M Tagore Hernandez intern architect tagoreh@gmail.com
Single Family Manchester MA
Lead Designer STATE PERSPECTIVES, LLC 3,400 sf • 3 months • design through Permit Set olby Way ster, MACAD, 01944Photoshop
M Tagore Hernandez Freelance 16 February 2
3 Knight Circle Manchester MA West Elevation 1/4” = 1’-0”
Duplex Cambridge MA Lead Designer 4,100 sf • 2 months • design through Permit Set CAD, Photoshop
M Tagore Hernandez Freelance
Mixed-Use Cambridge MA
M Tagore Hernandez Arrowstreet Inc.
Lead Designer 40,600 sf • 7 months • design through Permit Set Revit, SketchUp, Photoshop
COLOR LEGEND LOBBY COMMON AREAS RESIDENTIAL UNITS SERVICE AND MECHANICAL
15' - 0" SETBACK
C1
C2
C3
4
C5
C6
C7
C8
9
10
11
12
13
14
15
16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
GARAGE ENTRY/EXIT
15' - 0" SETBACK
C28
C73 29
30
31
32
33
34
35
36
C37
C38
C39
C40
41
43
44
45
46
47
48
49
50
C51
C52
C53
54
HC55
42 RAMP DOWN
C72
C71
ELECTRICAL TRANSFORMERS
C70 STORAGE
C69 73 PARKING SPACES 54 BIKE SPACES
C68
C67 RESIDENTIAL UNITS
ELECTRICAL SWITCH GEAR HC66
HC65
64
63
62
61
60
59
58
HC57
56
54 BIKE SPACES
LOBBY
RESIDENTIAL UNITS LEASING
FRONT ENTRANCE 15' - 0" SETBACK
LOADING
FAWCETT STREET 70 FAWCETT STREET
Level 1
Commercial Warehouse Northampton MA
M Tagore Hernandez Arrowstreet Inc.
Project Manager 12,400 sf • 2 months • design through CD’s and CA CAD, SketchUp, Photoshop
Finishing Area
Final Assembly Materials Shipping Storage
Machine Area Bench
Bench
Office Views + Daylight
26.5’
+/- 11’
Main Entrance
VCA, Inc.
Designiated Logo Location
Northampton, Massachusetts
VCA, Inc. Northampton, Massachusetts
Vertical Metal Panel
Canopy Above
Program Study
29 August 2007 AST No. 07065
North Elevation Study
31 August 2007 AST No. 07065
0
25’
50’
Hotel Revere MA Designer 40,600 sf • 3 months • initial design through schematic design CAD, SketchUp, Photoshop
M Tagore Hernandez Arrowstreet Inc.
Retail Complex Revere MA Designer 650,00 sf • 2 months • schematic design CAD, SketchUp, Photoshop
M Tagore Hernandez Arrowstreet Inc.
Adaptive Reuse - commercial New York City NY Lead Designer 40,600 sf • 3 months • design through Permit Set Revit, SketchUp, Photoshop, Illustrator
velent la feummolore feu faccums andionsed esequamcon hent velit lor augiam zzrit luptat in eum ipit in ver adignibh et lutat aut veniam quamconsed tem in velis exercing ex ero corem do digna aut atum dit alit, commy num iure tinibh eugait nonsed euis elestisi Mlamet Tagore Hernandez tat dolore venibh eugiamc onullaore feumsan vel dolorper iriustrud dolobore facilis am, Arrowstreet Inc. cortions ea facilis nons dolore volorper adiamet praestrud deliquat wisim iusto odolor sequate min henibh et wisi et in voluptat. Ure corem delis nulputat. Obortio et illaorem dolobor si tem dignibh enim inci ent lortin utat amconse qui
Urban Planning - housing + retail Town Center MD
M Tagore Hernandez Arrowstreet Inc.
Lead Designer 1,600,000 sf • 4 months • design through Permit Set CAD, SketchUp, Photoshop, Illustrator
Quick Service Restaurant Full Full Service Service Restauran Restaurant Anchor Furniture & Fashion Service / Other Office Hotel Community Center Housing Loading Office or Housing above
Ground Floor Plan
1” = 60’ April 9, 2008 AST #: 07052
Rock Spring Town Center Bethesda, Maryland
N
Landscape Design Wayland MA Lead Designer 1 week • schematic design Mixed media
M Tagore Hernandez Arrowstreet Inc.
