ã S TON EB
E
VE DA
VALLE YR D
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LO
G
RD
OO KW
N E TT
RD
CRE EK RD
AV E
LEY DR
AL
NTE C IT O
D
OO
BE N
C RE
RD
NORTHEAST
EL
AV E
SON Doyle Community Park
VE LE A MAP
NORTHEAST
RANGE AVE
ARMORY DR
HUM BOL DT ST
I
BR
VE CO RB Y A
WEST AVE
E DU TTO N AV
AV E BURBANK
DUTTON MEADOW
RF
E
E AV
T ES
O LIVE ST
W
GO NT
TA
S
Spring Lake County Park
MM
T O LB
T
ST
ES
A
A OM
S
ST 3 RD
MO
Y ER M
SU
TA
VE TON A UT D
W 9TH ST
Skyhawk Park
PROPOSED CROSSING ENHANCEMENT LOCATIONS MELI
SPENC E R AVE
COLLEGE AVE
DR
AL
U RO
H IDD
MO
V
PROPOSED CROSSING ENHANCEMENT LOCATIONS S
U NTAIN G
EN
BA BUE NA Y ER MONTE VERD E
DR
RD
ELAND AVE
RD
N YO AN
ON INC
RANGE AVE
E
EV
IS
C
R
D
RD
DL
CL
W LE
BLV ITO
MID
VD BL
TE RD C H A NA
Sonoma County Offices
EC NT
RD
N AR
MO
D ER R
U RO
LAKE H A
FO
B ADG
Keysight Technologies Meldotronic CardioVascular
GA ISTO
S MA
HARVILLE RD RINCON AVE
C AL
TH O
R D
ND
B
VE P KW Y RO
CE LA
Nagasawa Community Park
L WA
S DR RE W ND
IS RR DR
N
¹
Park
BE N
D
RD
LA
DR
M O
DOWD DR
VA L L EY
N HIA N
PY T
NORTH ST
RD
SPRING ST
CORBY AVE
HUM BOL DT ST
MOORLAND AVE
BRU
RF
N TO
E AV
IE L
BROOKWOO D AVE DOWD DR
VE A A
AS
MORAGA DR
W AY RS GE
OM
BAK
HE
RD
T TE AVE
Urban Growth Boundary KAWANA SPRINGS R D
PR CY
SS
WA
0.5
NTA ROSA AVE
Q UE
L FARM ERS N
O
SE
E
EA
LEY RD V AL Spring La County P
City Limts
H O EN AV E
Co
YOLANDA AVE
1
MILES
¹
WILJAN C T
EE K RD
SH
MO N
CR
C ST B ST A ST
E TT
Memorial Park
BAKER AV
HEARN AVE
0
M
A
S
SANTA ROSA AVE
G
A
S
SP
AV E TO TEC I
GI O NAL PARK T R IL A
DR
E
VICTORIA DR
D
R
W AY
DUTTON M EADOW
G
RI N
SP
BURGESS DR
CR EE
R
D
VA L L EY
R
AV E MA
D
SON
ParkE
IL
ST
E AV
N BE N
Shopping Center
DR
TR A
SE
EY RTL
Y
VA
RD ILL A H ME U M UM AL S PE T
SPRING ST
RD
ST
NORTH ST
WILJAN C T
BRU SH
DR
GE
RO
LISCUM ST
STONY POINT RD
W AY
RS
GE
RO
AV E
SANTA ROSA
LE
S DE L
D NT O
D
GI O NAL PARK T R IL A
A
ST
VA L
DR
KM
C ON RIN
T
E
ST
EN TH LN 9 Trione-Anna OM State Park A A
OA
ST DR HN STAR 5T ST D 3R ST D 2N
School
WD DR
AV E
NTE
N
AH
GR
RS
BRU SH
AH
GR
ST
E AV OT LB TA DR ARK
M ID
ES
HA
E LLI
DOY LE P
H 4T
VE ST OL I
DOWD DR
RI N
E Y DR
CI TO
V ALL
H ID
CREEK RD
AV E
E Y DR
CI TO
MO
N HUM BOL DRDT ST
N
H ID
NTE
V ALL
ARMORY DR
L AC R M EE O RD
TAINGR
N
MO
RANGE AVE
S
BR YD
A K EA F
E DL
SMART TRAIL
D
S ON
BELLEVU EO AVE L
Hospital
N FRA
HUM BOL DT ST
SPENC E R AVE R
AV E
E
DUTTON AVE
TH O FO UN
TAINGR
FO UN
LAKE H A
S MA
RP O RATE C ENTE R PKWY
O ND
HUMBOLDT ST
ME
BR ID
G
R
ST
SANTA ROSA
RD
LAKE H A
ILL
CO
AH
AS TH OM
M LU
E AV
BU R T
COLL EGE AVE
MISSION BLV DST B
S
D
A
DOWD DR
P E TA
Franklin Community Park
N
ARMORY DR
AVE
I KL AN FR
ERFIELD RD MM SU
SMART TRAIL
ROSA
A
E AV
RANGE AVE
ST
AVE
I NO
TA
SMART StationHowarth
DR
ST
Doyle Community Park
J O Limts City LE
Skyhawk Park
EA RL E ST
ST
L VA
TONE
Trione-Annadel State Park
K
Hospital
Park
OC TE TA E ND M
RD
DE RD
RO O
D
ST
SON
MELI
Preferred Crossing Santa AR L Rosa RuralP E Enhancement Location Cemetery Trail Bridge S
R
SMART Station T
VE A A OM
CORBY
C ON IN
D
Shopping Center
ST
KAWANA SPRINGS RD
ANAT E RD CH
Transit Station M AP LE
RB LDE
D
E KSI
A
E AV OT LB TA DR ARK DOY LE P
T
B
ST
ES
A
ST H T 5T S D 3R
E AV
LN
S
R
AVE OTT E LLI AY CARR AVE W EN Santa Rosa DR TALMADGE REAmy's G Junior College ST Kitchen A PACIF IC AVE HE
ILL
EN
S
FO OT H
Transit Station
H 4T
2N
YD
DUP ONT D R TE 1 2
D
Galvin DESTINATIONS + SONO Community Park ST 12 E ROBLES AVE BOUNDARIES W ROBLES AVE Ã JO LLE
School BR
SPENC E R AVE
COLL EGE AVE
T 9 TH S ST 7 TH
A UP
E AV
PACIF IC AVE
R
T 9 TH S ST 7 TH
Taylor Mountain Regional Park
N
Santa Rosa Junior College
T
D BETH A R
Galvin R Community IN A Park
N E T D N ID U TAY LOR H MO
VE NA
B YERBA UEN
DR
LO
L YU
R
S
Skyhawk Park
SO U
C RE
Santa DESTINATIONS + Rosa Rural Cemetery BOUNDARIES
CARR AVE
CROSSING LOCATIONS (SOUTHWEST)
106
D
ON NY
E AV HO EN
ERFIELD RD MM SU
Taylor Mountain T ST Franklin B UR Park Regional
AY W
E
AVE OTT
Preferred Crossing Enhancement Location Trail Bridge
LN
TA
N
VE LE A
YOLANDA AVE SANTA ROSA BICYCLE RD LO & PEDESTRIAN MASTER N E R A I L Spring Lake D PLAN K T UPDATE 2018 ID County Park H
TARY E RD M
FA RM ERS
UN
Community Park
Amy's Kitchen
TE TA
RD
VE DA
RD
I KL AN FR
T ST B UR
C ON IN
O WO OEK O AV
D BETH A R
S
S RD RIN G KAWANA SP
YOLANDA AVE IN
TAY LOR MO
A
LE
E AV
Y
RD N AVV E TO E AS ACH T N A D H AT E R
R
AVE YOLANDA HEARN AVE
SANTA
E ST
LE
LVD MISSIO N B
RD AE
DD
T
VAL LE
L IL
RD
D
Preferred N ETCrossing DR T VAL L EY H RD Enhancement Location VA C RE E E KSI DE CH RD TA DR HTrail Bridge A A
AH
101 £
H
E RE
RD
DD
C
MI
LVD MISSIO N B
T ES
HO EN
UM AL PE T
S RIN G KAWANA SP
C
N ETT
T SO U
ST EA
G
VE AVE LE ABELLEVUE BEN VE
OO
AV E E AV
DR LEO
BEN
BRA UP
S
MA P
BR
M
DU TTO NRD L IL A HC I NO E U M AV WE AL ST O P E T E ND
V E AV E Y RB CO DA OO OLIVE ST KW
AVE P LE
L YU
ST
E AV
RD
R
MA P
A LG CO
E BAKER AV
SOUTHEAST
O G Ã NT MO SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018 O LB
B
T
T RMERS LN E S FA
O LB
ST
ST AV E ST D MA 1ST NO 3R SO
CA
D
ALOISE AVE
MELI
L TR A I Spring Lake K County Park
GA ISTO
MI
AV G KTO BURBAN AL IS
D
BLV ITO
R
E AV
A M
C AL
WE ST AV E
I ST
D
SOUTHEAST
SPENCER AVE RNCH BELLEV UE 12 ST H 4T S T ST Y AV E H ER 7T MA H M NO 5T O G SO ST O N T Doyle D M Community Park 2N
E N TO A V AS
E LLI
RD
O BLV C IT
TA
A
A
T ES
MA
ER B ADG
D ER R
R LEO D
RD RD TE HARVILLE C H A NARINCON AVE
N
O
AV E
PROPOSED CROSSING ENHANCEMENT LOCATIONS
B ADG
EC NT MO
E AC LL WA RD
KER HI L L
TT MORGA N S
S WRIGHT RD
T
E AV
ES
O
ST
O LIV
E DU TTO N AV
D
CO MA LL
PA
INT RD STONY PO
RD
S
101 £
BARH AM
RINCON AVE
VE L AZZI N I A
PACIF IC AVE
Doyle Community Park
T
101
E AC LL WA E MCMINN AV
S DR EW
KER HI L L
ELAND AVE
ST
ST
ST
TST S D 3 RD 2N
L O PO AST
£ AV E
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
H 4T
ES
Figure 5-17
Map produced January 2019.
1ST
E ANK AVRB RBYBU
¹
CO OLIVE ST
Amy's Kitchen
Map produced January 2019.
ST
DR LEO
SPENCER AVE
W 9TH ST 9TH
ST LINK LN B
O AST
RD PO L
YUBA DR
PACIFIC AVE
W
ST
SE B
HEARN AVE
SOUTHEAST
E AV TTON DU
ST 3 RD
WEST AVE
¹
AV E BURBANK
MILES 1.5
0.75
EV
N
SE B
ST
R
E D NT SR MO WI LE B D E R OM YERBA UEN OSS Franklin PEAERBL D DR RD AT Community V E YO N C HLN AN N A CAN R ST E E L E A R Southwest HE Park SCommunity R E Santa Rosa DUP ONT D TT AV Park Rural Cemetery EL L IO Santa R TE 1 2 E AV HEARN Rosa W Junior College
T H S ST 7T H 5T
D 3R
DU TTO N AVE
City Limts PROPOSED City Limts Urban Growth Boundary CROSSING Urban Growth Boundary MILES ENHANCEMENT 0.75 1.5 LOCATIONS
Junior College
A
W
Park
T MORGA N S
LINK LN
Park Shopping Center
0
PA
ELAND AVE
E AV TTON DU
Hospital
W 9TH ST 9TH
E HE S AV H UG
ST
D
EA RL E ST
AV E H AM BA R W HARVILLE RD
PROPOSED CROSSING ENHANCEMENT 12 Ã LOCATIONS
Sonoma County Keysight OIN T PK WY Offices NO RT HP Technologies R
RD W IS LE E Franklin D Community LN ST E E L E Park E Santa Rosa TT AV EL L IO Santa Rosa Rural Cemetery
LUDWIG AVE
Shopping Center
R Keysight Technologies Meldotronic CardioVascular
R
Sonoma County Offices
EV
N
Hospital
0
Nagasawa Community Park
CL
CL
SMART Station
Transit Station
Nagasawa Community Park
E PKWY OV
PKWY
VE O
Meldotronic CardioVascular
DESTINATIONS + Class I Shared-Use Path Class II Bike Lane BOUNDARIES
¹
S DR EW
Class IIIB Bicycle Boulevard
Major Employer
T
12 Ã
R ND
R ND
IS RR DR
Station
ST
RCO P
T IN
A
EXISTING
SMART Station
IS RR DR
T IN
Class I Shared-Use Path Class II Bicycle Lane Class IIB Buffered Bicycle Lane E FIN LEY AV Class III Bicycle Route Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane Class IV Separated Bikeway Study Class III Bike Route
SchoolTransit
ST
LN
E FRESNO AV
Class IIB Buffered Bicycle Lane SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER RD SEBASTOP OL Class IIIB Bicycle Boulevard PLAN UPDATE 2018 ClassSanta IV Separated Bikeway Rosa PROPOSEDStudyJunior College SA
DESTINATIONS Major+Employer BOUNDARIES
ST
A
CID ENTAL RD
Class III Bike Route School Class IIIB Bicycle Boulevard
D 3R
TS 1S
SA
OC Class II Bicycle Lane NORTHEAST
EXISTING
ON
FU LTO N RD
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
Southwest Branch
2N
SO
RD W 3
ST H 5T ST H T 4
ILS
LINK LN
ST
BRITTAIN
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
B
RD
W
T
HALL RD
W 3 RD
ST
ST
IN
7 TH
A
PO
CHERRY ST
OC
ST
W 9TH ST
Y
A Place To Play
NORTHEAST
AN
ST ON
N DUT TON AVE
RECOMMENDED BIKEWAYS
R OV ER D
IN
RIPLEY ST
CL
C IR
CREEK RD
IA
RO
UO
ND ME
Q
RG MO
S
E
R W AY
RS GE RO
RD
OWLS
S O M LA S
Station
CARR AVE
BR YD
EE K RD
AV E TO
NORTH ST
CR
TEC I
BRU
SH
MO N
IE L
BROOKWOO D AVE
RF
E AV
HE
D RD
WD DR
PR CY
O
SE
E
SS
WA
0.5
NTA ROSA AVE
Urban Growth Boundary KAWANA SPRINGS R D YOLANDA AVE
1
MILES
¹
107
WILJAN C T
W AY RS RO
GE
VE A A
N TO
MORAGA DR
DR VA L L EY
SPRING ST
Amy's Kitche
ST
NORTH ST
EA ST HEARN AV
SE RD ILL A H ME U M UM AL S PE T
HUM BOL DT ST
LD
RD
JO
City Limts
H O EN AV E
0
OM
AS
BAKER AV
AVE
J O Limts City LE
SON
HEARN AVE
ST
L VA
DR
T TE
ST
Park
Doyle Community Park
L FARM ERS N
D
ST
SON
VE A A OM
Shopping Center ParkE
Q UE
DR
Shopping Center
ST
EY RTL N FRA
K
D
Hospital
HA
SMART Station T Hospital
LE
Co
DR LEO
SMART Station
R
RO O
T
B
ST
ES
A
ST H T 5T S D 3R
C ON RIN
D
A
S
L
Transit Station
RB LDE
H 4T
2N
LN
Transit Station
COLL EGE AVE
T 9 TH S ST 7 TH
EN
E AV OT LB TA DR ARK DOY LE P
Preferred Crossing Enhancement Location Trail Bridge
YD
O PO AST
E Map produced January 2019. LE AV LEY RD AL M AP T V Spring L NE T N E B County P EA RL E ST Howarth BAK Memorial Park
FO OT H
School BR
SPENC E R AVE
E DL
PACIF IC AVE
ST
Santa Rosa Junior College
L VA
School
ILL
CROSSING LOCATIONS (SOUTHEAST)
¹
D 2N MILES VE MILES A A 1.5 OM 1.5 SON
Map produced January 2019.
Santa DESTINATIONS + Rosa Rural Cemetery BOUNDARIES
CARR AVE
0.75
VE ST OL I
E AV
AVE OTT
ST
3R
0 0.75 DESTINATIONS + 12 BOUNDARIES Ã
N
E LLI
E
SE B
Urban Growth Boundary ST
0
ST 3 RD
H T Urban Growth Boundary 5T S D
D
N
Limts
A W
ST
M ID
T
E
H 4T
City Limts ES
D
MISSION BLV DST B
I KL AN FR
H
ID
ST
E AV
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
T City 9 TH S ST 7 TH A
I NO
Franklin Community Park
SOUTHEAST Figure 5-18
ParkCOLLEGE AVE
ANAT E RD CH
OC ND
N STAR DR
Park Shopping Center
9 TH
LN W 9TH ST
E AV ST AVE WE OT LB TA DR ARK DOY LE P BURBANK AV E
Preferred Crossing Enhancement Location Trail Bridge
EN
A
Hospital
LINK LN
SPENC E R AVE Shopping Center
E AV TTON DU
HUM BOL DT ST
N
Preferred Crossing Santa Major Employer Santa Rosa SMART Station Rosa Rural Enhancement Location Junior College Cemetery Transit Station PACIF IC AVE Trail Bridge Hospital SMART Station
PROPOSED CROSSING 101ENHANCEMENT £ LOCATIONS
N
E AV
OTT E LLI
Galvin SANTA ROSA BICYCLE Community & PEDESTRIAN Park MASTER PLAN UPDATE 2018
APPLE LN
E
N
Park
Transit School AVE
RD
Taylor Mountain Regional Park
D
ELAND AVE
ID
EV
I KL AN FR
Community BOUNDARIES
H
CL
E AV
Major Franklin Employer
V
A LL SOUTHEAST E Y
YOLANDA AVE
DR
I NO
NE TT
E LLI
RANGE AVE
OC ND
SANTA ROSA BICYCLE Class III Bike Route School Class IIIB Bicycle Boulevard & PEDESTRIAN MASTER PLAN UPDATE 2018 DESTINATIONS +
R
AVE PA
BE N
HANAT E RD
ME
BROOKWOO D AVE
EXISTING
C SOUTHEAST DESTINATIONS + Class I Shared-Use Path Class II Bike Lane BOUNDARIES
LU
MORAGA DR
R
D
YU
SANTA ROSA AVE
E
R
CORBY AVE
Trione-Annadel State Park
KSI D
R
D
DOWD DR
MO U
O ND
CHE V AH D TA
BETHARDS D
ME
WILJAN C T
S AINT FRANCIS RD
ME
EE
VA L L EY
SPRING ST
NORTH ST
RD
Class II Bicycle Lane PROPOSED EXISTING Class IIB Buffered Bicycle Lane Class III Bicycle Route CROSSING Class I Shared-Use Path Class IIIB Bicycle Boulevard Class II Bike Lane ENHANCEMENT Class IV Separated Bikeway Study Class III Bike Route LOCATIONS Class IIIB Bicycle Boulevard
PROPOSED CROSSING ENHANCEMENT LOCATIONS
KAWANA SPRINGS R D
HEARN AVE
TR
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER Class IIIB Bicycle Boulevard PLAN UPDATE 2018 Class IV Separated Bikeway PROPOSEDStudy
D
CR
S LL
RD ILL
E BAKER AV
EL
Class II Bicycle LaneL NORTHEAST
IE L
WAY
O
AH
E AV
E
SS
NEOTOM AS AV E KN
UM AL PE T
N TO
MM
HUM BOL DT ST
SU
PR CY E
LLEY RD
AN N
Class I Shared-Use Path
EA RL E ST
AS
RF
AVE
ST
ST
BE N
A T V NE T
SON
VE A A OM
H O EN AV E
SE
VE ST OL I
E AV P LE
CH
T TE
JO
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
Q UE
LE
DR
N FRA
L VA
Doyle Community Park
L FARM ERS N
ST
VE A A
DR
D
ST
OM
ST
H
Y TLE AR
K
T
B
ST
SON
A
RO O
ES
A
ST H T 5T S D R 3 ST D 2N
LN RB LDE
H 4T
EN
E AV OT LB TA DR ARK DOY LE P
COLL EGE AVE
BR YD
Howarth Memorial Park
SPRING ST
D
O
L SANTAITAROSA BICYCLE RD MO N TG Y DR &OMER PEDESTRIAN MASTER PLAN UPDATE 2018
Spring Lake County Park
ILL
SPENC E R AVE
MA
A
E AV Santa Rosa Rural Cemetery
FO OT H
PACIF IC AVE
T 9 TH S ST 7 TH
K IN HAW NTA Skyhawk Park
NORTHEAST
BRU
SH
MO N
N
CARR AVE
Santa Rosa Junior College
YE R BA BU E NA RD TE VE R DE DR NEST D R
ME L
E
AVE OTT E LLI
N
RECOMMENDED BIKEWAYS
12 Ã
CR
TEC
I TO
EE K RD
AV E
DR VA L L EY
N
D DU PON T
RD
E
CALISTOGA
I KL AN FR
D
RD
E AV
ID
C ON RIN
I NO
H
E DL
OC ND
Franklin Community Park
R
MISSION BLV D
ME
¹
ANAT E RD CH
M O
M ID
Studies
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
05
108
A number of locations, including both bicycle and pedestrian corridors, require greater community outreach and/or analysis than can be conducted as part of this planning process. At some locations, further study is needed to determine whether bicycling or walking facilities are feasible. At others, a preferred facility has been identified but further study or outreach is needed to develop a detailed design or alignment that balances the needs of all community members. Studies are mapped with bicycle, pedestrian, and crossing projects on previous pages, and are described briefly below. STONY POINT ROAD CORRIDOR STUDY Stony Point Road is an important artery of the bicycle and pedestrian network in Santa Rosa, providing a north-south connection across State Route 12 from Guerneville Road to Sebastopol Road. It is also a busy, high-speed arterial street, with average daily traffic volumes between 20,000 and 30,000 and posted speed limits of 35 to 40 mph.
The corridor is also part of the HIN for both bicyclists and pedestrians, with fatal or severe injury collisions occurring at a higher frequency than other corridors in the community. This Plan Update 2018 recommends this corridor be studied from Guerneville Road to Sebastopol Road for bicycle or pedestrian facilities that increase comfort and may reduce the frequency and severity of collisions. OAKMONT CONNECTION ALTERNATIVES After the removal of a portion of the designated Bicycle Route 231, multiple alternative routes are identified for study to create a new walking and bicycling connection to SR 12 and the planned Sonoma Valley Trail through the Oakmont neighborhood. Some alternatives also have potential to create improved access for emergency vehicles into the Oakmont neighborhood. Community outreach produced differing opinions on acceptable locations for connections, suggesting a need for further study and more intensive engagement with neighborhood residents to identify a preferred route.
4TH STREET BIKEWAY
4th Street near College Avenue is a wide, multi-lane street that lacks comfortable bicycling facilities.
Bicycle facilities are recommended for further study on Montgomery Drive from Summerfield Road eastward, ending near Spring Lake and Boas Drive. This entire corridor was recommended for Class II bicycle lanes in the 2010 plan, and the segment west of Mission Boulevard was identified as part of the HIN during this Plan Update 2018. Montgomery Drive is narrow through this section; providing bicycle facilities may require widening the road or providing a separate Class I shared use path.
05 Projects, Programs, & Policies
4th Street is an important connection from D Street in downtown Santa Rosa to Farmers Lane where it becomes State Route 12. This corridor has limited space available, and was identified as part of the pedestrian HIN during this Plan Update 2018. A study is necessary to evaluate alternatives to provide bicycling or walking facilities while balancing high traffic volumes and other needs.
MONTGOMERY DRIVE BICYCLE FACILITIES
A second study for bicycle facilities on Montgomery Drive is recommended in this Plan Update 2018 between Alderbrook Drive and Hahman Drive. This segment was also identified as a priority in the 2010 plan.
109
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
05
110
COLLEGE AVENUE COMPLETE STREETS STUDY
BROOKWOOD AVENUE PEDESTRIAN IMPROVEMENTS
Between Kowell Lane and Morgan Street, College Avenue is a highly used corridor with limited right of way and a strong demonstrated need for bicycling and walking improvements. Between Link Lane and Mendocino Avenue, this corridor is part of the HIN identified during this Plan Update 2018. The width, lane configuration, and onstreet parking presence vary along the corridor, creating challenges for people walking and bicycling. A complete streets study is recommended to develop a corridor plan that balances the needs of all modes of transportation.
Brookwood Avenue from 2nd Street to Sonoma Avenue, across Santa Rosa Creek, was identified by the community during outreach for this Plan Update 2018. A study should evaluate opportunities to improve pedestrian access and comfort along this corridor, including considering pedestrian-scale lighting.
CONNECTION FROM SMART TO CODDINGTOWN MALL A study is recommended to identify a desirable route for people walking and bicycling between the SMART Santa Rosa North station and Coddingtown Mall, consistent with the station area plan. This may include an off-street connection between Range Avenue and Herbert Street, or across Steele Creek south of Guerneville Road. Once a preferred route is established and built, wayfinding signs should be installed to create a comfortable and easy-to-navigate connection.
BENNETT VALLEY ROAD TRAIL This study should evaluate alternatives to provide a Class I shared use path or other bicycling and walking connection along Bennett Valley Road from Farmers Lane to Yulupa Avenue. This Plan Update 2018 includes projects that connect to each end of this study: a Class I shared use path extending south from the intersection at Farmers Lane will connect to Yolanda Avenue, and Class II bicycle lanes will continue southeast on Bennett Valley Road from the intersection with Yulupa Avenue.
MCCONNELL AVENUE BICYCLE BOULEVARD
CAR-FREE ELLIOTT AVENUE
The Roseland neighborhood, newly annexed into the City of Santa Rosa, developed as an unincorporated area of Sonoma County and lacks sidewalks or other pedestrian connections in places. A shared use path along Roseland Creek would create a comfortable connection for people walking and bicycling between Stony Point Road and Burbank Avenue, potentially creating an alternative that allows bicyclists and pedestrians to avoid Stony Point Road which was identified as part of the HIN.
05 Projects, Programs, & Policies
Between Mendocino Avenue and North Street, McConnell Avenue is a candidate to create a bicycle boulevard connection on McConnell Avenue. This connection was identified as a desired bikeway by the community during outreach for this Plan Update 2018, and will be studied for feasibility including consideration of traffic speeds and volumes, parking utilization, neighborhood outreach, and crossings or connections at either end of the new facility.
ROSELAND CREEK TRAIL
Elliott Avenue, on the north edge of the Santa Rosa Junior College Campus, is an attractive route for people walking and bicycling. The street could potentially have significantly increased active transportation uses pending the outcome of the Highway 101 overcrossing environmental review. Community members expressed a desire for the City to consider closing Elliott Avenue to car traffic and creating a bicycle and pedestrian mall connecting the future Highway 101 overcrossing and Mendocino Avenue.
111
CITYWIDE PROJECTS
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
In addition to specific infrastructure projects and related programmatic efforts, some amenities are needed citywide to complete the active transportation network. These amenities should be installed as a matter of policy in conjunction with any City project as opportunities arise, or when development occurs. Citywide amenities recommended in this Plan Update 2018 include a comprehensive wayfinding program and secure bicycle parking.
Wayfinding
The California Manual on Uniform Traffic Control Devices (CA MUTCD) includes standard bicycle wayfinding signs, but they are also used for Class III Bicycle Route signs. This may cause confusion for bicyclists, and does not serve pedestrian wayfinding or trail users. Some cities have modified the standard sign to change “bike route” to “bikeway,” and others have developed and installed non-standard enhanced wayfinding signs that include unique branding for the community. The non-standard option provides the most flexibility to meet community needs and serve both bicyclists and pedestrians.
Wayfinding signs direct bicyclists or Fundamental Navigational Elements • On Street Signage This Plan Update 2018 recommends pedestrians along the existing network the City develop and implement a and to key community destinations. comprehensive wayfinding program for Signs typically include distance or time bicyclists and pedestrians, integrating and direction (using an arrow) to key this program with SMART station and destinations. Santa Rosa currently does downtown wayfinding initiatives. not have a consistent wayfinding sign program implemented throughout the city. 11’ 10’ NW Street Name
9’ 8’ 7’
Destination One
6
Destination Two
2
Destination Three
To Destination One
1
6’ 5’ 4’ 3’ 2’ 1’
Decision
Turn
Confirmation
112
EAST CENTRAL WISCONSIN WAYFINDING
BLACK & WHITE:
Street Sign Blade
Bicycle Parking
SHORT TERM BICYCLE PARKING Bicycle parking can be categorized into short-term and long-term parking. Bicycle racks are the preferred device for short-term bicycle parking. These racks serve people who leave their bicycles for relatively short periods of time, typically for shopping or errands, dining, or recreation. Bicycle racks provide a high level of convenience and moderate security. The rack types illustrated below and recommended for use in Santa Rosa are consistent with the Association of Pedestrian and Bicycle Professionals (APBP) Essentials of Bike Parking: Selecting and Installing Bike Parking that Works (2015). The City may also choose to partner with local artist
LONG TERM BICYCLE PARKING Long-term bicycle parking includes bike lockers and secure parking areas (SPAs) and serves people who intend to leave their bicycles for longer periods of time. Bike lockers may vary in design and operation including keyed lockers that are rented to one individual on an annual or monthly basis or e-lockers that can be reserved online in hourly increments and unlocked with a credit card or an access code.
05 Projects, Programs, & Policies
No bicycling network is complete without convenient and secure bicycle parking. Bicycle parking can take many forms, from a simple bicycle rack to secure storage in a locker or gated area. This Plan Update 2018 recommends the City continue to expand its bicycle parking as opportunities arise and new development occurs.
groups to pursue customized racks that serve as bicycle parking in addition to public art. Where possible, on-street bicycle corrals can be used to provide increased bicycle parking where high demand or limited sidewalk space exists.
These facilities provide a higher level of security than bicycle racks, and are typically found at transit stations, multifamily residential buildings, and commercial buildings, though they may also be useful in Downtown Santa Rosa, near SMART stations, or in other areas where bicyclists running multiple errands would benefit from a secure place to store parcels in addition to their bicycle.
113
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
05
114
Pedestrian Scale Lighting
Amenities
Pedestrian scale lighting is a type of lighting with frequent lampposts at low height that illuminate the walking area. This typically includes poles 12 to 15 feet high spaced 25 to 30 feet apart, directly above walking areas. Pedestrian scale lighting not only increases visibility of pedestrians for drivers at night, it contributes to a more comfortable and inviting streetscape for people walking at night.
