HQ hendy urban village
DEVELOPMENT PROSPECTUS HENDY QUARRY 16 DECEMBER 2020
Land Owner/ Site Promoter Consultant Team
Masterplanning, Ecologists, Landscape and Heritage.
Project Management, Planning and Viability.
Public Relations and Community Consultation.
Engineering, Air Quality and Drainage.
Minerals and Noise.
Highways and Transportation
Report Ref: edp3110_r007 Author
Formatted
Peer Review
Proofed by/Date
007_DRAFT
GH
PD
PD
-
007a
GH
PD
PD
-
007b
GH
PD
PD
-
007c
GH
PD
PD
FD 15/12/20
© The contents of this document must not be copied or reproduced in whole or in part without the written consent of The Environmental Dimension Partnership Ltd. All plans are reproduced from Ordnance Survey digital map data. © Crown Copyright 2020. All rights reserved. License number 0100031673. Imagery © 2020 Getmapping plc, Map data © 2020 Google United Kingdom.
2
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
HQ hendy urban village
CONTENTS Executive Summary 1. Introduction 1.1
Project Background
1.2
Prospectus Aims
8 9 10
2. Site and Surroundings
12
2.1
Site Location and Context
12
2.2
Site Description
16
3. Site Assessment
18
3.1 Transportation 3.2
18
Drainage and Flooding
19
3.3 Heritage
20
3.4 Trees
21
3.5 Landscape
22
3.6 Ecology
24
3.7 Utilities
27
3.8
28
Constraints and Opportunities
4. Vision and Concept
30
4.1
Satisfying the Planning Policy Wales Site Search Sequence
32
4.2
Responding to the Welsh Placemaking Agenda
33
5. Placemaking and Design 5.1
Land Use
38 40
5.2 Density
40
5.3
Scale and Building Heights
41
5.4
Access and Movement
42
5.5
Landscape and Green Infrastructure
44
5.6
Urban Design and Legibility
46
5.7
Character Areas
48
5.8
EDP GI and the ‘Ecosystem Services’ Approach
50
6. Conclusions
56
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
3
Executive Summary This Development Prospectus is part of a package of
• Hendy Quarry sits within the Cardiff Capital Region,
documentation that has been prepared on behalf of Tarmac
which is looking to develop a Spatial Development
Trading Ltd (Tarmac), to support the submission of Hendy
Plan to complement its current Economic Strategy.
Quarry, near the village of Miskin, as a Candidate Site for
This Spatial Plan will seek to recognise the re-
potential allocation in the emerging Replacement Local
emerging areas that are capable of accommodating
Development Plan (RLDP) for Rhondda Cynon Taf County
value-added development, renewed resident
Borough Council (RCTCBC).
populations and supporting university expansion;
The Prospectus has been prepared by The Environmental
• The adopted Local Development Plan (LDP) for
Dimension Partnership Ltd. (EDP), with input from a wider
Rhondda Cynon Taf has failed to deliver the amount
development team, which includes Savills, Arup, DTA
of housing that was planned for;
Transportation and Freshwater. The content has been informed by a series of discussions with the local planning team and with local stakeholders, a comprehensive review of both the policy and physical context of the site and detailed analysis of the unique opportunities it brings. This prospectus is envisaged to be a live document that could be updated as the project progresses. It is proposed that the first stage in any potential development process would involve a brief period of additional mineral extraction and the creation a purposebuilt development platform. The initial extraction and site preparation work makes Hendy Quarry a suitable Candidate Site for inclusion in the RLDP as a strategic allocation for a residential-led, mixed-use development with a capacity of up to 400 homes. Over the following pages, the Prospectus will demonstrate why the site itself should be viewed as a strategic location in terms of growth potential within the local authority area and the wider Cardiff Capital Region. It also sets out why we believe that the proposed ‘re-purposing’ of Hendy Quarry from an industrial site to a new, mixed-use neighbourhood for the local area, should be considered acceptable on technical grounds.
• The proposals for Hendy Quarry represent a viable and deliverable development, which would make an important and significant contribution to meeting the local authority’s pressing housing need in a sustainable manner; • Hendy Quarry is strategically located in close proximity to the M4 Motorway, with direct road links to Cardiff. It has safe and convenient walking links to existing bus stops, providing regular services to Talbot Green, Miskin, Pontyclun and further afield; and • Tarmac, as the site promoter, has a proven track record of enabling high-quality residential developments on former industrial sites across the UK. The Masterplan put forward for consideration includes: » up to 400 modern, energy-efficient homes; » a primary school, with playing fields and car parking; » a community park, linked to a network of cycling and walking trails; and
Hendy Quarry: a Strategic Location for Growth • The 2020 Future Generations Report says that having good quality homes that meet our needs is vital. The
» other community facilities, including a village centre, to serve the needs of local residents from the wider area.
Future Generations Commissioner is urging Welsh Government to focus on decarbonisation of homes,
This Prospectus sets out how the Hendy Quarry site and
updating design quality requirements to reflect modern
the proposed development scheme meets the objectives
technologies and working with organisations like Cardiff
and aspirations outlined above. It has been submitted,
Capital Region, local authorities and communities, to
alongside a Candidate Site Supporting Statement, as
agree a long term vision for the future of housing in
part of the site promotion process, set up by RCTCBC to
Wales;
support the development of the RLDP. It will also be used to continue engagement with partners, the local authority, technical and community stakeholders.
4
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
0
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
100m
5
THE VISION Hendy Urban Village presents a unique opportunity to create a new neighbourhood, set within the attractive natural amphitheatre of a former quarry, yet integrated within the wider environment and connected to the existing settlements of Miskin, Pontyclun and Talbot Green. The vision is based on creating a legacy and writing a new chapter by repurposing this industrial site and providing an alternative use that brings a wide range of benefits to the local community. It is a vision set around a variety of memorable, public open spaces and routes that respond to the unique ecological and landscape opportunities at this location. The layout will retain existing site features to create a naturalistic environment, enhancing biodiversity through a collection of water features and a series of green corridors, stretching east-west and northsouth through the site. A network of low-speed and distinctive streets will create a connected development that promotes walking and cycling, both within the development and between this neighbourhood and the wider settlements in the area. High quality design will combine with the latest thinking around sustainable development, energy efficiency and work-life balance, to create a vibrant community that operates in harmony with its surroundings and supports a more sustainable way of living.
6
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
7
1. Introduction Tarmac has carefully considered the different options
built development platform that could be planned
for the future use of the Hendy Quarry site, once
and designed to meet the needs of a high quality,
the potential for viable mineral extraction has been
sustainable development and opening up the
exhausted, alongside the key principles of selecting
northern faces of the quarry to ensure that any new
and delivering suitable sites for regeneration and
development looks and feels part of the existing
development.
community.
The current permission for mineral extraction includes
Importantly, the deliverability of the site and the
a restoration scheme, which involves importing
development creates an opportunity to provide
significant amounts of inert material by road to
much-needed housing for the area which, along with
fill the quarry void and create an area of seasonal
a potential site for a new primary school, provides
grazing land within the existing treeline. However,
further justification for the proposals.
Tarmac believes the location and nature of the site gives it far greater potential to deliver wider social and economic benefits. The intention is therefore to create a development plateau at a lower level, suitably engineered to support built development but also
Tarmac is committed to the long-term promotion of the Hendy Quarry site through the emerging RLDP process, but has been engaged in discussions with RCTCBC and other stakeholders around possible
significantly reducing the need to import material.
development options for some time. As such, a great
This has ultimately led to the decision to promote
been undertaken, both to support the development
Hendy Quarry as a site for development - a decision
proposals and to align the proposed further mineral
that is fundamentally sound in principle. We also
extraction and site preparation in line with the
believe the proposals that have been developed
proposals for the creation of Hendy Urban Village.
represent an appropriately scaled allocation of housing, together with associated features that make it an effective use of an accessible, under-utilised and
deal of technical information and survey work has
During the summer, Tarmac also participated in a series of meetings with local representatives,
sustainably located site.
in order to further understand the views of local
The proposal to start with a brief period of mineral
considered as a site for a new development. Whilst
extraction would fulfil a number of functions;
many elements of the early-stage proposals were
including the avoidance of sterilising a quantity of
welcomed, a common theme referred to the potential
valuable mineral resource, providing a purpose-
impact on the local road network, especially during
people towards the idea of Hendy Quarry being
peak times, of up to 400 new homes being built on the site.
8
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Whilst there are opposing views around the likely long
1.1 Project Background
term impact of the COVID-19 pandemic on future travel patterns, Tarmac has committed to investing
Tarmac is the owner of Hendy Quarry, and the UK’s
in additional highways and transportation studies to
leading sustainable building materials company and
support any development proposals that are brought
construction solutions business. It has stewardship
forward for Hendy Quarry. We will also be continuing
of over 40,000 hectares (ha) of land, including 120
our discussions with the Local Planning Authority
quarries across the UK. Central to Tarmac’s vision is
(LPA), and other organisations, to establish how any
the dual approach of sustainable mineral extraction
investment in the re-purposing of Hendy Quarry
to prevent unnecessary sterilisation and then to
could lead to enhancements to existing transport
responsibly restore land to a condition that is suitable
infrastructure locally.
for beneficial after-uses.