City Planning - housing + retail Rabat Morocco Job Captain + Lead Design 12,000,000 sf • 16 months • design through DD Set Revit, CAD, Sketchup, Photoshop
M Tagore Hernandez TRO Jung Brannen
Urban Planning - outpatient facility + retail Dubai UAE Designer 120,000 sf • 3 months • design through DD Set CAD
M Tagore Hernandez TRO Jung Brannen
Interior Architecture Cambridge MA Project Manager 2 months • schematic through CA CAD, SketchUp
M Tagore Hernandez Machado Blake
Shell Renovation Cambridge MA Project Manager 8,400 sf • 7 months • design through CA CAD, SketchUp
M Tagore Hernandez Machado Blake
Residential Somerville MA Designer 3,400 sf • 6 months • design through Permit Set CAD, SketchUp, Photoshop
M Tagore Hernandez Machado Blake
Residential Housing Cambridge MA Lead Designer 12,800 sf • 5 months • design through Permit Set CAD, SketchUp
M Tagore Hernandez Consultant
Residential Denver CO Lead Designer 5,400 sf • 3 months • design through construction CAD
M Tagore Hernandez Freelance
Urban Planning Shanghai China Design and Renderings 250,000 sf • 3 months • design through DD Set SketchUp, CAD, Podium
M Tagore Hernandez Consultant
Office Interiors - furniture design Cambridge MA Designer and Project Manager design through shop drawings CAD, SketchUp, Photoshop
M Tagore Hernandez Paul Lukez
Residential Design Newton MA Designer and Project Manager 2,100 sf • 4 months • design through construction Revit, CAD, Photoshop
M Tagore Hernandez Freelance
Residential Wayland MA Designer and Project Manager 2,500 sf • 4 months • design through construction CAD, SketchUp, Photoshop
M Tagore Hernandez Freelance
Commercial Interiors Boston MA
M Tagore Hernandez Consultant
Design and Production 5 months • design through construction documents CAD, SketchUp, Podium
7
+0'-0"
+0'-0"
+8'-8"
+8'-8"
+0'-0"
+0'-0"
+8'-8"
+8'-8"
+0'-0"
+0'-0"
6
SECTION
SECTION
1/4" = 1'-0"
1/4" = 1'-0"
+0'-0"
+0'-0"
+8'-8"
+8'-8"
+0'-0"
+0'-0"
+8'-8"
+8'-8"
+0'-0"
+0'-0"
Paul
5
4
SECTION 1/4" = 1'-0"
3
STAIR PLAN - EIGHTH FLOOR
+0'-0"
+0'-0"
+8'-8"
+8'-8"
9
STAIR TREAD SECTION
STAIR 3/8" = 1'-0"
3/8" = 1'-0"
STAIR TREAD SECTION
SECTION 1/4" = 1'-0"
4
10
L u ka r ceh i tze c t u r e
8
LANDING SECTION NINTH FLOOR
Commercial Interiors - furniture design Boston MA
2"
1/2"
3/4"
1/2"
2"
1/2" 3/4"
3/4"
2"
1/2"
3/4"
••
3 1/2"
••
••
1 1/2"
M Tagore Hernandez Consultant
Designer and Project Manager design through shop drawings CAD, SketchUp, Photoshop
1/2" 1 3/8" 3/4"
3/4" 1 3/8" 1/2"
3/4"
3/4"
2"
M8
M12
DTL - GLASS CORNER
M15
DTL - GLASS DOOR JAMB
3" = 1'-0"
DTL - GLASS DOOR HEAD
3" = 1'-0"
