POR F O + L I O Architecture Selected Works by SYAFIQA HANIM BSC (ARCH) PART I & M(ARCHD D) RIBA PART II OXFORD BROOKES UNIVERSITY, UK
SH EDUCATION
SYAFIQA HANIM SHARUDDIN 3rd November 1991 Shah Alam, Selangor
Hsyafiqa.sdin@Gmail.com +60 013 980 6044
https://issuu.com/syafiqahanim
B. Science in Architecture ( PART I ) Infrastructure University Kuala Lumpur M. Architecture Applied Dersign ( RIBA PART II ) Oxford Brookes University, United Kingdom
E XP E RI E N CE
PRIMAVOC Sdn Bhd, Shah Alam January 2017 - Current
Freelance Interior Designer & Graphic Designer ADA Design Internationale, TTDI September 2015 - September 2016
Assistant Architect
My name is Syafiqa Hanim. I am a fresh Part II Architecture graduate from Oxford Brookes University, United Kingdom. A minimal individual who loves simplicity and meaningful in design. I’m able to work independently with minimal guidance as I am also competence in adapting and improvising new ideas accordingly. I have a background in Planning and Urban Design as my core studio during my First Year of Part II, and amountful of Graphic Design works, as well as Interior Design projects as my part time job. The following is a curated collection of my Architectural, design and personal work that reflect my passion for creation and ambition to convert that passion into meaningful content.
GDP Architects, Bkt Damansara February 2014 - June 2014
Internship Programme RAM Architect Sdn Bhd, Shah Alam September 2011 - March 2012
Jr. Assistant Architect S K I L L S
AutoCAD Vray Lumion Sketchup Photoshop Illustrator InDesign Vectorworks Microsoft
RE F E RE N CE S Mr. Fiqri HylmanShah Managing Director of Primavoc Sdn Bhd +60 017 269 6090 Fiqri@primavoc.com
Ar. Hayazi Agusi B Arch Studio Leader Infrastructure University of Kuala Lumpur +60 012 604 5784
E XH I BI T I O N S
Mr Charles Parrack Technology Subject Lead Oxford Brookes University, UK cparrack@brookes.ac.uk
Other
Model Making 3D Printing Laser Cutting Hand Drawing Illustrations Graphic Design
Fluent in English Free Hand Drawing Photography Design & Research
PAM Annual Architecture Student Works. Oxford Brookes Annual Exhibition of Student Works.
Managing Director ADA DESIGN INTERNATIONALE +60 012 949 0840
Associate Lecturer in Planning and Urban Design Oxford Brookes University, UK gbutina@brookes.ac.uk
Fabrication
Selected to exhibit under Infrastructure University Kuala Lumpur booth.
En. Bakhtiar Amir
Professor Georgia Watson
Software
URBAN DESIGN specialization YEAR I works . DS3 (Design Studio 3) YEAR 2 selection of works.
V O LUN T E E R
Oxford Brookes University, DS3 MA Year 2 Volunteered in the context of mapping on conservation projects and charity works in reconstruction of the rural town of Anaklia for the Anaklia Development Consortium in Georgia.
I N T E RE S T S
Enjoys Reading Literature Art and Illustrations Music Festivals
Minimalism Modern Architecture Modularity in Architecture Travelling
revilitizing huangpu riverfront huangpu, shanghai Urban Design Studio Year 1, 2016 Location : Huangpu, Shanghai Supervised : Prof. Geogia Butina Watson Prof. Regina Jon Cooper
Huangpu is located in central of Shanghai which is a fast growing and developing city. Hence, it is one of the most densely populated cities in the world with an air pollution hit a record high. As the pollution and car problem in China increases rapidly by the year, the two major problems in this over densely populated area is the narrow sidewalks which force people to walk on the street and the fact that in some parts bicycle traffic is forbidden in favour of cars. Although the site is so densely populated, it gives me opportunity to investigate and find solution on how to achieve this issue by implementing the environmental qualities on the chosen area of Huangpu Riverfront as my 800m2 test site. The main feature of the Huangpu site is its waterfront area and the green network along the riverfront of Huangpu.
Site Information Area: 241 hectareS Population: 66, 285 Density: 275 PPHa
Buildings The building type in Huangpu is mostly highrise buildings with an average height of 13 storeys high. Buildings alongside the Huangpu River get progressively taller as they move father from the river. Land Use Huangpu District was largely located in the former Shanghai International Settlement and is the commercial centre of Shanghai. The area consist a lot of Mixed-use tower buildings and acts as a major financial and business districts in Shanghai. Transportation Shanghai is one of China’s major transport centres. The central city is both a seaport and a river port, with the Huangpu River serving as an excellent harbour; at high tide, oceangoing vessels can sail up the river to the city. Shanghai’s road network was improved and expanded considerably beginning in the late 20th century, notably with the construction of a network of express highways in and around the city. However, automobile use in particular rose dramatically, especially after 2000, resulting in frequent traffic jams and delays.
developing abstract model
When studying Huangpu, the I felt that Hugh Barton’s concepts of graded density and his neighborhood model would best suit the site. Ultimately, Barton’s model combines mixed land uses with density to create a place where use intensity varies according to its accessibility and closeness to items such as high streets and transportation stops (Barton, 2002, p.201) Barton (2002) also provides us with a framework for how use intensities may be distributed throughout his model. Although this model is produced for a population density of around 50pph, its principles can still be applied to a larger scheme, in this case 800pph. His framework is categorised into five areas of the model, which gives allocations of where particular uses may be found. These concepts have been represented within the conceptual model and final masterplan:
Town Centre High-density flats and offices, retailers, cinemas, library, colleges and hospitals. Local High Streets Flats, local shops, small offices, pubs, cafes and community facilities. Inner Accessible Zone Flats, schools and small pocket parks. Outer Accessible Zone Housing, industrial, schools, parks and allotments. Green Space System Parkland, playing fields, blue networks/ features,neighborhood farms and woodland.
Ground Floor Plan
applying theory through massing Interest and richness
What? To stimulate visitors’ senses through playful interventions, including tactile materials, sound amplifiers, heavily scented plants and flowers and trees bearing sweet fruits.
Fir Floor Plan
How? Meandering paths of differing widths offer a choice of routes through the undulating topography, further enhancing the contrast between seclusion and public interaction.
2nd-5th Floor Plan
diversity
What? A place with variety and choice
COMMERCIAL
OFFICES
RESIDENTIAL
ROAD NETWORK
PUBLIC SPACE
PEDESTRIAN WALKWAY
How? To promote diversity and choice through a mix of compatible developments and uses that work together to create viable places that respond to local needs and creating a mix of uses to provide opportunity for social interactions. Urban vitality and street life.
Providing a range of development types that allow for a mix of day and night time activities supported by dense residential activity that aids with natural surveillance and provides a ‘base load’ of activity. Providing high amenity open space and recreation areas especially for children.
quality of public realm
What? To create a sense of wellbeing and amenity. How? Provide well-designed lighting and street furniture and provided attractive & robust planting on the streets. Making separate footpaths or cycle tracks as direct as possible, and well overlooked. Provide a place with public spaces and routes that is lively and pleasant to use.
energy efficiency
What? Optimizing solar potential for good aspect. How? The best optimum use of solar access is by consider the building footprint that maximizes south and north exposures, and minimizes east and west exposures.
connectivity and permeability
What? To promote accessibility and local permeability by making places that connect with each other and are easy to move through and putting people before traffic.
How? Roads, footpaths and public spaces connected into well-used routes including well-paced crossings on major roads. Accomodating all users in the realm of the street treating the street as positive place.