The work that has already been undertaken in the
Mineral extraction at Hendy Quarry dates back to
preparation of development proposals for Hendy
the 19th century and has become regularised and
Quarry mean that, alongside the Supporting
registered through a series of planning permissions
Statement and completed Candidate Site Submission
since 1947, the most recent being a review of minerals
Form, Tarmac has been able to provide the LPA with
permission (ROMP) which was approved in 2015.
a range of technical survey data and assessment to
The extent of minerals extraction has now reached
support the promotion of the site. Relevant sections
that determined by the 2015 ROMP and therefore
of this work are summarised through this document,
quarrying onsite ceased in June 2019.
and include:The subsequent restoration of the quarry site is • Quarry Development Plans; • Stage 1 Candidate Site Assessment Matrix; • Ecological Technical Notes; and • Transport Technical Note.
currently defined by a separate permission (ref 01/2376/10). It requires the importation of a total of 2.4 million cubic metres of fill material (of which approximately 40% has been imported already), to create an area of a grassland within the existing treeline, to be managed on behalf of the land owner through seasonal grazing. The decision to pursue an alternative future for the site would prevent the sterilisation of the remaining workable minerals present at the site, as it includes a limited amount of further mineral extraction. The mineral extraction process would also create additional arisings that can be used as fill material to create the development platform which, accounting for the fact that the platform level would be considerably lower than that required by the restoration process, would signifcantly reduce the need for importation of additional fill material.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
9
1.2 Prospectus Aims The aim of this Prospectus is to demonstrate the
Paragraph 5.3 states: ‘At a strategic level, design
suitability of the Hendy Quarry site for a strategic
informs the spatial vision for places and ensures that
allocation within the RLDP. The supporting
sustainability sits at the heart of a plan, whilst also
statements and reports will provide additional, more
creating a framework to help deliver wider objectives
comprehensive detail that supports the allocation
through an integrated Placemaking approach. This
of the site within the emerging RLDP, including
can include LA strategies such as Well-being Plans,
evidencing the deliverability of the site as one
regeneration areas, site allocations, town centre
cohesive and sustainable urban development.
strategies and the promotion of sustainable transport modes and delivering infrastructure. The plan making
This Prospectus highlights how various design
process should consider how Placemaking principles
opportunities have arisen, from the initial analysis to
and good design influence the scale and location
shape the design concept, through to the eventual
of development. At a local level, the plan and policy
outcomes set out in the masterplan. It narrates
framework should ensure the creation of well designed
the vision we have for the site and its delivery, via
quality places where people will want to live, work and
the mechanism of the Development Plans Manual
visit. Placemaking Tools as an Evidence Base - Master
(Edition 3 March 2020) and drawing on best practice
Planning Approach Placemaking ‘tools’ can be a useful
for urban design, with appropriate design parameters
mechanism when prepared in parallel with the plan to
and strategies.
inform development proposals and policies and ensure
In essence, this Prospectus sets out the ‘design story’ of the site to-date. In compiling these pages, regard
Paragraph 5.4 states: ‘The value of a Placemaking
has been given to both the Development Plans
approach in the preparation of plans is to identify
Manual (Edition 3 March 2020) and the RCTCBC
key design parameters and cumulative infrastructure
Candidate Site Methodology (October 2020), and as
requirements of development across the wider area
such it is important to understand and highlight the
to inform policy and site specific allocations. This
following:
approach will ensure LPAs are in the driving seat and
Development Plans Manual (Edition 3 March 2020) Placemaking in the Development Plan Process
have sufficient ‘teeth’ to implement the key design and
Referring to the above document, which this
infrastructure requirements of sites, particularly where there are large sites in multiple phases and ownership, programmed over many years.’
process will be fundamentally assessed against, the
Paragraph 5.5 states: ‘The most appropriate
following extracts are pertinent to our proposals for a
‘Placemaking tool’ for a development plan will be for
sustainable urban village at Hendy Quarry.
the LPA to determine, based on the scale of site(s) and
Paragraph 5.2 states: ‘A key national priority is to deliver high quality, sustainable places, through a Placemaking approach which must be at the forefront of plan making. Plans must be prepared in line with the gateway test and search sequence set out in PPW. The National Sustainable Placemaking Outcomes must be used to inform the preparation of development plans. This will ensure development is located in the right place and places are planned comprehensively and achieve quality outcomes for communities. Understanding how places function at both a strategic and local level should influence how plans are prepared and implemented.’
10
effective implementation and delivery.’
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
where sites are in the development process. Table 11 shows how Placemaking tools should be used as part of the plan’s evidence base. Where possible, this work should be undertaken collaboratively between the LPA and key stakeholders responsible for the delivery of the site, as well as the local community. It will be essential for statutory bodies to comment on key issues such as flooding, sewerage infrastructure, natural environment and health. This will give the plan a legitimate base, highlight key issues, requirements and constraints that can be taken into account in the master planning process, achieving high quality places.
Development Plans Should Contain: A strategic and locally distinctive Placemaking vision for the plan area (informed by Council strategies/WBPs) supported by appropriate design policy(s) / master planning principles / green infrastructure and access. Where there are specific issues SPG can be prepared.
Concept/schematic frameworks, design principles and infrastructure requirements for key sites (set out in policies) that are core to delivery of the plan. Key sites and Placemaking and infrastructure requirements should be considered in detail from the early stages of plan making, prepared in collaboration with developers and the community. They can provide a key starting point for further design collaboration and inform detailed site specific master planning and viability work.’
“Table 11: Placemaking Tools as an Evidence Base” from Development Plans Manual (Edition 3 March 2020). MASTER PLANNING APPROACH
HOW TO EMBED IN THE DEVELOPMENT PLAN
Concept / Schematic Framework
Can be embedded as part of site specific policies, a broad mechanism for assessing and influencing proposals as they
Flexible conceptual vision setting out the key elements of
come forward.
a site (access, physical infrastructure, green infrastructure networks, development areas/uses, landscape, key features, key
Useful for key/strategic sites that are core to the delivery of the
opportunities and constraints).
plan.
Set out area/site specific planning issues and constraints.
Green Infrastructure Assessments/Area Statements should inform the master planning approach for site allocations
Set out the key vision and high level design principles of a site
to support ecosystem resilience and identify nature based
and how it should be developed.
solutions.
Can provide a broad mechanism for assessing and influencing
The information should be used to inform infrastructure
proposals as they come forward.
requirements/viability of sites. They can be made explicit in the plan. Prepared as SPG (including Place Plans).
A Detailed Master Plan Approach Can be universal or site specific. Can identify key design
Can be embedded within the plan as a general design policy/
principles that are definitive and vital to the creation of
overarching policy requirements – set out in a policy and or
sustainable places and those where more flexibility can be
graphical format.
applied. Can be embedded as part of site specific or a general design High level framework covering key parameters / master
policy.
planning requirements for a larger area or site specific: Design principles and infrastructure requirements in broad terms
•
Land uses, particularly those core to determining layout
•
Density and house types (where known)
•
Scale & massing
Useful for key/strategic sites that are core to the delivery of the
•
Key access, movement corridors and the street hierarchy
plan.
•
Transport / movement (all modes)
•
Green infrastructure
The information should be used to inform infrastructure
•
Physical infrastructure
requirements/site specific viability work. They can be made
•
Biodiversity
explicit in the plan.
•
Renewable energy/energy efficiency opportunities
•
Phasing and infrastructure requirements
•
Social and Community Assets
or site specific.
Prepared as SPG (i.e. Place Plan)
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
11
2. Site and Surroundings
M4 Junction 34
To Cardiff
2.1 Site Location and Context Hendy Quarry is already very well connected to the surrounding area and sits centrally within a recognised and regionally significant growth corridor, as is shown in Figure 1. The site is located to the east of Miskin in a strategic position alongside the A4119 and close to Junction 34 of the M4. The A4119 dual carriageway to the east of the site runs northwards from Junction 34 of the M4 (which is located 800m south of the site) up to the Rhondda Valley. This road forms a key north-south connection between Llantrisant, the Rhondda Valleys and the M4 motorway junction providing convenient access to Cardiff, Bridgend, Swansea and the rest of South Wales. Hendy Quarry is strategically located to the south-east of the village of Miskin which sits as part of a wider inter-connected conglomeration of settlements which also includes Pontyclun to the west and Llantrisant and Talbot Green to the north. The site’s location in the context of surrounding settlements, motorway junction, and strategic development sites is shown Figure 3 on page 14. Further to the north of this is ‘Cefn Yr Hendy’, a site which is allocated in the current LDP for a mixed use development
A4119
and benefits from planning permission (reference 16/1385/13) for 460 dwellings, a primary school, and a local centre.
Figure 1: Regional Context Figure 2: Aerial View of Site Looking South
12
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
M4
To Bridgend/ Swansea
Hendy Quarry
To Llantrisant and Rhondda Valleys
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
13
TALBOT GREEN
PONTYCLUN
MISKIN
HQ hendy urban village
Vale of Glamorgan Strategic Site. On the southern side of Junction 34 of the M4, 55.16ha of land is allocated for Class B1, Class B2 and Class B8 floorspace
Figure 3: Site Context
14
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Mwyndy/Talbot Green Area (SSA 8). A strategic allocation on both the eastern and western side of the A4119/Llantrisant Road is for 500 homes, 15ha of employment land, 23,4000sqm of retail floorspace, 10,000sqm of leisure floorspace, a primary school, and various community facilities.
CREIGIAU GROES FAEN
Cardiff Council Strategic Sites. Land between Junction 33 of the M4 and to the south of Creigiau is allocated for a total of 2,650 homes and a strategic park and ride
0
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
200m
15
2.2 Site Description The 22.07 ha site consists of the limestone quarry and Tarmac’s regional office, and a builders merchant which is presently leased out to a third party. The site is accessed from a T-junction on the southern side of School Road. The predominant feature of the site is the quarry which occupies the
MISKIN
southern part of the site and has a total area of 14ha. The north-eastern part of the quarry has recently been worked and there are therefore benches at average elevations of 50m above Ordnance Datum (aOD) and 70m aOD.
Braceys Builders Merchants
Much of the southern and western parts of the quarry have been backfilled. The quarry is presently dormant with quarrying having ceased in June 2019. The 8ha immediately adjacent to School Road is occupied by a number of non-quarrying activities: • Located on the western side of the main route into the quarry and
Tarmac Regional Office
closest to School Road is Braceys Builder Merchants. Braceys’ operations comprise of a large industrial unit and open yard; and • Located to the south of Braceys, on the western side of the main access into the quarry, is Tarmac’s Regional Office and associated staff car parking. A thick band of vegetation, mature trees and grassland separates the quarry from the A4119 to the east. The northern boundary of the site is formed by a dense band of mature trees and School Road which connects to the A4119 via a traffic-controlled junction to the east, and connects towards Miskin and Pontyclun to the west. On the northern side of School Road is an irregularly shaped parcel of grassland and a petrol filling station, car showroom, and vehicle repair garage. There are currently no footways along School Road in front of the site, but a footway is present further east and west. To the south and west of the site is a large area of grassland with various mature trees and hedgerows currently used for grazing. This slopes fairly steeply down from the site. To the west of this is the village of Miskin and to the south is Miskin Manor Hotel and associated sports pitches. The nearest residential properties to the site are those located at School Road and Beechlea Close approximately 150m west of the site and at Parc Ifor Hen approximately 120m north-west of the site.
Figure 4: Aerial View of Site Looking North
16
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
School Road
A4119
Site Access
Recent Quarry Workings
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
17
3. Site Assessment 3.1 Transportation The site is strategically located to the south-east of
Most of Miskin lies within 2km of the site and all of the
the village of Miskin which sits as part of a wider
settlement and the employment areas of Pontyclun
inter-connected conglomeration of settlements which
and Talbot Green lie with cycling distance.
also includes Pontyclun to the west and Llantrisant and Talbot Green to the north.
The area is very well served by bus routes with the
To the east of the site is the A4119 dual carriageway.
from the front of the site and 600m from the southern
The A4119 runs northwards from Junction 34 of
elements of the development.
