STELA CITY

Page 1

Stela City


Stela City


• •

• •

• • • •


9518 m2

•

Vistas




• •




Ă rea

Densidad viv/ha

COS

CUS

CAV

%/n

150

.75

10

.15

7,139 m2 6,800 m2

95,180 m2 60,900 m2

1428 m2 1875 m2

9518 m2








WWW.BETAHECA.COM

LP

LP 18

17

19

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

20

16

21 120.15 m

LP2 80.35 m

18 19

17 8.75 m

16

1.35 m

20 15

11.23° 11.2 7°

21

120.15 m

Nomenclatura 14

8.4

11 .24 °

9m

NSLA 8.00 m

LP2

22

m 8. 41

80.15 m NSLA

23

NPT 0.03 m

12 NSLA

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

120.15 m

Simbologia Nivel 25

80.15 m

Cambio de acabado en piso

NSLA

Cambio de nivel

8.2 0m

24

80.15 m

NSLA

26

7.9

8m

° .25 11

NSLA 40.00 m

12

25

NPT 0.05 m

NSLA 56.15 m

NSLA56.15 m

10 9

Pe nd ien te

NPT 0.00 m

27

NSLA 56.05 m 2%

28 NSLA 56.15 m

7.91 m

7° 11.2

8

11

29 NSLA 56.15 m

26 NPT 0.00 m

NSLA 40.15 m

NSLA 24.00 m

1.25 m

7

27 1.25 m

6.61 m

11.23°

103.08 m

9

Nivel de piso terminado

NSLA 120.15 m

11

10

NPT

.2 11

13

NSLA

NSLA 80.05 m

80.15 m

24

2%

e nt ie nd Pe

NSLA 64.00 m

nte 2% Pendie

11 .2

23

NSLA 120.05 m

13

14

LP2

NSLA

m 8.61

15

Especificaciones

22

28

NSLA 40.05 m

2% iente Pend

.69 101

7.76 m

NSLA 4.00 m

NSLA 40.15 m

6

CITELIS Stela City

31

m

11.23°

30

NSLA 8.00 m

NSLA 12.00 m

8

5

m 7.81

NPT 0.05 m

11.2 7°

29 NPT 0.04 m

7

NSLA 40.15 m

32

4

33

35

11 .24 °

2m 7.9

NPT 0.05 m

LP4

34

3

30

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

2 1

LP3

36

NPT 0.00 m

m

11 .2 6°

1 8.1

6

NPT 0.00 m

NPT 0.00 m

31

2 NPT 0.04 m

32 8. m

5

5° .2 11

32

NPT 0.05 m

8.4 8

° .25 11

m NPT 0.05 m

4

11.26° 112.33 m

8.69 m

2

36 1

4

6

8m 1:200

ARQ P. BAJA/TIPO/CONJUNTO 0001

34 35

-

Fecha LP4

LP3

Author

Autor

Checker

Revisado

A101

RESTAURANT/LOBBY/COMERCIAL 1 : 300

2

Numero de projecto

4° 11.2

1.35 m

3

1

1 : 400

0

33

8.6 3m

LP4

PLANTA DE CONJUNTO

Escala

1:200 y/o especificada


9 BAÑOS

7.76 m SALA DE JUNTAS BAÑOS

OFICINAS

8

WWW.BETAHECA.COM m 7.81

SERVICIO

BAÑOS

LP

SALA DE JUNTAS

OFICINAS

7 BAÑOS

2m 7.9

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

SALA DE JUNTAS

18 19

Elevadores

17

8.00 m

20

80.35 m

8.75 m

1.35 m

16

NPT

11.23°

21

11.2 7°

m 8.61 Elevadores

Especificaciones

SERVICIO

Nomenclatura

BAÑOS

6 1 8.1 m

OFICINAS

15

9 8.4

11 .24 °

m

LP2

Rampa de acceso a estacionamiento subterraneo

BAÑOS

8. 41

m

ÁREA ESTACIONAMIENTO: 4566 m2

14

57

56

55

54

53

50

Nivel superior de Losa

106

10 5

40

1 10

3 11

m

25 39

0 10

3

38

99

Elevadores

1 : 200

° .25 11

41

3 10

NPT

2 11

Cambio de nivel

4

42

10 4

-3.80 m

8.4 8

Cambio de acabado en piso

PLANTA TIPO OFICINAS

2

24 43

63

NSL

Nivel

.2 11

44

0 11

8m

Nivel superior de firme

SERVICIO

46 45

109

7° 11.2

37

64

98

7.91 m

NSF

47

108

12

Nivel superior de Losa azotea

Simbologia 5

107

1 11

NSLA

23

48

Estacionamiento discapacitados

62

49

NPT

62

7.9

11 .2

Nivel de piso terminado

m

60

8.2 0m

51

-4.00 m

61

13

52

32 8.

58

59

Elevadores

22

NPT

97

26

36

65

11

114

115

1.25 m

93

11.23°

93

32

116

92

8.75 m

8.75 m

16

CITELIS Stela City

16

8.66

m

m 8.66

-

91

31

67

-

---

---

30 90

120

72

29

29

28

89

121

73

27

88

2 12 87

SALA

86

30

NPT 108.00 m

11 .24 °

25 24

85 84

NPT

COCINA

1

82

1 8.1

78 2

81

79

m

21

80

3

20

Estacionamiento discapacitados

4

5

32 8.

17

NPT

m

8

Rampa de acceso a estacionamiento subterraneo

9

10

11

13

12

14

15

.2 11

16

A RECAMAR

2

0

32

8.69 m

3

4° 11.2

35

16

LP4

34

1

0001

Numero de projecto

33

11.26° 112.33 m

8m

A SAL

4

1.35 m

6

ARQ PLANTAS TIPO DEPARTAMENTOS

° .25 11

8.6 3m

4

1:200

RECAMARA 3

m

2

NPT 104.00 m

NPT 108.00 m

18

-4.00 m 7

R EDO OM C / A CIN CO

31

19

6

DOR /COME

23

83

77

11 .2 6°

76

NPT 104.00 m

22

2m 7.9

-3.80 m

75

2 RA AMA REC

SO CE AC

4 12

26

3 12

Elevadores

74

8.4 8

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

11.2 7°

6.61 m

68

17

28

m

119

71

7

5

19

27 .69 101

118

70

m 7.81 Elevadores

6

18

17 33

1.25 m

34

94

DN

117

69

7.76 m

8

11.23°

95

9

35

66

96

103.08 m

10

18

17

18

16

17

18

Fecha

-

Autor

-

Revisado

-

19

LP3

2 36

4

PLANTA TIPO ESTACIONAMIENTO 1 : 300

3

PLANTA TIPO DEPARTAMENTOS NIVEL 2 1 : 200

1

A102

PLANTA TIPO DEPARTAMENTOS NIVEL 1 1 : 200

Escala

1:200 y/o especificada


LP

18 17

19 20

1.35 m

WWW.BETAHECA.COM

11.23°

8.75 m

16

21

11.2 7°

m 8.61 120.15 m

8.4

15

11 .24 °

9m NSLA

68.03 m NSLA

4.03 m NSLA

120.15 m

m

Area 272 m2

11 .2

Area 272 m2

8. 41

14

LP2

22

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES

23

NSLA 120.05 m

P

8.2 0m

8.03 m

Pe nd ien te 68.032% m

NSLA NSLA

e 2% ient d n e

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

120.15 m 120.15 m

Area 260 m2

8m

4.03 m 4.03 m NSLA

7.9

NPT 24

° .25 11

nte 2% Pendie

2.00 m

NSLA 80.15 m

Nomenclatura

.2 11

2%

13

nte 2% Pendie

e nt ie nd Pe

Area 260 m2

Simbologia

Area 250 m2 NSLA

12

Cambio de acabado en piso

NSLA

NSLA 80.05 m

80.15 m

80.15 m

NSLA 44.03 m

Cambio de nivel

NSLA

7° 11.2

7.91 m

Nivel

25

0.04 m

80.15 m

11

nte 2% Pendie

Area 240 m2

11.23°

6.61 m

26

1.25 m

10

1.25 m

NSLA NSLA

56.15 m

56.15 m

0.05 m

9

Pendiente 2%

4.03 m

NSLA

Pendiente 2%

28

56.05 m

7.76 m

2%

11.23°

Pe nd ien te

27

NSLA 56.15 m

Area 240 m2 8

CITELIS Stela City

29 NSLA

Pe nd ien te 2%

11.2 7°

m 7.81

0.04 m 56.15 m

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

NSLA 40.15 m

4.03 m

28.03 m

30

0.05 m

2m 7.9

11 .24 °

Area 250 m2

7

4.03 m

Area 260 m2 te 2% dien Pen

40.05 m

Area 260 m2

31

Pendie nte 2%

40.15 m

m

1:100 0

NSLA

32 8.

.2 11

40.15 m

m

5

Pe nd ien te 2%

NSLA

1 8.1

6

8.03 m

11 .2 6°

0.00 m NSLA

2% iente Pend

0.04 m

32

PLANO DE AZOTEAS

Area 272 m2 ° .25 11

Area 272 m2

m

4

5m

12.03 m 8.4 8

2

0.04 m

33

0001

Numero de projecto 4° 11.2

8.6 3m

LP4

11.26°

8.69 m

3

35 1 m 1.35

2 LP

1

36

LP4

34

LP3

-

Fecha

Author

Autor

Checker

Revisado

A102.1

PLANTA DE CONJUNTO 1 : 250 Escala

1:100

y/o especificada


031 Nivel 31 120.00 m

030 Nivel 30 116.00 m

029 Nivel 29 112.00 m

028 Nivel 28 108.00 m

027 Nivel 27 104.00 m

WWW.BETAHECA.COM

026 Nivel 26 100.00 m

025 Nivel 25 96.00 m

024 Nivel 24 92.00 m

023 Nivel 23 88.00 m

022 Nivel 22 84.00 m

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Ni帽o A00810504

Bethuel Serbulo A00808771

021 Nivel 21 80.00 m

Especificaciones

020 Nivel 20 76.00 m

3

ELEVACION ESTE 1 : 1000

4

ELEVACION NORTE 1 : 1000

5

ELEVACION SUR

6

1 : 1000

ELEVACION OESTE

Nomenclatura

019 Nivel 19 72.00 m

1 : 1000 018 Nivel 18 68.00 m

017 Nivel 17 64.00 m

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia 016 Nivel 16 60.00 m

Nivel Cambio de acabado en piso

015 Nivel 15 56.00 m

015 Nivel 15 56.00 m

014 Nivel 14 52.00 m

014 Nivel 14 52.00 m

013 Nivel 13 48.00 m

013 Nivel 13 48.00 m

012 Nivel 12 44.00 m

012 Nivel 12 44.00 m

011 Nivel 11 40.00 m

011 Nivel 11 40.00 m

010 Nivel 10 36.00 m

010 Nivel 10 36.00 m

009 Nivel 9 32.00 m

009 Nivel 9 32.00 m

008 Nivel 8 28.00 m

008 Nivel 8 28.00 m

007 Nivel 7 24.00 m

007 Nivel 7 24.00 m

006 Nivel 6 20.00 m

006 Nivel 6 20.00 m

005 Nivel 5 16.00 m

005 Nivel 5 16.00 m

004 Nivel 4 12.00 m

004 Nivel 4 12.00 m

003 Nivel 3 8.00 m

003 Nivel 3 8.00 m

002 N.S.L 4.00 m

002 N.S.L 4.00 m

001 Nivel Acceso 0.00 m

001 Nivel Acceso 0.00 m

-001 Estacionamiento 1 -4.00 m

-001 Estacionamiento 1 -4.00 m

Cambio de nivel

CITELIS Stela City 50000 m2 Ubicaci贸n: Monterrey, Nuevo Le贸n Av. Covarrubias, esquina con Revoluci贸n

0

2

4

6

8m 1:200

2

-002 Estacionamiento 2 -8.00 m

-002 Estacionamiento 2 -8.00 m

-003 Estacionamiento 3 -12.00 m

-003 Estacionamiento 3 -12.00 m

-004 Estacionamiento 4 -16.00 m

-004 Estacionamiento 4 -16.00 m

-005 Estacionamiento 5 -20.00 m

-005 Estacionamiento 5 -20.00 m

-006 Estacionamiento 6 -24.00 m

-006 Estacionamiento 6 -24.00 m

-007 Nivel Zapatas -27.00 m

-007 Nivel Zapatas -27.00 m

CORTE OFICINAS 1 : 300

1

CORTE TORRE DEPARTAMENTOS 1 : 300

ARQ Cortes/Elevaciones 0001

Numero de projecto Fecha

-

Autor

-

Revisado

-

A103 Escala

1:200 y/o especificada


LP 18 17

LP2

1

19 20

1.35 m

Planta tipo estacionamiento 1 : 200 Especificaciones

11.23°

8.75 m

Pisos

LP3

16

Nota: todos los pisos incluyen, losa de concreto aligerado de 40 cm de espesor, empastado con mortero de 1:4 1cm o hasta nivelar con el NPT del material mas alto.

21 8.61

11.2 7°

m

80.35 m

15

9m 8.4

3 5 10

3 5 10

10

11 .24 °

10

LP2

22

3

3

6 10 5 6

Rampa de acceso a estacionamiento subterraneo

0

5 0

11 .2

m 8. 41

14%

14

Porcelanato Slim Avorio 1*1* .003m, unido con pega porcelanato Castel .08cm esp. Porcelanato Wood CE 16.5 x 100 cm duela laminada instalada sobre loseta nivelada.

WWW.BETAHECA.COM

Porcelanato Serie Ecotech.40*.80*.008,unido con pega porcelanato Castel . 08cm espesor Piso Epoxico impernet para transito vehicular pesado .005 mm de espesor transparente Impermeabilizante top comex de alto desempeño color blanco .005 mm de espesor

Nota: todos los muros internos estan instalados de acuerdo al manuel de instalacion de muros de Hebel.

23 NPT -4.00 m

6 6

Porcelanato Pretiosa DG .40* .60* .008, unido con pega porcelanato Castel .08cm esp.

Muros

6 0

Porcelanato Quarzita Silver .305* .614* .008, unido con pega porcelanato Castel .08cm esp.

1 2 3 4 5 6 7

NPT -0.55 m

0

NPT -3.74 m

8.2 0m

.2 11

Estacionamiento discapacitados

13

24

1 2

Porcelanato Slim Avorio Castel 1*1*.003 m, unido con pega porcelanato Castel .08cm esp.

3

Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

4 5 6 7 8 9 10

Mosaico Veneciano 33*33 cm Castel, unido con pega porcelanato Castel .08cm esp.

1

Zoclo pegado al muro .6mm de altura mismo material del piso usado en el piso de la zona.

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Afine con yeso .05 cm de espesor y pintura Berel Blanco Ostra 601.

Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1

Especificaciones

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

Especificaciones

Zoclos 5

7.9 EL 8m EV AD OR ES

12

ELEVADORES

0

10 5

3

0

3

0

3

0 5

10

Nota: Tolas las lozas incluyen, losa de concreto aligerado de 40 cm de espesor.

Ver detalle de barandales en plano A-01

5

6 5

Nota: Todos las cotas son metros.

Cielos

° .25 11

0

25

P1 Tipo de puerta.

Losa con acabado aparente de concreto y hueco de caseton.

1 2

Plafon de tabla roca Panel corrido PLC-450, terminado y pintura Berel Blanco Ostra 601.

Nomenclatura NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

3

6 0

10 5

3 10

7° 11.2

6

NPT -4.00 m

5

10 5

6

7.91 m

3

0

0

Simbologia

Rampa circulación automóviles

11

6 0

Nivel 26

10

Cambio de acabado en piso

0

NPT -4.00 m

Cambio de nivel

6.61 m

11.23°

1 Piso

2 .69 101

6

5

DN

0

6 0

27

1.25 m

1.25 m

9

5

6

0

0

7.76 m

NPT -3.80 m

3

5.8%

10

5

6

0

3

3

0

6

Ver detalle de barandales en plano A-01

10 10 5

7

0

0 3

0 5

3

6

Cambio de nivel

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

ELEVADORES

3

10 5

Arranque de piso o azulejo

CITELIS Stela City

11.2 7°

m 7.81 10 5

6 0

0 6

30

5 0

11 .24 °

2m 7.9 5

Estacionamiento discapacitados

0

4 Cielo

Cambio de acabado en piso

29

6 6

3 Zoclo

Cubierta exterior

Rampa circulación automóviles

RES ADO ELEV

8

2

Cambio de acabado en muro

11.23°

NPT -4.00 m

NPT -3.80 m

3 4 2

28

6

NPT -2.00 m

2

m

103.08 m

10

2 Muros

Simbologia

0

2

4

6

8m 1:200

31

Acabados Estacionamiento

m

11 .2 6°

1 8.1

6

NPT -2.90 m

NPT -4.00 m

14% 6 6

0

NPT -0.42 m

.2 11

m

Rampa de acceso a estacionamiento subterraneo

32 8.

5

6

4

8.4 8

m

-

Autor

-

Revisado

-

A106

4° 11.2

8.6 3m

3

11.26°

8.69 m

LP4

34

Escala

35 112.33 m 1.35 m

LP

Fecha

° .25 11

33

LP4

0001

Numero de projecto 32

2

1

36

LP3

1:200 y/o especificada


18

Restaurante/Lobby/Locales-comerciales/Ambientacion-exterior

1

80.35 m

19

1 : 200

17

LP2

1.35 m

20

Especificaciones

1 0

8.75 m

Cuarto Cisterna

16

21

2

Ver detalle de barandal de escalera en plano A-01

E1 6 3 1 0 0 3 6

NPT 0.04 m 9 m 4

4 3 1 1 4

4

3

8.

15

6 1 3 0 0 6

P1

P2

B

P6

Reposteria.

4 P2

4 3 1 1 4

4 P1

Ver detalle de acabado de de muerete en plano A-01

4

Bodega Alimentos.

4

4

P1

4 3 1 1 4

P1

4 P1

P1

m

1 1 1 2 1

1

1

P2

Cocina 2

P1

1 1 1 2 1

P7

11 .2

1

23

P5

Comensales

Acceso Estacionamiento Restaurante 1

3

1

1

1

1

8.2 0m

3 1 1 3 2 3

.2 11

13

4

1

Ver detalle de anclaje de muro cortina en Plano A-01

Lobby Dptos 1 1 3 1 1 2 3

3 0

3 3 1 1 3

3

2

4 3 1 1 1 1

Bodega.

3

0

0

6

0

24

6

3

2 1 1 1 2 2

Sala de espera.

P1

P4

P2 P1

4

P1

2

6

4

3

Bar

0

P1

3

4

ACCESO VEHICULAR

P4

8m

4

2

1

1

1

3 5

s to en m a t 1 3 ar 1 1 ep 1 4 D 1 y bb Lo

P2

3

2

3

P4

4 1

2 2

Porcelanato Wood CE 16.5 x 100 cm duela laminada instalada sobre loseta nivelada. Porcelanato Serie Ecotech.40*.80*.008,unido con pega porcelanato Castel . 08cm espesor

WWW.BETAHECA.COM

Piso Epoxico impernet para transito vehicular pesado .005 mm de espesor transparente Impermeabilizante top comex de alto desempeño color blanco .005 mm de espesor

Porcelanato Slim Avorio Castel 1*1*.003 m, unido con pega porcelanato Castel .08cm esp.

3

Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

4 5 6 7 8 9 10

Mosaico Veneciano 33*33 cm Castel, unido con pega porcelanato Castel .08cm esp.

1

Zoclo pegado al muro .6mm de altura mismo material del piso usado en el piso de la zona.

0

0

0

4

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Afine con yeso .05 cm de espesor y pintura Berel Blanco Ostra 601.

Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1

Especificaciones

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

Especificaciones

Zoclos

0

Cielos

6

Nota: Todos las cotas son metros.

Nota: Tolas las lozas incluyen, losa de concreto aligerado de 40 cm de espesor.

3

° .25 11

1

1

1 2

P4

P1 Tipo de puerta.

Losa con acabado aparente de concreto y hueco de caseton. Plafon de tabla roca Panel corrido PLC-450, terminado y pintura Berel Blanco Ostra 601.

Nomenclatura

P2

4

2

6 1 3 0 3 0 6

Ba ño sM

2 1 1 1 2 2

uje r

es

3

Lobby Hotel

4

4 1 1 3 1 1

3

6 5 0 0 0 0 0

P2

25 3

NPT 0.05 m

Ver detalle de barandal de escalera en plano A-01

1 1 1 1 3 1

Lo bb y

s

6 1 0 0 6

P4

0

0 6 0 0 0

7° 11.2

Ba ño sH om bre

4 3 1 4 2 4

E2

4 3 1 2 4 4

4

P2

4 3 1 1 4 4

Ho tel

7.9

1

1

1 1 1 1 4 1

6 1 0 0 3 6

7.91 m

1

2 1 2 1 1 2 2

Sala Estar

4

1

1

4

1

1

Ver detalle de barandal de escalera en plano A-01

3

4

3

4 4

1

3

12

E1

1 1

P1

Sala espera/ cafeteria

3

3

4

Porcelanato Slim Avorio 1*1* .003m, unido con pega porcelanato Castel .08cm esp.

1 2

1

Sala Estar

Porcelanato Pretiosa DG .40* .60* .008, unido con pega porcelanato Castel .08cm esp.

Nota: todos los muros internos estan instalados de acuerdo al manuel de instalacion de muros de Hebel.

Cuarto audio, Video. Caja.

1 Bodega 1 1 1 P2 Empleados. 1 2

Porcelanato Quarzita Silver .305* .614* .008, unido con pega porcelanato Castel .08cm esp.

Muros

P1

P2

1

22

P1

P1

1 1 1 1 2 1 1

8. 41 2

4 3 1 1 4

Cuarto Frio.

14 0 6 0 0 2

4

LP2

11 .24 °

0 5 0 0 0 0 3

1 2 3 4 5 6 7

Baño Muje res

Rampa Acceso Estacionamiento Subterraneo

Nota: todos los pisos incluyen, losa de concreto aligerado de 40 cm de espesor, empastado con mortero de 1:4 1cm o hasta nivelar con el NPT del material mas alto.

LP3

11.2 7°

m

8.61

P1

Baño Hombres

2

Acceso carga/descarga

2 6 1 1 1

Pisos

11.23°

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia

0

Nivel P8

11

Ver detalle de anclaje de muro cortina en Plano A-01

P2

3

3 4 0 0 3

0

1

1 1 1 1 3

1

11.23°

10

P4

P4

27

0

1

3 4 0 0 3

1

3

0

2 Muros

Simbologia

2

3 4 2

28

2

3 Zoclo 4 Cielo

P2

4

Cambio de acabado en muro

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

1

1 1 1 1 3

1

4

4 3 1 2 4

0 4 0 0 0

1 Piso

2

m

2

1.25 m

1 1 1 1 3

6 5 0 0 0

1.25 m

3

.69 101

2

103.08 m

Local comercial

9

Cambio de nivel

4

6.61 m

4

4 3 1 2 4

Cambio de acabado en piso

26

P8

7.76 m

0

11.23°

P4

6 5 0 0 0 0

3

4

4 3 1 2 4

P2

3 4 0 0 3

5

0

Cubierta exterior

6 0

4

Local comercial

CITELIS Stela City

1 1 1 1 1 3

8

29

1

NPT 0.05 m

2 6 5 0 2 0 0 P4

E1

Ver detalle de barandal de escalera en plano A-01

P2

1

3

6 1 3 0 0 6

3

Local comercial

Ver detalle de barandal de escalera en plano A-01

P4

6 1 0 0 6

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

3

E2 P2

30

4 3 4 1 2 4

1

1 1 1 1 3

1

11 .24 °

5

2m 7.9

5

4

0

7

4 3 4 1 2 4

3 1 1 1 1 1

4 6 1 3 0 3 0 6

11.2 7°

m 7.81

NPT 0.04 m

P2

P4

2 6 5 0 0 0 2 P2

1 1

4 4

3

1

1

1

3 1

3

4 1

2

1

4

1

1 1

1

1

0

2

4

6

3

P2

4 1

4

Local comercial

4

31

0

0

5

6

2

2

4

1 8.1

0

Acabados Plantas Tipo

m

11 .2 6°

2

6

8m 1:200

Local comercial

P8 P8

0 0

0

0

5

6

P2

0

4

3

4 1

2

4

3 1 1 1 1 1

P2

4

1

4

4

NPT 0.04 m

3 1 1 1 1 1 1

3 1 2 4

Ver detalle de acabado de murete en plano A-01

4

1 1

1

1

1

Local comercial

3

P8

Local comercial

P8

1

1

P2

4

2

P2

P2

2

4 3 4 1 2 4

4 3 1 2 4 4 4

4 3 1 2 4

2

m

6 5 0 0 0

-

Autor

-

2 2

Revisado

-

° .25 11

6 5 0 2 0 0

NPT 0.05 m

4

Fecha

4

8.4 8

P8

P8

6 5 2 0 0 0

4

4

Rampa Acceso Estacionamiento Subterraneo

P2

6 5 2 0 2 0 0

0001

Numero de projecto

0

32

P8 P8

NPT 0.04 m

. 11

6 2 5 0 0 0

6

1

2

5

3 1 1 1 1

-

4 3 1 2 4 4

2 6 0 0 0

1

4

2

P2

4 3 4 1 2 4

m

6 5 2 0 2 0 0

0

32 8.

5

° 25

33

2 5

Acceso carga/descarga

7

0

1 2 5

7 0

LP4

A107

0

4° 11.2

8.6 3m

3

11.26°

8.69 m

NPT 0.04 m Acceso Estacionamiento

LP4

34

Escala

35 1.35 m

112.33 m

1.35 m LP

2

1

36

LP3

1:200 y/o especificada


LP

Oficinas/Hotel/Departamentos

1

80.35 m

1 : 200

18

Especificaciones

17

Pisos Nota: todos los pisos incluyen, losa de concreto aligerado de 40 cm de espesor, empastado con mortero de 1:4 1cm o hasta nivelar con el NPT del material mas alto.

LP3 8.75 m

LP2

16

8.61

LP2 8.4

15

9m ra 2 ama Rec o Bañ

2

2

m 8. 41

Clos

P2

2

et

medor Sala/Co

Baño o Bañ

P1

a Lav

Recamara 1

ria nde

2 4 1 1 2

P2

sillo Pa P2

eria and Lav

2 P2

P1

sala/comedor 2 2

P11

2

1

1 2

8.2 0m

1

2

1

1

2

recamara

2

2 1

1

3

2

2

P11

Closet

P11

2

2 4 1 1 3

P2 P2

recamara principal

2

pr in cip 2 0 1 3 1 2

1

2

1

2

0

2

2

2

1

1

2

7.91 m

2

0 1 1 2 0

0

11

2

2

2 2 1 1 2

4 5 6 7 8 9 10

Mosaico Veneciano 33*33 cm Castel, unido con pega porcelanato Castel .08cm esp.

1

Zoclo pegado al muro .6mm de altura mismo material del piso usado en el piso de la zona.

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

Especificaciones

2

1

1

Losa con acabado aparente de concreto y hueco de caseton.

1 2

P1

Plafon de tabla roca Panel corrido PLC-450, terminado y pintura Berel Blanco Ostra 601.

Nota: Todos las cotas son metros. P1 Tipo de puerta.

P1

2

Nomenclatura

Baño

NPT

Nivel de piso terminado

2

2 1

1

2

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

3 3

Simbologia

2 2 1 2 1

2

2

2

2

1 1

2

Nivel

2

2 4 1 1 3

2 2

Cambio de acabado en piso

3

Cambio de nivel 3

3 2 1 1 3

6.61 m

2

2 3 1 2 4

Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

2

3

2

3

Afine con yeso .05 cm de espesor y pintura Berel Blanco Ostra 601.

Baño

2

3

2

2 3 1 2 4

Porcelanato Slim Avorio Castel 1*1*.003 m, unido con pega porcelanato Castel .08cm esp.

2

0

2

1

2

2

1

2

1 2

Cielos

ra 2 Recama

a 0

12

2

WWW.BETAHECA.COM

Impermeabilizante top comex de alto desempeño color blanco .005 mm de espesor

P1

re ca m ar

8m 7.9

2 1 1 2 2 0

Piso Epoxico impernet para transito vehicular pesado .005 mm de espesor transparente

Nota: Tolas las lozas incluyen, losa de concreto aligerado de 40 cm de espesor.

P1

2

Porcelanato Serie Ecotech.40*.80*.008,unido con pega porcelanato Castel . 08cm espesor

Zoclos

3

al

2

1

P1

2

3

2

2

2

P2

2

P11

Baño

2 2 2 1 3 1 3

P2

3

P11

t Close Baño

Baño

P1

Baño

dor me /Co

2

Sala

13

Porcelanato Slim Avorio 1*1* .003m, unido con pega porcelanato Castel .08cm esp. Porcelanato Wood CE 16.5 x 100 cm duela laminada instalada sobre loseta nivelada.

Nota: todos los muros internos estan instalados de acuerdo al manuel de instalacion de muros de Hebel.

3

P2

P1

sala/comedor

3 4 1 1 2

P2

P11

P2

Porcelanato Pretiosa DG .40* .60* .008, unido con pega porcelanato Castel .08cm esp.

Muros 3 4 1 1 2

P2

14

Porcelanato Quarzita Silver .305* .614* .008, unido con pega porcelanato Castel .08cm esp.

1 2 3 4 5 6 7

m

2

3 2 1 1 2

1.25 m

2

1

2

2

2 0 2

2 3 1 2 4

2 1 2 1 2 2

m 7.81

0

1

0

2 4 1 1 3

3

2

2 2 1 1 2

2

3 2 2 1 2 1 2

2

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

0

2m 7.9

2 3

2 2

1

1

4

1

1

2

3 3

3 3

3 1 2 2

2

1

3

2

2

1 8.1

3

m

1

0 0

2

1

1

1

2

0

2

2

2

2

1

3

2

2

1

2

2 3

2

32 8.

0

2

1

1

1

1

2

4

6

8m 1:250

Acabados Plantas Tipo Oficina Departamento Hotel

2 3

2

0

2

3

2

2

2 2

0001

Numero de projecto

3 2

m

5

Cambio de acabado en muro

3 2 2 1 1 2

7

6

4 Cielo

Cubierta exterior

2

1 2

3 Zoclo

2

8 0

2

3

1 2

2

3 2 1 1 3

0

2

3 4 2

2

7.76 m

0

3 2 1 1 2

2

m

2 3 1 2 4

2

.69 101

9

2 Muros

Simbologia

2

2

1 Piso

2

3

0

10

103.08 m

2 1 1 2 2

0 0

2

1

1

-

Fecha

2 0

Author

Autor 8.4 8

Checker

Revisado

m

4

A108 3 LP4

LP4 112.33 m

LP

LP3

Escala

1:150


LP

80.35 m

17

LP2

1

20 18

Especificaciones

11.23°

Pisos

21

1.35 m

Nota: todos los pisos incluyen, losa de concreto aligerado de 40 cm de espesor, empastado con mortero de 1:4 1cm o hasta nivelar con el NPT del material mas alto.

11.2 7°

m

8.61

1 : 200

19

8.75 m

16

Acabados Azoteas

120.15 m

1 2 3 4 5 6 7

LP2 8.4

15

11 .24 °

9m

22

NSLA

68.03 m NSLA

4.03 m NSLA

2%

120.15 m

2%

m

Area 272 m2 Area 272 m2

8. 41

14

11 .2

NSLA 120.05 m

8.2 0m

0

2%

NSLA 80.15 m

2%

8.03 m NSLA

P 3

NSLA

120.15 m

0

120.15 m

0

0

1

e 2% ient d n e

2% 24

0 0

° .25 11

4.03 m

7.9

4.03 m NSLA

Area 250 m2 0

7 NSLA 0 0 0

NSLA

1 2

Porcelanato Slim Avorio Castel 1*1*.003 m, unido con pega porcelanato Castel .08cm esp.

3

Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

4 5 6 7 8 9 10

Mosaico Veneciano 33*33 cm Castel, unido con pega porcelanato Castel .08cm esp.

1

Zoclo pegado al muro .6mm de altura mismo material del piso usado en el piso de la zona.

Afine con yeso .05 cm de espesor y pintura Berel Blanco Ostra 601.

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3

Especificaciones

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

Especificaciones Nota: Todos las cotas son metros.

1 2

25

80.05 m

Impermeabilizante top comex de alto desempeño color blanco .005 mm de espesor

Nota: Tolas las lozas incluyen, losa de concreto aligerado de 40 cm de espesor.

0

NSLA

Piso Epoxico impernet para transito vehicular pesado .005 mm de espesor transparente

Cielos

0

12

WWW.BETAHECA.COM

Porcelanato Serie Ecotech.40*.80*.008,unido con pega porcelanato Castel . 08cm espesor

Zoclos

2% Area 260 m2

8m

nte 2% Pendie

0 Pe nd 3 10 7 ien 0 te 0 2% 68.03 m

2%

0

Porcelanato Slim Avorio 1*1* .003m, unido con pega porcelanato Castel .08cm esp. Porcelanato Wood CE 16.5 x 100 cm duela laminada instalada sobre loseta nivelada.

Nota: todos los muros internos estan instalados de acuerdo al manuel de instalacion de muros de Hebel.

23

13

0 7 0 0 0

0 1 0 0 0

Porcelanato Pretiosa DG .40* .60* .008, unido con pega porcelanato Castel .08cm esp.

Muros

.2 11

2%

0

nte 2% Pendie

e nt ie nd Pe

Area 260 m2

3

Porcelanato Quarzita Silver .305* .614* .008, unido con pega porcelanato Castel .08cm esp.

P1 Tipo de puerta.

Losa con acabado aparente de concreto y hueco de caseton. Plafon de tabla roca Panel corrido PLC-450, terminado y pintura Berel Blanco Ostra 601.

Nomenclatura

2%

80.15 m

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

NSLA 44.03 m

7° 11.2

7.91 m

80.15 m

NSLA

2%

Simbologia

80.15 m

11

0

7 1 0 0 3

0

Nivel

26

Cambio de acabado en piso Cambio de nivel

56.15 m

0

28

4.03 m

0 NSLA 7 0 0 0 0

56.05 m

7.76 m

NSLA

3 4 2

2

2

3 Zoclo 4 Cielo

Cambio de acabado en muro

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

11.23°

2%

27

1.25 m

2%

56.15 m

2 Muros

Simbologia

m

1.25 m

NSLA

2%

Pe nd ien te

.69 101

Cubierta exterior

56.15 m

Area 240 m2

8

CITELIS Stela City

29 NSLA

2%

m 7.81

11.2 7°

56.15 m

Pe nd ien te 2% 0

2%

Area 250 m2 7

7 1 0 0 3

NSLA

0

2%

40.15 m

4.03 m

30

28.03 m 4.03 m

2% iente Pend

0 7 0 0 0

2%

NSLA

0

Area 260 m2 8.03 m

te 2% dien Pen

0

40.05 m

2%

NSLA

7

NSLA

0

1 7 0 0 0

7 7

7

.2 11

m

-

Fecha

2% 2%

° .25 11

m

1.35 m

A109

4° 11.2

11.26° 8.69 m

34 1

Escala

35

36

Checker

Revisado

33

8.6 3m

Author

Autor

Area 272 m2

4

2

0001

Numero de projecto 32

Area 272 m2 2%

8m

Acabados Azotea

2%

12.03 m

3

6

1:200

2%

8.4 8

4

31

40.15 m

2%

2

7

2%

32 8.