Implement 4 types of Renewable Energy. Rooftop photovoltaic cells Rainwater harvesting system Green roof Windbreaks / shelterbelts
active frontage
What? To activate street frontages where there is an active visual engagement between those in the street and those on the ground floors of buildings. How? Mixed-use buildings, with retail at grade and residential and office above, will allow residents to live, work and recreate within the Urban Growth Centre, creating “eyes on the street,” and enhancing safety and activity at all hours.
Maximising windows and doors to encourages active frontage with balconies can further enliven the frontage and views put ‘eyes on streets’, that can contribute to safety
To promote the continuity of street frontages and the enclosure of space by development which clearly defines private and public areas.
Transparent windows enable communication between inside and outside.
Reinventing high speed - rail anaklia, georgia Design Studio 3 Year 2, 2018 Location : Anaklia, Georgia Supervised : Charlotte Grace Maria Alexandrescu Ds3.osa.digital/
site context The proposed site is situated in Anaklia, tangent to the middle of east and west situation between Poti and Abhkazia and in the corner of north and south situation of China Europe. The area is an described as scaled leftover traffic island, an urban – non place – sense. It is characteristed by transit of vehicles and security distance. Anaklia is viable to be as part of a new line linking Georgia to neighbouring countries and Abkhazia. By proposing a new railway line into anaklia could potentially overcome the disconnection and the breaking down the barriers of the site’s isolation. Although anaklia is lacking adequate infrastructure, where the land uses are mostly dominated by commercial and residential uses that are not well integrated with the surrounding area (both functionally and physically) The site can be seen as potential transit hub where it sits strategically on the middle of east and west situation between Poti and Abhkazia and in the corner of north and south situation of China Europe. In being so, the idea of proposing a new rail line into anaklia could feed to the integrated logistic services and From a corridor perspective, railways also represent a viable choice for access to and from Black Sea ports, connecting Georgian maritime gateways with neighboring countries and Central Asia.
ANAKLIA TERMINAL TRAIN STATION PROGRAMME Design Gesture
Re spon se to Probl em Statement
Transit Hub + Logistic Park
T h e p r o j e c t t r a n s l a t e s h o w t h e Terminal Train station that operates as transb o u nd a r y o v e m e n t o f p e o p l e a nd logistics from the east and west condition that interlinks w i t h the future deepsea port development.
Programme Arrival P a s s e n ger Access and Assemble F r e i g h t C ontainer Arrival Terminal Bus Station Transition P assenger Facilities C i r c u l a t i o n o f C o m m o d i t i e s from processing warehouse to local retailers
k ay Lin ssia Railw khazia/Ru to Ab
Departure D e p a r t u r e concourse to Platform zones C o n n e c t i o n t o a l t e r n a t i v e transit routes via Exit Through Bus station
Formal Gesture Co ntextual Gesture + E x h i b i t s d i r e c t i o nality that represent viable choice b l a c k s e a p o rts and neighboring countries. + B y d o i n g t h i s , t h e t e r m i n a l train station introduce interchange meeting p o i n t f o r m o b i l i t y a s s e m b l y , dispersal of passengers and freight containers. + T h e t e r m i n a l t r a i n station a premier destination as a t r a n s i t h u b t hat acts as a supply chain city + T o i n t e r l i n k t he nonexistent connection between A na k l i a – A b k h a z i a r a i l w a y and to the future Deep-sea Port development.
+ Proposed Transit Hub
R fro ailw m ay Po L ti ink
Projecti on T h e p r o g r a m m e w i l l a llow an ease of navigation and enhance i n t e g r a t i o n o f e c o n o m i c g rowth to raise interest in among European i n v e s t o r s and tourist into Anaklia.
+ The Train Station is set to be a center beacon. + Further distribution of the line to set to Abkhazia
design strategy architecture gesture
The key points to consider in the beginning of the design process were by looking back at Semester 1 works, where I took the theme of modularity in understanding the properties of Axis and Linearity and bring it forward into designing a successful transit hub.
The purpose of the train station is that it act as dominant in urban space where it function as producing a node of interchange and junction between existing neighbourhoods where it could also feeds to the prososed logistic park by one of the ds3 member, Nur’s prosposed design where the railway could integrate to her logistic services. The intinial idea of designing this terminal is by understanding how the site works and how to integrate the design outcomes.
The initial idea is to elevate the programmes from the ground level to the top, to have a sequences of activity going on through different levels. These activity are laocated on the rooftop level as to activate the linear park above.
Axiality
I use axis to describe how the principle applies to the space organisation of the transit hub where I link back to the First term of understanding Modularity of designing a successful layout.
+
The Train station will be a bridge linking Nur’s logistic warehouses, where the building rest on top of the warehouse to enable maximum view towards the black sea and its linear relationship to the site context.
‘station’ evelated programme
+
views
The building is Tilted to get maximum views of the surrounding and the form of the building is driven by the environmental strategy that is by tilting the building sideways from Nur’s tower to get maximum visual richness from both facing exteriors and maximise solar gains for winter.
+ + Edge of the city The proposed site is placed at the edge where it can create a competitive pull and give to the civic center as it creates a new vibrant area within close proxoimity. + Seaport Seaport Condition is a valued destination in terms of view but also can act as an economic driver through ocean harvest. Thus, the station could enhance economic profit ability in Anaklia.
+
linearity
The proposition of the train station layout is to further enrich the vertical laneway towards the warehouse and more fluidy to the spatial circulation in conjuction to the site context.
ground floor spatial layout The building has total of 1 levels above ground, where all the visitors and commuters enter the building from the ground level. The ground level contains transit bus hub, commercial, public and admistarative activities for the crew. When arriving at the station, the commuters can easily orient themselves along the underpass which exits through the transit bus hub and locate themselves for other transportation modes. The east amphitheatre like staircase that is overlooking to the plaza could lead up to the level 1 (train terminal) and connects to Nur worker’s rest stop tower. The west large external stairs entrance which leads to the Terminal concourse.
Programme Legends: 1. Terminal Entrance.
13. Train Station Services Room
2. Bus Station
14. Tran Station M&E
3. Bus Ticket Counter
15. Operational Center
4. Platform Gate
16. File Room
5. Waiting Lounge
17. Conference Room
6. Lift Lobby
18. Security Room
7. Administration
19. Storage Room
8. Manager’s Office
20. Accomodation Building Entrance
9. Bus Crew Lounge
21. Crew’s Lounge Area
10. Public Lavatory
22. Loading & Unloading
11. Train Operational Entrance
23. Visitor’s Entrance
12. Crew Corridor
24. Drop Off Plaza
first floor spatial layout The 1st Floor plan was designed to host the main activities of the station. This is considered to be the main floor which includes amenities to increase the satisfaction experience of the user. The facilities contain all service spaces for the station to be functional and to serve the people in the platforms. The programs include retail, food hall at the far end that is overlooking a view to the black sea, terraced waiting lounge, ticket hall and Paid passenger lounge. The intention of having the spatial layout compressed in the middle is to further enrich a vertical laneway that directs the passenger to the far end of the terminal. Large staircase is placed at rear and front from the entrance of the terminal which could lead the passenger to the upper roof top. The spatial allocation of corridor zone with double faรงade retail is to increase spatial qualities and smooth transparency of the terminal. Programme Legends: 1. East Entrance 2. West Entrance 3. Building Accomodation Entrance 4. Terminal Lobby 5. Ticket & Information Center 6. Terminal Crew Office 7. Paid Passenger Lounge 8. Retail 9. Retail 10. Rooftop Public Square staircase 11. Food Hall 12. Alfresco corridor
+
roof floor spatial layout The public space that is on the rooftop can be access from the first floor where the passenger can have a visual enjoyment overlooking the port and the town. The noise restriction is a major concern for train station. Therefore, a landscape strategy is introduced to help entrap and absorb sound vibrations where having a green roof could help deflect the noise. The roof shared space can have a visual interior view from the skylight above the concourse which could transmits natural daylight into the building. The playfulness of the different levels is to further enrich visual enjoyment to the visitors and can act as look out point/view towards the black sea.