A122/X122 running along the A4119 around 200m
the M4 (which is located 800m south of the site)
The site is also within 2km of Pontyclun Railway
northwards up to the Rhondda Valley. It forms a key
Station which is located to the east.
north-south connection between Llantrisant and the Rhondda Valleys to the north and the M4 motorway
The site is currently served from a good quality
Junction 34 to the south before continuing eastwards
ghost island right turn junction which has safely
from the Castell Mynach junction towards Cardiff.
accommodated Quarry, Office and Builders 5km
Merchant traffic flows for many years. The proposed
The northern boundary of the site is formed by School
development will remove the traffic movements
Road which connects to the A4119 via a traffic-
5km
associated with those uses from the access.
controlled junction to the east and to the west via a series of roundabouts towards Miskin and Pontyclun. The first roundabout is situated to the west and
There are no 2kmpublic rights of way (PRoW) within the
5km
site, however, a footpath runs to the south of the
connects School Road to Heol Miskin and Ffordd 2km
Cefn-yr-Hendy.
southern boundary of the site (reference ANT/309/1), from the Chestnuts, directly west to the A4119 (at the access into Miskin Manor).
The site in the context of local2km services, bus routes
122
and facilities is shown in Figure 5.
20-minute frequency
122
20-minute frequency Potential bus
5km
re-route
122
20-minute frequency
Potential bus re-route 2km
Potential bus re-route
122
20-minute frequency
Potential bus re-route
Notes:
vid Tucker Associates nsport Planning Consultancy
Location Site Location Education Education Employment Employment
ster House, Doctors Lane, Henley-in-Arden wickshire, B95 5AW +44(0) 1564 793598 Fax: +44(0) 1564 793983 .dtatransportation.co.uk
es ltancy
Notes:
4 793983
Retail (as defined in Local Plan) Railway Station Bus Stops
18
Figure 1 Drawing Title Job Title Client
Active Travel Routes
Railway Station Station Bus Stops Active Travel Travel Route Routes
Figure 1 Drawing Title Job Title Client
Active Travel Routes
Railway Station Bus Stops
Retail (as (as defined defined in inLocal LocalPlan) Plan) Retail
Site Location Education Employment
rden
Retail (as defined in Local Plan)
Figure 1 Drawing Title Job Title Client
Scale : NTS
Site Location and Facilities Plan Hendy Quarry Tarmac Trading Ltd.
NORTH
Scale : NTS12 © Crown Copyright and Database Right 2010 - AL 1000304
Site Location and Facilities Plan Hendy Quarry Tarmac Trading Ltd.
NORTH
: NTS © CrownScale Copyright and Database Right 2010 - AL 1000304 12
Site Location and Facilities Plan Hendy Quarry Tarmac Trading Ltd.
Figure 5: Local Services, Bus Routes and Facilities© Crown Copyright and Database Right 2010 - AL 1000304 12
NORTH
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS David Tucker Associates Transport Planning Consultancy Forester House, Doctors Lane, Henley-in-Arden Warwickshire, B95 5AW Tel: +44(0) 1564 793598 Fax: +44(0) 1564 793983
Notes:
Site Location Education
Retail (as defined in Local Plan) Railway Station
Active Travel Routes
Figure 1 Drawing Title Job Title Client
Scale : NTS
Site Location and Facilities Plan Hendy Quarry Tarmac Trading Ltd.
NORTH
Whilst it is noted that highways and traffic impact
tidal flooding) to Flood Zone C2 (without significant
in particular has been raised as an issue by local
flood defence infrastructure). Land uses are
residents, the scheme will not result in significant
categorised as either “Highly Vulnerable” or “Less
adverse impacts. It will substantially reduce the level
Vulnerable” with uses only permitted in certain
of importation of material required to the site with a
flood zones.
consequential, significant, reduction in Heavy Goods Vehicle movements on the local road network. The inclusion of a school site and local facilities will further reduce the need for travel by existing residents near the site which will help relieve and reduce existing movements in and around the town. In due course, a full Transport Assessment will be prepared and, in line with policy requirements, any specific locations where significant capacity issues are identified as a result of the development will require mitigation.
3.2 Drainage and Flooding Welsh Government prepares and manages the Development Advice Maps (DAMs) which categorise all land according to their risk of flooding from fluvial, coastal, and reservoir sources. Land is characterised into four categories, ranging from Flood Zone A (considered to be little or no risk of fluvial or coastal/
Hendy Quarry is located within Flood Zone A (considered to be little or no risk of fluvial or coastal/ tidal flooding) and in accordance with Section 9 of Technical Advice Note 15: Flooding (TAN15), is suitable for accommodating forms of highly vulnerable such as new housing and a primary school. In anticipation of the publication of a draft replacement TAN15, Natural Resources Wales (NRW) has published a Draft Flood Map for Planning which, whilst having no planning status at present, provides an indication of the direction of travel and the likely position that will be in place as the RLDP progresses further. These maps show the site as being located within Flood Zone 1 (the equivalent of Flood Zone A) pointing to there being no constraints on the uses that would be acceptable.
Figure 6: Flooding HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
19
3.3 Heritage The site itself is not subject to, and does not contain,
The land sloping down from the southern edge of
any statutory or non-statutory heritage designations,
Hendy Quarry towards the M4 is included within
reflecting that the site has been extensively changed
the Miskin Manor Historic Park and Garden. It is
and disturbed by quarrying during the 20th century.
considered that if the site remains concealed by the
The nearest listed building to the site is Mwyndy House which is located approximately 300m east of the site. As well as being fairly distant from the site, Mwyndy House is well screened by existing planting
the Historic Park Garden and the site, then residential development is not likely to cause any impact or change its character or special interest.
and is physically separated from Hendy Quarry by
The masterplan submitted alongside this Supporting
the A4119 and built development at the Texaco petrol
Statements shows the retention and enhancement
filling station and associated car dealership on the
of this tree belt which will add to the screening effect
eastern side of the A4119. It is therefore considered
that the boundary screening plays
that the redevelopment of Hendy Quarry will not have an impact on Mwyndy House.
Figure 7: Hertiage Assets
20
wooded embankment and tree boundary bordering
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
3.4 Trees Groups of trees at the northern part of the site
eastern site boundary’s which will be subject to a
surrounding the existing operations buildings are
new ecological management regimes and could, in
subject to woodland Tree Preservation Orders (TPOs)
part, become accessible to the public. To compensate
under references W1, W2, W3, and W4. The extent
for the necessary loss of vegetation in the northern
of the area covered by TPOs has been determined
parts of the site to facilitate the proposed mineral
by historic mineral extraction and is shown coloured
extraction, a substantial area of new landscaping
green in Figure 8.
is proposed within the scheme, notably along
The removal of these trees is required to strip the overburden necessary to facilitate the extraction of the limestone underneath. As compensation for this tree loss, the masterplan proposes a comprehensive package of green
the bottom of the reduced height rock faces. This essentially will provide an ‘ecological wrap’ around the edge of the site comprising a woodland belt and large areas of new ecological habitats that will link these areas via green corridors with the community gardens at the heart of the development.
infrastructure. This includes the retention of the existing tree belt on the western, southern and
Figure 8: Tree Constraints
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
21
3.5 Landscape Land to the south and west of Hendy Quarry slopes
LANDMAP is a Wales wide resource (maintained by
upwards towards the site, whilst a thick border of
NRW) that identifies and evaluates key landscape
mature trees is located along the quarry’s upper rim.
characteristics. Landscape quality is assessed
The effect is therefore that views from the south and
against five criteria. These are then placed on a scale
west are of the band of trees and not of the quarry
of ‘Outstanding’, ‘High’, ‘Moderate’, and ‘Low’. The
itself. From the north, the location of uses associated
evaluation of the site against the five criteria is set out
with the quarrying operations as well as fairly dense
in Table 1.
trees mean that the quarry itself currently is not visible from School Lane.
The nature of LANDMAP means that parcels of
The site itself is not subject to any statutory landscape
rather than a single measure and so accordingly it is
designations although the sloping areas of grassland
not possible to definitively compare the landscape
used for grazing to the south and west of the site’s
value of different parcels of land, but nevertheless it
boundary are within the extent of Ely Valley at Miskin
is clear that the site performs comparatively to other
Special Landscape Area (SLA).
undeveloped parcels of land on the fringes of nearby
land are rated on the basis of the above five criteria
Planning Policy Wales (PPW), at Paragraph 6.3.12,
settlements.
states that SLAs are non-statutory landscape
Whilst the proposals will result in an increase in the
designations that should be put in place through LDP
level of the quarry floor, the proposed masterplan
where “normal planning policies cannot provide the
shows the management and strengthening of
necessary protection”.
the woodland that is located on the southern and
The “Proposals for Designation of Special Landscape Areas in Rhondda Cynon Taf”, prepared in 2008 to inform the preparation of the LDP, outlines a series of
western rim of the quarry, the effect being that the existing screening of the site will be maintained and enhanced.
landscape characteristics of the SLA of which Hendy
The retention of some of the reduced quarry faces will
Quarry, as a result of mineral extraction, does not
retain this geological landscape asset, however, under
display.
current restoration all of the geological asset would
Further, Hendy Quarry, due to its lower ground level
be lost and covered with inert fill.
than the surrounding level and the screening offered by woodland at the top of the quarry’s slopes, is seen very much separate from the SLA.
