A
B
C
7,320
6,000
6,000
5 deg sloping waterproofed 100mm thick roof slab over staircase
2,350
150
300 1,900 150
3,150
150
300 2,700
3,000
150
3,150
150
COURTYARD. [P.V]
[P.V]
[P.V]
MECHANICAL WORKS: 1. All sanitry fittings, doors, windows and lifts to schedules. 2. All plumping and drainage to comply with city council's specifications. 3. All service ducts to be accessible from every floor. 4. SVP denotes soil vent pipe to be provided at the head of drainage.
150
Ground Floor +1500
1,500
[G.L]
1,150
BASEMENT.
7,320
6,000
A
External wall treated in two layers of plaster. A thick base layer of 1:4 riversand lime mixture prepared 6months in advance. A thin layer called 'neru' of lime and water with yellow ochre added to the mixture for colour to architect's approval
3,600
3,150
STAIRWAY [public].
150
300
R.c foundation footing to S.E's details. Foundation depth to be determined on site.
STRUCTURAL WORKS: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black cotton soil to a distance of 3m. 2. All basement columns to be provided with angle iron protection 1500mm high. 3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the surface. 4. Refer to structural Engineers details for all r.c works. 5. Fountation depth to be determined on site to structural Engineer's approval. 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.
First Floor +3600mm
2,500
2,200 150
1,150
BASEMENT.
850mm high timber handrails on swahili timber balusters to detail.
150
300 2,700
[P.V]
3,450
3,600 1,500
[G.L]
Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval
Second Floor +6750mm
[P.V]
Ground Floor +1500
Basement -2500mm
[P.V]
150
300
STAIRWAY [residential].
+12250mm
CIVIL WORKS: 1. All soils under slabs and around external fountations to be treated for termite control. 2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angleof repose. 3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone blinding on hardcore.
Second Floor +9900mm
3,000
3,150
[P.V]
First Floor +3600mm
+0
2,200
2,350 3,150
[P.V]
Second Floor +3750mm
R.C U-Shape Main Staircase to detail C(24) 001 Tread=300mm; rise=158mm
[R.L]
150
[R.L]
Terrace +9900mm
850mm high timber handrails on swahili timber balusters to detail.
Pre-cast concrete coping on 200 thick parapet walls to architects details.
Basement retaining wall with 200mm thick outer r.c wall, 50mm tanking and a 150mm thick masonry protective inner wall to detail L (21)001.
+0
Basement -2500mm
150
+12250mm
NOTES GENERAL: 1. All dimensions to be checked on site before commencement of any work. Use figured dimensions only. Any discripancies should be reported to the Architect immediately. 2. All dimensions are in milimetres unless otherwise specified as interior room dimensions in metres.
4,095
5 deg sloping waterproofed 100mm thick roof slab over staircase
Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval
E
D
B
6,000
4,095
C
D
LEGEND.
E
450mm high masonry planter box with 300mm deep soil substrate to detail L[33]002
Steel grating over storm water drainainage sloped to city council's storm water drain.
150mm r.c floor slab waterproofed on 300mm well compacted hardcore fill to S.E's detail.
R.c foundation footing to S.E's details. Foundation depth to be determined on site.
FLOOR FINISH.
SKIRTING FINISH.
WALL FINISH.
CEILING FINISH.
[W-01] - WINDOW NUMBER. [D-01] - DOOR NUMBER.
A
B
C
7,320
6,000
Versatile roofing iron sheets for the pitched roofs with concealed rustic iron gutters to roof details. Roof pitch=12.50
D 6,000
E 4,095
Roof fascia board curved elaborately in a decorative pattern to immitate persian arches to roof detail.
Pre-cast concrete coping on 200 thick parapet walls to architects details.
Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval 150
Balcony.
OFFICE SPACE.
Balcony.
3,150
150
Walkway.
First Floor +3600mm
150
Walkway.
SUPERMARKET.
Ground Floor +1500
BASEMENT. [parking]
BASEMENT. [driveway]
2,650
2,500
150
150 300 2,200
BASEMENT. [driveway]
2,650
[G.L]
BASEMENT.
[G.L]
+0
Basement -2500mm
150
Basement -2500mm
150
850mm high timber handrails on swahili timber balusters to detail.
3,600
Walkway.
Landscaped Courtyard [open to sky].
3,450
CURIO SHOP.
3,150
3,600
300
150
First Floor +3600mm
+0
OFFICE SPACE.
Second Floor +3750mm
3,000
Walkway.
Ground Floor +1500
Ground floor raised by 1500mm above G.L with steel louvred ventilation grating on the sides. See detail L (21) 001
Walkway.
150 300
OFFICE SPACE.
2,700
3,150
Balcony.
Roor slab +6750mm
3,150
Walkway.
3,000
OFFICE SPACE.
2,700
3,150
Balcony.
Second Floor +3750mm
850mm high timber handrails on swahili timber balusters to detail.
[R.L]
150
[R.L]
300
Roor slab +6750mm
Parapet wall rising 900mm high running along the R.C concrete edge with pointed persian arched casps plastered and finished to architect's approval
Basement retaining wall with 200mm thick outer r.c wall, 50mm tanking and a 150mm thick masonry protective inner wall to detail L (21)001. External wall treated in two layers of plaster. A thick base layer of 1:4 riversand lime mixture prepared 6months in advance. A thin layer called 'neru' of lime and water with yellow ochre added to the mixture for colour to architect's approval
1: FLOOR FINISHES. 1. Ribbed concrete. 2. Tampered monolithic concrete. 3. 40mm thick steel float cement screed. 4. 250x250x10mm quarry tiles on cement grout. 5. 250x250x10mm granito flooring tiles on cement grout. 6. 300x300x10mm acid resistant ceramic floor tiles. 7. 300x300x10mm non-slip ceramic floor tiles. 8. 50mm thick chisel dressed stone. 9. 15mm thick polished random cut mazeras. 10. 150x50x10mm mnazi timber blocks. 1: SKIRTING FINISHES. 1. 150mm high 25mm thick painted cement screed. 2. 250x150x10mm quarry tiles. 3. 250x150x10mm granito skirting tiles. 4. 250x150x10mm ceramic skirting tiles. 5. 150x25mm hardwood strips. 6. 150mm high half-sawn rosewood poles. 7. 250x150x15mm mazeras skirting tile. 1: WALL FINISHES. 1. 3 coats water proofing textured paint. 2. 3 coats eggshell emulsion paint. 3. 12mm thick steel float plaster. 4. Half sawn rosewood poles to 1050mm height. 5. 250x150x10mm glazed ceramic wall tiles to 1800mm height,silk vinyl emulsion paint above. 6. 3 coats matt vinyl emulsion paint. 1: CIELING FINISHES. 1. Painted roughcast concrete. 2. Suspended softwood timber crate ceiling. 3. Half-sawn rosewood poles. 4. Fissured minaboard suspended ceiling. 5. Painted softboard on timber frame.
PROJECT TITLE: Mixed Use Urban Development. DRAWING TITLE:
7,320
6,000
R.c foundation footing to S.E's details. Foundation depth to be determined on site.
6,000
4,095
150mm r.c floor slab waterproofed on 300mm well compacted hardcore fill to S.E's detail.
A
B
R.c foundation footing to S.E's details. Foundation depth to be determined on site.
C
D
E
DRAWING NO: SCALE:
Sections L[--]05 & L[--]06. 1:100
DRAWN BY: OMOLLO STEPHEN. CHECKED BY: