1 STEPHANIE TUNG | 2012 - 2019
ARCHITECTURAL
2
Toronto | 325 Huron St, Individual Project Design Studio Project (Feb-April 2018) (1st Year Masters Architecture Studio) P1-4
Little Portugal Library + Community Center
Francis & Rose Yuen Center In Hong Kong (UCCHK)
Photokeratitis
Toronto | The Junction Team Leader Group Project (2 people) Toronto Design Offsite (Nov 2014-Jan 2015) People’s Choice Awards 2015 P13
Nova
Haw Par Music Farm (HPMF) Toronto | Ryerson DAS Team Leader Group Project (6 people) Nuit Blanche Proposal (Mar 2016) Selected Project to Display in Nuit Blanche 2016 P14
Toronto | Little Portugal Individual Project Design Studio Project (Jan-April 2015) (3rd Year Architecture Studio) P5-8
The Social Dock
The Link
Frankfurt | River Am Main Individual Project Travel Studio Project (Jun-Aug 2015) (4th Year Architecture Studio) P9-12
Hong Kong | Mount Davis Work (June 2016 - June 2017) P17-20
Hong Kong | Wan Chai Work (June 2016 - June 2017) P21-22
Selected work sample from dbdbdb
Hong Kong | Wing Lok Street Team Leader Independent Project (Oct 2016) Collaborative (2 people) Displayed on Des Veoux Road P15-16
Toronto Work (May 2018 - Current) P30-31
3
Kindergarten on Huron St.
KINDERGARTEN ON HURON ST. Location: 325 Huron St.Studio Type:1st Year Masters Studio- Individual Work Design Program: Kindergarten
4
| KINDERGARTEN ON HURON ST.
My kindergarten aims to provide a learning environment for children through play and imagination. Through defined spatial qualities, it inspires children to occupy and utilize spaces differently. The classrooms are designed to be regularly shaped with limited windows to provide ample natural light, which promote concentration and focused learning. While the indoor play space is designed into a zigzag form, the irregularity of the space hence maximizes space for play and circulation. The cascading floor plates creates different pockets of activity zones that encourages social engagement, free flow circulation and areas for creativity. My wild card is the theatre that is public facing and is located at the northeast corner, visible to the public. During off hours of the kindergarten, the indoor play space is open for the public to access as mini-open theaters. In the urban context, the orientation of entrance of the kindergarten is an extension from the Robarts’ path across the street. The ground floor of the design is also freed up for park space for families and users of the site as a structure for play during off-hours.
CONCEPT DIAGRAMS
!
!
?
To create an atypical architectural space that inspires imagination
The zig-zag playscape form creates pockets of different activities
!
SITE | 1:4000
Lifted building to allow underpass playspace to happen
?
!
G/F PLAN | 1:800
1/F PLAN | 1:800
!
?
!
HARBORD ST UP
| KINDERGARTEN ON HURON ST.
GLEN MORRIS ST SPADINA AVE
DN
UP
DN
SUSSEX AVE
5
WASHINGTON AVE
HURON ST
UP
ST GEORGE ST
DN
6
| KINDERGARTEN ON HURON ST.
1:100 MODEL PHOTO | INDOOR PLAYSPACE
SECTION A-A | 1:200
1:100 MODEL PHOTO | PERFORATED ROOF & SHADOWS
SECTIONAL PERSPECTIVE B-B | 1:200
7
| KINDERGARTEN ON HURON ST.
SECTIONAL MODEL | 1:50
Location: Little Portugal, Toronto, Canada Studio Type: 3rd Year Design Studio - Individual Work Design Program: Library +Community Center The site is located at the intersection between an aging community and one that is gentrifying. While wanting to create a modernized community hub for both communities, rich local cultures and built form would be respected majorly through texture and materiality of the new building. Bricks are a predominant building material found in many old Toronto neighborhoods, and hold a unique tectonic ability to layer itself - not just visually, but also resonating on how the neighborhood was built up, through layers of changing trends. Hence, the tectonics of brick is further developed into an architectural expression for the building from inside out.
8
| LITTLE PORTUGAL LIBRARY + COMMUNITY CENTER
The wood finish is also introduced to represent an interruption. Although different in nature, this dual materiality plays into the interaction of old and new.
CONCEPT DIAGRAMS
SITE ANALYSIS
The concept of layering, identified as a unique trait of the primary material - bricks, are also implemented on facade design and interior partition layouts and bulkhead designs
PLAN G/F | 1:800
Gates are a common feature within the building to separate common circulation and rooms; visually it creates the sense of layering space
TYPICAL PLAN (3/F)| 1:800
-0.3
-1.5
NEWSPAPER ROOM
OTA
CHILDREN’S LIBRA
RY
OTB CIRCULATION DESK
UP
LIBRARY ENTRANCE
HVAC
HVAC UP
LOBBY UP
HVAC LIBRARY COMM
ONS
Residential Commercial
LEGEND
ATRIUM
LEGEND
Public Amenities (Institutions, Recreation) Gentrifiiers Existing Retail Residents Park
CAFE
DN
ATRIUM
DN
LOBBY
UP
ATRIUM
LIBRARY ENTRANCE
READING STAIRS
LIBRARY COMMO
NS
0
0
OTA
SELECTED AREA FOR DETAILING
9
LEGEND
| LITTLE PORTUGAL LIBRARY + COMMUNITY CENTER
To create an atypical architectural space that inspires imagination
COURTYARD
COMM
N-S
T.O. 2/F 4500
G EXTERIOR
INTERIOR
ROOF 16500
ROOF 16500
TYPICAL LIBRARY ROOM (2/F) | WALL DETAIL 1:30 SELECTED AREA FOR DETAILING
IC IT INSULATION
DETAIL C5
13mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) G 12.7mm PLYWOOD 20mm WOOD FINISH
DETAIL S1
4/F 12500
4/F 12500
3/F 8500
3/F 8500
325
DETAIL S2
2/F 4500
2/F 4500
325 125.9
DETAIL S3
EXTERIOR
90 mm BRCIK VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm STEEL STUD BACKING 12.7mm PLYWOOD BUILT IN BOOKSHELF
INTERIOR G/F 0
G/F 0
350 x 350 mm Supply Air Duct
63.5 215
6
63.5
BASEMENT - 4000
DETAIL C1
T.O. 3/F 8500
90 mm BRCIK VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 500 x 500 CONCRETE COLUMN 12.7mm PLYWOOD 63.5mm WOOD FINISH
13mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 250mm SUSPENDED STEEL CHANNEL 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOO 12.7mm PLYWOOD 20mm WOOD FINISH
125.9
215 METAL FLASHING INSULATED DOUBLE GLAZED CURTAIN WALL INTERIOR WOOD FRAME
DETAIL C2b
INSULATED DOUBLE CURTAIN WALL W/ INTERIOR WOOD FRAME
DETAIL C5
RENDER | TYPICAL LIBARARY (2/F)
325
350 x 350 mm Supply Air Duct
Ceiling
125.9 63.5
INSULATED DOUBLE GLAZED WINDOW W/ INTERIOR WOOD FRAME
10
| LITTLE PORTUGAL LIBRARY + COMMUNITY CENTER
215
13 mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 90mm BRICK VENEER 152.4mm 50mm AIR SPACE DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 76.2mm RIGID INSULATION 20 mm WOOD FINISH 250mm SUSPENDED STEEL CHANNEL 152.4mm STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) BUILT-IN BOOKSHELF
90mm BRCIK VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 20 mm WOOD FINISH
METAL FLASHING INSULATED DOUBLE GLAZED CURTAIN WALL INTERIOR WOOD FRAME
DETAIL C3
WALL EMBEDDED BOOKCASE | PLAN DETAIL 1:10
DETAIL C4
INSULATED DOUBLE GLAZED WINDOW W/ INTERIOR WOOD FRAME 90mm BRICK VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 250mm SUSPENDED STEEL CHANNEL 152.4mm STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) BUILT-IN BOOKSHELF
T.O. 2/F 4500
G/F 0
RENDER | COMMON CORRIDOR TRANSITION INTO TYPICAL LIBRARY ROOMS DRAINAGE MAT 500mm CONCRETE FOUNDATION WALL 20mm DRY WALL FINISH