Table 1: Landscape Evaluation
22
LANDSCAPE QUALITY
ASSESSMENT
Geological Landscape
Outstanding
Landscape Habitats
Moderate
Visual and Sensory
Moderate
Historic Landscape
Moderate
Cultural Landscape
Moderate
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Figure 9: Landscape Planning Designations
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
23
3.6 Ecology An Ecology Briefing Note has been prepared by EDP
sensitive design of built development away from SINC
which provides a high-level assessment of the site
boundaries and inclusion of suitable buffers. The
with respect to identifying key ecological constraints
SINC provides a potential space to accommodate
and opportunities to inform residential development.
ecological mitigation and biodiversity enhancements
Two statutory designations, Ely Valley Sites of Special Scientific Interest (SSSI) and Brofiscin Quarry SSSI, occur within 2km of the site, being designated on ecological and geological grounds respectively. Ely Valley SSSI is located approximately 300m to the south, however is buffered from the site by the grounds of Miskin Manor and is unlikely to be impacted upon by any development of Hendy Quarry. Brofiscin Quarry SSSI is approximately 1.5km from the site, and given the distance and geological nature of
during development of adjacent land. Of further note, cessation of quarrying activities following development and occupation of the site and sensitive long-term management of sensitive habitats (e.g. scrub management to prevent encroachment into calcareous grassland) are likely to improve the existing condition of the retained areas of SINC, further compensating for habitat loss elsewhere across the site.
the designation, it is unlikely to be adversely impacted
Information on habitats within and around the site
by any future development proposals.
was obtained during the Extended Phase 1 survey by
A small portion of the site, comprising woodland and calcareous habitats around the quarry fringe and an area of woodland to the north, overlap with a nonstatutory Sites of Nature Conservation Importance (SINC) (SINC 153 – Hendy Quarry and Miskin Slopes). This is a large SINC extending 32.98ha with the majority of its extent occurring beyond the site boundary. There are also four other SINCs within 500m of the site. As such, a future planning submission will need to consider the potential for direct and indirect impacts to arise upon qualifying features as a result of, for example, potential increased recreational pressure on sensitive habitats, a deterioration in water quality following increased surface water runoff and loss, disturbance and or degradation of qualifying features. The Framework Masterplan indicates some of the woodland within SINC 153 would potentially be lost to facilitate development (particularly the younger woodland at W6 along School Road, and also potentially a section of W4), which will need consideration during a planning submission. However, this is a small proportion of the SINC and
EDP in September 2017 and further botanical surveys undertaken in May and June 2018. Information on protected species was obtained during surveys between 2018-2019. The site comprises an active quarry with a range of habitats within the boundary. The main active quarry is dominated by bare ground and scree with steep cliff faces around the edges. Broadleaved woodland is present around the upper fringes and around office/hardstanding areas, with the most valuable areas being on the upper quarry rim. Small areas of calcareous grassland also occur on the upper quarry fringes, with a mosaic of ephemeral vegetation, ruderal habitats and bare ground dominating the quarry bowl. There is also an operational sump, as well as several ephemeral waterbodies on site. There are several buildings towards the north of the site, with associated hard standing and amenity grassland. The areas of highest intrinsic ecological value comprise the areas around the rim of the quarry, especially the woodland to the south and west which contain a number of trees with bat roost potential, as well as badger setts.
the majority of the more sensitive areas of the SINC,
The mosaic of calcareous grassland, ephemeral
comprising the habitats of high ecological value on
habitats and scattered scrub on the quarry rim are
the quarry rim, will not be directly impacted. Such
botanically diverse and have value for a wide range of
retained features will be further protected from
invertebrates and common reptiles.
potential harm/damage/disturbance through the
24
and thus offset ecological impacts that may arise
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Figure 10: Phase 1 Habitat Plan
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
25
Woodland
Semi-improved Neutral Grassland
Examples of Existing Hendy Quarry Habitats
Woodland
Ephemaral Vegetation
Calcareous Grassland
Main Quarry Cliff Faces
26
Vegetated Cliff Faces
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
The quarry faces are used by breeding peregrine
Overall, it is considered that there are no obvious
falcon in addition to other bird species and provide
‘in principle’ (significant) ecological constraints that
opportunity for roosting bats, with a soprano
would preclude development, and which cannot be
pipistrelle bat recorded emerging from a crevice to
avoided by good design. It is considered that future
the south-west of the quarry. The lagoon/sump (P1)
development of the site could incorporate appropriate
is likely to have value for amphibians (though no
inherent avoidance, mitigation and enhancement
evidence of great crested newt was found), as well
measures required to ensure that a development
as invertebrates. All of the habitats (apart from the
scheme could be implemented in accordance
lagoon/sump) considered to have most ecological
with national and local planning policy and wildlife
value are located within the SINC boundary and
legislation with a focus on the retention of those
its designation is considered justified on the basis
habitats of greatest ecological value around the rim of
of the habitats present. The main active quarry,
the quarry.
comprising bare ground and scree, as well as areas of hardstanding and ephemeral/ruderal habitats have limited ecological value and offer most potential for development. One of the buildings within the site contains a day roost for small numbers of soprano pipistrelle. The Framework Masterplan has sought to locate the majority of development across those habitats of predominantly lower ecological value whilst retaining the quarry rim habitats as far as possible. In particular, the eastern, southern and western periphery of the quarry containing mature broadleaved woodland, calcareous grassland and ephemeral vegetation is proposed to be retained. Where avoidance of valuable habitats is not possible, the site is considered to be of sufficient size and extent to enable future development proposals to mitigate for any significant ecological constraints and compensate for the unavoidable loss of ecologically
3.7 Utilities Hendy Quarry is well located with regards to its ability to connect to various utility services reflecting that the site has an extensive history of mineral extraction and currently accommodates Tarmac’s regional offices and a builders merchants. In support of promotion of the site, Tarmac has undertaken utilities searches for Hendy Quarry, the results of which are summarised in Table 2 below. Whilst there will be a requirement for further investigation, the information presented in Table 2 demonstrates that there are existing utility services proximate to the site.
Table 2: Existing Utilities SERVICE
PROVIDER
COMMENTARY
Electricity
Western Power
11kV cables running
Distribution
over ground into site
valuable habitats through the enhancement and long-term management of retained habitat features of value to protected and notable species in addition
from School Road. Internet
Open Reach
to site.
to new habitat creation. This will be in addition to the sensitive positioning of built development away
Gas
from retained sensitive features on the quarry rim
Wales and
Intermediate gas main
West Utilities
running along School Road.
to minimise damage. In particular, the Framework Masterplan outlines proposals for community
Water
gardens, a ‘Linear Biodiversity Park’, attenuation ponds, tree-lined avenues and streets, as well as a
Foul Water
‘Run-Wild Trail’ incorporating information boards and
roosts within the site, species-specific measures will be devised to ensure the long-term maintenance of
Dwr Cymru
200mm water main
Welsh Water
along School Lane. 750mm gravity sewer along at Ffordd Cefn-
biodiversity features to connect people with nature. In consideration of the confirmed presence of bat
Existing connection
Yr-Hendy. Surface
225mm gravity sewer
Water
along at Ffordd CefnYr-Hendy.
these populations at favourable conservation status and which will be implemented in accordance with an approved Development Licence from NRW. HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
27
3.8 Constraints and Opportunities Importantly, there are not considered to be any constraints or designations on or adjoining the site that preclude future development and cannot be addressed through the design process or appropriate local mitigation. The following points summarise the analysis of the design influences at and surrounding the site. Key elements of this analysis are illustrated graphically on the plan opposite and described as a series of opportunities and constraints below:
Access and Connectivity
Ecology
• Provide access to the site via two main entrances
• Create a Green Infrastructure (GI) network which
off School Road with an internal spine road that
connects and enhances east-west connections
extends through the site from north to south. This
across the site;
spine road also has the opportunity to provide a bus route loop for the development also linking it to the other neighbouring settlements; • Create additional pedestrian and cycle connections to link with the existing footpaths, PRoW and Active Travel Routes; and • Create informal recreational pedestrian/cycle links through and out of the site to link to a wider open space and green infrastructure corridor network.
Landscape and Visual Context • The site itself is not subject to any statutory landscape designations although the sloping
• Potential to connect the scheme into the wider GI network to preserve habitats and where appropriate create new green corridors to connect areas of existing ecological value; • Design Sustainable Drainage Systems (SuDS) features and a drainage strategy to provide recreational, visual and ecological benefit; • Opportunity to create new internal features within the site as multi-functional assets; and • Potential to provide an ‘ecological wrap’ around the edge of the site comprising a woodland belt and large areas of new ecological habitats.
areas of grassland used for grazing to the south and west of the site’s boundary are within the extent of Ely Valley at Miskin Special Landscape Area (SLA); • Utilise the best characteristics of the areas landscape character to create a development of local character that integrates with its context – both man made and natural; • Retain and enhance existing site features around the periphery of the site, such as the woodland to the south; and • Appropriate mitigation of any tree loss required in the northern part of the site.
Drainage • Development platform optimised to provide passive drainage solution; • Use appropriate surface water attenuation measures and SuDS to create a naturalistic environment; and • Locate swales routes to convey water to ponds and provide habitat for wildlife.
Heritage • Potential to retain and enhance southern tree belt to add further screening effect to the Miskin Manor Historic Park and Garden.
28
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Notes:
- The keys are m - Boxes to be ma - Once you have and key to map - Tools > Origin > prevents crashin
Key
R-HEND Y
N
CEFN-Y
Si
Pr
FFORDD
Fi Bi
64
Pu
B42
DRAIN
FH
Pr
DRAIN
FH
OAD OL R
LP
FH
B
O
SCH LP
65
DRAIN
LP
19
EP EP
DRAIN
A
A41
LP
4
26
B4
Piez
70
60
FH
Ex
65
Tr 70
TP
Ex
LP
75
AD
75
50
OL
RO
Si
HO
TP
80
SC
Tr
75
Piez
TP
70
75
65 70
80
Se
Piez
85
80 80
70
75
75
Sp
Piez
70
75
65 MH
80
80
75
65 60
75
M
EP
85 EP
60
An
70
80
55
LP
80
85
85
Re Ne
70
65
60
60
TP
50
MH
60
peg
50
75 60
80
70 Piez
55
Si Co
60
FPS
60
80
65 65
65
60
45 FPS
60
75
55
60
W.L
80
80
55
65
70
50
Piez
A4
70
11
80
65 Piez
9
75
50 55
60
60
65 FPS
65 65
Notes: 80
65
70 75
80
70
80
75
client
70
70
- The keys are made to be 1:5000 on the titleblock - Boxes to be made invisible once filled - Once you have brought in a georeferenced map, move the 'page area' and key to map location. - Tools > Origin > Centre Drawing on Internal Origin > 'Okay' - This prevents crashing and corrupt files being generated.
Tarmac Lt
70
70 Piez
70
75
70
ST
80
Key
N
project title
75
80
School Ro
80
75 75
75
Site Boundary (22.07ha) Piez
75
drawing title
80
70 Piez
Constrain
Primary Vehicular Access Filtered Views to Billy Wynt Tower Landmark
date drawing num scale
Public Right of Way Notes:
Proposed Buildings Limited to 75 AOD
- The keys are made to be 1:5000 on the titleblock - Boxes to be made invisible once filled - Once you have brought in a georeferenced map, move the 'page area' and key to map location. - Tools > Origin > Centre Drawing on Internal Origin > 'Okay' - This prevents crashing and corrupt files being generated.
