Critical Section 8
8 7
7
1
1
1 3
2
3
2
2
9
4 4
6
5 6
5
10
6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
18”x40” SS tube truss system W12x24 SS frame mechanical supply (2) 30 mil glass door w/ Mecco shading 8”x18” alum frame channel custom alum roll-up track system 4”x10” SS C-channel deck support steel deck w/ conc. floor w/ raised floor 4”x4” SS tube acoustic support frame acoustic suspended paneling suspended SS lighting grid Theater: Structural Diagram Axon View Level 1: RCP w/ FlexSpace below Level 3: Theater with RCP Longitudinal Section Transverse Section
11
13
12
14
15
weeks 56
16