Programme Legends: 1. Roof Top North Lobby 2. Open Air Seating Area 3. Staircase to Lookout Point 4. Recreational Avenue 5. South Entrace to Terminal 6. Roof Top Garden
+
Combined Masterplan Transit Hub + Logistic Park
ground floor plan
+
first floor plan
+
ground floor plan
section a - a 1 The section is cut in the middle part of the terminal to show how the train is elevated above the street level and railtracks. My structure approach is to have a bridge-like building that overhangs from the warehouse with the support of Vierendeel truss system. The section also indicates the flow of how the passenger could circulate through the terminal from the ground level towards the roof top.
Detail Close Up Section of Terminal’s West Entrance
Detail Close Up Section of Terminal’s East Building
section b - b 1 The section cut shows the transition of space for both travellers and Goods travels in the terminal. Thus to show how the commuters or visitors circulate through these spaces.
Detail A
1
2
structure development 3
The building is formed by a Vierendeel steel frame on load bearing structure. The reason that I use a steel Frame Structure rather than a concrete structure is mainly the long span provided by a steel frame. The use of long span beams result in a range of benefits, including flexibke, collymn free spaces and reduced foundations cost, hence steel erection times.
5
4
6
7
1.
Medium light plant (grass) with growing medium
2.
Growing media or equiv-
3.
Aggregate Sub - base or equivalent.
4.
Aggregate Sub - base or equivalent.
5. 6.
Filter membrane on above with drainage layer and root marrier Extruded polystrene insulation board 60 PSI rated
7.
Stainless steel drain cover with inspection top with filter fabric with wire mesh as a drainage filter
Connections to the Steel truss ideally to sustain bending, axial and shear loads.
8 Detail B
9
Detail A 1 : 20
10
1.
Shoot Vinyl Floor and Vinyl Base
1.
Medium light plant (grass) with growing medium base.
1.
Composite Concrete Poured on Steel Deck
1.
Shear stud bolted to Vierendeel Steem Beam.
Detail Sectiom 1 : 100 Detail B 1 : 20
1. 2. 3. 4.
Glass Balustrade System Green Roof Sedum with root enforcement layers and Insulations. Painted Aluminium facade cladding panels. 800mm x 800 mm Vierendeel Truss Structure
5. Roofing slab with floating floor system composed with modular panels. 6. Mezzanine Steel Floor Structure with Supported Columns 7. Double Glazed Curtain Wall System Bolted to Primary Structure Steel Bracket
8. 9. 10.
Long Span Composite Profile Steel Floor System Steel Profiled Cladding Sheets Panel Covered walkway Single Flight Steel Staircase
+
Axonometric View
+
Axonometric View Detail Section
student hall of residence iukl, bangi Bachelor of Science in Architecture Design Studio IIIB Year 2, 2015 Location : Bangi, Selangor Supervised : Ar Hayazi Agusi
+
issue Site is considered alienated and lacking of social contact Site is lacking of Green Landscape and is mostly deserted The current student hall however is lacking basic living facilities
+
project aim
To improve the comfort living for the Users To provide complete accomodation and facility for students To Identify and Respond to Student’s Needs.
+
case study
PROGRAMME OBJECTIVES
PROBLEMS & NEEDS LIFESTYLE COMFORT AWARENESS LIMITED FACILITY SELF ESTEEM
+
LIVING SUPPORT SOCIAL CATALYST ADMISTRATION COMMERCIAL ENTRY SUPPORT
+
+
design concept
space programme
To design a strong emphasis on the concept of creating an ‘Eden Plaza’ Hall of Residence.
formulation of student hall of residence Dwelling Units that occupys an enclosure from such a small living space, with its interiors benefit from modular-like proportions. The Units will be joined by a common room, study centre and shops. Students will also have access to an on-site laundry room, cinema, gym, and garden.
+
design implementation
+
4 levels of housing units
+
types of units intoduced
+
targetted users
+
+
+
ground floor plan
upper floor plan
second floor plan
+
+
first floor plan
third floor plan
+
section a a1
+
section b b1
+
+
+
+
front elevation view
right elevation view
left elevation view
rear elevation view
+
3d rendering
+
architecture works +
ada design internationale sdn bhd
+
gdp architectS
PROJECT DESCRIPTION : PROPOSED 3 TYPES OF COMMERCIAL UNIT, PULAU PINANG DATE COMPLETION : PROPOSAL JOB DESCRIPTION : Produced ‘PLAN DRAWING, SECTION AND 3D PERSPECTIVES’ Produced Data Development calculations, Prepare Slides Info for Client
PROJECT DESCRIPTION : TTDI ASCENCIA CLIENT : NAZA TTDI DATE COMPLETION : COMPLETED JOB DESCRIPTION : Assisted on 3D Model & Detail Drawing
PROJECT DESCRIPTION : 3 STOREY COMMERCIAL UNIT CLIENT : HANDAL LAND SDN BHD, SEGAMAT DATE COMPLETION : Unknown JOB DESCRIPTION : Produced ‘PLAN DRAWING, SECTION AND 3D PERSPECTIVES’ Produced Data Development, Liased with Client and Project Manager Produced BP Drawings & Bomba Drawings.
PROJECT DESCRIPTION : KAMAL PRIVATE RESIDENCE, TTDI CLIENT : AR. KAMAL LATIF DATE COMPLETION : COMPLETED JOB DESCRIPTION : Assisted and Produced ‘PLAN DRAWING, SECTION AND DETAIL DRAWING’ Supervised and Liased Construction with Supervision
PROJECT DESCRIPTION : SWETTENHAM PIER, GEORGETOWN. PROPOSED WATERFRONT DEV. DATE COMPLETION : PROPOSAL JOB DESCRIPTION : Produced ‘MASTER PLAN, ILLUSTRATION AND 3D PERSPECTIVE’ Produced Data Development calculations, Prepare Slides Info for Client PROJECT DESCRIPTION : PROPOSED KANGAR SENTRAL CLIENT : KFM SDN BHD DATE COMPLETION : PROPOSAL JOB DESCRIPTION : Produced ‘MASTER PLAN & ILLUSTRATION’ Produced Data Development calculations, Prepare Slides Info for Client.
+
ram architect
PROJECT DESCRIPTION : Wisma Standard Chartered Building & Commercial, Bukit Jalil CLIENT : STANDARD CHARTERED DATE COMPLETION : COMPLETED JOB DESCRIPTION : Assisted and Produced ‘PLAN DRAWING, SECTION AND DETAIL DRAWING’ PROJECT DESCRIPTION : MINI Showroom, Glenmarie Shah Alam CLIENT : MINI COOPER MALAYSIA DATE COMPLETION : COMPLETED JOB DESCRIPTION : Assisted and Produced ‘PLAN DRAWING, SECTION AND DETAIL DRAWING’
ada design Internationale sdn bhd
+
D
C
E
F
H
G
12000
5605
12000
12000
12000
12000
ROOF CONSTRUCTION SEL. CLIP N LOCKING SYSTEM 0.53 TCT WIND CAPACITY WITH CLEAN COLORBOND STEEL ROOFING SHEETS AT 2° PITCH TO ARCH'S APPROVAL TO BE FIXED ONTO STEEL TRUSSES CARRY WITH DOUBLE LAYER OF 50MM THK COMPRESSED ROCKWOOL INSULATION (32KG/M3) INCLUDED A LAYER OF APPROVED PLASTIC SHEET DAMP PROOF DOUBLE SIDED SISALATION & A LAYER OF ROOF WIRE MESH SECURELY FASTENED TO MS STRUCTURAL MEMBERS & COMPLETE WITH NECESSARY FITTING & ACCESSORIES WITH 25 YEARS WARRANTY AGAINST CORROSION.