5
6
READING ROOM (3-4/F) | WALL DETAIL 1:30 SELECTED AREA FOR DETAILING
DETAIL 1:20
BUILT IN SEATING
G EXTERIOR
325
INTERIOR
INSULATED DOUBLE GLAZED WINDOW W/ INTERIOR WOOD FRAME
ROOF 16500
BUILT IN BOOK SHELF 125.9 63.5
DETAIL C6
CORNER PLAN DETAILS 1:10
DETAIL S1
215
4/F 12500
13 mm COMPOSITE BOARD W/WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 500 x 500 CONCRETE COLUMN 12.7mm PLYWOOD 63.5mm WOOD FINISH
6
3/F 8500
DETAIL S2
90 mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 20mm WOOD FINISH
90 mm BRCIK VENEER 50mm AIR SPACE METAL FLASHING 76.2mm RIGID INSULATION INSULATED DOUBLE GLAZED CURTAIN 152.4mmWALL STEEL STUD BACKING INTERIOR 12.7mm WOOD FRAME PLYWOOD BUILT IN BOOKSHELF
DETAIL C2a
BUILT IN SEATING
2/F 4500
BUILT IN SEATING 325
DETAIL S3
BUILT IN BOOK SHELF
INSULATED DOUBLE GLAZED WINDOW W/ INTERIOR WOOD FRAME
125.9 63.5
G/F 0
215
DETAIL C4
DETAIL C5 BASEMENT - 4000
90 mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 20mm WOOD FINISH
5
13mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 20mm WOOD FINISH
13 mm COMPOSITE BOARD W/WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 500 x 500 CONCRETE COLUMN 12.7mm PLYWOOD 63.5mm WOOD FINISH
METAL FLASHING INSULATED DOUBLE GLAZED CURTAIN WALL INTERIOR WOOD FRAME
325
125.9 63.5
63.5 215
90 mm BRCIK VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 500 x 500 CONCRETE COLUMN 12.7mm PLYWOOD 63.5mm WOOD FINISH
METAL FLASHING INSULATED DOUBLE GLAZED CURTAIN WALL INTERIOR WOOD FRAME
325 325
63.5 125.9 215
63.5 215
INSULATED DOUBLE CUR W/ INTERIOR WOOD FRA
DETAIL C2b
INSULATED DOUBLE CURTAIN WALL W/ INTERIOR WOOD FRAME
DETAIL
125.9 63.5 215
METAL DETAIL INSULATED DOUBLE GLAZED CUR INTERIOR WO
11
90 mm BRCIK VENEER 90mm BRCIK VENEER 13 mm COMPOSITE BOARD W/ WOOD VENEER METAL FLASHING 50mm AIR SPACE 50mm AIR SPACE 50mm AIR SPACE INSULATED DOUBLE DETAIL RIGID INSULATION 76.2mm RIGID INSULATION 76.2mm RIGID76.2mm INSULATION GLAZED CURTAIN WALL 500(O.C. x 500 CONCRETE COLUMN 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL 600mm) INTERIOR WOOD FRAME C1 12.7mm PLYWOOD 12.7mm PLYWOOD 12.7mm PLYWOOD 63.5mm 20 mm WOOD FINISH 20 mm WOOD FINISHWOOD FINISH
DETAIL C2b
90 mm BRCIK V 50mm AIR SPAC 76.2mm RIGID 152.4mm STEE 12.7mm PLYWO BUILT IN BOOK 325
125.9
6
DETAIL C6
125.9
215
6
C1
13mm COMPOSITE BOARD W/ WOOD VENEER 50mm AIR SPACE 76.2mm RIGID INSULATION 152.4mm DOUBLE STEEEL STUD BACKING W/ ROCKWOOL (O.C. 600mm) 12.7mm PLYWOOD 20mm WOOD FINISH
325
DETAIL C2a
BUILT IN SEATING DETAIL
DETAIL C5
90 mm BRCIK V 50mm AIR SPAC 76.2mm RIGID I 152.4mm STEEL 12.7mm PLYWO BUILT IN BOOKS
| LITTLE PORTUGAL LIBRARY + COMMUNITY CENTER
DETAIL C3
C5
Location: Frankfurt am Main, Germany Studio Type: 4th Year Travel Studio - Individual Work Design Program: Ferry Terminal + Amenities
1572 1628 1770
12
| THE LINK
2015
CONCEPT | TIMELINE OF FORT MODIFICATION & HISTORIC REFERENCE Frankfurt green belt used to be its fort since 1572, when the population expanded outside of the wall, the fort was into a moat and later into todays green belt. The form of the entrance bridge is a continuation of the form of fort, creating a visual linkage between green belt and Frankfurt Am Main.
The proposal is inspired by the history of Frankfurt’s star-shaped fort in 1572 for defense. The points of these fort projections created lookouts of overseeing and defending around the inner city. As the city expanded rapidly in 1808, it was decided that the city no longer needed the city walls, thus replacing them with garden plots. It was not until 1991 that the Frankfurt government decided to set up laws to protect and regulate the greenbelt. The greenbelt not only acts as a buffer between the new town and historic area, but it also facilitates an underground rainwater collection system. Although the greenbelt is a very prominent feature of the city, its relationship with River Am Main is very weak especially when it is no longer a feature of isolation. Upon site visits, it is also noted that the ends/beginnings of the greenbelt are disconnected visually and physically from the river by traffic lanes. A visibly grand entrance linking the two entities was established in order to invite more Frankfurters and visitors to experience this interesting dialogue. When one approaches an access point to the lower river edge, there are often two impressions given off to its visitors - a preview of what is to expect or an interior that completely contrasts from the exterior. However, for this particular site, it is believed that a gradual transitional path is the most suitable approach to link the two distinct features. This transition can be seen as two competing forces that needs a common ground, through physical approach (circulation and typological differences) and materiality.
PROGRAM AXONOMETRIC 1 2 3 4 5 6 7
31
River Cruise Terminal 1 Entrance bridge Beer Gaden + Bar River Am Main Restaurant Ticketing River Cruise Terminal 2 Gift Shop
8 9 10 11 12 13 14
Water Sports Rental Floating Eco-Platform Area River Side Cafe Sand Pit River Side Bar Washroom River Cruise Terminal 3
4
FLOATING ECO-PLATFORMS 2
3
6 5
These platforms are designed an extended “land” for humans to interact with water in a “safe” zone and aquatic habitation to occur. These aquatic plants and raised river beds are made of gabion structures that would create habitable environment for potential aquatic life.
7
8 9 11 12
FLOATING FOOT BRIDGE The design of the FLOATING FOOTBRIDGE creates an experience of walking on water by the undulation of waves that initiates rocking motion of footbridges.
13
3
14
| THE LINK
STEEL ROD STRUCTURE WOODEN FINISH FLOATING BOARD FLOARING BOARD ANCHOR
10
13
FLOATING FOOTBRIDGE PANEL
FLEXIBLE TENSION STABALIZING ROD
| THE LINK
14
2
3
5
1
4
6
EXPERIENTIAL SECTION 0
5
10
15
20 m
1
3
RENDERS Entrance from Lange Street Viewing decks looking into ramp Elevated Walkway looking down to Beer Garden Beer Garden + Bar Exit of walkway to river edge Undulating Eco-platforms + Main Terminal Floating Deck
1 2 3 4 5 6 7
4
5
6
15 | THE LINK
7
Location: Cornerstone Fine Furnitures, 2886 Dundas West Work Type: Window Installation @ TODO 2015 Position: Project Leader Production: 3D Modeling + Diagram + Photographer Photokeratitis was a window installation done for a furniture storefront. The idea of the installation was to accentuate the tactility of furnitures displayed and sold from this company. Using a MDF skeletal structure coated with paper fins, with electric fans installed around the installation, creating an illusion of a living, breathing wall at the storefront. Drawing the pass-byer’s attention towards the installation as well as the furnitures displayed at the two oculuses. Through this project, a lot of prototyping was done before making a final design decision. During the design process, I am also exposed to an extensive variety of digital tools (e.g. grasshopper in Rhino modeling) and workshop experiences (e.g. access to tools to build prototypes).
16
| PHOTOKERATITIS
This installation was also one of the stops during the Toronto Design Offsite Festival 2015 and was also awarded People’s Choice Award 2015.