3" = 1'-0" 3/4"
3"
2" 3/4"
1/2"
1 1/2"
3"
2"
3/4"
3/4"
4 7/8" 1 3/8" 3/4" 1"
3/4" 1 3/8"
3/4"
3" = 1'-0"
1 3/8" 3/4"
1 1/2"
3/4" 2"
3/4" 2"
••
2"
•• 1/2"
3/4"
1/2"
3/4"
1/2"
2"
1/2"
3"
3/4"
3/4"
••
3/4" 3/4"
2"
3/4" 1 3/8" 1 1/2"
3"
3"
1 3/8" 3/4"
5/8" 2"
2 5/8"
3/4"
3/4"
3/4"
2"
3/4" 2"
2" 1/2"
3/4" 3/4"
••
••
••
••
3/4"
1/2"
2" 3/4"
3/4" 3/4"
M15
3" = 1'-0"
2"
1"
2 5/8"
••
••
1 1/2"
2" 3/4"
1/2" 1/2" 3/4"
3"3"==1'-0" 1'-0" DTL - GLASS DOOR JAMB
•• 1/2"
1/2"
3 1/2"
2"
3" = 1'-0"
M12
•• 3/4" 2"
2"
3/4"
4 7/8" 4 7/8" 3/4" 1 3/8" 1 3/8" 3/4"
3/4" 1 3/8"
3/4" 1"
4 7/8" 3/4" 1 3/8"
5/8"
3"
3"
1 1/2"
1 3/8" 3/4"
1 1/2"
5/8" 2"
2"
4 7/8" 3/4" 1 3/8"
3/4" 1 3/8"
••
3" 3/4"
2"
2" 1/2"
3/4"
3/4"
3/4"
3/4"
1/2"
3"
3"
3/4"
3/4"
1 3/8" 3/4"
3/4"
3" = 1'-0" 3" = 1'-0"
1/2"
2"
1/2"
3 1/2" 1 1/2" 2"
3/4"
2 5/8"
1 1/2"
PER PARTITION TYPE
1/2"
3" = 1'-0"
= 1'-0" 3" = 1'-0" M8 3"DTL - GLASS CORNER M15 DTL - GLASS DOOR HEAD 3 1/2" 1 1/2" 2"
2"
3" = 1'-0" 3" = 1'-0" 3/4" 3/4"
3/4"
3 1/2"
1/2"
2"
3" = 1'-0"
1/2"
3/4"
1/2"
DTL - GLASS G15 DTL DOOR - PLAN HEAD @ STONE VENEER 3" = 1'-0" 1" = 1'-0" M8 -- GLASS DTL - GLASS M15 DOORCORNER HEAD M8 DTL M1 DTL GLASS CORNER
3/4"
= 1'-0" 3" = 1'-0" 1" = 1'-0"- GLASS FRAME JAMB 1" = 1'-0"- GLASS FRAME SECT M1 M5- GLASS DTL DTL 8 3"M1 M12M5 DTLDTL - GLASS CORNER DTL DOOR JAMB - GLASS FRAME JAMB DTL - GLASS FRAME SECT
1'-0"3" = 1'-0" M5 3" = DTL - GLASS FRAME SECT M12 DTL - GLASS DOOR JAMB
2" 1/2"
3/4" 2"
3/4"
1/2"
3/4"
2"
2"
1/2"
M15 DTL G12 - GLASS DOOR JAMB DTL - PLAN WOOD VENEER 3/4"
1/2"
3/4"
1/2"
1/2"
•• •• ••
2 5/8"
5/8" 2"
3/4" 1 3/8"
1/2"
3/4"
3/4" 1 3/8"
2" 3/4" 1 3/8" 1/2" 3/4"
3/4" 3/4"
1 1/2"
1 3/8" 3/4"
2 5/8" 3/4" 3/4" 1/2"1/2" 3 1/2" 5/8" 2" 1/2" 1 1/2" 2"
2"
CORNER G8 ERDTL - GLASS DTL - PLAN @ TRAININGM12 RM
L u ka r ceh i tze c t u r e
3 1/2" 1 1/2" 2"
3 1/2" 1 1/2" 2"
3/4" 3/4" 1/2"
2" 5/8" 2 5/8"
2 5/8"
3/4"
3/4"
2"
3/4"
3/4" 3/4"
2"
1/2"
3/4" 2"
1/2" 3/4"
1/2" 2 5/8"
1/2"
•• •• ••
2"
2" 1/2"
1 3/8" 3/4"
2"
5/8"
5/8" 2"
1 3/8" 3/4"
Pau
L uP L
Paul
•• ••
3/4" 2"
3/4" 1/2" 3 1/2" 1 1/2" 2" PER PARTITION TYPE 3/4"
3/4"
3/4"
2"
PARTITION TYPE 3/4" 1/2" PER 2" 3/4" 1/2"
3/4"
DTL - GLASS PLATE PLAN
3" = 1'-0"
••
3" = 1'-0"
2" 1/2"
J15
DTL - GLASS PLATE SECTION
3/4"
J12
DTL - GLASS INTERSECTION
1/2"
J8
EAD
1 3/8" 3/4"
4 7/8"
