T A
A R
C
H
M I
T
E
C
I T
U
R
E
h
i
,
h m
y
n
a
m
e
i
s
t
a
m
i
n
a
n
i
w
a
i
a
m
f
r
i o
m
t
h
e
w
o
r
l
d
“
blocks
CENTRE CENTRE THREE THREE
b r a z i l - sa o pa u l o - ca m p i n as - v i r a c o p o s With the help of the environment, it was decided that the programs would be divided into three blocks: the cultural one (near the Santos Dumont highway, with the purpose of attracting people from the metropolitan area to cultural attractions, sports (using and revitalizing the company BRT proposed in the urban program
facilitating transportation, polarizing and receiving more people for this equipment, and finally, the educational one, which would also have its function of covering the metropolitan region, but mainly, As we have seen, the current social situation needs this to reverse the evils caused by landlessness.
The initial idea was to establish 4 distinct programs: cultural, sports, educational and an administrative module, so that this administration block could also be an equipment in the region. In this first diagram, the cultural building is not yet articulated with the site, nor is there a management of project flows.
With the reassessment of the demands of the region, there was a re-dimensioning of the necessary areas of the educational, administrative and sports blocks, which decreased significantly, increasing the free area of the land. And also, the deconstruction of the cultural building began, to provide lightness and prioritize the visuals.
As a result of the increase in the free area of t he land, it was necessary to create attractions in the area and to begin to see it in the park scale, so the first step was to bring the dam inside, in order to utilize the potential of this company for the Sports block The administrative block was extinguished, due to a reassessment of the program and also by the rearrangement of the use of neighboring blocks (the neighboring blocks will satisfy the demand of coworking administrative space). And also, the three existing blocks could have their own administrative area. As for the architectural blocks, the articulation of the buildings continued, this time trying to bring unity to the reading of the observer.
Being implanted on a park scale, it was necessary to create a cover that would guarantee shelter during rainy hours for visitors, so, at first, large arms were articulated between the sports, educational and cultural building (which at first in this deployment had The coverage function). The topography was not yet articulated.
To ensure more quality for this park, an open-air theater, which has a direct relation with the cultural building (the theater of the cultural building opens outwards, looking at the bleachers, and cultural buildings) has been designed externally. It began, the first traces of jogging paths and cycle paths, and the definition of the Singer dam within the terrain.
3
c
u
l
t
u
r
e s
p
o
r
t
s
e d u c a t i o n
3
In this final implementation, the coverage (the coverings cited in diagram 4) that remained was only that which links the educational building to the sports building, and the rest of the arms would be the transition between topography (land) and construction (concrete), making Building totally interactive, now people walk on top, have access to cultural, watch volleyball, enjoy the view of the dam ... The intention is to make space, not to determine a ladder, bleachers ... space is what The subject wants the space to be.
In relation to the rest of the free areas, lookout squares were created so that people could be on another level looking at everything above the tree tops (as in Duffy square in NY, but the relation is person-nature and not person-edification ). Also close to the sports building, multisport courts were established as a gateway to the cultural building. And the dam becomes part of the program, serving as an area for water sports. As for the main accesses, the access of the cultural building is given
by the street in the number 105 (marginal of Santos Dumont) and the entrance in quota 100, generating a kind of control of the natural entrance to the building, the same happens to the docks With a more private access). The education building is with main access to the street 01 and 02 or (intra-neighborhood). As for sports, they have main access to BRT and 02 (intra-neighborhood). The priority of this project is to take advantage of the public transport implemented in the area of “borders”, but as it is intended to reach
the greatest number of people, it was democratic to create parking pockets close to buildings with parking spaces for cars, motorcycles and bicycles, and a special For buses (in the case of excursions or circulars). With this, the implantation became homogeneous. And it intends to shelter in this space, the greatest number of social functions, it can have, to fulfill the goal of being a space of transformation for the region of Campinas.
level 100
level 102,50
level 105,00
level 107,50
level 110,00
level 112,50
aa
bb
cc
dd
Physical model
#JAX #JAXMUSEUM MUSEUM OF OF THE THEURBAN URBANNATURE NATURE jacksonville - fl
FASHION ADVERTISEMENT
GRAFFITI
03
1
2
3
4
C
5
6
78 9
10
B
A B C 0.00
D
STORAGE
E
KITCHEN 0.00
F
TRASH C
G 0.00
A
A
02
02
H I MECHANICAL
TICKETS
STORAGE FOOD
J
KITCHEN
4.00
K
4.00
L
4.00
M
0.00
level 0
A
B
LOAD UNLOAD RESTAURANT SMALL TRUCKS
03
10 C
B
RAGE
0
H
A
A
A
02
02
CAL
TORAGE FOOD
LOAD UNLOAD RESTAURANT SMALL TRUCKS
00
00
level 15
A
B
03 C
A
B
A
A
02
level 30
B
FLOOR PLAN | LEVEL 0 | 1:20
FLOOR PLAN | LEVEL 03 C
B
A B C
D E
F
G A
A
A
02
02
H I
J
K
L
M
level 45
B
03
1
2
C
3
4
5
B
6
78 9
10
A B C
A B C
MECHANICAL
D D
E E
F F
G G A
A
A
H
02
02
H
A
I I
J J
K
K
L
L
M
M
B
level 60 and up
1 10
2 C
A B C
3
4
5
6
78 9
10
B
MECHANICAL
D E
F
G
A
A
A
H
02
I
J
K
L
M
B
level 60 and up
WC
WC
WC
WC
”
GEOM APLL
TO ARCHI
METRY LIED
TECTURE SPACE - 2012
FURNI
DES
ITURE
IGN STUDENT CHAIR - 2012
MANUAL PARA MONTAGEM - CADEIRA FYMS
3
4
1
5
2
COMPE
ETITION MIRANTE CATARATAS- 2013
ELETR
DES
RONIC
IGN 3DSTUDIOMAX- 2013
2.2 [ 3dsmax - eletronic design - 2015 ]
ELETR
DES
RONIC
IGN RHINOCEROS - I FEEL- 2015
4.2. [ i fell- eletronic design- 2015]
ELETR
DES
RONIC
IGN NEW HILLS- 2015
ELETR
DES
RONIC
IGN A PLACE TO SEAT- 2015
COMP
A R
PUTER
T S
CAN
NVAS
tami.naniwa@gmail.com https://www.behance.net/taminaniwa1d8c https://br.linkedin.com/in/taminaniwa
2
0
1
7