Sidewalk and trail furnishings like benches, shade structures, restrooms, water fountains, and trash receptacles contribute to a cleaner, more comfortable, and more pedestrian-oriented public realm. These elements not only encourage the activation of Santa Rosaâ&#x20AC;&#x2122;s sidewalk and trail networks, they contribute to a more accessible pedestrian network for all residents. The City has adopted a Street Furnishings Palette as part of its Bicycle and Pedestrian Facility Guidelines for the downtown core area, which may be expanded to include recommended furnishings for trails and other areas of the community. Seniors and those with mobility impairments will benefit from frequent places to stop and rest, and this was a priority identified by the community during outreach for this Plan Update 2018.
Pedestrian scale lighting should be appropriately designed to illuminate only the areas needed and be no brighter than necessary. Street trees should be appropriately maintained so they do not obstruct illumination from the lighting along sidewalks and pathways. This Plan Update 2018 recommends the City evaluate locations where pedestrian scale lighting may improve pedestrian comfort and encourage walking, including Downtown, the junior college area, and trails.
This Plan Update 2018 recommends the City identify and pursue opportunities to provide amenities in the downtown, near transit stops, and along trails in the community.
PROGRAMS
The fifth E commonly included in discussions of active transportation is Engineering, which is reflected by the recommended infrastructure projects listed in this chapter.
Education programs are designed to improve safety and awareness. They can include programs that teach students how to safely cross the street, or teach drivers where to anticipate bicyclists and how to share the road safely.
Programs recommended on the following pages should include outreach and education in both English and Spanish to serve the diverse Santa Rosa community. Given limited staff time and resources available, programs should be implemented or continued as funding and resources allow. Partnering with local organizations and other agencies is a key strategy to sustainable program activity.
Encouragement programs provide incentives and support to help people leave their car at home and try walking or bicycling instead.
05 Projects, Programs, & Policies
This section describes recommended bicycle and pedestrian related programs for the City of Santa Rosa. The recommendations are organized in four Eâ&#x20AC;&#x2122;s:
Enforcement programs enforce legal and respectful walking, bicycling, and driving. They include a variety of approaches, ranging from police enforcement to neighborhood signage campaigns. Evaluation programs are an important component of any investment. They help measure success at meeting the goals of this Plan Update 2018 and to identify adjustments that may be necessary.
115
Education UPDATED “STREETSMARTS” CAMPAIGN
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
116
Santa Rosa has joined other California cities in implementing “StreetSmarts” media campaigns. StreetSmarts uses print media, radio, and television to educate the community about safe driving, bicycling, skateboarding, and walking behavior. As part of this campaign, the City distributed posters with messages that addressed issues such as: red light running, speeding, bicycle safety, crosswalk safety and compliance, school zone speed compliance, and stop sign compliance. This Plan Update 2018 gives Santa Rosa an opportunity to update these messages to address the most current priorities they have heard from the community, including not texting while driving or walking, how to securely lock your bicycle, the importance of being seen at night as a pedestrian or bicyclist, and helping drivers understand where to anticipate bicyclists. One message identified by the community as a priority is increasing
awareness of California’s Three Foot Passing law, which requires drivers to overtake bicyclists only when there is sufficient room for a three-foot clearance. The County is currently running a related campaign that the City could support with their own artwork and messaging. Artwork for the updated campaign could be created by local students as part of a Traffic Safety Poster Contest, or photos of local families on streets that will be familiar to the community could be used. Posters could also highlight and share information about newly completed projects, such as green transition areas. Funding could be provided by a grant from the California Office of Traffic Safety. To maximize engagement and effectiveness of the campaign, the city can develop messaging and choose graphics with involvement from the Bicycle and Pedestrian Advisory Board, Sonoma County Bicycle Coalition, law enforcement, schools, business owners, civic leaders, and community advocates.
BICYCLE SAFETY EDUCATION FOR ADULTS
This Plan Update 2018 recommends continuing these classes, which the City can support by advertising the classes and/or providing meeting space.
Santa Rosa benefits from a robust Safe Routes to School (SRTS) program coordinated by Sonoma County Transportation Authority (SCTA) and the Sonoma County Bicycle Coalition. Twenty-six schools in the City participate in activities with the SRTS program, but involvement varies from school to school. This Plan Update 2018 recommends the City seek grant funding to prepare a SRTS Plan to document and evaluate effectiveness of existing program activities, and identify priority programs to expand to all schools. This should include Suggested Routes to School maps at all schools, which help families plan their walking or bicycling trip to school by highlighting enhanced crossings and bikeways, and continued participation in school walking audits to identify infrastructure improvements.
05 Projects, Programs, & Policies
The Sonoma County Bicycle Coalition (SCBC) currently offers Smart Cycling classes once a month at their office in downtown Santa Rosa, in addition to periodically offering on-bicycle educational rides for adults. These courses are based on a curriculum from the League of American Bicyclists that focuses on how bicyclists should behave so they are safer, more predictable, and can be confident riding on streets both with and without dedicated bicycle facilities. The SCBC classes also incorporate photos and video clips of local streets to help students understand how various scenarios apply to real Santa Rosa locations.
SAFE ROUTES TO SCHOOL
117
Encouragement
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
05
118
HIRE A BICYCLE AND PEDESTRIAN COORDINATOR This Plan Update 2018 recommends hiring a staff person who can work on bicycle and pedestrian projects and program coordination full time. This person ensures that all planning, public works, and transportation projects account for bicyclists and pedestrians. They can also write grant applications to fund projects and programs and be tasked to support all bicycle and pedestrian coordination with the public and neighboring jurisdictions. If funding is not available to create a new position, the City may consider hiring interns to work on bicycle and pedestrian projects until a full-time staff member can be funded. Some organizations and foundations will fund staff member salaries, fellowships, or contractor salaries for a set period of time. The City may consider applying for grants from one or more of these foundations.
SOCIAL WALKS/RIDES Supporting social walks and bicycle rides in Santa Rosa can provide many benefits to the community. People who are uncomfortable bicycling or walking alone, or who are unfamiliar with the best routes to use, will benefit from having a group to show them the way. Rides can also be used as informal education opportunities to remind participants about safe walking and bicycling behavior and sharing the road, or combined with other efforts like tours of historic neighborhoods. This Plan Update 2018 recommends the City partner with or support local organizations who wish to host rides or walks, for example the Council on Aging and the Sonoma County Bicycle Coalition. WALKING & BIKING AMBASSADORS During the public outreach activities conducted for this Plan Update 2018, the community repeatedly expressed concerns about personal security and comfort when bicycling or walking in Santa Rosa, especially on the extensive creek trail network. These trails provide a high quality experience for walking and bicycling separated from high-traffic streets, but can be secluded with minimal surveillance.
The Guadalupe River Park Conservancy in San Jose operates a volunteer trail ambassador program, where volunteers wear green vests to identify themselves and spend at least 45 minutes each week bicycling or walking on the trail. In addition to reporting maintenance needs, ambassadors carry small kits with supplies for basic first aid, bicycle repairs, graffiti removal, or other tasks based on their interest and preference.
ADOPT-A-TRAIL PROGRAM The City of Santa Rosa may consider a voluntary Adopt-a-Trail Program to assist with maintenance and cleanup of trails in the community. This program may be combined or coordinated with the Walking and Biking Ambassador Program, if desired. The City of Sonoma supports maintenance of its trail network through a voluntary Adopt-a-Bike-Path Program. Participants commit to maintain their adopted section of pathway for one year, including maintaining it at least once per month. Maintenance activities performed as part of the program include litter removal and vegetation trimming, and participants are encouraged to discuss additional ideas with the Public Works Director. Path adopters are recognized on a sign on their section of trail.
05 Projects, Programs, & Policies
An ambassador program could recruit volunteers to act as eyes on the trail, report maintenance needs, share educational materials and maps, and provide a friendly presence on the trail network. Staffing needs for this program could be limited to coordinating occasional volunteer training sessions. Trusted volunteers may be enlisted to help with program coordination, and grant funds could be pursued to offer a stipend to ambassadors or coordinators.
This Plan Update 2018 recommends Santa Rosa consider a pilot Walking & Biking Ambassador program in partnership with the Bicycle & Pedestrian Advisory Board, the Southeast Greenway Team, and the Sonoma County Bicycle Coalition.
Photo credit: Guadalupe River Park Conservancy
119
BIKE RACK PROGRAM
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
120
Bike Rack programs coordinate and streamline bike rack installations. The program could be managed by an intern who could work with staff and business owners to install bike racks and bike corrals citywide. This also ensures bike racks are properly installed as to not block sidewalks while still being usable for bicyclists. Currently, there are no bike corrals installed in Santa Rosa. The City could evaluate installing bike corrals in high-traffic locations such as in vehicle parking spots on the corners of 4th and 5th Streets in downtown. This not only sends a statement that secure bike parking is important to the city and community members, but bike corrals increase visibility at intersections for all roadway users. An increase in visibility should reduce the risk of a collision in these locations.
bicycle theft. Bicycle lockers should also be considered in downtown Santa Rosa and at commercial hubs to serve people shopping or running multiple errands who would like a secure place to store their bicycle and deposit purchases or other items during their trip.
BICYCLE FRIENDLY BUSINESS PROGRAM
The city could also develop customized bike racks. These racks can serve as a “brand,” highlighting the Santa Rosa identity as a bicycle-friendly community and can double as art features.
Bicycle Friendly Business programs recognize businesses who make it easy and convenient for both employees and customers to arrive by bicycle. This requires different strategies to accommodate the different needs of customers and employees. To accommodate customers, providing bicycle parking and supporting City bicycling projects can make it safer and easier to travel by bicycle. Some businesses also choose to offer discounts or incentives to people who arrive by bicycle.
Where appropriate, this program could also coordinate with local businesses to provide bicycle lockers or other secure parking for employees and long-term visitors. Secure long-term parking is a key component of the bicycle network to encourage employees to bicycle instead of driving, and helps reduce
For employees, offering secure longterm parking for bicycles is key. This could include a secure gated bicycle parking area, or access to bicycle lockers. If space is not available for dedicated secure bicycle parking, business owners and landlords can consider allowing employees and tenants to bring bicycles
inside and store them in their workspace or another designated location. Providing changing areas, showers, or lockers to store belongings can also make it easier for employees to bicycle to work.
SMART CORRIDOR BIKE SHARE In November 2017, the Metropolitan Transportation Commission (MTC) approved over $800,000 for a bike share pilot program in Sonoma and Marin counties along the SMART train corridor. The program is considering employing GPS-enabled dockless bikes that do not require bikes to be placed at more traditional docking stations. These counties predict that the presence of shared bikes around SMART stations could free up space currently being used by people bringing bikes onto SMART trains. Instead, people can used shared bike near stations for their first mile and last mile commutes.
The City of Santa Rosa can support Sonoma County in these efforts, and help the county determine guidelines for the traditional or dockless bikes that best serve the needs of Santa Rosa residents. In addition, Santa Rosa can help advertise and gain interest for the bike sharing system.
05 Projects, Programs, & Policies
By recognizing businesses who support bicycling, Santa Rosa can support their local economy while fostering partnerships with the Chamber of Commerce and business owners to build community support for bicycling projects and programs. The League of American Bicyclists has a Bicycle Friendly Business program similar to the BFC program, and some communities have chosen to develop their own programs. Sutter Hospital was recently awarded the Cityâ&#x20AC;&#x2122;s first Bicycle Friendly Business award from the League.
SMART carried nearly 723,000 passengers and almost 65,500 bicycles in its first year of service from August 2017 to August 2018. This means one in nine riders are bringing a bicycle on board with them, and trains are quickly reaching capacity for bicycles. Supporting a regional bicycle sharing program could reduce the number of bicycles brought on board if riders have access to a shared bicycle at each end of their transit trip.
The City may also study shared e-scooters as an alternative or complement to bike share. Shared scooter systems have become increasingly popular, and according to a survey of system users in Portland, up to 34 percent of scooter trips taken by residents replaced a trip that would otherwise have been taken in a car. Among visitors to the city, 48 percent of scooter trips replaced a car trip.
121
Enforcement BAIT BIKE PROGRAM
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
Bike theft is a concern in the Santa Rosa community, with many residents identifying it as a barrier that currently discourages them from bicycling more often. Bait bike programs involve a bicycle outfitted with a discrete tracking device monitored by the local police department. The bicycle should be nondescript and consistent with the character of bicycles ridden in the community. Periodically, the police department will lock the bait bike at a location where thefts have been reported, and monitor the tracking device. When the bicycle is stolen, police can then use the location data to recover the bicycle and cite the thief. These programs can be particularly effective in prosecuting ‘organized’ bicycle theft operations that remove bicycles from the community to be sold in bulk at another location. Both Sonoma County and the City of Santa Rosa have used GPS tracking of “bait” items to apprehend thieves in the past. Sonoma County has implemented a bait bike program on occasion, and the Santa Rosa Police Department has used bait packages to target package thieves during the holiday season.
122
Citations should be monitored and routinely reviewed to ensure the bait bike program is not disproportionately targeting disadvantaged or minority communities in Santa Rosa. Similarly, bait bike deployment locations should be selected to provide geographic equity covering all parts of the City evenly. An alternative model to this traditional bait bike program involves inexpensive Bluetooth devices being installed on as many bicycles as possible in the community. In Davis, CA, the local bike club used donations to purchase small trackers called Tiles and install them inconspicuously on bicycles as requested. The Tiles pair with a smartphone app that shows the location of your bicycle. If a stolen bicycle is reported as “lost” through the app, any smartphones with the Tile app in the vicinity of the missing bicycle will receive an alert and can help law enforcement retrieve the bicycle. An outreach campaign should be paired with the launch of a bait bike program to publicize the effort and discourage theft by emphasizing that local police are taking bicycle theft seriously. It can also be a deterrent to thieves if they know the bicycle they are stealing may be a bait bike.
TARGETED ENFORCEMENT
This Plan Update 2018 recommends continuing these efforts, with a focus on those behaviors that create the greatest risk or potential conflict, and care should be taken that programs do not unfairly target specific demographics or modes of transportation. This Plan Update 2018 also recommends continuing current educational enforcement activities, where officers stop individuals and discuss the unsafe behavior observed without issuing citations. Behaviors and locations for targeted enforcement should be reviewed each year based on collision data and community input. Behaviors cited as challenges during public outreach for this Plan Update 2018 include drivers failing to stop at red lights and yield to pedestrians in crosswalks, parking in bicycle lanes, pedestrians crossing streets illegally, and bicyclists riding on the wrong side of the road.
Evaluation ANNUAL REPORT CARD An annual report card assesses the Cityâ&#x20AC;&#x2122;s progress toward goals and objectives outlined in this Plan Update 2018, implementation of its projects and programs, and changing mode splits for active transportation. Annual report cards can also incorporate a review of effectiveness to evaluate costs and benefits of various efforts and adjust investments to maximize results. This Plan Update 2018 recommends the City work with the BPAB to develop an Annual Report Card that tracks progress toward implementing this Plan Update 2018 and incorporates annual collision data, SRTS program and participation data, and other relevant information to highlight successes and challenges of improving walking and bicycling each year. Specific performance measures identified by the City and the community should be included in this card on an annual basis to track key metrics over time and better understand successes and challenge areas.
05 Projects, Programs, & Policies
The Santa Rosa Police Department currently conducts targeted enforcement periodically based on requests from the community or focus areas of grant funding received.
123
POLICY CHANGES
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
124
The following recommended changes include policies, operational changes, and municipal code revisions that support the goals of this Plan Update 2018 or address community-identified barriers to walking and bicycling in Santa Rosa.
Vision Zero Policy
The high-injury network identified in this 2018 Plan Update 2018 is a strong start to developing this understanding. Asking additional questions about the causes and locations of crashes can help the City re-prioritize funding for projects that target behaviors and locations that may be contributing to crashes:
Vision Zero is a traffic philosophy that rejects the idea that traffic crashes are accidents, and instead asserts that serious injuries or fatalities on the transportation system are preventable and unacceptable.
• What are the total number of crashes (all modes)? Of these crashes, how many were fatal or severe injuries?
The more Santa Rosa understands where and why crashes happen, the more different departments can take actions to reduce them. The City can use this understanding to develop roadway designs that prioritize bicycling, walking, and other transportation facilities that enhance comfort and can be implemented quickly to adapt and respond to identified challenges.
• How are the crashes affected by posted speed, road class, or other identifiable feature of the road?
• What were the most striking contributing factors?
An inclusive process and equitable outcomes are a core component of adopting Vision Zero. Santa Rosa has emphasized their commitment to equity in this 2018 Plan Update 2018 by offering inclusive outreach opportunities and identifying projects near schools, around housing for seniors and people with disabilities, and neighborhoods most reliant on public transportation. In addition, actions can be taken to address equity in enforcement.
As part of this Plan Update 2018, the City and the Bicycle and Pedestrian Advisory Board reached out to the City of Fremont to discuss their Vision Zero program.
The Vision Zero Network has resources and case studies available to guide cities as they develop and implement Vision Zero Action Plans. More information at: â&#x20AC;˘ visionzeronetwork.org/project/ roadmapforaction
Traffic deaths are inevitable Perfect human behavior Prevent collisions Individual responsibility Saving lives is expensive
VS
VISION ZERO
05 Projects, Programs, & Policies
This Plan Update 2018 recommends the City consider whether adoption of a Vision Zero Policy is an appropriate step to increase the Cityâ&#x20AC;&#x2122;s existing commitment for all users of its diverse transportation systems. MTC awards additional points in their Regional Active Transportation Program competitive grant process for communities that have adopted a Vision Zero Policy.
TRADITIONAL APPROACH
Traffic deaths are preventable Integrate human failing in approach Prevent fatal and severe crashes Systems approach Saving lives is not expensive
125
School Zone Speed Limits
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
On January 1, 2008, AB 321 took effect allowing local governments to extend school zones up to 1,000 feet and reduce speed limits within 500 feet of a school site to 15 mph in residential neighborhoods or on highways with speed limits of 30 mph or less. In Santa Rosa from 2007 to 2017, nearly 300 crashes involving a bicyclist or pedestrian occurred within 500 feet of a school campus—146 crashes involving a bicyclist, and 138 crashes involving a pedestrian. More than 40 percent of these occurred during school hours, between 7 am and 4 pm. At 15 mph, more than 90 percent of pedestrians are likely to survive a crash with only minor injuries. As speeds increase, however, crash severity increases dramatically. At 30 mph most crashes result in serious injuries to pedestrians, and nearly half may be fatal. At 40 mph, 90 percent of pedestrians will be killed in a crash. Reducing speeds even slightly can have a profound effect on safety for people walking and bicycling to school. Cities that have already enacted this law include Berkeley, San Francisco, Los Angeles, and the City of Goleta. This Plan Update 2018 recommends the City enact this law around eligible schools. AB 321 requires engineering and traffic surveys to be conducted to
126
indicate that the existing speed limit is not appropriate. Santa Rosa can work with the Transportation and Public Works department to determine an evaluation and implementation schedule that accommodates staff capacity. In addition, Santa Rosa can work with local law enforcement to educate parents and drivers about the new policy and why certain school areas were selected.
Vehicle Miles Traveled Transportation is the largest contributor to greenhouse gas emissions in Santa Rosa and the City’s 2012 Climate Action Plan recommends several strategies to reduce the number of miles residents and visitors travel daily by automobile. Following the passage of Senate Bill (SB) 743, CEQA guidelines will change how transportation impacts are measured by transitioning from auto delay calculated as Level of Service (LOS) to vehicle miles traveled (VMT). This Plan Update 2018 recommends the City adopt VMT as its standard for evaluating vehicle miles travelled and greenhouse gas emission impacts of transportation projects. To help make this transition, the Metropolitan Transportation Commission (MTC) offers Priority Development Area grants to assist municipalities in transitioning their general plans to implement VMT-based transportation impact standards.
Waste Tote Placement
Residential streets in Santa Rosa are currently swept once per month, and collector and arterial streets are swept more frequently. Despite this, community members expressed concerns about debris in bicycle lanes and on shared use paths.
In areas with curbside trash or recycling collection, waste totes improperly placed in bicycle lanes can create challenges for people riding bicycles either by placing them at risk of colliding with a tote or by forcing them to merge into the travel lane to avoid the obstacle.
This Plan Update 2018 recommends reviewing street sweeping practices and street sweeper driver training to ensure on-street bicycle lanes are swept at least monthly, and that they are cleared of any glass or other debris following a collision.
This Plan Update 2018 recommends the City provide clear instruction on its website and in utility bills mailed to residents about proper placement of waste totes. Where on-street parking exists, totes should be placed near the curb within the parking aisle. Where no on-street parking exists, residents should be instructed to place totes against the curb to minimize intrusion into the bicycle lane.
Vegetation Maintenance In many places in Santa Rosa, landscaping and vegetation near sidewalks and bikeways has overgrown into the travelway and creates challenges for people walking and bicycling. Overgrown vegetation can not only create mobility challenges by narrowing the usable travelway, it can limit visibility and contribute to debris on the pathway. Routinely trimming back vegetation and mowing pathway shoulders contributes to a safer and more comfortable active transportation environment.
05 Projects, Programs, & Policies
Street Sweeping
The City should also consider working with waste management companies to add reflective markings to totes to increase their visibility at night and reduce the risk of a bicyclist colliding with a misplaced tote, in addition to stenciling â&#x20AC;&#x153;Do Not Place In Bicycle Laneâ&#x20AC;? on totes to remind residents of proper placement.
This Plan Update 2018 recommends the City promote the online MySantaRosa application for reporting vegetation in need of maintenance to property owners, and develop a policy to respond to reports within a reasonable timeframe.
127
Bicycle Parking at Large Events
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
05
Chapter 11-40 of the Santa Rosa Municipal Code currently addresses the procedures and requirements to apply for an event permit within the City. This Plan Update 2018 recommends revising Section 11040.040 Permit – Conditions for Issuance to require events expected to draw more than 5,000 attendees must provide secure, attended bicycle parking for attendees at no charge. Key considerations include: • A space that is enclosed and secured on three sides (“corral”) must be provided, with the fourth side consisting of tables for checking in bicycles • The corral must be in a visible and easily accessible location within one block of the event • Bicycle parking must be offered for the full duration of the event, including the bicycle parking attendants having access to the location at least one hour before and one hour after the event for setup and break down • Availability and location of free bicycle parking must be noticed on all event
128
promotion where transportation or directional information for the event is advertised, in the same format and with an equal amount of space as parking and transportation information for other modes • Bicycle parking must be attended and monitored at all times with a number of staff sufficient for the size of the event and whether attendees are expected to arrive for a single start time or arrive throughout the event • Bicycles will be checked in and returned with a claim check to ensure the correct bicycle is released to each person, and bicycle valet attendants will record and share the number of bicycles parked at the event in order to better estimate the space needed for the following year • The valet bicycle parking service provider shall have insurance; should the event sponsor provide the bicycle parking service, bicycles checked in must be insured against theft The City of Oakland operates a successful bicycle parking policy for large events, and may be a resource to Santa Rosa.
This page intentionally left blank
05 Projects, Programs, & Policies
129
06
IMPLEMENTATION PLAN
130
This chapter outlines a strategy towards implementation of the infrastructure projects and includes the following sections: â&#x20AC;˘ Project Evaluation presents the method and data sources used to prioritize projects for implementation, along with a summary of the results
The intent of evaluating projects is to create a strategic list to guide implementation. The project list and evaluation results are flexible concepts that serve as guidelines. Over time as development occurs or other changes to land uses and the transportation network take place, this framework can be used to reevaluate remaining projects and continue pursuing implementation of this Plan Update 2018. A detailed list of all projects is included in Appendix A. Typical costs for each type of infrastructure project are included in the Bicycle and Pedestrian Facility Guidelines in Appendix B.
06 Implementation Plan
This Plan Update 2018 includes projects, programs, and policy changes intended to create a more walkable, bikeable Santa Rosa. Implementation of this Plan Update 2018 will require community support and political leadership in addition to significant funding.
â&#x20AC;˘ Funding Strategies provides an overview of competitive funding sources and eligibilities for the projects in this Plan Update 2018
131
PROJECT EVALUATION / IMPLEMENTATION STRATEGY
PROJECT EVALUATION
Two evaluation strategies were used to arrive at four categories representing varying phases and approaches to project implementation
PRIORITY EVALUATION Based on the following criteria:
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
06
The evaluation strategy described in this chapter reflects a systematic approach to determine each project’s community benefit in a manner that is feasible, fundable, and sustainable.
Collision Reduction
Studies for crossings and corridor improvements were evaluated and ranked on an individual basis, separate from proposed infrastructure projects.
Comfort Network
Connectivity
Gap Closure
Equity
Projects were scored and then considered either :
LOW
HIGH
or
PRIORITY
Implementation Categories Projects are sorted into four Implementation Categories based on the results of two evaluations: project priority and project feasibility. Each project was scored “high” or “low” on each axis, resulting in the four implementation categories represented in the graphic below.
FEASIBILITY EVALUATION Based on the complexity and typical cost of the project:
Hardscape Improvements
Signs & Striping
LOW
HIGH
FEASIBILITY
Based on the results from the two evaluations, projects are sorted into four:
LOW
PRIORITY
HIGH
IMPLEMENTATION CATEGORIES LONG TERM IMPROVEMENT
SHORT TERM IMPROVEMENT
Projects for further study and evaluation. Seek grant funding to advance those projects.
High priority and easy to implement projects for short term development.
LOW PRIORITY
OPPORTUNITY IMPROVEMENT
Low priority, challenging projects that may be pursued long term, but are not a priority at this time.
Lower priority projects that may become an opportunity if funding or partnership occurs.
LOW
HIGH
FEASIBILITY
132
Low priority improvements are those projects rated lower priority and low feasibility. They represent challenging projects that may not add significant value for a greater portion of the community walking or bicycling network on their own, but are part of a long term vision for active transportation.
Short term improvement projects are rated high priority and high feasibility, and represent projects that could be pursued for implementation within the first three to five years.
Implementation Plan
Long term improvement projects are rated high priority and low feasibility. They may require more study or analysis than short term projects, or more significant funding for construction.
06
Projects are summarized by implementation category in Table 6-1 and Table 6-2, and mapped in Figure 6-1 through Figure 6-4.
Opportunity improvements represent projects rated lower priority and high feasibility, and may be pursued when nearby development or an overlapping project creates an opportunity to include these easy to implement projects.
Table 6-1: Linear Projects (Number of Projects and Mileage) by Implementation Category
PROJECT TYPE
SHORT TERM
LONG TERM
OPPORTUNITY
LOW PRIORITY
TOTAL
NO.
NO.
NO.
NO.
NO.
MILES
Class I Shared Use Paths Class II Bicycle Lanes
MILES 24
16.2
18
5.2
7
3.1
Class II Buffered Bicycle Lanes
2
1.1
2
0.8
Class III Bicycle Routes
5
1.9
Class III Bicycle Boulevards Class IV Separated Bikeways
1
1.8
Sidewalk Total
26
10.0
MILES
68
26.6
111
33.4
1
0.3
MILES
MILES
45
22.7
69
38.9
22
13.6
115
48.5
4
1.9
116
35.3
7
2.2
8
2.5
1
0.1
1
0.3
3
2.2
7
1.7
61
19.5
68
21.2
41
21.9
136
58.3
383
150.5
180
60.3
Table 6-2: Crossing Locations by Implementation Category CROSSING TYPE Proposed Crossing Enhancement Locations
SHORT TERM
LONG TERM 10
Trail Bridges Total
OPPORTUNITY 5
17
2 10
7
17
LOW PRIORITY
TOTAL 7
39
29
31
36
70
133
PRIORITY DEVELOPMENT AREAS
A YF M SK
R D
R
HIA N
T N
Class I Shared-Use Path
DR
Class II Bike Lane Industrial
M M
LISCUM ST
Y D R
¹
AVE
Y D R
BR U
R
IN
TA
TH
HUMBOLDT ST
MENDO CINO AVE
ARMORY DR CLEVELAND AV E
PUTNEY
BR U SH CRE SH CRE EK RD EK RD
AH M O AH M O NTE RD N NTEC N S WRIGHT CI DR DR ITO TO A A
GR GR
WILJA N CT
R PAR K E
HILL
R PAR K E
RANGE AVE
A YF M SK
MA
AIRWAY DR
HA RDIES LN RANGE AVE
RUSSELL
MARLO W RD
PETERSON LN
P
HILL
R
R OVE
NG R T AI
OVE P
GR
IN
TA
HUMBOLDT ST BOLDT ST
OCINO MENDO CINO AVE AVE
RUSSELL
MA
MA MORY DR ARMORY DR CLEVELAND AND A AV E VE
PUTNEY
WALTZER RD
FRANCISCO AVE
FULTON RD
A YF M SK
S L AKE S L AKE FA Y MA MA M TH O TH O SK
AIRWAY DR AIRWAY DR HA RDIES LN HA RDIES LN RANGE AVE RANGE AVE
MARLO W RD MARLO W RD
RUSSELL
WALTZER RDWALTZER RD
FRANCISCO AVE FRANCISCO AVE
PETERSON LNPETERSON LN
N
A R
AV E
MILES 2
E
KA YO YERBA HEARN AV EBUE N ME R LI T AB U A RD R NT D DU PO Amy's Kitchen
BELLEVUE AVE
M
YERBA BU
CORBY
FULTON RD FULTON RD
WEST AVE
C T S H S HAV PR 7 TICE 5T
EA RL E ST
E DU TTO N AV
4
ST
T
MORG AN
WE D ST AVE R RD GA GA E IS TO IS TO N AV LINK LN C A L CAL AV E O BURBANK TT
D LL HI ERS FARM O
FO
ICO Amy'sHKitche
ME LI T A
RD
C ST
BR U
C ST SANTA ROSA AVE
LINK LN
DU
YUBA DR
LUDWIG AVE R E M O TG N O M VE AA 1 OM SON R E M
DR
S
T H S ST 7T TH 5
0
E
ST
HEARN AV
R NT D DR DU EOPO L
Urban Growth Boundary
4T H
LL HI
RD
T
AV E BURBANK
N
City Limts
E AV
MORG AN
E N AV LIN O TT D N
W 9TH ST
IS
TE RD C H A NA VE E FO
T O LB TA
DU
Park
GUERNEVILLE RD
W LE
D BLV O AVE GIFFEEN CIT TKW N P INT Y NO RTHPO O
O
N
DR
Shopping Center
N STE E LE L
Shopping Center
R LD F IE ER M LN LN U S IA IA S AC AC AC AC P LU YU PL L BLV PL PL BLV D D N P MISSI EN ERO EN ER ED LD ED LD A A
N
E LN WSSTEELE JE NNING AV
D BLV ITO AVE RINCON EC NT O INIRARVDE LAZZ BADGE
MISSI ON
COFF E Y L
R
Hospital
MARSH RD GUERNEVILLE RD
TAL R D
OC CIDEN Hospital RD SEBASTOP OL
Park
D SR WI LE N L STE E LE Sonoma County DF Offices
DR LEO
RINCON AVE W 3RD S T
Major Employer BADGE R RD
D
N
ES
PINER RD
D
RN BA
LN STEELE MajorWEmployer AVE
SMART Station
ICO AVE CH E TE RD PRICE AV AV E C H A NA LE Sonoma County Meldotronic FINV EY DF Offices CardioVascular
¹¹
S WI HALL LE
N STE E LE L
W 9TH ST
Map produced February 2018. HALL RD R
Y KW UN HARRF O D Meldotronic R CardioVascular IS
R
COFF E Y L
ES
SMART Station
MILES
MILES 2 1.5
Transit Station
Map produced January 2019.
