WORK EXAMPLES Sung Hye Park 02. 01. 2018
‘We have the world to live in on the condition that we will take good care of it. And to take good care of it, we have to know it. And to know it and to be willing to take care of it, we have to love it.’ - Wendell Berry, Poet, farmer, writer, activist and academic
Urban Design and Civic Place / Community and Regional Planning • Project title: Thu Thiem New Urban Area (Dai Quang Minh Development) Stage 1 Stage 1 Stage 2 Stage 2 Stage 3 Stage 3 Stage 4 Stage 4 Stage 5 Stage 5 StageVietnam 1 Stage 2 Stage 2 Stage 3 Stage 3 Stage 4 Stage 4 Stage 5 Stage 5 • Location: Ho ChiStage Minh1 City, 2.34 ha Park 2.34 ha Park • Year: 2012 2014 2.34 ha Park 2.34 ha Park Zone 2A Zone 2Avilla township, waterfront park, eco-wetland resort, convention center, mixed-use and condo • Usage: High-end Zone 2ACaZone 2A Tre Canal Ca Tre acres Canal (128.69ha) • Site area: 318 Ca Tre Canal Ca Tre Canal ZoneLead 3A Zone 3A • My role: Designer for Concept and Schematic Design Dai Quang Minh Development, Thu Thiem New Urban Area, District 2, Ho Chi Minh City, Vietnam (2012 - Present) Zone 3AMarina Zone 3A Park Marina Park Dai Quang Minh Development, Thu Thiem New Urban Area, District 2, Ho Chi Minh City, Vietnam (2012 - Present) Marina Park Marina Park
Zooming in location
3 Flower Market & Park (2.34 Ha)
3 Flower Market & Park (2.34 Ha)
7 Zone 2A (2.89 Ha)
2 Ca Tre Canal (10.5 Ha)
2 Ca Tre Canal (10.5 Ha)
7 Zone 2A (2.89 Ha)
Zooming in location
5 Zone 3 (34.91 Ha)
5 Zone 3 (34.91 Ha)
4 Marina Convention Centre (5.46 Ha)
6 Natural Park (15.3 Ha)
4 Marina Convention Centre (5.46 Ha)
6 Natural Park (15.3 Ha)
1 Zone 2 (37.15 Ha)
Regional plan
AREA (Ha)
TITLE 1 Zone 21 ZONE 2 (37.15 Ha)
2 CA TRE CANAL PARK 3 FLOWER MARKET PARK 4 MARINA CONVENTION CENTRE 5 ZONE 3 6 NATURAL PARK
7 ZONE 2A TITLE 1 ZONE 2 2 CA TRE CANAL PARK 3 FLOWER MARKET PARK
PROFILE
37.15 10.50
Villa Township, public park, clubhouse, school & streetscape Waterfront park, bridges, retail & clubhouse rooftop garden
2.34 5.46 34.91
Sightseeing & commercial facility on waterfront Commercial, clubhouse & exclusive garden Commercial boulevard, podium rooftop garden, school, park & clubhouse
15.30
Sports facility, natural & vernacular landscape park
AREA (Ha) 2.89 PROFILE Commercial & hospitality facility 37.15 108.55 Villa Township, public park, clubhouse, school & streetscape 10.50 Waterfront park, bridges, retail & clubhouse rooftop garden 2.34 Sightseeing & commercial facility on waterfront
Regional plan
New Communities and Housing / Campus and Institutions
Stitching parcels, understanding the site context and keeping coherence
Parks and Open Space
Understanding the site, finding nods and traffic speed
New Communities and Housing / Mixed Use and Retail
Integrated landscape master plan
Mixed Use and Retail
3.1.2 CONCEPT DIAGRAM
• Project title: ARCA South • Location: Taguig City, the Philippines • Year: 2014 • Usage: Public realm, commercial landscape and streetscape • Site area: 183 acres (74 ha) • My role: Lead Designer and Project Manager for Concept Design
ES
A.1
.2
y
Squares, composed
ERA
LL
SKE
TCH
Scattered
PLA
N Rounded
Re-composed + Superimposed
Methodology in shaping
L AND SC APE DE SI GN CO N CE P T
44
TC
H
Landscape design sketch
KE
Cit
OV
LANDSC APE DESIG N CONC EPT
46 62
2
19 18
3
5 4
7
8
11
18
29
27
31
27
27
27 LA N DS C A P E DES IGN CON CEP T
L A ND S C A P E D E S I G N CO NC E P T
LA N DS C A P E DES IGN CON CEP T