5

0 1 0 0 0

0 1 0 0 0

11 .2 6°

m

Area 260 m2

7

Pendie nte 2%

1 8.1

2% 40.15 m

11 .24 °

2m 7.9

2%

2%

6

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

2%

Pe nd ien te 2%

103.08 m

9

1 Piso

2

NSLA

10

nte 2% Pendie

Area 240 m2

11.23°

6.61 m

2%

112.33 m LP3

1:200 y/o especificada


5 8 002 N.S.N 119.70 m

3.60 m

002 N.S.II 76.00 m

002 N.S.JJ 75.60 m

3.60 m

002 N.S.KK 002 N.S.LL 72.00 m 71.60 m

3.60 m

002 N.S.MM 002 N.S.NN 68.00 m 67.60 m

3.60 m

002 N.S.OO 002 N.S.PP 64.00 m 63.60 m

3.60 m

002 N.S.QQ 002 N.S.RR 60.00 m 59.60 m

3.60 m

002 N.S.SS 002 N.S.TT 56.00 m 55.60 m 002 N.S.WW 002 N.S.XX 52.00 m 51.60 m

4.00 4.00 4.00 4.00 4.00 4.00 4.00

3.60 m

002 N.S.GG 002 N.S.HH 80.00 m 79.60 m

8

4.00

3.60 m

002 N.S.EE 002 N.S.FF 84.00 m 83.60 m

5

023 Nivel 23 88.00 m

4.00

3.60 m

002 N.S.CC 002 N.S.DD 88.00 m 87.60 m

024 Nivel 24 92.00 m

022 Nivel 22 84.00 m

021 Nivel 21 80.00 m

020 Nivel 20 76.00 m

1 : 300

Muros Nota: todos los muros internos estan instalados deacuerdo al manuel de isntalacion de muros de Hebel. Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1

1 2 3 4

WWW.BETAHECA.COM

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Modulo 1 Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Modulo 2 Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

5

5

Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm

6 7 8 9

025 Nivel 25 96.00 m

4.00

3.60 m

002 N.S.AA 002 N.S.BB 92.00 m 91.60 m

3.60 m

002 N.S.Z 95.60 m

3.60 m

002 N.S.Y 96.00 m

026 Nivel 26 100.00 m

4.00

002 N.S.X 99.60 m

Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Módulo de elevadores y escaleras de emergencia, para ver detalle referirse al plano D -36 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3

Especificaciones Nota: Todos las cotas son metros. P1 Tipo de puerta.

4.00

3.60 m

002 N.S.W 100.00 m

027 Nivel 27 104.00 m

019 Nivel 19 72.00 m

4.00

3.60 m

002 N.S.V 103.60 m

3.60 m

002 N.S.U 104.00 m

ELEVACION SUR Especificaciones

028 Nivel 28 108.00 m

018 Nivel 18 68.00 m

4.00

3.60 m

002 N.S.T 107.60 m

002 N.S.S 108.00 m

029 Nivel 29 112.00 m

017 Nivel 17 64.00 m

4.00

002 N.S.R 111.60 m

016 Nivel 16 60.00 m

4.00

3.70 m

002 N.S.Q 112.00 m

030 Nivel 30 116.00 m

015 Nivel 15 56.00 m

4.00

002 N.S.P 115.60 m

2

031 Nivel 31 120.00 m

8

002 N.S.O 116.00 m

1

014 Nivel 14 52.00 m

5

147.00

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

005 Nivel 5 16.00 m

4.00

1

004 Nivel 4 12.00 m

003 Nivel 3 8.00 m

2 Muros

Simbologia 8

2

3 4 2

2

3 Zoclo 4 Cielo

Cambio de acabado en muro

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

1

Cubierta exterior

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1

4.00

3.60 m

002 N.S.MMM002 N.S.NNN 16.00 m 15.60 m

006 Nivel 6 20.00 m

2

3.50

1 4.00

3.60 m

002 N.S.KKK 002 N.S.LLL 20.00 m 19.60 m

007 Nivel 7 24.00 m

002 N.S.L 4.00 m N.Plafon 2.38 m Base del Equipo

4.00

002 N.S.JJJ 23.60 m

1.10 m 001 Nivel Acceso 0.00 m

4.00

3.60 m

002 N.S.III 24.00 m

008 Nivel 8 28.00 m

-001 Estacionamiento 1 -4.00 m

4.00

3.60 m

002 N.S.GGG002 N.S.HHH 28.00 m 27.60 m

009 Nivel 9 32.00 m

-002 Estacionamiento 2 -8.00 m

4.00

3.60 m

002 N.S.EEE 002 N.S.FFF 32.00 m 31.60 m

1 Piso

2

012 Nivel 12 44.00 m

010 Nivel 10 36.00 m

-003 Estacionamiento 3 -12.00 m

12.00

3.60 m

002 N.S.CCC 002 N.S.DDD 36.00 m 35.60 m

013 Nivel 13 48.00 m

011 Nivel 11 40.00 m

3.00

3.60 m

002 N.S.AAA 002 N.S.BBB 40.00 m 39.60 m

5 4.00

3

3.60 m

002 N.S.YY 002 N.S.ZZ 44.00 m 43.60 m

3.60 m

002 N.S.UU 002 N.S.VV 48.00 m 47.60 m

4

0

2

4

6

0.00 m

8m 1:250

Acabados Elevaciones 0001

Numero de projecto

-004 Estacionamiento 4 -16.00 m

Fecha

-005 Estacionamiento 5 -20.00 m

Autor

-006 Estacionamiento 6 -24.00 m

Revisado

-007 Nivel Zapatas -27.00 m

Author Checker

A110 Escala

1:150


ELEVACION OESTE

2

1 : 300

1

031 Nivel 31 120.00 m

5 4.00 4.00

029 Nivel 29 112.00 m

4.00

028 Nivel 28 108.00 m

4.00

027 Nivel 27 104.00 m

4.00

023 Nivel 23 88.00 m

4.00

4.00 4.00 4.00

024 Nivel 24 92.00 m

022 Nivel 22 84.00 m

4.00

5

Especificaciones

Muros Nota: todos los muros internos estan instalados deacuerdo al manuel de isntalacion de muros de Hebel.

1 2 3 4

2

5 6 7 8 9

026 Nivel 26 100.00 m

025 Nivel 25 96.00 m

021 Nivel 21 80.00 m

1 : 300

1

030 Nivel 30 116.00 m

2

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Modulo 1 Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Modulo 2 Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado. Concreto Aparente con cimbra de madera Modulos de 1.22x2.44 Módulo de elevadores y escaleras de emergencia, para ver detalle referirse al plano D -36 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3

MODULO 1

3

WWW.BETAHECA.COM

Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm

MODULO 2

MODULO 3

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

MODULO 4

4 5

2

Especificaciones

4.00

020 Nivel 20 76.00 m

4.00

019 Nivel 19 72.00 m

4.00

8

018 Nivel 18 68.00 m

8

Nota: Todos las cotas son metros. P1 Tipo de puerta.

Nota: Para ver especifiaciones de los módulos de sistema por fachada referirse al plano de sistema por fachada. Nomenclatura

5

4.00

2

4.00

1

015 Nivel 15 56.00 m

4.00

4.00

017 Nivel 17 64.00 m

016 Nivel 16 60.00 m

014 Nivel 14 52.00 m

8

3

4

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

5

Simbologia Nivel Cambio de acabado en piso

4.00

012 Nivel 12 44.00 m

Cambio de nivel

4.00

011 Nivel 11 40.00 m

4.00

010 Nivel 10 36.00 m

4.00

009 Nivel 9 32.00 m

1 Piso

2

2 Muros

Simbologia

2

2

3 4 2

2

3 Zoclo 4 Cielo

Cambio de acabado en muro

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

4.00

008 Nivel 8 28.00 m

4.00

007 Nivel 7 24.00 m

4.00

006 Nivel 6 20.00 m

4.00

005 Nivel 5 16.00 m

4.00

004 Nivel 4 12.00 m

4.00

003 Nivel 3 8.00 m

4.00

002 N.S.L 4.00 m

4.00

Cubierta exterior

001 Nivel Acceso 0.00 m

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

0

2

4

6

8m 1:250

4.00

-001 Estacionamiento 1 -4.00 m

4.00

-002 Estacionamiento 2 -8.00 m

Acabados Elevaciones

4.00

-003 Estacionamiento 3 -12.00 m

4.00

-004 Estacionamiento 4 -16.00 m

4.00

-005 Estacionamiento 5 -20.00 m

-006 Estacionamiento 6 -24.00 m 4.00

1

013 Nivel 13 48.00 m

4.00 147.00

8

3.00

1

ELEVACION ESTE

-007 Nivel Zapatas -27.00 m

0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

A111 Escala

1:150


OFFICINAS/LOCALES/LOBBY/ESTACIONAMIENTO 1 : 100

0

0 0 0 0 0

3

1 : 100

031 Nivel 31 120.00 m

002 N.S.N 119.70 m

2

0 2 1 2 0

4

2

0 2 1 2 0

4

2

0 2 1 2 0

4

2

0 2 1 2 0

4

2

0 2 1 1 0

8

8

0 0 0 0 0

0

003 Nivel 3 8.00 m

4.00

4.00

004 Nivel 4 12.00 m

2

3.70 m

5

DEPARTAMENTOS A

030 Nivel 30 116.00 m

WWW.BETAHECA.COM

0

3

3

2 2 1 1 2

2

2

0 2 1 1 0

8

8

0 0 0 0 0

0

002 N.S.L 4.00 m

4.00

0 0 0 0 0

3.60 m

4.00

8.00

002 N.S.O 116.00 m 002 N.S.P 115.60 m

002 N.S.Q 112.00 m 002 N.S.R 111.60 m

029 Nivel 29 112.00 m

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

4.00

N.Plafon 2.38 m

0

0 0 0 0 0

3

3

2 2 1 1 2

2

001 Nivel Acceso 0.00 m

2

0 2 1 2 0

2

4

0 2 1 1 0

8

2

0 0 0 0 0

HOTEL

3

0

1 : 100

002 N.S.GGG 28.00 m 002 N.S.HHH 27.60 m

008 Nivel 8 28.00 m

6

4.00

-001 Estacionamiento 1 -4.00 m

6

6 6 1 2 6

6

0

3

0 2 1 1 0

0

3

0 2 1 1 0

2

0

0 2 1 1 0

2 0

0 2 1 1 0

3 3

0 0 0 0 0

Nota: Todos las cotas son metros.

4.00

3

0 2 1 1 0

0

P1 Tipo de puerta.

002 N.S.III 24.00 m 002 N.S.JJJ 23.60 m

007 Nivel 7 24.00 m

4

6

002 N.S.GGG 28.00 m 002 N.S.HHH 27.60 m

39.00

-002 Estacionamiento 2 -8.00 m

6 6 1 2 6

3.60 m

4.00

Especificaciones

DEPARTAMENTOS B 1 : 100

Nomenclatura NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia

008 Nivel 8 28.00 m

Nivel Cambio de acabado en piso

6

6 6 1 2 6

3

6

-003 Estacionamiento 3 -12.00 m

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

0

3

0 2 1 1 0

4.00

4.00

Cambio de nivel

0

4.00

002 N.S.III 24.00 m 002 N.S.JJJ 23.60 m

6

6 6 1 2 6

007 Nivel 7 24.00 m

-004 Estacionamiento 4 -16.00 m

2 Muros

Simbologia

6

6

RESTAURANT 1 : 100

1 Piso

2 2

3 4 2

2

3 Zoclo 4 Cielo

Cambio de acabado en muro

Cambio de acabado en piso

Arranque de piso o azulejo

Cambio de nivel

002 N.S.L 4.00 m

Cubierta exterior

6

6 6 1 2 6

CITELIS Stela City

4.00

4.00

N.Plafon 2.38 m Base del Equipo 1.10 m

6

-005 Estacionamiento 5 -20.00 m

4.00

001 Nivel Acceso 0.00 m

6

6 6 1 2 6

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

6

-006 Estacionamiento 6 -24.00 m

Especificaciones Pisos

3.00

Nota: todos los pisos incluyen, losa de concreto aligerado de 40 cm de espesor, empastado con mortero de 1:4 1cm o hasta nivelar con el NPT del material mas alto.

1 2 3 4 5 6 7

-007 Nivel Zapatas -27.00 m

Porcelanato Quarzita Silver .305* .614* .008, unido con pega porcelanato Castel .08cm esp. Porcelanato Pretiosa DG .40* .60* .008, unido con pega porcelanato Castel .08cm esp. 0

Porcelanato Slim Avorio 1*1* .003m, unido con pega porcelanato Castel .08cm esp.

2

4

6

Porcelanato Wood CE 16.5 x 100 cm duela laminada instalada sobre loseta nivelada.

8m 1:250

Porcelanato Serie Ecotech.40*.80*.008,unido con pega porcelanato Castel . 08cm espesor Piso Epoxico impernet para transito vehicular pesado .005 mm de espesor transparente Impermeabilizante top comex de alto desempeño color blanco .005 mm de espesor

Acabados Cortes

Muros Nota: todos los muros internos estan instalados de acuerdo al manuel de instalacion de muros de Hebel.

1 2

Porcelanato Slim Avorio Castel 1*1*.003 m, unido con pega porcelanato Castel .08cm esp.

3

Muro tapon de aluminio extruido EXTRAL linea ventana y puerta corrediza 3'' color negro, vidrio Tintex de Vitro 6 mm de espesor templado.

4 5 6 7 8 9 10

Mosaico Veneciano 33*33 cm Castel, unido con pega porcelanato Castel .08cm esp.

1

Zoclo pegado al muro .6mm de altura mismo material del piso usado en el piso de la zona.

Afine con yeso .05 cm de espesor y pintura Berel Blanco Ostra 601.

Concreto prefabricado:Slender Wall/malla galvanizada y perfiles de acero. Peso 140kg/m2 Muro de contencion de 40 cm de espesor de concreto vaciado en sitio f'c 250 kg/cm3

Fecha

-

Autor

-

Revisado

-

Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 1 Panel solido de concreto prefabricado para fachada de 12 cm de espesor Modulo 2 Muro de block de block de 20cm zarpeo 1.4 . Aplicacion de yeso a plomo espesor de 15 cm Concreto Aparente con cimbra de madera Modulos de 1.22x2.44

A112

Zoclos

1

STELA CITY 3D

Cielos Nota: Tolas las lozas incluyen, losa de concreto aligerado de 40 cm de espesor.

1 2

0001

Numero de projecto

Losa con acabado aparente de concreto y hueco de caseton. Plafon de tabla roca Panel corrido PLC-450, terminado y pintura Berel Blanco Ostra 601.

Escala

1:150


4.00 m

Módulo 1 Panel sólido de concreto prefabricado para fachada de 12 cm de espesor . ESC 1:50 2.40 m

WWW.BETAHECA.COM

1.20 m

Módulo 2 y 3 Panel slender wall sólido de concreto prefabricado para fachada de 12 cm de espesor . ESC 1:50

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Especificaciones

2.00 m

2.00 m

Nota: Todos las cotas son metros.

8.00 m

7.50 m

3.50 m

P1 Tipo de puerta.

CITELIS Stela City

0.02

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

Módulo 2 Panel sólido de concreto prefabricado para fachada de 12 cm de espesor. ESC 1:50

0

2

4

6

8m 1:250

Despiece Sistema Fachada 0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

A113 Escala

1:150


LP

18

19

17

LP2

20 1.35 m 11.23°

8.75 m

3

LP3

16

21 8.61

Isometria Extraccion Estacionamiento

11.2 7°

m

80.35 m 1.38

9 1.1

9m

11 .24 °

1 3.9

8.4

E1

LP2

22

E1 3.78

15

WWW.BETAHECA.COM 8 3.2 3.47

8. 41

m

11 .2

23 1. 42

14

3. 44

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

3. 80

E1

8.2 0m

.2 11

13

24

ESPECIFICACIONES

2 1.3

E1

NPT -4.00 m 0 3.9

Especificaciones

Todos los extractores se colocan a 2 metros sobre el nivel instalado.

2 1.8

7.9

8m

° .25 11

Nomenclatura

1.2 0

3.4 9

12

3.0 2

ELEVADORES

Base del Equipo 1.10 m

EL EV AD OR ES

Banqueta

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

001 Nivel Acceso 0.00 m

E1

7° 11.2

7.91 m

NPT 25

E1

Simbologia Nivel Cambio de acabado en piso

11

Cambio de nivel 4.00

26

8.00

6.61 m

1.40

E1

-001 Estacionamiento 1 -4.00 m

11.23°

2.96

Extraccion de aire al exterior

1.56

103.08 m

9

DN

4.00

27

1.25 m

1.25 m

10

28

-002 Estacionamiento 2 -8.00 m

E1

1.36

7.76 m

11.23°

3.69

3.52

8

29

2

6 3.9

CITELIS Stela City

1 : 100

11.2 7°

E1

3.28

0 3.1

m 7.81

1.38

E1

Corte HVAC Estacionamiento

1.58

0 1.2

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

ELEVADORES Cuadro de especificaciones

30

Nota:Para ver solucion de descarga de drenaje ver plano Hidrosanitarios Todos los equipos de condensadora van a 0.00 con referencia a N.P.T. Todos los equipos de manejadoras van a 2.80m con referencia a N.P.T.

11 .24 °

2m 7.9

RES ADO ELEV

7

Pieza

Simbolo

Especificaciones

NPT -4.00 m

Extractor Estacionamiento

Upblast Roof Fan Cast Aluminum Propeller Belt Drive Marca AUB 254 Ton

460 volts

31

0

m 4.

41

3. 42

47 5.

32 8. m 4.04

4

8.4 8

E1

E1

36

. 11

4.35

0001

Numero de projecto

° 25

° .25 11

m

Fecha

-

Autor

-

Revisado

-

33

1 : 200

5.54

5.57

Planta tipo estacionamiento 8.6 3m

3

4° 11.2

1.44

1.35 m

1.43

11.26°

8.69 m

2

A114

LP4

34 35

112.33 m LP

8m

32 1.

LP4

6

HVAC Estacionamiento

E1

0. 40

4.

1. 37

1

4

1:200

09

E1

5

2

11 .2 6°

1 8.1

6

E1

Requerimientos Electricos

1

36

LP3

Escala

1:200 y/o especificada


18

19

17 1.35 m

20 11.23°

8.75 m

21 16 8.61

11.2 7°

m

WWW.BETAHECA.COM

46"x46"

38"x38"

13" ø

2

24"x24"

600 CFM

24"x24"

32"x32"

32"x32"

11" 11"x " "x11

1"x 1" 11" 11"x1 111"x

600 CFM

13" ø

1"1 " 11 1"11"x 2 11"x11 111"x 600 CFM

"1 "11 11"1x 111"1x" 11"x1

1"x

11"x11"

" 11

2 600 CFM

11" 11"x

13"2 ø

1"x 1"1 x1 11"" 11"x

" 11

13" ø

" 11"x11

24"x24"

16 "

13" ø 2

16"x16 "

600 CFM

0.8 7

600 CFM

16"x 16"

13" ø

P4

13" ø

11"x

11"

11"x

11"

13" ø

11"x

2 600 CFM P4

2

600 CFM

11"

11"x

11"

11"

Nomenclatura

13" ø

16"x16 "

13" ø 11"x

P4

13" ø

1" "x1 11

2 600 CFM

13" ø 11"x

2 600 CFM

Nota: Todos las cotas son metros.

2

13" ø

13" ø 16"x16 "

2 600 CFM

2

16"x 16"

Sala de espera.

Especificaciones

600 CFM

16"x 16"

16"x16 "

16"

2

13" ø

13" ø

600 CFM

13" ø

11"

13" ø

2

13" ø

24"

16"x

16"x16"

11"x11" 11"x11" 11"x11"

6"x

24"x24"

13" ø

24"x

31 13" ø 400 CFM 16"x16"1 24"x24"

24" 11"

24"x24"

24"x

11 11"x

13" ø

11"x11"

1" "x1 111" 1"x11" 11"x1 1 " 1 "x1

2 600 CFM

"x1 7"

2 13" ø Comensales

14"x24"

2" "x3 32

24

P2

13" ø

1176"x "x 11617"x 6""161 " 6"x 16"x " 16 "

P5

4" "x2

Bethuel Serbulo A00808771

11"

11"

600 CFM

Bodega Empleados.

Hector Niño A00810504

11"x

17"

14"x10"

1.25

17"x

Cocina P7

13" ø

600 CFM

17"x 17"

P2

11"

2

1.43

13" ø

11"x

P1 P1

13" ø Cuarto audio, Video. Caja.

13" ø

11"x

7"x7"

11"x 11"

13" ø 7"x7"

17"1 7

4.09

P1

12"ø

12"ø

12"ø

12"ø

46"

P2

13" ø

P1

P1

1177" "x1 71"7 "x

46"x

7"x7"

Carolina Rdz A00810722

P1

8" ø

1.10

Jose O. Gonzalez A0036670

17"x

7" ø

8" ø

P1

11"x 11"

P1

Cuarto Frio.

2.29

Bodega Alimentos.

Baño Muje res

24"ø

11"x 11"

21"ø

7"x7"

27"ø

P1

7"x7"

7" ø P2

14"x10"

B

P1

P2

Reposteria.

Baño Hombres

1.59

P6

7"x7"

B

0.78

30

2

11"

11"x

600 CFM

ACCESO VEHICULAR

11"

2

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

600 CFM

600 CFM

2 600 CFM 2 600 CFM

Simbologia Nivel

1

Cambio de acabado en piso

HVAC Restaurante.

Cambio de nivel

1 : 150 002 N.S.L 4.00 m

LP2

N.Plafon 2.38 m

inyección aire.

Retorno de aire.

Ductos Flexibles.

Ducctos de inyección

Base del Equipo 1.10 m

Campana

CITELIS Stela City

001 Nivel Acceso 0.00 m

Ductos 51" Equipo Aire acondicionado

2

CORTE RESTAURANTE HVAC 1 : 75

Cuadro de especificaciones 002 N.S.L 4.00 m

Nota:Para ver solucion de descarga de drenaje ver plano Hidrosanitarios Todos los equipos de condensadora van a 0.00 con referencia a N.P.T. Todos los equipos de manejadoras van a 2.80m con referencia a N.P.T.

Pieza

N.Plafon 2.38 m

Condensadora Air cooled condensing unit

neopreno

Base del Equipo 1.10 m

001 Nivel Acceso 0.00 m

3

Simbolo

Manejadora Air handling Units

Especificaciones

Requerimientos Electricos

C1

Modelo:09A002-064 Tonelaje: 2

Marca:Carrier

C2

Modelo:09A003-064 Tonelaje: 3

Marca:Carrier

C3

Modelo:09A006-064 Tonelaje: 5

Marca:Carrier

C4

Modelo:38AUZA07A0G6 Marca:Carrier Tonelaje: 6

C5

Modelo:MMD-AP0071BH Marca:TOSHIBA 2.2 KW (.8HP) Tonelaje: 7.5

5 KW (253V) 5 KW (253V)

M2

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 3

M3

Modelo:2/4TEC3F18-60A10004 Marca:Trane 7.68KW 240VOLT Tonelaje: 5

M4

Modelo: 40RUAAA07A1A6 Marca:Carrier 2.4 (1.79) Hp(KW) Tonelaje: 6

M5

Modelo: 40RUAAA08A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje:7.5

M6

Modelo: 40RUAAA14A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje: 12.5 Marca: dumont Difusor doble deflexion curvo cara rectangular 14" calibre 28

Difusor

D1

Retorno

R1

1 : 50

Ductos Circulares Marca:dumont de radio variable aparente calibre 28

Ducto Cuadrado.

Ductos Cuadrados demensiones variables. Marca Dumont calibre 28

Extractor restaurante

Venco Productos vucb-100-4g

E1

4

6

8m 1:250

HVAC Restaurant 0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

Marca:dumont Rejilla de retorno acero inoxidable Calibre 28

Ducto Redondo

2

8.1KW (.8HP)

M1

A/C1

0

5 KW (253V)

Modelo: 38AUD14/40RU14 Marca:Carrier 13.4KW Tonelaje: 12.5 Modelo: LL serie 100 YPAL50CXE2LL 55.8KW Marca: JhonsonControls 50 ton. 360 v. Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 2

C6 Todo en uno.

Detalle de equipo aire acondicionado

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

A115 Escala 110 volts

1:150


11 .2

° .25 11

11 .24 ° 6 3.3 8. 11

4 2.9

1. 26

0 2.8

.2 11

Modelo:09A002-064 Tonelaje: 2

Marca:Carrier

C2

Modelo:09A003-064 Tonelaje: 3

Marca:Carrier

C3

Modelo:09A006-064 Tonelaje: 5

Marca:Carrier

2. 54

1

3.6 4

5 KW (253V)

8 3.1

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

1 400 CFM

5 KW (253V)

7

ALMACÉN

1 1.9

C5

Modelo:MMD-AP0071BH Marca:TOSHIBA 2.2 KW (.8HP) Tonelaje: 7.5

8 3.1

1.3 6

NPT 8.00 m

Modelo:38AUZA07A0G6 Marca:Carrier Tonelaje: 6

1

6 0.3

5 KW (253V)

C4

C5

8.1KW (.8HP)

400 CFM

4 1.3

NPT 8.00 m

Modelo: 38AUD14/40RU14 Marca:Carrier 13.4KW Tonelaje: 12.5

Y BB LO

1.5 1

4.6 7

8 0.5

BAÑOS

OFICINA PRINCIPAL

400 CFM

1

11 3.

AS IN FIC F O

ESPECIFICACIONES 1 400 CFM

2m 7.9

C6

2. 50

Requerimientos Electricos

400 CFM

NPT 0.00 m

OFICINAS

1. 25

C1

4 2.9

Condensadora Air cooled condensing unit

Especificaciones

2 2.8

SALA DE JUNTAS

7 2.1

Simbolo

2 1.2

0. 84

Nota:Para ver solucion de descarga de drenaje ver plano Hidrosanitarios Todos los equipos de condensadora van a 0.00 con referencia a N.P.T. Todos los equipos de manejadoras van a 2.80m con referencia a N.P.T.

Pieza

WWW.BETAHECA.COM

Cuadro de especificaciones

3 0.8

9 3.3

M3

Modelo:2/4TEC3F18-60A10004 Marca:Trane 7.68KW 240VOLT Tonelaje: 5 Modelo: 40RUAAA07A1A6 Marca:Carrier 2.4 (1.79) Hp(KW) Tonelaje: 6

M5

Modelo: 40RUAAA08A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje:7.5

M6

Modelo: 40RUAAA14A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje: 12.5 Marca: dumont Difusor doble deflexion curvo cara rectangular 14" calibre 28

D1

BAÑOS RECEPCIÓN 1.3 7

M5 72 0.

NPT 8.00 m

0.5 1

0.2 7

4

78 1.

Tuberia Cobre 1/2"

Nomenclatura

0.7 2 0.7 1 0.7 2

Upblast Roof Fan Cast Aluminum Propeller Belt Drive Marca AUB 254 Ton

460 volts

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia

m 2 A116

1

PLANTA TIPO OFICINAS 1 : 100

5

4

RESTAURANT/LOBBY/COMERCIAL

Nivel Cambio de acabado en piso

1 : 100

Cambio de nivel

3 002 N.S.L 4.00 m

004 Nivel 4 12.00 m

N.Plafon 2.38 m 4.00

E1

Nivel de piso terminado

0.4 3

4.00

Extractor Estacionamiento

8.4 8

NPT

m

Tuberia HVAC

SERVICIO

1 8.1

Ducto HVAC

6

30 4.

Marca:dumont Rejilla de retorno acero inoxidable Calibre 28 Ductos Circulares Marca:dumont 14" aparente calibre 28

Nota: Todos las cotas son metros. 33 3.

27 0.

R1

NPT 0.00 m

5

92 0.

M4

Especificaciones

1.8 5

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 3

2.0 3

M2

1 400 CFM

m

Retorno

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 2

32 8.

Difusor

M1

0. 62

Manejadora Air handling Units

2.3 1

31 3.

Base del Equipo 1.10 m 001 Nivel Acceso 0.00 m

6

0.00 m

HVAC LOBBY

HVAC OFICINA

2

1 : 100

CITELIS Stela City

003 Nivel 3 8.00 m

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

8.00 m

1 : 100

1:100 0

2

5m

HVAC Oficinas / Lobby Oficinas 0001

Numero de projecto Fecha

-

Autor

-

Revisado

-

A116 3

3D HVAC OFICINAS

5

3D HVAC LOBBY

Escala

1:100

y/o especificada


6

Corte HVAC Lobby Hotel

Corte HVAC Hotel Nivel Planta tipo

3

1 : 100

1 : 100

002 N.S.III 24.00 m 002 N.S.JJJ 23.60 m

002 N.S.L 4.00 m

007 Nivel 7 24.00 m

4.00

4.00

N.Plafon 2.38 m

WWW.BETAHECA.COM

Base del Equipo 1.10 m

002 N.S.KKK 20.00 m 002 N.S.LLL 19.60 m

001 Nivel Acceso 0.00 m

5

006 Nivel 6 20.00 m

Isometria HVAC Hotel lobby

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

Isometria HVAC Hotel

2

ESPECIFICACIONES

Especificaciones Nota: Todos las cotas son metros.

14

8.2 0m

Nomenclatura

13

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

C6

Simbologia 1.6 1

Nivel Cambio de acabado en piso

2.2 5

2.0 2 2.0 5

D1

8m

1.9 2

400 CFM

D1

7.9

2.3 0

2.0 5

D1

LO BB YH OT EL

400 CFM

Cambio de nivel

14

400 CFM

14 "ø

1.5 5

D1 400 CFM

D1

D1

8.2 0m

1.5 5

400 CFM

333 CFM

CITELIS Stela City

12 1.8 8

D1

2.8 0

400 CFM

D1

14" ø

333 CFM

1.9 6

R1

14 "ø D1

1.8 9

Marca:Carrier

C2

Modelo:09A003-064 Tonelaje: 3

Marca:Carrier

C3

Modelo:09A006-064 Tonelaje: 5

Marca:Carrier

C4

Modelo:38AUZA07A0G6 Marca:Carrier Tonelaje: 6

C5

Modelo:MMD-AP0071BH Marca:TOSHIBA 2.2 KW (.8HP) Tonelaje: 7.5

C6

Modelo: 38AUD14/40RU14 Marca:Carrier 13.4KW Tonelaje: 12.5

5 KW (253V)

3.0 9

C2

1.6 4

3/4 "ø

3/4

R1

3.4 0

"ø

5 KW (253V) 5 KW (253V)

1 : 100

Modelo: 40RUAAA08A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje:7.5

M6

Modelo: 40RUAAA14A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje: 12.5 Marca: dumont Difusor doble deflexion curvo cara rectangular 14" calibre 28

Tuberia HVAC

Tuberia Cobre 1/2"

E1

Upblast Roof Fan Cast Aluminum Propeller Belt Drive Marca AUB 254 Ton

11 .24 °

Marca:dumont Rejilla de retorno acero inoxidable Calibre 28 Ductos Circulares Marca:dumont 14" aparente calibre 28

1 460 volts

5m

0001

Numero de projecto 11 .2 6°

M5

2.5 4

Modelo: 40RUAAA07A1A6 Marca:Carrier 2.4 (1.79) Hp(KW) Tonelaje: 6

14 "ø

M4

2.4 2

Modelo:2/4TEC3F18-60A10004 Marca:Trane 7.68KW 240VOLT Tonelaje: 5

2

HVAC Hotel / Lobby Hotel

14 "ø

0.9 2

M3

Ducto HVAC

Extractor Estacionamiento

0

3.8 5

M2

2.9 0

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 3

R1

1:100

14 "ø

M2

Retorno

5.2 0

0.7 8

4

HVAC Hotel Nivel Acceso Lobby

12

0.4 2

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 2

D1

14 "ø

8.1KW (.8HP)

M1

Difusor

M3

0.9 9

R1

Manejadora Air handling Units

0.4 7

3/4 "ø

2.3 1

Modelo:09A002-064 Tonelaje: 2

7.9

C1

C3 8m

Requerimientos Electricos

5.5 1

333 CFM

3/4 "ø

.69 0.5 30

D1

11 .24 °

Condensadora Air cooled condensing unit

Especificaciones

1.8 4

0.3 9

C2

Nota:Para ver solucion de descarga de drenaje ver plano Hidrosanitarios Todos los equipos de condensadora van a 0.00 con referencia a N.P.T. Todos los equipos de manejadoras van a 2.80m con referencia a N.P.T.

Simbolo

M6

A117 Ver Solucionde Salida de drenaje en Plano de Hidrosanitario

400 CFM

Cuadro de especificaciones

Pieza

D1 333 CFM

M2

0.4 3

3

11 .2 6°

14" ø

14 "ø

400 CFM

333 CFM

1.7 2

D1

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1.5 3

13 D1

Fecha

-

Autor

-

Revisado

-

A117

HVAC Hotel Nivel 6 1 : 100 Escala

1:100

y/o especificada


Cuadro de especificaciones 18

17

8.75 m

HVAC NIVEL 30

Pieza Condensadora Air cooled condensing unit

1 : 100 m 8.61

120.15 m

600 CFM

D1

3

D1

116.00 m D1 D1

400 CFM

400 CFM

4.00

002 N.S.L 4.00 m

112.00 m

002 N.S.Q 112.00 m 002 N.S.R 111.60 m

M5

D1

4.00 m

3D HVAC LOCALES

Corte HVAC

3

400 CFM

1.99

029 Nivel 29 112.00 m

1 : 100

Marca:Carrier

C2

Modelo:09A003-064 Tonelaje: 3

Marca:Carrier

C3

Modelo:09A006-064 Tonelaje: 5

Marca:Carrier

C4

Modelo:38AUZA07A0G6 Marca:Carrier Tonelaje: 6

C5

Modelo:MMD-AP0071BH Marca:TOSHIBA 2.2 KW (.8HP) Tonelaje: 7.5

C6

Modelo: 38AUD14/40RU14 Marca:Carrier 13.4KW Tonelaje: 12.5

M1

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 2

M2

Modelo:2/4TEC3F18-60A10004 Marca:Trane 4.8KW 240VOLT Tonelaje: 3

M3

Modelo:2/4TEC3F18-60A10004 Marca:Trane 7.68KW 240VOLT Tonelaje: 5

M4

Modelo: 40RUAAA07A1A6 Marca:Carrier 2.4 (1.79) Hp(KW) Tonelaje: 6

M5

Modelo: 40RUAAA08A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje:7.5

M6

Modelo: 40RUAAA14A1A6 Marca:Carrier 2.9 (2.16) Hp(KW) Tonelaje: 12.5 Marca: dumont Difusor doble deflexion curvo cara rectangular 14" calibre 28

D1

Retorno

R1

5 KW (253V) 5 KW (253V) 5 KW (253V) 8.1KW (.8HP)

WWW.BETAHECA.COM

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES

Marca:dumont Rejilla de retorno acero inoxidable Calibre 28

Ducto HVAC

Ductos Circulares Marca:dumont 14" aparente calibre 28

Tuberia HVAC

Tuberia Cobre 1/2"

Especificaciones

Upblast Roof Fan Cast Aluminum Propeller Belt Drive Marca AUB 254 Ton

E1

460 volts

Nota: Todos las cotas son metros.

3.89

M1

1.23

0.63

0.40

400 CFM

Difusor

Extractor Estacionamiento

D1

Requerimientos Electricos

Modelo:09A002-064 Tonelaje: 2

400 CFM

M5

6

030 Nivel 30 116.00 m 8.00

2.66

A118

116.00 m

002 N.S.O 116.00 m 002 N.S.P 115.60 m

2.43

003 Nivel 3 8.00 m

1 : 100

Manejadora Air handling Units

2.91

600 CFM

3.60 m

7

4.00

3.70 m

D1

M1

031 Nivel 31 120.00 m

002 N.S.N 119.70 m

1.78

Especificaciones

C1

0.78

2.49

16

HVAC LOCALES

Simbolo

4.00

1

Nota:Para ver solucion de descarga de drenaje ver plano Hidrosanitarios Todos los equipos de condensadora van a 0.00 con referencia a N.P.T. Todos los equipos de manejadoras van a 2.80m con referencia a N.P.T.