Y KW
RD RD CE CE ITTAIN LNALL A BR LL A WA W
IS
RN BA
IR
SEQUOIA C
D
Santa Rosa Junior College D 101 DENNIS LN UN Transit Station FO
MARSH RD
N
IR
SEQUOIA C
HARR
£
W STEELE LN Urban Growth Boundary
ST
L Sonoma Coun O PO I SEQUO AST SE B Offices
DF
CityGrowth Limts Urban Boundary MARSH RD
DR
R D
D PINER RD
PINER RD
UN FO W 9TH ST Meldotron CardioVas RD W3
JE NNING S AV E College Santa Rosa Junior
R
HOPPER AVE AVE
COFF E Y L
R
HOPPER AVE
Shopping Center
Current AVE Park City Limts
DESTINATIONS + 0 1 0.75 BOUNDARIES 0 GUERNEVILLE RD
R D
£
R
Class IV Separated Bikeway
DESTINATIONS + 101 DENNIS LN BOUNDARIES
ES
Class III Bicycle Route
E AV TTON DU
RN BA
Hospital Crossing DLocation Park
N
£
D
IS
AS L AKE OM
HARR
101 LN DENNISStation SMART SMART Station HOPPER AVE
Class IIB Buffered Bicycle Lane
ELAND AVE
ClassSchool III Bicycle+Route DESTINATIONS BOUNDARIES Employer Bikeway ClassMajor IV Separated
Class II Bicycle Lane
Crossing Location
R D
EV
Class II Bicycle Lane
R DESTINATIONS + Class IIB Buffered Bicycle Lane BOUNDARIES
CL
Class III Bike Route Class IIIB Bicycle Boulevard
ORLAND AVE
M
SH CRE EK RD
A
AH M O N NTEC DR ITO
Y D R
DR
RD
DR
SANTA High Density & PEDESTRIAN MASTER OA PLANEXISTING UPDATE 2018 Commercial + High Mix Use PY T
R PAR K E
GR
AM O
HILL
R
GR IN HUMBOLDT ST
MA
AIRWAY DR
TA
S L AKE MA TH O
MENDO CINO AVE
AL
D
O KM
S
R
Trione-Annadel State Park
R
D
E
Class IIIB Bicycle Boulevard OAK Medium Density Class IV Separated Bikeway LE AF Study ROSA BICYCLE
D
R BETH A
Class II Bicycle Lane
NE B RI D G
RD
R
D
MOORLAND AVE
PROPOSED
N
STO
LD
EE KS I DE
VA LL
EY
WILJA N CT
12 Ã
Class I Shared-Use Path LAND USE INTENSITY N EL SHORT TERM
A
TR L
E AV
NE TT
S
IIB Buffered Bicycle Lane IMPROVEMENTS LowClass Density Class III Bicycle Route
F IE
VE AA
LN
STANDISH AVE
M ER M
SO
H
SU
M NO
S
RD
LISCUM ST
LO
ER
A UP
PUTNEY
RD
C
L YU
FARM ERS
ARMORY DR CLEVELAND AV E
MARLO W RD
HA RDIES LN RANGE AVE
RUSSELL
WALTZER RD
FRANCISCO AVE
FULTON RD PETERSON LN
RD
ME LI T A
LL
S WRIGHT RD
GA IS TO
M
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
D
LN
O TG
NORTHEAST
A RD
DR
A
DR
VE DA
Crossing Location
N
CityTransit Hall Station
IIB Separated Buffered Bicycle Lane Class IV Bikeway
134
BIKEWAYS
E
SHORT TERM IMPROVEMENTS
II Bicycle Class III BicycleLane Route
Class IV Separated Bikeway
YERBA B U
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Taylor Mountain PLAN UPDATE 2018 Regional Park
ST B U RT
SHORT TERM Class II Bicycle Lane IMPROVEMENTS Class IIB Buffered Bicycle Lane Class III Bicycle Route
RECOMMENDED FIGURE 3-2
NGS RD PR I KAWANA S YOLANDA AVE
& PEDESTRIAN MASTER PLAN UPDATE 2018 SANTA Figure 6-1ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Crossing Location
N MO
E TODD RD TODD RD
SHORT TERM IMPROVEMENTS SHORT TERM IMPROVEMENTS SANTA ROSA BICYCLE
D
DU PONT
CR
HI
116
ST
BE N
MA
Ã
U AL PE T
BELLEVUE AVE
4T H
ST VALLE J O
OO KW
ST
Amy's Kitchen
AV E
HEARN AV E
LUDWIG AVE
¹
CORBY
DR LEO
E DU TTO N AV
WEST AVE
YUBA DR
AV E BURBANK
NO RT
E GIFF EN AV HPO INT PKW Y
T
OO
E
LN
EA RL E ST
LAZZINI AV E
E FIN LEY AV
ND
ST BR
2
W 3RD S T
RD OC CIDENTAL RD SEBASTOP OL ICO AVE CH PRICE AVE
T H S ST 7T TH 5 S
BRITTAIN
HALL RD
ST
W 9TH ST
FO
E AV
MORG AN
E N AV LINK LN O TT
IR
SEQUOIA C
T O LB TA
DU
DR
E
LL HI
N
JE NNINGS AV E
RD
O
GUERNEVILLE RD
LE
N STE E LE L
S WI
BLV ITO
CI
W STEELE LN
TE RD C H A NA VE
Sonoma County Offices
EC NT O
A AC
MARSH RD
BADGE R RD
Meldotronic CardioVascular
DF
RINCON AVE
PL PL BLV D MISSI ON EN ER ED LD A
PINER RD
UN FO
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
CAL
N
AVE
R
E RD AC
R
D
Y KW
D
HOPPER AVE COFF E Y L
ES
ne
£
IS
RN BA
DENNIS LN
101
D
LL WA
HARR
OVE P
R
PRIORITY DEVELOPMENT AREAS
A YF M SK
R D
R
Y D R
RD
S
HIA N
DR
Class I Shared-Use Path
DR
Class II Bike Lane Industrial
WALTZER RD
RUSSELL
FRANCISCO AVE
A YF M SK
FULTON RD
GR OVE P HILL ARLO R M W RD PAR K E
R
AS L AKE PETERSON LN OM TH
IN
TA
MA
TE CI TO
PUTNEY
AIRWAY DR
HA RDIES LN RANGE AVE
RUSSELL
NORTH ST
ON
AH
N
M GR
HUMBOLDT ST
S WRIGHT RD ARMORY DR CLEVELAND AV E
MARLO W RD
A
TE CI TO
Y D R
BR U
DR
AH
N
M
LISCUM ST
PUTNEY
M
GR OVE PETERSON LN P HILL R PAR K E
TA
ON
MA
AIRWAY DR
SH CRE EK RD
R FULTON RD
WALTZER RD
FRANCISCO AVE
A YF M SK
S L AKE MA TH O
IN
GR
135
H
TH ST
VE DA
B ME LI T BEL A RD
MILES 2 MA
MBOL DT ST
OO KW
U AL PE T
MORY DR AND AV E
OO
ST
1
DU TTS
M
ER
E
HA RDIES LN RANGE AVE
E AV
BR
S
RUSSELL
RD
T O LB TA
GA IS TO
MARLO W RD
D
LN
CAL
WALTZER RD
N
E AV
ST
FRANCISCO AVE
DU TT
WEST AVE
D
AV E BURBANK
NO
FULTON RD
N BRITTAIN
CI
LAZZINI AV E
EA RL E ST
WEST AV
0
LN
RD
LUDWIG AVE
A
SEBASTOP OL
Urban Growth Boundary
W 3RD S T
CI
PETERSON LN
GA N
LINK LN
COFF E Y L
R
O
W3
City Limts A AC
C
MORG AN
Park
Shopping CenterOC CIDENTAL RD Park HICO AVE
IR
RD
E N AV LINK LN PL PL BLV O D RBANK MISSI ON TT ENBU ER ED LD A
IS
Shopping Center
DU
W LE
W 9TH ST TE C H A NA
E N L STE E LE L RD OC CIDENTAL RD SEBASTOP OL RINCON AVE
Hospital
N
N STE E LE L
D
AV E
Amy's Kitchen
D Major Employer SR WI
E RD AC
HALL RD
Hospital
N
SMART Station
LL WA
DF
DR LEO
AVE ICO LAZZINI AV E BADGE R RD CH PRICE AVE E AV Y FIN LEVD BL DR E ITO FF EN AV EC COLLEGE AVE GISTK W COLLEGE AV E NT INT H PA W Y HPOY O NO RT T ERB B 4 T U HS E 7T N 9TH ST ST A R TE RD W ST TH C H A NA 5 D E V N R L 2YUBA A DR V LE J O D DU PONT
LN
D
E
N
Transit Station
Major Employer
W STEELE L
Meldotronic DR CardioVascular W COLLEGE
E
W STEELE LN
JE NNINGS AV E
BRITTAIN
GUERNEVILLE RD
D
VE OA
Santa Rosa Junior College
N
IN
W STEELE LN
E
OC
N
AVE
SMART Station
¹¹
Transit M Station
Map produced January 2019.
GUERNEVILLE RD
Meldotronic CardioVascular SEQUOIA C
UN FO
SEQUOIA C
N
R
DESTINATIONS + MARSH RD BOUNDARIES PINER RD
D
UN Transit Station FO
M
AST
E AVE JE NNING SHEARN AV Santa Rosa Junior College
Map produced February 2018. AVE HALL RD DF
IR
COFF E Y L
ES
D
ES
R
R
£
HOPPER AVE D
R College Santa Rosa Junior
HOPPER AVE
LR AVE O PO
Urban Growth BoundaryD DESTINATIONS + R MILES MILES BOUNDARIES 1 0.75 2 1.5 101 GUERNEVILLE RD
COFF E Y L
ES
R D
D
RN BA
Class IIB Buffered Bicycle Lane
0 DENNIS LN
RN BA
Trail Bridge
101 £
SE B
Y KW
ST
RD W3
PINER RD
IS
Crossing Location0
IS
Crossing Location DENNIS LN
9TH ST
CityGrowth Limts Urban Boundary MARSH RD
DESTINATIONS + PINER RD Y KWMARSH RD BOUNDARIES HARR
Sidewalk
HOPPER AVE 9 W
Location D
R D Park Class IIB Buffered Bicycle LaneShopping CenterR Trail Bridge Current Park City Limts Class IV Separated Bikeway
Class IV Separated Bikeway
E AV TTON DU
RN BA
Hospital Crossing
Sidewalk
101 £
DENNIS LN
SMART Station
SMART Station
Class II Bicycle Lane
Class IIB Buffered Bicycle Lane
Trail Bridge
ARMORY DR
N
Station CityTransit Hall Sidewalk
Class I Shared-Use Path
Class I Shared-Use Path
Class II Bicycle Lane
S
BOUNDARIES Major Employer Class IV Separated Bikeway
HARR
Class I Shared-Use Path
ELAND AVE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER School Class + IIB Buffered Bicycle Lan PLAN UPDATE 2018 DESTINATIONS
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
& PEDESTRIAN MASTER
EV
Class I Shared-Use Path
LONG TERM IMPROVEMENTS
PLAN UPDATE 2018 LONG TERM IMPROVEMENTS
CL
Class III Bike Route Class IIIB Bicycle Boulevard
DESTINATIONS + Class II Bicycle Lane BOUNDARIES
ST B U RT
SANTA Figure 6-2ROSA BICYCLE
PY T
D
T N
R BETH A
O KM
LONG IMPROVEMENTS
R
VE NA
R D
VA LL
DR
NE TT
AF
Study ROSA BICYCLE SANTA High Density Trione-Annadel State Park & PEDESTRIAN MASTER OA EXISTING PLAN UPDATE 2018 Commercial + High Mix Use TERM
RANGE AVE
BR U
LD
Class IIIB Bicycle Boulevard
OAK Medium Density Class IV Separated Bikeway
RD
M
SH CRE EK RD
A
TE CI TO ON
M
DR N AH
GR
NORTH ST
AM O
R PAR K E
HUMBOLDT ST
STO
Class II Bicycle Lane
IIB Buffered Bicycle Lane IMPROVEMENTS Low Density III Bicycle Route
NE B RI DClass G E R Class D
F IE
C ST
PROPOSED
LE
D
MOORLAND AVE
12 Ã
Class I Shared-Use Path LAND USE INTENSITY NE LONG TERM L
N
TR L
E TODD RD TODD RD SANTA ROSA AVE
A
S
RD
WILJA N CT
S
AL
R
GR IN TA
HILL
S L AKE MA TH O MA
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
LL
STANDISH AVE
H
M
EE KS I DE
HI
LISCUM ST
LO C
ER M
ARMORY DR CLEVELAND AV E
AIRWAY DR
HA RDIES LN RANGE AVE
RUSSELL
WALTZER RD
FRANCISCO AVE
FULTON RD
MARLO W RD
RD
SU
PUTNEY
LN
PETERSON LN
RD
A
N VE MO AA OM
EY
MA
S WRIGHT RD
GA IS TO
NORTHEAST
A RD
CI
ME LI T A
Class II Bicycle Lane
Crossing Location
N
D
SON
NGS RD PR I KAWANA S YOLANDA AVE
LONG TERM IMPROVEMENTS
Sidewalk
BIKEWAYS
E
DR
DU PONT
Taylor Mountain Regional Park
Class IV Separated Bikeway
RECOMMENDED FIGURE 3-2 YERBA B U
LN
BE N
VE DA
U AL PE T
116
A STO
D
ER
CR
OO KW
ST
Ã
M
OO
E
BELLEVUE AVE
ST VALLE J O
BR
S
Amy's Kitchen
AV E
HEARN AV E
LUDWIG AVE
¹
CORBY
DR LEO
E DU TTO N AV
WEST AVE
AV E BURBANK
YUBA DR
E AV
ST
LN
NO RT
E GIFF EN AV HPO INT PKW Y
O TG
FARM ERS
MORG AN
E N AV LINK LN O TT
BRITTAIN
EA RL E ST
LAZZINI AV E
E FIN LEY AV
RD
COLLEGE AVE ST H 4T T HS T 7 ST H ST 5T D 2N
W 3RD S T
RD OC CIDENTAL RD SEBASTOP OL ICO AVE CH PRICE AVE
LE
S WI
BLV ITO
A AC
N STE E LE L
W 9TH ST
HALL RD
TE RD C H A NA VE
T O LB TA
DU
DR W COLLEGE AV E
DF
EC NT O
PL PL BLV D MISSI ON EN ER ED LD A
N
JE NNINGS AV E
D
E AV
GUERNEVILLE RD
N
NO
W STEELE LN
E
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
CAL
Meldotronic CardioVascular M
RINCON AVE
BADGE R RD
CI
MARSH RD
UN FO
O
N
AVE
R
E RD AC
COFF E Y L
R
D
PINER RD
IR
SEQUOIA C
ES
e
HOPPER AVE
Y KW
D
RN BA
DENNIS LN
IS
£ 101
D
LL WA
HARR
OVE P
R
N A STO
AV
PRIORITY DEVELOPMENT AREAS
A YF M SK
R D
R
N
NE
L
TR L
NE B RI D G
RD
RD
HI
A
RANGE AVE
R
KAWA YOLAN
ME LI T A C ST
AVE
¹
ORLAND AVE
M
NORTH ST
N
ME YERBA BLUI T EA NR AD
WILJA N CT
Y D R
DR
GR
IN
TA
HUMBOLDT ST
AIRWAY DR
HA RDIES LN
RUSSELL
LISCUM ST
SH CRE EK RD
M
SH CRE EK RD
BR U
A
AH M O N NTEC DR ITO
GR GR
OVE P
A YF M SK
S L AKE MA TH O
MENDO CINO AVE
PUTNEY
A
AH M O N NTEC DR ITO
S WRIGHT RD
HILL
R PAR K E
NORTH ST
ARMORY DR
PETERSON LN
HILL
R PAR K E
R
OVE P
GR IN TA
R
OVE P
GR
IN TA
HUMBOLDT ST
NO AVE MENDO CINO AVE
LDT ST
AIRWAY DR
WALTZER RD
FRANCISCO AVE
FULTON RD A YF M SK
S L AKFEA Y MA M TH O SK HA RDIES LN
RUSSELL
S L AKE MA TH O
RUSSELL
AIRWAY DR
WALTZER RD
HA RDIES LN
WALTZER RD
FRANCISCO AVE FRANCISCO AVE
ARMORY DR Y DR
T
E
Amy's Kitchen DR DU PONT
ER BELLEVUE AVE M O G T M N V E MILES A MO A OM 2 SON
BR U
C ST SANTA ROSA AVE
PUTNEY
1
S
FO
E
I FARM ERHS O
E
ST
S
LUDWIG AVE
4T H
YERBA BU
AV E
B ITO
EA RL E ST
CORBY
PETERSON LN
ST H 5T D 2N
RD RD A GAP OG CO TO ISR ELIS T CA WEST AV
LL WA
EC NT O
WEST AVE
COLLEGEAmy's AVE Kitche
CAL
LN
PKW Y
ELAND AVE
AV E BURBANK
R E LD N AV LINK LN F IE AV E O ER BURBANK TT M N DU LN UL N S IA IA AC AC IN T RD AC AC P STONY PO LU YU E RD PL L PL L BLV D P AC ON BLV D EN R P MISSI ON R EN EMISSI E ED LD ED LD A A
HEARN AV
DR DR LEO DU PONT LVD
Urban Growth Boundary DR
ST
D
BADGE R RD
YUBA DR
LL HI
0
E RD AC
BRITTAIN
NO RTHPO INT
City Limts
E AV
COLLEGE AVE
Park
O
IS
TE D NAY AVRE CFIN H ALE VE
E TFE RD C H A NA O E VT
RD
E NT O
LV OB CIT
Shopping Center RINCON AVE
T O LB TA
E N AV LIN O TT
EW N L STE E LE L
D
SonomaU N FO County Meldotronic Offices CardioVascular D SR WI LE LE L N Sonoma County Offices
DR LEO
LL WA
D
Major Employer TAL R D
EV
ND AVE
¹¹
SMART Station
OC CIDEN Hospital RD SEBASTOP OL
ST
ELA
N
EV CL
LINK LN
R
COFF E Y L
ES
Transit Station
IR
DU
IR
DR W STEELE LN RD W COLLEGE AV E LE IL V EST W 9TH RN
Park
STE E
ND AVE
VE
NNING A Shopping Center
RD
ELA
S
N
JE
GU
E
EV CL
N
Hospital
PINER RD
LL AVEVI E N ER
IS
R
COFF E Y L
ES
Major Employer W STEELE LN
ND AVE
SMART Station
PINER RD D
HOPPER AVE
ELA
N
RN BA
AVE
EV CL
COFF E Y L
R
£
JE NNINGS AV E
Map produced January 2019. W 9TH ST Y KW Map produced February 2018. HALL RD R RINCON AVE W 3RD S T BADGE R RD
UN FO Y KW Meldotronic HARR CardioVascular D R
Santa Rosa Junior College D DENNIS LN
D
IS
£
HOPPER AVE
W STEELE LN
DR W COLLEGE AV E
SEQUOIA C
UN FO Meldotronic W 9TH ST CardioVascula RD W3
CityGrowth Limts Urban Boundary
Santa Rosa Junior College
R D RHARR
E AV TTON DU
RN BA
R D
KW
Sonoma SEQUOIA L P OC CountySEBASTO Offices RD IS EW RD LHALL N L STE E LE
RD Urban Growth DESTINATIONS + Boundary LE IL V MILES E MILES BOUNDARIES RN 2 0 1 0.75 0 1.5 G UE
R
DESTINATIONS + 101 DENNIS LN BOUNDARIES
Shopping Center
AVE Current Park City Limts
N
£
SMART Station
SMART Station HOPPER AVE Crossing Hospital D Location Park
D
IS
CityTransit Hall Station 101 DENNIS LN
Crossing Location
Transit Station 101
HARR
CL
Class IIIB Bicycle Boulevard School DESTINATIONS + BOUNDARIES Major Employer
PINER RD
R D
R
DESTINATIONS + Class III Bicycle Route BOUNDARIES
Class IIIB Bicycle Boulevard
ERSON LN
DR
Class III Bike Route
Class III Bicycle Route
FULTON RD
T N
Class I Shared-Use Path
Class II Bike Lane Industrial
Class II Bicycle Lane
FULTON RD
HIA N
DR
S
O KM
D
DR
SANTA High Density & PEDESTRIAN MASTER OA EXISTING PLAN UPDATE 2018 Commercial + High Mix Use
Trione-Annadel State Park
D
R BETH A
E
R Class D III Bicycle Route Class IIIB Bicycle Boulevard OAK Medium Density Class IV Separated Bikeway LE AF ROSAStudy BICYCLE
DOWD DR
BR U
Y D R
PROPOSED
PY T
M
SH CRE EK RD
A
AH M O N NTEC DR ITO
AM O
R PAR K E
GR
HUMBOLDT ST
NORTH ST
MENDO CINO AVE
A
LD
DOWD DR
F IE
MOORLAND AVE
ER M
WILJA N CT
AL
HILL
R
GR IN TA
S L AKE MA TH O
AIRWAY DR
RUSSELL
WALTZER RD
FRANCISCO AVE
FULTON RD
HA RDIES LN
ARMORY DR
H
STO
SU
D
STANDISH AVE
12 Ã
Class I Shared-Use Path OPPORTUNITY LAND USE INTENSITY Class II Bicycle Lane IIB Buffered Bicycle Lane IMPROVEMENTS LowClass Density
R
EY
LISCUM ST
LN
S
SANTA ROSA BICYCLE & PEDESTRIAN MASTER Taylor Mountain PLAN UPDATE 2018 Regional Park
SEQUOIA C
Crossing Location
Priority Development Area SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
IIIB Bicycle Class II Class Bicycle Lane Boulevard
ES
136
S
NGS RD PR I KAWANA S YOLANDA AVE
Class IIIB Bicycle Boulevard Crossing Location
LO
E AV
EE KS I DE
R
RN BA
Class III Bicycle Route
RD
M
VA LL
VE NA
NORTHEAST
A RD
ER
A UP
PUTNEY
A
ME LI T A
Figure 6-3
Class IIIB Bicycle Boulevard Class II Bicycle Lane
N
DR
PLAN UPDATE 2018
OPPORTUNITY IMPROVEMENTS Class III Bicycle Route
E
D
L YU
NE TT
OPPORTUNITY SANTA ROSA BICYCLE IMPROVEMENTS & PEDESTRIAN MASTER SANTA ROSA BICYCLE & PEDESTRIAN MASTER Class II Bicycle Lane PLAN UPDATE 2018
BIKEWAYS
RD
YERBA B U
CI
PETERSON LN
GA IS TO
RECOMMENDED FIGURE 3-2
A AC
M
LN
VE DA
S WRIGHT RD
CAL
E RD AC
D
C
N VE MO AA OM SON
FARM ERS
OO KW
116
E AV
ST
Ã
BLV ITO
DU PONT
CR
BE N
E TODD RD TODD RD
OPPORTUNITY IMPROVEMENTS
O TG
OO
E
¹
BR
BELLEVUE AVE
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
OPPORTUNITY IMPROVEMENTS
AV E
Amy's Kitchen
ST
ST VALLE J O
A STO CORBY
AV E BURBANK
LUDWIG AVE
EA RL E ST
DR LEO
PKW Y
YUBA DR
S
W 3RD S T
E FIN LEY AV
NO RTHPO INT
ST H ST 5T D 2N
RCO P WEST AVE
LN
RD OC CIDENTAL RD SEBASTOP OL
IN T RD STONY PO
BRITTAIN
HALL RD
4T H
DR
E N AV LINK LN O TT
COLLEGE AVE
W 9TH ST
T
T O LB TA
DU
DR W COLLEGE AV E
FO LL HI
N
JE NNINGS AV E
E
EC NT O
PL PL BLV D MISSI ON EN ER ED LD A
LE
RD
O
GU
IL
LE
N STE E LE L
RD
S WI
RINCON AVE
BADGE R RD
TE RD C H A NA VE
Sonoma County Offices
ND AVE
W STEELE LN EV N ER
UN FO
Meldotronic CardioVascular
ELA
N
AVE
R
D
R
D
Y KW
EV CL
COFF E Y L
ES
HOPPER AVE
PINER RD
IR
SEQUOIA C
£
IS
RN BA
DENNIS LN
101
D
LL WA
HARR
OVE P
R
RD
RECOMMENDED BIKEWAYS
A YF M SK
R D
R
Class I Shared-Use Path
D
M
SH CRE EK RD
R
AM O
S
HIA N
DR
Class I Shared-Use Path
Class II Bike Lane BOUNDARIES
DR
EV
DESTINATIONS Major+Employer Class II Bicycle Lane BOUNDARIES
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
ST B U RT
Station SchoolTransit Class IIIB Bicycle
Separated Bikeway SMART Station N
Transit Station
A YF M SK FRANCISCO AVE
PINER RD OVE P MARLO W RD
R
S L AKELN PETERSON MA TH O
AIRWAY DR
GR
IN
TA
PUTNEY
AH M O N NTEC D IT
MA
GR
HUMBOLDT ST
MENDO CINO AVE
S WRIGHT RD RMORY DR A CLEVELAND AV E
MARLO W RD
HA RDIES LN RANGE AVE
FULTON RD
RUSSELL
FRANCISCO AVE
A YF M SK
S L AKE MA TH O
R TA IN GR OV PETERSON LNE P
LISCUM ST
M
SH CRE EK RD
BR U
AH M O N NTEC DR ITO
A
NORTH ST
PUTNEY
GR
VE DA
U AL PE T
MA
ST
OO KW
ST
BOLDT ST
E
137 H
DU TTS
WEST AV
D
D
OCINO AVE
OO
MA
E AV
BR
S
Urban Growth Boundary
BURBANK
LL HI
MORY DR AND AV E
T O LB TA
RD
AIRWAY DR
GA IS TO
City Limts ST
HA RDIES LN RANGE AVE
CAL
MORG AN
E N AV LINK LN O TT
RUSSELL
E
Shopping Center
DU
MARLO W RD
Hospital
E RD AC
O
N
Park
LN
Shopping Center
IN T RD STONY PO
FRANCISCO AVE
D
IN T RD STONY PO
EW N L STE E LE L RD OC CIDENTAL RD SEBASTOP OL RINCON AVE LN
W STEELE LN
Park
BRITTAIN
PETERSON LN
N
BRITTAIN
LL WA
Major EmployerIS RD
N
N
GUERNEVILLE R D
Transit Station
Major Employer Hospital
Santa Rosa Junior College
IR
N
SMART Station
W STEELE LN
County Offices
W 9TH ST T C H A NA
F
AVE ICO BADGE LAZZINI AV E R RD UN CH FO 4T PRICE AVE E AV Y FIN LE VD Meldotronic L WY CardioVascular D R OB RTH PO INT PK CIT NO E W COLLEGE AV E SEQUOIA C NT O YERBA BU T DR E HS N 7T ST 9TH DA A A TE RDW A N ST CH AN O Sonoma C VE RIN DF HALL RD W 3RD S ND DR R YUBA L L EJ O 2 A T D V County DU PONT Offices RD IS LUDWIG AVE EW ME N L LI T STE E LE L A RL E ST EA RD E RD TAL FO OC CIDEN MILES RD SEBASTOP OL T AV 0 1 2 N A STO AVE CO E INI AV HI 4LAZZ IR
COFF E Y L
R ES ALTZER RD W
DESTINATIONS + MARSH RD BOUNDARIES
AVE
W Sonoma 3RD ST SMART Station DF
AVE HALL RD
GUERNEVILLE R D
Transit Station
HOPPER AVE
PINER RD
IS
RN BA
Trail Bridge
£
HEARN AV
Transit Station
Map produced January 2019.
Santa Rosa Junior College
101
N
DR LEO
Meldotronic DR CardioVascular W COLLEGEAmy's AV EKitchen
SEQUOIA C
Map produced January 2019.