OVERALL ASSEMBLY | 1:40
CLOSE UP PHOTOS
1
3
5
4
17
1 Hang the mega-structure 2 Attach skeleton onto mega-strcuture 3 Connect U-fins 4 Reinforce frame with aircraft cable 5 Attach paper fins onto skeleton
| PHOTOKERATITIS
2
Location: 325 Church Street, Ryerson Architectural Science Department Work Type: Nuit Blanche Proposal Team Member (6): Stephanie Tung, Jessica Hoang Chen, Thy Vo, Ishan Patel, Shiva Suresh, Nineveh Rashidzadeh Position: Team Leader Production: Design + Build + 3D Modeling + Photographer + Renders NOVA is an installation inspired by the natural phenomenon itself. A star that suddenly increases in brightness and then slowly returns to its natural state over time. The hanging structure proposed increases in brightness as people approach it; the closer the person is, the brighter the structure becomes. The use becomes engulfed by a bright space, surrounded by tessellating tetrahedrons. Each surface of the tessellation contains a reflective surface, the closest of which is an infinity mirror that resonates the bright space. These mirrors reflect all of the light on the structure infinitely, providing the experience of being in the cosmos themselves.
18
| NOVA
Through this project, Arduino is used to program the LED light strips, in which when one approaches the installation, he or she will trigger a sensor, and the installation will increase or decrease brightness and changes color as programed.
CONCEPT | ILLUSION OF SPACE
HOW IT WORKS
ASSEMBLY
CONSTRUCTABILITY: MODULES RESPONSIVE RESPONSIVE TECHNOLOGY TECHNOLOGY (PROXIMITY) (PROXIMITY)
8 7
6 5
4 3 2 1 User User approaching approaching installation: installation: Dim Dim Light Light
Recreating the effects of a nova - a space phenomenon that happens when two masses collides, creating an expansive of light and space
NOVA
AscAsc 755: 755: Digital Digital Tools Tools | Assignment | Assignment 4 4
User User close close toto installation: installation: Bright Bright Light Light
Proximity between the user and sensors triggers the lights to flicker, light bounces off mirrors within to revel the expansive space.
09 09
Reflectivity Diagram Reflectivity Diagram
Asc 755: Digital Tools | Assignment 4
Module Components Module Component
1 2 3 4 5 6 7 8
1. One-Way Mirror 2. Holographic Film 3. 3mm Cardboard 4. Adhesive Reflective Film 5. LED Wiring 6. Adhesive Reflective Film 5mm 7. 5mm Cardboard Panel 8. 5mm Cardboard Shell
One - Way Mirror Laser / Holographic Film 3mm Cardboard Adhesive Reflective Film LED Wiring Adhesive Reflective Film 5mm Cardboard Panel 5mm Cardboard Shell
10
Asc 755: Digital Tools | Assignment 4 Hoang ASSEMBLY Jessica PHOTOS Ishan Patel
Chen
Nineveh Rashidzadeh Shivathmikha Suresh Kumar Doan Thy Vo Stephanie Tung
19
| NOVA
NOVA is an installation inspired by the natural phenomenon itself. A star that suddenly increases in brightness and then slowly returns to its natural state over time. The hanging structure proposed increases in brightness as people approach it; the closer the person is, the brighter the structure becomes. The use becomes engulfed by a bright space, surrounded by tessellating tetrahedrons. Each surface of the tessellation contains a reflective surface, the closest of which is an infinity mirror that resonates the bright space. These mirrors reflect all of the light on the structure infinitely, providing the experience of being in the cosmos themselves.
Location: Hong Kong Professional Involvement Team Members (2): Stephanie Tung, Gigi Yip Organizer, Designer and Builder, Photographer The Social Dock is a self-initiated independent project, a design build proposal for a campaign that advocates for public space designs in Hong Kong. This event was organized and called for open proposals to be submitted regarding their long term goal in transforming one of Hong Kong’s busiest vehicle-only streets to a pedestrian zone. On Sept 25 2016, Des Voeux Road was closed for this event. Our installation encouraged a pause – a rest area - for the Hong Kong people, a community so used to the fast-paced lifestyle. The form of our project was inspired by geographical history of the street; Des Voeux Road was once the water edge of Hong Kong in the 1930s. While other coastal cities made good use of their water edges as recreational use, parks, promenades, Hong Kong has still been neglecting this significant feature and is planning to one day close up the harbor. We brought back the water elements to allow people to think of our water edge as more of a possible public space generator instead of something seemingly non-approachable. The form is also inspired by several water edge conditions found in Hong Kong, including stone mounts near beaches, extended concrete decks, etc. We were inspired to create a streetscape that wasn’t commonly seen in Hong Kong streets.
20
| THE SOCIAL DOCK
We collected wood pallets, which are a major construction component easily found anywhere in Hong Kong, given it is a common tool for delivering goods. It not only reminds people of the city of Hong Kong as a port/trading hub, but also the allegory of the harbor.
DESIGN INTENT + PROCESS PHOTOS
5
Concept Parti - Installation that demonstrates the combined water edge conditions found in Hong Kong Model Making Computer Modeling Form driven from intent of simulating historic water edge Building Process Final Product & Event Day
1 2 3 4 5 6
6
1
The deck’s height is designed to be slightly taller than a person’s general height, in order to create this illusion of one sitting above a “sea of people” when it is crowded -linking back to the historic location of the waterfront
2
3
x60
305
11
00
00
11
NOTE: THIS MODEL IS BASED ON A TYPICAL PALLET MODULE OF 1100X1100mm IN SIZE. HOWEVER SIZE MIGHT SLIGHTLY VARY BASED ON WHAT COULD BE FOUND ON STREETS. THE SIZE OF PALLETS WILL BE KEPT IN A SQUARE SIZE OF 800mm TO 1100mm AS WIDTH. DRILL AND SCREWED TO ANCHOR PALLET TO STRUCTUAL FRAME
4
1830 (BASED ON TYPICAL THICKNESS) MIN. 1600
Elevated Piers DS
TU DS
m
0m
0X
0 11
TS
LE
AL DP
4X
0 11
AL
PIC
TY
PALLETS (WITHOUT STRUCTURAL FRAMES) ARE STACKED; DRILLED AND SCREWED FOR STABILITY
O WO
Rocky Edges
L
OO
/P
H AT
TB OO EF
RIZ
BE
B RU
17
60
0
00
44
The form of installation aims to bring back different water edge conditions found in Hong Kong
21 | THE SOCIAL DOCK
OO 4W
Beaches
Location: Mount Davis, Hong Kong Type: Work Building Type: Institutional During my employment at Revery Architecture (formerly known as Bing Thom Architects) Hong Kong, I was involved in two major projects - University of Chicago Booth (Hong Kong) and Haw Par Music Farm. I was majorly involved in the Construction and Administration phase of the UCCHK project, where I was in charged with updating and tender/ construction documents, visualization of design changes and the interpretation proposal of the heritage component in the project.
22
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
The following are samples of works I have done throughout my employment at BTA in 2016-2017.
UCCHK | Tender & Administration Phase | Carpet Package (Custom Finishing) Graphic Proposal, Site Visit & On-Site Photo Record/ Collage, Visualization, Coordination with Supplier & Final Mock-Up
KEY PLAN
X8
601
13
1
1000
RAMP 07
1
A673
D471
UP A3b
D470
1:21
NOTES:
A705
RSF2A
UP
RSF2A
5009
B-LG02
51.985
TZFE
B-LG-05
CORRIDOR
B-LG03a 185
CEILING FINISHES LEGEND
3257
CPF2A
RN01
B-LG-03 52.220 51.985 52.155
10
A3b
RN01
B-LG-01
1
3
D476
IGS1
300
EQ
EQ
280
1746
700
700
IGS1
D476
WALL MOUNTED MONITOR ON ADJUSTABLE MOUNT
RSF2B
1
D835
6
CD
7
FWP1
PC KIOSKS
A412
SLOT DIFFUSER
IGL2
SPEAKER (FIRE)
S
ITC
1000
RECESSED MOTORIZED PROJECTION SCREEN IN CEILING ABOVE
B-LG04
CORRIDOR
B-W04
LEGEND
2716
125
B-LG01b
B-LG-01
1793
A753
RN01
D476
D456
6A753
5
1.
