Detailing l[ ]07 & 08

Page 1

8

7

6

1,250

CIVIL WORKS: 1. All soils under slabs and around external fountations to be treated for termite control. 2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angleof repose. 3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone blinding on hardcore.

Beige lime wash on external walls.

2,050

2,050

2,050

+12250mm

[R.L]

3,150

[P.V]

3,150

150 3,000

600

NOTES GENERAL: 1. All dimensions to be checked on site before commencement of any work. Use figured dimensions only. Any discripancies should be reported to the Architect immediately. 2. All dimensions are in milimetres unless otherwise specified as interior room dimensions in metres.

6,000

[P.V]

Oriel window enclosed with carved lattice work.

STRUCTURAL WORKS: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black cotton soil to a distance of 3m. 2. All basement columns to be provided with angle iron protection 1500mm high. 3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the surface. 4. Refer to structural Engineers details for all r.c works. 5. Fountation depth to be determined on site to structural Engineer's approval. 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.

150

150

[P.V]

3,150

[P.V]

3,150

1,800

3,000

600

[P.V]

[P.V]

Oriel window enclosed with carved lattice work.

150

First Floor +3600mm

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

450

[P.V]

3,600

3,600

150

Wall arches framed with 250x250x10mm quarry tiles.

3,000

[P.V]

750

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[G.L]

MECHANICAL WORKS: 1. All sanitry fittings, doors, windows and lifts to schedules. 2. All plumping and drainage to comply with city council's specifications. 3. All service ducts to be accessible from every floor. 4. SVP denotes soil vent pipe to be provided at the head of drainage.

Metal vent windows to schedule.

1,650

[P.V]

1,650

[P.V]

Steel casement to schedule. Ground Floor +1500

1,650

375

900 225 150 750

6,000

525

+0

Metal vent windows to schedule. 6,000

8

6,000

6,000

7

6

6,000

6,000

5

6,000

4

6,000

3

2

1

LEGEND. FLOOR FINISH.

SKIRTING FINISH.

WALL FINISH.

CEILING FINISH.

[W-01] - WINDOW NUMBER.

[R.L]

Mvule wood balustrades at a height of 1050mm from finished floor level curved out to shape to balcony detai.

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

Beige lime wash on external walls. Terrace +9900mm

3,150

[R.L]

3,150

Terrace +9900mm

2,050

2,050

[D-01] - DOOR NUMBER.

[P.V]

Second Floor +3750mm

Mushrabiya oriel window to schedule. Second Floor +3750mm

Open balcony with mpingo wooden column supports decorated with latticework of curved wood to detail

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

[P.V]

3,150

3,150

Wooden carving to architects approval.

[P.V]

First Floor +3600mm

+0

[P.V]

[P.V]

[P.V]

[G.L] [P.V]

[P.V]

[P.V]

[P.V]

Wooden balcony brackets for balcony support curved from rosewood to detail A(99)004

Mushrabiya oriel window to schedule.

Ground Floor +1500

Metal vent windows to schedule.

1,678

[G.L]

[P.V]

3,600

[P.V]

3,600 Ground Floor +1500

Steel casement to schedule.

First Floor +3600mm

1,678

+0

[P.V]

525

Ground Floor +1500

1,650

[G.L]

6,000

1

150

[P.V]

2,000

600

[P.V]

2,550

3,600

Oriel window enclosed with carved lattice work.

2

Second Floor +3750mm

850

150

First Floor +3600mm

6,000

[P.V]

600

150 600 1,500

[P.V]

900

3,150

Steel casement window to schedule.

6,000

3

Terrace +9900mm

1,800

1,500

[P.V]

900

3,150 Second Floor +3750mm

4

400

400 2,050

400 150

Terrace +9900mm

600

[R.L]

600

Beige lime wash on external walls..

6,000

2,050

2,050

+12250mm

600

6,000

5

1: FLOOR FINISHES. 1. Ribbed concrete. 2. Tampered monolithic concrete. 3. 40mm thick steel float cement screed. 4. 250x250x10mm quarry tiles on cement grout. 5. 250x250x10mm granito flooring tiles on cement grout. 6. 300x300x10mm acid resistant ceramic floor tiles. 7. 300x300x10mm non-slip ceramic floor tiles. 8. 50mm thick chisel dressed stone. 9. 15mm thick polished random cut mazeras. 10. 150x50x10mm mnazi timber blocks. 1: SKIRTING FINISHES. 1. 150mm high 25mm thick painted cement screed. 2. 250x150x10mm quarry tiles. 3. 250x150x10mm granito skirting tiles. 4. 250x150x10mm ceramic skirting tiles. 5. 150x25mm hardwood strips. 6. 150mm high half-sawn rosewood poles. 7. 250x150x15mm mazeras skirting tile. 1: WALL FINISHES. 1. 3 coats water proofing textured paint. 2. 3 coats eggshell emulsion paint. 3. 12mm thick steel float plaster. 4. Half sawn rosewood poles to 1050mm height. 5. 250x150x10mm glazed ceramic wall tiles to 1800mm height,silk vinyl emulsion paint above. 6. 3 coats matt vinyl emulsion paint. 1: CIELING FINISHES. 1. Painted roughcast concrete. 2. Suspended softwood timber crate ceiling. 3. Half-sawn rosewood poles. 4. Fissured minaboard suspended ceiling. 5. Painted softboard on timber frame.

+0

PROJECT TITLE: Mixed Use Urban Development. DRAWING TITLE: DRAWING NO: SCALE:

Elevations. L[--]07 & L[--]08. 1:100

DRAWN BY: OMOLLO STEPHEN. CHECKED BY:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.