116.00 m

D1

2.80

600 CFM

D1

0.37

Nomenclatura 18

600 CFM

17

8.75 m

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia 16

Nivel m 8.61

11.27°

Cambio de acabado en piso

1.86 1.66

Cambio de nivel 0.62

3° 11.2 D1

112.00 m

2.24

400 CFM

° .25 11

600 CFM

7

D1

A118

400 CFM

4 2.9

C1

112.00 m

CITELIS Stela City

D1

3 2.5

0 2.8

600 CFM D1

2.25

6 3.3

D1

M1

400 CFM

3

2.33

A118

2.33

C5

9

1.7

.2 11

9 3.3 3 0.8

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

8 3.1 4 2.9

2 0.9

0 3.9

1.8

400 CFM

400 CFM

41 2.

0.40

1.7

C4

9

0.38

M5

1

7

400 CFM

D1

1

400 CFM

8 3.1

D1

M5

C2

1

1

D1

400 CFM

0 3.7

1.80

1.41

600 CFM

1 400 CFM

D1

D1

112.00 m

400 CFM

600 CFM

1.53

1 400 CFM

11 3.

1

112.00 m

400 CFM

M1

2.80

2m 7.9

S LE CA LO

1:100

2 1.5

M1

7 0.7

0

1.52

D1

31 3.

400 CFM

1

2

5m

400 CFM

2.41

C5

D1 600 CFM

2.16

0 0.2

33 3.

D1 400 CFM

D1

2.56

6

0.52

600 CFM

0001

Numero de projecto

D1

30 4.

HVAC Departamentos / Local Comercial

400 CFM

0.70

M5 27 0. 72 0.

1 8.1

-

Autor

-

Revisado

-

m

Fecha 78 1.

11.27°

5

5

002 Nivel 2 HVAC LOCALES 1 : 100

4

Isometria HVAC

2

HVAC NIVEL 29

3° 11.2

A118

1 : 100 Escala

1:100

y/o especificada


WWW.BETAHECA.COM

1"ø"ø 1

1 : 250

1"ø 1"ø

1"ø ø 1"

1"ø

1"ø

1"ø 1"ø

1"ø

1"ø

6"ø 1"ø

6"ø

6"ø

6"ø

6"ø

6"ø

6"ø

6"ø 6"ø

1"ø

6"ø

Elevadores

6"ø

6"ø

1"ø 1.09

6"ø

6" ø

6" ø

6" ø

6" ø

6"ø

ø 6"

6"ø

6"ø

6"ø

6"ø 1"ø 6"ø

1"ø

1"ø

6" ø

35

6"ø

6"ø

95

6"ø

6"ø

115

34

94

6"ø 6"ø

6" ø

6"ø 6"ø

28

30

91

6"ø

90 6"ø

6"ø

30

6"ø

6"ø 6" "ø ø 6"ø 6 6"ø

ø 6"ø 6"

6"ø ø 6"

6"ø

78

6

3

20

Estacionamiento discapacitados

4

5

19

6

17

NPT 8

9

10

11

13

12

4

6

14

15

0001

Numero de projecto

16 ø "

32

1

-

Fecha

1"ø

1"ø

Author

Autor 4

33

Checker

Revisado

3

35 1

A120

LP4

34

LP3

2 36

8m 1:250

18

-4.00 m 7

2

Hidrosanitario Estacionamiento

31

21

80

1"ø

Rampa de acceso a estacionamiento subterraneo

25

ø 1"

81

79

0

23

82

1"ø

2

ø 1"

83

6"ø

6"ø

6"ø

ø 6"

22

1

6"ø

6"ø 6"ø

6" ø

ø 6"

77

1.10

6"ø

ø 6"

76

24

6"ø

NPT

85

6"ø

-3.80 m

6"ø

ø 1"

ø 6"

2.51

6" ø

6"ø

84

6"ø

ø 6"

75

6" ø

6"ø

6"ø

74

5

ø 1"

86

4 12

7

26

6" ø

6"ø

ø 6"

3 12 ø 1"

6"ø

Elevadores

87

6"ø

27

88

2 12

6"ø

73

28

89

6" ø

6"ø

6"ø

121

6"ø ø 6"

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

29

29

6" ø

120

72

6"ø

1"ø

6"ø

ø 6"

71

119

6"ø

6"ø

31

92

118

70

CITELIS Stela City

32

93 6"ø 6"ø

6"ø 6"ø

ø 6"

6" ø

69

117

2.48

0.66

Elevadores

27

93

116

33

DN

1"ø

1"ø

6"ø

6"ø

6"ø

65

26

36

96

114

6"ø

37

64

Isometria Extraccion Estacionamiento

97

66

6"ø

38

98

67

6"ø 6"ø

2

6"ø

6" ø

1"ø

6"ø

ø 1"

99 ø 6"

ø 6"

68

6"ø

ø 6"

6"ø

6"ø

1"ø

6"ø

6"ø

6"ø

39

0 10

Elevadores

6"ø

9

8

1"ø

25

6" ø

ø 6"

10

6"ø

40

1 10

6"ø

41

6"ø

6"ø

1"ø

6"ø

ø 1"

6"ø

6"ø

-3.80 m

6"ø

11

6"ø

6"ø

10 4

NPT

1"ø

6"ø

1"ø

6"ø

6"ø

3 10

3 11

6"ø

24

10 5

ø 6"

2 11

Elevadores

6"ø

6"ø

42

6" ø

6"ø

1 11

6"ø ø 6" 6"ø 2.51

6"ø

ø 6"

ø 6"

6" 6"ø ø ø 6" 2.51

6"ø

63

6"ø

6"ø

43

6"ø

1.09

0 11

106

ø 1"

109

1"ø

44

6"ø

6"ø

6"ø

1"ø

6"ø

45

1"ø 6"ø

6"ø

46

108

62

6"ø

107

Bethuel Serbulo A00808771

6"ø

6"ø

6"ø

47

Estacionamiento discapacitados 1"ø

6"ø

6"ø

48

NPT

62

23

ø 1"

60

61

12

50

-4.00 m

59

13

51

49

58

1" ø

52

6"ø

6"ø

57

14

55

56

53

6"ø

6"ø

1"ø

54

Hector Niño A00810504

6"ø

6"ø

1"ø

6"ø

1"ø

Rampa de acceso a estacionamiento subterraneo

ÁREA ESTACIONAMIENTO: 4566 m2

LP2

22

15

6"ø

1"ø

6"ø

6"ø 6"ø 6"ø 6"ø

1"ø

Carolina Rdz A00810722

6"ø

21

6"ø

6"ø

16

6"ø

Jose O. Gonzalez A0036670

6"ø

20

1"ø

17

1"ø

1"ø

6"ø

18 19

Elevadores

1"ø

1

LP

1"ø 1"ø

HIDROSANITARIO ESTACIONAMIENTO

Escala

1:150


004 Nivel 4 12.00 m

LOBBY OFICINAS

4.00

3

1 : 100

° .25 11

NPT 8.00 m

° .25 11

1

PLANTA TIPO OFICINAS

1 : 100 003 Nivel 3 8.00 m .2 11 5°

.2 11

8.00 m

5° 0.0

BAÑOS

2

1"ø 2"ø 2"ø 4

6

2 0.1

1

0.5

4"ø

2"ø

0.1

0.8 1.2

6

HIDROSANITARIO LOBBY 1 : 100

2

2

004 Nivel 4 12.00 m

3

7

1"ø 2"ø ø " 4

6

.50

1"ø

SALA DE JUNTAS

3

7

0

0.3

4

0.1

1.2

NPT 0.00 m

2

.50

1"ø

2

0.8

WWW.BETAHECA.COM

9

0

3 0.2

0

0.3

1"ø 2"øø 2"

1

0.5

0.7

OFICINAS

3 0.2

0.1

1.2

4"ø

0.7

9

0

2"ø

4 1"ø "ø

4"ø

ALMACÉN

NPT 8.00 m

OFICINA PRINCIPAL

9 0.0

RECEPCIÓN

2"øø 2"ø 1"

BY OB

AS IN FIC F O

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES

003 Nivel 3 8.00 m

1 1.7

.29 90 0.1

1.

L

1 1.7

2"ø

.29 90 0.1

2"ø

2"øø 2""ø 1 18

2m 7.9

9m 7.8

2"ø

2"ø

BAÑOS

Jose O. Gonzalez A0036670

4.00

0.0 1.2

Especificaciones

8.00 m

9 0.0

8 1.1

NPT 0.00 m

5

NPT 8.00 m

HIDROSANITATARIO OFICINAS

Nota: Todos las cotas son metros.

1 : 100

6 6

NPT 0.00 m

Nomenclatura

SERVICIO

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

m

m

1 8.1

1 8.1

NPT

Simbologia Nivel Cambio de acabado en piso Cambio de nivel 5

5

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1:100 0

2

5m

Hidrosanitario Oficinas / Lobby Oficinas 0001

Numero de projecto

2

3D HIDROSANITARIO OFICINAS

4

Fecha

-

Autor

-

Revisado

-

A122

3D HIDROSANITARIO LOBBY Escala

1:100

y/o especificada


WWW.BETAHECA.COM

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES -Referirse a planos de HVAC y Pluvial -Todas las tuberias de drenaje tendran una pendiente del 2% -Especificaciones de tuberias: Gas: Cobre rigido de 1/2" L Agua: Cobre 3/4" Drenaje Hidrosanitario: PVC 2" 4" 6" Ventila: PVC 2" -Alturas de las salidas (Agua y gas) Lavabo: Regadera:

Nomenclatura

3

Isometria Hidrosanitario Hotel Planta Tipo Isometria Hidrosanitario Hotel Lobby

002 N.S.L 4.00 m

4

4.00

N.Plafon 2.38 m

0.00 m

BAP

Bajante agua pluvial

BAN

Bajante de aguas negras

BG

Bajante gas

V

Ventila

PAA

Pluvial aire acondicionado

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

Base del Equipo 1.10 m

14

Corte Detalle de Sanitario

Nivel de piso terminado

Agua caliente

NSLA

Nivel superior de Losa azotea

Agua fria

NSF

Nivel superior de firme

Gas

NSL

Nivel superior de Losa

Nivel

Simbologia

REXOLIT COLADERA INSTA-REX 100 MM

Nivel

1 : 100

CALOREX CALENTADOR DE PASO 20 L GAS NAT

Cambio de acabado en piso

Subida Agua/Gas

Cambio de nivel

Drenaje

CITELIS Stela City

8.2 0m

8.2 0m

6

14

51 1.

R1

13

1 1/2"ø

L1

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

13

v v

I2 42 1.

1 1/2"ø

4"ø

1

1/2 "ø

R1 4" ø

1

1/ 2" ø

ø 2" v

v

I2

L1

Nomenclatura NPT

Simbologia

001 Nivel Acceso 0.00 m

- La separacion entre el agua fria, caliente y gas, es de 15 cm, horizontal y verticalemnte. - La altura para la salida de agua de los lavabos es de 50 cm. - La salida de agua en las regaderas es de 1.2 m en las llaves y 1.8 m en la cebolleta. - La salida de agua para la lavadora esta a .90 m. -La salida de agua de los inodoros esta a . 30 m. La salida de gas para la estufa esta a .60 m. La salida de gas para los calentadores esta a .40 m. La bajante para agua para el boiler esta a .70 m sobre el NPT.

4"ø v v 6" ø

v

LO BB 6" ø YH OT EL

7.9

ø 2"

0.8 2"ø 4

BAN

BAN

ø 4" 3/

0.9 2

6"ø

2"ø

1/2

6"ø

6" ø

2"ø

2"ø

"ø

2" ø

"ø

v

1.2 0

3/4 "ø

v

2" ø

3/4 "ø

"ø v

v

11 .24 °

11 .2 6°

v

11 .24 °

2

Hotel Hidrosanitario Planta tipo 1 : 100

Hidrosanitario Hotel / Lobby Hotel

v

11 .2 6°

3/4

5m

v

0.8 9

v

2

v

0.8 4

3/4 "ø

3/4

3/4

Boil er

v

0.8 4

3/4

"ø

6"ø

1/2

3 0.7 /4"ø 2

6" ø

"ø

2"ø

12

0

2" ø

v

SAP

GA S

12

1:100

0.8 1

Cubo de BAP Instalaciones v BAN

v

v

6" ø

2"ø

Cubo de BAP Instalaciones

2" ø

BAN

v

BG

"ø

2"ø

2"ø

2"ø3/4"ø

1.2 7

3/4 "ø

ø 4" 3/

6" ø

"ø

"ø

3/4

1/2

v

0.8 5

6" ø

6"ø

2"ø

v

8m

7.9

8m

ø 4" 3/

1

Hotel Hidrosanitario Planta Nivel Acceso/Lobby 1 : 100

0001

Numero de projecto Fecha

-

Autor

-

Revisado

-

A123 Escala

1:100

y/o especificada


11 .2

031 Nivel Hidrosanitario Azotea

1

18

1 : 100 17 8.75 m

11 .24 °

NSLA 120.15 m

16

8.61

m

WWW.BETAHECA.COM

NSLA 120.15 m

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

45 0. 07 1.

BAN

2"ø

ESPECIFICACIONES

55 0. 10 1.

ø 2" 37

0.

18

ø 4"

0.

ø ø 1" 2" 0. 19

Nomenclatura

BAN BAP

ø 4" 4"ø

10

NSLA 120.05 m 4 A124

e nt ie nd Pe

"ø ø 1 2"

0.

5

Ventila

9.34

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

2%

4" ø

NPT

5

m

24

6 0. 3

Simbologia

1. 2

0

1.

ø 1"

32 8.

A124

0.

48

Nivel Cambio de acabado en piso Cambio de nivel

4

4

8.4 8

Corte Hidrosanitario Locales 11.42

4.00 m

BAP

1 : 100 002 N.S.L 4.00 m

m

031 Nivel 31 120.00 m

002 N.S.N 119.70 m

NSLA

4.00

N.Plafon 2.38 m 4.00

120.15 m

2

Hidrosanitario Locales Comerciales

3

Base del Equipo 1.10 m 002 N.S.O 116.00 m 002 N.S.P 115.60 m 001 Nivel Acceso 0.00 m

030 Nivel 30 116.00 m

NSLA 120.15 m

1 : 100 0.00 m

5

Corte Bajante Pluvial

11.27° 3° 11.2

1 : 100

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1:100 0

2

5m

Hidrosanitario Local Comercial / Azoteas 0001

Numero de projecto

3

Isometria Locales Comerciales

6

Fecha

-

Autor

-

Revisado

-

A124

Isometria Bajante Pluvial Escala

1:100

y/o especificada


Hidrosanitario Nivel 29

1

18

2

1 A103

1 : 100

8.75 m

17

Drenaje Nivel 29

18

1 : 100 8.75 m

17

8.61

m 8.61

16

m

16

WWW.BETAHECA.COM

4"ø

2m 1.2

"ø 3/4 "ø 3/4

3m 0.2 0m 0.7 m 5 1.0

ø 2"

6m 1.0

m 1.85

3/4"ø

m 1.69

BG

BAN BAP

4.00

6"ø

6"ø

ø 2"

ø 3/4" ø 3/4"

116.00 m

002 N.S.O 116.00 m 002 N.S.P 115.60 m

Ventila

0.95 m .92 m 0 m 1.10 1.02 m

"ø 1/2

119.15 m

Bethuel Serbulo A00808771

2" 2 ø "ø

-Referirse a planos de HVAC y Pluvial -Todas las tuberias de drenaje tendran una pendiente del 2% -Especificaciones de tuberias: Gas: Cobre rigido de 1/2" L Agua: Cobre 3/4" Drenaje Hidrosanitario: PVC 2" 4" 6" Ventila: PVC 2" -Alturas de las salidas (Agua y gas) Lavabo: Regadera:

- La separacion entre el agua fria, caliente y gas, es de 15 cm, horizontal y verticalemnte. - La altura para la salida de agua de los lavabos es de 50 cm. - La salida de agua en las regaderas es de 1.2 m en las llaves y 1.8 m en la cebolleta. - La salida de agua para la lavadora esta a .90 m. -La salida de agua de los inodoros esta a . 30 m. La salida de gas para la estufa esta a .60 m. La salida de gas para los calentadores esta a .40 m. La bajante para agua para el boiler esta a .70 m sobre el NPT.

Nomenclatura

030 Nivel 30 116.00 m 1.15 m

25 m m 0.90 m 1. 1.09 m 1.07

115.19 m

114.88 m

6

Hector Niño A00810504

ESPECIFICACIONES

4m 0.5

"ø 1/2

031 Nivel 31 120.00 m

119.00 m

Carolina Rdz A00810722

6"ø

1/2"ø

4m 0.5

002 N.S.N 119.70 m

6"ø

2"ø

BAN

3/4"ø

F BA

Jose O. Gonzalez A0036670

Corte Sanitario Nivel 30 1 : 100

BAP

Bajante agua pluvial

BAN

Bajante de aguas negras

BG

Bajante gas

V

Ventila

PAA

Pluvial aire acondicionado

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

Nomenclatura NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

Agua caliente

NSF

Nivel superior de firme

Agua fria

NSL

Nivel superior de Losa

Simbologia

18 18 17

8.75 m

8.75 m

17

11.27° 8.61

m

m 8.61

16

Simbologia

Nivel

Nivel

REXOLIT COLADERA INSTA-REX 100 MM

Cambio de acabado en piso

CALOREX CALENTADOR DE PASO 20 L GAS NAT

11.27°

3° 11.2

Gas

3° 11.2

Cambio de nivel

Subida Agua/Gas Drenaje

16

CITELIS Stela City

3/4 "ø

3/4"ø

2"ø

8m 1.8

6"ø

8m 2.1

2m 1.4

BAC

4"ø

0.76 m

1.84 m

Ventila

6m 0.7

6m 0.7

BAF

1.84 m

6"ø

3m 1.1

3m 1.1

m 1.13 m 0.76

BAN

4" ø

3m 1.1

BAC

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

3/4"ø

6"ø BAN

BAF

BAP

2"ø 2" ø

1/2"ø

3/4 "ø

1:100 0

"ø 3/4

2

5m

Hidrosanitario Departamentos

3/4 "ø

0001

Numero de projecto

11.27°

11.27°

3

Hidraulico Nivel 30 1 : 100

3° 11.2

3° 11.2

4

5

Isometria De La Red Hidrosanitaria

Fecha

-

Autor

-

Revisado

-

A125

Drenaje Nivel 30 1 : 100

Escala

1:100

y/o especificada


0.90 m

0.75 m

D 2

D

2.41 m

0.35 m

1.96 m

3

0.35 m

3

1.40 m

A 0.80 m

1.25 m

2.5 m

26 W

2.5 m

E

75 W 2

120 W

D

120 W

2.5 m

A

0.70 m

2.5 m

H 4 3

120 W

2.5 m

A

1.55 m

1

120 W

2.5 m

B

B

B

3

120 W

2.10 m

4

60 W

120 W

2.5 m

G

2.5 m

A

4

60 W

2.5 m

G 0.70 m

Nomenclatura

3

120 W

2.5 m

A

26 W 0.45 m

A

3

G 4

0.45 m

F 4

4

0.50 m

50 1

0.40 m

3

3

50 1

2.5 m

85 2

50 1

3

120 W

2.5 m

A 3

26 W

2.5 m

A

B

Nivel

F

4

60 W

2.5 m

F

85 2

1.40 m

0.10

85 2

Cambio de nivel

1.30 m

85 2

0.25 m

50 1

E 5

0.10 m

2.70 m

E

m

2 2.5 m

75 W 2

0.25 m

3 C 1

3 3 B 1

75 W 2 J 2

A 1

INTERRUPTOR GENERAL

0.20 m

50 1

0.60 m

1.20 m

2.5

3

1.40 m

60 W

3

3

26 W

1.40 m

120 W

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

2.5 m

D

3

5

E 2

2.5 m

60 W

3

0.60 m

2.5

C 3

D

26 W

PLC1

J

1.40 m

Ver requerimientos eléctricos de sistema de aire acondicionado en plano de HVAC

1

CENTRO DE CARGA

0.40 m

001 - Nivel Acceso Locales Eléctrico 1 : 50

3

26 W

2.5 m

C

1.45 m

1010 W 3

ACOMETIDA CFE

IG

5

0.90 m

2

SIMBOLOGÍA MEDIDOR

D

0.50 m

1.45 m

M

0.70 m

0.20 m

26 W F

2.5

Owner Project Name

1.10 m

1.00 m

120 W

1.30 m

F 2

E

5

0.79 m

G

75 W 2

1.00 m

1.10 m

2.5 m

60 W

1.00 m

26 W

26 W

2.5 m B 3

0.80 m

E

26 W

1.10 m

2.10 m

2

0.90 m

0.80 m

2.5 m

0.20 m

0.40 m

H 2

0.40 m

3 0.40 m

0.40 m

0.80 m

3

H

2

75 W 2 3.29 m

2.5 m

3

26 W

E

3

0.90 m

1.80 m

m 0.90

2.5

3

I

2

2.5

0.80 m

0.40 m

1.00 m

5

120 W

0.10 m

3

3 26 W

0.65 m

5

D 5

1.60 m

G 2

E

0.70 m

C 3.41 m

75 W 2

2.5

A 3

0.20 m 0.25 m

2.5 m

120 W

0.50 m

I 2

2.5 m

C

1

75 W 2

2

2.5 m

60 W

3

3

m

120 W

5

2.90 m

0.20

1

75 W 2

1.20 m

50 1

3

2.05 m

26 W

2.5 m

3

1.10 m

C

POC1

1010 W 6

1:50

Ver requerimientos eléctricos de sistema de aire acondicionado en plano de HVAC

2

0

003 Nivel 3 Oficinas Eléctrico 1 : 50

CONTACTO DUPLEX EN MURO SALIDA DE TV APAGADOR APAGADOR VAIVEN

I

SALIDA DE INTERNET

ILUMINACIÓN SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

ALTURAS DE MONTAJE - ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T

Numero de projecto

10 m

Issue Date

Autor

Author Checker

Revisado

VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS

-TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

Project Number

Fecha

H122

NOTAS SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

4

Eléctrico Oficinas -Locales

SALIDA TELEFONO

TV

Nivel superior de Losa

Cambio de acabado en piso

75 W 2

2.75 m

2.5 m

NSL

2.00 m

0.65 m

D 2

75 W 2

120 W

Nivel superior de firme

Simbologia

2.50 m

1

NSF

1.40 m

2

75 W 2

Nivel superior de Losa azotea

A

A

50 1

NSLA

1.20 m

26 W

2.5 m

Nivel de piso terminado

60 W

2.5 m

120 W

NPT

0.10 m

85 2

50 1

0.40 m

75 W 2

2.5 m

A

2.20 m

2.5 m

E

1.10 m

1.45 m

2.5 m

1.60 m

120 W

26 W

2.80 m

1

2.5 m

50 1

0.40 m

1.30 m

120 W

1.15 m

B

26 W

2.5 m

1.70 m

2.5 m

Bethuel Serbulo A00808771

2.10 m

1.17 m

B

D

120 W

3

3

75 W 2

2.70 m

3

2.15 m

75 W 2

26 W

1

Hector Niño A00810504

1.20 m

85 2

120 W

2.5 m

H

Carolina Rdz A00810722

1.40 m

0.40 m

75 W 2

2.5 m

1.30 m

1.30 m

0.70 m

2.80 m

A

26 W

0.70 m

E

2.80 m

1.30 m

2.5 m

4

Jose O. Gonzalez A0036670

85 2

0.50 m

50 1

1.00 m

1

26 W

2.80 m

D

120 W

75 W 2

2.70 m

2.5 m

3

50 1

1

1.00 m

85 2

A

2

26 W

H

1.00 m

1.15 m

2.5 m

1

1.70 m

26 W

75 W 2 2.70 m

2

0.50 m

A

1.20 m

2.5 m

2.70 m

120 W

2

2

2.5 m

1.00 m

50 1

1.55 m

2

1.00 m

2.90 m

1

2.5 m

75 W 2

26 W

0.90 m

D

1

75 W 2

4

0.80 m

2.5 m

1.20 m

26 W

2.5 m

2.5 m

H

3

2

1

2

2.5 m

50 1 50 1 50

1.40 m

75 W 2

75 W 2

120 W

1

75 W 2

75 W 2

4

1.20 m

120 W

0.30 m

2.95 m

1

0.15 m 0.15 m 0.15 m

A

3

2.5 m

WWW.BETAHECA.COM 0.80 m

A 120 W

H 0.50 m

E 2 1

2.5 m 85 2

1.10 m

2.5 m

120 W

120 W

1.30 m

1.70 m

3

1

4

1.30 m

2.5 m

85 2 1.40 m

26 W

1.45 m

1.30 m

3 2 1.00 m

Escala

1:50

y/o especificada


LP

18

19

17

LP2

20 1.10 m 11.23°

8.75 m

LP3

16

21 8.61

11.2 7°

m

80.35 m 1.38

9 1.1

9m

11 .24 °

1 3.9

8.4

E1

LP2

22

E1

D

D

44W

2.5

C8

44W

D C8

D

2 .5 44 W

44 W

D

C 8

2 .5

D

C9

D

2. 5

D

44 W

44 W

D C 9 2. 5

44W

2.5

C10 44W 2.5

8.90

B

10.10 6.00

6.00

C8

44W

C9

44W

2.5

A

2.5

A

4.10

44W

C9

44W

C8

44W

2.5

2.5

C

2.5

C

2.5

C

A

3.52

C

0 C1

W 44 A

2.5

A

C1 0 2. 5

A

44 W

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

4.10

A 2.5

C10 44 W

A

2.5

A

44 W

2.5

6.00

2.5

C9

A

44W

A

44W

2.5

C9 A

6.00

A

44W

2.5

. 11

8.90

A 2.5

2.86

44W C8

2.5

44W

44W

C8

C

C

2.5

C8

47 5.

W 44

C

32

5.57

5.54

3

4° 11.2

1

Planta tipo estacionamiento 1 : 200

11.26°

8.69 m

2

Fecha

-

Autor

-

Revisado

-

H123

LP4

34 35

1

8m

0001

Numero de projecto

112.33 m LP

6

1.44

1.10 m

1.43

-TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

° .25 11

33

8.6 3m

NOTAS

° 25

4

Electrico Estacionamiento

VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS

36

2

1:200

NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T

1.

E1

0

E1

2 .5

2.5

W 44 C 41

C8

m

m

- ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO

31

4.35

E1

ALTURAS DE MONTAJE

5 2.

C9

C10

44W

2.5

A

C1 0

44 W 2. 5

C9

44 W

C8

44W

1.58

C8

W 44

C

C

44W

C8

CITELIS Stela City

W 44

A

Cambio de nivel

SALIDA DE INTERNET

29

C

44 W

C9

C9 2 .5

2. 5

Cambio de acabado en piso

SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

C

4.

44W

0. 40

2.5

5 2.

C

C8

Nivel

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

44W

C8

C9

2.5

C9

C

3. 42

Simbologia

30

W 44

44W

C

2.5

32 8. A114

LP4

SALIDA DE TV

C

-4.00 m

44W

C

m

4.04

2

8.4 8

Nivel superior de Losa

44W

2.5

C

2 .5

C10

2.5

C10

2.5

1 8.1

09

E1

1. 37

NSL

C8

44 W C

0 C1

A

4.

Nivel superior de firme

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

W 44

W 44

NSF

ILUMINACIÓN

28

0 C1

2.5

4

C

ELEVADORES

A

2.5

5

44W

W 44

C9

C8

C9

C1 0 2.5

Nivel superior de Losa azotea

E1

2.5

A

NSLA

5 2.

2m 7.9

RES ADO ELEV

2.5

2.5

44W

SALIDA TELEFONO

C

44W C

A

C8

6

2.5

2.5

10.10

0 1.2

44W

C9

7

C8

C1 0 44W C10 A 2.5

27

44W

A

0 3.1

m 7.81

E1

C9 2.5

A

Nivel de piso terminado

44W C

44 W

2.5

2.5

44W C10 A 2.5

44W

2.5

4.10

1.38

1.36

7.76 m

44W

C8

6.00

C10

C10

Ver requerimientos electricos de sistemas de 3.96 extraccion en Planos HVAC

8

6.00

C10 44W

E1

C9

10.08

2.90

NPT

11 .24 °

2.90

CENTRO DE CARGA

APAGADOR VAIVEN

1.56

I

8.90

DN

D

2.5

Nomenclatura

APAGADOR

D

2.5

D

2.5

E1

11.23°

B

44W

C9

44W

C10

44W

C8

3.28

6.61 m

103.08 m

2.5

10

B

TV

D

11.23°

44W

C10

INTERRUPTOR GENERAL

CONTACTO DUPLEX EN MURO

D

2.5

1.40

C9

B

44W

IG

26

1.10 m

C10

D

2.5

2.96

2.5

D

C9

B

2.5

44W

44W

MEDIDOR

44W

C8

44W

2.5

C8

D

2.5

B

M

11.2 7°

C9

D 2.5

W 44

0 C1

44 W

D

11 .2 6°

EL EV AD OR ES

2.5

B

C9

Notas: El centro de carga y el interruptor general van a una altura de 1.20 con referencia a N.P.T ,por debajo del extractor de aire

ACOMETIDA CFE

2.5

W 44

B

44W

2.5

C8

2. 5

44 W

C1 0 C8

W 44

7° 11.2

7.91 m

44 W

44W 44W 2.5

C1 0

B

2.5

11

1.10 m

5

44 W

C 10

3.0 2

B

ELEVADORES

SIMBOLOGÍA

25

44 W

2.

C9

3.69

2.5

C9 D

44W

2.5

C10

2 .5 2.5

C 10

Bethuel Serbulo A00808771

2.5

C8

D C9

D 2.5

44W C10

2.90

D

44W

2.5

6.00

44 W

Hector Niño A00810504

2 1.8

C1 0

1.2 0

8.90

8.2 0m

8m

C8

IG A C8 B CD C9 C10

Carolina Rdz A00810722

24 E1

° .25 11

B

Centro de carga

W 44

E1

Jose O. Gonzalez A0036670

2 1.3

W 44

B

0 C1 5 2.

7.9

23

0 3.9

B

44W

B

2.5

B

44 W B

12

9

0 C1

5

W 44

2.

B

2. 5

C10 44W

2.5

2.5

C9

W 44

5

C9 3.4 9

C10

B

W 44

B

8 C 2.

El centro de carga y el interruptor general van a una altura de 1.20 con referencia a N.P.T ,por debajo del extractor de aire

.2 11

C9

2.5

W 44

5 2.

-4.00 m

11 .2

2.5

44W

B

C8

13

3.47

D

C9

m 8. 41

6.00

44W

44W

3. 80

C9

B

1. 42

2.5

C9

2.5

B

44W

E1

WWW.BETAHECA.COM

2.5

44W

44W

B

2.5

C8

3. 44

C8

C8

B

C8

2.5

14

10.10

2.5

8 3.2

44W

4.10

3.78

15

36

LP3

Escala

1:200


18

18

17 17 8.75 m

8.75 m

2.15 m 2.33 m

m

8

150 5

m 1.85

0m 0.8

I

1.76

m

120 W 2

5m

120 W 2

2.5

F

E 7

F

1.83 m

1.25 m

7

E

2.5

Q

m 0.20

26 W

2.5 m

K

7

26 W

2.5

I

K 8

2.5

I

2.5

L

L 7

850W 6

150 2

500 W 1

500 W 1

2000 W 4

7 7

26 W

2.5

M

150 2

5m

2.5 7

26 W

2.5

O

7

26 W

m

2.5

O

2000 W 4

3

680 7

500 W 5

A 8 500 W 5

8

.50 m m 0 0.30

2.5 m 8

850 W 6

2.5 m

8

26 W

2.5 m

I

I 8

B

26 W B

8

2.5 m

B

2.5 m

26 W B

2.5 m

H

G

26 W

2.5 m

H

Nomenclatura

1010 W 12

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

150 W 3 G 8

F

TV

2.5 m

M

m 2.05

M

M

8

m 2.15

2.5 m 8 2.5 m 8

26 W

2.5 m

M

M

1.18 m

m 1.95

0m 1.6

2.11 m

9

39 W

6.5 m

E

1.98 m F

INTERRUPTOR GENERAL

5m 1.7

9

9

39 W

6.5 m

E

9

39 W

6.5 m

E

39 W

8

26 W

8

26 W

8

26 W

2.5 m

P

2.5 m

P

2.5 m

P

9

39 W

6.5 m

E

9

39 W

6.5 m

E

26 W

2.5 m

M

-TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

1.40 m 1.60 m

N 8

E

150 W 2

8 2.5 m

8

26 W

2.5 m

O

26 W O

8

26 W

2.5 m

O

CITELIS Stela City

150 W 2

150 W 2

150 W 2 8

26 W

2.5 m

N

150 W 2

0m

SALIDA DE TV

9

39 W

6.5 m

E

8

26 W

2.5 m

M

5m 1.6

0m 1.3

2 .0

TV

150 W 2

P 8

150 W 2

O 8

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

150 W 2

150 W 2

8

26 W

2.5 m

N

8

26 W

2.5 m

N

8

26 W

2.5 m

N

9

39 W

6.5 m

E

2.75 m

N 8

0m 1.6

SALIDA TELEFONO CONTACTO DUPLEX EN MURO

8

NOTAS

E

5m 1.5

CENTRO DE CARGA 150 W 3

VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS

1.40 m

2.25 m

IG

2.14 m

150 W 2

P

m 2.67

F

2.5 m

1010 W 14

m

2.5 m

M

- ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T

M 8

2.00

3

2.5 m

26 W

2.5 m

m 1.60

0m

8

26 W

M

SIMBOLOGÍA MEDIDOR

8

m 1.90

6.5 m

M

ALTURAS DE MONTAJE

0.30 m

26 W

2 .0

2.10 m

F 8

26 W

26 W

M

26 W

ACOMETIDA CFE 8

8

3

150 W 2

K

150 W 2

m 0.33

F

Cambio de nivel

2.5

I

2.5 m

2.5 m

26 W

150 W 2

26 W

m 1.21

26 W

8

m

8

8

Cambio de acabado en piso

26 W

26 W

2000 W 1

2.00

I

2.5 m

0m

1.26 m

150 W 3

3

150 W 2

m 1.60

2 .0

8

E 8

K

K

150 2

26 W

Nivel

3

C

Simbologia

TV

150 W 3 150 W 3

2.5

7

0.19 m

2.5 m

G

26 W

3

C

8

8

M

1.81 m

m 0.60

2.5 m

2.5 m

L

m 0.60

26 W

26 W

2.5 m

m

8

H 8

2.5

150 2

2.05

26 W 1.83 m

m 1.50

8

8

7

1010 W 11

150 W 3

1.25 m

26 W

26 W

26 W

26 W

1.35 m

150 W 3

1.40 m

2.5 m

0m 2.6

150 W 2

2.5 m

8

8

2.5 m

8

150 W 3

150 W 2

8

150 W 2

150 W 3

26 W

1.84 m

m 0.60

B

26 W

I

M

7

26 W

2.5

1010 W 13

m 0.20

m 1.41

1.48 m 8

2.5 m

M

150 W 2

26 W

1.40 m

26 W

26 W

2.5

m

C 8

8

2.59 m

m 1.13

2.5

150 2

O

I

I

Nota: Revisar los diagramas filiares de los departamentos A y B en eplano H125

M

7

26 W

2.5 m

3

B 8

2.5 m

1.28 m

D 8

500 W 5

26 W

26 W

2.20

0m 0.1 0 m 0.1

m 0.66

m 0.28

m 0.96

8

26 W

L 8

1.00 m

A

8

2.81 m

150 W 3

850 W 6

7

26 W

0m 1.2

3

26 W

7

K 7

m 1.63

500 W 5

ESPECIFICACIONES

150 2

150 W 3

I 8

150 W 3

0.2

7

9

39 W

6.5 m

E

8

26 W

2.5 m

M

8

26 W

2.5 m

N

1:50

2.45 m

0 150 W 2

APAGADOR

11.27°

APAGADOR VAIVEN

18 17

I

3° 11.2

17

16

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

1

1 : 50

0001

SALIDA DE INTERNET

SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

Electrico Vivienda Nivel 29

10 m

Numero de projecto

ILUMINACIÓN

16

4

Electrico departamentos

150 W 2

11.27°

3° 11.2

Bethuel Serbulo A00808771

1010 W 10

O 7

O 7

Hector Niño A00810504

N

26 W

2.5

5m 1 .7

150 2

Q 7

0.40 m

1.28 m

850W 6

L

L 7

26 W

I

1.21 m

500 W 1

2.5

M 7

TV

5 0.9

680 7

8

500 W 1

0.32 m

3

680 7

D

m 0.25

26 W

26 W

2.5

1010 W 12

26 W

2.5 m

2.5 m

26 W

7

150 2

26 W

26 W

N

N

Carolina Rdz A00810722

1.95 m

m

7

750 W 3

750 W 3

7

I 7 7

m

150 2

J 7

1010 W 10

8

8

Q

M

8 0.1

F

2.5 750 W 3

2.52 m

2.5

2.5

7

2.5

150 2

1.61 m

26 W

D 7

750 W 3

26 W

1m 0.4 0m 0.2

26 W

7

F

120 W 2

Ver requerimientos electricos de equipos de Aire acondicionado en Planos HVAC

7

1.97 m

120 W 2 6 0 .8

2.5

J

7

3

26 W

2.5

26 W

2.5

J

m

7

7

2.5

5 1.3

C 7 120 W 2

J

7

2.5

2.5

Jose O. Gonzalez A0036670

m 1.70

3

A

A 7

120 W 2

2.5

26 W

2.5 N 7

m 0.55

C

26 W

0m 1.5

2.5

2.5

7 7

m

26 W

F 7

3

7

A

26 W

26 W 5 1.4

2.5 7

7 0.30 m

120 W 2

120 W 2

F 7

26 W

26 W

39 W

2.04 m

m 0.35

7

Q

L

39 W 2.5

7

150 2

26 W

2.5

8

8 39 W

2.00 m

A

2.5

8

m 2.00

2.5

2.05 m

150 2

m 0.80

26 W

L

m

0 .2

3

B 7

7

2.5

26 W 0m 1.2

A 7

m

A

7

26 W

0.95 m

3 0 .1

7

120 W 2 1.00 m

B

N

2.30 m

26 W 2.5

2.5

150 2

26 W

7

N

2.18 m

1.95

7

M

2.5

WWW.BETAHECA.COM

3

7

2.5

2.5

m 1.50

1010 W 9

TV

B

16

26 W

N

3 3

A

120 W 2

7

2.5

m 2.00

2.5

120 W 2

5m 0.3

2.5

26 W

26 W

A

2.30 m

7

7

2.5

3

120 W 2

26 W

TV

16

7

39 W

39 W

2.00 m

1010 W 11

8

8

39 W

I

8.61

m 8.61

Fecha

-

Autor

-

Revisado

-

18

H124

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

2

Electrico Vivienda Nivel 30 1 : 50

Escala

1:50

y/o especificada


18

17 8.75 m

NSLA 120.15 m

8.61

m

26w

WWW.BETAHECA.COM

C1

26w

16

A

C1 26w

0.00

A

C1

0.00 A 0.00

26w C1

NSLA

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

A

26w

120.15 m

Jose O. Gonzalez A0036670

0.00

C1

ESPECIFICACIONES Nomenclatura

A 26w

0.00

C1 A 0.00

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia

Interruptor general del circuito esta ubicado en el Panel de control general del edificio. Alturas Marcadas en ESPECIFICACIONES