L AN D S C APE D ES IG N CO N C EPT
3.4.3 PERSPECTIVE
50
72 0
1:1000
10
12 5
9
31
28
31 5
13
16
5
27
30 19
15
22
10
10
14
6
17
18
0
1:2000
20
50
22
23
5
25
24
26
31
19
18
100m
20
1 18
2 19
6 24
9
4
9 9
5
21
40m L A ND S C A P E D E S I G N CO NC E P T
L AN D S C APE D ES IG N CO N C EPT
3.2.3 PERSPECTIVE
3.6.5 PERSPECTIVE 1
51
3.1.4 ILLUSTRATED UNION SQUARE PLAN
63 73
Mixed Use and Retail / Resort, Hospitality and Recreation • Project title: Medini Lakeside Plot B78 + Lake Rejuvenation • Location: Johor, Malaysia • Year: 2014 - 2015 • Usage: Waterfront and mixed use with hospitality, service residence, office • Site area: 18 acres (7.3 ha), 13 acres (5.3 ha) of water surface • My role: Design Lead and Project Manager for Schematic Design, Design Development and Tender Package
56 L a n d s c a p e C o n c e p t D e s i g n
Report
1.6 INITIAL CONCEPT DESIGN ILLUSTRATIVE LANDSCAPE PLAN (GROUND LEVEL)
26
05 22 56
Landscape Schematic Design Report [] Chapter 2. Schematic Landscape Design
Landscape Schematic Design Report []
57
Chapter 2. Schematic Landscape Design
2.2 DETAILED BLOW-UP SCHEMATIC DESIGN
2.2 DETAILED BLOW-UP SCHEMATIC DESIGN
RETAIL PROMENADE - ZONE 1B - RETAIL PROMENADE PERSPECTIVES
RETAIL PROMENADE - ZONE 1B - RETAIL PROMENADE PERSPECTIVES
26
03
03
FL +15.15
02
FL +13.40
04
19
03 FL +16.20
12
21
VIEW OF THE FLOATING STAGE
21
06
18
18
14
16
FL +11.00
09
20
09
08
14
14
TS +9.20
15
14 28
07 11
10
WL +9.00
28
27
01
13
FL +11.50
18 FL+11.00
28
14
14 62 L a n d s c a p e C o n c e p t D e s i g n
Report M E D I N I LOT B 7 8 & L A K E R E J U V E N AT I O N
18
11
63
RL +12.70
1.6 INITIAL CONCEPT DESIGN RETAIL PROMENADE VIEW THROUGH RETAIL PROMENADE
FL +9.20
27
13
17
09 [ ] M E D I N I LOT B 7 8 & L A K E R E J U V E N AT I O N
18 16
09
09 12
14
LEGEND 1. Lake 2. Upper pro 3. F&B \Retai 4. Drop off 5. Parking ar 6. Lower pro 7. Bridge 8. Wetland te 9. Interpreta 10. Upgrade f 11. Boardwalk 12. Lake arriva 13. Water feat 14. Stormwate 15. Bus stop 16. Stormwate 17. Amphithe 18. Stop Node 19. Hotel Arri Water Feat 20. Sculptural M Exit Lands 21. Water Feat 22. Hotel 23. Maintenan 24. Connectio 25. Viridea Me 26. Buffer Plan 27. Pontoon 28. Floating W
12
RL +16.70
M E D I N I LOT B 7 8 & L A K E R E J U V E N AT I O N [ ]
14 18 28
11
18
24
11 27
10
13
09
12
14
18
11
14
11
23 12 12 18
11
25
15
0 Scale 1:1500
Resort, Hospitality and Recreation • Project title: Village Nature Paris (Rancho Davy Crockett Renovation) • Location: Bailly-Romainvilliers, France • Year: 2010 • Usage: Hospitality for Eco-tourism • Site area: • My role: Design Lead for master planning
01 Concept
02 The clearnings
03 The trail and cluster
Forest
04 36 Clans
05 Masterplan
Forest cluster
Community and Regional Planning • Project title: River of Life, Early Works Package Precinct 7 • Location: Kuala Lumpur, Malaysia • Year: 2014 - 2015 • Usage: Waterfront, heritage trail (part of River of Life Master Plan) • Site area: 3.59 acres (14,521 sqm) • My role: Project Manager during construction and post-construction
10
Traditional patterns served as inspiration
SILA Awards 2015
Jalan Petaling
New cafe on the Historic Triangle
New signage and wayfinding
Site Plan of Early Works Package
Daytime at Bangkok Bank Triangle
Art installation by local artist
Creative seating designs add vibrancy
Early Works Package site plan
Historic Triangle at night
Contemporary Streetscape
Sculptures Cafe
Heritage Trails
Historic Triangle
Parks and Open Space / Waterfront • Project title: Sejong Lake Park • Location: Sejong-si, South Korea • Year: 2011 • Usage: Waterfront, regional park • Site area: 174.40 acres (70.58 ha), 79.77 acres (32.28 ha) of water surface • My role: Project Manager in Landscape Design during construction
New Communities and Housing • Project title: Bahrain PPP Social and Affordable Housing • Location: Bahrain • Year: 20015-2016 • Usage: Collective Housing • Site area: 311 acres (126 ha) (Al Luwzi and AMAS combined) • My role: Project Manager and Design Lead during Construction Documents and Site Supervision
New Communities and Housing / Urban Regeneration • Project title: Seoul Sillim Humansia • Location: Seoul, South Korea • Year: 2005-2007 • Usage: Collective Housing • Site area: 38.14 acres (154,366 sqm) • My role: Project Manager in Landscape Design during tender submission and construction
New Community and Regional Planning / Urban Regeneration • Project title: Kwangju Yanglim Humansia • Location: Kwangju, South Korea • Year: 2005-2008 • Usage: Collective Housing • Site area: 21 acres (84,984 sqm) • My role: Project Manager in Landscape Design during design and construction
Campus and Institutions / Sustainability / Green Building • Project title: CleanTech One @ CleanTech Park • Location: Singapore • Year: 2011-2012 • Usage: Research & Development (R&D), test bedding of clean technologies • Site area: 3.71 acres (1.50 ha) • My role: Project Manager during design and construction
Campus and Institutions / Sustainability / Green Building • Project title: CleanTech Three @ CleanTech Park • Location: Singapore • Year: 2015-2016 • Usage: R&D, test bedding of clean technologies • Site area: 7.24 acres (2.93 ha) • My role: Project Manager in Landscape Design during Concept and Schematic Design
AMPHITHEATRE | VIEW OF LANDSCAPE FEATURE STAIRS
58
JTC CLEANTECHTHREE 5TH MAY 2016
Competitions / Post-industrial Regeneration / Adaptive Reuse • Project title: Jurong Lake Garden • Location: Singapore • Year: 2016 • Usage: Waterfront Park • Site area: 222 acres (90 ha) • My role: Project Research Lead
THEME
12Nodes 12Nodes Adjacency Adjacency ProgramProgr Woodlands Checkpoint
Woodlands Checkpoint Access Park into RC Kranji/Woodlands N1
N2
N1
Segment 5 - 4.56Km Kranji MRT Stn.
N2
Sungei Kadut Avenue
Productive landscape, wetlands,wetlands, collectivecollective farmers’Productive Mandai Mangrove Productive landscape, farmers’ landscape, wetla market, X-ing nodeX-ing to Johor(Malaysia Gateway),Gateway), cul-market, X-ing node to Johor market, node to Johor(Malaysia culSungei Mandai tural anchor, mangrove park, farms, war memorial tural anchor, mangrove park tural anchor, mangrove park, farms, war memorial Pang Sua Canal Kranji Turf Club Kranji War Memorial
Access into RC MandaiPark Mangrove Sungei Mandai Pang Sua Kranji MRTCanal Stn. Kranji Turf Club Kranji War Memorial
Sungei Kadut Industrial Estate
Sungei Kadut Industrial Estate
N3
N3
Stagmont Ring
Stagmont Ring
Garden, commu Community Garden, community involvement proCommunity Garden, community involvement pro- Community CCK Residential area grams, CCK Residential area, connection the zoo grams, CCK Residential area, connection to the zootograms,
Segment 4 - 5.08Km
N4
Steel Bridge (removed) N4 Urban Green-Blue Integration @ CCK
N5
Key Activity Node
N5
Former Bukit Timah Fire Stn. Key Activity Node
N6
Hindhede Gerder Bridge Segment 3 - 5.84Km
N6
Hindhede Gerder Bridge
N7
Bukit Timah Railway Stn.
N7
Bukit Timah Railway Stn.
N8
Crossing w/ Green+Blue
N8
Crossing w/ Green+Blue
N9
Crossing w/ Green, Blue+public transport node Segment 2 - 4.41Km
N9
Crossing w/ Green, Blue+public transport node
N10
Queensway Viaduct
N10
Queensway Viaduct
Bukit Merah Bus Interchange
N11
Bukit Merah Bus Interchange
N12
Tanjong Pagar Railway Stn.
Steel Bridge (removed) Urban Green-Blue Integration @ CCK
Hillview
water, adventure & na Former Bukit Timah Fire Stn. Fresh water, adventure nature, community garden, Fresh water, adventure & nature, & community garden,Fresh Education & Play, Central Gr & Play, Central Green EducationEducation & Play, Central Green
Holland Rd
Historic overlay, WSUD, food Historic overlay, WSUD, trail, art, temple, Historic overlay, WSUD, food trail,food urban art,urban temple, landscape, Urban For smart landscape, Urban Forest, + research +smart developsmart landscape, Urban Forest, research development, ecology ment, ecology ment, ecology
Alexandra Rd
N11
Segment 1 - 4.60Km
N12
Tanjong Pagar Railway Stn.
PLATFORMS: Safe Rail-Trail Connector + + TPRS
Heritage trail, Southern Rid Heritage trail, Southern Ridge, Civic surroundings Heritage trail, Southern Ridge, Civic surroundings
WOODLANDS NORTH COAST
North Coast Innovation Corridor Round Island Corridor / PCN Woodlands North MRT (Cross-border link to Malaysia)
01
WOODLANDS CHECKPOINT
Mandai Mudflats / Woodlands Town Garden Round Island Corridor / PCN
02
KRANJI MRT STATION
Kranji Turf Club Round Island Corridor / PCN Bus Terminal to Kranji Farms (20mins) ,Cross-border link to Malaysia (30 mins) Kranji War Memorial
Mandai Zoo (15mins)
03
YEW TEE COMMUNITY
2 Schools, Nursing Home, 10mins walk to CCKTown Orange Western Adventure Loop Cycling Trail / PCN 10mins walk to Yew Tee MRT
04
CHOA CHU KANG COMMUNITY Ten Mile Junction, New Housing Development Orange Western Adventure Loop Cycling Trail / PCN MRT Interchange with Bukit Panjang MRT, Ten Mile Junction LRT Cashew MRT Orange Western Adventure Loop Cycling Trail / PCN
B B
05
B
Bridge by Rail Mall (EXISTING) Rail Mall Upper Bukit Timah Rd
Upper Bukit Timah Rd
BUKIT TIMAH PARKLAND
06
B
B
B
Hillview Bridge (NEW) Hillview MRT
B
B
Old Fort Factory, Former Bukit Timah Fire Station, Bukit Batok Nature Park, Bt Timah Nature Reserve Hindehede Girder Bridge (EXISTING)
UNDER PIE
School, Mayfair Park Beauty World MRT
07
B
Upper Bt Timah Rd Rail Corridor Staage 1 Pre-Qualification
7
BTRS Bridge (EXISTING)
BUKIT TIMAH RAILWAY STATION
BTRS Bridge, School, Bt Timah Linear Park Upper Bt Timah Rd King Albert Park MRT
08
FAIR-FACE BRICK DRAIN
Middle-Density Residential Estate, Holland Woods WHY IS THIS SHELTER COOL EVEN THOUGH IT IS NOT PLUGGED?
09
BUONA VISTA
One North (5mins) Ulu Pandan PCN (5mins)
10
Bus Terminal (5mins) Buona Vista MRT
THIS ROBOT WALK IS SO COOL!
THANKS TO THE X-SING TO CONNECT ACTIVE TRAVEL MAP, I KNEW WHERE MY FAVORITE FOOD TRUCK IS STATIONED TODAY!