D
AV E BURBANK
D
W STEELE LN
U Santa RosaFOJunior College
HOPPER AVE
DESTINATIONS + PINER RD Y KWMARSH RD BOUNDARIES HARR
Sidewalk
£
COFF E Y L
R ES ALTZER RD W
R D
R
Class IV Separated Bikeway
0
DENNIS LN
RN BA
Trail Bridge
¹
KW
DESTINATIONS D+ MILES MILES 0 0.75 1.5 0.75 1.5 BOUNDARIES 101 GUERNEVILLE R D IS
Crossing Location
Class IIIB Bicycle Boulevard
R OL O APVE AST
MARSH RD Urban Growth Boundary Y
Urban Growth Boundary HARR
Class I Shared-Use Path
SE B
ST
WEST AVE
City Limts
RD W3
N
Sidewalk
City Limts
COFF E Y L
Park
W 9TH HOPPER AVE ST 9
R ES LTZER RD WA
Class IV Separated Bikeway
FULTON RD
Shopping Center Crossing Location D R Park Shopping Center D R Trail Bridge
RUSSELL
Hospital
LINK LN
Class II Bicycle Lane
101 £
DENNIS LN
RN BA
SMART Station
E AV TTON DU
Sidewalk Hospital
Class I Shared-Use Path
Class IIIB Bicycle Boulevard
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Class IIIB Bicycle Boulevard
S
Boulevard
Major Employer Class IV
LOW PRIORITY IMPROVEMENTS
D
ELAND AVE
Class I Shared-Use Path
NGS RD PR I KAWANA S YOLANDA AVE
FULTON RD
CL
Class III Bike Route School Class IIIB Bicycle Boulevard
RANGE AVE
D
PY T
A
AH M O N NTEC DR ITO GR
NORTH ST
AL
R
GR IN HUMBOLDT ST
MA
AIRWAY DR
TA
S L AKE MA TH O
MENDO CINO AVE
BR U
D
RD
DR
SANTA ROSA BICYCLE Class IIIB Bicycle Boulevard & PEDESTRIAN MASTER O EXISTING PLAN UPDATEA 2018 DESTINATIONS +
Trione-Annadel State Park
T N
C ST
R
O KM
MOORLAND AVE
E
Class IIIB Bicycle Boulevard Class II Bike OALane Class IV Separated Bikeway K LE AF Study Class III Bike Route
R
WILJA N CT
NE B RI D G
RD
STANDISH AVE
TR L
LL
LISCUM ST
LOW PRIORITY Class II Bicycle Lane EXISTING Class IIB Buffered Bicycle Lane IMPROVEMENTS Class III Bicycle Route Class I Shared-Use Path
L
RD
HI
SANTA ROSA AVE
PUTNEY
ARMORY DR CLEVELAND AV E
MARLO W RD
HA RDIES LN RANGE AVE
RUSSELL
FRANCISCO AVE
FULTON RD
PETERSON LN
NE
LD
D
MA
R BETH A
Class II Bicycle Lane
Crossing Location
12 Ã
LOW PRIORITY IMPROVEMENTS
R
VE NA
Crossing Location DENNIS LN
Sidewalk
N
E AV
EE KS I DE
EY
VE DA
U AL PE T
VA LL
Class I Shared-Use Path
Class IV Separated Bikeway
S
F IE
A UP
LN
CR
NE TT
Class IIB Buffered Bicycle Lan SANTA ROSA BICYCLE Class III Bicycle Route & PEDESTRIAN MASTER Class IIIB Bicycle Boulevard PLAN UPDATE 2018 Class IV Separated Bikeway PROPOSEDStudy STO
OM
A
S
ER M
SON
H
M
VE AA L YU
FARM ERS
OO KW
ST
& PEDESTRIAN MASTER
PLAN UPDATE 2018 LOW PRIORITY IMPROVEMENTS
LO
SU
DR
ST
Class II Bicycle Lane
SANTA Figure 6-4 ROSA BICYCLE
RD
C
OO
E
S WRIGHT RD
ME LI T A
Taylor Mountain Regional Park
LOW PRIORITY IMPROVEMENTS
Class II Bicycle Lane NORTHEAST
A RD
D
E TODD RD TODD RD
¹ 116
AV E
LUDWIG AVE
Ã
CORBY
Amy's Kitchen
4T H
BE N
A STO
N
DR DU PONT
T
ST VALLE J O
BR
S
E DU TTO N AV
DR LEO
HEARN AV E
YUBA DR
ND
ST
E
FO
E AV
ST
PKWY NO RTH PO INT
2
WEST AVE
E FIN LEY AV
T HS 7T
EA RL E ST AV E BURBANK
LAZZINI AV E
E
T O LB TA
MORG AN
E N AV LINK LN O TT
ICO AVE CH PRICE AVE
DU
LN
RD OC CIDENTAL RD SEBASTOP OL
IN T RD STONY PO
BRITTAIN
W 3RD ST
W 9TH ST
RD
YERBA B U
DR
LL HI
N DR W COLLEGE AV E
IS
RECOMMENDED PROPOSED BIKEWAYS Class I Shared-Use Path
O
GUERNEVILLE R D
W LE
N STE E LE L
RIN C
A AD ON
D
RD
W STEELE LN
TE RD C H A NA VE
E NT O
LV OB CIT
GA IS TO
N
MARSH RD
Meldotronic CardioVascular
DF
RINCON AVE
BADGE R RD
UN FO
Sonoma County Offices
SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
CAL
COFF E Y L
R ES ALTZER RD W
HALL RD
AVE
Y KW
E RD AC
RN BA
D
PINER RD
IR
SEQUOIA C
HOPPER AVE
IS
101 £
DENNIS LN
D
LL WA
HARR
OVE P
NORTHEAST
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
06
Priority Evaluation
Feasibility Evaluation
Using data from early phases of this Plan Update 2018 process, five criteria listed in Table 6-3 were used to evaluate the priority of infrastructure projects. Input from the community, the Bicycle and Pedestrian Advisory Board, and the Waterways Advisory Committee informed the weighting of these criteria in evaluating overall priority.
In addition to evaluating the priority of each project, this implementation strategy also considers the complexities to design, construct, and maintain the project in a feasibility evaluation. Typically, projects were rated as high or low feasibility based on the bikeway class, project type, or other treatments included. Some projects were reassigned after this initial evaluation based on site-specific considerations.
Each project received a priority score out of ten possible points, with projects scoring 6 or more considered high priority and projects scoring 5 or less considered low priority.
HIGH FEASIBILITY In general, high feasibility projects include: • Most Class II Bicycle Lanes and Class II Buffered Bicycle Lanes, where right of way is available or a road diet is feasible • Class III Bicycle Routes LOW FEASIBILITY In general, low feasibility projects include: • Class I Shared Use Paths • Class II Bicycle Lanes and Class II Buffered Bicycle Lanes that may require parking removal, additional right of way, or further study • Class III Bicycle Boulevards • Class IV Separated Bikeways • Sidewalks • Trail Bridges
138
Table 6-3: Priority Evaluation Criteria CRITERIA
DESCRIPTION Collisions involving bicyclists or pedestrians from September 2007 through August 2017 were analyzed to identify a High Injury Network (HIN) in Santa Rosa, where bicycle or pedestrian related collisions that result in either fatalities or severe injuries are occurring at a relatively high frequency in relation to the citywide street network. For more information about the HIN, see Chapter 3.
Collision Reduction
Projects located on HIN corridors were awarded points. Class I shared use paths, which are not located on the existing street network, were awarded points if they provide a parallel alternative route to a HIN corridor. Trail bridge projects along Class I paths that provide these alternative routes were also awarded points.
Connectivity
Projects within one quarter-mile of a SMART station, Santa Rosa City Bus transit station, or school were awarded points.
Implementation Plan
Improving walking and bicycling access to destinations including schools and transit hubs was identified as a priority by the Santa Rosa community.
06
Speed limits, travel lanes, daily traffic volumes, and other information about Santa Rosa streets was analyzed to develop a Level of Traffic Stress (LTS) score from one to four for every street segment in the city, with low scores representing relatively low-stress segments and high scores representing highstress segments. For more information about this analysis, see Chapter 3. Comfort Network
Projects along streets with an average LTS score of 3 or 4 were awarded points. Because Class I shared use paths and trail bridges provide a walking and bicycling path completely separated from potential traffic stress, all Class I and trail bridge projects were awarded points.
Closing gaps in the bicycling and walking network is important to create a seamless, connected transportation facility.
Gap Closure
Network projects that close a gap between two existing facilities were awarded points. Crossing projects were awarded points if a sidewalk or trail exists on both sides of the crossing.
Active transportation investments in disadvantaged communities support equity and provide access to transportation choices for neighborhoods that may be more reliant on bicycling, walking, or transit.
Equity
Projects located in a Community of Concern identified by the Metropolitan Transportation Commission (MTC) were awarded points. For more information about Community of Concern boundaries in Santa Rosa, see Chapter 3. Boundaries may change; the most recent boundaries are published by MTC.
139
First Phase
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
06
140
The Short Term and Long Term Implementation Categories together include nearly 70 linear projects likely to provide a great benefit to walking and bicycling in the Santa Rosa community. Given limited resources compared to this volume of improvements, this Plan Update 2018 recommends the City focus on a short list of transformative projects
and studies to be implemented first. This list includes 28 projects from both the Short Term and Long Term categories, and is expected to be reevaluated in the future as projects are completed. First Phase projects are listed alphabetically by location in Table 6-4 through Table 6-7. This order is not intended to reflect any one project being prioritized above another.
Table 6-4: First Phase – Class I Shared Use Paths TYPE
LOCATION
CROSS STREET A
CROSS STREET B
Class I Shared Use Path
Highway 101 Overcrossing
Coddingtown Mall
Santa Rosa Junior College
Class I Shared Use Path
Jennings Avenue
at SMART Tracks
–
Class I Shared Use Path
Roseland Creek Trail
Burbank Avenue
McMinn Avenue
Class I Shared Use Path
SMART Trail: Segment A Segment B Segment C
Prince Memorial Greenway 4th Street Guerneville Road
3rd Street 6th Street City Limits
Class I Shared Use Path
Southeast Greenway
Farmers Lane
Spring Lake Park
Class I Shared Use Path
Taylor Mountain Regional Park Trail
Bennett Valley Road/ Farmers Lane
Petaluma Hill Road/ Yolanda Avenue
Table 6-5: First Phase – On Street Bikeways TYPE
LOCATION
CROSS STREET A
CROSS STREET B
Class II Buffered Bicycle Lanes
3rd Street
Davis Street
Morgan Street
Class II Bicycle Lanes
7th Street
B Street
Mendocino Avenue
Class II Bicycle Lanes
Dutton Avenue
3rd Street
Sebastopol Road
Class II Bicycle Lanes
Guerneville Road
Range Avenue
Illinois Avenue
Class II Bicycle Lanes
Piner Road
Marlow Road
Cleveland Avenue
Class II Bicycle Lanes
Range Avenue
Piner Road
Russell Avenue
Class II Bicycle Lanes
Santa Rosa Avenue
Sonoma Avenue
Maple Avenue
06
Class II Bicycle Lanes
Sebastopol Road
Avalon Avenue
Sebastopol Ave
Class III Bicycle Route
B Street
4th Street
3rd Street
Implementation Plan
Table 6-6: First Phase – Sidewalks TYPE
LOCATION
CROSS STREET A
CROSS STREET B
Sidewalk
3rd Street
70 ft east of Roberts Avenue
250 ft west of Wilson Street
Sidewalk
Chanate Road
Mendocino Avenue
Lomitas Avenue
Sidewalk
Fulton Road
Appletree Drive
Guerneville Road
Sidewalk
Guerneville Road
Marlow Road
Ridley Avenue
Sidewalk
Sonoma Avenue
Farmers Lane
Village Court Transit Hub
Table 6-7: First Phase – Studies TYPE
LOCATION
CROSS STREET A
CROSS STREET B
Study
4th Street
D Street
Farmers Lane
Study
Brookwood Avenue
2nd Street
Sonoma Avenue
Study
College Avenue
Kowell Lane
Morgan Street
Study
Elliott Avenue
Armory Drive
Mendocino Avenue
Study
Montgomery Drive
Alderbrook Drive
Hahman Drive
Study
Northeast Connections: Santa Rosa Creek Trail Channel Trail Melita Road Channel Trail
Melita Road SR 12 SR 12 Stone Bridge Road
SR 12 Channel Drive Stone Bridge Road Channel Drive
Study
Roseland Creek Trail
Stony Point Road
Burbank Avenue
Study
Stony Point Road
Guerneville Road
Sebastopol Road
141
ST
A ND
RE
NORT H ST
SH BRU
ST
4T
VE HA
EJ
RD
RO
B
LL
SANTA ROSA AVE
G
LUP A AV E
OLIVE ST
G
W
U
F
O D
Taylor Mountain Regional Area
S A N TA
CORBY AVE
ID
DOWNTOWN
U
HI
N
W 3RD ST
VE ROSA A
DUTTON AVE
ER D
S D BE THA R Y
A
DUTTON MEADOW
S ID
BR
Trione-Annadel State Park
D RD
EEK
ONE
PACI FI C AV E FIEL
CR
UM
S T ONY P OINT R D
Z
ER
HO
E AV EN
E AV
L TA
S WRIGHT RD
RD
P H
12
M
L
MA
12
101
FIRST PHASE Figure 6-5 PROJECTS FIRST PHASE
FIRST PHASE PROJECTS Bicycle Lane (Class II)
AI N NT
SMART Station
Buffered Bicycle Lane (Class IIB)
Santa Rosa Junior College
Buffered Bicycle Lane (Class IIB)
City Limts
Bicycle Route (Class III)
Park
Sidewalk
Urban Growth Boundary
Study
ST
FO U
Bicycle Lane (Class II)
Bicycle Route (Class III)
GR OV
Sidewalk
EP
BADGER RD
KWY
Study NT
E
O CIT
D
Y BA BICYCLE ROUTE B
ER
UE
CA LIS TO
MO 142 SHARED-USE PATH RD
B LV
N
H
Shared-Use Path (Class I)
A
City Hall
DEST
UM
DESTINATIONS + BOUNDARIES
L TA
D O N Y P OI NT R
SANTA ROSA BICYCLE & PEDESTRIAN MASTER AS
PE
S EB SANTA ROSA BICYCLE & PEDESTRIAN MASTER PLAN UPDATE 2018
Shared-Use Path (Class I) PROJECTS
NAT E
LI T A
ST
W 9TH ST
D A S TO P O L R
1
EY
RD
VE DA
TT V AL L
E TO N AV AS
PE
0.5
ME
E AV
N
OO
OD HW Y
0
12
DR
MM
KW
B ENNE
101
MILES
MERY
E
CO LL EG E AV E
RD O CC ID E N TA L
A RD
SU
OO
WO
MA
AV E PLE
MA
E O E AV T ETT UT ND
T
NO
NQU
VAL L
O ST
BR
RED
BELLEVUE AVE
DR
Y
ST
HEARN AVE
N
Y A HW
R
E RY
AN
AA
O
NOM
GO NT
FR A
RG
M
ON
M TG O
SO FA R M E R S L N
H 4T
MO
C
C REEK R D
TA AV E
DR A L LE Y
AL TA VIS
H IDD
V
HUMBOLDT ST
MAR
CLEVELAND AVE
MEND OCIN O AVE
MA R
L OW R D
RANGE AVE
L OW R D
E AV
JENNINGS AVE
L RD
SO
D
U
AIRWAY DR
FRANCISC O AVE
N LN
N
SE BA STO PO
UE
O
U
GUERNEVILLE RD
12
B
PAC IFIC AVE
V
RD OC CID ENTAL
Y ER BA
Spring Lake Park
COLL EGE AVE
W 3R D ST
D
AT E R D AN
M
DOWNTOWN
W 9TH ST
B LV
RD
TT
W
I TO
CA LIS TO GA
U ND
B
A
EC
N B LVD
X
EN
T ON
MISS IO
P E T E RS
KWY
I
GUERNEVILLE RD
FULTON RD
EP
LN
Q
W STEELE LN
BB
OV
CH
K
JENNINGS AVE
M
PINER RD
S
R
BADGER RD
L RD
101
PINER RD
O
IL PA R K E R H
FE Y
J
TA I N N
FO
HUMBOLDT ST
G
GR
RO
VE
AI N NT
P
FO U
K WY
R WS D
D
CO F
SAN MIGUEL RD
HOPPER AVE
SHARED-USE PATH
BICY
FIRST FIRST PHASE PHASE PROJECTS PROJECTS
DESTINATIONS DESTINATIONS + BOUNDARIES + BOUNDARIES
Shared-Use Shared-Use Path (Class Path I) (Class I)
City Hall City Hall
Bicycle Lane Bicycle (Class Lane II) (Class II)
SMART Station SMART Station
Buffered Bicycle Buffered Lane Bicycle Lane (Class IIB)(Class IIB)
Santa Rosa Santa Junior Rosa College Junior College City LimtsCity Limts
Bicycle Route Bicycle (Class Route III) (Class III) Sidewalk Sidewalk
Park
Study
Urban Growth Urban Boundary Growth Boundary
Study
SHARED-USE SHARED-USE PATH PATH
D
JenningsJennings Avenue Avenue B
RoselandRoseland Creek Trail Creek Trail
ST
ONE
SMART Trail: SMART Trail: D
SEGMENT A (PRINCE SEGMENT MEMORIAL A (PRINCE MEMORIAL GREENWAY TO GREENWAY 3RD ST) TO 3RD ST)
BR
GE
SEGMENT C (GUERNEVILLE SEGMENT C (GUERNEVILLE RD RD TO CITY LIMITS) G E TO CITY LIMITS) D
F A I R FI E
LD LD DR DR TaylorF Mountain Taylor Mountain Regional Regional Park Trail Park Trail TE A K AK M M O
I
O I
H
H
NT
NT
E AV TH
4
Dutton Avenue Dutton Avenue H
O
(3RD ST TO SEBASTOPOL (3RD ST TO SEBASTOPOL RD) RD)
Guerneville Guerneville Road Road I
KW
KW
U
I
(RANGE AVE (RANGE TO ILLINOIS AVEAVE) TO ILLINOIS AVE)
VE DA
01
Guerneville Guerneville Road Road S
(MARLOW ROAD (MARLOW TO RIDLEY ROAD AVENUE) TO RIDLEY AVENUE)
Sonoma Sonoma Avenue T Avenue
(FARMERS LN(FARMERS TO VILLAGE LN COURT TO VILLAGE COURT TRANSIT HUB) TRANSIT HUB)
EStreet3rd V V EStreet 3rd A A O O T T N N NA S(DAVIS STNTO(DAVIS MORGAN ST ST) TO MORGAN ST) AS
4th Street 4th Street U
(D ST TO FARMERS (D ST TO LN)FARMERS LN)
W
College Avenue College Avenue W (KOWELL (KOWELL LN TO MORGAN LN ST TO MORGAN ST
X
Elliott Avenue Elliott Avenue X
Z
(ARMORY DR (ARMORY TO MENDOCINO DR TO MENDOCINO AVE) AVE)
Montgomery Montgomery Drive Drive Y (ALDERBROOK (ALDERBROOK DR TO HAHMAN DR DR) TO HAHMAN DR)
Northeast Northeast Connections: Connections: Z SANTA ROSA SANTA CREEK ROSA TRAILCREEK TRAIL (MELITA RD TO (MELITA SR 12) RD TO SR 12)
CHANNEL TRAIL CHANNEL (SR 12 TO TRAIL CHANNEL (SR 12 TO DR)CHANNEL DR) MELITA ROADMELITA (SR 12 TO ROAD STONE (SR BRIDGE 12 TO STONE RD) BRIDGE RD)
M (AVALON AVE(AVALON TO SEBASTOPOL AVE TO SEBASTOPOL AVE) AVE)
BUFFERED BUFFERED BICYLE LANE BICYLE LANE
STUDY
Brookwood Brookwood Avenue Avenue V (2ND ST AVE) (2ND ST TO SONOMA TO SONOMA AVE)
Sebastopol Sebastopol Road Road
M
(APPLETREE DRIVE (APPLETREE TO DRIVE TO GUERNEVILLE GUERNEVILLE ROAD) ROAD)
V
(MARLOW RD(MARLOW TO CLEVELAND RD TO AVE) CLEVELAND AVE) Y
VE DA
VE ROSA A
12
U
Piner JRoad Piner Road
Range Avenue K Range K Avenue (PINER RD TO RUSSELL RD AVE) TO RUSSELL AVE) E E AV AV (PINER PLE PLE A A L Santa Avenu Rosa e Avenue M M Santa Rosa L (SONOMA L AVE (SONOMA TO MAPLE AVE AVE) TO MAPLE AVE)
12
(MENDOCINO(MENDOCINO AVE TO LOMITAS AVEAVE) TO LOMITAS AVE)
STUDY
OO
OO J
S A N TA
L
HR O
O
U
G
(B ST TO MENDOCINO (B ST TO MENDOCINO DR) DR)
B
RO
B
VE HA
7th Street7th Street
G
(70FT EAST OF (70FT ROBERTS EAST OF AVEROBERTS TO AVE TO 250FT WEST OF 250FT WILSON WESTST) OF WILSON ST)
06
O
A (BENNETT (BENNETT RD/FARMERS VALLEY RD/FARMERS LN LN K VALLEY DR DTO D RHILL RD/YOLANDA TO PETELUMA PETELUMA RD/YOLANDA AVE) AVE) RHILL
O
DR
BICYCLEBICYCLE LANE LANE
G
T
W
W
O
K
Fulton Fulton Road R Road
S E (FARMERS LN(FARMERS TO SPRINGLN LAKE TO SPRING PARK) LAKE PARK)
D
A
R
Southeast Southeast Greenway Greenway
F O
Chanate Road Chanate Road Q
ID
F A I R FI E
TE
Q
R
R
PAA CVIFEIC AV EE IC
ne-Annadel tate Park
3rd Street P 3rd Street
C
SEGMENT B (4TH SEGMENT ST TO B 6TH (4TH ST)ST TO 6TH ST) ID
P
(BURBANK AVE (BURBANK TO MCMINN AVEAVE) TO MCMINN AVE)
D
BR
SIDEWALK SIDEWALK
(AT SMART TRACKS) (AT SMART TRACKS)
C
ONE
(3RD ST TO 4TH (3RD ST)ST TO 4TH ST)
Implementation Plan
HUMBOLDT ST
(CODDINGTOWN (CODDINGTOWN MALL TO MALL TO SANTA ROSA SANTA JUNIORROSA COLLEGE) JUNIOR COLLEGE)
B
ST
BICYCLEBICYCLE ROUTE ROUTE
Highway 101 Overcrossing 101 Overcrossing B Street B Street A Highway O O
A
Z
Park
CHANNEL TRAIL CHANNEL (STONE TRAIL BRIDGE (STONE RD BRIDGE RD TO CHANNELTO DR)CHANNEL DR)
AA
Roseland Roseland Creek Trail Creek Trail AA
BB
Stony Point Stony Road Point Road BB (GUERNEVILLE (GUERNEVILLE RD TO SEBASTOPOL RD TO SEBASTOPOL RD) RD)
(STONY POINT (STONY RD TO POINT BURBANK RD TO AVE) BURBANK AVE)
PE
PE
L TA
L TA
UM
UM
143
A
A
H
H
FUNDING STRATEGIES
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
06
A variety of sources exist to fund bicycle and pedestrian infrastructure projects, programs, and studies. Local and regional funding sources that can be used for construction or maintenance of bicycle or pedestrian improvements, along with statewide and federal grant programs, are described on the following pages. Eligibilities for the funding programs listed in this section are summarized in Table 6-8 on page 6-14.
Throughout the nine-county Bay Area, the Bicycle Facilities Grant program strives to reduce emissions from onroad vehicles and improve air quality by helping residents and commuters shift modes to bicycling and walking as alternatives to driving for short distances and first-and-last mile trips. BAAQMD has grant programs that fund both on-street facilities and bicycle parking facilities. Funds are programmed by the BAAQMD.
Local and Regional Funding Sources TRANSPORTATION FUNDS FOR CLEAN AIR Money in the Transportation Funds for Clean Air program, established by Assembly Bill 434, is generated by a $4 vehicle registration surcharge in the nine Bay Area counties. The funds may be used on projects that reduce vehicle emissions, including bicycle and pedestrian projects, and can also be used as a match for competitive state or federal programs. Funds are programmed by the Bay Area Air Quality Management District (BAAQMD) and Sonoma County Transportation Authority (SCTA).
144
BICYCLE FACILITIES GRANT PROGRAM
ONE BAY AREA GRANT In Sonoma County, One Bay Area grant funds are administered by SCTA. The program emphasizes funding for projects within Priority Development Areas in the region that are in-line with housing and land-use goals. Santa Rosa has received two One Bay Area 2 grants, including a project funding the design of a bicycle and pedestrian bridge over Highway 101. Funds are programmed by SCTA.
TRANSPORTATION DEVELOPMENT ACT ARTICLE 3
Funds are programmed by SCTA.
Measure M is a one-eighth cent sales tax to improve and protect Sonoma County's parks, safeguard water and wildlife, and expand walking, bicycling, and hiking trails. Trail maintenance projects and active transportation projects that improve access to regional parks and trails will be eligible for Measure M's expenditure list. Funds are anticipated to be programmed by Sonoma County Regional Parks (SCRP).
06 Implementation Plan
Transportation Development Act Article 3 (TDA 3) provides funding annually for bicycle and pedestrian projects. Two percent of TDA funds collected within the county are used for TDA 3 projects. Metropolitan Transportation Commission policies require that all projects be reviewed by a BPAC or similar body before approval.
MEASURE M (2018)
MEASURE M (2004) Measure M is a one-quarter cent sales tax in Sonoma County to fund transportation projects including maintenance and traffic safety improvement projects. Four percent of revenues are set aside for bicycle and pedestrian projects. Two projects in Santa Rosa have already been identified by the SCTA as priorities to receive funding: the Santa Rosa Creek Trail, the Highway 101 bicycle and pedestrian overcrossing, and bicycle lanes on Old Redwood Highway, Mendocino Avenue, and Santa Rosa Avenue.
REGIONAL MEASURE 3 Regional Measure 3 uses toll revenue from the Bay Areaâ&#x20AC;&#x2122;s seven state-owned toll bridges. The money from Regional Measure 3 funds a variety of highway and transit projects throughout the region. Funds are programmed by the Metropolitan Transportation Commission.
Funds are programmed by SCTA.
145
State and Federal Grant Programs
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
06
CALIFORNIA ACTIVE TRANSPORTATION PROGRAM Californiaâ&#x20AC;&#x2122;s Active Transportation Program (ATP) funds infrastructure and programmatic projects that support the program goals of shifting trips to walking and bicycling, reducing greenhouse gas emissions, and improving public health. Competitive application cycles occur every one to two years, typically in the spring or early summer. Eligible projects include construction of bicycling and walking facilities, new or expanded programmatic activities, or projects that include a combination of infrastructure and noninfrastructure components. Typically no local match is required, though extra points are awarded to applicants who do identify matching funds. Funds are programed by the California Transportation Commission (CTC).
SUSTAINABLE TRANSPORTATION PLANNING GRANTS Caltrans Sustainable Transportation Planning Grants are available to communities for planning, study, and design work to identify and evaluate projects, including conducting outreach or implementing pilot projects. Communities are typically required to provide an 11.47 percent local match, but staff time or in-kind donations are eligible to be used for the match provided the required documentation is submitted. Funds are programed by Caltrans. HIGHWAY SAFETY IMPROVEMENT PROGRAM Caltrans offers Highway Safety Improvement Program (HSIP) grants every one to two years. Projects on any publicly owned road or active transportation facility are eligible, including bicycle and pedestrian improvements. HSIP focuses on projects that explicitly address documented safety challenges through proven countermeasures, are implementation-ready, and demonstrate cost-effectiveness. Funds are programmed by Caltrans.
146
SOLUTIONS FOR CONGESTED CORRIDORS PROGRAM
Funds are programed by the CTC. OFFICE OF TRAFFIC SAFETY Under the Fixing Americaâ&#x20AC;&#x2122;s Surface Transportation (FAST) Act, five percent of Section 405 funds are dedicated to addressing nonmotorized safety. These funds may be used for law enforcement training related to pedestrian and bicycle safety, enforcement campaigns, and public education and awareness campaigns.
The Recreational Trails Program helps provide recreational trials for both motorized and nonmotorized trail use. Eligible products include: trail maintenance and restoration, trailside and trailhead facilities, equipment for maintenance, new trail construction, and more. Funds are programed by the California Department of Parks and Recreation.
06 Implementation Plan
Funded by SB1, the Congested Corridors Program strives to reduce congestion in highly traveled and congested through performance improvements that balance transportation improvements, community impacts, and environmental benefits. This program can fund a wide array of improvements including bicycle facilities and pedestrian facilities. Eligible projects must be detailed in an approved corridor-focused planning document. These projects must include aspects that benefit all modes of transportation using an array of strategies that can change travel behavior, dedicate right of way for bikes and transit, and reduce vehicle miles traveled.
RECREATIONAL TRAILS PROGRAM
AFFORDABLE HOUSING AND SUSTAINABLE COMMUNITIES PROGRAM The AHSC program funds land-use, housing, transportation, and land preservation projects that support infill and compact development that reduces greenhouse gas emissions. Projects must fall within one of three project area types: transit-oriented development, integrated connectivity project, or rural innovation project areas. Fundable activities include: affordable housing developments, sustainable transportation infrastructure, transportation-related amenities, and program costs. Funds are programmed by the Strategic Growth Council and implemented by the Department of Housing and Community Development.
Funds are programmed by the California Office of Traffic Safety.
147
CULTURAL, COMMUNITY AND NATURAL RESOURCES GRANT PROGRAM – PROPOSITION 68
City of Santa Rosa • BICYCLE & PEDESTRIAN MASTER PLAN
06
Proposition 68 authorizes the legislature to appropriate $40 million to the California Natural Resources Agency to protect, restore, and enhance California’s cultural, community, and natural resources. One type of eligible project that this program can fund are projects that develop future recreational opportunities including: creation or expansion of trails for walking, bicycling, and/or equestrian activities and development or improvement of trailside and trailhead facilities, including visitor access to safe water supplies. Funds are programmed by the California Natural Resources Agency.
This program provides local and regional agencies that have passed sales tax measures, developer fees, or other transportation-imposed fees to fund road maintenance and rehabilitation, sound walls, and other transportation improvement projects. Jurisdictions with these taxes or fees are then eligible for a formulaic annual distribution of no less than $100,000. These jurisdictions are also eligible for a competitive grant program. Local Partnership Program funds can be used for a wide variety of transportation purposes including roadway rehabilitation and construction, transit capital and infrastructure, bicycle and pedestrian improvements, and green infrastructure. Funds are programmed by the CTC.