B-LG-LT01
2.
D456
3
B-W07
B-W06
B-W08
1
SPRINKLER (WALL MOUNTED)
NOTES 1. 2. 3. 4. 5.
2
X8
X9
4 A324
6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
A131
A412
8
1
A753
D723
X10
1
X11
REV
1
1
D474
D472
DIGITAL CAMERA
SPRINKLER (EXPOSED) SPRINKLER (CONCEALED)
Y7 B-W05
CCTV EXIT SIGN
THE CONTRACTOR SHALL NOT DAMAGE THE EXISTING CELL PRINTS ON LG/F & G/F FLOOR SLAB, AND G/F CEILING/BEAM SOFFIT. ALL FIXING LUGS/ BRACKETS/ HOOKS SHALL NOT BE MOUNTING WITHIN THE AREA WITH THE PRINTS. SHOP DRAWING OF WALL PARITION/ RAISED FLOOR SYSTEM / SUSPENDED CEILING SYSTEM / COMBINED SERVICES DRAWINGS WITH ALL FLOOR/ CEILING MOUNTING LOCATION WITHIN THESE AREAS SHALL BE SUBMITTED FOR THE ARCHITECTS / CONSERVATION CONSULTANT 'S APPROVAL PRIOR TO WORKS.
51
A324
MICROPHONE
CM
GENERAL NOTES: LIFTING PLATFORM
7
WIRELESS ACCESS POINT
1430
RN01
B-LG-04
4
4
WALL MOUNTED MONITOR ON ADJUSTABLE MOUNT
SPEAKER (PA)
SMOKE DETECTOR
WAP
EXISTING CEILING/ FLOOR PRISON CELL PRINTS
B-LG04a
B-LG02
C
D470
D
2
SMART BOARD
52.155
SHADES (SHD)
SMOKE BAFFLE
349
2
3
52.220
WD1/2
WATER CURTAIN FS
144
910
2200
361
A673
CPF2B
ACT1
CEILING DROP
B-LG04b
3895
6429
4
4
A673
9 1
B-LG01
FCB1
CURTAINS (CURT)
2
WALL MOUNTED MONITOR ON ADJUSTABLE MOUNT
ACT2
FCP
CEILING DEVICES LEGEND
A3b
FLAT CLASSROOM
PLC1/2
ACT3
PROJECTOR
A673
B-LG03b
52.155
F1
A412
5 8
52.220
GWBP
CB1
ABOVE FINISH FLOOR DIM
A.F.F.
MOBILE LECTERN
FWP1
CPF2B
B-LG03
FULL HEIGHT LAMINATED GLAZING
IGS1
2
FULL HEIGHT LAMINATED GLAZING
B-W03
342
300
3915
B-LG01a
TA WORKSTATION
837
D476
5496
531
Y8
GWB
For Abbreviations, Symbols and Tags, please refer to Dwg. A003 For Ceiling assemblies, refer to Dwg. A104 For Ceiling systems and finishes refer to Dwg.A111 and Architectural Specifications For HVAC types, diffuser sizes and locations refer to Mechanical Dwg's Bulkhead or Ceiling Cove-mounted sidewall diffuser do not appear on the RCP's. These conditions are detailed on Dwg. D606, refer to Mechanical Dwg's for locations SLL ceiling devices to colour match adjacent FCP / ceiling colour Wireless Access Points are located above the ceiling, refer to Electrical Dwg's for locations For BOH Lighting layout, types and specifications refer to Electrical drawings Provide rigging and ceiling back support at all PR and PS locations Provide ceiling concealed sprinkler heads throughout, except in BOH spaces and on entire LGF Mechanical ductwork, water lines, sprinkler lines and cable tray to be painted where exposed For ceiling access panel details refer to Dwg. D606 For Elevator lighting details refer to Dwg.s A754-757 For AV ceiling equipment refer to AV DWG's. Coordinate location with Architect. For lighting integrated into millwork refer to D800 series.
2016-10-27 2016-06-10 DATE
ISSUE FOR CONSTRUCTION A003 ISSUE FOR CONSTRUCTION A001 DESCRIPTION
INITIAL
PROJECT TEAM
LEAD CONSULTANT / ARCHITECT
PLC2
210
AV
100 30
100 30
STAIR
B-LG05
B-LG-ST08
PLC2
352
PD B-LG06
150
150
Y9
210 1220
411
PLC2
1220
411
SMOKE CURTAIN IN CEILING ABOVE F6
PA
PA
P WA
1
F6
1
F6
WORK ONLY FROM DRAWINGS ISSUED FOR CONSTRUCTION DESTROY DRAWINGS WITH EARLIER REVISION NUMBER
TA WORKSTATION
F6
D470
D471
Copyright reserved . This drawing and design remains the exclusive property of BING THOM ARCHITECTS INC. who holds the copyright therein and shall not be used for any design or construction purpose other than as expressly authorized by BING THOM ARCHITECTS INC. specifically for the project
B-LG03 335
Y8
ACT3
1363
F3c
B-LG01
CORRIDOR
2600A.F.F.
P WA
B-LG02
CORRIDOR 350
150 TYP.
350
350
B-LG02
PA
PA
PROJECTOR
2400
F6
ACT3
2600A.F.F.
COVE LIGHT, REF. TO ELECT.
PA
ACT3
ROOM CENTERLINE
150 TYP.
352
F3c
ACT3
2600A.F.F.
2500A.F.F.
F6
FLAT CLASSROOM
1128
F3c
357
1128 F6
RECESSED MOTORIZED PROJECTION SCREEN
1220
1220
357
1128
1128
F6
1128
360
1220
1220
360 1128
357
EQ
1159
T 604-682-1881 F 604-688-1343 Email Address office@btagroup.com Web Address www.btagroup.com
VERIFY ALL DIMENSIONS ON SITE. REPORT ANY DISCREPANCIES TO THE CONSULTANT PRIOR TO CONSTRUCTION
2400
884
B-LG02
ALIGN
1159
1430 Burrard St Vancouver, BC V6Z 2A3 Canada
T 852 3727-2388 F 852 2660-9633 Email Address office@btagroup.com Web Address www.btagroup.com
DO NOT SCALE DRAWINGS
CORRIDOR
F6
357
Unit 3603, 36/F, Wu Chung House, 213 Queen's Road East, Wan Chai Hong Kong
C ACT3
ACT3
2600A.F.F.
2600A.F.F.
1200
1200
F6
F6
F6
F3c
F3c
F3c
2
2
PLC2
D470D471 CB1
JOB TITLE
UNIVERSITY OF CHICAGO CENTER IN HONG KONG
2350A.F.F. EQ
EQ
LIFTING PLATFORM
1200
1200
1200
Sim
COVE UPLIGHT, REF. TO ELECT.
EQ
4 D456
1200
ACT3
2600A.F.F.
DRAWING TITLE
PA
B-LG-LT01
455
BLOCK B LG/F - DETAIL PLAN & RCP
F1
PLC2 150
455
455
F6
3 A324
Y7 4 D456
5 D456
8
1
A753
D723
SCALE As indicated
PRINTED
10/31/15
CHECKED
KL
DATE
10/31/15
APPROVED
Approver
DATE
10/31/15
DRAWN
KL/ET
DATE
10/31/15
PROJECT NO. DRAWING NO.