BAN

Nivel Cambio de acabado en piso Cambio de nivel

ALTURAS DE MONTAJE - ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO

SIMBOLOGÍA Ventila

ACOMETIDA CFE

M

MEDIDOR

IG

INTERRUPTOR GENERAL

BAN

NSLA 120.05 m

NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T

CENTRO DE CARGA

NOTAS

2%

CONTACTO DUPLEX EN MURO

TV

VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS

e nt ie nd Pe

SALIDA TELEFONO

SALIDA DE TV

-TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

APAGADOR APAGADOR VAIVEN

I

CITELIS Stela City

SALIDA DE INTERNET

ILUMINACIÓN SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

1:50 0

4

10 m

26w C1

26w

A

C1

Electrico Azotea

A

C1 26w

NSLA

0.00

0.00 A

120.15 m

0.00

0001

Numero de projecto

-

Fecha

1

031 Nivel Eléctrico Azotea 1 : 50

Author

Autor

11.27°

NSLA

Checker

Revisado 3° 11.2

120.15 m

18

H125

17

Escala 16

1:50

y/o especificada


18

1.10 m

1

Electrico Restaurante

11.23°

17

20

8.75 m

1 : 50

11.2 7°

8.61

m

16 16 16

18 W

2.8 m

J

18 W

2.8 m

15

48 W

2.8 m

L

WWW.BETAHECA.COM

15

18 W

2.8 m

I

15

18 W

20

48 W

2.8 m

H

21

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

18 W

2.8 m

15

48 W

2.8 m

K

20

48 W

20

48 W

2.8 m

H

2.8 m

H

J

J 2.8 m

I 19

7W

2.5 m

D

ESPECIFICACIONES

15

18 W

16

18 W

16

18 W

16

18 W

16

18 W

16

18 W

16

18 W

2.8 m

M

2.8 m

J

2.8 m

J

2.8 m

J

2.8 m

J

2.8 m

J

2.8 m

J

15

18 W

2.8 m

I

20

48 W

2.8 m

H

Nota: Revisar los diagramas filiares de los departamentos A y B en eplano H125 20 7W

2.5 m

16

18 W

16

18 W

16

18 W

16

18 W J

2.8 m

J

2.8 m

J

2.8 m

J

2.8 m

J

3

J 16 A 17 C 18

16

18 W 16

2.8 m

18 W

2.8 m 16

18 W

2.8 m

J

J

18 2.5 m

7W

2.5 m

A

2.8 m

7W

26

2.5 m

A

26

7W

2.5 m

A

2.5 m

2.5 m

A

2.11

Nivel

2.14

9 2. 1

7W

26

Cambio de nivel

7W

2.03

A

26

MEDIDOR

2.5 m

2.11

5 2. 0

ACOMETIDA CFE

7W

26

2.5 m

A

2.5 m

A 7W

2.5 m

A

INTERRUPTOR GENERAL

26

7W

2.5 m

A

2 2. 1

8 2 .4 7W

2.5 m

A

2.48

SALIDA DE TV

26

26

7W

2.5 m

A

7W

2.5 m

C

APAGADOR VAIVEN

18

7W

2.5 m

C

ILUMINACIÓN

26

7W

2.5 m

A

1 2 .8

2.5 m

A

7W

2.5 m

D

19

7W

19

7W

2.5 m

D

19

7W

2.5 m

D

ALTURAS DE MONTAJE - ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO

7W

NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS 19

7W

2.5 m

D

2.48

2.5 m

D

2.78

18

7W

2.5 m

C

19

7W

2.5 m

D

NOTAS

-TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

19

7W

2.5 m

D

CITELIS Stela City

18

7W

2.5 m

C

18

7W

2.5 m

C

18

7W

2.5 m

C

19

7W

2.5 m

D

19

7W

2.5 m

D

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

C

1.98 18

7W

2.5 m

C

18

7W

2.5 m

C

2.59

3.02

18

7W

2.5 m

C

2.31 18

7W

2.5 m

C

19

7W

2.5 m

D

1:50 0

3.14

18

7W

2.5 m

A

2.5 m

C

19

7W

2.5 m

D

4

10 m

Electrico Restaurante 0001

Numero de projecto

4 2 .8 11.23°

1.10

-

Fecha

Author

Autor

11.2 7°

3° 11.2

8 2.417

D

2.97

7W

0 2 .8

16

2.80

19

7W

11.27°

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

D

19

26

SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

C

2.14

1 2. 1

SALIDA DE INTERNET

2.5 m

2.70

4 2 .8

7W

2.5 m

2.82

0 2 .3 APAGADOR

D

2.86

26

7W

C

2.5 m

2.11

SALIDA TELEFONO CONTACTO DUPLEX EN MURO

7W

7W

A

2.03

26

2.5 m

1.37

18

2.89

7W

CENTRO DE CARGA

I

7W

2.13

2.52

SIMBOLOGÍA

18

A

7W

2.5 m

TV

A

26

7W

2.70

1.97

2.5 m

A 26

IG

7W

18 2.5 m

C

2.82

C

2.52 26

2.5 m

C

2.5 m

2.87

2.5 m

7W

2.02

7W

7W

7W

18

26

18

2.85

Simbologia

Cambio de acabado en piso

18

2.85

2.89

19

2.96

2.5 m

2.5 m

2.52

3.15

18

B

26

C

2.69

2.88

Nivel superior de Losa

M

2.82

2.65

18 W

2.5 m

1.99

A

A

7W

2.8 m

1.94

Nivel superior de firme

2.5 m

2.5 m

7W

1.95

F

7W

2.02

Nivel superior de Losa azotea

26

1.95

LA

26

19

D 19

18

2.86

7W

B

15

Nivel de piso terminado

J

2.12

Nomenclatura

2.8 m

2.8 m

C

1.97

2.8 m

18 W

26

D

2.5 m

1.95

15

18 W

D

2.5 m

7W

B 15 16

2.5 m

H 20

J

M 15

2.8 m

7W

1.63

2.8 m

19 18 W

1.94

J

18 W

1.95

2.8 m

19

2.05

18 W

1.94

18 W

7W

1.95

16

H

1.96

18 W

D

1.96

16

19

0.11

M

J

2.5 m

0.59

2.01

2.8 m

2.8 m

7W

1.84

18 W

18 W

48 W

2.8 m

1.96

15

16

D

19

1.17 1.19

1.96

M

2.5 m

1.96

2.8 m

7W

1.96

18 W

D

19

1.77

15

0.06

19

T

L

19

Checker

Revisado 18

19

20

H127

21

0 2 .3

SPOT LIGHT EXTERIOR VOLTAJE: 26W SALIDA DEL LUZ A 0.00 CON REFERENCIA A NPT

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Escala

1:50

y/o especificad


18

19

1.10 m 475 W 24

17

11.23°

475 W 24

8.75 m

20

475 W 24 475 W 24

475 W 24

50500 W 21

8.61

11.2 7°

475 W 24

80 W 25

WWW.BETAHECA.COM

80 W 25

m 80 W 25

21

12254 W 22

80 W 25

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

2.95

80 W 25 80 W 25

1000 W 23

80 W 25

3 0.7

ESPECIFICACIONES

80 W

1000 W 23

6 0.8

1000 W 23

360 W 14

360 W 14

360 W 14

360 W 14

80 W 25

360 W 14

1.84

6 0.6

80 W 25

0 1.0

80 W 25

3200 W 12 80 W 25

1140 W 13

PR1 0.63

1.23

1.53

0.76

500 W 3

80 W 25

500 W 3 500 W 3

3.26

1.46

1.47

193 W 2

0.87

600 W 1 385 W 2

385 W 2

600 W 1

80 W 25

3

0.86

1.32

385 W 2

0.93

0.80

1.37

0.89

1.52

0.80

3600 W 4

3600 W 8

3700 W 6

3700 W 7

4000 W 9 3600 W 11

16

18 W

2.8 m

J

6.5 0

80 W 25

3200 W 10

Nomenclatura

T

Nivel de piso terminado

LA

Nivel superior de Losa azotea

F

Nivel superior de firme

L

Nivel superior de Losa

Simbologia

80 W 25

80 W 25

80 W 25

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

Nivel Cambio de acabado en piso Cambio de nivel

500 W 3

80 W 25

3 2 .8

SIMBOLOGÍA

4.5 0

80 W 25

M

MEDIDOR

IG

INTERRUPTOR GENERAL

2.43

ACOMETIDA CFE

80 W 25

1:50

80 W 25

CENTRO DE CARGA

0

SALIDA TELEFONO

4

10 m

80 W 25

CONTACTO DUPLEX EN MURO

3.2 5

SALIDA DE TV

8 2 .9

TV

APAGADOR

Electrico Restaurante contactos

APAGADOR VAIVEN

I

80 W 25

ILUMINACIÓN 11.27°

SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

-

Fecha

11.23°

1.10

Author

Autor

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

11.2

11.2 7°

16

1

Checker

Revisado 17

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W SPOT LIGHT EXTERIOR VOLTAJE: 26W SALIDA DEL LUZ A 0.00 CON REFERENCIA A NPT

0001

Numero de projecto

500 W 3

SALIDA DE INTERNET

18

19

20

H128

Electrico Restaurante 21

1 : 50

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Escala

1:50

y/o especificad


CUADRO DE ELEMENTOS DE CIMENTACIÓN

LP

Dimensiones (cm)

Peralte (cm)

Armado inf. X

Armado inf. Y

P1

335x335

100

23#8c/14

23#8c/14

P2

430x430

140

32#10c/13

P3

630x630

220

81#9c/7.5

P4 y P55

560x560

190

P5

710x710

P6 P7

LP2 18

17 80.35 m

19 11.23°

8.75 m

20

16

21

Cimentacion del complejo

1

#5@15

8.61

LP3

11.2 7°

m

P38

11 .24 °

(∅120 )

15

P36

(∅120 )

P53

63#10c/11

63#10c/11

770x770

275

120#9c/6.5

120#9c/6.5

76#10c/10

76#10c/10

525x525

180

46#10c/11

46#10c/11 47#10c/13

47#10c/13

35#10c/13

26#10c/18

26#10c/18

P12

580x580

200

57#10c/10

57#10c/10

41#10c/14

41#10c/14

P14

440x440

145

29#10c/15

29#10c/15

22#10c/20

22#10c/20

P15

330x330

100

15#10c/22

15#10c/22

P17

550x550

190

49#10c/11

49#10c/11

36#10c/15

36#10c/15

P18

435x435

140

30#10c/14

30#10c/14

P19

450x450

150

31#10c/14

31#10c/14

37#8c/12

37#8c/12

P20

570x570

195

56#10c/10

56#10c/10

40#10c/14

40#10c/14

P21 y P25

420x420

135

27#10c/15

27#10c/15

41#7c/10

41#7c/10

P22

390x390

120

22#10c/17

22#10c/17

25#8c/15

25#8c/15

P24

400x400

125

39#8c/10

39#8c/10

35#7c/11

35#7c/11

P26

315x315

95

19#8c/16

19#8c/16

16#8c/19

16#8c/19

P27

305x305

90

16#8c/18

16#8c/18

15#8c/20

15#8c/20

P29

305x305

90

11#10c/28

11#10c/28

P30

320x320

90

21#8c/15

21#8c/15

P49

220x220

45

11#7c/20

11#7c/20

10#6c/22

10#6c/22

P50

200x200

40

9#6c/23

9#6c/23

8#6c/25

8#6c/25

P51

190x190

40

7#6c/25

7#6c/25

7#6c/25

7#6c/25

P52

240x240

50

17#6c/14

17#6c/14

12#6c/20

12#6c/20

P53

660x660

235

89#9c/7

89#9c/7

54#10c/12

54#10c/12

P54

555x555

190

54#10c/10

54#10c/10

P56

430x430

140

28#10c/15

28#10c/15

33#8c/12.5

33#8c/12.5

P57

480x480

160

36#10c/13

36#10c/13

26#10c/18

26#10c/18

P58

415x415

135

27#10c/15

27#10c/15

40#7c/10

40#7c/10

P59

455x455

150

34#10c/13

34#10c/13

37#8c/12

37#8c/12

P60

365x365

110

20#10c/18

20#10c/18

P61

320x320

95

14#10c/23

14#10c/23

16#8c/19

16#8c/19

1.2.3.4.-

P62

315x315

90

20#8c/15

20#8c/15

15#8c/20

15#8c/20

5.- TODOS LOS RELLENOS DEBERAN SER

P63

320x320

90

13#10c/25

13#10c/25

16#8c/20

16#8c/20

P64

325x325

95

22#8c/14

22#8c/14

P65

295x295

85

11#10c/27

11#10c/27

P66

290x290

85

15#8c/19

15#8c/19

13#8c/21

P67

315x315

90

11#10c/28

11#10c/28

15#8c/20

15#8c/20

P68

310x310

90

21#7c/14

21#7c/14

15#8c/20

15#8c/20

450x310

100

30#2c/10

44#2c/10

(P10-P33)

785x385

230

55#9c/6.5

62#10c/12.5

30#10c/12.5

62#10c/12.5

(P13-P32)

360x765

275

75#10c/10

57#9c/6

75#10c/10

35#10c/10

(P16-P31)

315x525

175

51#8c/10

27#10c/11

51#8c/10

30#8c/10

(P23-P39)

315x610

215

46#10c/13

39#9c/8

46#10c/13

23#10c/13

(P28-P40)

300x385

120

25#8c/15

29#8c/10

(P41-P42)

310x225

50

18#8c/12

11#8c/29

11#6c/20

15#6c/20

(P43-P44)

335x250

55

16#10c/15

14#8c/24

(P45-P46)

325x210

40

20#8c/10

13#6c/25

8#6c/25

13#6c/25

(P47-P48)

330x195

45

8#10c/22

15#6c/22

m 8. 41

P63

(∅120 )

.2 11 5°

8.2 0m

101#9c/7

61#10c/10

P54

P4

(∅120 )

P30 (∅1

24

20)

NSZ -25.00 m

P37

(∅120 )

P35

(∅120 )

NZT

° .25 11

8m

101#9c/7

35#10c/13

23

(∅120 )

P6

(∅120 )

P65

P2

(∅120 )

7.9

(∅120 )

M20: 200x45

25

(P35-P37) y (P36-P38)

M19: 150x35

PREPARACION PARA ESCALERAS Y ELEVADOR CENTRAL

P5

(∅120 )

P21

(∅120 )

P7

P29

(∅120 )

(∅120 )

7.91 m

7° 11.2

11

26 ZAPATA

P45

(∅120 )

P8

COLUMNA

P66

(∅120 )

(∅120 )

Y

11.23°

6.61 m

NSZ -25.00 m P51

P49

(∅120 )

(∅120 )

1

10

PEDESTAL ZAPATA

1

103.08 m

27 P42

P34

P33

P39

P44

(∅120 )

NOTAS: DIMENSIONES EN CENTIMETROS NIVELES EN METROS CONCRETO f'c=350 kg/cm2. ACERO DE REFUERZO f'y=4200 kg/cm2. COMPACTADOS DE ACUERDO A ESTUDIO DE MECANICA DE SUELO

13#8c/21

6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO 7.- VER ESPECIFICACIONES EN ACI-318-99 A) ZAPATA Y LOSA DE CIMENTACION 7 cms. B) TRABES DE CIMENTACION 5 cms. C) PEDESTALES 5 cms. D) COLUMNAS 4 cms. 9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN. 10.- VERIFICAR DETALLES DE COLUMNAS EN PLANO H137

SIMBOLOGIA A.B.

ARMADO BASE

R.S.

REFUERZO SUPERIOR

R.I.

REFUERZO INFERIOR REPETIR ARMADO A LO LARGO DE FLECHA

ARMADO EN AMBOS SENTIDOS

PLANTILLA CONCRETO POBRE f'c=100kg/cm²

REFUERZO POR PUNZONAMIENTO

N.P.T.

28

(∅120 )

(∅120 )

(∅120 )

(∅120 )

P28

P23

P43

P41

P9

(∅120 )

Bethuel Serbulo A00808771

NSZ

1.25 m P10

(∅120 )

Hector Niño A00810504

N.F.E.

1.25 m

9

CORTE A121

DETALLE DE ZAPATA AISLADA

P40

(∅120 )

(∅120 )

(∅120 )

(∅120 )

(∅120 )

Carolina Rdz A00810722

COLUMNA

P22

(∅120 )

Jose O. Gonzalez A0036670

X

P46

(∅120 )

(∅120 )

WWW.BETAHECA.COM

8.- RECUBRIMIENTO MINIMOS LIBRES:

(P9-P34),

12

2388

37#10c/15

250

61#10c/10

22

11 .2

P56

37#10c/15

155

(∅120 )

P55

55#10c/10

215

P1

(∅120 )

47#10c/13

55#10c/10

470x470

P3

13

33#8c/12.5

47#10c/13

(∅120 )

(∅120 )

14

33#8c/12.5

81#9c/7.5

620x620

P64

(∅120 )

32#10c/13

P8

LP2 9m 8.4

Armado sup. Y

P11

1.35 m

1 : 200

Armado sup. X

0.12

#3@20

#5@15

Referencias

SEGUN MECANICA DE SUELO

1 : 50

TABLA DE CUANTIFICACION

P.

NIVEL FOSO ELEVADOR

Nivel superior de Zapata NIVEL PISO TERMINADO

Nivel

Nota: Todas las zapatas ban a -25 m

COLUMNAS

Ubicacion de carcamo para caida de agua.

m

11.23°

.69 101

7.76 m P52

P50

(∅120 )

(∅120 )

P48 (∅1 20)

P57

(∅120 )

P67

(∅120 )

P24

P12

(∅120 )

(∅120 )

P47

(∅120 )

8

CITELIS Stela City

29

11.2 7°

m 7.81 NSZ -25.00 m

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

PREPARACION PARA ESCALERAS Y ELEVADOR CENTRAL P11

NSZ -25.00 m

(∅120 )

P20 (∅1

P27

(∅120 )

M2: 170x35

20)

P25

(∅120 )

M16: 110x30

7

30

11 .24 °

2m 7.9

#5@15

P17

P58

(∅120 )

(∅120 )

P68

P14

(∅120 )

(∅120 )

P32

(∅120 )

120

P13

(∅120 )

0

1 A12

4

6

(∅120 )

P26

120

(∅120 )

8m 1:200

11 .2 6°

P19

m

60

2

31

1 8.1

6

Estructural Cimentacion

Ubicacion del plano en el conjunto

P59

(∅120 )

P62

32 8.

(∅120 )

m

5

A120 2

.2 11

#5@13

0001

Numero de projecto

32

IRE#3@25 HORIZONTAL (A TODO LO LARGO) Y IRE#3@15 VERTICALMENTE (DISTANCIA INDICADA)

-

Fecha P18

(∅120 )

P15

SOTANO 3

#5@13

Cimentacion Replanteo Concreto: f'c=350 Aceros en cimentación: fy = 4200 Escala: 1:200

30

#3@20

#4@15

100

60

(∅120 )

75

2

Corte A120 Muro de contencion MC-1

#5@15

40 25

105

8.4 8

P60

P31

(∅120 )

4

LP

33

4° 11.2

H132

1.35 m 11.26°

8.69 m

2

LP4

34 35

1

36

112.33 m

Checker

Revisado

P16

3

130

(∅120 )

(∅120 )

PLANTILLA DE CONCRETO POBRE f'c=100kg/cm ²

LP4

P61

(∅120 )

8.6 3m

Author

Autor

° .25 11

m

LP3

Escala

1:200 y/o especificada


-001 Est a c i on a m i en t o 1 Re pl an te o Co n cre to : f' c =300 Ac ero s e n l osa s: fy = 4200 E sc a l a : 1: 500

V-25

P36 P38

Marco 1

1#3

)

80

80

3#4

80

)

8#5

6#5

3#4 Insuf.

P53

(∅120

80 100x

(∅120

80

Mar co 33 Mar co 32

Insuf.

1#3 3#4

P64

100x80

80

)

80

(∅120

80

)

80

(∅120

100x80

3#4 Insuf. Insuf. 11#5

Insuf.

Insuf. 1#3

7#5

1#3 100

Insuf.

100

x80

Insuf.

1#3

)

21#5

4#3

19#4

(∅120

7#4

Insuf.

19#4

)

22#4

1#3

Insuf.

6#3

10 0x8

4#3

9#5

4#3

64

13#4 Insuf.

6#3

8#4

R3 h=40

1#3

18#4

R2 h=40

100x80

7#3 6#3

5#5 L=260

8#5 18#4

5#3

6#3

7#3

19

6#3

100 x80

x80

R7 40 h=

)

7#3

7#4

12#3

11#3

7#3

Insuf.

8#5

0x8

Insuf.

Mar co

L1 h=2 0

L2 h=20

6#3

(∅120

8#3

)

5#3

Insuf.

42 rco

o 39 Marc

0x 80 10

L4 h=20

20 x20

10 0x 80 45 rco

Ma

23 10#3

6#3

x80 100

Mar

B1

Insuf.

47

co

Insuf.

11#3

4#3

4#3

1#3 Insuf. Insuf.

6#3

5#3

20#4

10 2#3 7#3

20#4

0x 80

8#3

1#3

(∅120

4#3 6#3

19#4

P46

(∅120

Insuf.

19#4 8#4

P66

6#3 14#5

B31

x80 100

(∅120

h= L8 20

13#3 22#3

Insuf.

Marc

13#3

o 3

45x2e#2c/12 539

113

53

58x2e#2c/12 686

53

53

59x2e#2c/12 698

53

53

76

76

76

76

76

76

76

76 59x2e#2c/12 707

53

53

62x2e#2c/12 739

53

53

62x2e#2c/12 744

53

53

64x2e#2c/12 760

53

53

51x2e#2c/12 609

53

12x2e#3c/12 144

18

113

-001 Estacionamiento 1 Estructural - V-25

19

WWW.BETAHECA.COM

17

1.35 m 8.75 m

1 : 150

P36

(∅120)

3#3

Insuf.

P38

1#3

Insuf.

Insuf.

(∅120)

Insuf.

100x80

6#4

4#3

3#3

2#3

1#3

100x80

6#3

3#3

11#3

Insuf.

)

)

)

5#3

P51

(∅120

P49

10#3 7#3

19#3

2#3

100 x80

10

20x20

100x80

3#3

Mar co

x80

5#3 7#3 20#3

Insuf. Insuf.

5#3

100

6#3 13#3

Insuf.

100x80

6#4

9#4

R11 h=40

B37 x80

2#3

Insuf.

)

(∅120

Insuf.

4#3

13

Insuf. 2#5

(∅120

Insuf.

100

Mar co

1#5

P22

10#3

)

13#4

5#3

)

4#3

P8

(∅120

Insuf.

6#3

)

7#3 Insuf.

)

10#4

R16 h=40

8#4

20x2 0

Insuf.

(∅120

1#3

P45

Insuf.

P56

4

3#5

5#4 4#3

x80 100

L5 h=20

L7 20 h=

7#3

Insuf.

6#4

Insuf.

7#5

8#3

13#5

0

100x80

8#3

100x8

Insuf.

4#3

1#3

2#5 Insuf.

4#3

4#3

12#4

Insuf. 2#3

7#3 11#3

B34

7#3

Insuf.

14#5

3#3

x80

)

12#3 6#4

x80 100

100

P29

(∅120

7#5

Insuf.

20 20x

11#4 4#3

4#8 L=980 4#6 L=890

4#6 L=900

x80

7 8#3 7#3 9#3

8#3 5#4

2#3

17#3

5#3

co

6#3 7#5

12#3

Insuf.

Insuf.

1#3

4#3

B7

Mar 5#3

11#3

Insuf.

20#4

Insuf.

Insuf.

12#3

5#3

Insuf.

4#6 L=615

100

Insuf.

3#4

3#4

4#3

0 0x8

3#3

)

Insuf.

6#4

11

10

P21 (∅120

0 R1 40 h=

co

15#5

Insuf.

4#3

Mar

6#3A.LATERAL L=920 30

5#6 L=930

5#3 3#4

Insuf.

10#3 9#3

6#3

)

1#3

M19: 30

Insuf. P5

(∅120

4#6 L=485

4#6 L=825

6#3A.LATERAL L=930 32

5#6 L=900

18#4 2#3

Insuf.

Insuf.

31

6#3A.LATERAL L=915

9#6 L=880

6#3

9#3

Insuf.

2#3

8#5

6#3A.LATERAL L=910

9#6 L=845

Insuf.

7#4 5#3 12#3

L3 h=20

11#3

Insuf.

3#3

6#3

8#3

80

14#5

0

4#3

6#4

Insuf. 5#3

0 x2 20

R1 h= 4 40

2#3 18#4

32

6#3A.LATERAL L=875 30

5#6 L=850

0x

0x8

Insuf.

Insuf.

R8 40 h=

4#3

20 x20

B6

19#4

Insuf.

Estribos

8#3

2#4

B30

M20: 30

10

10

4#3

6#3 13#4

Insuf.

4#3

B33

9#3

2#3

19#4

Insuf.

100x80

Insuf.

5#3 5#3

Insuf.

100x80

18#4 9#4

15#5

100 x80

20 20x

x80

2

100 x80

100

4#3

Insuf.

6#3A.LATERAL L=865

5#6 L=840

4#6 L=680

5#3

12#4

11#3 6#3 6#3

3#3

11#4

)

)

B8

27#3

co

Insuf.

Insuf.

19#4

8#3

1#3 4#3 6#3

P7

(∅120

Insuf.

5#6 L=745

INFERIOR

P65

18#4

10 0x 80

100x80

2#3

20x20

30

6#3A.LATERAL L=855

31 2#4 Insuf.

4#3

Insuf.

P2

8#3

Mar

1#3

R1 h= 2 40

7#4

32

6#3A.LATERAL L=710

13#3

2#3 6#3

7#3

(∅120

5#4

20x20

Insuf.

5#3

2#4

6#4

2#4

Insuf.

Insuf.

5#3

B9

1#3

100x80

7#4

6#3

5#3

17#3

Insuf.

16#4

100x80

Ma

0 10

R6 h= 40

16#5 Insuf.

Insuf.

100x 80

Insuf.

5#3

11#4

100x80

12#3

10#3

10#3

8#3

6#3

9

5#3 L=925

31

)

4 18#3

6#3

9#3

17#4

31

5#3 L=930

49

3#8 L=500

190

2#4 Insuf.

Insuf.

Marco

100x80

0x 80

32

5#3 L=915

175

5#6 L=555

365

P30

Insuf.

36

29

)

Insuf.

10

100x80

295

195

32

100x80

175

4#6 L=475

280

190

5#3 L=910

30

100x80

230

175

5#6 L=555

365

2#3

)

12#3 6#3

P6

(∅120

18#4

5#3

4#3

6#3

7#3

Insuf.

9#3

3#3

80 100x

4#3

6#3

13#4

)

P35 (∅120

Insuf.

)

5#3 L=875

300

190

0 0x8

Mar co

R9 40 h=

Insuf.

Insuf.

Insuf.

30

5#3 L=865

170

4#6 L=510

320

13#4

0

Insuf.

P37

(∅120

Insuf. 15#5

5#3

260

180

3#8 L=380

10

0x8

Insuf. 2#3

6#3

P36

919

4#6 L=470

Insuf.

Insuf.

10

0 0x8 10

Insuf.

Insuf.

7#4

5#3

165

4#6 L=410

230

225

3#6 L=405

3#6 L=475

3#3

14#4

12#4

5#3 L=855

190

170

3#6 L=430

14#4

10#3

18#4

12#3

19#4

64 P53

866

18#5 16#5

Insuf.

Insuf.

Insuf.3#4

Insuf.

(∅120

12#5

16#5 Insuf.

3#5

1#3

64 P3

851

4#3

Insuf.

Insuf.

21#5

3#3

8#5

20#4

6#3

4#3

13#4

15#3

Insuf.

2#3

4#6 L=400

175

30

21#4

14#4 9#3

4#3

7#4

R4 h= 40

10#3

11#3

5#3

5#3

14#4

8#5 14#4

160 340

31

5#3 L=710

Insuf.

21#4

Insuf.

Insuf.

145

6#3

Insuf.

1#3

5

3#4 Insuf.

64 P54

846

2#8 L=200 3#6 L=355

3#6 L=330

275 4#6 L=485

5#4

7#3

2#5

P55

64 P4

813

30

0x 80

80

10

0x

8#3

9#3

100

7#4

6#3 21#4

5#5 L=385

9#3

8#4

4#3

3#4

48

SUPERIOR

10

1#3 Insuf.

8#3 6#3

(∅120

64 P55

805

3#6 L=405 Insuf. 1#3

Insuf.

14#3

64 P7

792

130

18#4

7#3

1#3

P56

706

Insuf.

6#3

6#3

100x80

5#3

)

15#4

2#3 R5 h=40

9#5

5#3

30

7#3 18#4 2#3 Insuf.

(∅120

Insuf.

14#4 7#5

2#3

R1 h=40

100x80

100x80

6#3 6#4

P33

P63

2#5

4#3

14#3 Insuf.

2#5

64

2#5

4#3 4#3

8#4 2#3

Ma rco

64

0

14#4

6#3 4#3

7#5 14#3

Insuf.

P4

100

64

)

2#4

(∅120

100

64

2#4

21#4

5#3

7#4

1#3

Insuf.

21#4

15#4

16#4 9#5

Insuf. 2#4

40

5 0: M1 P54

(∅120

100

64

76

6#3

22#4

76

8#4

Insuf.

76

3#4Insuf.

100

64

76

27

2#4

76

co

0 0x8

100

64

7#4

4#3

2#3 10

100

64

2#4

16#4

18#4

19#4

76

Mar

6#3 8#4

76

Insuf.

3#5

64

P1

Insuf.

20#5

4#4

8#5

2#5

100

2#3

Insuf. Insuf. 3#4

76

P3

(∅120

2#5

15#3

18#3 8#3

100x80

11#3 8#3 6#3

1#3

L6 h=20

x80 100

0 L1 20 h=

B2

Marco

R18 h=40

Insuf.

3#3

14#3

(∅120

100x80

)

Insuf.

2#3

9#5

8#3

Insuf.

7#5 5#3

4#3

P39

(∅120

P42

(∅120

P44

(∅120

)

3#3

4#5

3#3

3#3

3#3

)

8.61

17#4

P40

2#3

)

(∅120

100x80

100x80

)

P41

)

(∅120

100x80

3#3

Insuf.

5#3

P23

)

Insuf.

12#4

20x20

R15 h=40

L1 h= 2 20

20x20 (∅120

(∅120

)

)

x80 100

B25

P47

100

Insuf.

(∅120

B14

Mar

x80 100

)

co

10#3 9#3

100 x80

x80

P24

(∅120

Insuf.

)

R17 h=40

12#4

11#4

2#3

Mar co

Insuf.

2#3

20x2 0

L11 h=2 0

L1 h= 3 20

Insuf.

2#3

4#3

Insuf.

10#3 4#3

13#3

100 x80

100 x80 14#5

Insuf.

11#4

4#3

2#3 8#3

4#3

11#3 Insuf.

2#3

B15

Insuf.

21

(∅120

3 R2 40 h=

Insuf.

10

0 0x8

15#5

M2: 30

14#3 11#3

L1 h= 5 20

2#3

0x

46

100 x80

100 x80

Mar co 41 Mar co 40

24#3 5#3

Insuf.

100x80

100x8 Insuf.

0

4#3 16#3 6#3

P13

(∅120

Insuf.

5#3

13#3

5#3

2#3

P32

Insuf.

(∅120

Insuf.

)

0 0x8

Insuf.

0 0x8 10

Insuf. 3#4

22#5 8#5

Insuf. 17#4

10#3

Insuf. Insuf.

Insuf.

P26

(∅120

)

10#3 14#4

R2 h=4 9 0

6#3

20#4

8#3

5#3

13#3

10#3

10#4

Insuf.3#4

6 R2 40 h=

8#3

6#3

-001 Estacionamiento 1 Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:100

20#4

6#3

100 x80

8#3

5#4

100

9#3

8#4

x80

6#3 7#4

8#3

10

8#3

80 0x

6#3

0x 80

7#3

10

Insuf. 7#3 18#4

Insuf. 6#3

5#3

7#3

100x80

8#5

Insuf.

R31 h=40

18#4

2#3

6#3

rco

Insuf.

8#4

(∅120

4#3

6#3

9#5 14#4

4#3 22#4

Insuf.

2#4

1#3

6#3 21#4 6#3

34 co Mar

Insuf.

Insuf.

4#3

19#4

9#5

Insuf.