M5DTLDTL M8 - GLASS FRAME JAMB - GLASS FRAME SECT DTL - GLASS CORNER D8 D15 LL - PLAN @ STONE WALL - PLAN @ STONE WALL - PLAN @ STONE M5 -M1 DTLDTL - DTL GLASS FRAME SECT - DTL GLASS CORNER DTL - DTL GLASS DOOR JAMB WALL M J12 M8 J15 M12 DTL GLASS INTERSECTION DTL -D12 GLASS PLATE SECTION DTL - GLASS PLATE PLAN 3" = 1'-0" 3" = 1'-0" 3" = 1'-0" 1" = 1'-0" 1" = 1'-0" 1" = 1'-0" 3" = 1'-0" 3" = 1'-0" 3" = 1'-0" J1 - ELEVATOR J5 - SECT J8 - GLASS DTL - ELEVATOR DTL - STONE SECT STONE WALL HEADJ8 3" = 1'-0" DTL - GLASS INTERSECTION J1 J5 DTL JAMB JAMB DTL WALL HEAD DTL INTERSECTION 3"J1 = 1'-0" J12 3" = 1'-0" J15 DTL - GLASS INTERSECTION DTL - GLASS PLATE SECTION DTL - GLASS PLATE PLAN 1" = 1'-0" 1" = 1'-0" 3" = 1'-0" 1" = 1'-0" 1" = 1'-0" 3" = 1'-0" J5 3" = DTL J8 J12 J15 - SECT STONE WALL HEAD DTL - GLASS INTERSECTION DTL - GLASS PLATE SECTION 3" = 1'-0" J12 1'-0" DTL - GLASS PLATE SECTION J15 3" = 1'-0" DTL - GLASS PLATE PLAN 1 3/8" 3/4"
1"
3/4"
1"
3/4" 1 3/8"
3/4"
3/4"
3/4"
2"
3"
3/4"
1 1/2"
1/2"
3/4"
4 7/8"
4 7/8"
3/4" 1 3/8"
1 3/8" 3/4"
1"
3/4" 1 3/8"
2"
3" = 1'-0"
3/4"
3"
1/2"
1 1/2"
3" = 1'-0" 3" = 1'-0" 3/4"
3"
1" = 1'-0" 3" = 1'-0"
CEILING ELEV: 8'-8"
3/4"
1 3/8" 3/4"
Residential Interiors Boston MA Project Manager design through construction CAD, SketchUp, Photoshop
M Tagore Hernandez Freelance
Residential Interiors Waltham MA Project Manager design through construction CAD, SketchUp, Photoshop
M Tagore Hernandez Machado Blake
Residential Housing Amesbury MA Job Captain 64,500 sf • 6 months • schematic design CAD, SketchUp, Photoshop
M Tagore Hernandez Machado Blake
Residential Design Roxbury MA Designer and Project Manager 1,000 sf • 5 months • design through construction CAD, SketchUp
M Tagore Hernandez Freelance
Installation Boston University Dance Theater Design and Construction Steel, Wood
M Tagore Hernandez Urbanity Dance Company
Installation Bennington College USDAN Gallery Artist Glass, Steel, Fabric
M Tagore Hernandez Freelance
Institutional Norfolk VA Designer 20,00 sf • 14 months • design through construction CAD, SketchUp
M Tagore Hernandez Tymoff Moss
Graphics Boston Architectural College Graphic Designer Illustrator, Photoshop
M Tagore Hernandez Freelance
Environmental Graphics + Installation Boston MA Project Manager - Design Build 4 months • design through construction Cedar, Stainless Steel, Plexi-glass
M Tagore Hernandez Freelance Volunteer
Installation Boston Center for the Arts Project Manager - Design Build 2 months • design through construction Lycra, PVC, Conduit, Wood
M Tagore Hernandez Freelance Volunteer New England Conservatory
Degree Project Theater, Housing, Retail, High School 88,000 sf CAD, SketchUp, Illustrator, Photoshop
M Tagore Hernandez Boston Architectural College
Degree Project Theater, Housing, Retail, High School 88,000 sf CAD, SketchUp, Illustrator, Photoshop
M Tagore Hernandez Boston Architectural College