Architect's Supplementary Instruction A/E's ASI NO.:
A670
ASI - A003
CAD REF NAME:
A1 (841mm x 594mm) Sheet Size
1306 REV.
1 A670.dwg
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
RN01
B-LG02
TZFE
23
RN01
51.215
B-LG02a
D478
D475
620
PA
3
169
4
1
D475
2095
256
175
1050
2847
A131
UP
2
B-LG05a
986
STANCHION TYPE A, REFER TO DETAILS IN D SERIES
STAIR B-LG-ST08
AV RACK
B-LG02d
N
B-W09
B-LG02b
B-LG05
PIPE DUCT
30MM GAP, REF. TO DETAIL
G015
1090
AV
4444
1864
2
51.985
100 271 30
PD
X11
X10
2 D473
10838
3
Y9 B-LG06
X9
10
A705
D473
A324
25MM GAP BETWEEN DRYWALL AND CONCRETEN SCREEN GRILLE
UP
1
4
A412 ROOF OVERHANG ABOVE
UCCHK | Tender & Administration Phase | Tender Documents (Selected Samples) | Furniture Schedule Revit Modeling, Tender Document Update, Coordination and Administrative Work, Schedule, Tender Package Issue
G/F
CONFERENCE ROOM
Board Table: Board Table
1
G/F
CORRIDOR
Recycle Bin: Valuta 9"x18" (230x480)
2
Faculty Table: Faculty Table
4
G/F
FACULTY OFFICE
G/F
MULTIPURPOSE MP Table: MP Table HALL
12
G/F
MULTIPURPOSE Recycle Bin: Valuta 9"x18" HALL (230x480)
3
Level
Room: Name MEETING AREA
1
G/F
PREFUNCTION Bench: Bench
2
G/F
MEETING AREA
Coffee Table: Coffee Table Low
1
G/F
RECEPTION
HermanMiller_Seating_SAY L_WorkChair_UpholsteredM id-Back: Adj Arms
1
G/F
MEETING AREA
M_Sofa: 2400
1
G/F
FACULTY OFFICE TEACHING ASSISTANT
Office Desk: Office Desk 2000x2000 Office Desk: Office Desk 2000x2000 Planter: Planter Ricoh_copier_14254: Ricoh_copier_14254
4
PANTRY
4
G/F G/F
Arper Catfia 60: Arper Catfia 60
CORRIDOR
6
NOTES:
A
D286
55.510
S2 65 00
B
S2.1 C
4
28 00
57.690
1 1
57.700
S3 57.500
57.700
56.800
21 56.950 56.920
57.700
57.700 12
2510
900
Grand total: 27
S4
12
57.700
21 11
Grand total
DN 58.050
57.700
56.990 10 20
57.345
57.700
12 00
PLANTER 56.650
150 0 FD 15
56.800
1150
57.700
57.700
16 4
56.250
DN
11 6
56.000
33 9
4
44 26
CRASH GATE
57.700 18 90
4674
150
EVA SIGN ON POST - LAYOUT AT ENTRANCE 2/D188
150 2051
S2
702
10 1515
675
FD
1
H.R.
150 150
EVA SIGN ON S.S. POST - NO PARKING 4/D188
27 55
D144
16 4
57.700
2985
P.D.
1363
57.345
150
150
1753
57.700
1 2016-10-27 REV DATE
13 97 6
150 1742 235
ISSUE FOR CONSTRUCTION A003 DESCRIPTION
INITIAL
PROJECT TEAM
57.700
57.640 FD 1576
11 46 0
PA
150
LEAD CONSULTANT / ARCHITECT
10 0 30 2
10 68 8
30 45
X8
15 0 26 03
A412
53 2 30 0 11 6
57.700
2 21 11
H.R. 55 99
45 0
WDF1 SETTING OUT POINT
W P
29 28
45 0
S1
20 0 42 5
3
25 0
14 92
R
FD
P.D.
82 75
31 38
R 181 5
25 00
10 9
57.00
21 11
A830
17 70
57.345
15 5
55 70
10 0 30 100 0 25 40
57.700
3
57.700
°
FD
S3
VERIFY ALL DIMENSIONS ON SITE. REPORT ANY DISCREPANCIES TO THE CONSULTANT PRIOR TO CONSTRUCTION
53.50
20 0
0 330
T 604-682-1881 F 604-688-1343 Email Address office@btagroup.com Web Address www.btagroup.com
DO NOT SCALE DRAWINGS
Copyright reserved . This drawing and design remains the exclusive property of BING THOM ARCHITECTS INC. who holds the copyright therein and shall not be used for any design or construction purpose other than as expressly authorized by BING THOM ARCHITECTS INC. specifically for the project
12 50
15 0
84 75
25 50
FD
57.700
PA
1430 Burrard St Vancouver, BC V6Z 2A3 Canada
T 852 3727-2388 F 852 2660-9633 Email Address office@btagroup.com Web Address www.btagroup.com
WORK ONLY FROM DRAWINGS ISSUED FOR CONSTRUCTION DESTROY DRAWINGS WITH EARLIER REVISION NUMBER
26 95
Y8
Unit 3603, 36/F, Wu Chung House, 213 Queen's Road East, Wan Chai Hong Kong
57.640
20 0
27 60
11 6
57.700
75 R 14
24
Recycle Bin: Valuta 9"x18" (230x480)
17 15 56.890
57.700 57.700
57.640
JOB TITLE
55 26
A401
57.10
9
57.050
A753
57.236
57.374
S1.1
57.512
4
D780
D780
5 A412
PRINTED
01/17/17
Checker
DATE
01/17/17
APPROVED
Approver
DATE
01/17/17
DRAWN
Author
DATE
01/17/17
PROJECT NO. DRAWING NO.
Y7
1
GROUND FLOOR PARTIAL PLAN Copy 3 1 : 100
A1 (841mm x 594mm) Sheet Size
Y9
8
S5
7
S5 D
6
1 : 100
CHECKED
SCALE
PLANTER
A753
Furniture Layout (Ground Floor - South)
60 50
57.250 57.67
S4
UNIVERSITY OF CHICAGO CENTER IN HONG KONG
DRAWING TITLE
57.65
PLANTER
35 00
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
G/F
D
60 00
44 29
MULTIPURPOSE Recycle Bin: Valuta 18"x18" HALL (430x430)
Type Image Count
Family and Type
G/F
G/F G/F
KEY PLAN
Furniture Schedule (G/F) Type Image Count
Family and Type
33 8
Room: Name
45 0
Furniture System Schedule G/F Level
SK02 CAD REF NAME:
1306 REV.
1 SK02.dwg
UCCHK | Tender & Administration Phase | Tender Documents (Selected Samples) | Washroom Package Revit Modeling, Tender Document Update, Coordination and Administrative Work, Schedule, Tender Package Issue
KEY PLAN
LEGEND A
5
8
A632 2999
2383
EQ.
925
EQ
W
180
EQ
TILE SET OUT
P
D608 6000
EQ
2125
EQ
179
EQ
EQ
EQ
EQ
EQ
797
1000
1754
650
TH
FLOOR TRANSITION PROFILE
WP
WALL CORNER PROTECTION PROFILE
705
WTL1B
WTL1B
FLOOR FINISHES WP
80
TL1A/C (MALE TYP)
WP
WTL1B
WP
SD1
FEMALE WC 2600
F1
Sim
1
WTL1B 2600
A
3625
EQ.
M2
D571
SK1
LG29
LG29b
2 D153
TB1
EL. 53150
WTL1B
LG/F
WTL1B
TL2 (BOH/JANITOR)
EL. 53150
LG/F PTDWR CENTERED ON WALL TILE TYP.
TL3 (SHOWERS) LG/F
WALL FINISHES WTL1 A (MALE TYP)
2
D152
FEMALE WC (LG29) - SOUTH
2
1 : 50
FEMALE WC (LG29) - WEST
WTL1 B (FEMALE/ACCESSIBLE/SINGLE TYP)
FEMALE WC (LG29) - NORTH
3
1 : 50
NOTES:
TL1B/D (FEMALE/ACCESSIBLE/SINGLE TYP)
LG29a
WTL1B
TB1
EL. 53150
TB1
REMOVABLE SOLID SURFACE PANELS TO ACCESS P-TRAP AND WALL MOUNTED CONTROLS. ONE PANEL PER PTRAP AND FAUCET LOCATION
1
B
2600
EQ.
5
Sim
WTL2 (BOH / JANITOR)
1 : 50
WTL3 (SHOWERS)
8
5
Sim
D606
2482
1
8
Sim B
Sim
CEILING FINISHES
A
D606
GWB
GYPSUM WALL BOARD
D572 1000
668
SANITARY FIXTURES & WASHROOM ACCESSORIES
6000 EQ
EQ
EQ
EQ
EQ
EQ
WTL1A 1410
782 1300
290
WTL1B
WTL1B
800X800MM REMOVABLE TILED ACCESS PANEL CENTERED ABOVE WALL HUNG TOILET
2600
OPENING
800
WTL1B
D153
500
LG/F
WP
WP
WP
MALE WC
WTL1A
LG28
SF1
2
EL. 53150
WP
EL. 53150
TB1
EL. 53150
LG/F PTDWR CENTERED ON WALL TILE TYP.