20#4

5#4

Insuf. 1#3

Insuf.

37

Insuf.

Mar co

44

3#5 3#5

3#4

6#4

Insuf.

(∅120

)

100x80

P16 )

P31

(∅120

)

1.32

8. 41

3.88

14

0.12

10 0x 80

1.32

x80 100

Marco 30

B3

1.32

64

195

30

11 19

5#5 L=605 5#3 L=965

5#3 L=1085

100x80

8

7#8 L=525

25

100x80

2#5

8.2 0m

19

19 11 19

30

5#3 L=1060 100x80

14#4

21#5

2#3

0.12

2.39

14#4 Insuf.

16#5 14#4

6#8 L=1200

6#8 L=425

6#8 L=555

6#8 L=1160 12x2e#2c/12 144

22

Estribos

2

2

16x2e#2c/12 191

22

106x2e#2c/12 1265

38x2e#4c/12 456

13

113

V-2 5

108x2e#2c/12 1290

2#3

5#3

0.12

Insuf.

Insuf.

5#3

Insuf.

x80 100

1.32

0.12

3.88

10 0x 80

5#3

8#5

1.32

P37

(∅120)

9#3 3#3

12#3

6#3

4#3

6#3

0)

Insuf.

18#4

10#3

2.59

9#3

2 V-

1 : 150

17#4 11#4

5#3

8#3

CITELIS Stela City

B9

Insuf.

B8

20x20

6#3 16#4

7#3

5#3 35 16

14#5

Insuf.

1.32

(∅120)

3.21

53

53

2.58 Insuf.

18#4

2

V7

8#5

6#4

2.65

12#3

5#3

Insuf.

1 : 150

1.32

3#4

5#3

11#3

Insuf.

7.91 m

V-3 0

3#4

6#3

7#5

100x 80

11#4 4#3

12#3

1.32

100 x80

3#3

V-25

7#3

2#3

4#3

P45

(∅120)

0.12

6#3

19#4

10#4

0.66

5.59

R16 h=40

8#4

4#3 P8

Insuf. 5#3

13#4

2.80

3.88 P56

0.50

B37

100 x80

Insuf.

4#3

(∅120)

13#3 Insuf.

100x80

2#5

100x80

6#4

5#3

0.12

3#3

V-13

2#3

18#3

6.61 m

V-30

1.32

Insuf.

1.32 B0

22#5

2#3

R18 h=40

1.32

8#4 5#5

3.33

18#3

3#3

3#3

6#3

3#3

4#3

5#3

Nota: 25 cms de separación entre la junta constructiva

Ubicacion de carcamo para caida de agua.

19#3

Insuf. 6#3

3.21

4#3 4#3

14#3

3#3

14#3

H133

Insuf.

P42

100x80

V-16

P34

(∅120)

100x80

B26B38

9

100x80 P10 (∅120)

V-17

P9

(∅120)

Checker

Revisado

(∅120)

P33

(∅120)

Author

0 L1 20 h=

Insuf.

Insuf. 3#3

8#3

5#3

Insuf.

7#3

-

Fecha

22#3

Autor

2.91

6#5

P49

(∅120)

3#3

11#3

11#3

0.12

0001

Numero de projecto

13#3

7#3 20#3 10#3 19#3 7#3

Insuf.

Insuf.

2#3

x80 100 5#3

6#3

-4.00 NSL

Insuf.

5m

(∅120)

6#3

2.72

2

Estructural Losa Estacionamiento

10 0x 80

2.29

2.89

2.13

L7 20 h=

V-1 1

6#3 20#4

Insuf. Insuf.

10

0 7#3

Insuf.

6#4

1.32

11

Insuf.

Insuf.

1#3

0.12

1:100

7#3

14#5

4#3

2#3

B7

8#3 9#3 7#3

Insuf.

8#3 5#4

0.12

1#3

4#3 Insuf.

1.77

1.25 m

3

-001 Estacionamiento 1 Estructural - V-11

2.68

100x80

113

R h = 14 40

Insuf. 2#3

27x2e#2c/12 324

-4.00 NSL

Insuf.

2#3

35

4#6 L=420

8#8 L=520

39x2e#4c/12 468

6#3

P5

(∅120)

Marco

30

8#8 L=1200

76x2e#2c/12 905

4.63

3#3

7#8 L=1150 43x2e#3c/10 430

11#3 Insuf.

20 x2 0

Estribos

8#8 L=595

2.44

Insuf. x8 0

19#4

P7

3#3A.LATERAL L=420 23 11 11

30

6#3A.LATERAL L=1015

3#3A.LATERAL L=420

INFERIOR

10 0

4#3

0.12 Insuf.

6#3A.LATERAL L=1015

19#4

1.32

100x80

12 30

2#3

0.12

5#3 L=425

26 100x80

0 x2 20 L4 h=2 0

200

30

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

M19: 30 9#3

h= L8 20

30

5#3 L=1005

100 x80

70

10#8 L=835

Nota: 40 cms de separación entre la junta constructiva

B33

11#4

7#8 L=510 5#3 L=1000

Insuf.

6#3

M20: 30

x20

20x2 0

385

19#4

20

100 x80

7#8 L=435

3#3

1#3 4#3

0.12 1.32

4#3

5#3

100x80

1#8 L=415 345 9#8 L=585

6#8 L=380 2ªcapa 25 9

7.9

380

70

27#3

5#3

Insuf.

8#3

-4.00 NSL

7#4 1#3

8#3

30 V-

5 V-

P8

1969

R h = 12 40

6#3

1.82

Insuf.

64

8#8 L=415 2ªcapa 345

SUPERIOR

76

76

76

76

64

64 P7

8m

80

80

100

64

Insuf.

Insuf.

x80 100

1#3

1#3

100

19#4

10 0x 80

2.67 Insuf.

V-11

NIVEL PISO TERMINADO

100x80

5.01 (∅P126

7#3

2.89 Insuf.

N.P.T.

2.08

4#3

P55

(∅120)

V-30

Insuf.

6#3

0.12

NIVEL FOSO ELEVADOR

P35

1.32

3#4

N.F.E.

(∅120)

Insuf.

14#3

Insuf.

15#5

6#3

7#4

3.72 2.94

100x80

-001 Estacionamiento 1 Estructural - V-2

2

1.32

3#5

Insuf.

7 V-2

40x2e#4c/12 480

113

30

-4.00 NSL 12#3

6#8 L=1125 Estribos

10 0x 80

11

4#6 L=260

6#3A.LATERAL L=925

30

INFERIOR

11

11

11

4#6 L=210

7#8 L=450

33

7#8 L=1200

7#8 L=575

33

30

INFERIOR

3#3A.LATERAL L=235

6#3A.LATERAL L=975

V-29

3#3A.LATERAL L=190

3#3A.LATERAL L=235 31

Insuf.

7#4

Insuf. R9 40 h=

L=190 3#3A.LATERAL 32

6#3A.LATERAL L=950

Insuf.

Insuf.

12#4

3#3

100x80

1.98

6#3A.LATERAL L=1000

Insuf.

Insuf.

8#5

0.66

2.93

REFUERZO POR PUNZONAMIENTO

15#3

14#4

2#5 30

ARMADO EN AMBOS SENTIDOS

V-33

5#3 L=990 25

0.12

4#3 22

7#8 L=410

5#5 L=570 SUPERIOR

REFUERZO INFERIOR

Insuf.

V-32

5#5 L=570

REFUERZO SUPERIOR

R.I.

5#3

5#3

80 0x 10

5#5 L=530

8#8 L=535

ARMADO BASE

REPETIR ARMADO A LO LARGO DE FLECHA

0.12

P68

1836 6#8 L=360

8#8 L=415

10

A.B. R.S. 12#3

11#3

9#3

7#8 L=370 21 SUPERIOR

7#3

76

76

76

76

76

76

76

76

148

1.32

Insuf.

64

64

64

0.12

100

64

64

1885

9#3

80

80

80

80

100

100

64

1.32

21#4

1#3

P54

6#3

SIMBOLOGIA

9#3

6#3

7#3 Insuf.

3.21

8#3

0.34

1.32

3#4

Marco 18

64

7#3

R7 40 h=

P4

(∅120)

100

1.32

8#4

21#4

-001 Estacionamiento 1 Despiece de vigas Concreto: f'c=300 Acero: fy = 4200 Escala: 1:150

7#3

Insuf.

4#3

V-2

C) PEDESTALES 5 cms. D) COLUMNAS 4 cms. 9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN. 10.-CHECAR DETALLE DE COLUMNASEN PLANO H137

2#3

5#3

1#3

Ubicacion del plano en el conjunto

1 : 500

R5 h=40

0.12

1.32

0.12

18#4

B) TRABES DE CIMENTACION 5 cms.

7#3

18#4 9#5

A) ZAPATA Y LOSA DE CIMENTACION 7 cms.

0.12

6#4

100x80

2.72

2#3

Insuf.

-001 Estacionamiento 1 Estructural.

5

8.- RECUBRIMIENTO MINIMOS LIBRES: 6#3

Insuf.

Mar co 48

m

(∅120

100x80

100x80

)

7.- VER ESPECIFICACIONES EN ACI-318-99

R3 h=40

2#3

100x80

14#3

Insuf. P60

(∅120

6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO

6#3

4#3

0.66

P61

3#4

Insuf.

DE MECANICA DE SUELO 0.42

4#3

0.12

Insuf. 1#3

Mar co

10#4 Insuf.

COMPACTADOS DE ACUERDO A ESTUDIO

0.12

8#4

14#3

7#5

x80 100

Insuf.

1#3

5.- TODOS LOS RELLENOS DEBERAN SER

1.32 0.66

1.57

3.09

)

3.- CONCRETO f'c=300 kg/cm2. 4.- ACERO DE REFUERZO f'y=4200 kg/cm2.

-4.00 NSL

0.12

0.12

0.12

6#3

1.32

1.32

Insuf.

(∅120)

P15

(∅120

0.12 1.32

2#4

Insuf.

1.32

0.12

15#4

9#5

3#4

6#4 22#4

Insuf.

x80

P54

0 0x8

16#3 7#4

Insuf. 4#3

100

10

2#4

8#4

19#4

20#4

4#4

)

Insuf. 3#4

3#3

21#4

5#3

19#4 3#4

Insuf.

2#4

5#3

1.32

2#4

8#4

8#4

2#4

P18

(∅120

Insuf.

14#4

22#4

Insuf.

0

)

3#5 4#3

5#4

7#3

0x8

25 V

40

P62

4#3

14#4

10

Insuf. 3#5

5#3

8#5 14#4

: 50 M1

2#3 1#3

14#4 7#5

2#4

1.32 1.32

16#4

14#4

R30 h=40

2#4 4#3

23

31

co

Ma

Mar

100x80

R32 h=40

4#3

Insuf.

5#3

7#4

7#5 15#4

Insuf.

6#4

100x80

2#3

)

Insuf.

17#4 6#3

6#3

15#4

P59

(∅120

8#5 1#3

R28 h=40

6#3

Insuf.

17#4

5#3

6#3

100x80

1#3

1.- DIMENSIONES EN CENTIMETROS 2.- NIVELES EN METROS

0.66

0.12

7#4

22#4 11#3

6#3 5#4 8#4

22#4

1#3

Insuf.

Ma

Insuf.

4#3 4#5 Insuf.

NOTAS:

1.62

8#4

22#4

3.73

14#4

14#4

11#4 Insuf.

4#3

4#3

22#4

)

6#3

2#3

3.07

Insuf.

3#3

16#4 14#4

Insuf.

rco

13#4

17#4

Insuf. 16#5

3#3

3#3

0 0x8 10

Insuf.

15#6

8#5

14#4

3#4

Insuf.

7#4 Insuf.

Insuf. Insuf.

13#4

4 R2 40 h=

10 2#5

P19

12#3

13#4

3#4

80 0x 10

6#3 1#3

Insuf.

19#5 2#3

6#4

15#5 Insuf.

Insuf.

R2 h=4 7 0

7#4

)

1#3

5#3

8#4

15

P68

(∅120

4#3

16#5

6#4 13#3

(∅120

Insuf. 18#4

6#3

3#3

Insuf.

Insuf.

Insuf.

Insuf.

3#5

5#3 3#3

Insuf.

Insuf.

Insuf.

28

9#4 18#4

12#3

)

80 100x

4#3

Mar co 43

)

19#4 19#4

18 Insuf. (∅120

8#3 8#3

7#3 5#3

19#4

8#5

Insuf.

rco

4#3 4#3 9#3 4#3

4#3 9#3 4#3

2#5

2#5

Ma

7#3

L16 h = 20 5#3

)

Insuf.

3.57

2#5

7#3 7#3

15#5

P14

B17

100x80

P17

(∅120

Insuf. 5#3

5#3

Insuf.

80 0x

Insuf.

6#3

4#3

14#3

L1 h= 7 20

10 0x 80

5#3

8#3

18#4

Insuf.

21#5

Insuf.

10

Insuf.

2#5

9m

2#3

15#4

20x20

11#4

B27

5#3

26

1#3

Insuf.

6#3

Insuf.

3#3

10#3 6#3

20x20

co

)

co

5#3

9#5 18#4

Mar P58

R2 h=4 1 0

9#3

4#3 Insuf.

20x2 0

2#3 5#3

(∅120

7#4

5#3

Mar

4#36#3

Insuf.

14#5

6#3

x20

8.4

18#4 6#3

10

80

5 R2 40 h=

Insuf. 8#3

5#3

4#3

0x 80

10

x80

20

Insuf.

3#4

0

100

1#3

4#3

6#4

Insuf.

B16

Insuf. Insuf.

5#3

)

Insuf. 20#4

0

12#3

M16: 30

B20 4#3

8#3

0x8

5#3 4#3

B4 8#3 4#3

Insuf.

6#4

5#3

7#3

15#5

Insuf.

2#3

L14 0 h=2

11#4

6#3

10

Insuf.

0 x2 20

5#3

19#4

7#4

Insuf.

Insuf.

P27

(∅120

19#4

3#3

8#3

Insuf.

4#4

1#3

Insuf.

1#3

Insuf.

20 x2 0

)

Insuf.

100 x80

4#3

0x8

21#4

17#4

R1 h=4 9 0 Insuf.

P20

(∅120

3#3

Insuf.

Insuf. 8#5

)

Insuf.

2#3

12#3

Insuf. 3#5

10

Insuf.

6#4

P25

Insuf.

22

Insuf.

80 0x

7#5

co

10#3

10

10 0x 80

rco

12#3

Mar

ESPECIFICACIONES

Ma

3#3

)

Insuf.

3.88

1#3

5#3

B24

10#3

(∅120)

3#4 Insuf.

5#3

6#4

P11

P3

6#5 6#3 5#3

Insuf.

Insuf.

2.78

3#4

5#4

12#4

B3

6#3

8#3 6#3 4#3

2#3

1#3 Insuf.

1#3

5#3

Insuf.

B5

x80

0

100

100x8

Insuf.

Insuf.

20 20x

Insuf.

Insuf.

x80 100

12#3

Bethuel Serbulo A00808771

1#3

21#4 7#3

1#3

5#3

4#3 5#4

7#5

6#5

2.59

2.94 Insuf.

x80 100

Insuf. 1#3

9#3

5#3

16#3

Insuf. 3#3

14#3

2#3

Hector Niño A00810504

2.63

3#4

P53

(∅120)

1 : 100

8#4

9#3

Carolina Rdz A00810722

)

4#3 2#3

7#3

1#3

19#4

38

P48

(∅120

8#3

20#4

(∅120

)

5#3

Insuf.

1#3

Jose O. Gonzalez A0036670

3#4

100x80

19#4

Insuf. Insuf. 1#3

Insuf.

P67

(∅120

14#5

7#3

R22 h=40

)

8#4

3#3

Insuf.

15

6#3

19

Mar co

Insuf. Insuf.

)

P12

(∅120

2#4

Insuf.

Insuf.

P52

P50

Insuf. Insuf.

6#3

4#3

7#4

4#3

Insuf.

P57

17#4 3#3

100x80

Insuf.

14#5

1

12

1#3

3#3

(∅120

Marco

6#3

Insuf.

5#3

100x80

100x80

6#3 4#3 7#3

3#3

100x80

V-25

-001 Estacionamiento 1 Estructural

21#4

2#3

7#3

1#3

2#3

4#3

12#4

L9 h=2 0

x80 100

100x80

6#3

20#4

Insuf. Insuf.

18#4 7#4

1#3 Insuf.

8#3 10#3 4#3

R20 h=40

Insuf.

5#4 Insuf.

7#3 5#3 8#3

Insuf.

)

14#4 4#4

4#4

4#3

5#3 6#3 9#3

2#3

2#4

(∅120

100x80

Insuf.

Insuf.

Insuf.

16

P28

)

9#3 11#3

Insuf.

100x80

19#4

20#4

(∅120

100x80

100x80

)

3#3 9#3

m

P43

(∅120

7#3

6#3 Insuf. Insuf.

100 x80

5#3

Mar co 14

4#4

4#4

5#4

Mar co 20

Mar co 24

14#4

1#3

100x80

Ma rcrcoo 89 B32 B28 Ma

B26B38 P9

(∅120

100x80

)

R13 h=40

Insuf.

Insuf.

35

4#3

14#3

Mar co

Mar co 25

4#3

Insuf.

15#3

Insuf. 19#3 6#3

3#4

P34

)

Ma rc rc oo 17 16 Ma

P10

(∅120

6

5#3

Insuf.

Insuf.

5#3

4#3

3#3

3#3

3#3

3#3

Mar co 30

18#3 5#5

100x80

8#4 7#3 6#5

P33

(∅120

19#5

L2 h=2 0

100x80

B0 22#5

2#3

P41

100x80

(∅120)

Escala

1:100

y/o especificada


-006 Est a c i on a m i en t o 6 Re pl an te o Co n cre to : f' c =300 Ac ero s e n l osa s: fy = 4200 E sc a l a : 1: 100

P36

(∅120

)

P38

(∅120

)

Marco 1

100x80

)

P64

100x80

Mar co 33 Mar co 32

Insuf.

1#3 3#4

(∅120

)

7#5

6#4

3#4 Insuf.

P53

(∅120

3#3 3#3 Insuf.

80 100x

Insuf. 2#4 Insuf.

11#4

Insuf. 1#3

6#5

1#3

100 Insuf.

Insuf. Insuf.

P1

(∅120

8#5

18#4

)

Insuf. 2#4

20#4

Mar

5#3

19#4

co

8#5

Insuf.

20#4

4#4

9#5 Insuf.

17#4

19#4

4#3

27

3#5

V-30

2#3 4#3

21#4

3#4 2#4

7#4

80

2#5 2#3

10

0 0x8

3#5Insuf.

8#4

Insuf.

21#4

2#5

21#4

21#4

1#3

1#3

Insuf.

7#3 5#3

7#3

Insuf.

21#4

6#3

10 0x8

4#3 15#4

16#4 9#5

Insuf.

2#4

40

5 0: M1 P54

6#3

13#4

4#3

4#3

9#5

0

100

14#4 Insuf.

4#3

5#3

2#5

4#3 7#5 13#3

1#3

100x80

R5 h=40

7#3

5#3

R2 h=40

6#3

18#4

8#3

9#5 18#4

5#3

6#3

10

80

7#3

P34

100 x80

x80

6#3

8#3

7#4

11#3

11#3

Insuf.

R4 h= 40

7#3

23#4

14#4

4#3

13#4

Insuf.

19#3

0x8

2#5

Insuf.

100x80

100x80

8#3

)

20x20

16#4

100 x80

2

19#4

42

o 39 Marc

0x 80 10

L4 h=20

L3 h=2 0

Insuf.

9#3

20 x20

10 0x 80

5#3

x80 100

L5 h=2 0

L7 h=2 0

1#3 5#3 20#4

1#3

(∅120

1#3

)

Insuf. 9#4

)

7#3

)

1#5

P22 7#3 (∅120

P46

(∅120

10#4

R16 h=40

7#3

P45

10#3 19#4

x80

100

Mar co

x80

100 x80

10

13#4

B31

P49

Insuf.

x80 100

B36 (∅120

Insuf.

)

Insuf.

8#3

Insuf.

3#3

Marc

o 3

Insuf.

Insuf.

15#3 8#3 2#3

100x80

L6 h=20

x80 100

100x80

L1 h=2 0 0

8#3

B0

B2

22#5

Marco

R18 h=40

Insuf.

7#3

Insuf.

(∅120

9#4 7#3

Insuf.

6#5 4#3

P42

35

4#3

4#3

3#3

3#3

3#3

100x80

Mar co 25

3#3

P33

)

4#3

P39

P44

(∅120

(∅120

3#4

R13 h=40

Insuf.

Insuf.

Mar co

Insuf.

Mar co 30

18#3 5#5

22#5

6

8#3 6#3

8#5 7#3 6#5

3#3

3#3

)

)

4#5

3#3

3#3

17#3

(∅120

100x80

)

(∅120

100x80

)

100x80

Ma 89 Marcrcoo B38

B26

4#3

4#3

Insuf.

5#3

P41

(∅120

)

P43

(∅120

74#3

)

9#3 9#3

14#3

4#3

4#4

4#3

5#3

Insuf.

14#3

Insuf.

12#4

11#3

20x20

Insuf.

6#3 6#3

Insuf.

4#3 5#3

76

Insuf.

2.94

(∅120)

12#4

Insuf.

5#35#3

171#3

P53

1#3

Insuf. 19#4

Insuf.

6#3 6#3

R15 h=40

14#3

20x20

6#3

100x80

18#4 7#3

8#5

7#3

6#3

3#3

7#3

4#3

-006 Estacionamiento Estructural

8#5

100x80

2#4

Insuf.

Insuf.

P52

(∅120

)

rco

Insuf.

)

x80 100

B25

P47

100

Insuf.

(∅120

Mar

x80 100

)

x80

3#3 P67

(∅120

14#5

16 (∅120

Mar co

7#3 R17 h=40

1#3

38 7#3 36#3 6#3 21#3 15#3 16#3 14#3 23#3 30#3 24#324#3 7#3 20#3 Insuf. Insuf.

P48

(∅120

5#3

)

4#3

10

4#3

2#3 Insuf.

20#4

1#3 7#3

7#5

L1 h= 3 20 7#3

8#3

12#3

26#3

4#3

B3

7#3

Insuf.

Insuf. Insuf.

Insuf. 3#4

10 0x 80

10 80 0x

Insuf.

(∅120

15#5

M2: 30

6#3

P27

(∅120

10

Insuf.

0 x2 20

7#3

15#5

Insuf.

0x8

3#4

)

Insuf.

0

h= L15 20

19#4

0x B16

x20

7#4

4#3

100 x80

Insuf.

Mar co 41 Mar co 40

20x20 B27

5#3

5#3 11#3

8#3

L1 h= 7 20

Insuf.

Insuf.

18#4

B17

(∅120

L16 h = 20

8#3

100x80

16#3

P13

(∅120

5#3

0 0x8 10

Insuf.

22#5

16#5

3#3

0 0x8 10

Insuf.

25 V-

3#5 14#4

1#3

9#5 3#3

15#4

Insuf. Insuf.

P26

15#4

11#4

Insuf.

(∅120

)

10#3 14#4

Insuf.

Insuf.

Ma

rco

28

4 R2 40 h=

0 0x8

13#4

17#4

Insuf.

Insuf.

14#4 4#3

5#3

4#3 23#4

P19

4#5 Insuf.

20#4

R2 h=4 9 0

6#3

8#3

11#3

23#4

12#3 10#4

8#3

Insuf.3#4

6 R2 40 h=

10#3

6#3

6#3

20#4

6#3 8#4

9#3 9#3

10

8#3

8#3

80 0x

7#3

6#3 8#3

10

Insuf. 7#3 18#4

Insuf. 7#3

5#3

7#3

100x80

9#5

Insuf.

R31 h=40

18#4

18#4 5#3

6#3

100x80

1#3

2#3

7#3

31 rco Ma

14#3

R30 h=40 1#3

8#4

14#3 7#5

Insuf. 3#5

5#3 4#3 Insuf.

(∅120

4#3

21#4

Insuf.

2#4

9#5 15#4

21#4 21#4

6#3

34 co Mar

3#3

10

0.66

9#5

Insuf.

2#3

2#4

20#4

P15

(∅120

x80

1#3

Insuf.

1#3 Insuf. 2#3

Insuf.

44

Mar co

Insuf.

6#4

3#5

2#4

Insuf.

Insuf.

P61

(∅120

6#4

)

1.32

2#4

Insuf. Insuf. P60

(∅120

100x80

)

100x80

P16 )

3.88

Mar co 48 P31

(∅120

)

8. 41

1.32

8#3

6#3

x80 100

8#4

R7 40 h=

6#3

6#3

(∅120)

Insuf. 20#4

9#3

0.57

1.32

20#4

3.21

SIMBOLOGIA

8#3

0.12

1.32

11#3

11#3

Insuf.

14#4

4#3

5#3

0.12

1.32

15#3

2.93 80

8.2 0m

80

0.12

3#5

356

12#3

65

380

13

75

5#8 L=805

3#8 L=470

42

8#5 L=1010

8#5 L=405

19

14 100x80

100x80

3#4

7#5

5#3

0.12

5#3 Insuf.

14#3

1.32

23 11 11

Insuf.

109x2e#2c/12 1299

27x2e#4c/12 324

53

26x2e#2c/12 301

53

5#3

0.12 3.88

7#3 19#4

1.22

8m 7.9

1#3

0.66

80

76

Insuf.

420

4#8 L=510 8#5 L=1010

8#5 L=1015

245

5#8 L=685

5#3 L=650

14#5

V7

8#5

5#6 L=1200 5#6 L=115

5#6 L=180

Estribos

113

19x2e#2.5c/10 190

109x2e#2c/12 1307

27x2e#3c/11 297

53

53

Insuf.

4#6 L=115 92x2e#2c/12 1097

5#3

2#4

4#6 L=1200

4#6 L=115

1.76

2.77

30 6#8 L=515

5#8 L=1150

V-3 0

12#5A.LATERAL L=1020 6#8 L=1200

5#3

11#3

113

4#3

Insuf. 7#5

4#3

13#3

Insuf. Insuf.

V-25

V-1 1

6#3

0.12

Insuf.

5#4

2#3

20#4

1.32

7#3

2.29

0.66

P45

(∅120)

10#3 19#4

Insuf.

11

0

4#3

2#3

0.12

2.92

1:100

6#3

4#3

1#3

Insuf.

Insuf.

14#5

11#4 3#3

100 x80

1.32

1#3

6#3

L7 h=2 0

100x 80

0.12

1 : 150

B7

10#3

8#3 6#4

3#4

100 x80

7.91 m

-006 Estacionamiento Etructural V-17

6#3

6#3

1.32

10#4

R16 h=40

8#4

P46

(∅120)

5.59 P8

(∅120)

6#3

Insuf. 5#3

2.80

14#4

100 x80

3.88

P56

(∅120)

Insuf.

3#3

0.52 2.73

1#3

0.12

3#3

2#3

V-13

18#3

1.32

8#3

B0

0.12

1.32 6#5

3.33

5#5

7#3

18#3 3#3

3#3

3#3

3#3

P33

10

(∅120)

2.91

8#5

4#3

Insuf.

Insuf.

Insuf.

Marco

R18 h=40

Ubicacion de carcamo para caida de agua.

Nota: 25 cms de separación entre la junta constructiva

22#5

1#3

2.16

100x80

6.61 m

V-30

100x80

5#3

Estructural Losa Estacionamiento 6

7#3

4#3

P42

3.23

100x80

V-14

100x80

V-17

(∅120)

P34

(∅120)

100x80

P10

(∅120)

Author

Autor

Checker

Revisado

B37

H133.1

B26

9

-

Fecha

P9

(∅120)

0001

Numero de projecto

8#3

Insuf.

100x80

L10 h=2 0

Insuf. 6#4

5m

(∅120)

1.32

2#5

2

P49

-24.00 NSL

Insuf.

x80 100

B36

Insuf.

Insuf.

1.25 m

5

10#3 6#3

28

6#3A.LATERAL L=665

23

30

6#8 L=590

INFERIOR

6#3A.LATERAL L=665

8#3 Insuf.

80 0x 10

31

2.58

Insuf.

7#4 12#5A.LATERAL L=1020

7#3

P5

(∅120)

Insuf.

R h = 14 40

18#4

100x80

4.63

2.68 30

Insuf.

Insuf.

Insuf.

27

100x80

x8 0

2#3

40

6#6 L=540

5#3 L=650 40

16

3.21

6#6 L=430

265

31

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

M19: 30

35

3#8 L=430

4#3

3#3

23

380

(∅120)

0 x2 20

2.40

19#4

1.32

P7

245

4#8 L=625

6#3 10#3 5#3

Insuf.

0.12

220

1#8 L=625 2ªcapa

B33

Nota: 40 cms de separación entre la junta constructiva

20 x2 0

76

76

76

1263

4#8 L=565 2ªcapa 345 380

2#8 L=370

Insuf.

21#4

12

P41

10 0

x20

M20: 30

2#3

4#3

20

16#3

20x2 0

80

P9

1960

30

11#4

6#3

1.32

64

1#8 L=370 2ªcapa

10

-24.00 NSL 4#3 19#4

CITELIS Stela City

7#3

5#3

0.12

64

5#3

Insuf.

8#3

3#3

0.12

100

30 V-

Insuf.

Insuf.

4 V-

100 x80

7#4

5#3

64

64

R h = 12 40

6#3

Insuf.

1.32

100

SUPERIOR

B8

20x20

11#3

2.67

V-17

33

B9

Insuf.

16#4

Insuf.

1 : 150

33

6#3

6#3

2#3

P10

12#4

3#3 3#3

x80 100

4

-006 Estacionamiento Etructural -V-33

17#4

8#5

3#3 10#3

2.59

8#3

2

1.32

2.08

100x80

15x2e#2.5c/11 165

113

12#3

P6

Insuf.

19#4

1.32

3#3

4#3

L4 h=2 0

30

4#6 L=395

15#3 4#3

100x80

3#3A.LATERAL L=400

6#8 L=510

5#8 L=1140

2 V-

Estribos

6#8 L=1200

6#8 L=585

V-30

Insuf.

(∅120)

80 0x 10

INFERIOR

5.01

NIVEL PISO TERMINADO

(∅120)

Insuf.

x80 100

6#3

NIVEL FOSO ELEVADOR

N.P.T.

P35

Insuf.

4#3

N.F.E.

P37

2.93

6#3

0.12

REFUERZO POR PUNZONAMIENTO

(∅120)

Insuf.

2.89

3#3A.LATERAL L=400

32

12#5A.LATERAL L=1020

3.72

100x80

12#5A.LATERAL L=1020

15#6 Insuf.

P55

(∅120) 29

-24.00 NSL

1#3

6#3

10 0x 80

8#5 L=1015

30

3#8 L=430

1.32

3#5

75

4#8 L=455

V-2 5

1#8 L=380

Insuf.

7 V-2

1#8 L=380 2ªcapa

B9

Insuf.

Insuf.

7#4

R9 40 h=

P37 4#8 L=410 2ªcapa 345 1#8 L=455 2ªcapa 380

Insuf. 14#4 13#4

Insuf.

10 0x 80

64

1954

3#3

1.93

76

76

76

76

Insuf.

V-29

64

ARMADO EN AMBOS SENTIDOS

Insuf.

16#5 21#5

V-33

64

REPETIR ARMADO A LO LARGO DE FLECHA Insuf.

V-32

100

64

P38

1#3

80 0x 10

100

REFUERZO INFERIOR

4#3

9#5

0.66

2.40

3#5

REFUERZO SUPERIOR

R.I.

L2 h=2 0

V-33

ARMADO BASE

R.S.

14#4

0.12

1.32

14#4

22

A.B.

Insuf. 1#3

10#3

9

C) PEDESTALES 5 cms. D) COLUMNAS 4 cms. 9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN. 10.-CHECAR DETALLE DE COLUMNASEN PLANO H137

8#3

7#3

3#4

-006 Estacionamiento 6 Despiece de vigas Concreto: f'c=300 Acero: fy = 4200 Escala: 1:100

B) TRABES DE CIMENTACION 5 cms.

0.12

0.12

1.32

4#3

P4

A) ZAPATA Y LOSA DE CIMENTACION 7 cms.

Insuf.

10 0x 80

14

1 : 500

8.- RECUBRIMIENTO MINIMOS LIBRES: 7#3

5#3

18#4

8#5

1#3

0.12

7.- VER ESPECIFICACIONES EN ACI-318-99

2#3

R5 h=40

100x80

-006 Estacionamiento Estructural.

7#3

1.32

6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO

0.07

18#4

2#3 2.72 Insuf.

m

(∅120

6#3

x80 100

Insuf. 1#3

Mar co

37

1#3 10#4

Insuf. 3#5

)

DE MECANICA DE SUELO

0.66

14#3

Insuf.

4#4 Insuf.

100

COMPACTADOS DE ACUERDO A ESTUDIO 100x80

3#4

22#4 6#4

4#3

)

5.- TODOS LOS RELLENOS DEBERAN SER R3 h=40

4#3

100x80

P18

(∅120

3.- CONCRETO f'c=300 kg/cm2. 4.- ACERO DE REFUERZO f'y=4200 kg/cm2.

5#3

0.12

17#4 8#4

0.33

0.12

8#5

20#4

20#4

3#4 Insuf.

1.- DIMENSIONES EN CENTIMETROS 2.- NIVELES EN METROS

0.12

8#4

1.43

0 0x8

3#5 4#3

19#4

Insuf.

Insuf. 3#4

Insuf.

5#3

19#4

2#4

7#5 13#3

3.09

1#3

6#4

9#4

8#5

2#4

4#3

NOTAS:

-24.00 NSL

0.12

1.32

Insuf.

14#4

4#3

Insuf.

0

)

3#5 4#3

5#4

6#3 21#4

0x8

0.10 0.12

0.12

0.12

6#3

1.32 1.32

Insuf.

P62

4#3 6#3

9#5 14#4 15#4

10

15#4

9#5

2#3

2#4

2#5

23

5#3

2#4

1.32 1.32

co

Insuf.

Insuf.

5#3

1.32 1.32

2#4

Mar

100x80

)

R32 h=40

4#3

100x80

2#3

6#4

7#4

14#3 7#5

40

7#3 16#4

(∅120)

2#3 Insuf.

18#4 7#3

6#3

14#3

Insuf. P59

8#5

R28 h=40

6#3

Insuf.

(∅120

: 50 M1 P54

9#4

x80

6#3

5#4

100

100 x80

5#4

0x 80

)

1.55

0.66

1.32

1#3

7#4

Insuf.

15#5

17#4

10#3

3#5

Insuf.

Insuf.

Insuf.

Insuf. Insuf.

3#3 14#4

21#4

12#3

13#4

1#3 8#5

4#3

6#3 1#3

8#4

21#4

3.73

7#5 15#5

Insuf.

19#5 2#3

14#4

Insuf.

Insuf.

Insuf.

2#4 Insuf.

)

10 7#4 Insuf. 2#5

3.07

3#5

80 0x 10

0

(∅120

)

2#4

Insuf. P32

Insuf. Insuf.

R2 h=4 7 0

(∅120

Insuf.

14#3

5#3

16#5 6#3

(∅120

4#3

5#3

Insuf. 6#4

15

Insuf. 18#4

6#3

Insuf.

Insuf.

80 100x

Mar co 43

)

5#3

P68

7#3 10#3

0

13#3 Insuf.

2#5

2#3

2#3

9#3 4#3

6#3

100x8 Insuf.

Insuf.

100x80

15#3

)

Insuf.

5#3

5#3

)

5#3

P17

(∅120

Insuf. 14#3

2#5

ESPECIFICACIONES

5#3

19#4

2#3

rco 18

5#3 8#3

Insuf. 6#3

4#3

Insuf. 2#5

20#4

8#5

3#5

8#4 18#4

11#3

80 0x

10 0x 80

26

)

Ma

Insuf. P14

10

co

P58

6#3

20x20

11#4

18#4

9#5

7#3 15#4

0x8

5#3

2#3 Insuf.

