Detailing l[ ]05 & 06

Page 1

A

B

C

7,320

6,000

6,000

5 deg sloping waterproofed 100mm thick roof slab over staircase

2,350

150

300 1,900 150

3,150

150

300 2,700

3,000

150

3,150

150

COURTYARD. [P.V]

[P.V]

[P.V]

MECHANICAL WORKS: 1. All sanitry fittings, doors, windows and lifts to schedules. 2. All plumping and drainage to comply with city council's specifications. 3. All service ducts to be accessible from every floor. 4. SVP denotes soil vent pipe to be provided at the head of drainage.

150

Ground Floor +1500

1,500

[G.L]

1,150

BASEMENT.

7,320

6,000

A

External wall treated in two layers of plaster. A thick base layer of 1:4 riversand lime mixture prepared 6months in advance. A thin layer called 'neru' of lime and water with yellow ochre added to the mixture for colour to architect's approval

3,600

3,150

STAIRWAY [public].

150

300

R.c foundation footing to S.E's details. Foundation depth to be determined on site.

STRUCTURAL WORKS: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black cotton soil to a distance of 3m. 2. All basement columns to be provided with angle iron protection 1500mm high. 3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the surface. 4. Refer to structural Engineers details for all r.c works. 5. Fountation depth to be determined on site to structural Engineer's approval. 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.

First Floor +3600mm

2,500

2,200 150

1,150

BASEMENT.

850mm high timber handrails on swahili timber balusters to detail.

150

300 2,700

[P.V]

3,450

3,600 1,500

[G.L]

Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval

Second Floor +6750mm

[P.V]

Ground Floor +1500

Basement -2500mm

[P.V]

150

300

STAIRWAY [residential].

+12250mm

CIVIL WORKS: 1. All soils under slabs and around external fountations to be treated for termite control. 2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angleof repose. 3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone blinding on hardcore.

Second Floor +9900mm

3,000

3,150

[P.V]

First Floor +3600mm

+0

2,200

2,350 3,150

[P.V]

Second Floor +3750mm

R.C U-Shape Main Staircase to detail C(24) 001 Tread=300mm; rise=158mm

[R.L]

150

[R.L]

Terrace +9900mm

850mm high timber handrails on swahili timber balusters to detail.

Pre-cast concrete coping on 200 thick parapet walls to architects details.

Basement retaining wall with 200mm thick outer r.c wall, 50mm tanking and a 150mm thick masonry protective inner wall to detail L (21)001.

+0

Basement -2500mm

150

+12250mm

NOTES GENERAL: 1. All dimensions to be checked on site before commencement of any work. Use figured dimensions only. Any discripancies should be reported to the Architect immediately. 2. All dimensions are in milimetres unless otherwise specified as interior room dimensions in metres.

4,095

5 deg sloping waterproofed 100mm thick roof slab over staircase

Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval

E

D

B

6,000

4,095

C

D

LEGEND.

E

450mm high masonry planter box with 300mm deep soil substrate to detail L[33]002

Steel grating over storm water drainainage sloped to city council's storm water drain.

150mm r.c floor slab waterproofed on 300mm well compacted hardcore fill to S.E's detail.

R.c foundation footing to S.E's details. Foundation depth to be determined on site.

FLOOR FINISH.

SKIRTING FINISH.

WALL FINISH.

CEILING FINISH.

[W-01] - WINDOW NUMBER. [D-01] - DOOR NUMBER.

A

B

C

7,320

6,000

Versatile roofing iron sheets for the pitched roofs with concealed rustic iron gutters to roof details. Roof pitch=12.50

D 6,000

E 4,095

Roof fascia board curved elaborately in a decorative pattern to immitate persian arches to roof detail.

Pre-cast concrete coping on 200 thick parapet walls to architects details.

Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval 150

Balcony.

OFFICE SPACE.

Balcony.

3,150

150

Walkway.

First Floor +3600mm

150

Walkway.

SUPERMARKET.

Ground Floor +1500

BASEMENT. [parking]

BASEMENT. [driveway]

2,650

2,500

150

150 300 2,200

BASEMENT. [driveway]

2,650

[G.L]

BASEMENT.

[G.L]

+0

Basement -2500mm

150

Basement -2500mm

150

850mm high timber handrails on swahili timber balusters to detail.

3,600

Walkway.

Landscaped Courtyard [open to sky].

3,450

CURIO SHOP.

3,150

3,600

300

150

First Floor +3600mm

+0

OFFICE SPACE.

Second Floor +3750mm

3,000

Walkway.

Ground Floor +1500

Ground floor raised by 1500mm above G.L with steel louvred ventilation grating on the sides. See detail L (21) 001

Walkway.

150 300

OFFICE SPACE.

2,700

3,150

Balcony.

Roor slab +6750mm

3,150

Walkway.

3,000

OFFICE SPACE.

2,700

3,150

Balcony.

Second Floor +3750mm

850mm high timber handrails on swahili timber balusters to detail.

[R.L]

150

[R.L]

300

Roor slab +6750mm

Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval

Basement retaining wall with 200mm thick outer r.c wall, 50mm tanking and a 150mm thick masonry protective inner wall to detail L (21)001. External wall treated in two layers of plaster. A thick base layer of 1:4 riversand lime mixture prepared 6months in advance. A thin layer called 'neru' of lime and water with yellow ochre added to the mixture for colour to architect's approval

1: FLOOR FINISHES. 1. Ribbed concrete. 2. Tampered monolithic concrete. 3. 40mm thick steel float cement screed. 4. 250x250x10mm quarry tiles on cement grout. 5. 250x250x10mm granito flooring tiles on cement grout. 6. 300x300x10mm acid resistant ceramic floor tiles. 7. 300x300x10mm non-slip ceramic floor tiles. 8. 50mm thick chisel dressed stone. 9. 15mm thick polished random cut mazeras. 10. 150x50x10mm mnazi timber blocks. 1: SKIRTING FINISHES. 1. 150mm high 25mm thick painted cement screed. 2. 250x150x10mm quarry tiles. 3. 250x150x10mm granito skirting tiles. 4. 250x150x10mm ceramic skirting tiles. 5. 150x25mm hardwood strips. 6. 150mm high half-sawn rosewood poles. 7. 250x150x15mm mazeras skirting tile. 1: WALL FINISHES. 1. 3 coats water proofing textured paint. 2. 3 coats eggshell emulsion paint. 3. 12mm thick steel float plaster. 4. Half sawn rosewood poles to 1050mm height. 5. 250x150x10mm glazed ceramic wall tiles to 1800mm height,silk vinyl emulsion paint above. 6. 3 coats matt vinyl emulsion paint. 1: CIELING FINISHES. 1. Painted roughcast concrete. 2. Suspended softwood timber crate ceiling. 3. Half-sawn rosewood poles. 4. Fissured minaboard suspended ceiling. 5. Painted softboard on timber frame.

PROJECT TITLE: Mixed Use Urban Development. DRAWING TITLE:

7,320

6,000

R.c foundation footing to S.E's details. Foundation depth to be determined on site.

6,000

4,095

150mm r.c floor slab waterproofed on 300mm well compacted hardcore fill to S.E's detail.

A

B

R.c foundation footing to S.E's details. Foundation depth to be determined on site.

C

D

E

DRAWING NO: SCALE:

Sections L[--]05 & L[--]06. 1:100

DRAWN BY: OMOLLO STEPHEN. CHECKED BY: