PROJECT INSTALLATIONS BARRY CALLEBAUT
Projects Completed in Barry Callebaut Chocolate Manufacturing Facilities Include:
Saint-Hyacinthe, Quebec
Stonclad GS, Stonclad UR, Stonclad UT, Stonclad HT, Stonshield HRI, Stonchem 620, Stonkote GS4, Stonkote HT4
Employee Entrance, Corridor, Fat Room, Laundry Room, Powder Room, Forklift Corridor, Refiner, Hot Room, Tank Room, Pedestrian Area, Production Area, Factory, Warehouse, Pump Area, Melter Area
Montreal, Quebec
Stonclad GS, Stonkote GS4
Fridge Area, Various Rooms
Chatham, Ontario
Stonclad GS, Stonclad UR, Stonclad UL, Stonclad HT, Stonkote GS4, Stonkote HT4
Mezzanine, Wash Bays, New Mold Line, Drain Repair
![](https://assets.isu.pub/document-structure/230605152153-b7b9e1ad1f31ec0b2db3e599b79a431d/v1/54cce22cbdf1f6ea45a1d8526d885723.jpeg)
![](https://assets.isu.pub/document-structure/230605152153-b7b9e1ad1f31ec0b2db3e599b79a431d/v1/e40524856e0ae59b8e4f7268fba36ec3.jpeg)
STONHARD.CA | 800.263.3112 @ 2023 STONHARD 05/23