QUEENSWAY VIADUCT
Wessex Estate, Commonwealth) Commonwealth MRT (5mins)
BUKIT MERAH TOWN CENTRE
11
Bt Merah Town Centre, Southern Ridges (10mins) Bt Merah Bus Interchange
TANJONG PAGAR RAILWAY STATION Southern Waterfront, Eco-corridor
+
12
+
Keppel Rd
MARINA BAY / GARDENS BY THE BAY
Gardens by the Bay, Eco-Corridor, Marina South Bayfront MRT, Marina South MRT
5. Integrate technology driven open space experience Use of technology in the outdoor environment can invigorate the visitor experience and highlight the vast array of activities; events and functioning of the spaces that help people meaningfully connect with and actively engage audiences by inviting them to participate and contribute. The X-Sing to Connect enabled applications will encompass all things related to active travel and sustainability for the broader Corridor.
This may include information such as events calendar, transport information, associated organisation lists and links, community forum discussion rooms, information page on initiatives platforms. The X-Sing to Connect Active Travel Map could also represent and promote walking and cycling routes, destinations, time sheds, light rail stops and community highlights.
“X-SING TO CONNECT” WILL INSPIRE THE COMMUNITY, CELEBRATE NATURE, UNLOCK VALUE IN THE HEART OF THE CITY AND CONNECT PEOPLE TO THE NATURAL AND CULTURAL HERITAGE ACROSS THE LENGTH OF SINGAPORE.
TOCONNECT
THE RAIL CORRIDOR IS A PLACE BRIMMING WITH UNEXPLORED POTENTIAL. IT HAS DEEP HISTORICAL SIGNIFICANCE, BY PROVIDING AN OPEN SPACE SETTING AND REMOVING THE FORMER RAIL ECO CORRIDOR BARRIER THE CORRIDOR WILL BE A FANTASTIC PLACE CONNECTING TRANSITION TO SINGAPORE’S PEOPLE AND PLACES LIKE NO OTHER. THIS LINEAR GARDENS BY THE OPEN SPACE CROSSING WILL CREATE DESTINATIONS TO ENJOY STRAITS: A NEW THAT ARE ROOTED IN THE CULTURE AND HISTORY OF SINGAPORE’S WETLAND AND DIVERSE COMMUNITIES TO PROMOTE A HEALTHY AND MANGROVE PARK SUSTAINABLE LIFESTYLE. CONNECTING TO SUNGEI
This way to:
MOVEMENT CORRIDORS
⁄ Woodlands Checkpoint ⁄ Future Woodlands North Coast Innovation Corridor
MARINE TRANSIT
⁄ Woodlands North MRT (Cross-border link to Malaysia)
TRAM
PERSONAL BICYCLE TRANSIT OPTIONS
PEDESTRIAN
BULOH WETLAND RESERVE.
WE HAVE IDENTIFIED TWELVE (12) KEY CONNECTING NODES OR “PLATFORMS” AND TWO (2) ECO CORRIDORS ALONG THE 24 KM CORRIDOR CONNECTING SINGAPORE FROM NORTH COAST TO SOUTH COAST. THESE PLATFORMS WILL REALIZE THE “X-SING TO CONNECT” CONCEPT THROUGH RAIL TO TRAIL CONNECTIONS, ACTIVE NON-MOTORIZED TRAVEL AND OPPORTUNITIES OF COMMUNITY ENGAGEMENT AT ALL TIMES. FURTHER, THESE WILL BE INTEGRATED WITH CURATED KEY MOMENTS THAT BECOME PERMANENT IDENTIFIABLE ARCHITECTURAL INSTALLATIONS.
