CITY OF ATL ANTA 10TH STREET TWO-WAY CYCLE TRACK PHASE TWO CONSTRUCTION PLANS FINAL PROJECT INFORMATION

PROJECT LOCATION MAP

Jurisdiction: City of Atlanta / Fulton County Phase Two Extents: Charles Allen Drive to Piedmont Ave. Phase Two Length: 2,325 linear feet Functional Class: Urban Minor Arterial Street

Piedmont Park

PROJECT AREA

Contact: Cladie Washburn, Midtown Alliance, 404-441-8956 CHARLES ALLEN DRIVE

TAF T AVENUE

ARGONNE AVENUE

M Y R T L E S T.

PIED

MON

T AV E.

10TH STREET

Final Plans: May 27, 2014 Revised: June 26, 2014 Produced by Stantec Consulting Services Inc. for the Midtown Alliance and the City of Atlanta


1

ERADICATE AND REINSTALL THERMOPLASTIC STOP BARS ADD BIKE SYMBOL AND ARROW (TYP). SEE DETAIL 3.1

INSTALL 4” SOLID WHITE THERMOPLASTIC LINES

ADD “NO PARKING” SIGN SEE DETAIL 5.9

INSTALL ASPHALT PATCHING WITHIN HATCHED AREA.

5” SKIP WHITE (2’ SEG, 6’ GAP), SEE DETAIL 3.2 INSTALL DURA CURB RAISED SEPARATOR SEE DETAIL 1.3

1

25’ TYP. ADD SHARROW SYMBOLS SEE DETAIL 3.3

ADD SHARROW SYMBOL. SEE DETAIL 3.3

REFRESH STOP BAR WITH THERMOPLASTIC 16’

RAISED CONCRETE BULBOUT SEE DETAIL 2.2

WHITE FLEXIBLE CHANNELIZER POST SEE DETAIL 1.2

15’

EXCAVATE & FILL EXISTING LANDSCAPE STRIP WITH CONCRETE FROM THE STRIP’S WEST END TO THE EAST EDGE OF BULBOUT. EXISTING TREE BOX WILL NOT BE PAVED. MATCH CONCRETE TO EDGES OF TREE BOX. SEE DETAIL 2.2

REMOVE “NO PARKING” SIGN

M Y RT L E S T R E E T

T AV ENUE

INSTALL QUEUE BOX USING GREEN COLOR-SAFE COLOR PAVEMENT MARKING AND ANTI-SKID SURFACING BY TRANSPO INDUSTRIES, INC. QUEUE BOX IS TO BE OUTLINED IN 5” WHITE THERMOPLASTIC.

1

REMOVE EXISTING “PEDESTRIAN CROSSING” SIGN. INSTALL RAPID FLASHING BEACON. SEE DETAIL 4.1

ADD “PEDESTRIAN CROSSING” & “CROSSWALK ARROW” SIGNS FACING WEST. SEE DETAILS 5.3 & 5.5 RELOCATE EXISTING “PEDESTRIAN CROSSING” & “CROSSWALK ARROW” SIGNS CURRENTLY LOCATED 25’ WEST. SEE DETAILS 5.4 & 5.5

1

RELOCATE EXISTING MARTA BUS SIGN CURRENTLY LOCATED EAST OF INTERSECTION.

NEW THERMOPLASTIC STOP BARS

REMOVE PORTION OF STOP BAR INSIDE BIKE LANE ADD BIKE SYMBOL AND ARROW (TYP). SEE DETAIL 3.1

1

REPAINT CROSSWALK

1

INSTALL ASPHALT PATCHING WITHIN HATCHED AREA

WHITE FLEXIBLE CHANNELIZER POST SEE DETAIL 1.2

POSTS SPACED 20’ O.C.