TB1
TB1
GLP TOILET PARTITION RED GLASS
F1
WALL FAUCET (FOH)
F2
COUNTER FAUCET (FOH)
F3
FAUCET (ACCESSIBLE, SINGLE)
F4
FAUCET JANITOR SINK
GB1
GRAB BAR (WALL STRAIGHT)
GB2 GB3
GRAB BAR (WALL 90 DEG. STRAIGHT AND UP) FOLDING GRAB BAR (WALL DOUBLE WITH TEXT AND BRAILLE INSTRUCTION ON FIXING PLATE)
GB4
GRAB BAR (FLOOR MTD)
GB5
GRAB BAR (WALL ANGLE 120 DEG.) GRAB BAR (WALL STRAIGHT 90 DEG. CORNER)
LG/F
GB6
FEMALE WC (LG29) - EAST
4
FEMALE WC (LG29) - SECTION
5
1 : 50
MALE WC (LG28) - SOUTH
6
1 : 50
H
1 : 50
M1 M2
4
4
A
MR
2494 900
250
8
180
925
1000
1000
1000
1000
185 1000
Sim
1000
507 1388
D606
WTL1A
WP
WTL1A
PTDWR
M2
WTL1A WTL1A
ND
2569
WTL1A
WP
2600
MALE WC LG28
SF2
F1
1500
SK1
LG/F
7
TB1
250X250MM TILED FLANGELESS CLEANING EYE ACCESS PANEL
TB1
MALE WC (LG28) - WEST
LG/F
EL. 53150
WTL1A
TB1
250X250MM TILED FLANGELESS CLEANING EYE ACCESS PANEL
9
1 : 50
LG/F
REMOVABLE SOLID SURFACE PANELS TO ACCESS P-TRAP AND WALL MOUNTED CONTROLS. ONE PANEL PER P-TRAP AND FAUCET LOCATION
TB1
MALE WC (LG28) - NORTH
8
1 : 50
EL. 53150
400
D153 250
EL. 53150
600
2
MALE WC (LG28) - EAST 1 : 50
453
1050
425
8
1530
SOAP DISPENSER SURFACE, RECESSED SOAP DISPENSER SURFACE WALL MTD.
Sim
974
1052
759
SHOWER BENCH
SK1
TROUGH SINK CUSTOM BTA
SK2
SMALL BASIN (ACCESSIBLE WC'S)
SK3
JANITOR SINK
SK4
SINK (SINGLE, NON-ACC WC'S) TOILET PAPER DISPENSER (SURFACE MTD)
WC1
WATER CLOSET (WALL HUNG)
0
SF2
2400
PTD4
2600
2250
2600
2250
WTL3
WTL2
LG34a
EL. 53150
LG/F
10
11
1 : 50
EL. 53150
TB2
LG/F
EL. 53150
LG/F
LG/F
SHOWER ROOM (LG33) - EAST 1 : 50
15
LGF JANITOR (LG34) - SOUTH
1530
8
1928
179
Sim
1 : 50
14
1 : 50
2180
325
D606
2785
M1
0
MR
2275
2250
GB1
8. WALL TILE JOINT LINES AT TOILET PARTITIONS TO ALIGN WITH PARTITION SIDE WALLS
MR
WTL2
2750
GB3
PTD4
F4
GB3
SK3
GB6
1504
EL. 53150
SLOPE TO DRAIN
VERIFY ALL DIMENSIONS ON SITE. REPORT ANY DISCREPANCIES TO THE CONSULTANT PRIOR TO CONSTRUCTION WORK ONLY FROM DRAWINGS ISSUED FOR CONSTRUCTION DESTROY DRAWINGS WITH EARLIER REVISION NUMBER Copyright reserved . This drawing and design remains the exclusive property of BING THOM ARCHITECTS INC. who holds the copyright therein and shall not be used for any design or construction purpose other than as expressly authorized by BING THOM ARCHITECTS INC. specifically for the project
3. PROVIDE TILE EDGE TRIMS AND TRANSITION PROFILES WHERE NOTED
7. FOR SANITARY FIXTURE TYPES REFER TO MECHANICAL DRAWINGS
H SD2
WTL3
T 604-682-1881 F 604-688-1343 Email Address office@btagroup.com Web Address www.btagroup.com
SENSOR FLUSH FOR URINALS BUILT-IN
6. FOR TILES, GROUT AND TRIMS, REFER TO SPECIFICATIONS
WTL3
LINEAR FLOOR DRAIN
1430 Burrard St Vancouver, BC V6Z 2A3 Canada
T 852 3727-2388 F 852 2660-9633 Email Address office@btagroup.com Web Address www.btagroup.com
WATER CLOSET (FLOOR MTD AND MANUAL PUSH) URINAL
5. TOILET PARTITIONS TO HAVE ONE HOOK AT BACKSIDE OF DOOR TYPICAL
WTL3
GB1
SENSOR FLUSH FOR WC-1
4. PROVIDE WALL SUPPORT AND BLOCKING TO ALL WALL HUNG WASHROOM FIXTURES, ACCESSORIES, PARTITIONS AND MIRRORS
LGF JANITOR (LG34) - WEST
1785
SH
Unit 3603, 36/F, Wu Chung House, 213 Queen's Road East, Wan Chai Hong Kong
1. REFER TO DETAILS ON A608 AND SPECS A104 ASEEMBLIES
GLASS PATCH HARDWARE
SHOWER ROOM (LG33) - NORTH
EL. 53150
LG/F
EL. 53150
LG/F
TB2
LG/F
EL. 53150
LG/F
JOB TITLE
UNIVERSITY OF CHICAGO CENTER IN HONG KONG
DRAWING TITLE
LOWER GROUND FLOOR ACCESSIBLE WASHROOMS & SHOWER ROOM ELEVATIONS 1 : 50
PRINTED
01/15/2016
CHECKED
BF
DATE
01/15/2016
APPROVED
FY
DATE
01/15/2016
DRAWN
MH
DATE
01/15/2016
SCALE
PROJECT NO.
1954
DRAWING NO.
12
SHOWER ROOM (LG33) - SOUTH 1 : 50
13
INITIAL
LEAD CONSULTANT / ARCHITECT
NOTES
F4
SK3
PTDWR
EL. 53150
ISSUE FOR CONSTRUCTION A005 ISSUE FOR CONSTRUCTION A001 DESCRIPTION
IG2
WTL3
LG33a
2016-12-19 2016-06-10 DATE
PROJECT TEAM
DO NOT SCALE DRAWINGS
TPD1
U1
GWB PTD
1 REV
SHOWER
SHB
WC2
D606
WTL3
MOPRAIL AT JANITOR SINK WALL MTD NAPKIN DISPOSAL SURFACE MTD PAPER TOWEL DISPENSER AND WASTE RECEPTACLE RECESSED
SD2
SF1
1785
MIRROR SS FRAMELESS (ACCESSIBLE WASHROOMS) CUSTOM MIRROR FRAMELESS (ABOVE CUSTOM TROUGH SINKS)
SD1 SH
SD1
LG28a
HOOKS WALL MTD
SHOWER ROOM (LG33) - WEST 1 : 50
16
LGF JANITOR (LG34) - NORTH 1 : 50
17
LGF JANITOR (LG34) - EAST 1 : 50
Architect's Supplementary Instruction A/E's ASI NO.:
A632
ASI - A005
CAD REF NAME:
1306 REV.
1 A632.dwg
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
598
25
A1 (841mm x 594mm) Sheet Size
UCCHK | Tender & Administration Phase | Tender Documents (Selected Samples) | Detail Design Minor Detailing Design
NOTES:
10
290
10
295
10
STANCHION C/W PAINTED CAST IRON ROD & COLLAR WITH EYE BOLT
VARIES
10
295
STANCHION GATE
REV
10
HANDRAIL OF HERITAGE STAIRCASE HANDRAIL OF HERITAGE STAIRCASE
2016-06-10 DATE
ISSUE FOR CONSTRUCTION A001 DESCRIPTION
750
PROJECT TEAM LEAD CONSULTANT / ARCHITECT
Unit 3603, 36/F, Wu Chung House, 213 Queen's Road East, Wan Chai Hong Kong T 852 3727-2388 F 852 2660-9633 Email Address office@btagroup.com Web Address www.btagroup.com
1430 Burrard St Vancouver, BC V6Z 2A3 Canada T 604-682-1881 F 604-688-1343 Email Address office@btagroup.com Web Address www.btagroup.com
DO NOT SCALE DRAWINGS
26
WORK ONLY FROM DRAWINGS ISSUED FOR CONSTRUCTION. DESTROY DRAWINGS WITH EARLIER REVISION NUMBER
1
TYPICAL STANCHION TYPE A - SIDE ELEVATION
2
1 : 10
TYPICAL STANCHION TYPE A - FRONT ELEVATION
WALL
1 : 10
Copyright reserved. This drawing and design remains the exclusive property of BING THOM ARCHITECTS INC. who holds the copyright therein and shall not be used for any design or construction purpose other than as expressly authorized by BING THOM ARCHITECTS INC. specifically for the project.