SEL. METAL DOOR FRAME WITH DOUBLE LEAF PLYWOOD FLUSH DOOR TO DETAIL RC FLAT ROOF WITH APPROVED WATERPROOF CEMENT SCREEDING LAID TO FALL TO ENGR'S DETAIL C/W SEL. COLOURED EPOXY PAINT TO EXPOSED RC SURFACES C/W 38MM DIA. G.I. OVERFLOW PIPE
150
D8 2100MM HIGH CLAY BRICWALL WITH 150MM THK PRE-CAST CONC. COPING ABOVE TO ENGR'S DETAIL RC COPING PIECE TO ENGR'S DETAIL
W4
W5
RC FLAT ROOF / M&E AREA
300
2100 300
FFL +82.15
4500
M&E SERVICE SPACE
M&E SERVICE SPACE
250 W9A
M&E SERVICE SPACE
W9
W9A
W9
W9
M&E SERVICE SPACE
HR/ STAIRCASE 4 WR 4 D7
W9
SEL. METAL DOOR FRAME WITH 1 HOUR FIRE RESISTANT DOUBLE LEAF DOOR TO BOMBA'S APPROVAL RC COPING PIECE TO ENGR'S DETAIL
FD4
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
1000
1000
REPEAT
RAM ARCHITECT
SEL. NON-COMBUSTIBLE CEILING BOARD ON SUSPENSION CEILING SYSTEM TO ARCH'S APPROVAL 6TH FLOOR FINISH LEVEL - OFFICE
REPEAT
5TH FLOOR FINISH LEVEL - OFFICE
REPEAT
FFL +68.65
4500
M&E SERVICE SPACE
W9
W9
ARCHITECT
CAR PARK
CAR PARK
DRIVEWAY
CAR PARK
CAR PARK
CAR PARK
DRIVEWAY
CAR PARK
DRIVEWAY IN
DRIVEWAY OUT
CAR PARK
DRIVEWAY OUT
DRIVEWAY IN
230MM THK CLAY BRICKWALL WITH CEMENT PLASTER FINISH
W11
FD3 CORRIDOR
escalator 2
4800
GD1
RETAIL 4
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
D7
FD4
HR / WR 4
STAIRCASE 4
D7
D9
W11
HYPERMARKET
D3
W11
GD5
F&B 6
CORR.
GD5
GD5
F&B 7
F&B 8
GD4
F&B 9
RAMP OUT W2 RS1
EMC M&E SDN BHD NO. 45-2 PUSAT PERDAGANGAN ONE PUCHONG JALAN OP 1/2, OFF JLN. PUCHONG 47160 PUCHONG SELANGOR DARUL EHSAN
M&E
3000MM HIGH OF GLAZED CERAMIC WALL TILES INSIDE REFUSE CHAMBER
250
D3 REFUSE CHAMBER
ROAD FINISH LEVEL RFL +40.50 PREMIX DRIVEWAY / CAR PARK LOT TO ENGR'S DETAIL PROPOSED DRAINAGE SYSTEM TO ENGR'S DETAIL
RC RAMP AT GRAD. MAX. 1:7 WITH ANTI-SLIP GRROVE LINE TO ENGR'S DETAIL C/W 1000MM HIGH RC WING & DIVIDER WALL
RAMP IN
200
1000
W11
CSS KONSULTANT NO. 2-2, JALAN PJS 10/2 SUBANG INDAH, 46000 PETALING JAYA, SELANGOR DARUL EHSAN.
RC LIFT CORE TO ENGR'S DETAIL
3000
W11
CORR.
escalator 1
W11
6m (20') DRIVEWAY
2M GREEN AREA
2400
GROUND FLOOR FINISH LEVEL ( F&B & RETAIL ) FFL +40.65
5100
SEL. ALUMN FRAME C/W FIXED CLEAR GLASS PANEL WINDOW TO MANUF'S SPEC.
1000MM HIGH OF 600MM HIGH RC UPSTAND WALL & 400MM HIGH CLAY BRICKWALL
CAR PARK
RS2
GD5
FD3 CORR.
"Saya memperakui bahawa butiran-butiran dan pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Wilayah Persekutuan 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
CAR PARK
CAR PARK
200
2400
RETAIL 14
250
FFL +46.65
CAR PARK
CAR PARK
SERVICE LIFT 8 SHAFT
4500
W11 GD1
1ST FLOOR FINISH LEVEL - HYPERMARKET & RETAIL
No Pendaftaran LAM : A/H 59
SEL. ALUMN BOX LOUVRES OR EQ. SUN SHADING DEVICES TO MANUF'S SPEC.
SERVICE CORRIDOR
5000
600 1000
5100
900MM HIGH MS RAILING TO DETAIL
ARKITEK PROFESIONAL
W9
FD3
DRIVEWAY
CAR PARK
RS2
SEL. FIBROUS PLASTER CEILING ON SUSPENSION CEILING SYSTEM
............................................................ AR.HAZLINDA BT. HASHIM
M&E SERVICE SPACE
FD3
D7
FD4
200 200
FFL +52.65
W9
D7
DRIVEWAY
CAR PARK
3500
FFL +56.15
2ND FLOOR FINISH LEVEL - CAR PARK
M&E SERVICE SPACE
W9
1000
FD4 3RD FLOOR FINISH LEVEL - CAR PARK
M&E SERVICE SPACE
W9A
OFFICE AREA
3500
FFL +59.65
SEL. ALUMN BOX LOUVRES OR EQ. SUN SHADING DEVICES TO MANUF'S SPEC.
M&E SERVICE SPACE
D7
200 200
4TH FLOOR FINISH LEVEL - OFFICE
6000
M&E SERVICE SPACE
W9A
1000
45550 4500
M&E SERVICE SPACE
6000
RAM
SEL. ALUMN FRAME C/W CLEAR GLASS FIXED WINDOW TO MANUF'S SPEC.
FFL +64.15
150
SUITE 10G, 11G & 12G, 7TH FLOOR, BLOCK 1, WORLDWIDE BUSINESS PARK, JALAN TINJU 13/50, 40675 SHAH ALAM, SELANGOR DARUL EHSAN. Tel : (03) 5512 8485/8482 Fax : (03) 55100522 Email: ram1995@gmail.com
RC BEAM TO ENGR'S DETAIL
4500
FFL +73.15
M&E SERVICE SPACE
3000 1000
1000500
7TH FLOOR FINISH LEVEL - OFFICE
M&E SERVICE SPACE
D7
OFFICE AREA
2500
3000
4500
FFL +77.65
M&E SERVICE SPACE
W9
200
8TH FLOOR FINISH LEVEL - OFFICE
DASHED LINE INDICATE RC FLAT ROOF LINE BEHIND
600 150
3900
RC FLAT ROOF LEVEL - MECH. ROOM
6096
12000
6.096 (20') GARISAN ANJAKAN BANGUNAN
12000
250
FFL +86.05
J
96000 12000
6.096 (20') GARISAN ANJAKAN BANGUNAN
GARISAN SEMPADAN LOT
B
4186
GARISAN SEMPADAN LOT
A 6096
HIGHEST LEVEL
+
ram architect sdn bhd
MANUAL ALUMN ROLLER SHUTTER TO MANUF'S SPEC.