NEW STOP BAR

1

ARGONNE AVENUE

MATCH LINE - WEST SEGMENT (SEE ABOVE FOR CONTINUATION)

PIED

MON

1

ERADICATE AND REINSTALL TWO THERMOPLASTIC CROSSWALKS

TWO-WAY CYCLE TRACK TO BE CONSTRUCTED IN LIEU OF EXISTING TRAVEL LANE. SEE CYCLE TRACK TYPICAL PLAN (DETAIL 1.1) FOR DIMENSIONS AND STRIPING DETAILS

POSTS SPACED 20’ O.C.

RAISED CONCRETE BULBOUT SEE DETAIL 2.1 5” SKIP WHITE (2’ SEG, 6’ GAP), SEE DETAIL 3.2

ADD “BIKE LANE END” SIGN SEE DETAIL 5.7

100’ SPACING (TYP)

ERADICATE EXISTING CROSSWALK

10TH STREET TWO-WAY CYCLE TRACK FINAL LAYOUT PLAN - PHASE 2 (Piedmont Avenue to Charles Allen Drive)

FEET 0 10 20

40

TWO-WAY CYCLE TRACK TO BE CONSTRUCTED IN LIEU OF EXISTING TRAVEL LANE. SEE CYCLE TRACK TYPICAL PLAN (DETAIL 1.1) FOR DIMENSIONS AND STRIPING DETAILS

M A T C H L I N E - E A S T S E G M E N T ( S E E P- 2 F O R C O N T I N U A T I O N )

REMOVE EXISTING “PEDESTRIAN CROSSING” SIGN. INSTALL RAPID FLASHING BEACON. SEE DETAIL 4.1

MATCH LINE - EAST SEGMENT (SEE BELOW FOR CONTINUATION)

1

80 NORTH

P-1

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14

11

REVISION ONE: REVISION ONE: 6/26/14 6/26/14


MATCH LINE - EAST SEGMENT (SEE BELOW FOR CONTINUATION)

TWO-WAY CYCLE TRACK TO BE CONSTRUCTED IN LIEU OF EXISTING TRAVEL LANE. SEE CYCLE TRACK TYPICAL PLAN (DETAIL 1.1) FOR DIMENSIONS AND STRIPING DETAILS

WHITE FLEXIBLE CHANNELIZER POST SEE DETAIL 1.2

ADD BIKE SYMBOL AND ARROW (TYP). SEE DETAIL 3.1 POSTS SPACED 20’ O.C. 100’ SPACING (TYP)

RETAIN EXISTING “SCHOOL ZONE” SIGN. REPLACE “CHILDREN PRESENT” SIGN. SEE DETAIL 5.8 RIGHT TURN TO CHARLES ALLEN DRIVE USE QUEUE BOX

RELOCATE EXISTING MARTA BUS SIGN CURRENTLY LOCATED EAST OF TAFT ROAD.

ADD BIKE QUEUE BOX SIGN SEE DETAIL 5.11 INSTALL NEW THERMOPLASTIC STOP BAR

TWO-WAY CYCLE TRACK TO BE CONSTRUCTED IN LIEU OF EXISTING TRAVEL LANE. SEE CYCLE TRACK TYPICAL PLAN (DETAIL 1.1) FOR DIMENSIONS AND STRIPING DETAILS

REFRESH QUEUE BOX USING GREEN COLOR-SAFE COLOR PAVEMENT MARKING AND ANTI-SKID SURFACING BY TRANSPO INDUSTRIES, INC. QUEUE BOX TO BE OUTLINED IN 5” WHITE THERMOPLASTIC.

WHITE FLEXIBLE CHANNELIZER POST SEE DETAIL 1.2

ADD BIKE SYMBOL AND ARROW (TYP). SEE DETAIL 3.1

1

CHARLES ALLEN DRIVE

POSTS SPACED 20’ O.C.

10TH STREET TWO-WAY CYCLE TRACK FINAL LAYOUT PLAN - PHASE 2 (Piedmont Avenue to Charles Allen Drive)

1

PREVIOUS PROJECT PHASE

TAFT AVENUE

M A T C H L I N E - W E S T S E G M E N T ( S E E P- 1 F O R C O N T I N U A T I O N ) MATCH LINE - WEST SEGMENT (SEE ABOVE FOR CONTINUATION)

RETAIN EXISTING “HOSPITAL” SIGN AND CONSOLIDATE “NO CRUISE” SIGN ON TO THE SAME POST.