URBAN GREENING GRANTS Urban Greening Grants support the development of green infrastructure projects that reduce GHG emissions and provide multiple benefits. Projects must include one of three criteria, most relevantly: reduce commute vehicle miles travels by constructing bicycle paths, bicycle lanes or pedestrian facilities that provide safe routes for travel between residences, workplaces, commercial centers, and schools. Eligible projects include green streets and alleyways and non-motorized urban trails that provide safe routes for travel between residences, workplaces, commercial centers, and schools. Funds are programmed by the California Natural Resources Agency.
148
LOCAL PARTNERSHIP PROGRAM
ROAD MAINTENANCE AND REHABILITATION PROGRAM Senate Bill 1 created the Road Maintenance and Rehabilitation Program (RMRP) to address deferred maintenance on state highways and local road systems. Program funds can be spent on both design and construction efforts. On-street active transportationrelated maintenance projects are eligible if program maintenance and other thresholds are met. Funds are allocated to eligible jurisdictions. Funds are programmed by the State Controller's Office with guidance from the CTC.
STUDIES
PROGRAMS
CROSSING/ INTERSECTIONS
SAFE ROUTES TO TRANSIT
SAFE ROUTES TO SCHOOL
TRAILS
FUNDING SOURCE
ON-STREET BIKEWAYS
Table 6-8: Funding Source Eligibilities by Project Type
Local and Regional Programs Transportation Funds for Clean Air (SCTA)
One Bay Area (MTC) Transportation Development Act, Article 3 (SCTA) Measure M (2004 - SCTA)
Implementation Plan
Bicycle Facilities Program (BAAQMD)
06
Measure M (2018 - SCRP) Regional Measure 3 (MTC) Competitive Grant Programs Active Transportation Program (CTC) Sustainable Transportation Planning Grants (Caltrans) Highway Safety Improvement Program (Caltrans) Solutions for Congested Corridors (CTC) Office of Traffic Safety (CA OTS) Recreational Trails Program (CA DPR) Affordable Housing & Sustainable Communities (CA HCD) Cultural, Community, and Natural Resources (CA NRA) Urban Greening Grants (CA NRA) Local Partnership Program Road Maintenance and Rehabilitation Program
149
ENVIRONMENTAL IMPACT
City of Santa Rosa â&#x20AC;˘ BICYCLE & PEDESTRIAN MASTER PLAN
06
150
Pursuant to the California Environmental Quality Act (CEQA), an Initial Study was prepared for the 2010 Bicycle and Pedestrian Master Plan, which resulted in a Mitigated Negative Declaration that was approved by the City Council on February 15, 2011 (Resolution No. 27834). CEQA Guidelines section 15162 provides that no additional review is required where a negative declaration has been adopted for a project and there are no substantial changes to the project or changed circumstances which will result in new or more severe environmental impacts and there is no new information showing the project will have significant effects not discussed in the negative declaration.
No substantial changes have been proposed in the Master Plan Update that would result in new or more severe environmental impacts than were analyzed in the 2010 Master Plan mitigated negative declaration; there have been no changes in circumstances resulting in new or more severe impacts; and there is no new information indicating that the project will have one or more significant effects not discussed in the previous mitigated negative declaration. Therefore, further environmental review is not required.
This page intentionally left blank
06 Implementation Plan
151
A.
RECOMMENDATION TABLES
APPENDIX A. RECOMMENDATION TABLES This appendix includes tables listing the network and crossing recommendations summarized and mapped in Chapter 5. Projects within each table are listed alphabetically by street name.
A.
MILES
LOCATION
FROM
TO
Bellevue Ranch Trail
Liscum St
Arrowhead Dr
Calistoga Rd (extension)
Calistoga Rd
Montgomery Dr
0.20
Coffey Creek Trail
Piner Rd
Piner Creek Trail
0.21
Colgan Creek
Colgan Creek
Dutton Ave/Hearn Ave
0.14
Colgan Creek Trail
Southwest Community Trail
near Bellevue Ave
0.55
Ducker Creek Trail
Benicia Dr
0.15
Culebra Way
0.12
Ducker Creek Trail
Middle Rincon Rd
Benicia Dr
0.31
Francisco Ave Trail
N Village Dr/ Van Patter Dr
Claiborne Cir (extension)
0.45
Guerneville Rd
Ridley Ave
SMART Trail
0.39
South of Guerneville Rd
SMART Rail Line
Herbert Ln
0.05
Highway 101 Overcrossing
Edwards Ave
Elliott Ave
0.42
Idaho Dr
Spring Creek Dr
Spring Creek
0.14
Jennings Ave
SMART Railroad Tracks
Range Ave
0.13
Jennings Ave (extension)
Cleveland Ave
Armory Dr
0.03
Jennings Park connector
Clover Ln
New York Dr
0.14
Joe Rodota Trail
N Wright Rd
Sebastopol Rd
0.19
Recommendation Tables
Table A-1: Class I Shared Use Paths
Continued
A-1
Table A-1: Class I Shared Use Paths
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
Kawana Springs Creek Restoration
Petaluma Hill Rd/ Lumas Ct
Santa Rosa Plaza
Kawana Springs Rd
Kawana Ter
Turquoise Way
0.61
Matanzas Creek Trail
Doyle Park Dr
Vallejo St
0.21
Neotomas Ave (extension)
Ronne Dr
Neotomas Ave
0.05
Oaklake Green Park
Oak Lake Ave
Garfield Park Ave
0.10
Paulin Creek Trail
McBride Ln
Cleveland Ave
0.08
Piner Creek North Fork
Piner Creek
Airway Dr
0.05
Piner Creek Trail
Santa Rosa Creek Trail
SMART Trail
2.35
Piner Creek Trail
Marlow Rd
Piner Creek Trail
0.33
Piner Creek Trail
SMART path
City limits
1.14
Piner Creek Trail
Marlow Rd
Hardies Ln
1.14
Prince Memorial Greenway
Prince Memorial Greenway north
Sonoma Ave/ Santa Rosa Ave
0.08
Rae Street Park
Sonoma Ave
Brown St
0.03
Roseland Creek Trail
Burbank Ave
McMinn Ave
0.32
Roseland Creek Trail
Llano Rd
Ludwig Ave/Daniels Dr
0.17
Roseland Creek Trail
Maitland Ave
Ludwig Ave
0.72
Russell Creek Trail
Piner Rd
Range Ave/ Bicentennial Way
1.65
Santa Rosa Ave
1st St
Prince Memorial Greenway
0.05
Santa Rosa Creek Trail
Santa Rosa Ave
E Street
0.27
Santa Rosa Creek Trail
Doyle Park Dr
E St
0.66
Santa Rosa Creek Trail
Farmers Ln
Shortt Rd/Marian Ln
0.28
Santa Rosa Creek Trail
Shadow Ln
Santa Rosa Creek
0.15
Santa Rosa Creek Trail
Mission Circ (extension)
Calloway Dr/ Streamside Dr
0.12
Santa Rosa Memorial Park Trail
Parsons
Poppy Dr
1.67
Santa Rosa Rural Cemetery
Franklin Ave (extension)
Pasons Dr
0.05
0.44
Continued
A-2
Table A-1: Class I Shared Use Paths MILES
LOCATION
FROM
TO
Santa Rosa Southeast Greenway Extension
Spring Lake Park
Sonoma Valley Trail (planned)
Santa Rosa West County Connector
Santa Rosa Creek Trail
Joe Rodota Trail
1.49
SE Greenway Connector
Southeast Greenway
Spring Lake Path
0.27
Shadow Ln
Santa Rosa Creek Trail (extension)
Montgomery Dr
0.16
SMART Rail Line
Prince Memorial Greenway
W 3rd St
0.07
SMART Rail Line
6th St/W 6th St
4th St
0.12
SMART Trail
Guerneville Rd
River Rd (Fulton)
3.39
SMART Trail
Golf Course Dr (Rohnert Park)
Bellevue Ave
2.77
SMART Trail
6th St/W 6th St
4th St
1.08
SMART Trail
SMART Trail/Frances St (extension)
Range Ave/Frances St
Southeast Greenway
Hoen Ave/Hoen Frontage Rd
Spring Lake Park Campground Road
Southeast Greenway
Elkhorn Ct/Kodiak Ct
Hoen Ave/Mariposa Dr
0.68
Southeast Greenway
Wanda Way
Camden Ct
0.05
Southeast Greenway
Vallejo St
Hoen Frontage Rd
0.16
Southeast Greenway
Sierra Creek Ln
Princeton Way
0.17
Southwest Community Trail
Hearn Ave
Colgan Creek Trail
0.88
Spring Creek Trail
Hahman Dr/ Rock Creek Dr
Franquette Ave
0.49
State Rte 12
Melita Rd
Shady Acres Ln
3.68
State Rte 12
Middle Rincon Rd
El Encanto Way (extension)
1.07
Steele Creek Trail
Zinfandel Ave
Marlow Rd
0.11
Steele Creek Trail
Hyman Ln (extension)
Zinfandel Ave
0.09
Tanglewood Park Trails
Tanglewood Ct
Oak Lake Ave
0.36
Taylor Mountain Regional Park Trail
Bennett Valley Rd/ Farmers Ln
Petaluma Hill Rd/ Yolanda Ave
0.50
Taylor Mountain Regional Park Trail
Petaluma Hill Rd
City Limit
0.14
Todd Creek
Highway 101
Scenic Ave
0.62
Woodacre Trail
Fulton Rd
Woodacre Trail/ Guerneville Rd
0.63
Recommendation Tables
0.09
A.
1.62
1.22
A-3
Table A-2: Class II Bicycle Lanes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
1st St
B St
A St
0.10
2nd St
D St
E St
0.10
2nd St
Second Street
Montgomery Dr
0.33
W 3rd St
Rusch Ct
Stony Point Rd
0.49
W 3rd St
N Dutton Ave
SMART Railroad Tracks
0.32
Mendocino Ave
0.10
7th St
B St
7th St
Mendocino Ave
Humboldt St
0.09
Armory Dr
Ridgeway Ave
Elliott Ave
0.23
Aston Ave
Brookwood Ave
Hendley St
0.40
Badger Rd
Middle Rincon Rd
Baird Rd
0.26
Baker Avenue connector
Corby Ave
Santa Rosa Ave
0.22
Bellevue Ave
Stony Point Rd
Colgan Creek Trail
0.29
Bellevue Ave
Burgess Dr
SMART Railroad Tracks
0.63
Bellevue Ave
SMART Railroad Tracks
Moorland Ave
0.14
Bellevue Ave
Corby Ave
Santa Rosa Ave
0.27
Bellevue Ave
Santa Rosa Ave
Eastern end
0.31
Bellevue Ave (extension)
E Bellevue Ave
Petaluma Hill Rd
Bennett Valley Rd
Bennett Valley Rd/ City Limit
Mitchell Rd
1.40
Bennett Valley Rd
Yulupa Ave
City Limit
0.17
Bicentennial Way
Fountaingrove Pkwy
Mendocino Ave
0.47
Brigham Ave
Mount Olive Dr/ Maple Ave
Bennett Valley Rd
0.08
Brookwood Ave
College Ave
2nd St
0.25
Brookwood Ave
Maple Ave
Sonoma Ave
0.48
Brookwood Ave
Maple Ave
Allan Way/Aston Ave
0.52
0.60
Continued
A-4
Table A-2: Class II Bicycle Lanes MILES
FROM
TO
Burbank Ave
Roundelay Ln
Hearn Ave
1.00
Calistoga Rd
Rincon Ave
Badger Rd
0.17
Chanate Rd
Lomitas Ave
Humboldt St
0.10
Chanate Rd
Bonita Vista Ln
Montecito Ave
0.65
Cleveland Ave
Frances St
Carrillo St
0.23
Cleveland Ave
Carrillo St
Lincoln St
0.13
Cleveland Ave
Lincoln St
9th St
0.27
Cleveland Ave
Hopper Ave
Industrial Dr
0.28
Cleveland Ave
Industrial Dr
Guerneville Rd
Cleveland Ave
Guerneville Rd
Coddingtown Center
0.35
Coffey Ln
Empire Industrial Ct
Piner Rd
0.10
College Ave
W College Ave
Mendocino Ave
0.58
College Ave
Mendocino Ave
4th St
0.73
College Ave
Monroe St/Allison Way
4th St
0.05
County Center Dr
Administration Dr
Steele Ln
0.31
Davis St
9th St
7th St
0.17
Davis St
6th St
3rd St
0.17
Dutton Ave
W 3rd St
Sebastopol Rd
0.25
Dutton Ave
Dutton Meadow (extension)
Dutton Ave (extension)
0.38
Dutton Ave
Sebastopol Rd
Torzelli Ln/South Ave
0.45
Dutton Ave
Torzelli Ln/South Ave
Hearn Ave
0.68
Dutton Ave
250 Ft N of Duke Ct
City Limit
0.84
Dutton Ave
City Limit
W Robles Avenue
N Dutton Ave
W 9th St
W 3rd St
1.17
A. Recommendation Tables
LOCATION
0.17 0.55 Continued
A-5
Table A-2: Class II Bicycle Lanes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
N Dutton Ave
W College Ave
W 9th St
0.32
Dutton Ave extension
Hearn Ave
Dutton Ave extension
0.32
Dutton Ave extension
Dutton Ave
Dutton Ave extension
0.05
Dutton Ave extension
near Birch Meadow St
Burbank Ave
0.68
Dutton Ave extension
Colgan Creek
Dutton Ave
0.26
Dutton Meadow
Hearn Ave
Bellevue Ave
0.86
E St
Bennett Valley Rd
Hendley St
0.08
S E St
Wheeler St
Clark St
0.10
S E Street
Wheeler St
Bennett Valley Rd
0.25
Elliott Ave
Armory Dr
Mendocino Ave
0.47
Frances St
150 W of Briggs Ave
Cleveland Ave
0.16
Francisco Ave
City Limit
San Miguel Ave
1.01
Franklin Ave
Mervyn Ave
Crest Dr/Lewis Rd
0.15
Fresno Ave
New Zealand Ave
Finley Ave
0.21
Fresno Ave (extension)
Finley Ave
Northpoint Pkwy
Guerneville Rd
Range Ave
Cleveland Ave
0.58 0.17
Guerneville Rd/Steele Ln
Cleveland Ave
Illinois Ave
0.20
Hall Rd
City Limit
Countryside Drive
0.19
Hearn Ave
Whitewood Dr
Santa Rosa Ave
0.42
Hopper Ave
Coffey Ln
Airway Dr
0.49
Humboldt St
Chanate Rd/ Belvedere Way
Mervyn Ave
0.09
Illinois Ave/Armory Dr
Steele Ln
Elliott Ave
0.31
Kawana Springs Rd
Brookwood Ave
Kawana Ter
0.33
King St/E St/S E St
S E St/Clark St
College Ave/King St
0.37 Continued
A-6
Table A-2: Class II Bicycle Lanes MILES
LOCATION
FROM
TO
Lewis Rd
Humboldt St
Franklin Ave
Linwood Ave
Aston Ave
Brookwood Ave
0.10
Los Alamos Rd
Melita Rd
State Rte 12
0.19
Ludwig Ave
S Wright Rd
City Limit
0.98
Ludwig Ave
City Limit
Stony Point Rd
0.50
Ludwig Ave
Stony Point Rd
Bellevue Ave
0.28
Ludwig Ave
S Wright Rd
Llano Rd
0.10
Maple Ave
Brown St
Santa Rosa Ave
0.14
Melita Rd
Montgomery Dr
Los Alamos Rd
0.06
Miller Rd Trail
Petaluma Hill Rd
Bellevue Ave (extension)
0.52
Mission Blvd
State Rte 12
Montgomery Dr
0.19
Montecito Blvd
Mission Blvd
Middle Rincon Rd
0.38
Montgomery Dr
2nd St
Talbot Ave
0.39
Northpoint Pkwy
Corrigan St
S Wright Rd
0.40
Occidental Rd
Occidental Rd/City Limit/Fulton Rd
Occidental Rd/City Limit/Piezzi Rd
0.94
Olive St
Railroad St
Sebastopol Ave
0.20
Pacific Ave
Mendocino Ave
Humboldt St
0.16
Petaluma Hill Rd
City Limit
Hopi Trail
0.93
Petaluma Hill Rd
Santa Rosa Ave
Barham Ave/Pressley St
0.16
Piner Rd
Pinercrest Dr/Marlow Rd
Cleveland Ave
1.22
Railroad Street
3rd St
Santa Rosa Creek
0.12
Range Ave
Piner Rd
Russell Ave
Range Ave
Guerneville Rd
Edwards Ave
0.31
Range Ave
Edwards Ave
Jennings Ave
0.10
0.11
A. Recommendation Tables
0.20
Continued
A-7
Table A-2: Class II Bicycle Lanes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
A-8
MILES
LOCATION
FROM
TO
Ridgway Ave
Morgan St
Mendocino Ave
0.27
Ridgway Ave
Morgan St
Armory Dr
0.06
San Miguel Rd
Fulton Rd
Francisco Ave
Santa Rosa Ave
Santa Rosa Creek
Sonoma Ave
Sebastopol Ave
Sebastopol Rd
Olive St
0.14
Sebastopol Rd
N Wright Rd
Leddy Ave
0.12
Sebastopol Rd
Leddy Ave
Louis Krohn Dr
0.09
Sebastopol Rd
Fresno Ave
Corporate Center Pkwy
0.34
Sebastopol Rd
Avalon Ave
Sebastopol Ave
Standish Avenue
W Robles Ave
Todd Rd
0.50
State Rte 12
Farmers Ln
Melita Rd
3.90
Taylor Mountain Regional Park Trail
Bennett Valley Rd/ Farmers Ln
Petaluma Hill Rd/ Yolanda Ave
2.03
S Wright Rd
Sebastopol Rd
Ludwig Ave
Yolanda Ave
Petaluma Hill Rd
Santa Rosa Ave
0.51 0.06
0.31
1.47 0.50
Table A-3: Class II Buffered Bicycle Lanes MILES
LOCATION
FROM
TO
3rd St
Davis St
Morgan St
0.07
W 3rd St
Brittain Ln/Malibu Cir
Stony Point Rd
0.60
Petaluma Hill Rd
Yolanda Ave
Barham Ave/Pressley St
2.01
A.
MILES
LOCATION
FROM
TO
5th St
Humboldt St
D St
7th St
Humboldt St
Beaver St
Acacia Ln
Las Raposas Ct
State Rte 12
0.35
Alderbrook Dr
Sonoma Ave
4th St
0.57
B St
4th St
3rd St
0.06
W Barham Ave
0.25 0.18
Barham Ave
Olive St
0.01 0.11
W Barham Ave
Barham Ave
Dutton Ave
Barndance Ln
Stony Point Rd
Liscum St
0.11
Beachwood Dr/ Baker Ave
SMART Trail
Corby Ave
0.33
Bear Cub Way
Armory Dr
Mendocino Ave
0.49
Beaver St
7th St
Cherry St
0.05
Blacksmith Wy
Arrowhead Dr
Silver Spur
0.24
Brown St
Rae St
Wheeler St
0.18
Brush Creek Road
Montecito Blvd
Urban Growth Boundary
0.80
Bryden Ln
Montecito Ave
St Helena Ave
0.53
Burgess Dr
Bellevue Ave
Dutton Meadow
Calistoga Rd
State Rte 12
Firestone Pl
Recommendation Tables
Table A-4: Class III Bicycle Routes
0.15 0.07 Continued
A-9
Table A-4: Class III Bicycle Routes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
Channel Dr
Channel Trl
Montgomery Dr/ Channel Dr
0.09
Cherry St
Beaver St
E St
0.08
Clairborne Cir (extension)
Francisco Ave Trail
Claiborne Cir/ Francisco Ave
0.13
Clover Dr
Jennings Ave
W College Ave
0.37
Clover Dr
W College Ave
Link Ln
0.37
Clyde Ave
Morley Way
4th St
Colby Ave/Colby Ave Ext
Hearn Ave
Dowd Dr
Comalli St
Hughes Ave
Lazzini Ave
0.17
Corby Ave
Earle St
Hearn Ave
1.04
Creekside Rd
Cypress Way
Yulupa Ave
0.54
Cypress Way
Hoen Ave
Creekside Rd
0.32
D St
5th St
3rd St
D St
3rd St
Sonoma Ave
0.19
Delport Ave
West Ave
McMinn Ave
0.17
Ditty Ave/Russell Ave
Ditty Ave/Coffey Ln
Russell Ave/Hardies Ln
Dowd Dr
Corby Ave Extension
Talmadge Dr
Doyle Park Dr
Talbot Ave
Doyle Park
Dutton Ave
W Barham Ave
Torzelli Ln/South Ave
0.11
Earle St
S A St
Santa Rosa Ave
0.17
Earle St
S Davis St
Corby Ave
0.14
El Encanto Dr/St Francis Rd/Desoto Dr/Owls Nest Dr
Beach Ave/Marit Dr
San Ramon Way/ Owls Nest Dr
0.81
Elizabeth Way
Pacific Ave
Parsons Dr
Exeter Dr/Putney Dr
Jennings Ave
W College Ave
Florence St
Hewett St
Duncan St
0.12 0.24
0.11
0.64 0.41 0.44
0.20 0.41 0.05 Continued
A-10
Table A-4: Class III Bicycle Routes MILES
FROM
TO
Florence St
Duncan St
Duncan St
0.03
Francisco Ave
San Miguel Rd
Pinercrest Dr
0.24
Franquette Ave
Montgomery Dr
Spring Creek
0.42
Franquette Ave
Spring Creek
Hoen Ave
0.32
Gamay St
Zinfandel Ave
Jennings Ave
0.02
Hansen Dr
Middle Rincon Rd
Jack London Dr
0.26
Hardies Ln
Russell Ave
Terry Rd
0.39
Hardies Ln
Terry Rd
W Steele Ln
0.24
Hartley Drive
Montgomery Dr/ Franquette Ave
Yulupa Ave/Hartley Dr
0.25
Hewett St
Umland Dr
Florence St
0.09
Hopper Ave
Barnes Rd
Coffey Ln
Hospital Trail
Doyle Park Dr/Parker Dr
Santa Rosa Creek
Hughes Ave
McMinn Ave
Burbank Ave
0.17
Hughes Ave
Comalli St
Burbank Ave
0.11
Imwalle St
W Third St
Santa Rosa Creek Trail
Jack London Dr
Hansen Dr
Klondike Ct
0.05
Knolls Dr
Lornadell Ln
Lornadell Ln
0.03
Knolls Dr
Lornadell Ln
Bethards Dr
0.66
Lazzini Ave
Comalli St
Stony Point Rd
0.22
Lazzini Ave
Stony Point Rd
Marble St
Leo Drive
Burbank Ave
SMART Trail
0.70
Leonard Ave
Talbot Ave/Doyle Park Dr
Alderbrook Dr
0.20
Leonard Ave/Shortt Rd
Alderbrook Dr/ Leonard Ave
Shortt Rd/Marian Ln
0.32
Link Ln
Umland Dr
W 9th St
0.41
A. Recommendation Tables
LOCATION
0.51 0.06
0.18
0.17
Continued
A-11
Table A-4: Class III Bicycle Routes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
Link Ln
Lodi St
W 9th St
0.16
Lornadell Ln
Neotomas Ave
Knolls Dr
0.05
McMinn Ave
Delport Ave
Hughes Ave
0.15
Mendocino Ave
College Ave
4th St
0.41
Monte Verde Dr
Garfield Park Ave
Calistoga Rd
0.06
Monte Verde Dr
Calistoga Rd
San Ramon Way
0.99
Montecito Ave
El Capistrano Way
Pacific Ave/Bryden Ln
0.09
Moraga Dr
Aston Ave
Tokay St
0.38
Morgan St
9th St
Ridgeway Ave
0.67
Morley Way
Park Way
Bryden Ln
0.04
Neotomas Ave
Farmers Ln
Ronne Dr
0.46
Neotomas Ave
Tachevah Dr
Tuscan Dr
0.05
Neotomas Ave
Tuscan Dr
Compadre Dr
0.04
Neotomas Ave
Compadre Dr
Tamarisk Dr/Tamarisk Ct
0.10
Neotomas Ave
Tamarisk Dr/Tamarisk Ct
Wawona Dr/Wawona Ct
0.04
Neotomas Ave
Cielo Ct
Maynes Ct
0.03
Neotomas Ave
Wawona Dr/Wawona Ct
Cielo Ct
0.05
Neotomas Ave
Maynes Ct
Yulupa Ave
0.04
Oakmont Dr
Valley Oaks Dr
State Rte 12
1.53
Old Stony Point Rd/Liscum St
Roseland Creek
Ludwig Ave
0.79
Olive St
Sebastopol Ave
Earle St
0.22
Peterson Ln
Pinercrest Dr
Piner Rd
0.16
Peterson Ln/Pinercrest Dr/Francisco Ave
Appletree Dr/Laylani Ct
San Miguel Rd
1.39
Pinercrest Dr
Francisco Ave
Peterson Ln
0.12 Continued
A-12
Table A-4: Class III Bicycle Routes MILES
FROM
TO
Proctor Dr
Clyde Ave
Park Way
0.03
Prospect Ave
Sherbrook Dr
Acacia Ln
0.25
Pythian Rd
State Rte 12
Valley Oaks Dr
0.81
Rinconada Dr
Mission Blvd
Middle Rincon Rd
0.42
Ronne Dr
Neotomas Ave
Neotomas Ave Trail Connection
0.01
Russell Ave
Range Ave
Hardies Ln
0.11
Russell Ave
Coffey Ln
Hardies Ln
0.38
San Miguel Rd
Francisco Ave
SMART Rail Line
0.43
San Miguel Rd
SMART Rail Line
Coffey Ln
0.34
Santa Rosa Ave
4th St
3rd St
0.07
Shadow Ln
Montgomery Dr
Santa Rosa Creek Trail
Sherbrook Dr
Mission Blvd
Prospect Ave
0.04
Sherbrook Dr
Mission Blvd
Sherbrook Dr west
0.05
Sorrento Way
Acacia Ln
Culebra Way/Acacia Ln
South Ave
Dutton Ave
West Ave
0.20
Spencer Ave
St Helena Ave
Spring St
0.62
Spencer Ave/Proctor Dr/Park Way
Humboldt St
Morley Way
0.83
Spring St
Spencer Ave
Pacific Ave
0.12
St Helena Ave
Bryden Ln
Spencer Ave/Proctor Dr
0.70
Summerfield Rd
Bethards Dr
Woodview Dr
0.60
Tachevah Dr
Bennett Valley Rd
Yulupa Ave
0.55
Talbot Ave
4th St
Doyle Park Dr/ Leonard Ave
0.14
Trowbridge St
Link Ln
Umland Dr
Umland Dr
Trowbridge St
Hewett St
A. Recommendation Tables
LOCATION
0.12
0.12
0.11 0.06 Continued
A-13
Table A-4: Class III Bicycle Routes
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
A-14
MILES
LOCATION
FROM
TO
Vallejo St
S E St
End of street
1.28
Valley Oaks Dr
Pythian Rd
Oakmont Dr
0.11
Wallace Rd
City Limit
Badger Rd
Wheeler St
Brown St
S E St
Willjam Court
Talmadge Dr
Bellevue Ave
0.34
Wilson St
9th St
3rd St
0.43
Zinfandel Ave
Steele Creek Trail
Gamay St
0.22
Zinfandel Ave
Jennings Ave/Gamay St
Zinfandel Ave/ Piner Creek Trail
0.18
0.20 0.21
Table A-5: Class III Bicycle Boulevards MILES
LOCATION
FROM
TO
3rd St/Montgomery Dr
E St
2nd St
0.34
6th St
W 6th St
Davis St
0.10
W 6th St
Pierson St
6th St
0.17
Colgan Ave
Santa Rosa Ave
Petaluma Hill Rd
Humboldt St
Mervyn Ave
Lewis Rd
Humboldt St
Lewis Rd
Pacific Ave
0.60
Humboldt St
Pacific Ave
College Ave
0.53
Humboldt St
College Ave
5th St
0.29
Jennings Ave
Exeter Dr
N Dutton Ave
1.30
Jennings Ave
N Dutton Ave
SMART Railroad Tracks
0.07
Jennings Ave
Range Ave
Cleveland Ave
0.30
Middle Rincon Rd
Montecito Ctr
State Rte 12
0.93
Pierson St
Santa Rosa Creek Trail
W 6th St
0.02
Roseland Ave/ McMinn Ave
Roseland Ave/ Joe Rodota Trail
McMinn Ave/Hughes Ave
0.32
Sonoma Ave
Hahman Dr
Yulupa Ave
0.46
Spencer Ave
Humboldt St
Mendocino Ave
0.50
West Ave
Sebastopol Rd
South Ave
0.45
West Ave
South Ave
Hearn Ave
0.63
0.35 0.15
A. Recommendation Tables
A-15
Table A-6: Class IV Separated Bikeways MILES
LOCATION
FROM
TO
3rd St
Morgan St
B St
Guerneville Rd
Westberry Dr/N Dutton Ave
SMART Santa Rosa North Station Tracks
0.06
Northpoint Pkwy (extension)
Stony Point Rd
Burbank Ave
0.33
Sebastopol Rd
Corporate Center Pkwy
Sebastopol Ave
LOCATION
FROM
TO
Baker Ave
100 feet west of Santa Rosa Ave
Santa Rosa Ave
0.04
3rd St
Morgan St
Davis St
0.07
W 3rd St
250ft West of Wilson St
70ft East of Roberts Ave
W Third St
Surrey Dr
N Dutton Ave
0.69
4th St
Rogers Way
State Rte 12
0.05
W Barham Ave
Dutton Ave
250ft East of Beachwood Dr
0.28
Barnes Rd
Windrose Ln
Dennis Ln
0.33
Bicentennial Way
Lake Park Dr
Fountaingrove Pkwy
0.16
Brookwood Ave
College Ave
5th St
0.08
Brush Creek Rd
State Rte 12
Los Olivos Rd
0.27
Burbank Ave
Hearn Ave
Sebastopol Rd
0.99
Carr Ave
Humboldt St
North St
0.32
Chanate Rd
Bonita Vista Ln
Montecito Ave
0.68
Chanate Rd
Lomitas Ave
Mendocino Ave
0.17
Clover Dr
Clover Ln
W College Ave
0.20
W College Ave
Marlow Rd/Stony Point Rd
Albion Pl
W College Ave
Ridley Ave
Tyara Way
0.17
1.78
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A. Table A-7: Sidewalks MILES
0.11
0.12 0.08 Continued
A-16
Table A-7: Sidewalks MILES
FROM
TO
W College Ave
Marlow Rd/Stony Point Rd
Sparrow Creek St
0.12
W College Ave
Halyard Dr
Dorrit Ave
0.19
Corby Ave
Baker Ave
Hearn Ave
0.45
Corporate Center Pkwy
Griffen Ave
Northpoint Pkwy
0.10
Dowd Dr/Wijan Ct
Hearn Ave
Bellevue Ave
0.87
Dutton Ave
Duke Ct
W Robles Ave
1.02
N Dutton Ave
Decker St
W 9th St
0.06
N Dutton Ave
Jennings Ave
Tesconi Cir
0.22
S Dutton Ave
Bellevue Ave
Hearn Ave
0.85
Eardley Ave
Jennings Ave
W College Ave
0.43
Eddy Dr/Robin Way/Barbara Dr
Moorland Ave
Moorland Ave
0.25
Franklin Ave
North St
Carr Ave
0.13
Franklin Ave
Monroe St
Terrace Way
0.47
Fulton Rd
Piner Rd
Wishing Well Way
0.68
Fulton Rd
Appletree Dr
Guerneville Rd
0.16
Gloria Dr
Dutton Ave
Westland Dr
0.42
Gordon Ln
Bennett Valley Rd
Saint Irene Way
0.30
Guerneville Rd
Marlow Rd
Ridley Ave
0.28
Guerneville Rd
Lance Dr
Ridley Ave
0.41
Guerneville Rd
Lance Dr
Lance Dr
0.10
Hahman Dr
Montgomery Dr
Midway Dr
0.05
Hearn Ave
Santa Rosa Ave
Corby Ave
0.22
Jennings Ave
Clover Dr
Herbert St
0.37
Lance Dr
Jennings Ave
Eardley Ct (extension)
0.08
A. Recommendation Tables
LOCATION
Continued
A-17
Table A-7: Sidewalks
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
MILES
LOCATION
FROM
TO
Lance Dr
Jennings Ave
W College Ave
0.05
Los Alamos Rd
Villa Los Alamos
State Rte 12
0.10
McDonald Ave
Pacific Ave
Park St
Montecito Ave
Chanate Rd
Norte Way
1.59
Montgomery Dr
Jackson Dr
Mission Blvd
0.31
Montgomery Dr
325ft west of Calistoga Rd
Jackson Dr
0.77
Moorland Ave
W Robles Ave
Todd Rd
0.50
Mount Olive Dr
Brigham Ave
Vallejo St
0.60
Neville Way
West end
Moorland Ave
North St
McConnell Ave
Pacific Ave
0.10
Pierson St
W 3rd St
W 6th St
0.18
Ridley Ave
Tonja Way
Brooklyn Dr
0.06
W Robles Ave
SMART Railroad Tracks
East end
0.25
Silva Ave
Humboldt St
Slater St
0.09
Sonoma Ave
Village Ct
Farmers Ln
0.06
South Ave
West Ave
Vineyard Ct
0.16
State Rte 12
Sonoma Hwy
S Boas Dr
0.91
State Rte 12
Mission Blvd
Brush Creek Rd
0.42
State Rte 12
Sonoma Hwy
Sonoma Hwy
0.26
State Rte 12
Randall Ln/State Rte 12
Prospect Ave/ State Rte 12
0.17
State Rte 12
Redwing Dr
Acacia Ln
0.11
State Rte 12
Java St
Middle Rincon Rd
0.16
State Rte 12
Calistoga Rd
State Rte 12 (north)
0.14
State Rte 12
Calistoga Rd
State Rte 12 (south)
0.02
0.06
0.11
Continued
A-18
Table A-7: Sidewalks MILES
LOCATION
FROM
TO
Stony Point Rd
Bellevue Ave
Northpoint Pkwy
1.00
Todd Road
SMART Railroad Tracks
S Moorland Ave
0.21
Wilson St
4th St
3rd St/W 3rd St
0.07
A.
