STONDECK PROJECT INSTALLATIONS
DURHAM REGION POLICE SERVICE - Oshawa, ON
23 LORRAINE DRIVE - Toronto, ON
PROJECT INSTALLATIONS: Stonhard has been successfully installing StonDeck waterproofing systems throughout Canada since 2009 and has undertaken a wide range of projects from simple patch repairs to full membrane removal and replacement. We have also worked on a number of new construction projects including LEED projects for major hospitals, government buildings and arenas. StonDeck systems can be installed up to 60% faster than traditional alternatives and give owners and operators alike an alternative to time consuming traditional repairs. This allows renovation on structures with single ramp access to be carried out with minimal disruption to businesses and tenants. StonDeck is also designed with durability in mind and has been extensively used internationally for over 30 years, including Scandinavian Countries with mandatory metal studded snow tires. This durability helps to alleviate continued repair and maintenance costs. StonDeck offers a wide range of colour options allowing clients to customise their parking space to suit their needs, added to this extensive locally required testing to ensure compliance with Canadian Building Codes S413-07 and ASTM C957. We believe our systems offer a faster, more durable and exciting alternative to traditional repair techniques.
CONDOMINIUM Parking Deck Projects – StonDeck Polyurethane System New Construction 7th Avenue Calgary - Calgary, AB Total area 151,000ft2 - StonDeck FD2 & Sealers (2017) 21 E Arrondissement - Montréal, QC Phase 2, total area 65,000ft2 StonDeck FD2 & StonDeck XD3 (2016) 39 New Delhi - Markham, ON Total area 44,071ft2 - StonDeck FD2 (2019) 155 Caroline Street - Waterloo, ON Total area 113,050ft2 - StonDeck XD2 & StonDeck FD2 110,000ft2 - Sealer (2019) 300 Inlet Condominium - Orleans, ON Underground parking, total area 37,655ft2 StonDeck XD3, FD2 & FD2+ (2020) Baseline Road Condominium - Nepean, ON Underground parking, total area 28,823ft2 - StonDeck FD2 & FD2+ (2020)
Condominium Le Vert Mezzanine - Québec City, QC Underground parking, total area 35,000ft2 StonDeck XD2 (2013) Earlton Road Condominium - Kanata, ON Underground parking, total area 15,217ft2 - StonDeck XD3, FD2 & FD2+ (2020) Hull Parkade - Gatineau, QC Underground parking, total area 85,000ft2 - StonDeck XD2 (2012) Le Verre-Bourg Condominium - Québec, QC Underground parking, total area 60,000ft2 - StonDeck XD2 (2015) Le Vibe Condo - Gatineau, QC Total area 70,100ft2 - StonDeck FD2 & StonDeck XD3 (2018) Luxembourg II - Québec City, QC Total area 10,800ft2 - StonDeck FD2 (2016)
STONDECK PROJECT INSTALLATIONS Princess Lane - Waterloo, ON Total area -14,500ft2 - StonDeck FD2 11,000ft2 - Sealer (2016)
Tandem Sur Cour Condominium - Québec, QC Underground parking, total area 22,000ft2 - StonDeck FD2 7,500ft2 - StonDeck XD2 (2015)
Stationnement 125 Boulevard Charest Est. - Québec, QC Total area 18,305ft2 - StonDeck FD2, StonDeck FD2 HD & StonDeck XD3 (2019)
Major Refurbishment 1 Hurontario Street - Mississauga, ON Total area 20,000ft2 - StonDeck FD2 (2017) 23 Lorraine Drive - Toronto, ON Underground parking, total area 45,000ft2 - StonDeck XD2 5,000ft2 - StonDeck QD2 (2012)
Loggia Condominium - Etobicoke, ON Crack repairs & resurfacing, total area 22,220ft2 StonDeck FD2+ (2021) Mount Stephen Club - Montréal, QC Total area 33,600ft2 - StonDeck FD2 HD (2017)
133 Merton Street - Toronto, ON Total area 18,000ft2 - StonDeck XD2 (2019)
Pederson Street - Fredericton, NB Total area 11,100ft2 - StonDeck FD2 & StonDeck XD2 (2016)
716 The West Mall - Etobicoke, ON Underground parking, total area 10,000ft2 StonDeck XD2 & StonDeck FD2 (2015)
Pretel Apartments - Montreal, QC N/S garages, total area 21,900ft2 - StonDeck XD2 (2018)
Condominium Le Kent - Boischatel, QC Underground parking, total area 8,000ft2 - StonDeck XD2 (2013) Condo Markham - Markham, ON Total area 54,000ft2 - StonDeck FD2 HD, StonDeck XD2 & StonDeck XD3 (2017) Le Charles Huot Condo - Québec, QC Total area 23,450ft2 - StonDeck FD2 & StonDeck XD3 (2018) Lockerby Towers - Sudbury, ON Underground parking (P2 level), total area 17,000ft2 StonDeck XD2 (2013)
Residence Les Cascades - Montréal-Nord, QC Total area 9,700ft2 - StonDeck XD2 (2018) Stanbrooke Apartments - Toronto, ON Drive lanes refurbishment, total area 11,885ft2 StonDeck FD2 & StonDeck XD2 (2019) Syndicat Du Baron Royal - St Leonard, QC Total area 14,800ft2 - StonDeck FD4 (2018) Villa D’Elegance - Markham, ON Underground parking, total area 25,000ft2 - StonDeck XD2 Moisture management, total area 5,000ft2 - Stonfil OP2 (2013)
Minor Repairs 20 Joe Shuster Way - Toronto, ON Crack repairs, total area 800 linear feet - StonDeck FD2 HD (2019)
Condominium Parking Garage - Québec, QC Drive lanes & ramps, total area 5,400ft2 - StonDeck FD2 (2020)
2050 De Maisonneuve - Montreal, QC Underground parking, total area 4,400ft2 StonDeck XD2 (2011)
Condos La Vigie - Montréal, QC Total area 5,000ft2 - StonDeck FD2 HD (2017)
Broadway Avenue - Winnipeg, MB Total area 2,200ft2 - StonDeck XD2 (2016)
Hampton Mews - Toronto, ON Condo parking, total area 260ft2 - StonDeck FB4 (2020)
STONDECK PROJECT INSTALLATIONS Inland Concrete - Calgary, AB Ramp coating, total area 660ft2 - StonDeck XD3 (2018) Jack-O - Sherbrooke, QC Total area 760ft2 - StonDeck FD4 (2018) Majestic Court Condominium - Markham, ON Total area 100ft2 - StonDeck FB4 (2019) McRae Avenue - Ottawa, ON Ramp resurfacing, total area 1,400ft2 - StonDeck XD3 (2016) Mcleod Garage - Peterborough, ON Total area 1,100ft2 - StonDeck FD2 (2018)
Residence Les Cascades - Saint-Laurent, QC High wear area patching, total area 1,200ft2 StonDeck XD2 (2012) Retirement Residence - Ottawa, ON Condo parking, total area 3,654ft2 - StonDeckFD2/FD2+ (2020) Tour St Mathieu - Montreal, QC Underground parking, total area 4,600ft2 - StonDeck XD2 (2011) V2 Condominium - Guelph, ON Underground parking, total area 2,000ft2 - StonDeck XD2 (2015)
Morguard Investments - Winnipeg, MB Parkade, total area 4,235ft2 - StonDeck XD1 (2018)
Viglione Condominium - Montréal, QC Total area 2,000ft2 - StonDeck XD2 & Five Star Concrete Repair (2017)
Parkview Towers - Markham, ON Parking stall resurfacing, total area 5,000ft2 StonDeck XD2 (2013)
Vincent D’indy - Montréal, QC Underground parking, total area 1,600ft2 - StonDeck XD2 (2013)
Princeton Waterfront Condominium - Calgary, AB Total area 150ft2 - StonDeck FB4 (2017)
Garbage / Compactor Room 25 Stratford - Toronto, ON Garbage rooms & compactor, total area 1,500ft2 StonDeck XD2 (2019)
Hillside Ravine Condominiums - Toronto, ON Garbage room recoating, total area 500ft2 StonDeck XD2 (2012)
600 Queens Quay - Toronto, ON Compactor rooms, total area 1,000ft2 - StonDeck FD2 (2018)
StonDeck Polyurethane-MMA Hybrid System 1 Hurontario Street - Mississauga, ON Total area 20,000ft2 - StonDeck QD3 (2017)
Braebury Properties Building - Kingston, ON Ramp refurbishment, total area 2,250ft2 (2009)
7 Lorraine Drive - Toronto, ON Ramp application, total area 2,800ft2 (2012)
City of Windsor - Windsor ON Ramp refurbishment, total area 1,500ft2 (2019)
23 Lorraine Drive - Toronto, ON Ramps & high-traffic areas, total area 5,000ft2 (2012)
Cornwall Square Shopping Centre - Cornwall, ON MMA exterior, total area 500ft2 (2015)
40 Scollard Street - Toronto, ON Surface crack treatment with MMA banding system, 350 linear feet treated in live parking structure (2010)
Majestic Court - Markham, ON Garage ramp resurfacing, total area 1,000ft2 (2012)
245 Eglinton Avenue East - Toronto, ON Patching repairs & ramp refurbishments, total area 1,000ft2 (2010)
Royal City Centre Mall - New Westminster, BC Critical access ramp refurbishment, total area 1,500ft2 (2011)
STONDECK PROJECT INSTALLATIONS SHOWROOM / GARAGE PROJECTS Grand Touring Automobiles - Toronto, ON Total area 5,300ft2 - StonDeck FD2 & StonDeck XD2 (2017)
Volvo Villa - Thornhill, ON Traffic topping, total area 6,000ft2 - StonDeck XD2 (2019)
Mercedes Benz - Toronto, ON Ramps, total area 7,500ft2 - StonDeck XD3 (2018)
Weber Mercedes Benz - Edmonton, AB Total area 14,200ft2 - StonDeck XD2 (2015)
HOSPITALITY PROJECTS Ahern Manor - Manitoba Entrance pad, total area 500ft2 - StonDeck FB4 (2018)
Fairmont Hotel - Vancouver, BC Fan room - total area 1,000ft2 - StonDeck FD2 (2019)
Bristol Manor - Calgary, AB Walkway, total area 200ft2 - StonDeck XD2 (2018)
Monsieur Jean Hotel - Québec, QC Parkade, total area 6,145ft2 StonDeck FD2 & StonDeck XD2 (2019)
Coast Inn of the North - Prince George, BC Exterior deck, total area 10,000ft2 - StonDeck FD4 (2015)
COMMERCIAL PROJECTS 405 Terminal - Ottawa, ON Total area 40,300ft2 - StonDeck FD2, StonDeck XD2 & StonDeck XD3 (2016) Cornwall Square Shopping Centre - Cornwall, ON Underground parking, total area 4,000ft2 - StonDeck XD2 (2015)
Royal City Centre Mall - New Westminster, BC Phase 1: Underground parking, total area 23,600ft2 - StonDeck XD2 (2011) Phase 2: Underground parking, total area 18,500ft2 - StonDeck XD2 Ramp coating, total area 1,500ft2 - StonDeck QD2 (2011)
Giant Tiger - Ottawa, ON Parking deck, total area 43,705ft2 - StonDeck XD2 (2021)
Safeway - Langley, BC Total area 6,000ft2 - Sealer (2016)
Howland Green Business Centre - Markham, ON Underground parking, total area 11,700ft2 - StonDeck FD2 12,300ft2 - StonDeck XD2 (2020)
Societe de Transport de Montreal - Saint Laurent, QC Total area 38,319ft2 - StonDeck XD1 (2019)
Lone Star - Kingston, ON Slab on grade, total area 880ft2 - StonDeck XD4 (2018) Metro Plus - Montréal, QC Parking deck, total area 26,108ft2 - StonDeck FD2 HD (2020) Nova Centre - Halifax, NS Total area 94,000ft2 - Silane Sealer (2017) Total area 214,595ft2 - StonDeck QD4, StonDeck FD2 & StonDeck FD2 HD (2018)
TRANSPORTATION PROJECTS Bus Terminal - Ottawa, ON Maintenance bay repairs, total area 4,680ft2 - StonDeck FD2 HD (2021)
Sportsplex Arena - Langley, BC Total area 39,500ft2 - StonDeck XD2 (2011) TD Place - Ottawa, ON Underground parking, total area 18,000ft2 - StonDeck XD2 (2015) Union Street - Montréal, QC Underground parking, total area 8,000ft2 - StonDeck XD2 (2013)
STONDECK PROJECT INSTALLATIONS Hospital / Ambulance Bay / Police Facility Projects 7th Avenue - Calgary, AB Total area 29,000ft2 - Sealer (2017)
Princess Lane - Waterloo, ON Total area 11,000ft2 - Sealer (2016)
Advent Health Care - North York, ON Total area 18,000ft2 - StonDeck FD2 & StonDeck XD3 (2017)
Princeton Waterfront Condominium - Calgary, AB Total area 11,700ft2 - Silicate Sealer (2015)
Barrie Simcoe EMS - Barrie, ON Total area 25,000ft2 - StonDeck FD2 HD (2020)
Queensway Carelton Hospital - Winnipeg, MB Repairs stalls, drive lanes & parking spaces, total area 5,560ft2 StonDeck FD2 HD (2020)
Collins Bay Institution - Kingston, ON Modular kitchen, total area 3,200ft2 - StonDeck FD4 (2018) Defense Construction Canada (DCC) - St. John’s, NL Total area 6,000ft2 - StonDeck FD2 HD (2019) Service wash bay, total area 7,800ft2 - StonDeck XD2 (2021)
RCMP Ramp - Fredericton, NB Total area 580ft2 - StonDeck XD3 (2018) St. Michaels Hospital - Toronto, ON Total area 800ft2 - StonDeck XD2 (2018)
OLRT - Ottawa, ON Total area 49,300ft2 - Sealer (2016)
Super Clinique - Gatineau, QC Total area 12,900ft2 - Silicate Sealer (2017)