FEET 0 10 20

40

80 NORTH

P-2

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14 1

REVISION ONE: 6/26/14


DETAIL 1.1 TWO -WAY CYCLE TRACK TYPICAL PL AN (N.T.S) TWO-WAY CYCLE TRACK - TYPICAL PLAN (N.T.S)

DETAIL 1.2 28” WHITE FLEXIBLE CHANNELIZER POST INTERSECTION CROSSING (N.T.S)

BUFFER ZONE

8’

72” 20’ O.C.

BUFFER WIDTH 3’ DESIRED ( 24” MIN.)

3 . C ONT RAC T OR T O IN S TA L L TRA N S P O IN D U S TR IES , IN C . C OLOR-SAF E C OLO R PAV EM EN T M A R K IN G A N D A N TISKI D SURFAC I NG F O R B IC YC L E FA C IL ITIES A S N O TED I N PL ANS. C OLOR TO B E A P P R O V ED BY O W N ER P R IO R T O C ONST RUC T I O N A C TIV ITIES A N D O R D ER IN G O F M AT E RI AL S. 4 . E X I ST I NG G RE E N PAV EM EN T M A R K IN G S IN P H A S E 1 A R EA ( M ONROE DRI V E T O C H A R L ES A L L EN D R IV E) S H O U L D Place MUTCD R9C-3B at beginning of B Eintersection RE F RE SHE markings D AS S P EC IF IED IN N O TE 3. IN A D D ITIO N , NE W G RE E N PAV EM EN T M A R K IN G S A R E TO B E A D D ED AT Begin and end intersection markings at edge of I NT E RSE C T I ONS MATC H IN G TH E P H A S E 2 D ES IG N .

12”

FACE OF CURB

3” DIA. WHITE FLEXIBLE CHANNELIZER POST (TYP) MAINTAIN CONSISTENT 12” OFFSET FROM INNER BUFFER LINE

min.

IMPROVEMENTS NOT TO ENCROACH INTO ADJACENT EXISTING TRAVEL LANES

1 . C ONT RAC T OR T O F IEL D V ER F IY A L L M A R K IN G S W ITH OW NE R PRI OR T O F IN A L S TR IP IN G A N D IN S TA L L ATIO N .

bike lane

4’

4’ min.

1

2 . C ONT RAC T OR T O C O O R D IN ATE W ITH M ID TO W N A L L IA N C E PRI OR T O C ONST R U C TIO N A C TIV ITIES A N D O R D ER IN G OF M AT E RI AL S T O D ETER M IN E LO C ATIO N O F R EQ U IR ED 5” skip white lines, 2’ segments - 6’ gaps ROADWAY ASPHA LT PATC H IN G . Width of skip-lane to be equal to width of

VEHICULAR TRAVEL LANE (WIDTH VARIES)

4’ MINIMUM BIKE LANE WIDTHSVARY CURB SIDE BIKE LANE WIDTH WHERE CYCLE TRACK IS WIDER THAN 11’ TOTAL

NO T ES ( G ENER A L )

crosswalks

5” YELLOW SKIP CENTER LINE (10’ STRIP, 10’ SKIP - TYP) 8” SOLID WHITE OUTER BUFFER LINE (TYP)

CHEVRON MARKINGS

40” Curb Section

4” SOLID WHITE INNER BUFFER LINE (TYP)

L St_DETAILS.dgn 8/7/2012 3:15:57 PM

8” SOLID WHITE - 45 DEGREES FROM EDGE OF CYCLE TRACK, 20’ ON-CENTER

5

4

40”

A

11

10

9

L St_DETAILS.dgn 8/7/2012 3:15:57 PM 1

DETAIL 1.3 - DURA CURB RAISED SEPARATOR 2

BIKE LANE SYMBOL (N.T.S)