6m (20') DRIVEWAY
LOADING/ UNLOADING
2M GREEN AREA
LIFT PIT
PREMIX DRIVEWAY / CAR PARK LOT TO ENGR'S DETAIL PROPOSED DRAINAGE SYSTEM TO ENGR'S DETAIL RC FOOTING & FOUNDATION TO ENGR'S DETAIL
PROPOSED ESCALATOR TO SPECIALIST'S SPEC.
RC FLOOR SLAB WITH WATERPROOF MEMBRANE ON 50MM THK LEAN CONC. ON 150MM THK WELL-COMPACTED HARDCORE TO ENGR'S DETAIL
YONG DAN MOHAMAD FAIZ SDN BHD NO. 18-1, JALAN PJS 8/12, DATARAN MENTARI, 46150 PETALING JAYA, SELANGOR DARUL EHSAN.
RC LIFT PIT WITH APPROVED WATERPROOF MEMBRANE TO ENGR'S DETAIL
1 : 200 KERATAN A-A
CADANGAN PEMBANGUNAN SEBUAH BANGUNAN PERDAGANGAN 9 TINGKAT YANG MENGANDUNGI :- 2 TINGKAT RUANG PERNIAGAAN - 2 TINGKAT TEMPAT LETAK KERETA - 5 TINGKAT RUANG PEJABAT DI ATAS SEBAHAGIAN LOT PT 13821, TAMAN TEKNOLOGI MALAYSIA, OFF JALAN PUCHONG - SG. BESI, MUKIM PETALING, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK : TETUAN GAPURNA SDN. BHD.
2
1
12000
12000
12000
750
12000
ROOF CONSTRUCTION SEL. CLIP N LOCKING SYSTEM 0.53 TCT WIND CAPACITY WITH CLEAN COLORBOND STEEL ROOFING SHEETS AT 2° PITCH TO ARCH'S APPROVAL TO BE FIXED ONTO STEEL TRUSSES CARRY WITH DOUBLE LAYER OF 50MM THK COMPRESSED ROCKWOOL INSULATION (32KG/M3) INCLUDED A LAYER OF APPROVED PLASTIC SHEET DAMP PROOF DOUBLE SIDED SISALATION & A LAYER OF ROOF WIRE MESH SECURELY FASTENED TO MS STRUCTURAL MEMBERS & COMPLETE WITH NECESSARY FITTING & ACCESSORIES WITH 25 YEARS WARRANTY AGAINST CORROSION.
450MM WIDE X 50MM DEEP SHALLOWSCUPPER DRAIN WITH WATERPROOFCEMENT SCREED LAID TO FALL TOENGR'S DETAIL C/W SEL. UPVC OR EQ. ROOF GUTTER GRATING OVER 150MM DIA. UPVC RWDP BELOW RC FLAT ROOF WITH APPROVED WATERPROOF CEMENT SCREEDING LAID TO FALL TO ENGR'S DETAIL C/W SEL. COLOURED EPOXY PAINT TO EXPOSED RC SURFACES TO ARCH'S APPROVAL RC PARAPET WALL WITH COPING ABOVE TO ENGR'S DETAIL
250
1800
2100 300 1000500
SEL. METAL DOOR FRAME WITH 1 HOUR FIRE RESISTANT DOUBLE LEAF DOOR TO BOMBA'S APPROVAL
3000
W9A
REPEAT
W6
SEL. ALUMN FRAME C/W CLEAR GLASS FIXED WINDOW TO MANUF'S SPEC.
landing
300MM HIGH OF RC UPSTAND BEAM TO ENGR'S DETAIL 1000MM LONG RC HOOD TO ENGR'S DETAIL
300
1000 2500
3000
SERVICE LANE
SPS 2 SHAFT
1000
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
500
FFL +73.15
REPEAT
6TH FLOOR FINISH LEVEL - OFFICE FFL +68.65
4500
W6
RC COLUMN TO ENGR'S DETAIL W9A
SEL. ALUMN FRAME C/W CLEAR GLASS FIXED WINDOW TO MANUF'S SPEC.
REPEAT W6 W9A
W9A
SEL. ALUMN BOX LOUVRES OR EQ. SUN SHADING DEVICES TO MANUF'S SPEC.
W9
FD3
FFL +56.15
W6
2ND FLOOR FINISH LEVEL - CAR PARK
W6
6m DRIVEWAY
CAR PARK
CAR PARK
6m DRIVEWAY
CAR PARK
2200
CAR PARK
CAR PARK
6m DRIVEWAY
CAR PARK
6m DRIVEWAY
CAR PARK
1000MM HIGH OF 600MM HIGH RC UPSTAND WALL & 400MM HIGH CLAY BRICKWALL
900
3500
SERVOCE CORRIDOR
A/C 2 RISER
A/C 1 RISER
landing
6m (20') DRIVEWAY
GROUND FLOOR FINISH LEVEL ( F&B & RETAIL ) FFL +40.65
MW ROOM
SPS SHAFT
6m (20') DRIVEWAY
CAR PARK
5000
6000
CAR PARK
150
6m (20') DRIVEWAY
W6
ELEC ROOM
landing
PROPOSED DRAINAGE SYSTEM TO ENGR'S DETAIL PREMIX DRIVEWAY / CAR PARK LOT TO ENGR'S DETAIL
GD1
GD1
GD5
W11
GD5
RETAIL 8
CORRIDOR
D3
GD1 GD5
CORRIDOR / KIOSK
F&B 7
4500
GD5
HYPERMARKET
W6
slope
SEL. FIBROUS PLASTER CEILING ON PROPOSED DRAINAGE SYSTEM TO SUSPENSION CEILING SYSTEM ENGR'S DETAIL DASHED LINE INDICATE 100/150MM DIA. UPVC RWDP WITH BRICK ON EDGE 750MM HIGH LOW WALL WITH PC CONC COPING ABOVE 6m (20') 6m (20') DRIVEWAY DRIVEWAY CAR PARK CAR PARK
GD5
OUTDOOR DINING
F&B 3
CAR PARK
ROAD FINISH LEVEL RFL +40.50
CAR PARK
EMC M&E SDN BHD NO. 45-2 PUSAT PERDAGANGAN ONE PUCHONG JALAN OP 1/2, OFF JLN. PUCHONG 47160 PUCHONG SELANGOR DARUL EHSAN
M&E
750
FFL +46.65
4500
6000
W11 landing
3000
1ST FLOOR FINISH LEVEL - HYPERMARKET & RETAIL
SEL. ALUMN FRAME C/W FIXED CLEAR GLASS PANEL WINDOW TO MANUF'S SPEC. SEL. ALUMN FRAME C/W DOUBLE LEAF FRAMELESS TEMPERED GLASS DOOR & FIXED CLEAR GLASS PANEL WINDOW TO MANUF'S SPEC.
250
W6
RC STAIRCASE 3 TO ENGR'S DETAIL WITH R:150, T:255 C/W 900MM HIGH MS RAILING TO DETAIL
CSS KONSULTANT NO. 2-2, JALAN PJS 10/2 SUBANG INDAH, 46000 PETALING JAYA, SELANGOR DARUL EHSAN.