+
ECO CORRIDOR
This way to: ⁄ Sungei Buloh Wetland Reserve ⁄ Kranji Farms
A GREEN CONNECTOR TO FUTURE WOODLANDS MRT, WOODLANDS TOWN PARK AND THE FUTURE WATERFRONT OF INNOVATION PARK
WOODLANDS CHECKPOINT
WOODLANDS NORTH COAST ⁄ Round Island Corridor / PCN
01
This way to: ⁄ Woodlands Checkpoint ⁄ Future Woodlands North Coast Innovation Corridor ⁄ Woodlands Town Garden
WOODLANDS CHECKPOINT ⁄ Mandai Mudflats ⁄ Round Island Corridor / PCN ⁄ Woodland Town Center
KRANJI MRT
EVOLUTION OF A CITY NORTHERN GATEWAY
02
A PRODUCTIVE LANDSCAPE AND AGRITOURISM INITIATIVE AND A GATEWAY WITH STRONG CONNECTIONS TO JOHOR BAHRU, SINGAPORE ZOO, KRANJI CEMETERY AND SINGAPORE TURF CLUB
This way to: ⁄ Kranji War Memorial ⁄ Mandai Zoo ⁄ Sungei Buloh Wetland Reserve ⁄ Kranji Farms
KRANJI MRT ⁄ Kranji Turf Club ⁄ Round Island Corridor / PCN ⁄ Bus Terminal to Kranji Farms ⁄ Cross-border BUS link to Malaysia
This way to: ⁄ Marsiling Neighbourhood
03
COMMUNITY TOWN PARK
YEW TEE COMMUNITY ⁄ Orange Western Adventure Loop Cycling Trail / PCN
This way to: ⁄ Sungei Kadut Industrial Estate ⁄ Mandai Zoo
A SPACE FOR ACTIVE RECREATION AND PLAY GROUNDS WITHIN COMMUNITY GARDENS WITH SAFE STREET CONNECTIONS TO THE MRT LINE This way to: ⁄ Yew Tee Neighbourhood ⁄ 2 Schools ⁄ Nursing Home
YEW TEE COMMUNITY
NEW COMMUNITY
04
A NEW COMMUNITY WITH A REGIONAL PARK EMBRACING ROBUST SUSTAINABILITY INITIATIVES IN REGIONAL ECOSYSTEMS, WSUD, BIODIVERSITY AND MICROCLIMATE
CHOA CHU KANG COMMUNITY ⁄ Orange Western Adventure Loop Cycling Trail / PCN ⁄ MRT Interchange with Bukit Panjang MRT ⁄ Ten Mile Junction LRT ⁄
This way to: ⁄ Chua Chu Kang New Town This way to: ⁄ Bukit Panjang New Town
Hillview Bridge
Bridge at Rail Mall
ECO LINK
05
CHOA CHU KANG
A NEW PEDESTRIAN BRIDGE STRUCTURE TO LINK RIDGE LINES OF ADJACENT OPEN SPACE RESERVES PROVIDING INCREASED HABITAT. INCORPORATE ADAPTIVE REUSE OF FIRE STATION AND FORD FACTORY WITH APPROPRIATE PROGRAMS
This way to: ⁄ Old Ford Factory ⁄ Dairy Farm ⁄ Rail Mall
This way to: ⁄ Bukit Batok New Town ⁄ Tengah New Town
Hindehede Girder Bridge
ACTIVE PLUGINS
06
PROVIDE SHADED WALK UNDER THE EXPRESSWAY FOR ADJACENT SCHOOLS AND PARKS AND PLUG-IN SMALL PIECES OF ACTIVE RECREATION AND FLEXIBLE SPACE FOR MARKETS AND OTHER EVENTS
This way to: ⁄ Bukit Timah Residential Community ⁄ Schools ⁄ Bukit Timah Plaza
BTRS Bridge
BUKIT TIMAH PARKLAND
07
CULTURAL LANDSCAPE
UNDER P.I.E
AN ARCHITECTURAL JEWEL AND ARBOR TO PROVIDE SHADE AND FLEXIBLE COMMUNITY EVENT SPACE. INTEGRATE CHILDREN’S PLAY ON EXISTING RAILWAY LINE WITH A TROLLEY CAR. ADAPTIVE REUSE OF THE SIGNAL BOX AND STATION MASTERS HOUSE AS DINING FACILITY
UNDER P.I.E ⁄ Mayfair Park ⁄ Beauty World MRT
This way to: ⁄ Bukit Timah Residential Community ⁄ Bukit Timah Nature Reserve
BUKIT TIMAH RAILWAY STATION ⁄ Bt Timah Linear Park ⁄ King Albert Park MRT
This way to: ⁄ Bukit Timah Residential Community ⁄ Schools
This way to: ⁄ Bukit Timah Residential Community ⁄ Schools
WSUD EDUCATION
BUKIT TIMAH STATION
BUKIT TIMAH PARKLAND ⁄ Former Bukit Timah Fire Station ⁄ Bukit Batok Nature Park ⁄ Bt Timah Nature Reserve