Table A-8: Studies FROM
TO
4th St
D St
Farmers Ln
1.56
Bennett Valley Rd
Farmers Ln
Yulupa Ave
1.85
Brookwood Ave
2nd St
Sonoma Ave
0.23
Channel Trail
State Rte 12
Channel Dr/Channel Trail
0.50
Channel Trail
Channel Dr/Channel Trail
Stone Bridge Rd (extension)
Coddingtown Mall transit center connector
Range Ave
Guerneville Rd
College Ave
Mendocino Ave
Glenn St
0.15
W College Ave
Kowell Ln
Morgan St
1.09
Elliott Ave
Armory Dr
Mendocino Ave
0.33
Guerneville Rd/ Range Ave
Range Ave
SMART-Santa Rosa North Station Tracks
0.34
Marlow Rd/Stony Point Rd
Stony Point Rd/ Sebastopol Rd
Marlow Rd/ Guerneville Rd
McConnell Ave
Mendocino Ave
North St
2.00
Melita Rd (extension)
State Rte 12
Stone Bridge Rd
0.40
Montgomery Dr
Alderbrook Dr
Hahman Dr
0.47
Montgomery Dr
Summerfield Rd
Boas Dr
1.08
Roseland Creek Trail
Burbank Ave
Stony Point Rd
0.75
Santa Rosa Ave
Sonoma Ave
Maple Ave/S A St
0.37
Santa Rosa Creek Trail
Melita Rd
State Rte 12
0.39
Stony Point Rd
State Rte 12 overpass
State Rte 12 overpass
0.06
Recommendation Tables
MILES
LOCATION
0.11 0.34
0.16
A-19
Table A-9: Crossing Locations
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
CROSS STREET A
CROSS STREET B
CROSS STREET A
CROSS STREET B
3rd St
B St
Delport Ave
West Ave
3rd St
D St
Dutton Ave
Jennings Ave
4th St
D St
Farmers Ln
Montgomery Dr
4th St
Between Chinn St and Pierce St
Farmers Ln
Sonoma Ave
4th Street
Alderbrook Ln
Fulton Rd
Appletree Dr
5th St
D St
Fulton Rd
Guerneville Rd
5th St
Humboldt St
Gardner Ave
Richards Manor Dr
7th St
Riley St
Giffen Ave
Lathrop Dr
9th St
Davis St
Glenbrook Dr
Stony Point Rd
Baker Ave
Santa Rosa Ave
Guerneville Rd
Santa Rosa Creek Trail
Bellevue Ave
Moorland Ave
Guerneville Rd
Herbert Ln / Coffey Ln
Breeze Way
Petaluma Hill Rd
Hearn Ave
SMART Trail
Brooklyn Dr
Ridley Ave
Howard St
Mendocino Ave
Brooklyn Dr
Manhattan Way
Jennings Ave
Dudley Pl
Burt St
Parkcreek Dr
Jennings Ave
Halyard Dr
Carr Ave
North St
Jennings Ave
Marlow Rd
Chanate Rd
Lomitas Ave
Joe Rodota Trail
Stony Point Rd
Chanate Rd
Parker Hill Rd
Joe Rodota Trail
N Wright Rd
Chico Ave
midblock, 900ft west of S Wright Rd
Marsh Rd
Marlow Rd
Cleveland Ave
Carrillo St
Marsh Rd
Holiday St
Colgan Ave
Santa Rosa Ave
Mayette Ave
Yulupa Ave
College Ave
Cleveland Ave
McConnell Ave
North St
W College Ave
Manhattan Way
Mendocino Ave
Steele Ln / Lewis Rd
W College Ave
Stony Point Rd / Marlow Rd
Mendocino Ave
Pacific Ave Continued
A-20
Table A-9: Crossing Locations CROSS STREET B
CROSS STREET A
CROSS STREET B
Mission Circle
Quigg Drive
Sonoma Hwy
Farmers Ln
Montecito Ave
El Capistrano Way
South Ave
Dutton Ave
Montecito Ave
Norte Way
W Steele Ln
Apache St
Montecito Blvd
Bridgewood Dr
Stony Point Rd
State Rte 12 overpass
Montecito Blvd
Brush Creek Rd
Stony Point Rd
Yuba Dr
Montgomery Dr
Hahman Dr
Stony Point Rd
W 3rd St
Montgomery Dr
Jackson Dr
Stony Point Rd
Occidental Rd
New York Dr
Manhattan Way
Terrace Way
Franklin Ave
Petaluma Hill Rd
Yolanda Ave
Westland Dr
Hearn Ave
Piner Creek Trail
Marlow Rd
Yulupa Ave
Hoen Ave
Piner Rd
Waltzer Rd
Piner Rd
Oak Village Dr
Price Ave
midblock, west of Wright Charter School
Price Ave
midblock, east of Wright Charter School
Range Ave
Guerneville Rd
Ridgway Ave
Mendocino Ave
Russell Ave
Ventura Ave
Santa Rosa Creek Trail
Santa Rosa Ave
Santa Rosa High School
Mendocino Ave
Scott St
Cleveland Ave
Sebastopol Rd
Stony Point Rd
Sebastopol Rd
Dutton Ave
Silva Ave
Franklin Ave
Sonoma Ave
Village Ct
A. Recommendation Tables
CROSS STREET A
A-21
Table A-10: Trail Bridges
City of Santa Rosa â&#x20AC;¢ BICYCLE & PEDESTRIAN MASTER PLAN
A.
A-22
CROSS STREET A
CROSS STREET B
CROSS STREET A
CROSS STREET B
850 ft south of Bellevue Ave
1000 ft east of Terrimay Ln
Piner Creek Trail
Steele Creek
Acacia Ln
near Prospect Ave
Piner Creek Trail
near Chapman Way
Hunter Creek Trail
near Santa Rosa Ave
Piner Creek Trail
near Cherokee Avenue
Kawana Springs Creek Restoration
near Bedford St
Piner Creek Trail
near Gamay Street
near Alejandro Dr
near San Antonio Dr
Roseland Creek
Yuba Dr
near Bellevue Ave
near Juniper Ave
Santa Rosa Creek Trail
near Calloway Dr
near Boas Dr
near Charmain Dr
Santa Rosa Creek Trail
Farmers Ln
near Boas Dr
near Tunisia Ave
Santa Rosa Creek Trail
near Rogers Way
near Fresno Ave
near Maitland Ave
Santa Rosa Creek Trail
near Leland St
near Idaho Dr
near Princeton Way
Santa Rosa Creek Trail
near Charro Dr
near Meyers Dr
near Administration Dr
Santa Rosa Creek Trail
near Link Ln
near Sacramento Avenue
Brookshire Circle
Santa Rosa West County Connector
near Sea Biscuit Ct
near Stagecoach Rd
near Bent Tree Pl
Santa Rosa West County Connector
near Saddlehorn Ct
near Sunhawk Dr
near Nighthawk Dr
Sherbrook Dr
near Shady Oak Pl
near Tanglewood Ct
Tanglewood Park Trail
Steele Creek Trail
Near Nyla Pl
near Trombetta St
near Giffen Ave
B.
BICYCLE & PEDESTRIAN FACILITY GUIDELINES
Context
Table of Contents Chapter 1
CONTEXT...........................................................................3 Introduction..................................................................... 4 Guidance Basis............................................................... 6 Design Needs of Pedestrians................................ 8 Design Needs of Bicyclists.....................................12 Chapter 2
PEDESTRIAN TOOLBOX.......................................... 13 Marked Crosswalks.....................................................14 Raised Pedestrian Crossings.................................16 Sidewalk Zones.............................................................18 Curb Ramps...................................................................20 Curb Extensions.......................................................... 22
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Median Refuge Islands............................................ 23 Pedestrian Signalization Improvements........ 24 Rectangular Rapid Flashing Beacon...............26 Pedestrian Hybrid Beacon.................................... 27 Chapter 3
BICYCLE TOOLBOX................................................... 29 Lane Reconfigurations and Road Diets........30 Bicycle Boulevards.................................................... 32 Shared Lane Markings............................................. 34 Standard Bike Lanes................................................. 36 Buffered Bike Lanes.................................................. 38 One-Way Separated Bike Lanes........................40 Two-Way Separated Bike Lanes........................ 42 Lateral Shift................................................................... 44 Protected Intersection.............................................46 Separated Bicycle Signal Phase.........................48 Separated Bikeway Barriers.................................50 Separated Bikeways at Driveways (& Minor Streets).............................................................................52 Bicycle Box.....................................................................54 Colored Pavement Treatments...........................56 Chapter 4
MIXED USE TOOLBOX............................................. 59 Shared Use Paths.......................................................60
b-2
Sidepaths........................................................................62
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Context
Chapter I
Context
b-3
Context
Introduction Updating the City of Santa Rosaâ&#x20AC;&#x2122;s Bicycle and Pedestrian Master Plan is intended to promote pedestrian and bicycle activity and comfort level by identifying policies, programs, and infrastructure improvements in the City. This Design Guide has been developed to complement the Cityâ&#x20AC;&#x2122;s Bicycle and Pedestrian Master Plan update and other nationally recognized efforts to promote pedestrian and bicycle comfort level. The chapter will present a toolbox of current engineering standards and design approaches to implement bicycle and pedestrian enhancements.
What, Why, Where, When and How?
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Future roadway planning, engineering, design and construction will continue to strive for a balanced transportation system that includes a seamless, accessible bicycle and pedestrian network and encourages bicycle and pedestrian travel wherever possible.
b-4
There are many reasons to integrate bicycle and pedestrian facilities into typical roadway development policy. The goal of a transportation system is to better meet the needs of people - whether in vehicles, bicyclists or pedestrians - and to provide access to goods, services, and activities. Supporting active modes gives users important transportation choices, whether it is to make trips entirely by walking or cycling, or to access public transit. Often in urban or suburban areas, walking and cycling are the fastest and most efficient ways to perform short trips. Convenient non-motorized travel provides many benefits, including reduced traffic congestion, user savings, road and parking facility savings, economic development, and a better environment by helping reduce the greenhouse gases as identified in the Climate Action Plan. Compatible design does more than help those who already walk or bicycle. It encourages greater use of non-motorized transportation. The design guidelines and recommendations in this document are for use on City of Santa Rosa roadways. Projects must not only be planned for their physical aspects as facilities serving specific transportation objectives; they must also consider effects on the aesthetic, social, economic and environmental values, needs, constraints and opportunities in a larger community setting. This is commonly known as Context Sensitive Design, and should be employed when determining which standard is applicable in each scenario.
Context
All walkway and bikeway design guidelines in this document meet or exceed the minimums set by the Americans with Disabilities Act Accessible Design. All traffic control devices, signs, pavement markings used and identified in this document must conform to the “California Manual on Uniform Traffic Control Devices” (CAMUTCD) as supplemented and adopted by Caltrans and Caltrans Design Manual.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Whenever possible and appropriate City of Santa Rosa’s Traffic & Construction Standards, the California Building Code (CBC), and the National Association of City Transportation Officials (NACTO)’s standards should be used for all facilities. There are situations where standards cannot be achieved due to geometric or environmental constraints, or may not be appropriate, due to a special situation. Engineering judgment may determine that for specific situations, the dimensions may be reduced.
b-5
Context
Guidance Basis The sections that follow serve as an inventory of pedestrian and bicycle design treatments and provide guidelines for their development. These treatments and design guidelines are important because they represent the tools for creating a pedestrian- and bicycle-friendly, accessible community. The guidelines are not, however, a substitute for a more thorough evaluation by a professional engineer prior to implementation of facility improvements. The following guidelines are referred to in these guidelines.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
National Guidance
b-6
The National Association of City Transportation Officialsâ&#x20AC;&#x2122; (NACTO) Urban Bikeway Design Guide (2012) and Urban Street Design Guide (2013) are collections of nationally recognized street design standards, and offers guidance on the current state of the practice designs.
Separated Bike Lane Planning and Design Guide (2015) is the latest national guidance on the planning and design of separated bike lane facilities released by the Federal Highway Administration (FHWA). The resource documents best practices as demonstrated around the U.S., and offers ideas on future areas of research, evaluation and design flexibility.
Context
The California Manual on Uniform Traffic Control Devices (CAMUTCD) (2014) is an amended version of the FHWA MUTCD 2009 edition modified for use in California. While standards presented in the CA MUTCD substantially conform to the FHWA MUTCD, the state of California follows local practices, laws and requirements with regards to signing, striping and other traffic control devices.
Main Street, California: A Guide for Improving Community and Transportation Vitality (2013) reflects California’s current manuals and policies that improve multimodal access, livability and sustainability within the transportation system. The guide recognizes the overlapping and sometimes competing needs of main streets.
The California Highway Design Manual (HDM) (Updated 2015) establishes uniform policies and procedures to carry out highway design functions for the California Department of Transportation.
The Caltrans Memo: Design Flexibility in Multimodal Design (2014) encourages flexibility in highway design. The memo stated that “Publications such as the National Association of City Transportation Officials (NACTO) “Urban Street Design Guide” and “Urban Bikeway Design Guide,” ... are resources that Caltrans and local entities can reference when ma king planning and design decisions on the State highway system and local streets and roads.”
Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians (2010) is a reference guide presents information and concepts related to improving conditions for bicyclists and pedestrians at major intersections and interchanges. The guide can be used to inform minor signage and striping changes to intersections, as well as major changes and designs for new intersections.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
California Guidance
b-7
Context
Design Needs of Pedestrians The CA MUTCD recommends a normal walking speed of 3.5 ft per second when calculating the pedestrian clearance interval at traffic signals. The walking speed can drop to 3 ft per second for areas with older populations and persons with mobility impairments. While the type and degree of mobility impairment varies greatly across the population, the transportation system should accommodate these users to the greatest reasonable extent.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Types of Pedestrians
b-8
Pedestrians have a variety of characteristics and the transportation network should accommodate a variety of needs, abilities, and possible impairments. Age is one major factor that affects pedestriansâ&#x20AC;&#x2122; physical characteristics, walking speed, and environmental perception. Children have low eye height and walk at slower speeds than adults. They also perceive the environment differently at various stages of their cognitive development. Older adults walk more slowly and may require assistive devices for walking stability, sight, and hearing.
Disabled Pedestrian Design Considerations The table below summarizes common physical and cognitive impairments, how they affect personal mobility, and recommendations for improved pedestrian-friendly design.
IMPAIRMENT
EFFECT ON MOBILITY
DESIGN SOLUTION
Physical Impairment Necessitating Wheelchair and Scooter Use
Difficulty propelling over uneven or soft surfaces.
Firm, stable surfaces and structures, including ramps or beveled edges.
Cross-slopes cause wheelchairs to veer downhill or tip sideways.
Cross-slopes of less than two percent.
Require wider path of travel.
Sufficient width and maneuvering space.
Physical Impairment Necessitating Walking Aid Use
Difficulty negotiating steep grades and cross slopes; decreased stability and tripping hazard.
Cross-slopes of less than two percent. Smooth, non-slippery travel surface.
Slower walking speed and reduced endurance; reduced ability to react.
Longer pedestrian signal cycles, shorter crossing distances, median refuges, and street furniture.
Hearing Impairment
Less able to detect oncoming hazards at locations with limited sight lines (e.g. driveways, angled intersections, channelized right turn lanes) and complex intersections.
Longer pedestrian signal cycles, clear sight distances, highly visible pedestrian signals and markings.
Vision Impairment
Limited perception of path ahead and obstacles; reliance on memory; reliance on non-visual indicators (e.g. sound and texture).
Accessible text (larger print and raised text), accessible pedestrian signals (APS), guide strips and detectable warning surfaces, safety barriers, and lighting.
Cognitive Impairment
Varies greatly. Can affect ability to perceive, recognize, understand, interpret, and respond to information.
Signs with pictures, universal symbols, and colors, rather than text.
Context
PEDESTRIAN CHARACTERISTICS BY AGE AGE
CHARACTERISTICS
0-4
Learning to walk Requires constant adult supervision Developing peripheral vision and depth perception
Eye Level 4’ 6” - 5’ 10” (1.3 m - 1.7 m)
5-8
Increasing independence, but still requires supervision Poor depth perception
9-13
Susceptible to “darting out” in roadways Insufficient judgment Sense of invulnerability
14-18
Improved awareness of traffic environment
Shoulders 1’ 10” (0.5 m) Walking 2’ 6” (0.75 m) Minimum Accessible Width* 3’ (0.9 m)
19-40
Active, aware of traffic environment
41-65
Slowing of reflexes
65+
Difficulty crossing street Vision loss Difficulty hearing vehicles approaching from behind
Preferred Operating Space 5’ (1.5 m) *At point of contact
Source: AASHTO. Guide for the Planning, Design, and Operation of Pedestrian Facilities, Exhibit 2-1. 2004.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Insufficient judgment
b-9
Context
Design Needs of Runners
Design Needs of Strollers
Running is an important recreation and fitness activity commonly performed on shared use paths. Many runners prefer softer surfaces (such as rubber, bare earth or crushed rock) to reduce impact. Runners can change their speed and direction frequently. If high volumes are expected, controlled interaction or separation of different types of users should be considered.
Strollers are wheeled devices pushed by pedestrians to transport babies or small children. Stroller models vary greatly in their design and capacity. Some strollers are designed to accommodate a single child, others can carry 3 or more. Design needs of strollers depend on the wheel size, geometry and ability of the adult who is pushing the stroller. Strollers commonly have small pivoting front wheels for easy maneuverability, but these wheels may limit their use on unpaved surfaces or rough pavement. Curb ramps are valuable to these users. Lateral overturning is one main safety concern for stroller users.
RUNNER DIMENSIONS
Preferred Operating Space 5’ (1.5 m)
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Shoulders 1’ 10” (0.5 m)
b-10
STROLLER DIMENSIONS
Sweep Width 4.3’ (1.3 m)
Sweep Width 3’ 6” (1.5 m)
Physical Length 5’ (1.5 m)
Context
Design Needs of Wheelchair Users
Power wheelchairs use battery power to move the wheelchair. The size and weight of power wheelchairs limit their ability to negotiate obstacles without a ramp. Various control units are available that enable users to control the wheelchair movement, based on their ability (e.g., joystick control, breath controlled, etc).
As the American population ages, the age demographics in Santa Rosa may also shift, and the number of people using mobility assistive devices (such as manual wheelchairs, powered wheelchairs) will increase. Manual wheelchairs are self-propelled devices. Users propel themselves using push rims attached to the rear wheels. Braking is done through resisting wheel movement with the hands or arm. Alternatively, a second individual can control the wheelchair using handles attached to the back of the chair.
Maneuvering around a turn requires additional space for wheelchair devices. Providing adequate space for 180 degree turns at appropriate locations is an important element of accessible design.
Effect on Mobility
Design Solution
Difficulty propelling over uneven or soft surfaces.
Firm, stable surfaces and structures, including ramps or beveled edges.
Cross-slopes cause wheelchairs to veer downhill.
Cross-slopes of less than two percent.
Require wider path of travel.
Sufficient width and maneuvering space.
Wheelchair User Dimensions
Eye Height 3’8” (1.1 m) Handle 2’9” (0.9 m) Armrest 2’5” (0.75 m)
Physical Width 2’6” (0.75 m) Minimum Operating Width 3’ (0.9 m) Minimum Width of Accessway* 4’ (1.2 m) Minimum to Make a 180 Degree Turn 5’ (1.5 m) *Provide 5’ x 5’ passing zone every 200’ if travel way is at minimum width
Physical Width 2’2” (0.7 m) Minimum Operating Width 3’ (0.9 m) Minimum to Make a 180 Degree Turn 5’ (1.5 m)
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Wheelchair User Design Considerations
b-11
Context
Design Needs of Bicyclists The facility designer must have an understanding of how bicyclists operate and how their bicycle influences that operation. Bicyclists, by nature, are much more affected by poor facility design, construction and maintenance practices than motor vehicle drivers. By understanding the unique characteristics and needs of bicyclists, a facility designer can provide quality facilities and minimize user risk.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle as a Design Vehicle
b-12
Bicycle Rider - Typical Dimensions
Similar to motor vehicles, bicyclists and their bicycles exist in a variety of sizes and configurations. These variations occur in the types of vehicle (such as a conventional bicycle, a recumbent bicycle or a tricycle), and behavioral characteristics (such as the comfort level of the bicyclist). The design of a bikeway should consider reasonably expected bicycle types on the facility and utilize the appropriate dimensions.
Operating Envelope 8’ 4”
Eye Level 5’
The Bicycle Rider figure illustrates the operating space and physical dimensions of a typical adult bicyclist, which are the basis for typical facility design. Bicyclists require clear space to operate within a facility. This is why the minimum operating width is greater than the physical dimensions of the bicyclist. Bicyclists prefer five feet or more operating width, although four feet may be minimally acceptable.
Handlebar Height 3’8”
In addition to the design dimensions of a typical bicycle, there are many other commonly used pedaldriven cycles and accessories to consider when planning and designing bicycle facilities. The most common types include tandem bicycles, recumbent bicycles, and trailer accessories. Preferred Operating Width 5’
Bicycle as Design Vehicle - Design Speed Expectations BICYCLE TYPE Upright Adult Bicyclist
Recumbent Bicyclist
FEATURE
Physical Operating Width 2’6” Minimum Operating Width 4’
TYPICAL SPEED
Paved level surfacing
8-12 mph*
Crossing Intersections
10 mph
Downhill
30 mph
Uphill
5 -12 mph
Paved level surfacing
18 mph
* Typical speed for causal riders per AASHTO 2013.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Context
2 Pedestrian Toolbox Chapter
b-13
Pedestrian Toolbox
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Marked Crosswalks
14
A marked crosswalk signals to motorists that they must yield to pedestrians and encourages pedestrians to cross at designated locations. Installing crosswalks alone will not necessarily enhance the comfort level of crossings. At mid-block locations, crosswalks can be marked where there is a demand for crossing and there are no nearby marked crosswalks.
Typical Use All crosswalks should be marked at signalized intersections. At unsignalized intersections, crosswalks may be marked under the following conditions: »»
At a complex intersection, to orient pedestrians in finding their way across.
»»
At an offset intersection, to show pedestrians the shortest route across traffic with the least exposure to vehicular traffic and traffic conflicts.
»»
At an intersection with visibility constraints, to position pedestrians where they can best be seen by oncoming traffic.
»»
At an intersection within a school zone on a walking route.
Design Features »»
The crosswalk should be located to align as closely as possible with the through pedestrian zone of the sidewalk corridor.
»»
Users should not have to leave the crosswalk or reorient themselves from the crosswalk when accessing the curb ramp onto the sidewalk.
»»
See page 20 for design guidelines for curb ramps.
Pedestrian Toolbox
Marked crosswalks at Stony Point Road and Stony Circle
Pedestrians are sensitive to out-of-direction travel, and reasonable accommodations should be made to make crossings both convenient at locations with adequate visibility. Continental crosswalk markings should be used at crossings with high pedestrian use or where vulnerable pedestrians are expected, including: school crossings, across arterial streets for pedestrian-only signals, at mid-block crosswalks, and at intersections where there is expected high pedestrian use and the crossing is not controlled by signals or stop signs. High-visibility crosswalks are not appropriate for all locations. Other crosswalk marking patterns are provided for in the CA MUTCD. Some cities prohibit omitting or removing a marked crosswalk at intersections in order to require a three-stage pedestrian crossing. Intersections with three-stage crossings lead to arduous and increased crossing distances, pedestrian frustration, encourages jaywalking, and exhibits modal bias favoring motor vehicle level-of-service over other modes. There are circumstances when only three crosswalks are utilized and typically occur at or near interchanges and freeway ramps.
Materials and Maintenance
Approximate Cost
Because the effectiveness of marked crossings depends entirely on their visibility, maintaining marked crossings should be a high priority. Thermoplastic markings offer increased durability than conventional paint.
Depending on the type of material used, width of the crossing and width of the roadway, approximate installation costs are $500 for a regular striped crosswalk, $1,000 for a ladder crosswalk, and $8,000 for a patterned concrete crosswalk. In addition, the cost of a curb ramp is about $5,000-$10,000 per ramp. Due to various number of crosswalk styles in use, signing standards, color and aesthetics, other factors will affect the final cost.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Further Considerations
Maintenance of markings should also be considered. 15
Pedestrian Toolbox
Raised Pedestrian Crossings A raised crosswalk or intersection can eliminate grade changes from the pedestrian path and give pedestrians greater prominence as they cross the street. Raised crosswalks also functions as speed tables, and encourage motorists to slow down. As such, they should be used only in cases where a special emphasis on pedestrians is desired. Raised crosswalks are typically implemented on low-speed streets, Bike Boulevards and other areas of very high pedestrian activity. They are often paired with other treatments such
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
as curb extensions for greater traffic calming effect.
16
Typical Use
Design Features
Like a speed hump/table, raised crosswalks have a traffic slowing effect which may be unsuitable on high-speed streets, roadways with sharp curves, designated transit or freight routes, and in locations that would reduce access for emergency responders. Use detectable warnings at the curb edges to alert vision-impaired pedestrians that they are entering the roadway.
»»
Use detectable warnings at the curb edges to alert vision-impaired pedestrians that they are entering the roadway.
»»
Approaches to the raised crosswalk may be designed to be similar to speed humps.
»»
Drainage improvements may be required depending on the grade of the roadway.
Approaches to the raised crosswalk may be designed to be similar to speed humps/tables.
»»
Special paving materials can be used to increase conspicuity of the crossing, and alert drivers to the presence of pedestrians.
Raised pedestrian crossing on Thomas Lake Harris Drive
Further Considerations »»
The noise of vehicles traveling over raised crosswalks may be of concern to nearby residents and businesses.
»»
Refer to Americans with Disabilities Act (ADA) and California Building Code (CBC) for additional requirements.
Materials and Maintenance Because the effectiveness of marked crossings depends entirely on their visibility, maintaining marked crossings should be a high priority. Ensure drainage pipes used to channel stormwater past the raised intersection are kept free of debris, to prevent stormwater from backing up and pooling.