EXPOSED RC FLAT ROOF SURFACES TO BE PAINT WITH SEL. COLOURED EPOXY PAINT TO ARCH'S APPROVAL
200
1000
1000
CAR PARK
landing
CAR PARK
No Pendaftaran LAM : A/H 59
"Saya memperakui bahawa butiran-butiran dan pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Wilayah Persekutuan 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
SEL. NATURAL ANOD. OR EQ. BOX LOUVRES SUN SHADING DEVICES TO MANUF'S SPEC.
landing
FFL +52.65
PROPOSED DRAINAGE SYSTEM TO ENGR'S DETAIL
ARKITEK PROFESIONAL
1000MM LONG RC PIECE TO ENGR'S DETAIL
200
landing
FD3 3RD FLOOR FINISH LEVEL - CAR PARK
............................................................ AR.HAZLINDA BT. HASHIM
M&E SERVICE SPACE
OFFICE AREA
900 1200
3500
FFL +59.65
1000MM HIGH LOW BRICKWALL
M&E SERVICE SPACE landing
SEL. METAL FRAME PLYWOOD FLUSH DOOR TO DETAIL 4TH FLOOR FINISH LEVEL - OFFICE
SUITE 10G, 11G & 12G, 7TH FLOOR, BLOCK 1, WORLDWIDE BUSINESS PARK, JALAN TINJU 13/50, 40675 SHAH ALAM, SELANGOR DARUL EHSAN. Tel : (03) 5512 8485/8482 Fax : (03) 55100522 Email: ram1995@gmail.com
ARCHITECT
RC BEAM TO ENGR'S DETAIL landing
5TH FLOOR FINISH LEVEL - OFFICE FFL +64.15
RAM ARCHITECT
RAM
SEL. NON-COMBUSTIBLE CEILING BOARD ON SUSPENSION CEILING SYSTEM TO ARCH'S APPROVAL RC FLOOR SLAB TO ENGR'S DETAIL
W9A
300
4500
W9
1000 1500
4500
landing
7TH FLOOR FINISH LEVEL - OFFICE
45550
FD3
W6
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
4500
M&E SERVICE SPACE
W9A
OFFICE AREA
1000
FFL +77.65
M&E SERVICE SPACE
W9A
2100MM HIGH CLAY BRICWALL WITH 400MM X 150MM THK PRE-CAST CONC. COPING ABOVE TO ENGR'S DETAIL
5000
3900 4500
landing
8TH FLOOR FINISH LEVEL - OFFICE
600MM WIDE OF 1.0MM THK ZINCALUME GUTTER PROFILE TO MANUF'S SPEC. C/W SEL. uPVC ROOF GUTTER GRATING TO MANUF'S SPEC.
600
FFL +82.15
RC STAIRCASE 3 TO ENGR'S DETAIL WITH R:150, T:255 C/W 900MM HIGH MS RAILING TO DETAIL
0
RA0810 / TD / SC - 110
3000
EXHAUST FAN ROOM 2
W7
RC FLAT ROOF LEVEL - MECH. ROOM
DASHED LINE INDICATE RC FLAT ROOF LINE BEHIND
250
250 150
400
RC FLAT ROOF
FFL +86.05
150
HIGHEST LEVEL
SEL. WEATHERSHIELD ARCYLIC PAINT / SPRAY TILES TO EXTERNAL FACADE
- KERATAN A - A
GARISAN SEMPADAN LOT
3 49500
6.096 (20') GARISAN ANJAKAN BANGUNAN
4
3400
GARISAN SEMPADAN LOT
6.096 (20') GARISAN ANJAKAN BANGUNAN
5 750
CAR PARK
2m GREEN AREA
PREMIX DRIVEWAY / CAR PARK LOT TO ENGR'S DETAIL PROPOSED DRAINAGE SYSTEM TO ENGR'S DETAIL RC FOOTING & FOUNDATION TO ENGR'S DETAIL RC FLOOR SLAB WITH WATERPROOF MEMBRANE ON 50MM THK LEAN CONC. ON 150MM THK WELL-COMPACTED HARDCORE TO ENGR'S DETAIL
YONG DAN MOHAMAD FAIZ SDN BHD NO. 18-1, JALAN PJS 8/12, DATARAN MENTARI, 46150 PETALING JAYA, SELANGOR DARUL EHSAN.
1 : 200 KERATAN B-B
CADANGAN PEMBANGUNAN SEBUAH BANGUNAN PERDAGANGAN 9 TINGKAT YANG MENGANDUNGI :- 2 TINGKAT RUANG PERNIAGAAN - 2 TINGKAT TEMPAT LETAK KERETA - 5 TINGKAT RUANG PEJABAT DI ATAS SEBAHAGIAN LOT PT 13821, TAMAN TEKNOLOGI MALAYSIA, OFF JALAN PUCHONG - SG. BESI, MUKIM PETALING, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK : TETUAN GAPURNA SDN. BHD.
project boundary line 2M PLANTING PERIMETER
RUANG LETAK KERETA
- KERATAN B - B
RUANG LETAK KERETA
6.096m (20') building set-back line
( size 2500 x 5000 ) premix finish
( size 2500 x 5000 ) premix finish
0
GD5
GD5
1750 1184 1408
homogenous tiles FFL. ±40.60m
FFL. ±40.60m
RAMP UP rwdp
GD2
6000
1500
8225
10000
ur
D10
D10
ft
50dp
50dp
GD2
PUMP ROOM cement render FFL. ±40.65m
cement render FFL. ±40.65m rwdp FD1
50dp
100dp
W3
FD1
100dp
W3
1650
8475
7950
2401
10050
FIRE PUMP ROOM
EX 2
2724 ELEC (LANDLORD)
MW
D2
ft
STAIR. 3
rwdp
1575 1125
2465 D6
2575
LIFT LOBBY 2
LIFT 6
230MM THK CLAY BRICK WALL WITH 20MM THK CEMENT PLASTER ON BOTHIDES - SHOWN HATCH 8110
D7
50dp
ELEC (SCB)rwdp
FD6 rwdp
50dp
FD3
3225
D6
2525
2375
D3 1750 D3
cement render FFL. ±40.65m
3105
METER ROOM FW2
cement render FFL. ±40.65m FD5 FW1
50dp
100dp
3175
ft
7970
TELCO ROOM 3 cem. render
LPG ROOM HOLDING AREA homo. tiles
W2
homo. tiles
5250
LOADING DOCK
cement render FFL. ±40.65m 8750
FD6
FW2
50dp 100dp
1310
STAIR. 4
homo. tiles UP
1000
FW3
RAM ARCHITECT SUITE 10G, 11G & 12G, 7TH FLOOR, BLOCK 1, WORLDWIDE BUSINESS PARK, JALAN TINJU 13/50, 40675 SHAH ALAM, SELANGOR DARUL EHSAN. Tel : (03) 5512 8485/8482 Fax : (03) 55100522 Email: ram1995@gmail.com
RAM
DOUBLE LEAF MS GRILLE DOOR TO DETAIL
100dp
RC RAMP TO ENGR'S DETAIL
5150
RC CULVERT WITH HEAVY DUTY MS GRATING TO ENGR'S DETAIL
D3 5100 W2 1075
REFUSE CHAMBER LIFT 9
homo. tiles
RS1
LOADING / UNLOADING premix finish FFL. ±40.50m
RAMP UP 100
FFL. ±40.60m
............................................................ AR.HAZLINDA BT. HASHIM
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
ARKITEK PROFESIONAL No Pendaftaran LAM : A/H 59
100dp
RC COLUMN TO ENGR'S DETAIL
RAMP UP 150
50dp
LIFT 9 LOBBY
RFL. ±40.50m
"Saya memperakui bahawa butiran-butiran dan pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Wilayah Persekutuan 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
CSS KONSULTANT NO. 2-2, JALAN PJS 10/2 SUBANG INDAH, 46000 PETALING JAYA, SELANGOR DARUL EHSAN.
