Detailing l[ ]01

Page 1

NOTES GENERAL: 1. All dimensions to be checked on site before commencement of any work. Use figured dimensions only. Any discripancies should be reported to the Architect immediately. 2. All dimensions are in milimetres unless otherwise specified as interior room dimensions in metres.

1

2

3

4

5

6

7

CIVIL WORKS: 1. All soils under slabs and around external fountations to be treated for termite control. 2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angleof repose. 3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone blinding on hardcore.

8

L[--]07

150

Ducts.

400

600mm steel louvered double leaf doors on ducts.

400 600

5,700

1,500

200

R.C staircase to detail L[24]01.

10 Person /1000kg 1800x1800x5200mm [wxdxh], 1.6m/s.

735

5,800

1,800

965

400

1,850

200

3,000

900

150

200

[P.V]

350

1,800

550 400 100

4,670

FALL

All columns in parking area to be protected with 1500mm high angle iron bars on all sides.

Fire alarm & swing reel.

[P.V]

400

FALL

FALL

FALL

FALL

FALL

FALL [W-21/B]

18

17 3,000

15

3,000

14

3,000

13

3,000

FALL

12

3,000

3,000

3,000

16

11

3,000

10

3,000

9

3,000

[P.V]

6m wide Driveway.

FALL

6,000 5,600

[B-02]

5 3 2 1

700

300

Refuse Chutes. [B-04] 12m2

435

1,370

85° Paper Others. & Plastic.

400 630

400

4,285

400

4,250 4,665

1,815 400 1,985

430

FALL Fire alarm & swing reel.

5,600

400

400

[D-02/B] [P.V]

200

1,500

Composite basement wall with internal ashphalt tanking.See detail L[21]01.

200

4 2 2 2

400 400

5,620

5,620

5,620

400

5,620

5,620 6,020

400

400

5,620 6,020

5,600

6,000

400

400

5,620 6,020

5,600

6,000

200 920

[P.V]

B 140

150

Landing 99°

A

400 400

[P.V]

[W-15/B]

300kg 980x920x1200m m high, 0.3m/s.81°

Ribbed concrete finish to approval laid to slope.

10m2

[W-01/B] [W-02/B]

5,600

6,000

9kg water type fire extinguisher. 9kg carbon dioxide type fire extinguisher.

Refuse Chutes. [B-03]

100mm thick R.C goods lift core walls to S.E details.

1,680

Garbage Collection Point.

[P.V]

370 400

1,785

200

[P.V]

200

6,200

4,100

400

5,620 6,020

400

400

4,900

5,620

5,620 6,020

400

400

4,900 5,100

47,890

400

5,600

6,000

400

5,600

6,000

400

5,600

6,000

400

4,900

6,000

5,100

47,730

1: FLOOR FINISHES. 1. Ribbed concrete. 2. Tampered monolithic concrete. 3. 40mm thick steel float cement screed. 4. 250x250x10mm quarry tiles on cement grout. 5. 250x250x10mm granito flooring tiles on cement grout. 6. 300x300x10mm acid resistant ceramic floor tiles. 7. 300x300x10mm non-slip ceramic floor tiles. 8. 50mm thick chisel dressed stone. 9. 15mm thick polished random cut mazeras. 10. 150x50x10mm mnazi timber blocks. 1: SKIRTING FINISHES. 1. 150mm high 25mm thick painted cement screed. 2. 250x150x10mm quarry tiles. 3. 250x150x10mm granito skirting tiles. 4. 250x150x10mm ceramic skirting tiles. 5. 150x25mm hardwood strips. 6. 150mm high half-sawn rosewood poles. 7. 250x150x15mm mazeras skirting tile. 1: WALL FINISHES. 1. 3 coats water proofing textured paint. 2. 3 coats eggshell emulsion paint. 3. 12mm thick steel float plaster. 4. Half sawn rosewood poles to 1050mm height. 5. 250x150x10mm glazed ceramic wall tiles to 1800mm height,silk vinyl emulsion paint above. 6. 3 coats matt vinyl emulsion paint.

5,620

5,620 6,020

CEILING FINISH.

[W-01] - WINDOW NUMBER.

[B-01]

295

450

[D-03/B] 2,050

L[--]06

700

1,000 150

2,000

150

150

3,580

400

1,000 150

345

1,470

400

4 2 2 2

1,330

400

400

200

WALL FINISH.

[D-01] - DOOR NUMBER.

400

1,730

200

600mm steel grating cover on trench drain sloping to sump.

400

FALL

140

Ramp Slope 1:10

[UP]

1 1 1 1

Parking markers to be done with road paint to approval.

2,195 1,500 200

3,000

1

93°

3,660 3,275

LANDING

SKIRTING FINISH.

19m2

400

FALL

3,000

2

FALL

[P.V]

[B-12]

200

L[--]05

400

FALL

[W-14/B]

5,655

Basement walling to be provided with external tanking & protective walling. No excavation to be done outside plot boundary.

1,656

Restaurant Dry Store.

3,000

Parking markers to be done with road paint to approval.

Beam above.

900

FLOOR FINISH.

C

[P.V]

200

4,350

FALL

400x400mm R.C column to S.E's details.

120 980 100

FALL

All basement windows to be high level steel vent windows to schedule.