Approximate Cost Raised crosswalks are approximately $2,000 to $15,000, depending on drainage conditions and material used.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Pedestrian Toolbox
17
Pedestrian Toolbox
Sidewalk Zones & Widths Sidewalks are the most fundamental element of the walking network, as they provide an area for pedestrian travel separated from vehicle traffic. Providing adequate and accessible facilities can lead to increased numbers of people walking, improved accessibility, and the creation of social space.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
SUBURBAN SIDEWALK
18
SIDEWALK IN UNINCORPORATED AREAS
Curbside Lane
Buffer Zone
The curbside lane can act as a flexible space to further buffer the sidewalk from moving traffic., and may be used for a bike lane. Curb extensions and bike corrals may occupy this space where appropriate.
The buffer zone, also called the furnishing or landscaping zone, buffers pedestrians from the adjacent roadway, and is also the area where elements such as street trees, signal poles, signs, and other street furniture are properly located.
In the edge zone there should be a 6 inch wide curb.
Pedestrian Through Zone The through zone is the area intended for pedestrian travel. This zone should be entirely free of permanent and temporary objects. Wide through zones are needed in downtown areas or where pedestrian flows are high.
Frontage Zone The frontage zone allows pedestrians a comfortable â&#x20AC;&#x153;shyâ&#x20AC;? distance from the building fronts. It provides opportunities for window shopping, to place signs, planters, or chairs.
Pedestrian Toolbox Parking Lane/ Enhancement Zone
Buffer Zone
Pedestrian Through Zone
Frontage Zone
Local Streets
Varies
4 - 6 ft
6 ft
N/A
Downtown and Pedestrian Priority Areas
Varies
4 - 6 ft
12 ft
2.5 - 10 ft
Arterials and Collectors
Varies
4 - 6 ft
6 - 8 ft
2.5 - 5 ft
Street Classification
»»
Wider sidewalks should be installed near schools, at transit stops, in downtown areas, or anywhere high concentrations of pedestrians exist.
»»
At transit stops, an 8 ft by 5 ft clear space is required for accessible passenger boarding/alighting at the front door location per ADA requirements.
»»
Sidewalks should be continuous on both sides of urban commercial streets, and should be required in areas of moderate residential density (1-4 dwelling units per acre).
»»
When retrofitting gaps in the sidewalk network, locations near transit stops, schools, parks, public buildings, and other areas with high concentrations of pedestrians should be the highest priority.
»»
In unincorporated areas of Santa Rosa, no curb and gutter is necessary to establish a sidewalk. Instead, the sidewalk should feature a wide furnishing zone, which may be configured as an open ditch for stormwater catchment and infiltration. Ditches can be retrofitted into bioswales or raingardens for filtration and water purification.
Materials and Maintenance
Approximate Cost
Sidewalks are typically constructed out of concrete and are separated from the roadway by a curb or gutter and sometimes a landscaped boulevard. Less expensive walkways constructed of asphalt, crushed stone, or other stabilized surfaces may be appropriate. Ensure accessibility and properly maintain all surfaces regularly. Surfaces must be firm, stable, and slip resistant. Colored, patterned, or stamped concrete can add distinctive visual appeal.
Cost of standard sidewalks range from about $25 per square foot for concrete sidewalk. This cost can increase with additional right-of-way acquisition or addition of landscaping, lighting or other aesthetic features. As an interim measure, an asphalt concrete path can be placed until such time that a standard sidewalk can be built. The cost of asphalt path can be less than half the cost of a standard sidewalk.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Typical Uses
19
Pedestrian Toolbox
Curb Ramps Curb ramps are the design elements that allow all users to make the transition from the street to the sidewalk. A sidewalk without a curb ramp can be useless to someone in a wheelchair, forcing them back to a driveway and out into the street for access. There are a number of factors to be considered in the design and placement of curb ramps.
Diagonal ramps shall include a clear space of at least 48” within the crosswalk for user maneuverability
Curb ramps shall be located so that they do not project into vehicular traffic lanes, parking spaces, or parking access aisles. Three configurations are illustrated below.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Parallel Curb Ramp
20
Perpendicular Curb Ramps (Recommended)
Diagonal Curb Ramp
(Crosswalk spacing not to scale. For illustration purposes only)
Typical Use »»
»»
Curb ramps must be installed at all intersections and midblock locations where pedestrian crossings exist, as mandated by federal legislation (1973 Rehabilitation Act and ADA 1990). All newly constructed and altered roadway projects must include curb ramps. In addition, existing facilities must be upgraded to current standards when appropriate. The edge of an ADA compliant curb ramp shall be marked with a tactile warning device (also known as truncated domes) to alert people with visual impairments to changes in the pedestrian environment. Contrast between the raised tactile device and the surrounding infrastructure is important so that the change is readily evident to partially sighted pedestrians. These devices are most effective when adjacent to smooth pavement so the difference is easily detected.
Design Features »»
The level landing at the top of a ramp shall be at least 4 feet long and at least the same width as the ramp itself. The slope of the ramp shall be compliant to current standards.
»»
If the ramp runs directly into a crosswalk, the landing at the bottom will be in the roadway.
»»
If the top landing is within the sidewalk or corner area where someone in a wheelchair may have to change direction, the landing must be a minimum of 4’-0” long (in the direction of the ramp run) and at least as wide as the ramp, although a width of 5’-0” is preferred.
Pedestrian Toolbox
Not recommended: diagonal curb ramp configuration on Marlow Road at Monroe School.
Recommended: SMART Crossing at College Avenue provides bidirectional curb ramps for crossing in both directions.
Further Considerations
Curb return radii need to be considered when designing directional ramps. While curb ramps are needed for use on all types of streets, the highest priority locations are in downtown areas and on streets near transit stops, schools, parks, medical facilities, shopping areas.
Materials and Maintenance
Approximate Cost
It is critical that the interface between a curb ramp and the street be maintained adequately. Asphalt street sections can develop potholes at the foot of the ramp, which can catch the front wheels of a wheelchair.
The cost is approximately $5,000-$10,000 per curb ramp depending on drainage and right-of-way.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Where feasible, separate directional curb ramps for each crosswalk at an intersection should be provided rather than having a single ramp at a corner for both crosswalks. Although diagonal curb ramps might save money, they orient pedestrians directly into the traffic zone, which can be challenging for wheelchair users and pedestrians with visual impairment. Diagonal curb ramp configurations are not recommended.
21
Pedestrian Toolbox
Curb Extensions Curb extensions minimize pedestrian exposure during crossing by shortening crossing distance and giving pedestrians a better chance to see and be seen before committing to crossing.
D
C
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
22
B
Typical Use »»
»» »» »» »»
Design Features
Within parking lanes appropriate for any crosswalk where it is desirable to shorten the crossing distance and there is a parking lane adjacent to the curb.
»» For purposes of efficient street sweeping, the A
May be possible within non-travel areas on roadways with excess space.
»» When a bike lane is present, the curb extensions B
Particularly helpful at midblock crossing locations. Curb extensions should not impede bicycle travel in the absence of a bike lane. Curb extensions are often utilized as in-lane transit stops, allowing passengers to board and alight outside of the pedestrian through zone.
Materials and Maintenance Planted curb extensions may be designed as a bioswale, a vegetated system for stormwater management. To maintain proper stormwater drainage, curb extensions can be constructed as refuge islands offset by a drainage channel or feature a covered trench drain.
minimum radius for the reverse curves of the transition is 10 ft and the two radii should be balanced to be nearly equal.
should terminate one foot short of the parking lane to enhance bicyclist access.
»» Reduces pedestrian crossing distance by 6-8 ft. C »» Planted curb extensions may be designed as a D bioswale for stormwater management.
Approximate Cost The cost of a curb extension can range from $2,000 to $20,000 depending on the design and site condition, with the typical cost approximately $12,000. Green/vegetated curb extensions cost between $10,000 to $40,000.
Pedestrian Toolbox
Median Refuge Islands Median refuge islands are located at the mid-point of a marked crossing and help improve pedestrian access by increasing pedestrian visibility and allowing pedestrians to cross one direction of traffic at a time. Refuge islands minimize pedestrian exposure at mid-block crossings by shortening the crossing distance and increasing the number of available gaps for crossing. Cut-through median refuge islands are preferred over curb ramps to better accommodate wheel chairs users.
Typical Use »»
Refuge islands an be applied on any roadway with a left turn center lane or median that is at least 6’ wide. Islands are appropriate at signalized or unsignalized crosswalks.
»»
The refuge island must be accessible, preferably with an at-grade passage through the island rather than ramps and landings.
»»
The island should be at least 6’ wide between travel lanes (to accommodate wheelchair users) and at least 20’ long (40’ minimum preferred).
»»
Provide double centerline marking, reflectors, and “KEEP RIGHT” signage (CA MUTCD R4-7a) in the island on streets with posted speeds above 25 mph.
Materials and Maintenance Refuge islands may require frequent maintenance of road debris. Trees and plantings in a landscaped median must be maintained so as not to impair visibility, and should be no higher than 1 foot 6 inches.
Design Features »»
Median refuge islands can be installed on roadways with existing medians or on multilane roadways where adequate space exists
»»
Median Refuge Islands should always be paired with crosswalks, and should include advance pedestrian warning signage when installed at uncontrolled crossings.
»»
On multi-lane roadways, consider configuration with active warning beacons for improved yielding compliance.
Approximate Cost The approximate cost to install a median refuge island ranges from $500 to $1,100 per foot, or about $3,500 to $4,000, depending on the design, site conditions, landscaping, and whether the median can be added as a part of a larger street reconstruction project or utility upgrade.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
W11-2, W16-7P
23
Pedestrian Toolbox
Pedestrian Signalization Improvements
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Pedestrian signal heads indicate to pedestrians when to cross at a signalized crosswalk. All traffic signals should be equipped with pedestrian signal indications except where pedestrian crossing is prohibited by signage. Pedestrian signals should be used at traffic signals wherever warranted, according to the CA MUTCD.
24
Typical Use »»
Countdown pedestrian signals are particularly valuable for pedestrians, as they indicate whether a pedestrian has time to cross the street before the signal phase ends. Countdown signals should be used at all new and rehabilitated signalized intersections. Countdown timers are now standard at all signalized crossings in Santa Rosa.
»»
Adequate pedestrian crossing time is a critical element of the walking environment at signalized intersections. The length of a signal phase with parallel pedestrian movements should provide sufficient time for a pedestrian to safely cross the adjacent street.
»»
There are several types of signal timing for pedestrian signals, including concurrent, exclusive, “Leading pedestrian interval” (LPI),
and all-red interval. In general, shorter cycle lengths and extended walk intervals provide better service to pedestrians and encourage better signal compliance. For optimal pedestrian service, fixed-time signal operation usually works best. »»
Leading Pedestrian Intervals (LPI) are used to reduce right turn and permissive left turn vehicle and pedestrian conflicts. The through pedestrian interval is initiated first, in advance of the concurrent through/right/permissive left turn interval. The LPI minimizes vehicle-pedestrian conflicts because it gives pedestrians a 3-10 second headstart into the intersection, thereby making them more visible, and reducing crossing exposure time. Accessible Pedestrian Signals (APS) are recommended with an LPI.
Pedestrian Toolbox
Range Ave at Guerneville Rd
»»
The CA MUTCD recommends that traffic signal timing assumes a pedestrian walking speed of 3.5 ft per second.
»»
At crossings where older pedestrians or pedestrians with disabilities are expected, crossing speeds as low as 3 ft per second should be assumed. Special pedestrian phases can be used to provide greater visibility or more crossing time for pedestrians at certain intersections.
»»
Pedestrian pushbuttons may be installed at locations where pedestrians are expected intermittently. When used, pushbuttons should be well signed and within reach and operable from a flat surface for pedestrians in wheelchairs and with visual disabilities. They should be conveniently placed in the area where pedestrians wait to cross. Section 4E.09 within the CA MUTCD provides detailed guidance for the placement of push buttons to ensure accessibility.
Further Considerations »»
When push buttons are used, they should be located so that someone in a wheelchair can reach the button from a level area of the sidewalk without deviating significantly from the natural line of travel into the crosswalk. Push button should be marked (for example, with arrows) so that it is clear which signal is affected.
»»
In areas with very heavy pedestrian traffic, consider an all-pedestrian signal phase to give pedestrians free passage in the intersection when all motor vehicle traffic movements are stopped.
»»
At locations with very high pedestrian volumes, such as downtown, an exclusive pedestrian signal phase called a “Pedestrian Scramble” can be provided to reduce vehicle turning conflicts.
Materials and Maintenance It is important to perform ongoing maintenance of traffic control equipment. Consider semi-annual inspections of controller and signal equipment, intersection hardware, and detectors.
Approximate Cost Adjusting signal timing is relatively inexpensive, as it requires only a few hours of staff time to accomplish. New signal equipment ranges from $20,000 to $140,000.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Design Features
25
Pedestrian Toolbox
Rectangular Rapid Flashing Beacons (RRFB) Rectangular Rapid Flash Beacons (RRFB) are a type of active warning beacon used at unsignalized crossings. They are designed to increase motor vehicle yielding compliance on multi-lane or high-volume roadways. Guidance for marked/unsignalized crossings applies.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Providing secondary installations of RRFBs on median islands improves driver yielding behavior
26
W11-2, W16-7P
Rectangular Rapid Flash Beacons (RRFB) dramatically increase compliance over conventional warning beacons
Typical Use
Design Features
RRFBs are typically activated by pedestrians manually with a push button, or can be actuated automatically with passive detection systems.
Guidance for marked/unsignalized crossings applies. »»
A study of the effectiveness of going from a no-beacon arrangement to a two-beacon RRFB installation increased yielding from 18 percent to 81 percent. A four-beacon arrangement raised compliance to 88%. Additional studies of long term installations show little to no decrease in yielding behavior over time.
»»
See FHWA Interim Approval 21 (IA-21) for more information on device application standards.
RRFBs shall not be used at crosswalks controlled by YIELD signs, STOP signs, or traffic control signals. RRFBs shall initiate operation based on user actuation and shall cease operation at a predetermined time after the user actuation or, with passive detection, after the user clears the crosswalk.
Materials and Maintenance
Approximate Cost
RRFBs should be regularly maintained to ensure that all lights and detection hardware are functional.
RRFBs range in price from $5,000 to $20,000 for a solar powered unit depending on the location, width of the road and other factors.
Pedestrian Toolbox
Pedestrian Hybrid Beacon (HAWK)
Typical Use HAWK beacons are only used at marked midblock crossings or unsignalized intersections. They are typically activated with a pedestrian pushbutton at each end. If a median refuge island is used at the crossing, another pedestrian pushbutton can be located on the island to create a two-stage crossing.
Design Features »»
Hybrid beacons may be installed without meeting traffic signal control warrants if roadway speed and volumes are excessive for comfortable pedestrian crossings.
»»
If installed within a signal system, signal engineers should evaluate the need for the hybrid signal to be coordinated with other signals.
»»
HAWK beacons should be installed at least 100 feet from side streets or driveways that are controlled by STOP or YIELD signs. Parking and other sight obstructions should be prohibited for at least 100 feet in advance of and at least 20 feet beyond the marked crosswalk to provide adequate sight distance. (CA MUTCD 4F)
Further Considerations »»
HAWK beacons may also be actuated by infrared, microwave, or video detectors.
»»
Each crossing, regardless of traffic speed or volume, requires additional review by a registered engineer to identify sight lines, potential impacts on traffic progression, timing with adjacent signals, capacity, and safety.
»»
The installation of HAWK beacons should also include public education and enforcement campaigns to ensure proper use and compliance.
Materials and Maintenance Hybrid beacons are subject to the same maintenance needs and requirements as standard traffic signals. Signing and striping need to be maintained to help users understand any unfamiliar traffic control.
Approximate Cost Hybrid beacons are more expensive than other beacons, ranging in costs from $150,000 to $250,000, but are generally less expensive than full signals.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Hybrid beacons or High-Intensity Activated Crosswalk (HAWK) beacons are used to improve unsignalized intersections or midblock crossings of major streets. It consists of a signal head with two red lenses over a single yellow lens on the major street, and a pedestrian signal head for the crosswalk. The signal is only activated when a pedestrian and/or bicyclist is present, resulting in minimal delay for motor vehicle traffic.
27
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Pedestrian Toolbox
28
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
3 Bicycle Toolbox Chapter
29
Bicycle Toolbox
Lane Reconfigurations and Road Diets
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Streets with excess roadway capacity or wider lanes often make excellent candidates for lane reconfigurations or road diet projects. The removal of a single travel lane will generally provide sufficient space for bike lanes on both sides of a street. Even if the width of the sidewalk does not increase, pedestrians benefit from the buffer that the new bike lanes create between the sidewalk and travel lanes. Although the actual roadway crossing distance has not been reduced, the addition of bike lanes reduces the number of vehicle travel lanes pedestrians must cross.
30
BEFORE
11-12’ Travel
11’ Travel
11’ Travel
11-12’ Travel
AFTER 6’ Bike
10-12’ Travel
10-12’ Turn
Typical Use »»
Depending on a street’s existing configuration, traffic operations, user needs, and comfort level, various lane reconfigurations may be appropriate.
»»
For instance, a four-lane street (with two travel lanes in each direction) could be modified to provide one travel lane in each direction, a center turn lane, and bike lanes.
»»
Prior to implementing this measure, a traffic analysis should identify potential impacts, including diversion to other parallel neighborhood streets. Road diets should also consider school, city bus, emergency service access, and other truck volumes.
10-12’ Travel
6’ Bike
Design Features »»
Narrower lanes generally encourage slower vehicle speeds, higher comfort for people walking and biking.
»»
Vehicle lane width: Width depends on project. No narrowing may be needed if a lane is removed. Lanes along transit and freight routes may need a minimum of 11 feet to accommodate larger vehicles.
»»
Bicycle lane width: Standard bicycle lane width is 5-6 feet. A buffered bike lane requires an additional 2-3 feet.
»»
Number of Lanes: Generally, 3 lanes with a center turn lane can support 20,000 vehicles per day.
Bicycle Toolbox
Materials and Maintenance
Approximate Cost
Road configurations are often paired with the road repaving schedule to reduce costs. Repair rough or uneven pavement surface. Use bicycle compatible drainage grates, and ensure they are flush with the pavement.
Adding striped shoulders can cost as little as $1,000 per mile if old paint does not need to be removed. The cost for restriping a street to bike lanes or reducing the number of lanes to add on-street parking is approximately $11 per foot on street, depending on the number of lane lines to be removed. The approximate cost for restriping a roadway as depicted can range from $10,000-$60,000 per mile.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Before-and-after road diet on Sonoma Avenue. The roadway goes from 4 travel lanes to 3 travel lanes, bike lanes, and parking.
31
Bicycle Toolbox
Bicycle Boulevards
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A Bicycle Boulevard is a low-speed, low-volume roadway that has been modified, as needed, to enhance comfort and convenience for people bicycling. It provides better conditions for bicycling while maintaining the neighborhood character and neighborhood and emergency vehicle access. Bicycle Boulevards are intended to serve as the primary low-stress bikeway network, providing direct, and convenient routes across Santa Rosa. Key elements of Bicycle Boulevards are unique signage and pavement markings, traffic calming and diversion features to maintain low vehicle volumes, and convenient major street crossings.
32
Typical Use
Design Features
»»
Parallel with, and in close proximity to major thoroughfares (1/4 mile or less) on low-volume, low-speed streets.
»»
Signs and pavement markings are the minimum treatments necessary to designate a street as a bicycle boulevard.
»»
Follow a desire line for bicycle travel that is ideally long and relatively continuous (2-5 miles).
»»
»»
Avoid alignments with excessive zigzag or circuitous routing. The bikeway should have less than 10% out of direction travel compared to shortest path of primary corridor.
Implement volume control treatments based on the context of the bicycle boulevard, using engineering judgment. Motor vehicle volumes should not exceed 1,500 vehicles per day.
»»
Intersection crossings should be designed to enhance comfort and minimize delay for bicyclists, following crossing treatment progression to achieve Level of Traffic Stress 1 or 2.
»»
Local streets with traffic volumes of fewer than 1,500 vehicles per day. Utilize traffic calming to maintain or establish low volumes and discourage vehicle cut through / speeding.
Bicycle Toolbox
Further Considerations »»
Bicycle boulevards are established on streets that improve connectivity to key destinations and provide a direct, low-stress route for bicyclists, with low motorized traffic volumes and speeds, designated and designed to give bicycle travel priority over other modes.
»»
Bicycle boulevard retrofits to local streets are typically located on streets without existing signalized accommodation at crossings of collector and arterial roadways. Without treatments for bicyclists, these intersections can become major barriers along the bicycle boulevard.
»»
Traffic calming can deter motorists from driving on a street. Anticipate and monitor vehicle volumes on adjacent streets to determine whether traffic calming results in inappropriate volumes. Traffic calming can be implemented on a trial basis.
Materials and Maintenance Bicycle boulevards require few additional maintenance requirements to local roadways. Signage, signals, and other traffic calming elements should be inspected and maintained according to local standards.
Approximate Cost Costs vary depending on the type of treatments proposed for the corridor. Simple treatments such as wayfinding signage and markings are most costeffective, but more intensive treatments will have greater impact at lowering speeds and volumes, at higher cost. Costs can range from $5,000/mile on the simple end to $50,000/mile for significant horizontal deflection and diversion.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Humboldt Street Bike Boulevard
33
Bicycle Toolbox
Shared Lane Markings Shared Lane Marking (SLM) or “Sharrow” stencils are used in California as an additional treatment for Bike Route facilities and are currently approved in conjunction with on-street parking. The CA MUTCD approved pavement marking can serve a number of purposes, such as making motorists aware of the need to share the road with bicyclists, showing bicyclists the direction of travel, and, with proper placement, reminding bicyclists to bike further from parked cars to prevent collisions with drivers opening car doors.
CA MUTCD R4-11 (optional)
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
CA MUTCD R117 (optional)
34
CA MUTCD D11-1 (optional)
A
Typical Use »»
»»
Shared Lane Markings are not appropriate on paved shoulders or in bike lanes, and should not be used on roadways that have a posted speed greater than 35 mph. Shared Lane Markings should be implemented in conjunction with BIKES MAY USE FULL LANE signs.
Design Features »» Placement in the center of the travel lane is A preferred in constrained conditions.
»»
Markings should be placed immediately after intersections and spaced at 250 foot intervals thereafter.
»»
When placed adjacent to parking, markings should be outside of the “door zone”. Minimum placement is 11 feet from the curb face.
Bicycle Toolbox
Further Considerations »»
Consider modifications to signal timing to induce a bicycle-friendly travel speed for all users.
»»
Though not always possible, placing the markings outside of vehicle tire tracks will increase the life of the markings and the longterm cost of the treatment.
»»
A green thermoplastic background can be applied to further increase the visibility of the shared lane marking.
»»
A “Pass Bicycle 3 FT MIN” sign (R117(CA)) can be installed to indicate to drivers the required passing distance per California Vehicle Code section 21760.
Approximate Cost Sharrows typically cost $200 per each marker for a lane-mile cost of $4,200, assuming the CA MUTCD guidance of sharrow placement every 250 feet.
Materials and Maintenance »»
Shared lane markings should be inspected annually and maintained accordingly, especially if located on roadways that feature high vehicle turning movements, or bus, or truck traffic. They can be placed in the center of the lane of travel to reduce wear from vehicles.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Sharrows also serve as positional guidance and raise bicycle awareness where there isn’t space to accommodate a full-width bike lane. Center lane markings may or may not be necessary depending on travel lane widths. Narrower two way residential streets (less than 22 ft between parked cars) have a natural traffic calming effect without center turn lanes. Pictured above: sharrows on Sonoma Ave.
35
Bicycle Toolbox
Bicycle Lanes On-street bike lanes (Class II Bikeways) designate an exclusive space for bicyclists through the use of pavement markings and signs. The bike lane is located directly adjacent to motor vehicle travel lanes and is used in the same direction as motor vehicle traffic. Bike lanes are typically on the right side of the street, between the adjacent travel lane and curb, road edge or parking lane.
C
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
B
36
A
D
Typical Use »»
Bike lanes may be used on any street with adequate space, but are most effective on streets with moderate traffic volumes ≤ 6,000 ADT (≤ 3,000 preferred).
Design Features »A » Mark inside line with 6” stripe. (CA MUTCD 9C.04) Mark 4“ parking lane line or “Ts”.1
»»
Bike lanes are most appropriate on streets with lower to moderate speeds ≤ 25 mph.
»B » Include a bicycle lane marking (CA MUTCD Figure 9C-3) at the beginning of blocks and at regular intervals along the route. (CA MUTCD 9C.04)
»»
Appropriate for skilled adult riders on most streets.
»C» 6 foot width preferred adjacent to on-street parking, (5 foot min.) (City of Santa Rosa, HDM)
»»
May be appropriate for children when configured as 6+ ft wide lanes on lower-speed, lowervolume streets with one lane in each direction.
»»
D 5–6 foot preferred adjacent to curb and gutter (4 foot min.) or 4 feet more than the gutter pan width.
1 Studies have shown that marking the parking lane encourages people to park closer to the curb. FHWA. Bicycle Countermeasure Selection System. 2006.
Bicycle Toolbox
Further Considerations On high speed streets (≥ 40 mph) the minimum bike lane should be 6 feet. (HDM 301.2)
»»
It may be desirable to reduce the width of general purpose travel lanes in order to add or widen bicycle lanes. (HDM 301.2 3)
»»
On multi-lane streets, the most appropriate bicycle facility to provide for user comfort may be buffered bicycle lanes or physically separated bicycle lanes.
Manhole Covers and Grates: »»
Manhole surfaces should be manufactured with a shallow surface texture in the form of a tight, nonlinear pattern
»»
If manholes or other utility access boxes are to be located in bike lanes within 50 ft. of intersections or within 20 ft. of driveways or other bicycle access points, special manufactured permanent nonstick surfaces are required to ensure a controlled travel surface for cyclists breaking or turning.
»»
Manholes, drainage grates, or other obstacles should be set flush with the paved roadway. Roadway surface inconsistencies pose a threat to safe riding conditions for bicyclists. Construction of manholes, access panels or other drainage elements should be constructed with no variation in the surface. The maximum allowable tolerance in vertical roadway surface will be 1/4 of an inch.
Standard Class II Bike Lane on Stony Point Road
Place Bike Lane Symbols to Reduce Wear
Bike lane word, symbol, and/or arrow markings (MUTCD Figure 9C-3) shall be placed outside of the motor vehicle tread path in order to minimize wear from the motor vehicle path. (NACTO 2012)
Materials and Maintenance
Approximate Cost
Bike lane striping and markings will require higher maintenance where vehicles frequently traverse over them at intersections, driveways, parking lanes, and along curved or constrained segments of roadway.
The cost for installing bicycle lanes will depend on the implementation approach. Typical costs are $16,000 per mile for restriping.
Bike lanes should also be maintained so that there are no pot holes, cracks, uneven surfaces or debris.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
»»
37
Bicycle Toolbox
Buffered Bicycle Lanes
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Buffered bike lanes are conventional bicycle lanes paired with a designated buffer space, separating the bicycle lane from the adjacent motor vehicle travel lane and/or parking lane.
38
B A
Typical Use
Design Features
»»
Anywhere a conventional bike lane is being considered.
»A » The minimum bicycle travel area (not including buffer) is 5 feet wide.
»»
While conventional bike lanes are most appropriate on streets with lower to moderate speeds (≤ 25 mph), buffered bike lanes are appropriate on streets with higher speeds (+25mph) and high volumes or high truck volumes (up to 6,000 ADT).
»B » Buffers should be at least 2 feet wide. If buffer area is 4 feet or wider, white chevron or diagonal markings should be used. (CA MUTCD 9C-104)
»»
On streets with extra lanes or lane width.
»»
Appropriate for skilled adult riders on most streets.
»»
For clarity at driveways or minor street crossings, consider a dotted line.
»»
There is no standard for whether the buffer is configured on the parking side, the travel side, or a combination of both.
Buffered bike lanes transition into conflict markings on W. 3rd Street
The use of pavement markings delineates space for cyclists to ride in a comfortable facility.
Further Considerations
Materials and Maintenance
»»
Color may be used within the lane to discourage motorists from entering the buffered lane.
»»
A study of buffered bicycle lanes found that, in order to make the facilities successful, there needs to also be driver education, improved signage and proper pavement markings.1
»»
»»
On multi-lane streets with high vehicles speeds, the most appropriate bicycle facility to provide for user comfort may be physically separated bike lanes. NCHRP Report #766 recommends, when space is limited, installing a buffer space between the parking lane and bicycle lane where on-street parking is permitted rather than between the bicycle lane and vehicle travel lane.2
1 Monsere, C.; McNeil, N.; and Dill, J., “Evaluation of Innovative Bicycle Facilities: SW Broadway Cycle Track and SW Stark/Oak Street Buffered Bike Lanes. Final Report” (2011).Urban Studies and Planning Faculty Publications and Presentations. 2 National Cooperative Highway Research Program. Report #766: Recommended Bicycle Lane Widths for Various Roadway Characteristics.
Bike lane striping and markings will require higher maintenance where vehicles frequently traverse over them at intersections, driveways, parking lanes, and along curved or constrained segments of roadway. Bike lanes should be maintained so that there are no pot holes, cracks, uneven surfaces or debris.
Approximate Cost The cost for installing buffered bicycle lanes will depend on the implementation approach. Typical costs are $16,000 per mile for restriping. However, the cost of large-scale bicycle treatments will vary greatly due to differences in project specifications and the scale and length of the treatment.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
39
Bicycle Toolbox
One-Way Separated Bikeway
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
One-way separated bikeways, also known as protected bikeways or cycle tracks, are on-street bikeway facilities that are separated from vehicle traffic. Physical separation is provided by a barrier between the bikeway and the vehicular travel lane. These barriers can include flexible posts, bollards, parking, planter strips, extruded curbs, or on-street parking. Separated bikeways using these barrier elements typically share the same elevation as adjacent travel lanes, but the bikeway could also be raised above street level, either below or equivalent to sidewalk level.