A SEL. ALUMN ROLLER SHUTTER TO MANUF'S SPEC. RC LIFT CORE TO ENGR'S DETAIL
3150 rwdp
EMC M&E SDN BHD NO. 45-2 PUSAT PERDAGANGAN ONE PUCHONG JALAN OP 1/2, OFF JLN. PUCHONG 47160 PUCHONG SELANGOR DARUL EHSAN
M&E
230MM THK CLAY BRICK PARTY WALL WITH 20MM THK CEMENT PLASTER ON BOTHIDES - SHOWN HATCH
4030
cement render FFL. ±40.65m
AD1
D3
homo. tiles
LANDING
GEN-SET ROOM (LANDLORD)
FD6 50dp
G1
homogenous tiles FFL. ±40.65m
4450 D9
SPS 4
homo. tiles
7500
D8
50dp
ft WR/HR 3
PROPOSED BRICK DRAIN SUMP C/W MS GRATING TO ENGR'S DETAIL
COMMON MDF ROOM W2
ft t 50dp
D4
FCR/ SECURITY W2 ROOM homo. tiles 2650
D7
PROPOSED UNDERGROUND BLOCK DRAIN TO ENGR'S DETAIL
W1
D3
JAN.
FD3 50dp
LV SWITCH ROOM (landlord)
CONSUMER HT ROOM
cement render FFL. ±40.65m
LIFT 5 FD1
50dp
FEMALE
7550
13975
TNB ROOM
wc
2465
wb
homo. tiles
RC RAMP AT GRAD. 1:7 / 10 WITH ANTI-SLIP GROOVE LINE TO ENGR'S DETAIL
ARCHITECT
wb
t
1150
SERVICE CORRIDOR
FD6 50dp
50dp
50dp
1575
OKU
D3
LIFT 7 (BOMBA)
D7
OKU ft
t
300MM WIDE X 230MM HIGH RC DIVIDER RAMP TO ENGR'S DETAIL
D3
D3
EX 4
TEL (SCB) 50dp D7
W6
3950
1500
ft t wc
50dp
3100
F&B 9
homogenous tiles
FD2
ELEC FD1 (LANDLORD)50dp
LPS
GD4
50dp
D9 homo. tiles FFL. ±40.65m
homo. tiles UP
rwdp rwdpLANDING
EX 3
FD3
D7
50dp ft 50dp
50dp
D10 D6
MALE
TELCO ROOM 2
W1 cem. render
1000MM HIGH LOW BRICKWALL 100dp
ft t wc
homo. tiles FFL. ±40.60m
D6
3090
8700
1750 1850
9975
wc ft
ft t wc
50dp
ur ft ur
D10
D8
50dp
ur
wb
D10
50dp wb
1790
50dp
rwdp AC 1
D10
ft
t 200dp SQ
RC LIFT CORE TO ENGR'S DETAIL
RAMP GRADIENT AT 1 : 7
1150
7875
50dp
D3
5590
LV SWITCH ROOM (SCB) cement render FFL. ±40.65m
7730 RC STAIRCASE 4 TO ENGR'S DETAIL WITH R:150, T:255 C/W 900MM HIGH MS RAILING TO DETAIL
GEN-SET ROOM (SCB) cement render FFL. ±40.65m
50dp 100dp
INDICATE CAR RAMP ABOVE
AD1
FD3
50dp
50dp
YONG DAN MOHAMAD FAIZ SDN BHD NO. 18-1, JALAN PJS 8/12, DATARAN MENTARI, 46150 PETALING JAYA, SELANGOR DARUL EHSAN.
100dp
6M ONE WAY DRIVEWAY
RFL. ±40.50m 6000
5000
RFL. ±40.50m
FFL. ±40.60m
7950
5299
50dp
2775
CORRIDOR
D10
50dp
D7
AC 2 EX 1
1650
RC FIRE WATER TANK
1200
750
rwdp
50dp
ur ft ur
50dp
6000
4370
RC RC SUCTION SUCTION WATER WATER TANK 2 TANK 1
1500
12000
100dp
D10
50dp
50dp
6150
4370
2599
7876
W11
PEDESTRIAN CROSSING
50dp
D10
t wc ft
PORTABLE KIOSK 10
homogenous tiles
3200 D3
1750
D3
SPS 2
9260
ENTRANCE 4
PEDESTRIAN CROSSING
18000
F&B 8
3200
2724
R:150, T:255
12025
UP TO 1ST FLOOR
DOWN FROM 1ST FLOOR
homogenous tiles
RC WATER STORAGE TANK WITH WATERPROOF SYSTEM TO ENGR'S DETAIL D3
D7
GD1
ur
230MM THK CLAY BRICK PARTY WALL WITH 20MM THK CEMENT PLASTER ON BOTHIDES - SHOWN HATCH
F&B 7
2876
rwdp
homogenous tiles
2100MM HEIGHTS SEL. GLAZED CERAMIC TILES OR EQ. TO ARCH'S APPROVAL - INSIDE TOILET AREA ONLY
GD5
homogenous tiles Grd FFL. ±40.65m
F&B 6
homogenous tiles
rwdp
100dp
OUT
GD5
RC COLUMN TO ENGR'S DETAIL
RETAIL 5
PORTABLE KIOSK 9
Grd FFL. ±40.65m
GD5
7700 2700
50dp
GD1
1200
1408
homogenous tiles
CORRIDOR
homogenous tiles
CORRIDOR
3600
RETAIL 4
6000
2400
W11
PORTABLE KIOSK 8
CORRIDOR
SEL. NATURAL ANODIZED ALUMN FRAME C/W DOUBLE LEAF OF 12MM THK CLEAR TEMPERED GLASS DOOR & CLEAR FIXED GLASS PANEL TO MANUF'S SPEC.
homogenous tiles Grd FFL. ±40.65m
5
9600
PORTABLE KIOSK 7
3000
eq
GD1
homogenous tiles
PORTABLE KIOSK 6
UP
6000
homogenous tiles
SQ ft t
GD3
CORRIDOR PORTABLE KIOSK 5
1200
eq
GD1
1200 3600
RETAIL 3
W11
WR/HR 5
2M PLANTING PERIMETER
A
PORTABLE KIOSK 4
W11
1200
PEDESTRIAN WALKWAY
PROPOSED BRICK DRAIN SUMP C/W MS GRATING TO ENGR'S DETAIL
6M ONE WAY DRIVEWAY
12000
PROPOSED UNDERGROUND BLOCK DRAIN TO ENGR'S DETAIL
PORTABLE KIOSK 3
9975
12000 49500
SEL. NATURAL ANODIZED ALUMN FRAME WITH DOUBLE LEAF 12MM THK TEMPERED GLASS DOOR TO MANUF'S SPEC
homogenous tiles
GD5
D10
D10
PORTABLE KIOSK 2
1800 6000
RETAIL 2
homogenous tiles
2850
4450 8000
W11
homogenous tiles
homog tiles
PORTABLE KIOSK 1
GD1
RFL. ±40.50m
ENT. 2
homogenous tiles Grd FFL. ±40.65m
11050
homogenous tiles
F&B 5
RAMP GRADIENT AT 1 : 7
F&B 4
RAMP UP TO 2ND LEVEL
F&B 3
RC STAIRCASE 2 TO ENGR'S DETAIL WITH R:150, T:255 C/W 900MM HIGH MS RAILING TO DETAIL
RAMP DOWN TO FROM 2ND LEVEL
GD3
LIFT 4
LANDING WR/HR D3 LPSI 1 & 2 4ft 50dp D7 homog tiles FAS 1 50dp TEL FD1 ELEC 50dp (SCB) FD1 (LANDLORD) D7 50dp ELEC KED 1 TEL 50dp (SCB) TELCO ROOM 1 (LANDLORD) FD4 1900 1300 cem. render TURNSTILES D3 5025 5025 1950 1950 3075 3075 1950 200dp
800
110mm THK CLAY BRICKWALL REINF. WITH `EXMET' ATEVERY 4TH COURSE & 20mm THK CEMENT PLASTER & PAINTED ON BOTHSIDES
PEDESTRIAN CROSSING
GD5
homo. tiles LIFT 2 FFL. ±40.65m (BOMBA)
2650
F&B 2
GD2
ENT. 3
rwdp
3375
F&B 1
GD3 W11
GD5
RC CULVERT WITH HEAVY DUTY MS GRATING TO ENGR'S DETAIL RAMP UP
STAIR. 2
UPhomo. tiles
3730
GD5
2850
1200
homogenous tiles
SEL. NATURAL ANODIZED ALUMN FRAME C/W FIXED CLEAR GLASS PANEL WINDOW TO MANUF'S SPEC.