WALL MOUNTED HINGE
TYPE B STANCHION
50 10
50
VARIES
WALL MOUNTED TYPE A STANCHION
STANCHION GATE
JOB TITLE 10 10
326
10
290
10
326
10
HANDRAIL OF HERITAGE STAIRCASE
UNIVERSITY OF CHICAGO CENTER IN HONG KONG
LOCK-PLATE 800
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
VERIFY ALL DIMENSIONS ON SITE. REPORT ANY DISCREPANCIES TO THE CONSULTANT PRIOR TO CONSTRUCTION
MAINTENANCE ACESS FOR INTERPRETATION ONLY
DRAWING TITLE
BLOCK A, B & B ANNEX STANCHION DETAILS DOOR FRAME
EL. 57180
MEP HUT G/F
SCALE
1 : 10
PRINTED
03/08/16
CHECKED
Checker
DATE
03/08/16
APPROVED
Approver
DATE
03/08/16
DRAWN
Author
DATE
03/08/16
PROJECT NO.
3
TYPICAL STANCHION TYPE B - VIEW FROM CORRIDOR 1 : 10
4
AXONOMETRIC OF STANCHION GATE TYPE A&B 1 : 10
DRAWING NO.
REV.
D478 CAD REF NAME:
A3 (420mm x 297mm) Sheet Size
1306 D478 .dwg
UCCHK | Tender & Administration Phase | Tender Documents (Selected Samples) | General Building Plan Submission (GBP)
Assisted in preparation of General Building Plan submission (indicating and ensuring the building is designed to code in terms of occupancy capcity, fire code, general building code, etc.)
N
BD REF:
FSD REF:
55.05
54.60
NOTES:
54.87
METAL GATE
54.97
B G014 55.026 54.826 54.733
55.59
55.30
16R DN
55.33
2300MM(H) NEW FENCE WALL
54.533
G012 1 METAL GATE
A S2
PAVEMENT
13 00
45 5 16 4
56.600
< 36 M
13 97 6
36 R
2
RELOCATED DRAINAGE RESERVE
10 0
- 2015-07-21 REV DATE
AP1
(2ppl)
ST-06 11 54
S1.1
57.250
57.667
PLANTER
LIFTING PLATFORM
SERVICE COUNTER WITH MIN. 750mm(L) NOT HIGHER THAN 750mm(H)
NON-BUILDING ZONE
36 R
4 60 50
UP
1
ST-07 ON GRADE
82 75
RECEPTION AP1
X12
1100MM (H) METAL BALUSTRADE
BUILDING LINE ABOVE
Y9
57.20
Unit 3603, 36/F, Wu Chung House, 213 Queen's Road East, Wan Chai Hong Kong
1430 Burrard St Vancouver, BC V6Z 2A3 Canada
T 852 3727-2388 F 852 2660-9633 Email Address office@btagroup.com Web Address www.btagroup.com
T 604-682-1881 F 604-688-1343 Email Address office@btagroup.com Web Address www.btagroup.com
57.40
S7
S7
LANDSCAPE DECK
PLANTER
EXISTNIG GENERATOR RM TO BE PARIAL DEMOLISHED UNDER SEPERATE SUBMISSION
5
PLANTER
57.250
56.890
35 00
R 12 DN
57.00
STRUCT URAL FALL
6
Sausalito Laguna Beach Houston Dallas SanFrancisco Los Angeles
GLASS TUBE FACADE
TO 56.8 90
Y7 UNEXCAVATED
DD
1100MM (H) METAL BALUSTRADE
8
77
CENTRE FOR ARCHITECTURAL HERITAGE RESEARCH
香港中文大學
THE CHINESE UNIVERSITY OF HONG KONG
X5 8
57.03
E
PA
57.50
57.180 PLANTER
X15 S4
INITIAL
LEAD CONSULTANT / ARCHITECT
S4
P.D.
UFA=8.475 m²
57.640
57.10
1st GBP SUBMISSION DESCRIPTION
PROJECT TEAM
3
49 61
D
32 90
36M T.D .=8.6 M<
57.06
15 00
LT-01
57.700
56.890
1100MM (H) LOCKABLE METAL GATE
GRAD
20 0
45 0
57.18 62 79
T.D. = 31 .1M
57.08 57.09 57.30
56.65
56.510
85.35°
56.85
57.05 57.03 56.80 56.62 56.425
56.18
56.20 56.17
M < 36
6005
29.3M
2500
.= T.D
EXISTNIG INTERROGATION RM FOR INTERPRETATION USE ONLY
RAMP UP 1:12
F
57.640
G015 DN
29 28
FD
(MVAL)
4R
X3
ON GRADE PLANTER
57.700
80 0
UP3
(SAY=38ppl)
ON
86 34
FD
MALE WC
BUILDING LINE ABOVE
RAMP UP 1:21
1100MM (H) METAL BALUSTRADE
ST11
BUILDING LINE ABOVE
70 20
X11
62 45
4068
2 X S.B.
EXISTNIG WC FOR INTERPRETATION USE ONLY
X11
(MVAL)
15 0
FIRE CONTROL ROOM
1102
(MANDATORY) 57.180
S4 S4
X4
X7
BUILDING LINE ABOVE
BUILDING LINE ABOVE
NTER
UP23R
3500
4.5kg CO² F.E.
GENERATOR ROOM
(MVAL)
FD
PLA
200
4.5kg CO² F.E.
57.00
56.970
UP23R
LT-02 D 55.480
VOID
PROPOSED STANCHION
57.000
UP 0 1:1
57.022
H.R.
FEMALE WC
57.65
X12 X13
(2ppl)
(154ppl)
D1B
F.E.
DLP
MEETING AREA
(MVAL)
G
LT-03
1
PARKING FOR SLIDING UFA=17.171 m² /10 PARTITIONS
ADE
STUDENT LOUNGE
ELEC.
57.020
ON GR
99° 120.
6505
3500
(MANDATORY)
K
NTER
UFA=101.402 m²
EXISTING
LIFT
S1 57.030
ON GRADE PLANTER
PLA
PROPOSED STANCHIONS
57.800
SUMP PIT
S1
X14 X13
METAL GRILLE
TRANSFORMER ROOM
X3
ELEC.
57.040
57.980
(MANDATORY) 4.5kg 57.180 CO² F.E. 57.180
NTER
ST-10
55.480 300
HV SWITCH ROOM
PLA
CORRIDOR
57.040
200
X2
EXISTING
EXISTING MASONARY WALL
EXISTING
1600 57.030
18M
ON GRADE PLANTER
57.155
X7 X7
2167
L/UL
NTER
(MANDATORY) (MVAL) H.R.
9L WATER F.E. FD
3500
EXISTING
1975
H.R.
ST-13
80 0
25 38
DROP OFF AREA
UFA=3.494 m² /30
55.480
H.R. 80 0
CORRIDOR
57.050
X6
EXISTING
56.800
PLA
REFUSE ROOM
3
.=8.5 M<
57.155
57.145
EXISTING STAIRCASE AND CORRIDOR FOR INTERPRETATION ONLY
2168
8685
6327
G013
FD
150
X16 S6
(3ppl)
P2
X6X6
2800
PANTRY
LE P5 SSIB ACCE ING PARK
CORRIDOR
NEW
D.D
UFA=27.759 m² /2
NEW
1500
ACC. WC
(MVAL)FD
1192
UFA=12.461 (1ppl) m² /4.5
56.90
57.000
D4A
150
57.040
ON GRADE PLANTER
(4ppl) < 36M
57.040
1:13
2400
(1ppl) DRY STORE
T.D. =18.4M
CORRIDOR
57.022
D2B
ELEC. F.E. STORE 150 1896m² /30 UFA=7.274
1501650
1100MM (H) R.C. PARAPET
D2B
0 50 1516
(2ppl)
56.980
F.E.
4737
SERVERY
1491
1160
UFA=4.053 m² /30
EVA X1
FD
H.R.
20 16
MANAGEMENT OFFICE
57.010
UNI. WC
57.030 EXISTING
EXISTING.
UFA=17.905 m² /9
(MVAL)
31 13
ACC. WC
2 96 10
UFA=12.744 m² /9
P2
IT ROOM
UNI. WC FD
55.210
D.D. = 8.1M < 36M
(4ppl)
CORRIDOR
(MVAL)
(SAY=204ppl)
FD
X10 X10
CONFERENCE ROOM
(2ppl)
15 0
56.82 0
G
New
CONCRETE SCREEN M <36 .8M 13 .= T.D
PROPOSED STANCHIONS
5045
1598
PETROL INTERCEPTOR BELOW
57.00
EXISTING HOLLOW CONCRETE SCREEN
(1ppl)
UFA=15.090 m² /4.5
(1ppl)
9R DN
2500
RESOURCE OFFICE
55.405
(SAY=28ppl) EXISTING HOLLOW G EXISTNIG STAIR AND GATE FOR INTERPRETATION USE ONLY
BUILDING LINE ABOVE
EXISTNIG GATE FOR INTERPRETATION USE ONLY
FURNITURE STORAGE
UFA=9.000 m² /9 FD
P4
56.45
UFA=10.915 m² /30
57.040
Y1
P3
EX-G03
ST-08
S3
4 71
56.930
SITTING BENCH
56.980
PRESERVED STAIRCASE FOR INTERPRETATION ONLY NEW 1100H METAL BALUSTRADE
CLASSROOM
G014
HERITAGE COURTYARD
PLANTER
X1
PLANTER
55.340 55.340
EXISTING
34G
A
ON GRADE
Y2
55.405 EXISTING
UP MP 0.5 RA 1:2
56.350
G
C G015
2 X S.B.
P1
ON GRADE PLANTER
Y3
VOID
X9 X9
EXISTING
61 73
UFA=40.654 m² /10
13 6
OFFICE 5
UFA=195.573 m² /0
16 4
(1ppl)
31 08
CORRIDOR
EVA
55.210
UFA=60.486 m² /0
00 80
G
PROPOSED STANCHIONS
NEW
ON GRADE PLANTERS
Y4
UP
X8 X8
Y5 57.080 56.810
RUN IN/ OUT
PAVEMENT
Y6
R. 1H P FR
S2
118.86°
2300MM(H) NEW FENCE WALL
2300MM(H) EXISTING RC HERITAGE FENCE WALL
R
D
(2ppl)
80 0
MULTIPURPOSE HALL
JANITOR
VOID
D1C
AL
UFA=2.606 m² /9
G015
15 1
(MVAL)
OFFICE 6 (MVAL)
E 60 00
OFFICE 4 13 6
41 .10°
80 0
C
35 87m² /9 UFA=15.803
(2ppl) (MVAL)
(2ppl) UFA=13.493 m² /9
(6ppl)
85 29
9R DN
PAVEMENT
R 16 DN
ET )M (H E MM RAD 00 11 LUST BA
VOID
IT ROOM
OFFICE 3 36 M
28 00 13 6
31 04
(MVAL)
(MVAL) 57.74°
4.5kg CO² F.E.
D2B
P.D. 56.90
(2ppl)
<
13 6
B
S3
13 6
UFA=16.2643628 m² /9
(MVAL)
23 .2M
UFA=14.491 m² /9
4674 PANTRY
0 P.D. 15 2876
1100MM (H) METAL BALUSTRADE
55.405
NEW 1100MM (H) METAL BALUSTRADE
150
13 00
40R
S5
Y8
23 65
OFFICE 7
AV CABINET
UFA=23.904 m² /4.5
UP
25 22
Y7
AP1
31 04
UFA=13.161 m² /9
FD
150 693
X8
(2ppl)
39R
56.800
F.S. & SPRINKLER INLET
Y9
OFFICE 8
UP
1150 150
OFFICE 2 (2ppl)
T.D .=
13 6
(MVAL)
56.650
D4A
34 28
(1ppl)
D4A
56.00
G015
UFA=14.467 m² /9
X15
X14
LANDSCAPE DECK
PROJECT
PROPOSED POST SECONDARY COLLEGE DEVELOPMENT AT EX-VICTORIA ROAD DETENTION CENTER J/O VICTORIA ROAD AND MOUNT DAVIS PATH (TO BE KNOWN AS INLAND LOT NO. 8950)
56.941
4
9
X5
10
1100MM (H) METAL
BALUSTRADE
Y3
X16 S6
G013 DRAWING TITLE
Y2
G/F PLAN
Y1 NON-BUILDING ZONE 9
10
SCALE
1 : 200
PRINTED 21/07/15
CHECKED
FY
DATE
21/07/15
APPROVED
FY
DATE
21/07/15
DRAWN
KW/KL
DATE
21/07/15
PROJECT NO. DRAWING NO.
1
G/F PLAN
G009
1 : 200
CAD REF NAME:
1306 REV.
G009.dwg
| FRANCIS AND ROSE YUEN CENTER IN HONG KONG (UCCHK)
P PU RAM 1:12
(MVAL) 30 90
FURNITURE STORE
11 46 0
56.23
56.157
ELEC.
(2ppl)
12 4
UFA=26.197 m² /30 8503
AP1
56.920
1100MM (H) R.C. PARAPET
56.250
D
PLANTER
LAND GRANT SITE BOUNDARY
C
65 00
UFA=16.2643642m² /9
84 75
56.08 56.25
S1.1
ROLLING GATE
UT /O N IN59 RU 79
56.35
DELIVERY ROUTE
VOID
13 6
OFFICE 1
18 67
57.550 56.800
ILLUMINATED SS SIGNAGE
EXISTING STREET FIRE HYDRANT ON VICTORIA ROAD
UFA=16.042 m² /9
15R DN
S1
ACCESS ROUTE TO LANDSCAPE DECK
B
S2.1
57.650
2
55 76
G012
VOID
10 99 0
55.77
55.510 2300MM(H) EXISTING RC HERITAGE FENCE WALL
27
A1 (841mm x 594mm) Sheet Size
Location: Mount Davis, Hong Kong Studio Type: Work Building Type: Music School, Heritage Conservation & Revitalization
28
| HAW PAR MUSIC FARM
As Revery Architecture Hong Kong was in the position of Project Manager on this project, I was involved mostly on administration work and rendering work of interior finish proposals for clients.
HPMF | Visualization & Rendering Work
Rhino Modeling, Rendering, Coordination with Suppliers
RENDERING DONE TO VISUALIZE COLOR PALETTES AND ACOUSTIC PANEL OPTIONS
GRASSHOPPER SCRIPT FOR PANEL PERFORATION PATTERN
29
| HAR PAW MUSIC FARM
PHOTO OF COMPLETED ROOM
Location: Toronto Type: Work Building Type: Residential
30
| DBDBDB
During my employment at dbdbdb, I was involved in both architectural work and marketing work. In terms of architecturerelated work, I was involved with preparing drawings for permit submissions, visualization of concepts and Revit modelling for several residential projects (including Studio Emerson, Badgerow and Cortleigh). In terms of marketing-related work, I was the photographer of built projects and managing dbdbdbâ&#x20AC;&#x2122;s website.
Estudio Emerson | House Measuring & Revit Modelling 1 2 3
1
Sketches from house measure Transfer measure into CAD drawings Transfer CAD drawings to Revit Model
2
31
|DBDBDB
3
32
St
STEPHANIE TUNG sstephanietung@gmail.com +1-647-924-2855 21 Iceboat Terrace, Toronto, ON, M5V 4A9