1

DURA DURA-CURB CURB

Description

2

2

VISION STRIP, YELLOW

4

2

DURA-POST MOUNT STUD

5

2

QUICK PIN

9

2

3/4” X 3-9/16” MOLLY PLUG

10

2

5/8” FLAT WASHER, COATED

11

2

5/8” X 6” HEX LAG BOLT,, COATED or 5/8” x 5”

Anchor studs 40” with Quick pins and mounting socket FACE OF CURB

10

72” PARTS LIST

2

72”

Nose Section

18” NOSE SECTION

8” HAZARD MARKER DELINEATOR

NOTES: 1. THESE DETAILS ARE FOR T IS MANUFACTURED BY JOH

2. DURA-POST DELINEATORS 5

A

11

1

Qty

1

5

4

9

Item

SHARROW SYMBOL (N.T.S)

40”CURB Curb Section 40” SECTION

40”

PARTS LIST

Item

Qty

1

1

DURA DURA-CURB CURB

Description

2

2

VISION STRIP, YELLOW

4

2

DURA-POST MOUNT STUD

5

2

QUICK PIN

9

2

3/4” X 3-9/16” MOLLY PLUG

10

2

5/8” FLAT WASHER, COATED

11

2

5/8” X 6” HEX LAG BOLT,, COATED or 5/8” x 5”

3. DURA-CURB IS INSTALLED AND ANCHORS.

4

4

1

NO PARKING SIGN SIZE 18”x24”

2

2

112”

PARTS LIST Item Qty 1 1 2 1 3 2 4 1 5 1

Description 40” Arched Dura-Curb Section Dura-Post Assembly Quick Pin Reflectorized Material Quick Mount Base

36”

72”

3 5

MUTCD R9C-3A DETAIL A SCALE 1 / 1.5

5

4’ 72” Anchor studs O.C. MUTCD R9C-3B with Quick pins 10TH STREET TWO-WAY CYCLE TRACK and mounting FINAL CONSTRUCTION DETAILS PHASE 2 (Piedmont Avenue to Charles Allen Drive) socket Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14 4

6

The Dura-Curb™ Raised Separator System v1.01 | www.duracurb.net

MEDIAN BARRIER SEPARA

EN RE

1

DURA-CURB SY DURA-POST DELI

2

1 DETAIL A SCALE 1 / 1.5

1

REVISION ONE: 6/26/14

D-1

Part Number: 40-36-00-00

DURA-POST, 36”, WHITE DELINEATOR W OF REFLECTIVE SHEETING.


43.0

B. Grade: 84” x 108” B. Grade: 84” x 133” Footprints (including bicycles)

B. Grade: 84” x 83”

18.0

Double-Sided

Single-Sided

29.0

5 Bicycles

DETAIL 2.1 - RAISED CONCRETE BULBOUT - WEST (NTS)

3 120” Bicycles Flange: x 83”

Flange:

DETAIL 2.3 - SARIS “BRANDED” MIDTOWN BICYCLE RACK (NTS) 2X .25"X 12.75" STEEL RO D

2.38

* rack to be powder-coated black

1.10

18.0

9 Bicycles

4 Bicycles Flange: 120”x133”

120”x108”

B. Grade: 120”x108”

B. Grade: 120” x 83”

2.0

43.0

7 Bicycles

Flange:

11.0

32.0

B. Grade: 84” x 158”

Flange:

86” x 83”

B. Grade: 120”x133”

86” x 108”

11 Bicycles

5 Bicycles 120”x158”

6 Bicycles

Flange:

B. Grade: 120”x158”

Flange:

86” x 133”

Flange:

86” x 158”

DETAIL 2.4B. Grade: - CONCRETE SL AB & B.CURB (NTS) B. Grade: 84” x 83” B. Grade: 84” x 133” Grade: 84” x 158” 84” x 108”