15#4

4#3

x80

20x2 0

6#313#3 8#5 18#4

1#3

Insuf.

6#3

Insuf.

100

8#3 8#3

Insuf.

8#3

Insuf.

46

Insuf.

14#5

R2 h=4 1 0

4#3 7#3

co

20

Mar

4#3

Insuf. Insuf.

5#3

10

80

4#3

8#3

7#3

5#3

0x 80

10

6#3

7#3

6#4

Insuf.

B20

5 R2 40 h=

Insuf.

2#3 Insuf.

6#3

11#3

7#3

M16: 30

100 x80

B4 4#3 8#3 4#3

Insuf.

6#4

5#3

10

100 x80

9m 8.4

5#3

2#3 5#3

11#3

7#4

1#3

L14 0 h=2

Insuf.

20#4

4#3

5#4 2#3

3.57

2#4

Insuf.

3#3

Insuf.

23#5

13#3

Insuf.

5#3

20 x2 0

)

8#3

0 0x8

2#3

Insuf. P20

(∅120

10

6#3

10

Bethuel Serbulo A00808771

21#4

3#4

R1 h=4 9 0

Insuf. 3#3

4#3

5#3

19#4

SUPERIOR

Hector Niño A00810504

8#5

)

Insuf.

2#3

12#3

20#4

22

Carolina Rdz A00810722

6#4

Insuf.

Insuf.

2

Jose O. Gonzalez A0036670

P25

4#4

Mar

Insuf.

3.88

1 : 100

12#3 4#3

2#3

Insuf.

Insuf.

2#3

(∅120)

7#5 5#3

14#3 12#3

10#3

2.59

1#3 P3

5#3

5#3

Insuf.

3#5

(∅120

3#4

5#4

6#4

Insuf.

12#3

22

)

5#3

2#3

10#4

9#3

6#3

3 R2 40 h=

(∅120

co

14#5

Insuf.

B15

B24 Insuf. 3#3

7#5

Mar

13#3

7#3

6#3

5#3

6#4 12#3

P11

6#3

100 x80

Insuf.

4#3

6#3 Insuf. Insuf.

2#3

3#3

3#3

Insuf. Insuf.

11#4

2#4

Insuf.

7#3

100 x80

Insuf.

Insuf.

6#4

2#4

18#3 10#3 14#320#3 Insuf.

Insuf.

Insuf.

46#3

B5

x80

x80 100

5#3

0

100

100x8

Insuf.

L11 h=2 0

20 20x

6#3 5#3

2#3

5#3

20x2 0

Insuf. Insuf. Insuf. 4#3

14#3

8#4

8#3

7#3

2#3

19#4

Insuf. 4#3

10#34#3 19#310#3

80 0x

1#3

1

)

12#4 4#3

)

5#3

Insuf.

P24

18#3 11#3

5#3

11#4

2#3

8#3

20#4

co

Insuf.

100 x80

21

P12

(∅120

14#5

R22 h=40

19#4

Insuf.

B14

Ma

3#3

5#3

8#4 Insuf. Insuf. 2#3

Insuf.

8#3

67#3

)

100x80

P50

(∅120

7#3

19

Mar co

)

Insuf.

6#3 4#3

2.63

2#4 Insuf. 2.78

18#4

L9 h = 15

25#3

Insuf. Insuf.

P57

1#3

12

1#3

5#3 5#3 28#3

100x80

Insuf.

(∅120

Marco

Insuf.

1#3

3#3

4#3

Insuf.

2#4 Insuf.

100x80

6#3

1#3

x80 100

21#4

100x80

100x80

L1 h= 2 20

Insuf.

L8 h=2 0

x80 100

100 x80

4#3

R20 h=40

20#4

Insuf. 1#3 3#4

3#4

5#4

6#3 9#3

9#3 19#4

)

13#4 Insuf.

5#3

23#3 28#3 7#3 6#3

Insuf.

(∅120

100x80

100x80

V-25

m 8.61

16

P28

)

6#3 10#3

13#3

82#3

30#3 3#3

6#3

6#3

Insuf.

Mar co 15

4#3

5#4

Mar co 20

Mar co 24

14#4

(∅120

100x80

100x80

P38

(∅120)

B32 B28 P23

)

WWW.BETAHECA.COM

P36

(∅120)

1 : 150

P40

1#3

B37

100x80

P9

(∅120

100x80

1#3

76

-006 Estacionamiento Etructural-V-30

P34

)

Ma rc rc oo 17 14 Ma

)

2#5

6#4

5#3

3#3

2#3

1#3

100x80

20x20

100x80

Insuf.

100x80

18#3

P10

3

1#3

Insuf.

100x80

2#3

)

5#3

Insuf.

P51

(∅120

)

8#3

1#3

Insuf.

P66

(∅120

100 Insuf.

Insuf.

Insuf.

6#3

Insuf.

14#4

3#3

7#4

)

20x20

5#3

19#4

R11 h=40

P8

(∅120

Insuf.

6#3

1.35 m 8.75 m

16#3

Insuf. Insuf.

5#3

Insuf.

(∅120

17 3#5

4#3

4#3

1#3

(∅120

113

Insuf.

0

Insuf.

P56

1#3

53

7#5 6#4

8#3

3#3

53

4#3

x80 100

1#3

2#3

5#3

53

13#5

Insuf.

47

Insuf.

5#4

19

45 rco

co

100x8

100x80

x80 100

Mar

B1

Insuf.

7#3

6#4

53

Insuf. 11#3

8#3 11#4

Insuf.

18

6#3 5#3

6#3

2#5

53

21x2e#3c/11 231

2#4

4#3

20 20x

6#3

6#3

4#3

8#4

53

54x2e#2c/12 641

7#5

Insuf.

14#5

3#3

x80

20#4

Insuf.

113

)

17x2e#2.5c/12 204

17#3

3#3

10#3

7

6#3

11#4

100

4#3

13

4#6 L=590

41x2e#2c/12 484

6#4

Insuf.

8#3 6#4

1#3

Mar co

P29

(∅120

13x2e#2.5c/12 156

12#3 7#3

Ma

co

4#3 6#3

7#5

)

2#4 Insuf.

1#3

9#3

B7

Mar 5#3

11#3 Insuf.

2#3

5#6 L=1075

5#6 L=980 4#6 L=570

64x2e#2c/12 767

B34

Insuf.

13#3

Estribos

Insuf.

Insuf.

Insuf.

0x 80

49x2e#2c/12 585

21#4

0 R1 40 h=

10 6#3

5#3

2#4

-006 Estacionamiento 6 Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:100

6#3A.LATERAL L=1040

30

4#6 L=525

4#6 L=415

31

6#3A.LATERAL L=1010

5#6 L=905

5#6 L=790

4#3

0 0x8

3#3

)

Insuf.

8#3 10#3

Insuf.

7#4

3#4

10

P21

(∅120

Insuf.

(∅120

15#5

Insuf.

)

8#5

11

INFERIOR

5#3 3#4

R1 h= 4 40

18#4

co

1#3

19#4 2#3

Insuf.

Insuf.

Mar

32

Insuf.

6#3

12#3 4#3

Insuf.

2#3

)

6#3

5#3 11#3

x80

Insuf. (∅120

P7

8#3

6#4

Insuf. 5#3

6#3A.LATERAL L=935

7#3

P5

(∅120

4#3

7#4

B6 0 x2 20

100

100 x80

Insuf.

R8 40 h=

3#3 7#3 4#3

31

6#3A.LATERAL L=755

M19: 30

Insuf.

3#3

Insuf.

Insuf.

80

21#4

B30

20 x20 6#3 10#3 5#3

4#3

14#5

0

12#4

0x

0x8

)

8#3

Insuf.

10

10

4#3

P65

(∅120

7#3

15#5

100 x80

co

B33

M20: 30 Insuf.

11#4

2#3

5#3

2#5 Insuf.

18#4 8#5

2#4

5#3 5#3

4#3 6#3 19#4

100x80

Insuf.

Insuf.

3#3 7#4

1#3

Insuf. 4#3

20 20x

16#3

Insuf.

8#3

100x80

10#3 10#3

Mar

19#4

R1 h= 2 40

6#3 Insuf.

100x80

5#3

11#4

20x20

11#3 7#3

Insuf.

8

4#8 L=460

5#3 L=1045

B8

Insuf.

Insuf.

29

4#8 L=350 360

14#3

18#4

10 0x 80

L1 h=2 0

L2 h=20

(∅120

7#3 Insuf. 2#3

5#4

4#3

6#3 1#3 Insuf.

P2

10#3 4#3

23

12#4

6#3

3#8 L=245 285

3#8 L=715

355

5#3 L=1010

1#3

Insuf. 4#3

rco

0 0x8 10

17#4

Insuf.

4#3

B9

8#5

3#8 L=570

285 350

30

180

31

100x80

6#5

5#3

100x 80

6#3 6#3

3#3 10#3 6#3

3#3 3#3

270

6#6 L=660

310 5#3 L=935

31

Insuf.

Insuf.

Marco9#3 5

)

8#3

6#3

16#5

Mar co

15#3 12#3

3#3

4#3

6#3 P6

(∅120

Insuf.

0x 80

235 335

190

12#3

)

36 4#3

80 100x

Insuf.

Insuf.

6#3

10 5#3

270

33

Ma

5#3

4#3

19#4

Insuf.

2#5

5#6 L=550

6#6 L=505

215 5#4 L=760

0 0x8

5#3

14#3

)

155

4#6 L=300 5#6 L=375

10

Insuf.

)

Insuf.

3#4 Insuf.

P55

7#4

P35

(∅120

29

Insuf.

2#5 Insuf.

R6 h= 40

49

13#4

2#3

Insuf.

Mar co

R9 40 h=

7#5

(∅120

Insuf. 15#6

3#5

(∅120

13#4

Insuf.

P37

1#3

6#3

10

0 0x8 10

Insuf. 18#4

12#3

8#5

1#3 Insuf.

Insuf.

SUPERIOR

3#3

16#5 Insuf.

Insuf.

Insuf.

)

14#4

18#5

16#5 Insuf.

0

21#5 14#4

13#4

P30

(∅120

10#3

Insuf. Insuf.

1#3

3#3

4#3

12#4

Insuf.

Insuf. 4#3

7#4 Insuf.

3#5

6#6 L=425

15#3

10#3 14#4

9#5 14#4

Insuf.

P35

1038

2#8 L=370

23

Insuf.

4

3#5

64 P6

950

Insuf.3#4

4#3

5#3

64 P5

873

20#4

6#3

Insuf.

20#4 1#3

P8

752

6#3

10#3

11#3

30

0x 80

0x

100

6#3

64

8#3

8#3

9#3

5#4

R7 40 h=

3#4

64

8#3

6#3

6#3

Ma rco

64

10

Insuf. 7#3

8#4

20#4

)

100

64

Insuf. 1#3

Insuf.

4#3

P4

100

64

23

18#4 1#3

)

Insuf.

76

18#4

64

P63

(∅120

15#3 6#4

2#3

Insuf. 2#3 8#5

5#3 6#3

7#3

Insuf.

2#3

R1 h=40

100x80

100x80

6#3 6#4

76

2#3

7#5 14#4

14#3 Insuf.

2#5

8#4

R3 h=40

76

4#3

76

8#4

76

Insuf.

76

2#4

(∅120

100

)

100x80

(∅120

80

1.20

80

)

x80

Insuf.

2#3

80

P3

(∅120

100x80 P41

(∅120)

Escala

1:100

y/o especificada


V-3 30

CUANTIFICACIÓN DE MATERIALES.

L=500

L=500

2#3A.LATERAL

40

100x80 P36

3#4

1#3

0 x4 20

10 0x 80

1.66

13

3#5

8m

V-32

20x4 0

20x40

V-31

B24

2#5

B43

18#3

20 x40

5#3

1.47

6#4 5#3 16#3

3#3

5#5 3#3

V-21

3#3

20 x4 0

B0

3#3

100x80

3#3

4#3 1#3

9#4

6#3

2.97

8#4

2.49 2.79

(∅120 ) (∅110 )

P34

12#151#5 12#5

8 R1 40 = h

9#3

3#4

V-21

2#3

17#5

5#3

1.69 2.90 x80 B71600

3.49

2#3

2#3

100x80

(∅120

B74

3.50

6#6

100x8 0

8#3

9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN.

6#3

10.- EL NIVEL DE LOSA SUPERIOR ES 0.0M

5#3

NOTA IMPORTANTE: REVISAR LOS PLANOS DE ESTRUCTURALES DE VIGAS NIVEL DE ACCESO H136. REVISAR EL PLANO DE COLUMNAS H137. REVISAR EL PLANO DE NERVADURAS LONGUITUDINALES Y TRANSVERSALES H139 H140.

SIMBOLOGIA

11#4

A.B.

ARMADO BASE

R.S.

REFUERZO SUPERIOR

R.I.

REFUERZO INFERIOR REPETIR ARMADO A LO LARGO DE FLECHA

18#4

ARMADO EN AMBOS SENTIDOS

1.55

100 x80

P2

NIVEL FOSO ELEVADOR

N.P.T.

NIVEL PISO TERMINADO COLUMNAS.

CITELIS Stela City

(∅12(0∅110) )

R1 3 h=4 0

N.F.E.

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1:100 0

3.84

3#3 4#5

5.84 4#5 )

2

5m

Estructural Losa Nivel Acceso 0001

Numero de projecto B69

P45 P4 6 (∅120

)

100

x80

-

Fecha

Author

Autor

3.18

4.01

R2 h=40

DIMENCIONES. 12 cm EN SU PARTE MÁS ANCHA.

1#3

1#3

(∅120

2#3

2.75

M19: 30

3.00 4.00

8.- TODAS LAS NERVADURAS TIENEN LAS MISMAS :

M20: 30

1#3

3.15

19#4

100 x80 1#3

3#5

1#3

6#3

13#4

3#3

13#4

1#3

40 h=

3.27

1#3

h=4 0 R3 2 3#3

1 R2

DE MECANICA DE SUELO 6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO

3#3

11#3

3#3

2#3 5#3 5#3

B78

3#3

5#4

10#3

10 0x 80

2#3

2#3

9#3

3#3

2.99 1.85

3#3

11#3

1.38

100x8 0

R35 h=40 3#3

1.46

3.80

R2 h= 6 40

V-1 5

3.19

1.69

22#5 2.60

12#4

2#3 2#3

3.20

P8

4#3

V-17

B25

6#5

R30 h=40

10#4

(∅110 ) (∅120 )

8#3

12#5

1.72

3.29

2#3

V8

10#4

100x80

V-41

V35

100 x80

V-4 1 100x8 0

V-41

14#3 7#4 7#5

2.83

V-47

6.61 m

V36

7.9 7.91 m

2.49

6#3

13#4

5#4

5#3

15#3

2#6

100x80

1.25 m

B42 20x4 0

100 1#3 x80

4#3

9#3

1.25 1.69

5#4 4#4

3#3

COMPACTADOS DE ACUERDO A ESTUDIO

14#4 1.66

4#4

20x40

5#3

6#3 3#3

5#5

5#3

20x40

5.- TODOS LOS RELLENOS DEBERAN SER

6#6

20x40

7#4

5#3

5#5 3.33 1#3

1#3

B80

1#3

8#5

100x80

4#3

1#3

40 h=

2#3

1#3

3.69

V10

12#4

4.02

110) ((∅∅1 20)

20x40

3.- CONCRETO f'c=300 kg/cm2. 4.- ACERO DE REFUERZO f'y=4200 kg/cm2.

REFUERZO POR PUNZONAMIENTO

1.39 2.97 2.24

0 R2 2#3

2#4

3.79

V-7

B77

1.- DIMENSIONES EN METROS 2.- NIVELES EN METROS

7#4

3.67

V-50

3#5 8 #4 7#5 8#4 8#4

5#3

P5

3.14

20x40

12#4

1#3

3.71

3#3

R2 3 h= 40

6#4

2.89

11#3 14#4

18#4

B79

3#3

3#3

14 16#4 R 0 4 h=

1.85 6#5 2.49

14#4

1#3

x80 100

3#4

9#6

2#34.12

9

V-1 5

3#3

3#5

3.93

(∅110 ) (∅120 )

17#4 8#5

B20 41x4 B0 40

1.49

P33

2#3

(∅110 ) (∅120 )

3.96

19#4

4#3

B53

P6

2.63

NOTAS:

)

7.- VER ESPECIFICACIONES EN ACI-318-99

14#4

(∅110 (∅120 ) )

7 V-4

x80 100

3 V-4

4#5

10

19#4

B22

8#5 4#5

1.31

20 x4 0

B23

) (∅120 )

(∅110 ) (∅120 )

V1#3 11

3.64

10#3

B52

B54

Insuf .

8#3

4#3

10 0x 80

2.91

(∅110

P56

18#4

3.71

B55

1.53

2.89

2.78

(∅110 ) (∅120 )

100x80

7#4 17#4 6#3 5# 3

6#3

8#3

P35

3.07

14#5 Insuf .

P37

3.55

20x40

P7

R1 h= 7 40

14#5

13#4

12#4 2.81

2.44

1#3

10 0x 5#3 80

14#3

ESPECIFICACIONES

4#3

6#3

10#3

V-49

1#3

11#3 4#3

6#3 6#3

21#5

5 V-

1#3

3.16

40 V 4#

5#3 4#3

17#4 8#5 7#3

2.62

12

5#3

17#4

6.10

Ubicacion del plano en el conjunto

6#3

14#3

3.07

(∅110 ) (∅120 )

11

12#3

12#4

2#3

3

7#4

3#4

P55

B57

7#4

3.13

1.15

8#5

V8

0 x4 20

0 R1 40 h=

2#5

14#4

10#3

9#3

9#3

100 x80

8.2 0m

V41

2.97

3.14

1#3

7#3

5#3

B56

4 V-

13#4 2#5

2#3

21#4

3.22

6#3

2#3

0 x4 20

V-46

(∅110 ) (∅120 )

B58

13#4

21#4

7#3

8#3

Bethuel Serbulo A00808771

100 x80

39 V

3.73

80 0x 10

P4

B59

21#4

1#3

5#3

1#3 2#3 7#3

3.29

9#5

1#3

R1 h=40

Hector Niño A00810504

V-5 6

0 10 0x 8

V41

1 : 500

8#5

4#3

6#3

x80 100

8#3

6#3

(∅110

3#4

7#4

4#3

6#3

6#3

R7 40 h=

2

RESTAURANT/LOBBY/COMERCIAL

V-2

7#4 16#4 6#3

4#3

2#3

3.80

18#4

P1

100 x80

V-5 6

21#4

2.54

5#3

0 20x4

B61

20#5

V-53

m

9#5 18#4

2#3

3.94

Carolina Rdz A00810722

1#3

2.49 2.46

4#3

B60

V-3

3#4

4#3

5#3

)

Jose O. Gonzalez A0036670

100 x80

100x8 0

0x 80 10

1#3

14

18#4

R5 h=40

6#3

4#3

V52

V-60 100x80

V60 x80

80 0x

100 x80

V65

V5 (∅1 10) (∅1 20)

P31

(∅1 10) (∅1 20)

6#4

10 0x 80

80 0x

6

100

2#3

P15

(∅1 10) (∅1 20)

P61

100x80

6.78

P49

)

(∅120

)

P42

Checker

Revisado 001 Nivel Acceso Restaurante-Locales.

H134

Concreto: f'c=300 Aceros en losas: fy = 4200

5#6 100x80

10 0x

80

8. 41

100x80

65

x80

V-54

100 x80

100 x80 100

10

100x80

80 10 0x

80

0x

V51

V-

80 10 0x

10

48

V-

V-53 x80

V52

V3

6

0x 80 10

100

100

20x 40

5

20x 40

V3

6

x80

100

80 0x

V41

10 100 x80

V41 x80 100

V-4 1 100x8 0

20x40

20x40

Marco 31 Marco 32

V-41

V-41

V5

65 V-

2#4

14#3

R3 h=40

(∅120

)

11#5

4#3

5#3

(∅110

1.30

6#5

2.06

100x80

(∅1 10) (∅1 20)

2#4

x80 100

3.06

2#3

40 20x

B62

1#3

7#4

6#3

100x80

0 0x8

71#45 #3

5#3

7#3

40 20x

10

65 V-

2#4

6#3

8#4 B63

9#5

18#4

19#4

21

2.07

4#3

100x80

(∅1 10) (∅1 20)

8#4 17#4

21#4

14#4

8#5 18#4

4 V-4

P26

21#4 1.39

2#3

3 V-4

P54

13#4

3.47

1.77

P64 1.54

V-3 3

8#5 #4

3.12

4.16

6.90

15#4

3.20

2.89

2.66

3#4 3.65

3.15

100x80

V-49

V-65

V45

V-65

1#3 3#4

: 50 M1

40

1#3

1.49

V-50

100x80

(∅1 10) (∅1 20)

V-3

P16

100x80

2#4

V-65

100x80

V-3

V-28

0

(∅1 10) (∅1 20)

1#3 3#4

3#4

3#3

3#4

10#4 6#4

100x8

P60

20#4 3#5

(∅110 ) (∅120 )

P68

P62

3#5 3#5

1 4 V- 2#4

V65

3#5

x80

16#4 7#4

14 7##4 5

1#3

x80

1#3

100

18#4

5#4 20#4

V-3

4#3

6#4

1#3

1#3

11.2 7°

(∅110 ) (∅120 )

4.43

1.86

3#4

80 0x 10

14#4

9#5 14#4

21#4

0

5#3 19#4

21#4 8#4

0x8

6#3

10

18#4

18#4

14#4

6#3

1#3

P27

(∅1 20)

1#3

4#4

19#4

17 8# #4 5 17#4

6#4

7#4

4#3

3#3

40 h=

9#5

V7

3#3 100

40 h=

4#4

V28

V-3

3#4

1#3

4#3 4#3

8#4

21#4

8#4

5#3 6#3 5#3

7#3

80

21#4

8#3

5#3

6#3

2#3

V-61

2#4

P18

14#4

6#3 6#3

3#5

1#3

13#3

3#4

8#4

27 V-

13#4

2#4

(∅1 20) (∅1 10)

5#3

8#5

0 R5 0 4 h=

80

R61 h=40

6#3

15

3#4

9#5 13#4

)

2#4

(∅1 20)

7#4 16#4

20#4

6#3

6#4

22

7#5 12#3

5#3

2#3

16#4

80

0x

4#3

R57 h=40

1#3

V-

7#4

5#3

7#6

18#4

5#3

16#4 6#4

4#3

3#3

17#4

5#3

6#3

P67

41 V

9m

18#4

6#3

4#3

7#3

7#5

3#3

7#3

0x 10

10

R63 h= 40

4#3

100x80

2#4

5#3

5#3

100x80

7##4 15 5

2#

V- 4 28

3#3

7#4

6#3 2#3 100x80

(∅1 10)

1#3

9#3

7#3

100x80

30

15#4 (∅1 20)

R62 h=40

6#3

6#3

3#3

(∅110

6#3

R3 8 h= 40 1#3

6#3

6#3

8.4

(∅1 20)

4#3

80

5#3

3#3

9#3

6#3

1#3

6#3

5#3 18#4

V-7

o rc

18#4

8#3 3#3

12#4

2#3

8#4

5#4 12#36#5

3#3

8#3

11#3

0 0x8 10

Ma

8#4 B11

11#4

3#3

hR =444 0

5#3 9#3

14#4

7#4

13#3

4#3

3#3

16#4

17#4 11#4

6#3

6#3

1#3

x80

4#3

1#3

22#5

4#3

3#3 0x

12#3

7#4

3#3

9#3

7#3

0

B13

P59

7#3

10

15#4

P14

Insuf. 15#5

11#3

V25

x80 100

80 0x

x4 20

4# h=3 1#3 R6 40 7

80

2#3

2#3

3 R5 40 h=

10

6#3

100x

5#3 5#3

P3

)

20#4

6#3

1#3

(∅1 10) (∅1 20)

60 V-

63 V-

7#4

B31 B30

11#4

P25

(∅1 10) (∅1 20)

60 V-

(∅1 10) (∅1 20)

15#4

9#3

7#3

5#6

14#5

P32

P13

V-57

0

Ma 7#4 rc o 29

R6 h= 0 40

x80

80

14#5

9#3

5#3 6#3

5#6 14#4 16#5

V-58

x4 20

28 V-

4#3

5#3

100

0 0x8

14#3 7#4

x4 0

15#5

1#3

17#3

3#3

7#3

2#3

9#3

14#4

(∅120

(∅1 20)

1#3

19#4

2#3

19#5

5#5

3#5

4#3

12#6

5#5

P28

14#4

19#3

5#3

3#3

B3

4#5

5#4

WWW.BETAHECA.COM

P38

(∅110 (∅120 ) )

100x80

3#4

3#4

1#3

x80 100 (∅1 20)

P40

4#4

R33 h= 40

10#3

V19

15#5

17#4

2#3

V-7

10

20

6#3

2 R4 h=40

20x40

20x40

100x80

100x

6#5

2#3

100

10#4

3#4

16#4

4#5

3#3

2#3

Insuf.

h=40

x80 100

100x80

1#3

1#3

2#3 2#3

7#3

5#3

(∅1 10) (∅1 20)

19#5

12#3

3#4 3#4

0x

80

x80 100

63 V-

V-57

V-58

28

13#3

0 x4 20 B28 B29

2#3

10

0x

100x80

B82

15#5

2#3

4#3

2#3

1#3

14

3 V-

10

20x40

20x40

100x80

P17

3#3

2#5 4#4

4#4 hR =646 0

V-50

V-

9#3

4#4

1#5

80

h=

6#3

8#5 10#3

1#3 80

4#4

13#4

(∅1 20)

1#3

10 0x

3#3

15#3

0

V24 hR =545 0

1#3

1#3 1#3 3#3

4#3

V-41

)

2.94

19#4

V-16

P24

5#3

3#3

3#3

R27 h=40

12#3

M2: 30

B81

20x40

6#3

7#5

B10

B12

hR =645 0 (∅1 10)

(∅1 20)

3#3

0x

52 40 R h=

8 o 3 7 Marc o 3 MaRrc6440

2#4

P19

3#3

20x40

14#5 R5 6 1#3 h=4 14#5 0

4#3

5#3

6#4 12#3

2#4

Marco

5#3

3#3

100x80

4#3

5#3

7#3

11#3

100x80

R3 h= 6 40

11#5 14#5 16#5 7#3

1#3

12#3

19#4 7# 5

3#3

(∅110 ) (∅120

2#4

100x80

V-13

(∅1 20)

3#3

x80

3#3

3#3

10#4

1#4

4#4

B8420x40

(∅1 (∅1 10) 20)

9#3

5#3

10#5

3#3

1#3

1#3

V- 11#4 25

x80 100

P23

4#3

2#3

V-12 5#3 1#3

3#3

100

6#3

(∅1 20)

R3 h= 1 40 2#3

R22 h=40

8#4

P39

P36

1.22

P66

(∅1 20)

5#4 14#3

4#3

3#3

2#3

Insuf.

18#4 7#4

6#3

5#3

3#3

m

3#4

12#3

6 R140 h=

2#3

8.61

16

20#4

100x80

4#4

1#3

4#3 3#3

4#3 4#3

11#4

B2

100x80

4#3

(∅1 20)

2#4

11#3 7#5

5#4

6#3 8#3

2#3

V19

M16: 30

4#3

4#3

2#5

R5 4 h=4

2#3

13#4

5#3

18#4 2#5 14#3

9#5

5#4 5#4

20x40

B4

5#3

6#3

9# 184#4

B17

6#3

8#3 4#3

8#4

B16

(∅1 20) (∅1 10)

B72

1#4

h=4 0

3#3 3#3 1#3

B83

14#5

10

x80

7#3

V-55

(∅1 20)

(∅1 20)

9#5

2#3

20x40

100

11#3

5#3

P47 P48 x80

1#3

V24

3#3

V-49

0 20x4

5490 R h=

0 20x4

V-28

P58

3#3

R4 3 h=4 0

4#3

4#5

P20

(∅1 10) (∅1 20)

14#4

6#3

42 V-

7#4

0 20x4

1#3

1#3 0 0x8 10

B75 100

(∅1 20)

5 R240 h=

1#3

12#4 11#4

x80 100

1#3

V-6

100x80

V-13 6#4

4#3

10#4

10#4

2#3 1#3

1#3

P29

11#3

3#3

13#5

3#3

9#4 9#5 9#4

10#4

(∅1 20)

1#4

9#3

2#5

5#3

147# #34

B34B35

2#3

P52

(∅1 20)

4#3

2#3

3#3

V-12

(∅1 20)

12#3

3#3

6#4 Insuf.

P43

15#5 17#5 Insuf.

1#3

45 V-

9#3

4#3

15#3

4#3

3#3

10#5

1#5 4#4

7#4

3#3

5#3

9#3

13#4

P22

4#3

5#3

2#3

16#3

20

11.23°

8.75 m

P53

3#3

20#4

5#4

4#3

x80 100

V-6 2#4

3#3

0 0x8

3#3

4#3

(∅1 20)

11#3

11#4

3#3

9#3

0 20x4 B33B32

100x80

58 40 R h=

7#4

3#3 2#4 6#5 2#4 3#3

11#3

5#3 1#3

P51

6#4

19 1.35 m

17

1 : 100

5#3

1#3

5#3

12#3 8#5

P44

P50 1#4 V18

14#4 13 #4 13#4

1 R4 h=40

B5

6#3

9 R4 40 h=

6#4

100x80

B14

B15

3#3

4#3

6 V-25#3

12#3

6#3

5#3

10#4 11 #5 12 #5

(∅1 20)

10

B1

9 R140 h=

18#3

4#3

2#3

Insuf. 5#3

18

(∅1 20)

1#3

3#3 1#3

1#3

80

1#5

7#5

11#5

6

3#4

x80

0

1#3

5#4

7#5

13#5

9#3

1#3

2#4

10#4

100

100x8

2#3

4#3 1#3

x80 100

4#3

P49

18 V-

6#3 5#3

4 V-2

V-28

7#3 1#3

V- 9#5 14

0x 10

1#3

12x2e#2c/12 22 200 2

7#4

5#3

9#3

11#3

108x2e#2c/12 600

P65

2#3 16#4

6#3

8#3

3#3

B71

1#3

1#3

V-2

P12

(∅1 10) (∅1 20)

100 x80

(∅1 20)

x80 100

Marco 34 Marco 33

21#4 3#3

13#4

2#3

20#4

14#3

14#5

9#3

R46 h=40

B69

P45 P4 6

x80

6#3

2#5

3#3 1#3

62 V-

1#5

P42 P41

x80 100

1#3 3#3

5#3

6#4

8#4

4#5

B73

12#5

12#5

2#3

7#3 15#5 13#4 11#5

9#3

h=40

100x80

3#3 4#5

7#4

7 R3 5#3

100x80

20x40

20x40

V-23

B21

2#3

3#3

5#3

x80 100

100x80

100x80

V-24

V-28

12#3 7#4

B39 20x40 B38

(∅1 20) (∅1 10)

9 R340 h=

6#3

2#3

16#4

7#3 5#3

P21

2#3

3#4

13#3

6#4 5#3

15#5

(∅1 10) (∅1 20)

5#3

1#3

B70

2#3

5#3

3#3 17#3

h=40

2#3

1#3

1#3

(∅1 20)

(∅1 20)

100x80

6#3

1#3

5#6

2#3

2#5

7#3

1#3

(∅1 20)

100x80

P9 V-20

(∅1 20) (∅1 10)

5#3

6#6

14#5

7#3

(∅1 20)

B74

3#3

5#3

M19: 30

13#4 17#5

13#4 2#3

V-21

1#3 4#3

1 R240 h=

B76 100

x80

R33 3# h= 2 40 3#4

P34

10#3

B20

(∅1 (∅1 10)20)

P11

(∅1 20) (∅1 10)

100x80

4#3

4#4

5#4

100

B78

5#3

13#4

62 6#4 V-

B6

R1 h= 3 40

1#3

3#3

1#3

14#5

2#4 12#3

7#5

1#3

2#3

10#3

V7

M20: 30

3#3

19#4

1#3

8#4

6#3

4#3 1#3

3#3

2#3

11#3

V15 11#5 12#5 12#5

3#3

2#3

8#3

6#6

1#3

7#4 6#3

2#3 6#3

4#4 3#5

3

8#5

R6 h= 40

3#3

(∅1 10) (∅1 20)

12#4

13#3

L=200

L=1000

3#8

40x2e#4c/12 300

109

NERVADURA 1 LOSA 1 RESTAURANTE.

P30

3#4

19#4

3#3

14#4

3#3

11#3

3#3

80

2#3 5#3 5#3

3#3

P2

80

19#4

5#3

8#5

2#3

10#3

9#4

12#4

100x80

15#3

7#4 3#4 1 R540 h= Insuf.

P57

P8

20x40

5#4 4#4

9#3

hR =246 0

10#4

100x80

3#3

V8

10 0x

B0

3#3

9#3

10#4

(∅1 10) (∅1 20)

2#3

V-20

3#4 8 R440 h= 1#3 4#4

13#4

20x40

3#3

5#4

5#4

4#3

2#3

V-21

6#4 12#4

B36 B37 20x40

1#3

3#3

5#5

2#3

R35 h= 40

3#3

8#3

3#5 R45 h=40

9#3

B80

8 R140 h=

43 V-

5#3

3#3

B18

B19

P10

1#3

2#3 1#3

x80

R30 h= 40

22#5

2#3

1#3

100

8#3

Marco 47

100x80

6#4 5#3 16#3

6#518#3 5#5

(∅1 10) (∅1 20)

4#3

6#3

V-17

B25

2#5

P33

5#3

V10

6#3 3#3

h=40

5#3

5#5 1#3

12#5

5#3

0 R2 2#3

12#4

1#3

(∅1 10) (∅1 20)

1#3

5#3

14#3 7#4 7#5

2#6

B24

7#4

P5

14#4

B77

20x40

100x

6#3

4#4

4#3

(∅1 10) (∅1 20)

20x40

3# 46 9# R34 h= 40

(∅1 10) (∅1 20)

4#3

B41 20x40 B40

B42 20x40 B43

(∅1 10) (∅1 20)

5#3

4#5 8#5 3#5 7#5 8#4 R29 h= 40 8#4 8#4 R2 8 h=40 3#5 15#3

12#4

1#3

Insuf.

1#3

20x40

6#3

18#4 11#3

P37 V-7

1#3 7#4

5#3

8#3

18#4

(∅1 20)

80

9#5

R4 h 6#3 =40

8#3

(∅1 10)

1#3

8#3

6#3

11#4 14#4

18#4 B79

3#3

12#4

14 16#4 R h=40

6#5

3#3

R2 3 h= 40

6#4

14#4

4#3

B53

V-46

20x 40

100x

P6

11#3

10#3

(∅1 10) (∅1 20)

Insuf.

3#3

V- 3#3 1#3 11 2#3

B54

3#3

V15

5 V-

18#4 19#4

10#3 Insuf. 14#3

18#4

3#8

Estribos

(∅1 10) (∅1 20)

2#5 18#4

4#3

5#3 6#3

P63

2#5

14#4

5#3

L=900

INFERIOR

80

7#5

6#3

R2 h= 40

1#3

10 0x

14#4

7#4

7#3

P35

10#3 19#4

4#3 100 x80

14#5

(∅1 10) (∅1 20)

8#3

9#5

2#3

5#3

1#3 7#3

14#5 Insuf.