40
B
C A
Typical Use »»
»»
Along streets on which conventional bicycle lanes would cause many bicyclists to feel stress because of factors such as multiple lanes, high bicycle volumes, high motor traffic volumes (9,000-30,000 ADT), higher traffic speeds (25+ mph), high incidence of double parking, higher truck traffic (10% of total ADT) and high parking turnover. Along streets for which conflicts at intersections can be effectively mitigated using parking lane setbacks, bicycle markings through the intersection, and other signalized intersection treatments.
Design Features »A » Pavement markings, symbols and/or arrow markings must be placed at the beginning of the separated bikeway and at intervals along the facility based on engineering judgment to define the bike direction. (CA MUTCD 9C.04) »B » 7 foot width preferred in areas with high bicycle volumes or uphill sections to facilitate safe passing behavior (5 foot minimum). (HDM 1003.1(1)) »C » 3 foot minimum buffer width adjacent to parking lines (2 foot minimum when adjacent to travel lanes), marked with 2 solid white (DIB 89, 2015).
Bicycle Toolbox
Parked cars serve as a barrier between bicyclists and the vehicle lane. Barriers could also include flexible posts, bollards, planters, or other design elements Source: Bike East Bay.
»»
»»
Separated bikeway buffers and barriers are covered in the CAMUTCD as preferential lane markings (section 3D.01) and channelizing devices (section 3H.01). If the buffer area is 4 feet or wider, white chevron or diagonal markings should be used (section 9C.04). Curbs may be used as a channeling device, see the section on islands (section 3I.01). Grade-separation provides an enhanced level of separation in addition to buffers and other barrier types. Where possible, physical barriers such as removable curbs should be oriented towards the inside edge of the buffer to provide as much extra width as possible for bicycle use.
»»
A retrofit separated bikeway has a relatively low implementation cost compared to road reconstruction by making use of existing pavement and drainage and using a parking lane as a barrier.
»»
Gutters, drainage outlets and utility covers should be designed and configured as not to impact bicycle travel.
»»
For clarity at major or minor street crossings, consider a dotted line (CA MUTCD Detail 39A - Bike Lane Intersection Line) for the buffer boundary where cars are expected to cross.
»»
Special consideration should be given at transit stops to manage bicycle and pedestrian interactions.
Materials and Maintenance Bikeay striping and markings will require higher maintenance where vehicles frequently traverse over them at intersections, driveways, parking lanes, and along curved or constrained segments of roadway. Green conflict striping (if used) will also generally require higher maintenance due to vehicle wear. Bikeways should be maintained so that there are no pot holes, cracks, uneven surfaces or debris. Access points along the facility should be provided for street sweeper vehicles to enter/exit the separated bikeway,
Approximate Cost Separated bikeway construction costs can vary drastically depending on the type of separation used, the amount of new curb and gutter, stormwater mitigation, and crossing treatments. On the lower end of the scale, construction of a striped parking protected bikeway without delineators or other vertical elements can cost as little as $8,000-$16,000 per mile.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Further Considerations
41
Bicycle Toolbox
Two-Way Separated Bikeway Two-Way Separated Bikeways are bicycle facilities that allow bicycle movement in both directions on one side of the road. Two-way separated bikeways share some of the same design characteristics as one-way separated bikeways, but often require additional considerations at driveway and side-street crossings, and intersections with other bikeways.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
B
Typical Use »»
Works best on the left side of one-way streets.
»»
Streets with high motor vehicle volumes and/or speeds
»»
Streets with high bicycle volumes.
»»
Streets with a high incidence of wrong-way bicycle riding.
»»
Streets with few conflicts such as driveways or cross-streets on one side of the street.
»»
Streets that connect to shared use paths.
Design Features »A » 12 foot operating width preferred (10 ft minimum) width for two-way facility. »»
»B »
»»
»» 42
In constrained locations an 8 foot minimum operating width may be considered (HDM 1003.1(1)). Adjacent to on-street parking a 3 foot minimum width channelized buffer or island shall be provided to accommodate opening doors (NACTO, 2012) (CA MUTCD 3H.01, 3I.01). A separation narrower than 5 feet may be permitted if a physical barrier is present. (AASHTO, 2013) Additional signalization and signs may be necessary to manage conflicts.
Bicycle Toolbox Two-Way Separated Bikeway
Further Considerations
Materials and Maintenance
»»
On-street bikeway buffers and barriers are covered in the CA MUTCD as preferential lane markings (section 3D.01) and channelizing devices, including flexible delineators (section 3H.01). Curbs may be used as a channeling device, see the section on islands (section 3I.01).
Bikeway striping and markings will require higher maintenance where vehicles frequently traverse over them at intersections, driveways, parking lanes, and along curved or constrained segments of roadway. Green conflict striping (if used) will also generally require higher maintenance due to vehicle wear.
»»
A two-way separated bikeway on one way street should be located on the left side.
Bikeways should be maintained so that there are no pot holes, cracks, uneven surfaces or debris.
»»
A two-way separated bikeway may be configured at street level or as a raised separated bikeway with vertical separation from the adjacent travel lane.
Access points along the facility should be provided for street sweeper vehicles to enter/exit the separated bikeway.
»»
Two-way separated bikeways should ideally be placed along streets with long blocks and few driveways or mid-block access points for motor vehicles.
Approximate Cost
»»
See Caltrans Design Information Bulletin No. 89 for more details.
Separated bikway construction costs can vary drastically depending on the type of separation used, the amount of new curb and gutter, stormwater mitigation, and crossing treatments. On the lower end of the scale, construction of a striped parking protected bikeway with delineators or other vertical elements can cost as little as $15,000-$30,000 per mile.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A two-way facility can accommodate cyclists in two directions of travel.
43
Bicycle Toolbox
Lateral Shift To increase the visibility of bicyclists for turning motorists, a lateral shift in or “bend-in” intersection approach laterally shifts the separated bikeway immediately adjacent to the turning lane.
B
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
44
Typical Use »»
Bikeways separated by a visually intensive buffer or on-street parking.
»»
Where it is desirable to create a curb extension at intersections to reduce pedestrian crossing distance.
»»
Where space is not available to bend-out the bikeway prior to the intersection.
Design Features »» At least 20 ft prior to an intersection, provide A between 20 – 40 ft of length to shift the bikeway closer to motor vehicle traffic. »B » Where the separated bikeway uses parked cars within the buffer zone, parking must be prohibited at the start of the transition. »»
Place a “Turning Vehicles Yield to Bikes” sign (modified MUTCD R10-15) prior to the intersection.
»»
Optional - Provide a narrow buffer with vertical delineators between the travel and lane and bikeway to increase comfort for bicycle riders and slow driver turning speed.
Clear sight lines at intersections and driveways for people on bikes and people driving are an important aspect of this design.
The approach to an adjacent crossing intersection in Vancouver, BC.
Further Considerations
Materials and Maintenance
»»
The design creates an opportunity for a curb extension, to reduce pedestrian crossing distance. This curb extension can also create public space which can be used bike parking corrals, bikeshare stations, parklets, public art exhibits, and/or stormwater features such as bioswales.
»»
Can be paired with intersection crossing markings such as green colored pavement to raise awareness of conflict points.
Bikeway striping and markings will require higher maintenance where vehicles frequently traverse over them at intersections, driveways, parking lanes, and along curved or constrained segments of roadway. Green conflict striping (if used) will also generally require higher maintenance due to vehicle wear. Bikeway should be maintained so that there are no pot holes, cracks, uneven surfaces or debris.
Approximate Cost The costs of the lateral shift or protected intersection elements vary depending on materials used and degree of implementation desired. Inexpensive materials can used, such as paint, concrete planters, and bollards.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
45
Bicycle Toolbox
Protected Intersection A protected intersection, or “Bend Out” uses a collection of intersection design elements to maximize user comfort within the intersection and promote a high rate of motorists yielding to people bicycling. The design maintains a physical separation within the intersection to define the turning paths of motor vehicles, slow vehicle turning speed, and offer a comfortable place for people bicycling to wait at a red signal.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
46
C B
Typical Use »»
Streets with separated bikeways protected by wide buffer or on-street parking.
»»
Where two separated bieways intersect and two-stage left-turn movements can be provided for bicycle riders.
»»
Helps reduce conflicts between right-turning motorists and bicycle riders by reducing turning speeds and providing a forward stop bar for bicycles.
»»
Where it is desirable to create a curb extension at intersections to reduce pedestrian crossing distance.
Design Features »A » Setback bicycle crossing of 19.5 feet allows for one passenger car to queue while yielding. Smaller setback distance is possible in slowspeed, space constrained conditions. »B » Corner island with a 15-20 foot corner radius slows motor vehicle speeds. Larger radius designs may be possible when paired with a deeper setback or a protected signal phase, or small mountable aprons. Two-stage turning boxes are provided for queuing bicyclists adjacent to corner islands. »C » Use intersection crossing markings.
Protected intersections feature a corner safety island and intersection crossing markings.
Protected intersections incorporate queuing areas for two-stage left turns.
Further Considerations
Materials and Maintenance
»»
Pedestrian crosswalks may need to be further set back from intersections in order to make room for two-stage turning queue boxes.
»»
Wayfinding and directional signage should be provided to help bicycle riders navigate through the intersection.
»»
Colored pavement may be used within the corner refuge area to clarify use by people bicycling and discourage use by people walking or driving.
»»
Intersection approaches with high volumes of right turning vehicles should provide a dedicated right turn only lane paired with a protected signal phase. Protected signal phasing may allow different design dimensions than are described here.
»»
Green conflict striping (if used) will also generally require higher maintenance due to vehicle wear.
»»
Bikeways should be maintained so that there are no pot holes, cracks, uneven surfaces or debris.
»»
Bikeways protected by concrete islands or other permanent physical separation, can be swept by street sweeper vehicles with narrow widths.
Approximate Cost The cost of protected intersection elements vary depending on materials used and degree of implementation desired. »»
Complete reconstruction costs comparable to a full intersection.
»»
Retrofit implementation may be possible at lower costs if existing curbs and drainage are maintained. Inexpensive materials can used, such as paint, concrete planters, and bollards.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
47
Bicycle Toolbox
Separated Bicycle Signal Phase Separated bicycle lane crossings of signalized intersections can be accomplished through the use of a bicycle signal phase which reduces conflicts with motor vehicles by separating bicycle movements from any conflicting motor vehicle movements. Bicycle signals are traditional three lens signal heads with green, yellow and red bicycle stenciled lenses.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
48
B
Typical Use »»
Two-way protected bikeways where contraflow bicycle movement or increased conflict points warrant protected operation.
»»
Bicyclists moving on a green or yellow signal indication in a bicycle signal shall not be in conflict with any simultaneous motor vehicle movement at the signalized location
»»
Right (or left) turns on red should be prohibited in locations where such operation would conflict with a green bicycle signal indication.
Design Features »A » An additional “Bicycle Signal” sign should be installed below the bicycle signal head. »B » Designs for bicycles at signalized crossings should allow bicyclists to trigger signals via pushbutton, loop detectors, or other passive detection, to navigate the crossing. »»
On bikeways, signal timing and actuation shall be reviewed and adjusted to consider the needs of bicyclists. (CA MUTCD 9D.02)
A bicycle signal head at a signalized crossing creates a protected phase for cyclists to safely navigate an intersection.
A bicycle detection system triggers a change in the traffic signal when a bicycle is detected.
Further Considerations
Materials and Maintenance
»»
A bicycle signal should be considered for use only when the volume/collision or volume/ geometric warrants have been met. (CA MUTCD 4C.102)
»»
The Federal Highway Administration (FHWA) has approved bicycle signals for use, if they comply with requirements from Interim Approval 16 (I.A. 16). Bicycle Signals are not approved for use in conjunction with Pedestrian Hybrid Beacons.
»»
»»
Bicyclists typically need more time to travel through an intersection than motor vehicles. Green light times should be determined using the bicycle crossing time for standing bicycles. Bicycle detection and actuation systems include user-activated buttons mounted on a pole, loop detectors that trigger a change in the traffic signal when a bicycle is detected and video detection cameras, that use digital image processing to detect a change in the image at a location.
Bicycle signal detection equipment should be inspected and maintained regularly, especially if detection relies on manual actuation. Pushbuttons and loop detectors will tend to have higher maintenance needs than other passive detection equipment.
Approximate Cost Bicycle signal heads have an average cost of $12,800. Video detection camera system costs range from $15,000 to $25,000 per intersection.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
49
Bicycle Toolbox
Separated Bikeway Barriers Separated bikeways may use a variety of vertical elements to physically separate the bikeway from adjacent travel lanes. Barriers may be robust constructed elements such as curbs, or may be more interim in nature, such as flexible delineator posts. Barrier Separation
Media Separation 3’ Buffer and Spatial Envelope for Barriers
Raised Curb (2’ min. width)
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Flexible Delineators (10’-40’ spacing) Wheel Stops (6’ spacing, 1’ from travel lane)
50
Optional Planting
Grade Separation
Raised Bike Facility Planter Boxes (Consistent spacing)
Parking Separation
Jersey Barriers (consistent spacing)
P
Buffered Door Zone (2’ min. and optional Flexible Delineators)
Typical Use Appropriate barriers for retrofit projects: »»
Parked Cars
»»
Flexible delineators
»»
Bollards
»»
Planters
»»
Parking stops
Appropriate barriers for reconstruction projects: »»
Curb separation
»»
Medians
»»
Landscaped Medians
»»
Raised protected bike lane with vertical or mountable curb
»»
Pedestrian Refuge Islands
Bicycle Toolbox
Raised separated bikeways are bicycle facilities that are vertically separated from motor vehicle traffic.
Materials and Maintenance
»»
Maximize effective operating space by placing curbs or delineator posts as far from the through bikeway space as practicable.
Separated bikeways protected by concrete islands or other permanent physical separation, can be swept by smaller street sweeper vehicles.
»»
Allow for adequate shy distance of 1 to 2 feet from vertical elements to maximize useful space.
»»
When next to parking allow for 3 feet of space in the buffer space to allow for opening doors and passenger unloading.
Access points along the facility should be provided for street sweeper vehicles to enter/exit the separated bikeway.
»»
The presences of landscaping in medians, planters and safety islands increases comfort for users and enhances the streetscape environment.
Further Considerations »»
Separated bikeway buffers and barriers are covered in the CA MUTCD as preferential lane markings (section 3D.01) and channelizing devices (section 3H.01). Curbs may be used as a channeling device, see the section on islands (section 3I.01).
»»
With new roadway construction a raised separated bikeway can be less expensive to construct than a wide or buffered bicycle lane because of shallower trenching and sub base requirements.
»»
Parking should be prohibited within 30 feet of the intersection to improve visibility.
Approximate Cost Separated bikeway barrier material costs can vary greatly, depending on the type of material, the scale, and whether it is part of a broader construction project.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Design Features
51
Bicycle Toolbox
Separated Bikeways at Driveways (and Minor Streets) The added separation provided by separated bikeways creates additional considerations at intersections and driveways when compared to conventional bicycle lanes. Special design guidelines are necessary to preserve sightlines and denote potential conflict areas between modes, especially when motorists turning into or out of driveways may not be expecting bicycle travel opposite to the main flow of traffic.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
At driveways and crossings of minor streets, bicyclists should not be expected to stop if the major street traffic does not stop.
52
Typical Use »»
Along streets with separated bikeway where there are intersections and driveways.
»»
Higher frequency driveways or crossings may require additional treatment such as conflict markings and signs.
Design Features »»
Remove parking to allow for the appropriate clear sight distance before driveways or intersections to improve visibility. The desirable no-parking area is at least 30 feet from each side of the crossing.
»»
Use colored pavement markings and/or shared line markings through conflict areas at intersections.
»»
If a raised bikeway is used, the height of the lane should be maintained through the crossing, requiring automobiles to cross over.
Bicycle Toolbox
»»
Motor vehicle traffic crossing the bikeway should be constrained or channelized to make turns at sharp angles to reduce travel speed prior to the crossing.
»»
Driveway crossings may be configured as raised crossings to slow turning cars and assert physical priority of travelling bicyclists.
»»
Motor vehicle stop bar on cross-streets and driveways is setback from the intersection to ensure that drivers slow down and scan for pedestrians and bicyclists before turning.
Further Considerations »»
Removing obstructions and providing clear sight distance at crossings increases visibility of bicyclists.
»»
Treatments designed to constrain and slow turning motor vehicle traffic will slow drivers to bicycle-compatible travel speeds prior to crossing the separated bikeway.
Materials and Maintenance Green conflict striping and markings, will require higher maintenance where vehicles frequently traverse over them at driveways and minor intersection. Green conflict striping (if used) will also generally require higher maintenance due to vehicle wear.
Approximate Cost The cost for installing high visibility colored crossing markings will depend on the materials selected and implementation approach. Typical costs range from $1.20/sq. ft. installed for paint to $14/sq. ft. installed for Thermoplastic. Colored pavement is more expensive than standard asphalt installation, costing 30-50% more than non-colored asphalt.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Intersection crossing markings can be used at high volume driveway and minor street crossings, as illustrated above.
53
Bicycle Toolbox
Separated Bikeways at Transit Side Boarding Islands A transit side boarding island is a channelized lane for bicyclists designed to provide a path for bicyclists to pass stopped transit vehicles, and clarify interactions between pedestrians, bicyclists, and passengers, boarding and alighting. This is particularly helpful on corridors with high volumes of transit vehicles and bicyclists, where “leapfrogging” may occur, and on separated bikeway corridors where maintaining physical separation is important to maintain user comfort.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
D
54
E F A
B
Typical Use »» »» »»
C
Design Features
Routes where bike lanes or separated bikeways and transit operations overlap.
»» Pedestrian median refuge island (optional) A
Provides an in-lane stop for buses, reducing delay at stops.
»» Pedestrian ramp into crosswalks should be ADA B
Median refuge also provides a shorter crossing for pedestrians at intersections
»» Direct pedestrians to crossing locations to C
shortens the crossing distance at intersections. compliant with detectable warning surfaces. minimize conflicts between modes.
»» High volume stops should have room for D appropriately sized shelters and transit amenities.
Bicycle Toolbox
E»» Pavement markings and signage should clarify expectations among users. The bikeway could also ramp up to sidewalk level at this crossing to reduce bicycle speeds and enhance ADA access to the stop.
F»» Pavement markings on the bikeway should
define the bicycle path of travel to minimize intrusion by pedestrians, except at designated crossings.
Further Considerations »»
Transit island should be wide enough to accommodate mobility devices. An 8’x5’ accessible clear space is required at the front door per ADA requirements.
»»
Transit platforms should feature pedestrian scale lighting.
»»
Side boarding island will require detectable warning surfaces along full length of platform if greater than 6” high.
Materials and Maintenance Similar to median refuge islands, side boarding islands may require frequent maintenance of road debris. If at street grade, the bikeway can be swept by street sweeper vehicles with narrow widths.
Approximate Cost The approximate cost of a side boarding island is similar to median refuge islands ranging from $500 to $1,100 per foot, or about $3,500 to $4,000, depending on the design, and site conditions. This cost is exclusive of transit shelters and amenities, landscaping, and lighting.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A transit side boarding island clarifies user spaces and minimizes conflict between bicyclists. pedestrians, transit passengers, buses, and vehicles.
55
Bicycle Toolbox
Bicycle Box A bicycle box is an experimental treatment, designed to provide bicyclists with a safe and visible space to get in front of queuing traffic during the red signal phase. Motor vehicles must queue behind the white stop line at the rear of the bike box. On a green signal, all bicyclists can quickly clear the intersection. This treatment is currently under experiment, and has not been approved by Caltrans.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
56
B
C
Typical Use »»
At potential areas of conflict between bicyclists and turning vehicles, such as a right or left turn locations.
»»
At signalized intersections with high bicycle volumes.
»»
At signalized intersections with high vehicle volumes.
»»
Not to be used on downhill approaches to minimize the right hook threat potential during the extended green signal phase.
Design Features »A » 14 foot minimum depth from back of crosswalk to motor vehicle stop bar. (NACTO, 2012) »B » A “No Turn on Red” (CA MUTCD R10-11) or “No Right Turn on Red” (CA MUTCD R13A) sign shall be installed overhead to prevent vehicles from entering the Bike Box. (Refer to CVC 22101 for the signage) A “Stop Here on Red” (CA MUTCD R10-6) sign should be post mounted at the stop line to reinforce observance of the stop line. »C » A 50 foot ingress lane should be used to provide access to the box. »»
Use of green colored pavement is recommended.
A bike box allows for cyclists to wait in front of queuing traffic, providing high visibility and a head start over motor vehicle traffic.
Further Considerations »»
This treatment positions bicycles together and on a green signal, all bicyclists can quickly clear the intersection, minimizing conflict and delay to transit or other traffic.
»»
Pedestrian also benefit from bike boxes, as they experience reduced vehicle encroachment into the crosswalk.
»»
Bike boxes are currently under experiment in California. Projects will be required to go through an official Request to Experiment process. This process is outlined in Section 1A.10 in the CAMUTCD, and jurisdictions must receive approval prior to implementation.
Materials and Maintenance Bike boxes are subject to high vehicle wear, especially turning passenger vehicles, buses, and heavy trucks. As a result, bike boxes with green coloring will require more frequent replacement over time. The life of the green coloring will depend on vehicle volumes and turning movements, but Thermoplastic is generally a more durable material than paint.
Approximate Cost Costs will vary due to the type of paint or thermoplastic used and the size of the bike box, as well as whether the treatment is added at the same time as other road treatments. Typical costs range from $1.20/sq. ft. installed for paint to $14/sq. ft. installed for Thermoplastic.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
57
Bicycle Toolbox
Colored Pavement Treatment Colored pavement within a bicycle lane may be used to increase the visibility of the bicycle facility, raise awareness of the potential to encounter bicyclists, and reinforce priority of bicyclists in conflict areas.
B
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A
58
Typical Use
Design Features
»»
Within a weaving or conflict area to identify the potential for bicyclist and motorist interactions and assert bicyclist priority.
»A » Typical white bike lane striping (solid or dotted 6” stripe) is used to outline the green colored pavement.
»»
Across intersections, driveways and Stop or Yield-controlled cross-streets.
»»
At bike boxes and two-stage turn boxes
»B » In weaving or turning conflict areas, preferred striping is dashed, to match the bicycle lane line extensions. »»
The colored surface should be skid resistant and retro-reflective (MUTCD 9C.02.02).
»»
In exclusive use areas, such as bike boxes, color application should be solid green.
Bicycle Toolbox
Further Considerations »»
Green colored pavement shall be used in compliance with FHWA Interim Approval (FHWA IA-14.10).1
»»
While other colors have been used (red, blue, yellow), green is the recommended color in the US.
»»
The application of green colored pavement within bicycle lanes is an emerging practice. The guidance recommended here is based on best practices in cities around the county.
Materials and Maintenance As intended, paint or thermoplastic are placed in locations that are trafficked by vehicles, and are subject to high vehicle wear. Colored pavement treatments will experience higher rates of wear at locations with higher turning vehicles, buses, and heavy trucks. At these locations, green coloring will require more frequent replacement over time. The life of the green coloring will depend on vehicle volumes and turning movements, but thermoplastic is generally a more durable material than paint.
Approximate Cost The cost for installing colored pavement markings will depend on the materials selected and implementation approach. Typical costs range from $1.20/sq. ft installed for paint to $14/sq. ft installed for thermoplastic. Colored pavement is more expensive than standard asphalt installation, costing 30-50 percent more than non-colored asphalt.
1 FHWA. Interim Approval for Optional Use of Green Colored Pavement for Bike Lanes (IA-14). 2011.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Green colored conflict striping indicates the path of travel of people on bicycles, and alerts people intending to turn across the bike lane to yield when bicyclists are present. Pictured left: green conflict striping on Santa Rosa Ave.
59
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Bicycle Toolbox
60
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
Mixed Use Toolbox
4 Mixed Use Toolbox Chapter
61
Mixed Use Toolbox
Shared Use Path Shared use paths are off-street facilities that can provide a desirable transportation and recreation connection for users of all skill levels who prefer separation from traffic. They often provide low-stress connections to local and regional attractions that may be difficult, or not be possible on the street network.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
B
62
A
Typical Use »»
In abandoned rail corridors (commonly referred to as Rails-to-Trails or Rail-Trails.
»»
In active rail corridors, trails can be built adjacent to active railroads (referred to as Rails-with-Trails.
»»
In utility corridors, such as powerline and sewer corridors.
»»
In waterway corridors, such as along canals, drainage ditches, rivers, and creeks.
»»
Along roadways.
Design Features »A » 8 ft is the minimum width (with 2’ ft shoulders) allowed for a two-way bicycle path and is only recommended for low traffic situations. (Caltrans Design Manual) »»
10 ft is recommended in most situations and will be adequate for moderate to heavy use.
»»
12 ft is recommended for heavy use situations with high concentrations of multiple users. A separate track (5’ minimum) can be provided for pedestrian use.
Mixed Use Toolbox Lateral Clearance »»
A 2 ft or greater shoulder on both sides of the path should be provided. An additional ft of lateral clearance (total of 3’) is required by the MUTCD for the installation of signage or other furnishings.
»»
If bollards are used at intersections and access points, they should be colored brightly and/or supplemented with reflective materials to be visible at night.
Overhead Clearance
Striping »»
When striping is required, use a 4 inch dashed yellow centerline stripe with 4 inch solid white edge lines.
»»
Solid centerlines can be provided on tight or blind corners, and on the approaches to roadway crossings.
Further Considerations »»
The provision of a shared use path adjacent to a road is not a substitute for the provision of onroad accommodation such as paved shoulders or bike lanes, but may be considered in some locations in addition to on-road bicycle facilities.
»»
To reduce potential conflicts in some situations, it may be better to place one-way sidepaths on both sides of the street.
»»
The design of the trail should conform to Crime Prevention Through Environmental Design (CPTED) principles. CPTED is a framework that encourages intuitive visual cues to guide path users, increase the visibility of the corridor and adjacent landmarks and properties, careful design that indicates active use and upkeep, and manages conflicting uses, and regular maintenance to prevent improper or illegal uses.
Prince Memorial Greenway connects users to downtown Santa Rosa Source: Peter Stetson.
Materials and Maintenance Shared use paths must be regularly maintained so that they are free of potholes, cracks, root lift, and debris. Signage and lighting should also be regularly maintained to ensure shared use path users feel comfortable, especially where visibility is limited. Adjacent landscaping should be regularly pruned, to allow adequate sightlines, daylight, and pedestrianscale lighting, and so as not to obstruct the path of travel of trail users.
Approximate Cost The cost of a shared use path can vary, but typical costs are between $65,000 per mile to $4 million per mile. These costs vary with materials, such as asphalt, concrete, boardwalk and other paving materials, lighting, and ROW acquisition.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
»B » Clearance to overhead obstructions should be 8 ft minimum, with 10 ft recommended.
63
Mixed Use Toolbox
Sidepath Design
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A sidepath is a bidirectional shared use path located immediately adjacent and parallel to a roadway. Sidepaths can offer a high-quality experience for users of all ages and abilities.
64
Typical Use Sidepaths should be considered where one or more of the following conditions exist: »»
The adjacent roadway has relatively high volume and/or high-speed motor vehicle traffic that might discourage many people bicycling from riding on the roadway to achieve the targeted low stress. Sidepaths do not preclude the installation or maintenance of existing bike lanes.
»»
Along corridors with few intersections with minor streets and driveways.
»»
To provide continuity between existing segments of shared use paths.
»»
For use near schools, neighborhoods, and mixed use commercial areas, where increased separation from motor vehicles is desired, and there are few roadway and driveway crossings.
Design Features »»
Sidepaths shall be designed to meet transportation standards as defined by AASHTO, PROWAG, and MUTCD.
»»
Materials: Asphalt is the standard paving material for sidepaths.
»»
Minimum Width: Minimum width of a sidepath is 10’. Where user volumes are high, additional width, as well as parallel facilities such as bike lanes and sidewalk can provide needed space.
»»
Roadway Separation: The preferred minimum roadway separation width is 6.5 - 16.5’ (Schepers, 2011). Absolute minimum separation width of 5’ (AASHTO Bike Guide 2012, p. 5-11).
»»
Roadway Separation: Separation from roadway traffic is an essential design feature of sidepaths. Separation should increase as volumes and speed of adjacent roadway increase (AASHTO Bike Guide 2012, p. 5-11).
Mixed Use Toolbox
»»
Horizontal Clearance: A lateral clearance to landscaping, street furnishings and signs is required. MUTCD identifies minimum clearance. Signs and other street furniture should be placed outside of the minimum path width.
»»
Vertical Clearance: Standard clearance to overhead obstructions is 10’.
»»
Cross Slope and Running Slope: As sidepaths are typically located within public rights of way, their designs are governed by ADA guidelines.
Further Considerations »»
»»
Sight Lines: It is important to keep approaches to intersections and major driveways clear of obstructions due to parked vehicles, shrubs, and signs on public or private property. Corner radii at driveways and minor streets should be minimized to facilitate vehicle turning speeds of 10-15 mph.
Materials and Maintenance Like shared use paths, Sidepaths must be regularly maintained so that they are free of potholes, cracks, root lift, and debris. Signage and lighting should also be regularly maintained to ensure sidepath users feel comfortable, especially in areas where visibility is limited. Adjacent landscaping should be regularly pruned, to allow adequate sightlines along the path and at minor street crossings and driveways, allow for daylight, and pedestrian-scale lighting, and so as not to obstruct the path of travel of trail users.
Approximate Cost The cost of a sidepath can vary, but typical costs are similar to shared use paths between $65,000 per mile to $4 million per mile. These costs vary with materials, such as asphalt, concrete, boardwalk, and other paving materials, and ROW acquisition.
CITY OF SANTA ROSA BICYCLE AND PEDESTRIAN FACILITY GUIDELINES
A sidepath provides a continuous path of travel along roadway corridors with few driveways or intersections. Depending on the anticipated volumes and context, the sidepath can be constructed in lieu of sidewalk and/or bike lanes. Oftentimes, anticipated volumes, mix of skills, or other factors such as route continuity will also be considered in the decision to also include bike lanes and sidewalks.
65