08
FAIR-FACE BRICK DRAIN ⁄ Clementi Woodlands
This way to: ⁄ Future Residential Neighbourhood
POTENTIAL LOCATION OF WATER TREATMENT PLANT OR PUMP HOUSE FOR THE PROPOSED POTABLE WATER PIPELINE. THE BUILDING WILL HAVE A VISITORS CENTER AND GALLERY SPACE
FAIR FACE BRICK DRAIN
TECHNOLOGY LANDSCAPES SMART LANDSCAPE INTERVENTIONS ADJACENT TO THE FAMOUS ONE NORTH SCIENCE PARK INCLUDING KNOWLEDGE GARDEN AND INITIATIVES LIKE URBAN FOOD JUNGLE
BRINGS TOGETHER FORMAL ART SCENE OF GILMAN BARRACKS AND INFORMAL ARTS STUDIOS AND RESIDENCES OF WESSEX ESTATE. FACILITATE EVENTS PROGRAM OF OUTDOOR ART INSTALLATIONS SET WITHIN SCULPTURE GARDENS AND INCLUDE ADAPTIVE REUSE POTENTIAL OF ALEXANDRA HOSPITAL WITH APPROPRIATE PROGRAMS
BUONA VISTA
09
This way to: ⁄ Ghim Moh Neighbourhood ⁄ Holland Village
This way to: ⁄ Bus Terminal ⁄ Ulu Pandan PCN
ART SPACE
10
QUEENSWAY VIADUCT ⁄ Wessex Estate ⁄ Alexandra Hospital
This way to: ⁄ Queensway Neighbourhood This way to: ⁄ Gilman Barracks (Formal Arts Cluster) ⁄ Southern Ridges (Alexandra Arch) ⁄ Commonwealth MRT
STRONG TOWN CENTER CONNECTION AND ACTIVE TRANSPORT GATEWAY TO THE SOUTHERN RIDGES
QUEENSWAY VIADUCT
BUONA VISTA ⁄ One North ⁄ Buona Vista MRT
11
This way to: ⁄ Redhill Community
BUKIT MERAH TOWN CENTER ⁄ Bt Merah Town Centre, ⁄ Bt Merah Bus Interchange
TOWN CENTRE
This way to: ⁄ Depot Road Neighbourhood ⁄ Mount Faber and Southern Ridges
HERITAGE AND ADAPTIVE REUSE
12
TANJONG PAGAR
BUKIT MERAH TOWN
⁄ Southern Waterfront (Future) ⁄ Eco-corridor
TANJONG PAGAR
A SPACE FOR EVENTS, F+B, ENTERTAINMENT FOR THE FIRST TWENTY YEARS. POTENTIAL FOR RETAIL AND A BOUTIQUE HOTEL, COMMERCIAL STUDIOS, POP UP ART SPACES. PROVIDE MULTIPLE CONNECTIONS TO THE FUTURE GREATER SOUTHERN WATERFRONT
ECO CORRIDOR TO GARDENS BY THE BAY
Population 96%
7% 11%
Households with Income below the Singapore median 96 96% %
0 - 10,000 10,000 - 50,000 0%
50,000 - 100,000
8% 18%
11% 8%
0%
100,000 - 150,000 150,000 - 200,000
10% 7%
200,000 - 250,000 250,000 - 300,000
Primary Dryland Forest
10,000 - 20,000
Old Secondary Forest
20,000 - 30,000
Young Secondary Forest
30,000 - 40,000 90% 78%
87%
Habitat Types
< 5,000
>40,000 No Data % Proportion of Population Residing in HDB Flats
Scrubland Managed Vegetation Mangrove Forest Freshwater Swamp Water
Rail Corridor
1
DISUSED
+
MARINA BAY ⁄ Gardens by the Bay, Eco-Corridor ⁄ Marina South ⁄ Bayfront MRT ⁄ Marina South MRT
ECO CORRIDOR CONNECTION THROUGH SINGAPORE BUSINESS DISTRICT EXPANSION TO CONNECT WITH MARINA BAY AT GARDENS BY THE BAY
0%
9% 9%
This way to: ⁄ Outram ⁄ Chinatown
Schools
Neighborhoods
80 41
EDUCATIONAL INSTITUTIONS
SUB ZONES
MRT Connections
19
MRT STATIONS
Nature Reserves
4
BUKIT BATOK,LABRADOR, BUKIT TIMAH & SUNGEI BULOH WETLAND RESERVE
Competitions / Adaptive Reuse / WSUD • Project title: Jurong Lake Garden • Location: Singapore • Year: 2016 • Usage: Waterfront Park • Site area: 222 acres (90 ha) • My role: Project Research Lead
JURONG, SINGAPORE
FUTURE PARK CONNECTOR NETWORK*
LEGEND JURONG LAKE PARK EXISTING PARK
[PARK, OPENSPACE, BEACH AREA AND SPORT&RECREATION]