B - Road 0
Registered offic
Figure 11: Constraints and Opportunities Plan
ental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Key
N
100m
A - Road
Existing Buildings on Site
Trees With Bat Roosting Potential
Site Boundary (22.07ha)
Existing On-Site Vegetation 50
FPS
Primary Vehicular Access
Site Topography
Filtered Views to Billy Wynt Tower Landmark
Tree Preservation Order (TPO)
Public Right of Way
Settlement Edge
Proposed Buildings Limited to 75 AOD
Special Landscape Area (SLA)
B - Road
Miskin Manor Historic Park
A - Road
Ancient Semi-Natural Woodland
Existing Buildings on Site
Retain Point of Access to Neighboring Land
Trees With Bat Roosting Potential
Site of Importance for Nature Conservation (SINC)
Existing On-Site Vegetation 50
80
Site Topography
Tree Preservation Order (TPO) Piez
A4
70
11
80
Settlement Edge
9 Special Landscape Area (SLA) FPS
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
29
4. Vision and Concept Environmental Principles The masterplanning process has been led by a detailed understanding of the existing physical, ecological, landscape and heritage context of the site, as illustrated in the preceding constraints and opportunities plan. The masterplan has been informed by proposals for mineral extraction and preparing development plateaus which will help to make the site more suitable for the optimum development solution. The masterplan is guided first and foremost by GI requirements, with the environmental issues at the forefront of the design process and with an aim of being able to yield an increase in the biodiversity value of the site, whilst enhancing habitat and wildlife corridors wherever possible. The key environmental objectives which have guided the scheme are: • Retain and enhance existing site features around the periphery of the site, such as the woodland to the south; • Create a GI network which connects and enhances east-west connections across the site; • Knit the scheme into the wider GI network to preserve habitats and where appropriate create new green corridors to connect areas of existing ecological value; • Design SuDS features and a drainage strategy to provide recreational, visual and ecological benefit; and • Develop design principles around the central community gardens where blue and green Infrastructure, amenity and potentially sustainable energy infrastructure combine to make this a multi-functional asset.
Built Form Principles The guiding principles of the built form have evolved from an understanding of the unique site setting and aim to create a strong contemporary urban narrative whilst having recognisable characteristics in the building tradition which will contribute to a relevant new vernacular. The urban form provides a clear block structure through the central core of the site to create a distinctive series of spaces, streets and squares, maximising opportunities for solar orientation. The central community garden delivers a planned formal space in strong contrast to the informality of the edge conditions around the quarry ‘bowl’. This formal community space takes its cues from Victorian city gardens providing a necessary urban lung in the centre of the development. These guiding principles may be described as: • The layout structure should prioritise the pedestrian/cyclist and offer a range of street characters and styles suitable to the location and function of the street; • Development should maximise opportunities for green spaces to provide an attractive outlook for new residential development; and • New homes will be of a similar scale to development in the area and respect recognisable building forms and styles, with 2.5 to 3 storey dwellings focussed on key frontages, movement corridors and spaces; and • The density should reduce as the built form radiates southwards which aligns to the building height parameter to create a simple legible development.
30
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
‘
‘
Setting a high benchmark of design quality in the re-purposing of this industrial site, creating a responsive, sustainable and deliverable development for a new urban neighbourhood at Hendy Quarry.
N
64
B42 64 B42
CAR PARK LOCAL CENTRE LOCAL CENTRE
MUGA
19
A41
A41
PRIMARY SCHOOL 2.F.E SCHOOL
19
OL
SPORTS PITCHES SPORTS PITCHES
CASTELL-Y-MYNACH
LAP LAP
CASTELL-Y-MYNACH
LAP
LAP
LAP
EET STR
LIN
EA
RP
LIN
EA
AR
K
LE
RP
AR
K
SWA
LE
SWA
EET STR LEAP
ATTENUATION ATTENUATION
T
CARMEN
ROCK ES ENT
ESCARM
NEW WOODLAND MITIGATION NEW WOODLAND MITIGATION
0
Figure 12: Concept Masterplan
date date
10 MARCH 2020
drawing number edp3110_d023
HENDY
10 MARCH 2020
drawing clientnumber edp3110_d023 scaleTarmac Ltd1:1250 @ A1 URBAN VILLAGE drawn by title |GHDEVELOPMENT project
scale
1:1250 @ A1
drawn by
GH
checked School
checked
OS
QA drawing title
OS Miskin Road,
client
Tarmac Ltd project title
PROSPECTUS School Road, Miskin drawing title
Concept Masterplan
31
50
4.1 Satisfying the Planning Policy Wales Site Search Sequence PPW, in providing guidance on how LDPs should
boundaries. Only if there is no previously developed
allocate sites for housing, introduced at Paragraphs
or underutilised sites should greenfield sites either
3.39 and 3.40, a site search sequence which should
within or outside of settlements be considered.
be used when considering sites for allocation. The exact policy wording is replicated below: “3.39 In developing their spatial strategy planning authorities must prioritise the use of suitable and sustainable previously developed land and/or underutilised sites for all types of development. When identifying sites in their development plans planning authorities should consider previously developed land and/ or underutilised sites located within existing settlements in the first instance with sites on the edge of settlements considered at the next stage. It is recognised, however, that not all sites of this nature are suitable for all types of development.” “3.40 Where there is a need for sites, but it
Whilst Hendy Quarry does not constitute previously developed land as defined in PPW given that a restoration scheme for the site has been approved, mineral extraction has ceased and the site is currently vacant save for the operation of Tarmac’s regional office. Whilst a restoration scheme has been agreed as part of the site’s planning history, this would see the site restored to calcareous grassland which will be privately owned and would offer little inherent social, community, or economic benefits. In accordance with PPW, by virtue of being underutilised, the site is considered to be highly ranked within the site search sequence introduced in PPW and should be considered in advance of any greenfield allocations.
has been clearly demonstrated that there is no previously developed land or underutilised sites (within the authority or neighbouring authorities), consideration should then be given to suitable
1. Previously Developed Land/Underutilised Land in Settlements
and sustainable greenfield sites within or on the edge of settlements.” and “The search process and identification of development land must be undertaken in a manner that fully complies with
2. Previously Developed Land/Underutilised Land at Edge of Settlements [Hendy Quarry meets this criterion]
the requirements of all relevant national planning policy.” 3. Greenfield Land Inside Settlements The site search sequence introduced in PPW (illustrated in Figure 13) establishes that previously developed and underutilised land within settlements
4. Greenfield Land Outside of Settlements
be considered first when identifying sites for inclusion within a Local Development Plan. Such land is finite and is typically either an existing allocation or has been delivered as a windfall. Next in the site search
5. Greenfield Land Away From Settlements
sequence, PPW directs LPAs to consider previously developed or underutilised sites outside of settlement
32
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Figure 13: Illustration of PPW Site Search Sequence
4.2 Responding to the Welsh Placemaking Agenda The desire for the site to be delivered as a
One of the key changes to the Guidance is the greater
comprehensive sustainable development derives
emphasis placed on the concept of placemaking,
from the national guidance set out by the Welsh
both in plan making and as part of development
Government in PPW (Edition 10) - which sets out
management decisions.
the importance of placemaking in order to create sustainable places.
PPW outlines seven well-being goals and five ways
Edition 10 of PPW was published by Welsh
based around four themes (illustrated in Figure 14).
Government in December 2018. This PPW set out the
These are Strategic and Spatial Choices, Active and
Government’s plan to help promote prosperity for all
Social Places, Productive and Enterprising Places,
parts of society in Wales. As confirmed by the Written
and Distinctive and Natural Places. Together these
Statement by the Welsh Government when publishing
themes promote placemaking and are considered to
the document on the 5th December 2018, Edition 10
create sustainable places.
of working that link through the document, and are
of PPW was completely reworked from the previous edition, not least to take account of the Well-Being of Future Generations Act.
Figure 14: PPW Themes Collectively Contributing to Placemaking (Source: PPW Edition 10)
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
33
PPW objectives of good design The publication of PPW is considered by the Government to be a small, but important, step in delivering placemaking. The Written Statement outlines that the Welsh Government, Local Planning Authorities, developers and other stakeholders all have a role to play in ensuring the principle of Placemaking is turned to reality. The Statement sets out that all parties have a part to play in delivering high quality development which enriches lives for the better. Planners must, once again, become creators of better places, rather than regulators of other’s proposals. The concept of Placemaking is defined within PPW 10 as:
Figure 15: PPW Objectives of Good Design (Source: PPW Edition 10)
‘A
holistic approach to the planning and design of development and spaces, focused on positive outcomes. It draws upon an area’s potential to create high quality development and public spaces that promote people’s prosperity, health, happiness and well-being in the widest sense.’ Furthermore, good placemaking is outlined in paragraph 2.10 as being ‘essential to the delivery of sustainable development and achieving improvements in the well-being of communities.’
In order for a development to successfully incorporate
Accordingly, the Masterplanning exercise has been,
placemaking as a concept, PPW advises of the need
and will continued to be based on the Placemaking
for proposals to address and assist in delivering the
Principles of PPW 10, in order to fully consider and
national sustainable placemaking outcomes. Figure
assess the best approach to provide the key strategic
14 on page 33 depicts how placemaking relates to,
access into the Regeneration Area.
and assists in achieving, these outcomes.
34
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Placemaking Charter The Placemaking Charter was developed in conjunction with The Design Commission for Wales, it brings together a number of organisations to build on the strengthening focus on Placemaking in policy and practice in Wales and aims to provide a common understanding of the range of considerations that go into placemaking. The charter outlines six placemaking principles that cover the range of considerations that contribute to establishing and maintaining good places (see excerpt from ‘Placemaking Wales’ to right). The following section outlines how the proposed masterplan responds to this placemaking agenda.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
35
Building Better Places The Welsh Government have released an addendum to PPW in light of Covid 19. It emphasises the importance of placemaking in local communities and the importance of having local facilities within easy access in order to ensure well being. Relevant material considerations should still be used in this process to both approve and refuse applications which do not demonstrate good placemaking. Decision makers should consider widely what is material to a particular application and apply this to their considerations, particularly where the outcome will be a benefit to creating better places.
working from home as far as possible. This will have a significant impact on the need for office space but also emphases the need to meet needs and provide for home working opportunities. Furthermore it is clear that provision of homes is an important part of the Welsh economy and delivering new social and market homes can make a significant contribution to economic recovery and social cohesion. In this regard the policy requires that “With uncertainty over the impact of the pandemic on the economy and jobs and associated ability to enter the housing market, we must increase housing output by refocussing on building new social housing and ensuring that rough sleepers do not return to the streets�.
The Welsh Government will support this approach wherever it can be demonstrated to be of benefit to communities, whilst making the decision making process as effective as possible. We are strongly of the view that providing a means to help address the failure to meet existing housing needs, including affordable housing, will contribute significantly to the local community. Indeed, in this regard Building Better Places is clear that the planning system has an important role in supporting healthier lifestyles and reducing inequalities. The masterplan (see Figure 16) addresses the following Building Better Places themes:
1. Staying Local/Creating Neighbourhoods The Welsh Government are clear that they expect working from home to become a long term trend and would like 30% of the workforce to remain
2. Active Travel The Welsh Government are clear that the planning system has a key role to play in continuing to reduce the need to travel and creating places which support sustainable and active travel. The planning system needs to support developments which are sited in the right locations, where they can be easily accessed by active and sustainable travel modes without the need for a car. It must maximise opportunities for people to make sustainable and healthy travel choices for their daily journeys and leisure.
3. Revitalising our Town Centres It is clear that the Welsh Government would like town centres to become places where a variety of retail, employment, commercial, community, leisure, health and public sector uses come together in a hub of
36
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
activity to make them viable as go-to destinations once more. In this regard, it is appropriate for office locations to be within Town Centres rather than out of centre office parks which are based around the private car. It is indicated that “Our existing out-of-centre locations will need to be carefully managed, particularly where opportunities for new development come forward at these locations. New development here should not perpetuate unsustainable travel patterns”.
6. Green Infrastructure, Health and Well-Being and Ecological Resilience Requires that we focus on nature-based solutions as part of development proposals gives us an opportunity to re-balance society in favour of health and well-being and green infrastructure, and increase our biodiversity net worth. The benefits provided by green infrastructure are important at all scales in shaping places and will have benefits in improving health and well-being. It is unquestionable that the Welsh Government are seeking to move towards a more sustainable means of living taking forward the principles of living
4. Digital Places Given homeworking is likely to become more prevalent across the country and indeed a long term policy aspiration of the Welsh Government in the interests of sustainability, it is important that high quality infrastructure is provided to enable easy home working.
5.Changing Working Practices Our future need for employment land: The guidance is clear that “our workplaces have undergone a seismic shift during the Covid-19 lockdown with a significant
locally that worked successfully during the pandemic lockdown. For town planning, this means: • Encouraging home working where possible (most likely in office settings for up to 30% of the time); • Focusing office development in town and retail centres and moving away from unsustainable patterns of employment that has seen large office parks on main transport infrastructure; and • Reinforcing local communities and sustainability at the local level.
increase in people working from home, particularly in the office-based sectors of the economy. Even when all restrictions are lifted, the impacts of this are likely to have longer term impacts on where we work. People and organisations are becoming familiar with flexible working and the potential benefits and savings (as well as the positive impacts on decarbonisation and reducing unnecessary travel) it can bring. This in turn is likely to have impacts on the requirements for future workspace and there is potential for significant surplus existing stock”. HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
37
5. Placemaking and Design
Enhanced offsite highways/ pedestrian improvement works
Compact local centre to serve the needs of the residents.
The Illustrative Masterplan, design parameters and strategies show a way of delivering the vision for Hendy Quarry Urban Village and objectives. The Illustrative Masterplan presents in two dimensions the principles for the character and structure of the development. Whilst the exact location of built form, routes and spaces are not intended to be fixed as shown at this early stage. It is assumed a future application will
PRIMARY SCHOOL
be expected to comply with the general principles and character expressed here. These principles provide clear guidance and a framework for the required quality and character of development. The Masterplan Structure
A range of different tiered streets in site.
Overall, the masterplan structure is clear and legible with movement routes and green corridors defining the structure of development parcels, delivered by the following: • Approximately 400 new homes at a range of densities and forms; • The northern entrances define the urban form structure extending southwards into the site; • The potential Primary School could be located in an accessible part of the site adjacent to the Local Centre and connected to the bus route, with a stop proposed by the school entrance and community square; • The simple spine road loop and secondary road network grid connects all development and character area parcels into a legible hierarchy and spaces; • The formality of the grid breaks down to the periphery of the development as a response to the organic edge condition formed by the quarry; • A network of connected green spaces which will provide for a range of functions including play, recreation and amenity, sport, wildlife corridors and sustainable urban drainage as well as pedestrian and cycle routes; and • At the heart of the development a formal community garden making a unique sense of place and gathering space for the community.
Masterplan includes well connected pedestrian and bicycle routes. Figure 16: Illustrative Masterplan
38
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Building Better Places Local centre with potential to incorporate a local business hub.
The Illustrative Masterplan is annotated to show how the design responds to the relevant Building Better Places themes. Staying Local/ Creating Neighbourhoods
Digital Places
Active Travel
Changing Working Practices
Revitalising our Town Centres
GI/Health/ Well-Being and Ecological Resilience
High quality infrastructure designed into the masterplan with new homes designed flexibly to accomodate home working.
Green Infrastructure provided at all scales in shaping the masterplan and placemaking qualities.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
39
5.1 Land Use
5.2 Density
The Land Use Plan illustrates the component uses
The development will provide approximately 400 new
forming the Masterplan, which are summarised as:
homes with densities varying across the site to create a legible urban scale design.
• Residential development parcels (approximately 400 homes);
Higher density homes will be focussed around
• Primary School;
the site ‘gateway’, and will be clustered around the
• Local Centre;
proposed civic spaces along the main spine loop road
• Green Infrastructure/Informal open space;
in order to establish a sense of arrival and provide
• Areas of play – nature play, trim trails;
enclosure at key nodal locations.
• Road Infrastructure: spine road loop road alignment; and
These areas of higher density plotting utilise key
• Areas suitable for attenuation ponds, swales and
areas along the spine road to vary the street scene
rain gardens, subject to detail design review.
and to incorporate the use of a range of property types. Potential use of apartments consisting of 1
Key N
Site Boundary (22.07ha)
Residential Area
Key Area of Higher Density
N
Key
A41
Residential Area
19
OAD
Site Boundary (22.07ha) Gateway/ Area Suitable for 2.5-3 Storey Development
LR HOO
Road Alignment
SC
N
Area of Higher Density Site Boundary (22.07ha) Open Space Gateway/ Area Suitable for 2.5-3 Storey Development
Residential Area
19
OO
SCH
Existing Vegetation
A41
AD L RO
Road Alignment
School
Area of Higher Density Open Space
School Pitch and MUGA
Existing Vegetation Approximate Location of Suitable Gateway/ Area for Surface Water Attenuation Area School
19
CHO
S
2.5-3 Storey Development
A41
D
OA OL R
Road AlignmentSchool Pitch and MUGA
Open Space
Approximate Location of Surface Water Attenuation Area
A41
Existing Vegetation
19
School
19 A41
School Pitch and MUGA
Approximate Location of Surface Water Attenuation Area
client
A41
Tarmac Ltd
19
project title
School Road, Miskin client drawing title
Tarmac Ltd Land Use Parameter Plan date drawing number scale
project title drawn by CBP 30 School NOVEMBER 2020Miskin Road, edp3110_d033 checked GH 1:2000 @ A2 QA drawing title
Land Use Parameter Plan
0
date drawing number
100m
30 NOVEMBER 2020 edp3110_d033
1:2000 @ A2 scale - www.edp-uk.co.uk Registered office: 01285 740427 - info@edp-uk.co.uk
drawn by CBP checked GH QA
© The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Figure 17: Land Use and Density 0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
client
Tarmac Ltd
40
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
project title
School Road, Miskin drawing title
5.3 Scale and Building Heights and 2 bedroom flats can offer height and strong,
The site will consist of predominantly 2 storey
dual aspect frontage which creates a recognisable
dwellings, however, 2.5 and 3 storey dwellings are
street scene, a sense of place and can be used to
appropriate in order to vary the roofscape and to
frame key areas of open space. Town houses, terrace
enable the creation of a legible development and
units, coach houses and smaller semi-detached units
well defined nodal spaces and key routes that have
complete the higher density pockets and allows the
a strong sense of enclosure. At key locations, this
seamless integration of open market and affordable
additional height can also aid wayfinding with the
housing.
additional mass positively contributing to the street, defining corners and terminating important vistas.
Medium density development will radiate from the higher density ‘core’ of the development to enclose other public realm, movement corridors and public gathering spaces. The remainder of the site will consist of lower density development and is focused at the development perimeters to create a transitional area to the surrounding natural habitat.
N
Site Boundary (22.07ha)
Up to 2 Storey
Up to 2.5 Storey
N
Site Boundary (22.07ha)
A41
Up to 3 Storey
19
OOL
SCH
D ROA
Up to 2 Storey
N
Potential Land for a Primary School or Residential (up to 3 storey) Up to 3 Storey
A41
Up to 2 Storey
19
OAD
OL R
O SCH
Potential Land for a Primary School or Site Boundary (22.07ha) Residential (up to 2.5 storey) Up to 2.5 Storey
Potential Land for a Primary School or Residential (up to 2.5 storey)
Up to 2.5 Storey Potential Land for a Primary School or Residential (up to 3 storey)
A41
AD
Up to 3 Storey
19
L RO
HOO
Potential Land for a Primary School or Residential (up to 2.5 storey)
19
A41
Potential Land for a Primary School or Residential (up to 3 storey)
19
A41 client
19
A41
Tarmac Ltd project title
School Road, Miskin client drawing title
Tarmac Ltd Building Heights Parameter date drawing number scale
project title drawn by OS 30 School NOVEMBER 2020Miskin Road, edp3110_d031 checked GH 1:2000 @ A2 QA drawing title
Building Heights Parameter
0
date drawing number
100m
30 NOVEMBER 2020 edp3110_d031
1:2000 @ A2 scale - www.edp-uk.co.uk Registered office: 01285 740427 - info@edp-uk.co.uk
drawn by OS checked GH QA
Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Figure 18: Building Height 0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
client
Tarmac Ltd project title HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
School Road, Miskin drawing title
41
5.4 Access and Movement From an access strategy perspective, the Illustrative
centre site. At the detailed design stage bus stops
Masterplan has been designed in accordance with
can be provided to ensure all of the development
good practise guidelines for ensuring high quality
parcels can be within easy walk distance of a bus.
access for active travel modes. Internal routes will be a combination of shared surfaces and segregate cycle
Externally, a fundamental part of the scheme will be
and walkways.
to provide a roadside foot/cycle way along School Road. This will connect from the A4119 and to the
The proposed parameter plan shows an internal
roundabout the west. This will connect the site
highway network comprising of two access points
directly to the facilities in the existing settlement. At
from School Road, to accommodate vehicle
the detailed design stage consideration will be given
movements appropriate for both the residential
to introducing pedestrian phasing into the traffic lights
element of the scheme and the primary school.
to allow a crossing point.
