Draft Scoping Document November 2009

Page 1

REVISED WORKING DRAFT

CHEHALIS RIVER WATER RETENTION STRUCTURES SCOPING DOCUMENT AND PROPOSED STUDIES

Prepared for: Chehalis River Fish and Aquatics Work Group Chehalis Basin Flood Authority

Prepared by:

EES Consulting, Inc. 1155 N. State Street, Suite 700 Bellingham, Washington 98225

November 10, 2009


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Draft Scoping Document November 2009 by Jim Wilcox - Issuu