MOUNTING options

Double-Sided

29.0

Below-Grade Mounting 5 Bicycles

Surface (Flange) Mounting for use on poured concrete surfaces

7 Bicycles

9 Bicycles

19.7 TY P

*Bicycle racks must be anchored into concrete using bolts as shown in detail below 11.0

Flange:

30.0

Flange:

120” x 83”

LEVELING SURFACE PARALLEL TO GROUND

Varies

120”x108”

Flange:

11 Bicycles

120”x133”

Flange:

120”x158”

2X R 9.0

B. Grade: 120”x108”

B. Grade: 120” x 83”

2.0 2X .25"X 12.75" STEEL RO D

2.38

* rack to be powder-coated black

1.10 32.00

B. Grade: 120”x158”

GROUND LEVE

48.7

2X ANCHOR RO (INCLUDED )

2X16. 8

25.0 TY P

L

D

MOUNTING options 10°

B 18.0

B

B. Grade: 120”x133”

32.3

Side

Front

2X .25

Surface (Flange) Mounting Front for use on poured concrete surfaces A

A

25.25 REF

Side

Below-Grade Mounting

2.38

Surface (Flange) Mounting

*Bicycle racks must be anchored into concrete using bolts as shown in detail below 3.0

19.7 TY P

6.0

4X .44 THRU

30.0

Bottom

2X R 9.0

* rack to be powder-coated black

6.0

2X 32.1

3.0

.5 TYP

15.2 TY P

1.10 .5 TYP SECTION

B- B

25.0 TY P

32.3

48.7

A-A SECTION SCALE 1 : 4

Side

L1

2X ANCHOR RO (INCLUDED )

Atlanta Development Design Guidelines RG

N

S

S

47

S

, G

RG

N

S

2.38

T

47

Surface (Flange) Mounting A

6.0 3.0

* rack to be powder-coated black

4X .44 THRU

Bottom

L

A.

18

Side

L

8 65

Front

25.25 REF

A.

18

8 65

A

A

D

Side Front “CITY RACK” 2400 SERIES DETAIL 2.5 - SARIS (NTS)

2X .25 A

25.0 TY P

L

updated 5.28.13 10°

B 18.0

B

GROUND LEVE

Front 2X16. 8

32.00

DETAIL 2.2 - RAISED CONCRETE BULBOUT - EAST (NTS)

Varies

LEVELING SURFACE PARALLEL TO GROUND

36. 9

T

, G

36. 9

6.0

2X 32.1

3.0

.5 TYP

25.0 TY P

15.2 TY P

1.10 .5 TYP SECTION

B- B

L1

SECTION A-A SCALE 1 : 4

Side

Front

updated 5.28.13 Atlanta Development Design Guidelines DETAIL 2.6 - METAL TRENCH GRATE COVER (NTS)

10TH STREET TWO-WAY CYCLE TRACK FINAL CONSTRUCTION DETAILS - PHASE 2 (Piedmont Avenue to Charles Allen Drive)

D-2

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14

1

REVISION ONE: 6/26/14


DETAIL 3.1 - BIKE L ANE SYMBOL (NTS)

DETAIL 3.2 - INTERSECTION CROS SING (NTS)

DETAIL 3.3 - SHARROW SYMBOL (NTS)

FACE OF CURB

40” 5” skip white lines, 2’ segments - 6’ gaps. Width of skip-lane to be equal to width of bike lane

112” 72” MUTCD R9C-3A

72”

4’

O.C.

72”

1

72”

NOTE:

Place MUTCD R9C-3B at beginning of intersection markings

MUTCD R9C-3B

PAV E M E N T M A R K IN G S TO B E I NSTAL L E D W I T H TH ER M O P L A S TIC .