1#3

B52

17#4 8#5

B22

12 40 R h=

P56

B55

5#3

21#5

13#4

8#3

6#3

7#4 17#4 6#3

11#3 4#3

80

R1 h= 7 40

6#3

B23

40 V- 4#

6#3 10 0x

5#3

12#4

2#3

5#3 4#3

17#4 8#5 7#3

1#3

4#5

5#3

17#4

1#3

(∅1 20)

6#3

1#3

R1 h= 40

4#3

6#3

9#3

9#3

0

3

7#4

14#3

x4

20x40

2#3

7#3

5#3

B56

20

0 R1 40 h=

3#5

4#3

B57

7#4

(∅1 10) (∅1 20)

(∅1 10)

8#5

3#4

P55

P7

14#4

12#3

2#5

1#3

x40 20

V8

2#5

B58

2#3

4 V-

13#4

2 Marc o

8#3

x80 100

21#4

40

R740 h=

V

3#4

1#3

6#3

2#3

20x

2#3

V-3 2#4

2#4

1#3 14#4

4#3

4#3

5#3

13#4

21#4

B60

B61

6#3

6#3

B59

9 -3

0 0x8 10

P4

(∅1 10) (∅1 20)

5#3

8#3 8#5

R5 40 h=

R3 40 h=

21#4

6#3

4#3

5#3

4#3

2#3

44

9#5 18#4

21#4

4#3

h=

6#3

o Marc

1#3

18#4

0 20x4

B62

0 20x4

2#3

13#3 Marco R9 4#3 40

1#3

7#4

6#4

6#3

100x80

7# 145#3 14#3

B63

2#4

7#4

6#3 4#3

8#8

(∅1 20)

3#4

7#4 16#4

18#4

4#3

x80

2#4

5#3

L=500

2#3A.LATERAL

(∅1 10)

x80

50

14#4

15 #4 9# 5

6#3

L=500

P1

x80

2#3

100

M1

41 V- 2#4

40

18#4

19#4

8#4

7#3

V51

P54

:

21#4

43 V-

(∅1 10) (∅1 20)

8#5 18#4

8#4 17#4

2#3

3#4

0

100

11#5

20#5

2#3A.LATERAL

30

V-3

1#3

6#5

4#3

V55

0x8

21#4

Insuf.

V-49

2#4 3#5 10

1#3

1#3

1#3

3#4

3#4

100x80

41 V-

(∅1 10)

P64

(∅1 10) (∅1 20)

V-3

100x80

8#5 3#4

V-50

P3

(∅1 20)

(∅1 10) (∅1 20)

100x80

3#4

3#4

1#3

80 100x

100x80

P38

(∅1 10) (∅1 20)

V-41

10

P53

(∅1 10) (∅1 20)

RESTAURANTE.

L=370

1#3 2#3A.LATERAL

NERVADURA VERTICAL 1 LOSA 1

148

L=470 L=570

1#8 2#8

SUPERIOR

10000

40

AREA LOCALES Y RESTAURANTE.

V-7

64

Escala

1:100

y/o especificada


18 17 8.75 m

0.12

3.17

1.32

0.12

19#4

1.32

3.21

0.12

)

)

18#4

0

V-3 0

4#3

Insuf.

Insuf.

V-25

6#3

0.15

0.66

80

26

76

76

30 30

30 30

30

30

30

30

80

76

76 30

19

30

14 19

30

30

30

80 76

76

30 26

30 30 30 30

18 19

DE MECANICA DE SUELO

18

10#5A.LATERAL L=1030

10#5A.LATERAL L=1030

23

16#3

INFERIOR

Estribos

B33

30

Viga 12

0

76

20x2

4x 1e#2 c/13 40

6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO

40

21x2e#3c/12

96x2e#2c/12

36x2e#4c/12

252

1152

432

89

P59

882

7.- VER ESPECIFICACIONES EN ACI-318-99

3#6 L=340 M19: 30

170

5#5 L=255

TABLAS DE CUANTIFIACION

170

4#6 L=375

185

5#5 L=310

8#8 L=585

7#8 L=1165

2#4 L=130

2 41

64

8#8 L=1200

8#8 L=575

30

7#3

190 32

5#3 L=900 30

8.- RECUBRIMIENTO MINIMOS LIBRES: A) ZAPATA Y LOSA DE CIMENTACION 7 cms. B) TRABES DE CIMENTACION 5 cms. C) PEDESTALES 5 cms. D) COLUMNAS 4 cms. 9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN.

2.40

2.24 2.29

1.95

10#4

R16 h=40

32 INFERIOR

4#6 L=865 Estribos

Para detalle de columnas Ver tabla en plano H137 Tabla de columnas

5.59 0.15

5#6 L=920

63x2e#2c/12 752

90

40

NOTA IMPORTANTE:

40

4#3

10#3

19#4

30

6#3A.LATERAL L=895

6#3

6#3

0.12

56.00 NSL

2#3

0.15

10#3

Insuf.

V-1 1

2.40

7#3

8#4

31

B7

6#3

1.32

0.12Insuf.

6#4 5#4

Identificacion de anclaje de prefabircado

Insuf.

2.92

1.32

13#3

4#3

20#4

0.12

1#3

0.12

2.40 2#3

1.32

Insuf.

14#5

11#4 9#3

3#3

10 100x 0x80 80

1#3

0.12

5.- TODOS LOS RELLENOS DEBERAN SER

100x80

COMPACTADOS DE ACUERDO A ESTUDIO

64

L7 h=20

100x80

8#3

V-4 4#3

0.15

B8

20x20

1.32

0.12

7#3

100x 10 0x80 80

2.40 6#4

1.32

20x30

100

V-1 6

6#3 6#3

7#5

10#3

Insuf.

6#3

5#3 5#3

11#3

13#3

3.- CONCRETO f'c=250 kg/cm2. 4.- ACERO DE REFUERZO f'y=5200 kg/cm2.

3

80 0x

2.40

0.15

7#5 L=1025

4#5 L=1080

0.66

Insuf.

0.12

2#8 L=397 19

B9

V16

8#3

1.32

0.12

1.32

0 15x2

SUPERIOR

2.61

0.17

0.66

5#3

3#4

15x20

0.12

5#3

0.15

6#8 L=500

3#5 L=1100 2ªcapa 15x20

2.58

1.32

1.32

0.12 1.76

2#4 Insuf.

4#8 L=465

3#8 L=485

SUPERIOR 15x20

15x20

10

2.40 2.77

2#8 L=446

100x80 Insuf.

P17

1965 5#8 L=425 2ªcapa

15x20

0 x2 6#3 4#3 15 3#3 3#3

P18

83

12#3

4#3

15x20

1.- DIMENSIONES EN CENTIMETROS 2.- NIVELES EN METROS

64

1#8 L=465 2ªcapa

12#3

3#3

(∅90)

V7

1.32

0.12 5#4 7#4

9#3 10#3

B3

1.32

0.12

8#5

P35

P5 (∅80)

Insuf. Insuf. 0.12

3#3 2#3

16

7#3

Insuf.

6#4

1.89

2.68

2.70

2.40

ESTÁ PENDIENTE EL NIVEL DE DESPLANTE DE LA CIMENTACION POR OTROS, DEBIDO A QUE LA CISTERNA INTERFIERE CON LA LOSA DE CIMENTACION, SE PROPONE SE BUSQUE UNA SOLUCION AL PROBLEMA.

P45

(∅120)

P46

(∅120)

P8

(∅120)

Insuf.

P8

14#4

Insuf.

Insuf. 1#3

-24.00 NSL

0.12

3#3

2#3

V-13

1.32

8#3

100x80

B0

22#5

3#3

3#3

V-5

Insuf. 7#3

4#3

4#3

3#3

P42

3.23

P34

V-14

(∅120)

4#3

8#3 3#3

20x30

P9

(∅120)

100x80

6#4

6#4

6#5

6#4

9#4

5#3

1.32

2#3

B18

3.13

4#3

3.88

P12 (∅80)

12#4

NIVEL PISO TERMINADO

NSZ

Nivel superior de Zapata

B19

9#3

6#4

Nivel

1.32

R8 h=40

0.15

2.40

100

6#3

64

0.12

SUPERIOR

7#8 L=500

0.15 P20

4#3

(∅90

6#3

)

5#5 L=490 5#3 L=1010

5#3 L=1045

12

3.48

4#3

SUPERIOR

319

B3

30 20

16

16

370

828

B7

2#3 L=880

20

16

16

201

99

B8

2#3 L=495

2#3 L=720

2#3 L=340

2#3 L=890 31

100x80

0 x3 20

3.61

20

11

30 9#3

B9

5#5 L=455

30

6#3

16

7#8 L=465

8#3

20

11

0 20x3

0.15 10#3

2.40

20

Marco 16

2021 7#8 L=425

26

P54

0 20x3

B8

CITELIS Stela City

B5

1.77

2.40

30

64

Identificacion de anclaje de prefabircado

0.15

2.40

26

3.11

26

0.15

2.40 18#4

8#6

Viga- 9

30

7#5 B7

30

m 7.81

6#4

0.15

2.40

V-8

5#4

26

21#4

Ubicacion del plano en el conjunto

Viga- 1

80 100x

26

0 100x8

0 20x3

5#3

0.12

30

0.15

2.40

30

5#4

0.12

11

V-10

0.12 0.12

1.32

1.32

4#3

0.12

1.32 1.32

0.12

0.12

0.12

1.32

0.12

2.40

0.12

1.32

20#4

3#5

0.12

1.32

1.32 3#5

2.04

1.32 1.32

18#4

76

3.42

14 19 19

0.12

(∅90)

80

20x30

8#3

P57 (∅80)

0 20x3 B20

1.81

76

1.32

20x30

20x30

20x30

20x30

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

20x30

10 V17

12#4

1.32

30 0x

6#3A.LATERAL L=1020

INFERIOR

8#8 L=1200

8#8 L=585

0.12

1.32 2#3

Estribos

0.12 (∅90

1.32

19 V-

)

2.40

1.32 2.47

40x2e#4c/12

114x2e#2c/12

480

1357

84

1.32

1.32

64x1e#2c/13 824

22

22

16x1e#2c/13 197

22

8x1e#2c/13 95 2

100

20

Viga -5

0.12

7#3

29x1e#2c/13 366

20

26

0.12

8#8 L=595

Identificacion de anclaje de prefabircado

P17

7#3

1#3 L=695

22

30

0x 80

B6

1.32

8#4

0.12

10

44.00 NSL

20 x3 0

2.81

1#3 L=285 25x1e#2c/13 315

2

7#8 L=1155

10#3 1#3

Estribos

30

11

0.15

20

26

0.12 2

INFERIOR 18

6#3A.LATERAL L=1030

2#3 L=130

2#3 L=235

30

V-

2#3 L=860

2#3 L=405

30

0.12 Insuf. 1.32

2#3

2#3 L=345

26

17 V-

44.00 NSL

11

B2

30

011 Nivel 11 Losa Azotea Tipo Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:200

16

1.32

80 0x 10

7

N.P.T.

(∅90) 8#4

(∅90)

NIVEL FOSO ELEVADOR

0 20x3

14#4 B5

P11 (∅80)

N.F.E.

2#3

1.00

B4

B6

20x30

100x80

V7

B39 0 20x4 B3 8 Insuf.

20x30

R51 h=40

B17

20x30

20x30

6#4

3#4

REFUERZO POR PUNZONAMIENTO

20x30

12#3

1#3

2.86

B16

1.32 0.12

0.12

20x30

0.12

1.32

B15

ARMADO EN AMBOS SENTIDOS

V-14

1.32 0.66

B13

20x30

1#3

Insuf.

1.44 0.12

1.44 0.12

0.121.44

0.12

0.12

100x80

20x40

20x40

V-9

7.76 m

1.32 1.320.12

3.02

1.32

1.32

15#3

0.12

4#4

1.32

P41

(∅120)

B14

Insuf. 0.12

12#5

12#4

1.32

V-13

20x30

0.12 R7 h=40

2.72

1.32 1.32

0.12

1.32 R48 h=40

11#3

7#4

0.12 12#4

B36 0 20x4 B3 7

20x30

1.45 Insuf.

R45 h=40

6.19

B12

(∅90)

Insuf.

3#4

Despiece de Vigas Plantas Tipo Nivel 14 Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:50

B26

B11

8#3 2#4

P9 (∅80)

2.50

8#3

1#3

REFUERZO INFERIOR REPETIR ARMADO A LO LARGO DE FLECHA

3#3

4#4

3.99

3#5

6#3 B3

REFUERZO SUPERIOR

R.I.

B37

100x80

5#3

0.22

V-17

100x80 100x80

V-6 P10 (∅80) (∅90)

ARMADO BASE

B10

100x80

6#3 P10

(∅120)

A.B. R.S.

(∅120)

20x30

P33

(∅120)

20x3 0

3#3

Insuf.

Insuf.

7#3

18#3

Marco

5#5

2.16

35

8#5

20x30

6#5

3.33

2.91

100x80

R18 h=40

1.32

8

L10 h=20

5#3

V-30

100x80

100x80

6#4

0.12

Losa estructural Planta Tipo Oficinas Nivel 14

SIMBOLOGIA

8#3

Insuf.

1.32 Insuf.

2#5

1#3

9

80 100x

B36

P49

18#3

B9

100x 80

(∅120)

2.73 Insuf.

(∅80 ) (∅90 )

2.80 2.40

0.15 Insuf.

3#3

0.52

0

5#3

3.88

P56

(∅120)

20x2

6#3

Bethuel Serbulo A00808771

NOTAS:

64

6#3

P5 (∅120)

4.63

2.01

100

20

0 x2 20

4#3

Insuf.

1.32

V-3

4#3 3#3

R h= 6 40 R1 h1.32 =4 4 0

Insuf.

P7

(∅80

14#5 14#5

0.12

0 1#3

92

Marco 13

P19

2.49 2.40

Hector Niño A00810504

2#4 L=110

5#3

1.78

20 x4

NIVEL PISO TERMINADO

P37

19

Insuf.

(∅90

4#3 3#3

B54

21#4

NIVEL FOSO ELEVADOR

N.P.T.

730

(∅120)

6#3 10#3

1.32

1.32

0.12

N.F.E.

61x2e#2c/12

20 x2 0

1.32

0.12

Insuf.

8#8 L=180 120x2e#2c/12

15#3 4#3

(∅80) (∅90)

13#4

2#3

101 00x0 8x08 0

20 x4

1.32

1.32

0.12

R h= 2 4 40

20x 40

5#3 5#3

0.12 18#4

V-30

L4 h=20

11000 0xx8 800

V-2 5 V-11 10 10 0x80 0x 80

V-1 1

1.32

0.12

11#4

6#3

REFUERZO POR PUNZONAMIENTO

M20: 30

1100 00xx 8800

8.2 0m

8m 7.9

1.32

P7

3#3

19#4

8#3

P35

x2 0 5#3 P615

5#3

0.12

2#3

-24.00 NSL 4#3

6#3

5#3

Insuf.

1.32 4#3 3#3

4 V-

1.32

0.12

1.32

30 V-

Insuf.

Insuf.

8#3

0.66

18#4 0.12

1.32

0.12

9#3 7#4

0.12

6#3 5#3

7#4

0.66

14#3

130

100x80

Insuf.

0.12

1.32 1#3 1#3

0.12

19#4

2#3

R h= 5 40 R1 h1.32 =4 2 0

Insuf.

9#8 L=590

8#8 L=1200

4#6 L=565 13x2e#2.5c/10 92

16#5

16#4

19#4

1.32

0.12

V-16

15x20

3#3

80 100x

7#3 6#3

7#3

11#3

1.32

4#8 L=1099

Estribos

V-33

6#3 7#3

0.69 1.22

2.54

15x20

1.32

2.67 2.57

1.12

12#4 12#3

(∅80) (∅90)

4.03

2.56 17#3

2.59 2.48

2 V-

1.32 0.12

Insuf. 2#3 2#3

3.72

100x80

Insuf.

56.00 NSL

8#3

V-32

80 0x

3.88 3.88

V-29

10

0.12

17#4

8#5 8#4

7 V-2

0x 80

P6

(∅120)

0.12

0.12

2.93

6#3

2.08

5.01

INFERIOR

ARMADO EN AMBOS SENTIDOS

Insuf.

1.68 1.32 9#3

10

5#3 5#3

0.12

Insuf. Insuf.

1.85 80 0x80 10 100x

0.12 6#3 7#3

0.12 20#4 1.32 1.32

V-12

1.32

80 0x80 100x 10

R3 40 h=

1 V-

V2

4#3 4#3

Insuf.

1.32

REFUERZO INFERIOR

(∅120)

Insuf.

Insuf.

REFUERZO SUPERIOR

R.I.

REPETIR ARMADO A LO LARGO DE FLECHA

0.12

Insuf.

6#3 5#3

0.12 21#4 19#4

1.32

15#6

14#3

1.32

0.12

0.12

1.32

1.32

56.00 NSL

5#3 5#4

0.12

0.12

Insuf. Insuf.

0.12 15#5

-24.00 NSL

R.S.

4.30 Insuf.

Insuf. 19#5

1.32

1.32

9#8 L=1200

33x2e#4c/12

Carolina Rdz A00810722

19

6#3A.LATERAL L=1025

6#3A.LATERAL L=1015 9#8 L=580

8#8 L=170

Insuf.

1.32

Insuf. Insuf.

0.12

6#3

14#3

1.32 Insuf.

0 x08 x08 100 10

6#3

7#5 7#4

1.32

0.12

2#4 3#5

9 RR4 4400 = hh=

12#3

Insuf.

0.12

16#5

14#4 13#4

13#4

100x80

Jose O. Gonzalez A0036670

Viga 24

16#5

12#4

5#3 L=1040

ARMADO BASE

0.12

15#3 15#4

1.32

1#3 1#3

1.32

1.32

2#4 3#4

3#3

0.12

7#4

1.32 0.12

21#5 21#5

5#5 L=490 5#3 L=1005

22

6#3A.LATERAL L=1000

17#5 Insuf.

14#4 14#4

0.12

1.32 7#4

1.93

11#3

A.B.

1.32

1#32#3

Insuf. 12#3

3.00 2.89

P55 P5

(∅120) 5 (∅80 ) (∅90 )

40 0x 24#3

15#4 0.12

0.98

0.12

1.32

B57

5#8 L=500

17

SIMBOLOGIA

13#4

0.12 10#3 11#3

0.12

5#5 L=450

13

14

100x80

5#8 L=460

INFERIOR

10#3 9#3

0.12

1.51

Insuf.

0.12

SUPERIOR

1.32

1.32

4#34#3

0.12 1.32 8#5

9#5

0.66

8#3 10#3

B2

2014 5#8 L=425

5#3 L=1015

B) TRABES DE CIMENTACION 5 cms.

1.32

8#3

19.94

2 R1 40 h=

2.91

1#3

15#4

1.32

14#4

4#3 5#3 0 x4 20

1.72

2.40

2#5 3#5

2#3

0.12

1.32

14#4

0.12

2.93 3#5

1.32

0.12

1.32 Insuf.

1.26

9#3

6#6 L=395

C) PEDESTALES 5 cms. D) COLUMNAS 4 cms. 9.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN. 10.-CHECAR DETALLE DE COLUMNASEN PLANO H137

1.32 0.12

8#3

7#3

6#3 6#3

R7 0 4 h=

0.12

1#3

2#5

0.57

2#3 0 x4 20

6#3

(∅90)

Losa estructural Planta Tipo Hotel Nivel 14

1.32

20#4

21#41.32 20#4

1#3

P4 (∅80)

0.12

21#4

1.32

A) ZAPATA Y LOSA DE CIMENTACION 7 cms.

7#3 8#3

0.12

5#3 6#3

1.32

8.- RECUBRIMIENTO MINIMOS LIBRES:

1.32

P59

5#6 L=375

76

1100 00xx 8800

8#3 7#3

SUPERIOR

2#3

V-15

1.32

Insuf.

1.32

6#6 L=310

7.- VER ESPECIFICACIONES EN ACI-318-99

0.12 6#3 8#3

0.12 0.12

8#4

2#4 3#4

3.16 3.21

20x40

B61

0.12

0.12 1.32

1.32

8#4

P4

R2 R5 0 h=4 h=40

4#3 5#3

64

6#6 L=325

6.- CAPACIDAD DE TERRENO CONSIDERADA DE 8.00 Kg/cm2 A UNA PROFUNDIDAD DE SEGUN MECANICA DE SUELO

1.32

0.12

18#4 20#4

8#5

6#3 7#3

P17

1043

DE MECANICA DE SUELO 6# 6#3 4

15x20

0.12

1.32

Insuf.

4#3 4#3

(∅120)

0.07

P20

COMPACTADOS DE ACUERDO A ESTUDIO 100x80

10#4

11

0.12

1.32

64

5.- TODOS LOS RELLENOS DEBERAN SER

R1 R3 0 h=4 h=40

0.12

1.32

20#4 18#4

3.88

1#3

4#3 2#3

64

3.- CONCRETO f'c=300 kg/cm2. 4.- ACERO DE REFUERZO f'y=4200 kg/cm2.

100x80 100x80

3.88

1#3

2#3 2#3

0.12

x80 x80 100 100

V-

0.12

0.66

91

100

2.- NIVELES EN METROS

5#3

5#4 6#4

1.32 2#3 2.72 Insuf. 2.62

6#4

1.32

0.33

100x80

15#4

0.12 14#3

1.32

1.- DIMENSIONES EN CENTIMETROS

0.12

0 20x4

1.32

3#3 4#3

R9 h=40

4#3

480

64

NOTAS:

-24.00 NSL

0.12 0.12

0.12

0.12

7#4

1.43

Insuf.

2#3

20

0.12

40x2e#4c/12

928

Viga 22

0.10

0.12

Viga 11

6#4

5#3

23

0.12

3.09

6#3 4#3

1.32 x40

B62

78x2e#2c/12

430

WWW.BETAHECA.COM

23

1.32 0.12

56.00 NSL

1.55

0.12

43x2e#3c/10 90

100

0.66

1.32 1.32

1.32

1.32 8#4

10#8 L=590

8#8 L=1185

5#3

8#4 7#3

1.32

1.32

0.66

20#4 19#4

1.32

1.32

0.12 6#5 7#5 13#3 15#4

1.32

18#4

80

1.32

Insuf.

10#8 L=1200

0.66

1.32

15#4

20

6#3A.LATERAL L=1020

6#3A.LATERAL L=1020 10#8 L=590

Estribos

0.12

14#4

8#5 9#5

20

30

Insuf.

0.12

7#3 7#3

0.12 16#4 16#4

2

21#4

7#4

21#4 21#4

21#4 21#4

1.32

0.12

2#4 2#4

2.97

1.32

Insuf.

1.95

1.88

2#4 2#4

19#4

0.12

16#4

1.32

19#4

8#4

0.12 0.12

3.73

1.74

91x1e#2c/13 1171

2

INFERIOR

V-17

: 50 M1 P54 P54 (∅80) (∅90)

(∅120)

5 -2

3#5

2.95Insuf.

3#5

1#3

Estribos

19

m 8. 41

V

40

20 15x

8800 00xx 1100

11 V-

0.12 0.12 8#5

1.84

2#3

0.12

9#5

1.44 1.32

3#3

3#5

3.07

4.29

Insuf.

0.12 1.32

15

2#8 L=1185 2ªcapa

1.32 8#5

Insuf.

5#3 L=1010 100x80

20#4

Insuf. 0.12 3#4

3.57

7#8 L=505 5#3 L=1010

Insuf. Insuf.

3.88 3.88 Insuf.

2#4

3#5

14

0.12

1.32

2#3 2#3

4.02

5#8 L=505

80

1#3 2#4

P3 P3 (∅120) (∅80) (∅90)

Losa estructural Planta Tipo Vivienda Nivel 14

2.59 Insuf.

1.32

2#4 Insuf. 2.78 3#5

7#8 L=465

6#3

Insuf. 3#5

2.94

3.45

2#3 L=90

1#3 L=1155

(∅90)

6#4

6#8 L=425 2ªcapa

5#8 L=465

15

76

0

7#5

2#3

3#4 3#4

2#3 L=1175

INFERIOR

P36 (∅80)

2.63

23 23

x2 15

SUPERIOR

8#3 4#3

Insuf.

0.51

3#4

3.87

1#3

P20

2019 5#8 L=425

76

3.81 P53 (∅80) P53 (∅90) (∅120)

100x80 100x80

V-11

V-25

64 P19

(∅120)

18

6#3

64

P38

6#3

6#3

0 15x2

80 0x80 10 100x

20x30

(∅120)

100

2#4 L=620

P36

12#3

0

0 15x2

1 V-1

(∅120)

SUPERIOR

2#4 L=620

11

9m

56.00 NSL

Viga 19

B6

1175

L2 h=20

8.4

15

20 15x

12

15x20

15x20

15x20

15x20 15x2

2.08

13

16 B5

23

014 Nivel 14 Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:200

20

15

-006 Estacionamiento 6 Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:100

Losa estructural Planta Tipo Vivienda Nivel 14

Viga 10

15

m

30

8.61

30

Despiece de Vigas Losa Azotea Replanteo Concreto: f'c=300 Aceros en losas: fy = 4200 Escala: 1:50

16

16

16

16

341

1600

390

0.12 0.12

R h= 1 1 40

0.15

9#5

P19

(∅90

B4

1.32

0.12

10#5

)

0.12 18#4

0.12

1.32

1.32

8#3

4#3

0.12 1.32

1.66

4#3

2.40

1.32

7#3

6#3

0.12

2#3 L=420 20x30

2#3 L=370

2#4 L=1200

2#4 L=280

2#3 L=415

2#4 L=280

Estribos

0

1#3 L=390 26x1e#2c/13 2

337

123x1e#2c/13 22

2

4

6

29x1e#2c/13

1596

22

368

8m 1:200

20

100x 80

6#4

0.12

INFERIOR

0.15

1.32 0.66

20x30

8#3

0.12

25#4

1.32

4.20

2#3

R h= 1 2 40

0.12

20x30

9#4

2#3

0.66

0.12

11#6

230 30 32

2.40

1.32

24#4

6#3

355 2#3 L=845

2#3 L=1170

11

16#4

V22

3.74 8#3

2#3 L=705

11

0.12

11

SUPERIOR

11#3

1.32

10 0x 80

1.32 0.12

B10

2#4 L=585

0.12

8#4

1.32

2.40

1.32

0.12

3.24

B9

13#4

1.32

11

7#4

0.12 1.32

0.15

8 0x 10

0.12

0

Estructural Losas Tipo y Azotea

80

80

0.15

21#4

80

5#4

0.12 1.32

80

3.49

VIGA - 11

2.40

1.32

0.12

3.88

80

21#4

6#3

80

12

1.32

0.12

8#4

V-2 4

V-

P59

(∅90

)

0.12 1.32 20 x3 0

21#4

100

64

6#4

100

64

100

64

100

64

100

64

64

3.69

10 0x 80

64 P7

4#4

3.60

64 P4

813

64 P54

846

64 P3

851

76

76

76

76

76

76

76

76 64

P55

855

64 P53

866

P36

909

0.15

1#8 L=290 2ªcapa 2#8 L=290

2.40

SUPERIOR

6#6 L=355 23

B3

23

8.4 8

165

5#6 L=435

4#6 L=390

180 5#3 L=870

3#6 L=335

165

165

210 30

5#3 L=875

4#6 L=370

180

6#6 L=625 170

300

190

6#6 L=775

370

m

195

325 405

5#3 L=910

30 100x80

3#6 L=370

32 100x80

100x80

175

4#6 L=455

265 32

5#3 L=915

5#3 L=930

3#8 L=390 4#8 L=490

190 30

30

3#6 L=330

0

)

20 x3

P18

(∅90

30

12

5#3 L=925

100x80

100x80

1

6#3A.LATERAL L=915

31

30 23

LOSAS ESTRUCTURALES PLANTAS TIPO / OFICINA VIVIENDA HOTEL AZOTEA 1 : 200

32

6#3A.LATERAL L=910

6#3A.LATERAL L=875

INFERIOR

5#6 L=875

4#6 L=835

86

62x2e#2c/12 734

35

35

62x2e#2c/12 742

5#8 L=900

5#6 L=895

35

35

65x2e#2c/12 775

35

35

Autor

-

Revisado

-

65x2e#2c/12 780

6#3A.LATERAL L=920 30 5#8 L=975

5#6 L=930

4#8 L=885

4#6 L=880

4#6 L=645 Estribos

6#3A.LATERAL L=930 32

5#6 L=910

-

100x80

4#8 L=890

4#6 L=900

35

35

67x2e#2c/12 795

30

30

Fecha

31

4 6#3A.LATERAL L=865

0001

Numero de projecto

30

V-

2.40

30

m

2.35

76

2.26

76

76

0.15

Losa Estructural Azotea Nivel 11 Planta tipo Oficina

76

21#4

32 8.

5

100

2.40

35

35

53x2e#2c/12 634

14x2e#2c/11 154

85

H135

3

Escala

1:200 y/o especificada


(∅1 10) (∅1 20)

80 10 0x

80 0x 10

6

V-60 100x80

V60 x80

100

80

100x8 0

V5

0x

100 x80

V65

V-53 100x80

P26

10

0x 80

(∅1 10) (∅1 20)

2#3

V-

65

x80

P16

100 x80

100

V51

10

80 10 0x

80

0x

48

V-

6 V5

0x 80 10

x80 100

80 10 0x

23

30

x80

Marco 31 Marco 32

23

30

11

23 11

V45

76

76

80

76

76

80

76 23 14 23

20x 40

x80 100

V-4 1 20x40

20x40

100x8 0

V-41

V-41

80 76

76

76

80 30

V3

10

V-65

100x80

V-65

V-28

3#4

V-65

(∅1 10) (∅1 20)

1#3 2#4

3#5 3#5 1#3 3#4

10

0 0x8

65 V-

P62

(∅1 10) (∅1 20)

2#4 3#4

10#4 6#4

100x80

P60

20#4 3#5

V-3

3#5

100x80

14 7##4 5

3#3 2#4

P15

(∅1 10) (∅1 20)

x80

1#3

V-3

21#4 8#4

0

16#4 7#4

100x8

18#4

5#4 20#4

3#4

14#4

9#5 14#4

21#4

4#4

1#3

(∅1 20)

1#3

13#4 3#4

8#4 19#4

V65

4#3

6#4

x80

5#3 19#4

40 h=

18#4

18#4

V7

9#5

27 V-

3#3 100

14#4

6#3

6#3

0 R5 0 4 h=

4#4

V28

4#3

4#3

P68

80

8#4 3#4

3#3

5#3 8#4

21#4

17 8# #4 5 17#4

6#4

1#3

3#4

20#4

5#3

7#4

6#4

1#3

13#3 7#5 12#3

9#5 13#4

6#3

8#3

6#3

2#3

4#3

6#3

7#3

0x 10

P18

21#4

6#3 6#3

R57 h=40

1#3

1#3

V-61

2#4 (∅1 20) (∅1 10)

14#4

R61 h=40

0 0x8 10

13#4

4#3

5#3

5#3

8#5

2#4

5#3

100x80

80

R63 h= 40

4#3

V-7

0x

x80

10

5#3

2#3 100x80

2#4

1#3 3#3

7#4

7##4 15 5

100x80

V28

R62 h=40

6#3

6#3

15#4

100

18#4

2#4

6#3

100x80

B11

6#3

5#3

V-7

18#4

6#4

5#3

6#3

(∅1 20)

18#4

5#3

22

16#4

6#3

6#3

P27

16#4

7#4 16#4

7#4

x80 100

8#4

6#3

1#3

7#3

V-

7#3

4#3

5#3

3 R5 40 h=

0

9#3

7#5

17#4

6#3

4#3

2#3

18#4 4#3

6#3

3#3 7#6

6#3

3#3

8#3

3#3

(∅1 20)

P67

8#4

6#3

5#4 12#36#5

3#3

5#3

5#3

3#3

7#3

2#3

13#3

4#3

R3 8 h= 40 1#3

80

hR =444 0

11#3

9#3

3#3

3#3

16#4

8#3 3#3

1#3

x80

3#3 0x

12#3

7#4

15#4

12#4

9#3

7#3

10

5#3 9#3

14#4

11#4

11#3

7#3

100

80

9#3

7#3 6#3

B13

P59

15#4

11#4

V25

17#4 11#4

22#5

1#3 7#4

4#3

2#3

3#3

Insuf. 15#5

5#3 2#3

VIGAS LOSA DE NIVEL DE ACCESO.

20#4

6#3

5#3

1#3

1#3

63 V-

x4 20

14#5

2#3

3#3

P25

P14

60 V-

80

(∅1 20)

1#3

19#4

100

(∅1 10) (∅1 20)

14#5

100x

6#3

5#3

9#3

14#4

(∅1 10) (∅1 20)

60 V-

(∅1 10) (∅1 20)

V-57

R6 h= 0 40

5#6

16#5

P32

P13

15#5

5#6 14#4

4#3

7#3

2#3

19#5

5#5

3#5

80

V-58

30

0x

20x40

20x40

100x80

1#3

1#3

4#5 5#5

P28

14#4

17#3

3#3

R33 h= 40

10#3 4#3

15#5

2 R4 h=40

5#3

2#3

12#6

h=40

5#4

3#3

B3

10#4

4#4

19#3

13#4

V19

2#3

Insuf.

7#3 x80 100

100x80

14#5 R5 6 1#3 h=4 14#5 0

2#3

6#5

40 h=

10

x80 100

63 V-

V-57

5#3 6#3

7#4

2#3

6#3

17#4

9#3

B31 B30

(∅1 10)

113

V-58

5#3

3#4 3#4

(∅1 10) (∅1 20)

19#5

12#3 2#3

(∅1 20)

92x2e#2c/12 1101

49

20x40

49

18 V-

276

4#3

Ma 7#4 rc o 29

4# h=3 1#3 R6 40 7

L=180

5#6

x80 100

23x2e#3c/12

1383

80

116x2e#2c/12

143

L=1200 L=940

1#5

0x

13x2e#2c/11 109

5#6 4#6

L=115

14#3 7#4

x4 0

30

5#6

20

o rc

L=515

5#8

13#3

0 x4 20 B28 B29

4#4 hR =646 0

2#3

1#3

14

2#3

80

4#4

19#4

V-16

(∅1 20)

1#3 10 0x

3#3

(∅1 20)

P40

R27 h=40

P24

5#3

1#3

1#3 1#3 3#3

1#3

4#3

4#3

5#3

7#3

11#3

12#3

3#4

16#4

4#5

100x80

100x80

R3 h= 6 40 1#3

15#3

M16: 30

100x

10#4

11#5 14#5 16#5 7#3

V-13

M2: 30

B81

B82

15#5

2#3

4#3

Ma

Estribos

L=1200 L=1160

5#8 5#8

L=590

80 0x

5#8

30

28

L=665

3#3

20x40

P17

3#3

2#5 4#4

4#4

(∅1 20)

6#3A.LATERAL

3#3

20x40

V24 hR =545 0

8#5 10#3

9#3

10

INFERIOR

12x2e#2c/12 22 144 2

L=1010

6#3A.LATERAL

P19

L=665

6#3A.LATERAL

Marco

1#3

1#3

R5 4 h=4 0

2#3

4#3

0

L=200

4#6

L=450

31

3#3

12#3 3#3

x80

5#3

3#3

3#3

100x80

5#3 1#3

3#3

100

3#3

P66

2#4

19#4 7# 5

3#3

ESPECIFICACIONES (∅1 20)

5#4 14#3

4#3

3#3

2#3

Insuf.