This creates a simple circulation spine road with secondary routes connecting the various
On site car parking can be provided to appropriate
development parcels whilst a series of active travel
standards and can incorporate EV charging facilities
routes connect the site to form a network of routes to
as necessary.
open space and other housing parcels. There are no public rights of way within the site, The provision of key facilities on site including the
however a footpath runs to the south of the southern
primary school and local centre opportunities will
boundary of the site (reference ANT/309/1) and the
help reduce the need for external travel from the
masterplan envisions a pedestrian connection being
site. The main access and spine road allow for the
provided to link to this existing PRoW.
opportunity to create a convenient and accessible bus
N Site Boundary (22.07ha)
route to be provided that serves the key nodal spaces
Proposed Site Access Primary Route/Spine Road
N
Site Boundary (22.07ha) Secondary Route
A41
Proposed Site Access
19
AD L RO
OO
SCH
400m
of the development and the potential school/local
Neighbourhood Street
400m
N
Secondary Route
A41
D
ROA
B
19
OOL
SCH
Primary Route/Spine Road Site Boundary Informal Recreational (22.07ha) Route
400m
Road
Existing Public Rights of Way/Byway B Potential Bus Route
Secondary Route
A41
Traffic Calming Feature Potential Bus Stop with 400m catchment
19
B
OAD
Access
Neighbourhood Street Potential Bus Stop with 400m catchment Primary Route/Spine Informal Recreational Route
B
LR HOO
Potential Bus Route Proposed Site
Neighbourhood Street
SC
Existing Public Rights of Way/Byway
Traffic Calming Feature Informal Recreational Route
19
A41
Potential Bus Route
B
Potential Bus Stop with 400m catchment
A41 19
B
Existing Public Rights of Way/Byway Traffic Calming Feature
400
m
client
Tarmac Ltd
A41
project title
19
400
School Road, Miskin
m
client drawing title
*
Tarmac Ltd Access and Movement Parameter date drawing number scale
Potential connection from recreational pathway to public right of way
project title drawn by OS 30School NOVEMBER 2020 Road, Miskin edp3110_d030 checked GH 1:2000 @ A2 QA drawing title
Access and Movement Parameter
0
date drawing number
100m
30 NOVEMBER 2020 edp3110_d030
1:2000 @ A2 Registered office: 01285 scale 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
Figure 19: Access and Movement and Street Hierarchy
drawn by OS checked GH QA
© The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
42
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
Street Hierarchy The principles for the street hierarchy have been prepared in accordance with the Manual for Streets. The over-arching objective is to create ‘places’ that will help to build and strengthen the new community
A summary of each ‘tier’ is set out below and shown in Figure 19.
Primary Route
as well as meeting the needs of all users. The streets
This includes the main primary entrance route
connect to create a legible and permeable network
providing access to the development from the School
with character and identity.
road and which connects to the wider context and
There will be a variety of street types within the development which create a legible and distinctive streetscape, contributing a sense of place and a green character to the development.
Miskin village to the immediate west of the site. This will have semi-formal tree planting on one side of the street within the rain garden strips, which will create a ‘gateway’ effect into the development. This central route unites all character areas.
Across the site, the principles below apply:
Secondary Routes
• Create a legible and permeable network for
These routes radiate from the central road access
movement; • Reinforce the distinctiveness of the proposed character areas; • Safely accommodate the anticipated traffic flows; • The creation of a grid of connected streets to facilitate the creation of a ‘walkable neighbourhood’; • A network of quiet ‘Green Street’ shared-surface streets will be provided;
for vehicles across the site, forming a network connecting clear and legible routes around plot parcels so there is strong active edges around the development. Within the secondary tier, two street types are proposed: • Secondary Roads; and • Neighbourhood Green Streets.
• The design of streets will be integrated with the character area they are within and the built form enclosing them; and • Measures such as shared surfaces, changes in surface materials, horizontal alignment, lighting and the design of the street should be used as appropriate to encourage slow speeds.
Tertiary Streets Tertiary level streets provide local access to end of development parcels typically around the periphery of the site. These private drives are located in the less dense edges of the development. Within the third tier, one street type is proposed: • Private Drives.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
43
5.5 Landscape and Green Infrastructure The proposed strategy is informed by the existing landscape setting and natural resources. The existing habitats around the periphery are retained and enhanced where possible whilst providing linkages to the PRoW, extensive informal public open space, vantage viewpoints and adjacent woodland. A green corridor designed to run centrally through the site provides links with the wider movement network and open spaces. Circular walks and cycle rides within the site provide opportunity for active travel and recreation. Additionally, connectivity to and from the site is increased via enhancing and extending links with established public rights of way to the surrounding area.
Green Infrastructure Strategy N
Site Boundary (22.07ha)
Green Infrastructure Strategy Green Infrastructure Strategy Pedestrian and Cycle Access Point
N
N
Site Boundary (22.07ha)
Site Boundary (22.07ha)
Central Linear Park
Pedestrian and Cycle Access Point Street Swales/Attenuation Pedestrian and Cycle
Street Swales/Attenuation Central Linear Park
A41
D
Public Open Space Attenuation Informal Route StreetRecreational Swales/Attenuation
19
ROA
Public Open Space Hedgerows/Trees to be Retained
A41
D
Attenuation
19
OA OL R
O
SCH
Attenuation
19
OOL
SCH
Access Point
Central Linear Park
A41
OAD
OL R
O SCH
Informal Recreational Route Hedgerows/Trees to be Retained
Public Open Space Informal Recreational Route Hedgerows/Trees to be Retained
19
A41 19
A41
19
A41 client
Tarmac Ltd client
project title
Tarmac Ltd School Road, Miskin project title
drawing title
Road, Miskin Landscape and GISchool Parameter date drawing number scale
drawing title2020 drawn by OS 30 NOVEMBER Landscape and GI Parameter GH edp3110_d032 checked 1:2000 @ A2 QA date drawing number scale
0
30 NOVEMBER 2020 edp3110_d032 1:2000 @ A2
drawn by OS checked GH QA
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Figure 20: Landscape and Green Infrastructure
0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
© The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
client
Tarmac Ltd project title
School Road, Miskin drawing title
Landscape and GI Parameter
44
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
date drawing number scale
30 NOVEMBER 2020 edp3110_d032 1:2000 @ A2
drawn by OS checked GH QA
The primary objective of the landscape and GI framework is to provide a landscape structure which: • Protects and retains the best characteristics and features of the site; • Maximises amenity value for new residents; • Creates an appropriate setting for the new development; • Helps to integrate the development into the existing landscape and in doing so keeps the landscape and visual impacts to a minimum; • Builds upon and enhance the strongest parts of the existing landscape framework; • Create a series of new green corridors and areas of open space with connections to adjoining future open space; and • Reinforce and strengthen existing habitat. Overall, the landscape and GI strategy seeks to provide a framework for the delivery of high quality multi-functional green infrastructure that will provide numerous amenity, drainage and wildlife benefits. Blue and Green Infrastructure is at the heart of ‘Placemaking’. It is important that all future residents have access to and a connection with nature and open spaces. Sustainable drainage features such as ponds, swales and rain gardens will contribute to an attractive and sustainable development and create varied and interesting public spaces. The principle design of the SuDS system, its long-term sustainability and adoption are to be discussed in greater detail with RCTCBC’s Drainage Authority.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
45
5.6 Urban Design and Legibility Focal Buildings
The Plan identifies the key elements of the urban design and their location on the Masterplan. The
Focal buildings and key frontages such as the school,
Plan is not prescriptive but outlines the relationships
local centre, School Road frontage and homes
between the key nodal spaces, key frontages, key
fronting the community gardens are located in
pedestrian routes and vistas, and proposed landscape
accordance with prominent views and vistas and key
features. The key elements together are used to
junctions to enhance legibility as well as distinctive
provide legibility and interest at different scales within
character and ‘sense of place’.
the street hierarchy, reinforcing the character areas within the development.
These areas could be distinguished through the use
Nodes
of contrasting enhanced facade materials, projection forward of the established building line, the use of
Legibility is enhanced by defining key nodes. This
a contrasting walling and/or roofing material, an
can be achieved by creating public spaces and or
increase in height above surrounding buildings, and, a
landmarks at the intersection of key movement
distinctive roofline.
routes. The plan defines locations where nodal points can be defined.
Where focal buildings are grouped to create a key space, they should adopt a similar and coordinated
The community gardens and square spaces are
approach using at least one of the methods set out
intended to be key nodes of activity. The façades of
above.
buildings framing this space should have a distinctive treatment to enhance this prominent public open
Views and Vistas
space.
The legibility of the development will be enhanced through incorporating views and vistas both within, and beyond, the site, particularly the northern views N
Site Boundary (22.07ha)
out of the site towards Llantrisant. Centrally within the Informal Recreational Route
development views towards the quarry escarpments Key Route
Building Frontage
A41
N and woodland should also be exploited.
19
OAD
OL R
O SCH
N D
19
ROA
Site Boundary (22.07ha)
Key Views
Informal Recreational Route
Gateway
Key Route
Building Frontage KeySite NodeBoundary (22.07ha)
A41
OOL
SCH
Key Buildings
Central Community GreenKey Buildings
Informal Recreational Route Green Corridor/Link
Key Route
Key Views
Gateway
Key Node
A41
D
ROA
Central Community Green
19
OOL
Key Buildings
Green Corridor/Link
19
A41
SCH
Building Frontage
Key Views
Gateway
19
A41
Key Node Central Community Green Green Corridor/Link
client
Tarmac Ltd project title
School Road, Miskin
A41
drawing title
19
Legibility and Urban Design Principles client
Tarmac Ltd date drawing number scale
30 NOVEMBER 2020 edp3110_d029 project title 1:2000 @ A2
drawn by OS checked GH QA
School Road, Miskin drawing title
Legibility and Urban Design Principles 0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
date drawing number scale
© The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Figure 21: Urban Design Principles
46
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
0
30 NOVEMBER 2020 edp3110_d029 1:2000 @ A2
drawn by OS checked GH QA
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Relevant exemplar UK developments with placemaking and local distinctiveness at their heart.
credit: Pollard Thomas Edwards
credit: Proctor and Matthews
credit: Pollard Thomas Edwards
credit: HTA Design
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS 47 credit: HTA Design
credit: PRP
5.7 Character Areas Whilst the overall objective for Hendy Quarry Urban
There are a number of factors that have influenced
Village is to create a place with a strong identity
the definition of these areas. These include the need
and character of its own, in order to create a legible
to create areas of a significant size to create a ‘sense
development that responds appropriately to its
of community’ within each one, the setting and views
setting, a series of three subtle ‘Sub-Character Areas’
out of the wider area and the creation of a strong
have been identified:
focal community space at the centre to unite the whole.
• Northern Gateway; Routes, spaces, places or edges have a particular • Urban Village Core; and
character as influenced by their location within the masterplan, the proposed density, site features or
• Quarry Edge.
proposed land uses.
Each sub-character area has it’s own defining characteristics, with variations in average density and formality, but there are subtle material and detailing elements which unite the whole. These provide the framework for developing and reinforcing character at the next (more detailed) tier of design.