50dp
2000
1200
D9 150dp
rwdp rwdp FFL. ±40.65m
LIFT 3
LIFT LOBBY 1
2755
homogenous tiles Grd FFL. ±40.65m
W10
RETAIL 1
50dp
3000
3100
W8 LIFT 1
50dp
GD2 50dp
MASUK
4150
GD3
homogenous tiles Grd FFL. ±40.60m
6000 PRE-CAST CONC. ROADSIDE KERB TO ENGR'S DETAIL
300
3000
4150
50dp
3100
5975
9475
50dp
homogenous tiles
2
OUTDOOR EATING AREA
SEL. NATURAL ANODIZED ALUMN FRAME C/W DOUBLE LEAF OF 12MM THK CLEAR TEMPERED GLASS DOOR & CLEAR FIXED GLASS PANEL TO MANUF'S SPEC. 1200
9600
rwdp 1500
VARIES
6300
KELUAR
4025
premix finish RAMP UP
ENTRANCE 1
FD3
5050
1200 50dp
RFL. ±40.50m
4675
2000
50dp
9400 3200
4650
GD3
WR/HR 1
4075
ft
9325
10250
3100
2400
FD4
RFL. ±40.50m
rwdp
2730
1525
LIFT 8
LOBBY FFL. ±40.65m D7 homo. tiles
rwdp
50dp
D7 750MM HIGH LOW WALL WITH PC CONC COPING ABOVE
KED 2 RC LIFT CORE TO ENGR'S DETAIL SEL. LIFT CARS TO SPECIALIST'S SPEC. TO ENGR'S DETAIL - MOTORLESS ROOM SYSTEM
( size 2500 x 5000 ) premix finish
OFFICE DROP OFF
100dp WR/HR6 6 WR/HR
rwdp
2500
3150
50dp
rwdp 6000
1418
3100
6300
RUANG LETAK KERETA
RFL. ±40.50m
3065
SPS 2
homo. tiles
rwdp
FAS 2
4500
2935
STAIR. 1
WR/ HR 2
3150
LIFT 8
rwdp
UP
3425
4475
LANDING
R:150, T:255
( size 3600 x 5000 )
1500 RAMP UP
100dp
1200
750
premix finish
100dp 150dp
RC STAIRCASE 1 TO ENGR'S DETAIL WITH R:150, T:255 C/W 900MM HIGH MS RAILING TO DETAIL
RUANG LETAK KERETA OKU
10400
1275 1275 1095
D9
RFL. ±40.50m
5000
1050 1650
3600
9225
HYPERMARKET DROP OFF
4500
2500
R:150, T:255
3600
6200
3600
2495
1200
1400
4500
1200
13800
RFL. ±40.50m
300
12000
6M ONE WAY DRIVEWAY
4500
3000
1200
5000 3600
2500
8025
4050
12000 2500
4175
2500
12000
9350
2500
OUT
4
12000
2M PLANTING PERIMETER
12000
6.096m (20') building set-back line
B
12000
1085
2000
J
4225
12000
1400
12000
6000
H
G
7500
12000
RC COLUMN TO ENGR'S DETAIL
3
F
RFL. ±40.50m INDICATE ROOF ENTRANCE ABOVE
12000
E 96600
IN
1
D
C
2975
B
9025
A 300
project boundary line
PEDESTRIAN CROSSING
RA0810 / TD / SC - 109
6M ONE WAY DRIVEWAY
6000
RUANG LETAK KERETA ( size 2500 x 5000 ) premix finish
RUANG LETAK KERETA
B
( size 2500 x 5000 ) premix finish
RUANG LETAK KERETA ( size 2500 x 5000 ) premix finish
CADANGAN PEMBANGUNAN SEBUAH BANGUNAN PERDAGANGAN 9 TINGKAT YANG MENGANDUNGI :- 2 TINGKAT RUANG PERNIAGAAN - 2 TINGKAT TEMPAT LETAK KERETA - 5 TINGKAT RUANG PEJABAT DI ATAS SEBAHAGIAN LOT PT 13821, TAMAN TEKNOLOGI MALAYSIA, OFF JALAN PUCHONG - SG. BESI, MUKIM PETALING, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK : TETUAN GAPURNA SDN. BHD.
1 : 200 PELAN LANTAI TINGKAT BAWAH - ruang kedai NOTES :1. ACTUAL PRE-CAST HOLLOW CORE SLAB, COLUMN & BEAM SIZE TO ENGR'S DETAIL & TO BE ADJUSTED WITH ARCH'S APPROVAL. 2. ACTUAL MECHANICAL & ELECTRICAL ROOM & SERVICE SHAFT SIZE & REQUIREMENT TO ENGR'S DETAIL. 3. ACTUAL FIRE FIGHTING LOCATION, POSITION & REQUIREMENT SHALL BE AS PER BOMBA'S APPROVAL PLAN.
- PELAN LANTAI
RA0810 / TD / SC - 100
0
gdp architects
interior design works
+
client
GENTLEMEN’S TONIC, KUALA LUMPUR PROJECT DESCRIPTION : Gentlemen’s Tonic in Robinsons, Fourseason KL Front Shop ‘FACADE DESIGN’ DATE COMPLETION : COMPLETED
+
client
GENTLEMEN’S TONIC, KUALA LUMPUR PROJECT DESCRIPTION : Gentlemen’s Tonic (Bespoke Barbershop) Permanent Pop Up Booth in Robinsons, Fourseason KL DATE COMPLETION : UNDER CONSTRUCTION DESIGNER : SYAFIQA HANIM
+
client
GENTLEMEN’S TONIC, KUALA LUMPUR PROJECT DESCRIPTION : Gentlemen’s Tonic (Bespoke Barbershop) Event Booth DATE COMPLETION : UNDER CONSTRUCTION DESIGNER : SYAFIQA HANIM
DESIGNER : SYAFIQA HANIM
+
client
GENTLEMEN’S TONIC, KUALA LUMPUR PROJECT DESCRIPTION : Gentlemen’s Tonic in Robinsons, Fourseason KL BARBER STATION DESIGN AND FITTING DATE COMPLETION : COMPLETED DESIGNER : SYAFIQA HANIM
graphic & illustration works +
client
GENTLEMEN’S TONIC, KUALA LUMPUR
+
no shave november promotion
+
gt gift voucher klfw
+
+
client
fragrance promotion
RAMLEES SPORT BARBER’S CLUB ( RSBC)
Thank you