Begin and end intersection markings at edge of crosswalks

40”

40”

10TH STREET TWO-WAY CYCLE TRACK FINAL STRIPING DETAILS - PHASE 2 (Piedmont Avenue to Charles Allen Drive)

D-3

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14

1

REVISION ONE: 6/26/14


DETAIL 4.1 RECTANGUL AR RAPID FL ASHING BEACON (NTS)

DETAIL 4.2 BIKE RRFB PUSH BUT TON (NTS)

15W SOLAR PANEL

R10-24M SEE SIGNAGE DETAIL 5.2

ALL ITEMS ASSOCIATED WITH INSTALLATION OF RECTANGULAR RAPID FLASHING BEACONS ARE TO BE INCLUDED IN THE PRICE BID FOR SIGNAL INSTALLATION N0 1.

W11 - 2 30” x 30”

1. WHEN ACTIVATED, THE TWO YELLOW INDICATIONS IN EACH RRFB SHALL FLASH IN A RAPIDLY ALTERNATING “WIG-WAG” FLASHING SEQUENCE (LEFT LIGHT ON, THEN RIGHT LIGHT ON).

SEE SIGNAGE DETAIL 5.6

3. THE LIGHT INTENSITY OF THE YELLOW INDICATIONS SHALL MEET THE MINIMUM SPECIFICATIONS OF SOCIETY OF AUTOMOTIVE ENGINEERS (SAE) STANDARD J595 (DIRECTIONAL FLASHING OPTICAL WARNING DEVICES FOR AUTHORIZED EMERGENCY, MAINTENANCE, AND SERVICE VEHICLES) DATED JANUARY 2005.

RAPID FLASHING BEACONS 31/2” H x 20” W

SEE SIGNAGE DETAIL 5.3 OR 5.4

13’

W16 - 7P 24” x 12”

4. THE RRFB SHALL BE NORMALLY DARK, SHALL INITIATE OPERATION ONLY UPON PEDESTRIAN OR CYCLIST ACTUATION, AND SHALL CEASE OPERATION AT A PREDETERMINED TIME AFTER THE ACTUATION. 5. ALL RRFBS ASSOCIATED WITH A GIVEN CROSSWALK (INCLUDING THOSE WITH AN ADVANCE CROSSING SIGN, IF USED) SHALL, WHEN ACTIVATED, SIMULTANEOUSLY COMMENCE OPERATION OF THEIR ALTERNATING RAPID SLASHING INDICATIONS AND SHALL CEASE OPERATIONS SIMULTANEOUSLY.

41/2” O.D. POLE

SEE SIGNAGE DETAIL 5.1

4’ MAX

2. AS A SPECIFIC EXCEPTION TO 2003 MUTCD SECTION 4K.01 REQUIREMENTS FOR THE FLASH RATE OF BEACONS. RRFBS SHALL USE A MUCH FASTER FLASH RATE. EACH OF THE TWO YELLOW INDICATIONS OF AN RRFB SHALL HAVE 70 TO 80 PERIODS OF FLASHING PER MINUTE AND SHALL HAVE ALTERNATING BUT APPROXIMATELY EQUAL PERIODS OF RAPID PULSING LIGHT EMISSIONS AND DARK OPERATION. DURING EACH OF ITS 70 TO 80 FLASHING PERIODS PER MINUTE, ONE OF THE YELLOW INDICATIONS SHALL EMIT TWO RAPID PULSES OF LIGHT AND THE OTHER YELLOW INDICATION SHALL EMIT THREE RAPID PULSES OF LIGHT. THE FLASH RATE OF EACH INDIVIDUALLY YELLOW INDICATION, AS APPLIED OVER THE FULL ON-OFF SEQUENCE OF A FLASHING PERIOD OF THE INDICATION, SHALL NOT BE BETWEEN 5 AND 30 FLASHES PER SECOND. TO AVOID FREQUENCIES THAT MIGHT CAUSE SEIZURES.

6. A PEDESTRIAN INSTRUCTION SIGN WITH THE LEGEND PUSH BUTTON TO TURN ON WARNING LIGHTS SHALL BE MOUNTED ADJACENT TO OR INTEGRAL WITH EACH PEDESTRIAN PUSHBUTTON.