Parkland Regional Health Centre - Dauphin, MB Ambulance Bay, total area 2,480ft2 - StonDeck XD2 (2019)
Thompson General Hospital - Winnipeg, MB Parking deck, total area 2,100ft2 - StonDeck FD2 (2021)
Peel Memorial Hospital - Brampton, ON Total area 100,000ft2 - Sealer (2017) Total area 130,000ft2 - StonDeck FD2 (2017)
MECHANICAL ROOM PROJECTS Calgary City Centre - Calgary, AB Total area 37,888ft2 - StonDeck XD2 (2013)
Toronto Condominium - Toronto, ON Total area 700ft2 - StonDeck FD (2017)
EDUCATION PROJECTS Central Public School - Pembrooke, ON Entrance, total area 330ft2 - StonDeck QD2 (2019) Ecole de Technologie Superieure - Montréal, QC Total area 42,000ft2 - StonDeck XD2 (2017) Column repairs - total area 265ft2 - StonDeck XD1 (2018)
McMaster University - Hamilton, ON Total area 2,720ft2 - StonDeck XD4 Slab on grade sealer, total area 19,000ft2 (2019) University of Western Ontario - London, ON Exterior ramp, total area 400ft2 - StonDeck FD4 (2019)
Ecole Technologie Superieure - Montréal, QC Bay repairs, total area 100ft2 - StonDeck FD2 (2020)
POWER / WATER WASTEWATER PROJECTS Cold Lake Energy Centre - Bonny Ville, AB Total area 2,360ft2 - StonDeck FB4 (2019)
Englishman River WTP - Parksville, BC Treatment rooms - total area 9,178ft2 - StonDeck FD2 (2019)
STONDECK PROJECT INSTALLATIONS balcony repair projects All Seniors Care Living Centre - Calgary, AB Total area 11,100ft2 - StonDeck FB4 (2016)
Les Condos Project 2 - Montréal, QC Balcony, total area 150ft2 - StonDeck FB4 (2018)
Terrasses Alston - Anjou, QC Total area 6,050ft2 - StonDeck FD4 (2016)
Terrasses Monet - Pointe-Claire, QC Total area 13,800ft2 - StonDeck FD4 (2016)
Best Western - Truro, NS Total area 2,500ft2 - StonDeck FB4 (2017)
Western University - London, ON Total area 915ft2 - StonDeck FB4 (2017)
Georgetown Rental Units - Georgetown, ON Total area 700ft2 - StonDeck QD3 (2017)
Windermere Golf & Country Club - Edmonton, AB Total area 2,700ft2 - StonDeck XD2-UV (2014)
Greystone Brewing - Fredericton, NB Total area 500ft2 - StonDeck FB4 (2018)
waterproofing projects - stondeck polyurethane-mma hybrid system The versatile nature of the MMA system has allowed Stonhard the opportunity to use them for waterproofing major structures and landmarks, some of which we detail below: 41 Rue King Condominium - Montreal, QC Column repairs, total area 380ft2 - StonDeck FD2 (2018) 350 Webb Drive - Mississauga, ON 500ft2 of StonDeck QD3 installed in 1 day (2013) ALMISE Co-operative Homes Inc. - Toronto, ON 500ft2 of StonDeck QD3 installed in 1 day (2012) Charles Street Condo - Toronto ON 600ft2 of StonDeck QD3 installed (2016) City Gate Complex - Mississauga, ON 2,000ft2 of StonDeck QD3 installed in 2 days (2013) Canada Games Stadium - Saint John, NB Podium deck waterproofing for the entire stadium, total area 15,000ft2 - StonDeck QD4 25,000ft2 - Coatings (2010) Calgary Housing Authority - Calgary, AB Sundeck waterproofing, total area 2,700ft2 (2010)
EXTERIOR WATERPROOFING PROJECTS Ottawa Hydro - Ottawa, ON Total area 25,500ft2 - StonDeck FD4 (2016)
Don Mills Condo - Toronto, ON 1,000ft2 of StonDeck FD2 installed (2016) Kingsbridge Grand - Mississauga, ON 2,500ft2 of StonDeck QD3 installed in 1 day (2013) Niagara Detention Centre - Niagara, ON Waterproofing to external exercise yard, total area 5,000ft2 (2010) Rogers Centre / CN Tower Salmon Pond Fountain - Toronto, ON Re-waterproofing to prevent leaking into the basement parking structure, total area 2,500ft2 (2009) Victoria University - Toronto, ON External entrance deck waterproofing, total area 1,500ft2 (2012) 500ft2 of StonDeck QD3 installed in 1 day (2013) Yonge Street Condo - Toronto, ON 1,400ft2 of StonDeck QD3 installed (2016) York Mills Condo - Toronto, ON 600ft2 of StonDeck XD2 installed (2017)
800.263.3112 www.stonhard.ca
#2616-05/21