EXISTING PARK CONNECTOR NETWORK
JURONG, SINGAPORE
WATER
FUTURE PARK CONNECTOR NETWORK
* PARK CONNECTOR NETWORK : PCN
LEGEND JURONG LAKE PARK WATER WATER CATCHMENT AREA
Barn House Esches
Residential Gardens
- Impressionist, post-impressionist, figurative painings depicting garden activities - Place for retreat appreciating seasonal transformation in nature
with meditative loop path for different activities • Project- Necklaced title: Barnhouse Esches - Front courtyard to be refurbished for better first impression of the house • Location: Esches, France - Back garden to be touched-up with minor arrangement • Year: 2017 • Usage: Single family home with three children • Site area: 8,072 sqf (750 sqm) • My role: Design Lead for Pre-liminary Design
A Woman Walking in a Garden, 1887 Vincent Van Gogh
Arbor Robert Alexander Graham
In the Garden Paul Milner
Barn House Esches
Barn House Esches
1
2
- Impressionist, post-impressionist, figurative painings depicting garden activities - Place for retreat appreciating seasonal transformation in nature - Necklaced with meditative loop path for different activities
3
4
- Front courtyard to be refurbished for better first impression of the house Garden Party Alan Maley
- Back garden to be touched-up minor arrangement Bathingwith c1912 Dame Laura Knight
Maria and Elizabeth van Rysselberghe knitting in the Garen c1912 Theo van Rysselberghe Piano Room Guest room
Family Room Kitchen
1
Reading Room
Workshop Laundry room
4 5
Garage
Main access 6 3
2
A Woman Walking in a Garden, 1887 Vincent Van Gogh
Arbor Robert Alexander Graham
In the Garden Paul Milner
Garden Party Alan Maley
Bathing c1912 Dame Laura Knight
Maria and Elizabeth van Rysselberghe knitting in the Garen c1912 Theo van Rysselberghe
6 Barnhouse gate
5
Competitions / Festival Garden • Project title: Le pouvoir des sorcières • Location: Chaumont-sur-Loire, France • Year: 2017 • Usage: show garden • Site area: 239 sq yard (200 sqm) • My role: Designer and Project Manager JARDIN N°9
JARDIN N°8
JARDIN N°7 JARDIN N°6
JARDIN N°4
BIS
JARDIN N°12 N°5 JARDIN
JARDIN N°13 JARDIN
37
JARDIN
N°14
N°4
N°2
N°15
JARDIN
JARDIN
36
JARDIN N°3
JARDIN N°17
JARDIN
N°16
N°22
JARDIN N°19
JARDIN
JARDIN N°1
N°18
JARDIN
N°23
JARDIN
JARDIN
N°19
BIS
JARDIN N°21
JARDIN N°20
42 36
34 35
30 44 41
32
°3
JARDIN N
33
28 29
25
7 5 3
27 21 20
9 13
31 22
17
8
19
9
9
2 6
11
14
1
26
12
16
40
24
23
18
39 38
10
5
4
N°24 JARDIN
Small Scale / Architecture Adlestrop Park Glass Cube
• Project title: Adlestrop Park Glass Extension • Location: Oxfordshire, UK • Year: 2011 • Usage: Outdoor living room • My role: Designer during Detail Study
Adlestrop ParkPark Glass CubeCube Adlestrop Glass
Hanging lightings or objects
Hanging lightings or objects Undulated bottom lines of timber roof
Highlighting for spots
Highlighting for spots Hanging soft materials underneath glass roof
â&#x20AC;&#x2DC;Humankind has not woven the web of life. We are but one thread within it. Whatever we do to the web, we do to ourselves. All things are bound together. All things connect.â&#x20AC;&#x2122; - Chief Seattle 1854