R10-25 9” x 12”

7. THE DURATION OF A PREDETERMINED PERIOD OF OPERATION OF THE RRFBS FOLLOWING EACH ACTUATION SHOULD BE CLEARANCE TIMES FOR PEDESTRIAN SIGNALS. 8. A SMALL LIGHT DIRECTED AT AND VISIBLE TO PEDESTRIANS IN THE CROSSWALK SHALL BE INSTALLED INTEGRAL TO THE RRFB OR PUSH BUTTON TO GIVE CONFIRMATION THAT THE RRFB IS IN OPERATION.

CROSSWALK PUSH-BUTTON 7’ MIN

9. ALL RRFBS SHALL BE POWERED USING SOLAR PANELS AND SHALL USE WIRELESS COMMUNICATION TO AVOID TRENCHING. 10. EXCEPT AS OTHERWISE PROVIDED ABOVE, ALL OTHER PROVISIONS OF THE MUTCD APPLICABLE TO WARNING BEACONS SHALL APPLY TO RRFBS.

4’ MAX PEDESTAL BASE

1 W11-2 & W16-7P SIGNS, AND FLASHING BEACONS TO BE INSTALLED ON BOTH SIDES OF THE POLE.

10TH STREET TWO-WAY CYCLE TRACK FINAL RRFB DETAILS - PHASE 2(Piedmont Avenue to Charles Allen Drive)

D-4

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14

1

REVISION ONE: 6/26/14


MUTCD STANDARD SIGNAGE:

CUSTOM SIGNAGE

* SIG N G R A P H I CS N OT TO S CALE

* S IGN G R A PHI CS NO T TO SCA L E

R10-24

DETAIL 5.1 PED PUSH BUTTON WARNING LIGHT - (2) MUTCD R10-25 SIZE 9”x12”

51-1W11-15 1W

R10-25

DETAIL 5.2 PED & BIKE PUSH BUTTON FOR SIGNAL - (1) MUTCD R10-24 MODIFIED SIZE 9”x15”

DETAIL 5.9 NO PARKING - (1) SIZE 18”x24”

DETAIL 5.10 LEFT TURN BIKE QUEUE BOX - (1) SIZE 18”x24”

R10-24 Modified Text DETAIL 5.3 CROSSWALK ARROW SIGN RIGHT - (3) MUTCD W16-7pR SIZE 12”x24”

P7-6W16-7P 1W

DETAIL 5.5 PED CROSSING GRAPHIC - (1) MUTCD W11A-2 SIZE 24”x24”

TO ENTER CYCLE TRACK USE QUEUE BOX

DETAIL 5.4 CROSSWALK ARROW SIGN LEFT - (2) MUTCD W16-7pL SIZE 12”x24”

DETAIL 5.6 BIKE/PED GRAPHIC - (4) MUTCD W11-15 SIZE 24”x24”

W11-15

RIGHT TURN TO CHARLES ALLEN DRIVE USE QUEUE BOX

DETAIL 5.11 RIGHT TURN BIKE QUEUE BOX - (1) SIZE 18”x24”

W16-7P

DETAIL 5.7 BIKE LANE ENDS- (1) MUTCD R3-16A SIZE 24”x30”

DETAIL 5.8 WHEN CHILDREN ARE PRESENT SIGN - (1) MUTCD S4-2 SIZE 10”x24”

ALL SIGN MATERIALS TO BE: • 0.08” WITH DIAMOND GRADE SHEETING • AUTO-REFLECTIVE PER MUTCD • AFFIXED TO CITY OF ATLANTA STANDARD GREEN U-CHANNEL POSTS

*CUSTOM SIGNAGE TEXT TO UTILIZE MUTCD/ FHWA-APPROVED “CLEARVIEW” FONT

10TH STREET TWO-WAY CYCLE TRACK FINAL SIGN DETAILS - PHASE 2(Piedmont Avenue to Charles Allen Drive)

D-5

Produced for The Midtown Alliance and The City of Atlanta by Stantec Consulting Services Inc. - Final 05/27/14

1

REVISION ONE: 6/26/14


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.