[D-12/B]

150

400x400mm R.C column to S.E's details.

LEGEND.

[W-13/B]

100

BASEMENT -2500mm

FALL

169

9kg water type fire extinguisher. 9kg carbon dioxide type fire extinguisher.

400

Beam above.

FALL

1,500

FALL

400

FALL

3,000

FALL

D

[D-11/B]

600mm steel grating cover on trench drain sloping to sump.

400

400

200

[P.V]

400

6,000 5,600

[W-20/B]

[D-07/B]

[B-02]

600mm steel grating cover on trench drain sloping to sump.

[P.V]

1,500

1,800 250

500

625

500

[W-19/B]

Drip oil drain channels with steel grating sloped to sump.

[D-10/B]

1,500

29,631

4

600mm steel louvered double leaf doors on ducts.

[P.V]

18m2

22,710

FALL

[D-08/B] [P.V]

[P.V]

[W-12/B]

[P.V]

Drip oil drain channels with steel grating sloped to sump.

Public [B-08] Stair.

Electrical . Telephone & Data

2 1 1 1

[B-11]

L[--]08

400x400mm R.C column to S.E's details.

400

250 200

500

Dry & Wet Risers.

FALL

1

Door to be 1800x2100mm metal louvered door to schedule.

[D-09/B]

[P.V]

260

6m wide Driveway.

3,000

26,910

5

Beam above.

295

200

200

150 700

9m2

Door to be 1800x2100mm metal louvered door to schedule.

MECHANICAL WORKS: 1. All sanitry fittings, doors, windows and lifts to schedules. 2. All plumping and drainage to comply with city council's specifications. 3. All service ducts to be accessible from every floor. 4. SVP denotes soil vent pipe to be provided at the head of drainage.

Door to be 1800x2100mm metal louvered door to schedule.

Sump.

500

100

150

30m2

Transformer Room.

2 1 1 1

Pump.

190

700

625

100

250mm thick R.C lift core walls to S.E details.

FALL

200

700

150

1,400

2

400

[B-09]

200

900

2,800

200 425

200

725 100

200 200 900

150

[D-05/B]

100

1,200

2,900

400 400

4

2 1 1 1

1,500

3,000

6,000 5,600

[P.V] 900

5,700

3

E

16,595

30,570

150

200 200

Beam above.

Beam above.

A

200

FALL

All columns in parking area to be protected with 1500mm high angle iron bars on all sides.

FALL

800

[D-06/B]

[P.V]

[P.V]

525 400

3 B

[W-18/B] 400

1,500

6

C

3 1 3 1

3 1 3 1

8

Generator Room.

Switch Room. [B-10]

2,600

1,550

200

7

[P.V]

400

1,500

200

9m2 2,800

Lift Shaft.

5

1,922

[W-11/B]

168°

200

200

[P.V]

LOADING BAY FALL FALL

13m2 2,800

7 6

150

[W-17/B]

[P.V]

Fire alarm & swing reel.

2,600 8

Curio Shop Storage. [B-07]

100

400

[W-16/B]

400 50

[P.V]

400 525

450

200

2,140 1,845 350 1,800

800

[D-04/B]

D

1,800

400

150 200 1,400 200 150

500

Shop Fashion163° Storage. [B-06]

9kg water type fire extinguisher. 9kg carbon dioxide type fire extinguisher.

200

860

4,365 4,165 400 4,095 3,695

250 400 400 200

All basement windows to be high level steel vent windows to schedule.

1,500

[P.V]

[P.V]

200

Service lift 1000kg hydraulic lift 1.1mx1.4mx2. 2m [wxdxh] 1.0m/s.

[W-10/B]

[P.V]

[P.V]

17

3 1 3 1

9,467 2,265

1,500

[W-09/B]

[W-08/B]

[W-07/B]

.V]

2,280

16

1,100

1,500

1,570 240

[W-06 /B] [P

7,890

13

40m2

1,500

12

.V]

1,960

1,500

9,070

1,500

11

[B-05]

20,365

2,760

Floor channels for electric cabling..

9

[W-05 /B] [P

SUPERMARKET STORE 200

L[--]05

1,500

76°

150

All basement windows to be high level steel vent windows to schedule.

14,66 0 3,055

.V]

E

L[--]06

1,500

[W-04 /B] [P

15

1,295

.V]

10

1,500

[W-03 /B] [P

14

All basement windows to be high level steel vent windows to schedule.

1,310

STRUCTURAL WORKS: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black cotton soil to a distance of 3m. 2. All basement columns to be provided with angle iron protection 1500mm high. 3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the surface. 4. Refer to structural Engineers details for all r.c works. 5. Fountation depth to be determined on site to structural Engineer's approval. 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.

N

1: CIELING FINISHES. 1. Painted roughcast concrete. 2. Suspended softwood timber crate ceiling. 3. Half-sawn rosewood poles. 4. Fissured minaboard suspended ceiling. 5. Painted softboard on timber frame.

PROJECT TITLE: Mixed Use Urban Development.

1

2

3

4

5 E-03

6

7

8

DRAWING TITLE:

Basment Plan.

DRAWING NO:

L[--]01.

SCALE:

1:100

DRAWN BY: OMOLLO STEPHEN. CHECKED BY:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.