Key N
Site Boundary (22.07ha)
Northern Gateway
Urban Village Core
Key A41 19
OOL
SCH
D ROA
Quarry Edge
Key
N
N
Site Boundary (22.07ha)
Site Boundary (22.07ha) Northern Gateway
Northern GatewayUrban Village Core Quarry Edge
Urban Village Core
A41 19
OAD
LR HOO
SC
Quarry Edge
A41 19
OOL
SCH
OAD
R
19
A41 19
A41 client
A41
Tarmac Ltd
19
project title
School Road, Miskin drawing title
Character Areas Plan client
Tarmac Ltd date drawing number scale
30 NOVEMBER 2020 edp3110_d035 project title 1:2000 @ A2
drawn by CBP checked GH QA
School Road, Miskin drawing title
Character Areas Plan 0
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk
date drawing number scale
© The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
Figure 22: Character Areas
0
30 NOVEMBER 2020 edp3110_d035 1:2000 @ A2
drawn by CBP checked GH QA
100m
Registered office: 01285 740427 - www.edp-uk.co.uk - info@edp-uk.co.uk © The Environmental Dimension Partnership Ltd. © Crown copyright and database rights 2020 Ordnance Survey 0100031673
48
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
client
Tarmac Ltd project title
School Road, Miskin
credit: Proctor and Matthews
credit: PRP
Relevant exemplar UK developments with placemaking and local distinctiveness at their heart.
credit: Pollard Thomas Edwards
credit: Proctor and Matthews
credit: Pollard Thomas Edwards
credit: Pollard Thomas Edwards
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS 49 credit: Pollard Thomas Edwards
credit: Proctor and Matthews
5.8 EDP GI and the ‘Ecosystem Services’ Approach Multifunctionality ‘Multifunctionality’ is key to the green and blue infrastructure concept and approach for this site is considering public open space amenity and biodiversity. It refers to the potential for GI to have a range of functions and to deliver a broad range of ecosystem services. Multifunctionality can apply to individual sites and routes, but it is when the sites and links are taken together that we achieve a fully multifunctional GI network.
Ecosystem Services Ecosystem Services are the multiple and various benefits provided to humans by the natural environment and from healthy ecosystems within that environment. Such ecosystems, functioning properly, offer such things as natural pollination of crops, clean air, extreme weather mitigation, human mental and physical well-being etc. Typically, ecosystem services are grouped into four broad categories: • provisioning; • regulating; • supporting; and • cultural. EDPs ‘Ecosystem Services’ wheel (above) sets out a range (not exhaustive) of services which sit under each of the ecosystem services categories. The Green Infrastructure of the site seeks to deliver a number of these services through its GI strategy. The ultimate aim is to balance the social, environmental and economic needs to address climate change adaptation and resilience for the benefit of future generations. These key GI areas, links and features are highlighted and the Ecosystem Services they offer identified on the masterplan. • New Woodland; • Community Gardens; • Linear Bio-Diversity Park; • Attenuation Ponds and Pocket Parks; • Spine Street and Boulevard; • Secondary GI streets and Neighbourhood Green Streets; and • ‘Run Wild’ Trim Trail.
50
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
GI ELEMENT
DESIGN APPROACH AND PHYSICAL ATTRIBUTES
ECOSYSTEM SERVICES PROVIDED
1. Quarry Woodlands
This environment around the eastern, southern and western periphery of the site will be retained and enhanced within the scheme.
Biodiversity Pollination Habitat Education Aesthetic Value/ Cultural Identity/Sense of Place Climate Regulation Flood Control Clean Air
Public access will be provided/encouraged within this area, through the provision of informal recreational routes connect to connect to the wider natural context. The focus of this GI Element will be continued habitat provision and biodiversity, though it will continue to provide its natural hydrological function and may offer educational opportunities as part of a wider network. As a key part of the natural setting of Garden Village it will continue to contribute to its sense of place. Attenuation for peak surface water events is also provided in this area. 2. Community Gardens
The central Community Gardens provides a significant new recreational outdoor space at the heart of the development. Incorporating benches for resting and socialising, the space seeks to provide an attractive green focus in this part of the site. The planting is also designed to be ‘forager friendly’ with fruiting and nut species dominating hedgerow and shrub planting and avenues/groupings of apple, pear and cherry species throughout the space. Such planting also provides further habitat opportunities, especially for pollinator species, and encourages biodiversity. This approach to the landscape, particularly in a site close to the proposed school, offers excellent educational and social opportunities and enhances the sense of place.
Pollination Habitat Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Social Climate Regulation Clean Air
Tree planting and meadows soften the space and add habitat opportunities and create a connection to the wider landscape character. Formal paths defined through a desire lines study provide strong pedestrian connectivity in a more formal park setting.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
51
GI ELEMENT
DESIGN APPROACH AND PHYSICAL ATTRIBUTES
ECOSYSTEM SERVICES PROVIDED
3. Linear Biodiversity Park
The Western Green Corridor protects a key hedgerow and wildlife connection between the SINC and the Northern Grasslands, allowing free movement for wildlife between the two with strong vegetation cover and buffers to housing.
Biodiversity Pollination Habitat Biodiversity Pollination Habitat Education Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Social Climate Regulation Flood Control Clean Air
The corridor also allows for enhanced pedestrian connectivity, short-cutting the larger trail around the perimeter of the scheme, and offers an attractive setting for the new homes.
4. Attenuation Ponds and Pocket Parks
A substantial area of new landscaping is proposed, notably along the bottom of the reduced height rock faces. This essentially will provide an ‘ecological wrap’ around the edge of the site comprising a woodland belt and large areas of new ecological habitats. These ‘paternoster’ of open water features are augmented with further planting and habitat buffers between the rock face and the new housing. Local Areas for Play (LAPs) and Local Equipped Areas for Play (LEAPs) are also provided in these locations, providing local play, recreation and social opportunities in this part of the site.
5. Spine Street, including the Boulevard and School Square
52
The Spine Street provides a broad tree lined avenue connecting throughout the site. The Spine provides a range of Ecosystem Services – improving the aesthetic experience for pedestrians, adding habitats and foraging opportunities for pollinators and enhancing the character of the development and its sense of place. Trees are also noted to help with urban cooling, air quality and thereby to have positive health benefits. Verges below trees will be planted with wild flower meadow seed to create a significant further resource for pollinators.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Biodiversity Pollination Habitat Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Social Climate Regulation Clean Air
Pollination Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Climate Regulation Clean Air
GI ELEMENT
DESIGN APPROACH AND PHYSICAL ATTRIBUTES
ECOSYSTEM SERVICES PROVIDED
6. Secondary GI Streets and Green Streets
Away from the Spine Street, residential roads seek to provide significant green ‘interventions’ to maximise tree cover, habitat opportunities and improve the aesthetic of the built form. Secondary streets incorporate adoptable verges with tree planting, carriageway build outs with trees and shrubs and further incidental landscaping to augment on plot domestic planting.
Pollination Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Social Climate Regulation Clean Air
Green Streets take this concept further with greater levels of tree and shrub planting in verges and build outs, a ‘shared surface’ approach to carriageway design and strong planted gateways to minimise vehicle speeds and prioritise pedestrians. Careful design in both areas seeks to minimise/prevent anti-social parking behaviour with verges and build outs located to limit incidental on street parking and these features being protected by knee rails/bollards where necessary. 7. The ‘Run Wild’ Trail
The ‘Run Wild’ Trail is a route around the quarry ‘bowl’ perimeter of the development. The route incorporates a sequence of information boards, designed biodiversity features and exercise stations, and is intended to get people better connected with the environment, fitter, healthier and happier. The trail also has the potential to tie a Public Art Strategy for the site with artist created information boards and waymarker posts. These could be linked to digital information services related to ecology and wildlife, as well as the exercise stations, and accessed by all local residents allowing further social opportunities.
Biodiversity Habitat Education Recreation Aesthetic Value/ Cultural Identity/Sense of Place Health and Wellbeing Social
The ’Run Wild’ trail would also tie in the whole Play Strategy for the site, connecting all key play and recreation features along the route.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
53
Spine Street/ Boulevard/ School Square
PRIMARY SCHOOL
‘Run Wild’ Trail
‘Linear’ Biodiversity Park
54
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
Community Gardens
Secondary/ Green Streets
Quarry Woodlands Attenuation/ Pocket Parks HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
55
6. Conclusions The extent of minerals extraction has now reached that determined by the 2015 ROMP, and therefore quarrying onsite ceased in June 2019. The subsequent restoration site is currently defined by a separate permission (ref 01/2376/10) which requires the importation of a total of 2.4M m3 of fill material (of which circa 984,000m3 has been imported already) to create an area of a grassland managed by seasonal grazing within the existing treeline. In considering the implementation of this permitted scheme, Tarmac believes that the location and nature of the site is such that it has a greater potential to deliver wider social and economic benefits. The proposition therefore is to pursue an alternative future for the site, which would prevent the sterilisation of remaining workable minerals present at the site and thus, re-commence limited further mineral extraction and, subsequently, create a plateau for new development at the site. With the extent of the development plateau that can be created at the site to be approximately 11.5ha it is considered that the site could accommodate approximately 400 homes, a primary school, and a local centre with extensive GI across the site.
HQ hendy urban village
56
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
In this context, the Prospectus sets out: • The development sets a high benchmark of design quality in the re-purposing of this industrial site, creating a responsive, sustainable and deliverable development for a new urban neighbourhood at Hendy Quarry; • This overarching vision is to create a distinctive development that builds upon the special characteristics, features and unique history of the site and its environmental context to deliver a new development totally appropriate to its location and setting, which will leave a lasting legacy; • Through evaluation and design review proposals have evolved with a thorough appreciation of both the immediate character and the environmental credentials of the site. The Illustrative Masterplan and associated design strategies have been shaped by the extensive work already provided by the promotion team; • The site is highly sustainable and exceptionally well located to offer access to existing jobs, services and facilities - including health, education, shops, leisure and open space. Connectivity and public transport links present a great opportunity to provide a new urban neighbourhood complementing the surrounding area and contributing to the economic vitality of the region; • The development would be an attractive place to live and work, and will integrate sensitively within existing settlements in the area; and • Set within a generous and attractive network of landscaped open spaces, the design retains the existing GI wherever possible, and builds upon this with a series of well-connected green spaces and routes with strong health and wellbeing placemaking principles at its heart. Overall, Hendy Quarry Urban Village is an opportunity for a genuinely sustainable development, including social, environmental and economic components. Accordingly, the site should be included in the Rhondda Cynon Taf County Borough Council Replacement Local Development Plan as a strategic allocation.
HENDY URBAN VILLAGE | DEVELOPMENT PROSPECTUS
57
The Environmental Dimension Partnership First Floor, The Bonded Warehouse, Atlantic Wharf, Cardiff CF10 4HF t 02921 671900 e info@edp-uk.co.uk w www.edp-uk.co.uk