18#4 7#4

6#3

5#3

3#3

3#3

3#3

1#4

4#4

B8420x40

(∅1 (∅1 10) 20)

4#3 6#3

x4 20

109

7#8 108x2e#2c/12 1294

30

L=1010

9#5

5#4 5#4

20x40

B4

9#3

5#3

10#5

2#3

4#3

2#3

V-12

R3 h= 1 40

V19

6 R140 h=

6#3

(∅1 20)

(∅1 20)

3#4

12#3

R22 h=40

8#4

P39

P23

1#3

4#3

(∅1 20)

2#4

11#3 7#5

5#4

20#4

2#3

2#3

12#4 11#4

V- 11#4 25

x80 100

B72

1#4

h=4 0

3#3 3#3 1#3

B83

14#5

5#3

7#5

B10

B12

28 V-

L=1200 L=1100

6#3A.LATERAL

V-55

(∅1 20)

(∅1 20)

9#5

2#3

10

0 0x8

2#4

R4 3 h=4 0

6#3

4#3 5#3

6#4 12#3

(∅1 10)

L=190

x80

10

Estribos

7#8 6#8

L=575 40x2e#4c/12 480

L=190

3#3A.LATERAL 32 3#3A.LATERAL

L=950

100

28

7#8

6#3A.LATERAL

4 V-2

18#4 2#5 14#3

9#3

V24

13#4

5#3

B16

V-

INFERIOR

100x80

h=

9# 184#4

2#5

P47 P48 x80

1#3

6#3

8#3 4#3 6#3

hR =645 0

L=1000

6#3A.LATERAL

11#3

5#3 7#3

12#3

3#3

4#3

4#5

3#3

8#4

B17

(∅1 20) (∅1 10)

27

2#3

B75 100

1#4

B2

100x80

9#4 9#5 9#4

10#4

(∅1 20)

15#5 17#5 Insuf.

1#3

2#5

P20

(∅1 10) (∅1 20)

14#4

5420 R h=

8 o 3 7 Marc o 3 MaRrc6440

P58

3#3

2#4

30

100x80

x80

5#3

100x80

33

9 R4 40 h=

0 20x4

100

L=650

5#3

L=320 L=455

10#5

1#3 0 0x8 10

6#3

42 V-

7#4

0 20x4

6#6 6#6 L=650

3#3

P52

(∅1 20)

8#3

100x80

1#3

6#4

4#3

100x80

4#4

2#3 1#3

1#3

4#3 3#3

6#3

10#4

5 R240 h=

V-13

(∅1 20)

4#3

4#3

11#4

10#4

3#3

P29

11#3

3#3

13#5

2#3

3#3

V-12

(∅1 20)

11#3

9#3

5#3

147# #34

4#3

1#3

11#3

45 V-

B5

6#3

4#3

15#3

B34B35

30

100x80

5490 hR=

31

L=995

5#3

L=1000

26

220 245 265

1 R4 h=40

11#4

3#3

9#3

0 20x4 B33B32

0 20x4

5#3

L=565 L=625 L=705

4#8 5#8 5#8

1#3

4#4

P43

P50 1#4 V18

14#4 13 #4 13#4

5#3

6#4

7#4

3#3 2#4 6#5 2#4 3#3 3#3

5#3

13#5

9#3

6#3

6

6#4 Insuf.

7#4

x80 100

1#3

V-6

(∅1 20)

4#3

5#3

1#5

7#5

11#5

10#4

1#3

x80 100

4#3

6 V-25#3

B14

V-28

100x80

10

345 380 440

7#5 12#3 B15

5#3

1#3

2#4

3#4

V-6 2#4 1#5

B71

x80 100

P12

(∅1 10) (∅1 20)

4#3

4#3

5#4

5480 hR=

L=1065

100x80

0

5#3

25

SUPERIOR

42

(∅1 20) (∅1 10)

1263

L=360 L=430 L=520

3#8 4#8 4#8

1#3

P11

6#3 3#3

14#3

13#4

2#3 7#3 1#3

8#5

P44

P42 P41

1#3

1#3

V-2

P51

P22

4#3

4#3 x80 100

2#3

16#3

3#3

5#3

9#3

13#4

4#3

5#3

12#3

3#3

20#4

1#3

9 R140 h=

Bethuel Serbulo A00808771

5#4

Insuf. 5#3

10#4

B73

h=40

14#5

9#3

R46 h=40

21#4

100x8

L=990

5#3

1960

L=535 L=575

V-28

SUPERIOR

4#6 5#6

P42

5#3

6#4

8#4

3#3

P49

3#3

0 0x8

3#3

B1

11 #5 12 #5

(∅1 20)

9#3

12#5

12#5

100x80

V- 9#5 14

10

2#3

8#3

3#3

7#4

7 R3 5#3

1#3

20#4

2#3

P34

148

L=380 7#8 L=415 7#8 L=535 8#8

10 10

Marco 34 Marco 33

1885

B21

2#3

3#3

5#3

V-23

B20

(∅1 (∅1 10)20)

64

P33

64

20x40

Marco 47

P57

9 R340 h=

100 x80

(∅1 20)

(∅1 20)

2#3

5#3

1#5

P45 P4 6

x80

2#3

1#3 18#3

6#4 5#3 4#3

1#3

Hector Niño A00810504

(∅1 20)

6#3

3#3

1#3

80

1#3

62 V-

B69

0x 10

11#3

Carolina Rdz A00810722

P65

2#3 16#4

5#3

9#3

2#5

3#3 1#3

7#3 13#4

15#5 11#5

4#5

5#6

(∅1 20)

6#3

2#3

7#3 5#3

Jose O. Gonzalez A0036670

2#3

16#4 7#4

P21

5#3

1#3 3#3 4#5

5#3

15#5

(∅1 10) (∅1 20)

h=40

B70

2#3

2#5

3#3 17#3

2#3

1#3

1#3

(∅1 20)

B74

14#5

3#4

13#3

6#3

13#4

62 6#4 V-

7#3

1#3

6#3

B76 100

6#6

100x80

M19: 30

(∅1 20)

100x80

7#3 10#3

12#3 7#4

B39 20x40 B38

64

100

5#3

20x40

P54

100x80

100

VIGA 20

V-21 P9 V-20

(∅1 20) (∅1 10)

4#3

5#3

3#4

P34 1#3

4#3

15#3

7#4 3#4 1 R540 h= Insuf.

1#3

100

64

64

(∅1 20) (∅1 10)

100x80

4#4

5#4

6#4 12#4

6#3

B78

1#3

3#3

2#3 3#3

R1 h= 3 40

13#4 17#5

13#4

1#3

R33 3# h= 2 40

14#5

B6

1#3

1 R240 h=

19#4

x80

V7

M20: 30

12#3

7#5

1#3

2#3

2#4

6#4

10#3

3#3

11#3

100

11#5 12#5 12#5

4#3 1#3

5#3

1#3

8#4

100x80

2#3 2#3

3#5

11#3

3#3

80

5#3

V15

V-24

V-28

VIGA 5

64

64

Marco 47

100x80

100 64

12#4

3#3

3#3

10#3

9#4

100x80

B0

3#3

V-21

8#3

B36 B37 20x40

3#4 8 R440 h= 1#3 4#4

P8

3#3

2#3

1#3

2#3

9#3

hR =246 0

10#4

(∅1 10) (∅1 20)

2#3 2#3

V8

5#4

4#3

V-20

3#5 R45 h=40

1#3

3#3

B18

P10 (∅1 10) (∅1 20)

5#3

3#3

8 R140 h=

9#3

10#4

2#3

20x40

5#4 4#4

3#3

5#4

10 0x

R35 h= 40

3#3

13#4

8#3

22#5

B19

9#3

R30 h= 40

V-17

6#518#3 5#5

(∅1 10) (∅1 20)

6#3 3#3

1#3

20x40

B80

x80

6#3

6#4 5#3 16#3

P33

100

5#5 12#5

5#3

4#3

2#3 1#3 5#3

5#5 1#3

x80 100

2#6

B25

2#5

V10

5#3

14#3 7#4 7#5

B42 20x40 B43

2#3

5#3

15#3

3# 46 9# R34 h= 40

B24

4#3 7#4

1#3

8#3

6#6

20x40

8#4 8#4 8#4

B41 20x40 B40

R28 h= 40 3#5

(∅1 10) (∅1 20)

5#3

h=40

12#4

1#3

(∅1 10) (∅1 20)

3#3

R2 3 h= 40

6#4

0 R2 2#3

43 V-

V15

P5

14#4 4#3

B53

3#3

B77

20x40

20x40

6#3 5#3

2#3 6#3

4#4 3#3

100x80

20x 40

4#5 8#5 3#5 7#5 R29 h= 40 4#5

3#3

V- 3#3 1#3 11 2#3

B54

18#4 B79

12#4

1#3

7#4

3#3

14#4

P2

80

8#5

20x40

18#4 19#4

B22

6#5

3#3 11#3

100 x80

5#3

14#4

19#4

8#3

4#3 B52

17#4 8#5

B23

(∅1 20)

P56

B55

1#3

14 16#4 R h=40

100x80

(∅1 10)

(∅1 10) (∅1 20)

100x

(∅1 10) (∅1 20)

20x40

P7

R1 h= 7 40

6#3 7#4 17#4 6#3

P6

Insuf.

8#5

R6 h= 40

3#3

(∅1 10) (∅1 20)

12#4

13#3

4#3

3#3

P30

3#4

19#4

5#3

V-3

1#3 1#3

P37 V-7

80

x80

80 0x 10

113

5

53

V41

23

23

100 x80

53

100x

4#4

19 6#3 #4

5#3

18#4 11#3

(∅1 20)

1#3 7#4

6#3

8#3

18#4

(∅1 10)

(∅1 10) (∅1 20)

Insuf.

R4 h 6#3 =40

11#4 14#4

P35

10#3

20x 40

53

13#4

14#5

8#3

6

53

21#5

12#4

1#3 9#5

8#3

6#3

8#3

(∅1 10) (∅1 20)

18#4

4#3

6#3

10#3

14#3

14#5 Insuf.

1#3

6#3

V3

53

5#3

17#4 8#5 7#3

12#4

11#3 4#3

80

5#3

5#3

7#3

10#3 Insuf.

9#3

9#3

6#3 10 0x

5#3

1#3 7#3

P63

2#5 18#4

14#4

0

53

17#4

(∅1 10) (∅1 20)

6#3 2#3

2#3

40 V- 4#

5#3 4#3

2 Marc o

R2 h= 40

1#3

2#5

7#5

6#3

0x8

49

P55

46x2e#2c/12 545

5#3

2#3

80

10

49

14#3

7#4

V-3

49

57x2e#2c/12 674

6#3

7#4

3#5

3#4

2#3

20x40

B61

0

3

7#4

12#3

2#5

1#3

R1 h= 40

4#3

10 0x

14#4

80

49

L=755 L=685

5#6 4#6

L=815

9#6

B57

x4

5#3

V-3 2#4

2#4

1#3 14#4

9#5

B60

8#3

7#3

5#3

B56

20

R3 40 h=

13#4

21#4

4#3

4#3

V-50

49

57x2e#2c/12 676

6#3A.LATERAL

8#5

4#3

R5 40 h=

4#3

21#4

6#3

4#3

V-49

49

61x2e#2c/12 722

32

L=815

9#6

L=855

9#6

31

L=845

6#3A.LATERAL

1#3

14#4

3 40 h= 2#3

6#3 4#3

5#3

V-46

49

62x2e#2c/12 735

6#3A.LATERAL

40

5 V-

65x2e#2c/12 770

30

L=865 L=630

5#6 4#6

L=880 5#6 L=510 4#6 63x2e#2c/12 750

31

L=885

6#3A.LATERAL

V8

6#3

2#3

20x

2#3

21#4

1#3

B58

R740 h=

V

5#3

6#3

0 20x4

6#3

6#3

0 0x8 10

49

31

L=915 L=900

6#3A.LATERAL

5#3

B59

9 -3

1420 R h=

109

5#6 4#6

31

L=910

L=715

6#3

8#3 8#5

x40 20

32

L=855 5#6 L=775 4#6 54x2e#2c/12 643

6#3A.LATERAL

9#5 18#4

21#4

4#3

3#4

2#5

18#4

B63

13#3 Marco 4# R9

7#4

6#4

8#4

7#3 B62

1#3

x80

1#3

21#4 14#4

15 #4 9# 5

7# 145#3

0 R1 40 h=

Estribos

6#3A.LATERAL

2#4

4 V-

INFERIOR

31

L=805

6#3A.LATERAL

2#3

3#4

0

(∅1 20)

2#4

0x

100x80

13#4

L=845

0x8

41 V- 2#4

40

2#3

(∅1 10) (∅1 20)

L=895

:

14#3

P4

L=930

50

(∅1 10)

3#4 7#4

100

M1

V51

P54

L=715

5#3

30

100x80

(∅1 10) (∅1 20)

WWW.BETAHECA.COM

P1

x80

2#3 7#4 16#4

18#4

4#3

10

100x80

L=250 50 L=390 19

23

L=845

5#3

10

1#3

6#5 5#5

V41

31

100x80

3#5

711

L=360 135 L=435 145

3#6 225 4#6 290

100

11#5

20#5

3 V-

100x80

L=845

5#3

32

L=375 L=460160 175

6#3

100x80

L=885

5#3

780

3#6 2154#6 285

19#4

V-3

1#3

6#5

4#3

100x80

31

100x80

L=895

5#3

30

782

L=385 L=470 160 175

3#6 2254#6 295

x80 100

100x80

L=910

L=395 L=475165 185

18#4

44

31

100x80

L=930

5#3

824

3#6 2304#6 290

o Marc

5#3

31

833

L=355 170 L=420 185

3#6 185 4#6 235

0 20x4

32

L=375 200 L=450 255

3#6 4#6

100x80

L=810

5#4

848

175 195

8#5 18#4

8#4 17#4

43 V-

SUPERIOR

42

868

L=420 270 L=500 335

3#6 4#6

150 165

21#4

Insuf.

V-49

801

L=315 L=440

1#3

3#4

x80

41 V-

(∅1 10)

3#4

100x80

P3

(∅1 20)

P64

(∅1 10) (∅1 20)

V-3

100x80

8#5 3#4

100

P40

V52

P66

1#3

P38

(∅1 10) (∅1 20)

3#4

3#4

1#3

80 100x

2#4

5#6 5#6

(∅1 10) (∅1 20)

V-41

100x80

100

P29

P36

P53

(∅1 10) (∅1 20)

V55

76

76

80

76

76

80

76

76

76

P65

64

100

100x80

P30

Acceso Despiece de vigas Concreto: f'c=300 Acero: fy = 4200 Escala: 1:50

100x80

P63

64

100

1 :001500 Nivel

V-54

100

100

64

100

64

2

64

100

64

76

76

80 64

100

P1

76

76

76

80

76

76 100

P64

64

100

64

64

V-50

P38

80

76

76

80

64

80

VIGA 3

64

64

64

80

64

64

ESTRUCTURAL NIVEL DE ACCESO.

65 V-

x80 100

P61 (∅1 10) (∅1 20)

P31

(∅1 10) (∅1 20)

80

80

VIGA 56

100

100

64

11x2e#4c/13 143

49

5#6 5#6

57x2e#4c/15 844

49

49

49

5#6 4#6 20x2e#3c/15 302

53

76

76

80

76

76

80

76

76

19

275 275

L=395 L=420

5#5 5#5

5#3

L=780 L=410

3#3A.LATERAL 30

117

INFERIOR

145 L=450 175 31 5#3 31

L=165

6#3A.LATERAL

6#3A.LATERAL

L=685

L=685 31

L=165

3#3

5#6 L=180 4#6 10x2e#2c/12 2 120 2 2

L=150

5#6

L=1200

4#6

L=1135

55

L=420

100x80

A.LATERAL

27x2e#3c/10 270

3#6 4#6

L=670

5#3

L=780

100x80

L=740

6#3A.LATERAL 31

53

2

100x80

30

L=915

L=885 5#6 L=560 4#6 69x2e#3c/11 751

L=745

5#3

SUPERIOR

55 65 L=330 31

316#3A.LATERAL

L=135

5#3

L=1005

5#3

31 L=330

6#3A.LATERAL

8#8

6#3A.LATERAL 8#8 8#8

L=525

9

L=1010

24

L=1020

L=285

21

L=435 L=510

7#8 7#8

100x80

L=300

4#6

L=385 2ªcapa

6#8

100x80

5#6 5#6

CITELIS Stela City

1976

2ªcapa L=395 345 2ªcapa L=440 6#8 385 L=440 4#8 385 L=500 10#8 435

10#8

30

76

76

6#3A.LATERAL

L=975 L=585

L=245 L=385 44

6#6 6#6

270

P1

L=1020

L=1200 L=1150

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

29 L=595

8#8

23

109

L=1005

6#3A.LATERAL 32

31

266

50

30

100x80

100x80

31

L=930

L=965 L=525 42x2e#4c/15 626

L=915

5#3

L=345 125 L=480 L=620190

1248

64

100

30

23

5#6 4#6

L=1005

124

742

2#8 2203#8 290 3#8 350

P2

B69

16 19

30

Estribos

31

100x80

5#3

64

853

L=375 2ªcapa 1#8 220 155 L=375 2#8 220 3#8 155 L=490 290 L=645 200 4#8 370 275

64

64

100

P39

11

L=935

5#3

6#3A.LATERAL

INFERIOR

295

P22

11

160 175

L=260 4#8 L=340 4#8 L=455 4#8

L=375 2ªcapa 215 L=375 2#8 215 L=440 3#8 265 L=630 4#8 335 32

1#8

64

64

64

942

160 21 10

76

76 64

927

SUPERIOR

P21

64

100

64

23

64

76

P2

76

76

P37

100

64

23

100

64

76

100

64

80

80

80

80

76

VIGA 7

76

64

Estribos

104x2e#2c/12 1244

22

18x2e#2c/12 215

49

42x2e#4c/12 504

49

73x2e#2c/12 870

37x2e#4c/12 444

109

1:100 80

0 100

L=1010

26

ibos

31

6#3A.LATERAL

30

8#8

109

6#3A.LATERAL 8#8 8#8

L=600

37x2e#4c/12 444

1

L=1025

74x2e#2c/12 886

L=1200 L=1155

5#3

L=760

L=1025 L=525

41x2e#4c/12 492

VIGAS RESTAURANTE/LOBBY/COMERCIAL

6#3A.LATERAL

31 5#8 49

49

24

100x80

32 8#8

L=765

L=275 82x2e#2c/12 974

5#8

L=1200

4#8

L=900

1#8 12

SUPERIOR

2#8 3#8 4#8

12 10

L=390 L=430 L=505 5#3

5#3

L=1000

L=995

L=500 L=550 L=645 33 32

100x80

155 170 190

5#4

76

76 76

76

80

76

5#8 345 5#8 3805#8 455

929

L=915

375 375

3#6 4#6

L=550 L=570 31

100x80

Vigas Nivel de Acceso. Comercio/restaurante. 0001

Numero de projecto

175 195 L=935

5#3

4#6 5#6

L=240 L=390 49

100x80

-

Fecha

28

L=775

5#8 29x2e#4c/12 348

849

L=390 2ªcapa

24

6#3A.LATERAL

L=775

76

76 5#3

32

100x80

28

IOR

L=1010

1954

27 27 10

P46

64

100

23

30

5#3

5#3

260 285 320

L=290 2#8 2ªcapa L=290 2#8 L=335 5#8 L=445 5#8

64

5m

L=350 113

6#3A.LATERAL

29

INFERIOR Estribos

5#8

109

15x2e#2.5c/11 165

L=585

L=1010

6#3A.LATERAL 5#8 5#8 112x2e#2c/12 1345

L=1200 L=1190

L=1010

32 5#8

L=510

26x2e#3c/11 286

30

49

49

6#3A.LATERAL

L=910

L=880 5#6 L=865 4#6 67x2e#2c/12 798

30

6#3A.LATERAL 5#6 4#6

22

68x2e#2c/12 813

Author

Autor

L=930

L=980 L=730

23

L=435 L=515

260

P37

64

100

30

10

350 385 425

L=390 2ªcapa 7#8 7#8

L=610 L=670 L=745

4#8 9#8 9#8

30

7#8

L=610 2ªcapa

30

350 17

P38

1483

4#8

64

64

P49

64

100

1980

IOR

VIGA 50 80

P5

64

100

76

80

76

76

80

P4

64

64

64

30

VIGA 8

2

113

Checker

Revisado

H136

1 : 150

Escala

1:100

y/o especificada


CUADRO DE COLUMNAS P1=P15

P2

P11

P13

P14

P16

P18

P19

P21

P22

P23=P45

P24

P25

P26=P30

P27=P67

P28=P40 P51=P52

P29=P65 P66=P68

P31

P32=P37

P33

P34

P38

P39=P47 P49=P50

P41=P42 P43=P44 P46=P48

P56

P58

P60

P61=P64

P62=P63 015 Nivel 15

80

WWW.BETAHECA.COM

28#8 15#3c/30

014 Nivel 14

80

28#8 15#3c/30

013 Nivel 13

90

28#8 15#3c/30

90

90

90

012 Nivel 12

90

28#8

12#6

20#8

12#6

15#3c/30

17#3c/25

15#3c/30

17#3c/25

90

90

90

90

28#8

22#8

38#8

12#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

90

90

90

90

90

28#8

22#8

38#8

12#8

32#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

100

100

100

100

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Ni帽o A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES 011 Nivel 11

NOTAS: 1.- DIMENSIONES EN CENTIMETROS 2.- NIVELES EN METROS

010 Nivel 10

3.- CONCRETO f'c=350 kg/cm2. 4.- ACERO DE REFUERZO f'y=5200 kg/cm2. 5.- TODOS LOS RELLENOS DEBERAN SER

100

100

COMPACTADOS DE ACUERDO A ESTUDIO

Detalle de estribado de pilares

009 Nivel 9

DE MECANICA DE SUELO 6.- TODAS LAS MEDIDAS, NIVELES Y COTAS DEBERAN SER CHECADAS CON LOS PLANOS ARQUITECTONICOS; LOS CUALES REGIRAN.

22#8

38#8

12#8

20#8

32#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

100

100

100

100

100

100

100

28#8

22#8

38#8

12#8

36#8

32#8

16#6

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

100

100

100

100

100

100

008 Nivel 8 S

28#8 15#3c/30

7.- LAS COLUMNAS NO ESPECIFICADAS ESTAN PENDIENTES A CALCULAR.

Eje del pilar Columna

Longitud de solape

007 Nivel 7

22#8

38#8

12#8

36#8

32#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

100

100

100

100

100

100

100

32#8

22#8

38#8

12#8

36#8

32#8

32#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

110

110

110

110

110

110

110

32#8

22#8

38#8

12#8

36#8

32#8

32#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

110

110

110

110

110

110

006 Nivel 6

Eje de la viga o del forjado

fy = 4200

0.05

28#8

Resumen Acero Long. total Peso+10% Losas 1 a 37 (m) (kg) Columnas

Armado del pilar 15#3c/30

110

110

110

110

110

32#8

36#8

22#8

22#8

38#8

12#8

36#8

32#8

32#8

38#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

110

110

110

110

110

110

110

110

110

110

110

110

110

110

30#8

44#8

38#8

36#8

44#8

22#8

22#8

38#8

20#8

36#8

12#8

36#8

16#8

32#8

32#8

38#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

110

30#8

44#8

46#8

36#8

44#8

22#8

22#8

38#8

36#8

36#8

26#8

20#8

36#8

12#8

40#8

16#8

32#8

32#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

#8

51073.5

223597

30#8

44#8

46#8

36#8

44#8

22#8

22#8

38#8

36#8

28#8

22#8

28#8

36#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

40#8

16#8

20#8

20#6

32#8

32#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

30#8

44#8

46#8

36#8

44#8

22#8

22#8

38#8

36#8

28#8

22#8

28#8

36#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

40#8

16#8

20#8

20#6

32#8

32#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

002 Nivel 2

50000 m2 Ubicaci贸n: Monterrey, Nuevo Le贸n Av. Covarrubias, esquina con Revoluci贸n

001 Nivel Acceso

-001 Estacionamiento 1

-002 Estacionamiento 2

1:100 0

30#8

44#8

36#8

44#8

22#8

28#8

40#8

36#8

28#8

22#8

28#8

36#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

50#8

16#8

20#8

20#6

32#8

32#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

30#8

44#8

36#8

44#8

22#8

38#8

36#8

28#8

22#8

28#8

36#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

16#8

20#8

20#6

36#8

32#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

2

5m

-003 Estacionamiento 3

Estribar en el encuentro con el forjado

Cuadro de Columnas

-004 Estacionamiento 4

0001

Numero de projecto 30#8

46#8

36#8

48#8

22#8

50#8

36#8

28#8

22#8

28#8

36#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

16#8

20#8

20#6

46#8

36#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

247992

CITELIS Stela City

003 Nivel 3

110

15#3c/30

110

9897

004 Nivel 4

110

15#3c/30

14498

4050.0

Cuadro de columnas Concreto: f'c=350 Acero: fy = 4200 Escala: 1:100

0.05

005 Nivel 5

23647.0

#6

h

Estribar en el encuentro con el forjado

#3

Total

-

Fecha

-005 Estacionamiento 5

Author

Autor 30#8

36#8

22#8

46#8

28#8

22#8

32#8

48#8

26#8

26#8

16#8

24#8

20#8

36#8

12#8

16#8

20#8

20#6

50#8

38#8

28#8

28#8

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

15#3c/30

17#3c/25

15#3c/30

15#3c/30

15#3c/30

15#3c/30

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

30#8 30#8 L=203

36#8 36#8 L=203

22#8 22#8 L=203

28#8 28#8 L=203

22#8 22#8 L=203

38#8 38#8 L=203

26#8 26#8 L=203

26#8 26#8 L=203

16#8 16#8 L=203

24#8 24#8 L=203

20#8 20#8 L=203

36#8 36#8 L=203

12#8 12#8 L=203

16#8 16#8 L=203

20#8 20#8 L=203

20#6 20#6 L=184

38#8 38#8 L=203

28#8 28#8 L=203

28#8 28#8 L=203

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

10#3c/30

11#3c/25

10#3c/30

10#3c/30

10#3c/30

Cimentacion

Checker

Revisado

-006 Estacionamiento 6

2

H137

Detalle de estribado de pilares 1 : 50

Escala

1:100

y/o especificada


WWW.BETAHECA.COM

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Ni帽o A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES

CITELIS Stela City 50000 m2 Ubicaci贸n: Monterrey, Nuevo Le贸n Av. Covarrubias, esquina con Revoluci贸n

1:100 0

2

5m

MEMORIA CALCULOS HIDRO/HAVAC.

0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

H138 Escala

1:100

y/o especificada


WWW.BETAHECA.COM

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Ni帽o A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES

CITELIS Stela City 50000 m2 Ubicaci贸n: Monterrey, Nuevo Le贸n Av. Covarrubias, esquina con Revoluci贸n

1:1000

0

50

100 m

MEMORIA CALCULO ELECTRICO 0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

H139 Escala

1:1000

y/o especificada


Tuberias de distribucion agua diametro 3mm Separacion cada 20 cm

0.50 m

Tuberia agua fria cobre 3/4 de alimentacion para muro de agua

3.00 m

WWW.BETAHECA.COM

Planta Ubicacion Detalle Agua 6 Muro 1 : 200 001 Nivel 2

0.50 m

Modulo 1.20 x3.5 m

Llave de paso para alimentacion de agua

Hector Niño A00810504

Bethuel Serbulo A00808771

Nota: Ver conexion de instalaciones a cubo de instalaciones en plano hidrosanitario de Lobby Hotel Todas las cotas estan en metros La escala de cada detalle esta especifiaca

0.35 m

0.50 m

3.00 m

0.50 m

5

Bomba Hidraulica Presion Minima 0,10 P ( m.c.a.

Carolina Rdz A00810722

4.00 m

1.20 m

Toma electrica 120v para conexion de bomba

Jose O. Gonzalez A0036670

000 Nivel Acceso 0.00 m

Seccion frontal muro agua 1 : 50 Toberas

Isometria con 1 especificaciones 25 mmø

Pieza de anclaje Tuberia de Alimentacion de agua

13 mmø

CITELIS Stela City

Tuberia Caudal Distribuidores de agua 3mm diametro

Tuberias de Distribucion de Agua @20cm

Plafon

0.06 m

1.20 m

0.25 m

Panel Cristal 2mm 1.20 X 3.5m

Tuberia 3/4 cobre conexion a bomba caudal minimo 0.49 (l/min)

Instalacion de Modulo de Crsital

Anclaje

Muro Block Hebel .50 m de altura

0.50 m

Llave de paso

0.20 m 0.30 m

Piso con adhesivo porcelanico Adhesivos Interceramic en sustitucion del agua

Pileta de recoleccion de agua Nota:Ver especificacion de acabado de piso

0.20 m

0.05 m

0.50 m

Bomba Hidraulica presion minima 0,10 P (m.c.a)

Panel cristal 2mm 1.20x3.5m

1:100 0

3.00 m

Tuberia 3/4 cobre conexion a Bomba Caudal Minimo Q 48 (l/min)

Tuberia agua fria cobre 3/4 de alimentacion para muro de agua

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

0.50 m

Tuberia Alimentacion Dentro de Muro

Alimentacion de Agua Llave de paso

Cristal

2

5m

Detalle Muro de Agua Lobby Hotel Numero de projecto

-

Fecha

-

Autor

-

Revisado

-

H131 2

Detalle de intalaciones 1 : 10

Seccion detalle de muro de 3 agua 1 : 25

Anclaje en planta de crsital 4 especificaciones 1:5

Escala

1:100

y/o especificada


Vidrio templado

1

RESTAURANT/LOBBY/COMERCIAL

17 3" greenscreen ® PANEL ANCLADO AL MURO. REMOVER LAS RAMAS SECUNDARIAS

1 : 50

0,045

Baranda

8" TIERRA PARA MASETAS. LC

WWW.BETAHECA.COM

0,680

soporte de FE cromado 16

LAS RAMAS SE SOSTENDRAN DE LA MALLA, COMENZANDO DESDE LA BASE.

® 3"greenscreen PANEL ATTACHTED ANCLADO AL MURO POR DETRAS.

vista frontal

ACERO DE LA MALLA

vista lateral

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

vista frontal

ESPECIFICACIONES

MONTAJES

MURO EXISTENTE

550 LBS. C L

TIERRA PARA MASETAS.

1 : 10

3" greenscreen PANEL, TYP.

18" FACE OF PANEL TO FACE OF WALL

®

2

Barandal

#5159 STANDOFF BRACKET c/ (2) 1/4"

3"

SECCION Y

5

C L

3/4"

#5136 SEPARADOR - 1/2" x 1 1/2" PLASTICO UHMW COLOR NEGRO.

4 1/2"

LA SEPARACIÓN ENTRE CADA PLATA SERÁ DE 15 CM. CON UN TOTAL DE DISTRIBUIDAS EN TODO EL SISTEMA DE greenscreen

6"

LA PLANTA PARA QUE SE UTILIZARÁ EN EL MURO VERDE UBICADO EN EL EL RESTAURANTE DEL PROYECTO STELA SERA LA CAMPANILLA COLOR AZUL.

3/4"

(2) 1/4" DIA. TAQUETE

GENERAL NOTES:

#5159 STANDOFF BRACKET SECTION

ELEVATION - COLOCACIÓN DE PLANTAS

- WALL MOUNTED

Detalle muro verde restaurante 1:1 50

17

16

16

CITELIS Stela City

030 Nivel 30 116.00 m

5m 6.0

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

0.79 m

2.3 12

Tabla de madera de Cedro 3"x6"

Perfil redondo de aluminio 4mm °

3.58 m

.69 57

Perfil de Acero 6.7

0m

0.28 m 4 H129

0.9

3m

1:50 0

Vidrio templando 5mm 36"x22"

0.58 m

9m 1.0

0001

0.17 m

Numero de projecto

0.30 m

029 Nivel 29 detalle escalera 1 : 50

10 m

Detalles

16

3

4

4

Detalle Escaleras

029 Nivel 29 112.00 m

Author

Autor

Checker

Revisado

1 : 25

H129

Vista 3D Escala

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

-

Fecha

1:50

y/o especificada


1

1 : 100

14.50 m

5.01 m

2.00 m

Recubrimeinto modulado de Basalto, 15mm de espesor, acabado pulido, en la medida señalada.

3m 2.7

Isometria Hidraulica del detalle de cascada

0.05 m 0.11 m 0.08 m 0.01 m

0m 2.0

Murete de contencion de concreto reforzado de 10 cm de espesor f'c 250, con malla electrosoldada de barras corrugadas de acero ME 20x20 cm D:5-5 mm 6x2,2 m B500T UNE-EN 10080, simbrado en madera en modulos de 1.5 * .50 m, y moños a .10 cm de las aristas. Relleno para pendiente de concreto f'c 150, 2% pendiente.

0.12 m

5m 1.9

° .50 22

0.12 m

WWW.BETAHECA.COM

0.80 m

-0.05 m 1.72 m

ø 10 .00 m

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

9. 56 m

ESPECIFICACIONES 2% te ien nd Pe

Nota: todas las cotas estan en metros y/o especificadas. Ver detalles estructurales en el plano H135 de la misma categoria. Ver detalles hidrosanitarios y sus calcualos en la memoria de calculo y /o plano A120. Ver detalles de las termnales electricos y/o de iluminanion en los planos electricos correspondientes.

0.10 m

Pila de agua Nivel -6 Estacionamiento

2

1 : 100

0.40 m

1.37 m

0.33 m

Salida de agua

PVC 2"

Alimentacion de agua potable Subida de agua a la caida (24 m). 6.00 m

3.98 m

4.02 m

0.40 m

4

Nomenclatura

H129

Muro de contencion de concreto reforzado de 40 cm de espesor f'c 250, con malla electrosoldada de barras corrugadas de acero ME 20x20 cm D:5-5 mm 6x2,2 m B500T UNE-EN 10080, simbrado en madera en modulos de 1.5 * .50 m, y moños a .10 cm de las aristas.

m .00 ø6

-24.50 m

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Nivel

00° 45.

1m 2.3

6m 5.3

4

Corte de la caida de agua

CITELIS Stela City

1 : 50

2%

1.34 m

Valvulas de cierre.

Alimentacion de agua potable

Canal de agua hacia la caida NSMT 0.12 m

5.50 m

3. 97

m

te ien nd Pe

Estria del firme a cada 45 grados con respecto a la horizontal.

Bomba Pumptech de 4280 GPH para Fuente con Cascada. No. 566407 Modelo WGP-95PW Altura Máxima de Bombeo de 30’ Descarga de 1-1/4” FNPT Descarga Lisa del Adaptador de 1-1/4” Uso Vertical u Horizontal 700-Watts Cable de 16’

Subida de agua a la caida (24 m).

Recubrimeinto modulado de Basalto, 15mm de espesor, acabado pulido, en la medida señalada.

50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

000 Nivel Acceso 0.00 m

Murete de contencion de concreto reforzado de 10 cm de espesor f'c 250, con malla electrosoldada de barras corrugadas de acero ME 20x20 cm D:5-5 mm 6x2,2 m B500T UNE-EN 10080, simbrado en madera en modulos de 1.5 * .50 m, y moños a .10 cm de las aristas.

Loza de concreto aligerado, para ver especificaciones ver planos estructurales.

NSLT 0.00 m Salida de agua

1:50 0

Taquete metalico diametro 10mm. 1.00 m

4

10 m

Detalles en el estacionamiento

1.00 m

0.20 m

Luminaria 20 watts a cada 2 metros.

Nivel superior de Losa azotea

Simbologia

Placa de acero 10mm Detalle anclaje soporte pasamanos

Losa de concreto armado de 40 cms de espesor.

NSLA

Cambio de nivel

-24.00 m

Conexion a corriente electrica 110 V

Luminaria tipo spot ENERGY SMART marca LG

Nivel de piso terminado

Cambio de acabado en piso

PVC 2"

Pasamanos tubo de acero inoxidable de 40 mm.

NPT

Firme de concreto reforzado de 40 cm de espesor f'c 250, con malla electrosoldada de barras corrugadas de acero ME 20x20 cm D:5-5 mm 6x2,2 m B500T UNE-EN 10080

-23.00 m

0001

0.60 m

1.20 m

Numero de projecto 2.00 m

-

Fecha

0.45 m

1.00 m

Author

Autor

0.32 m

3

Detalle de caida de agua Nivel Acceso

6

Detalle Rampa

7

Isometria Rampa

H129

1 : 25

Rejilla de drenaje Textura antiderrapante a cada 7 cms

Checker

Revisado

Escala

1:50

y/o especificada


18

17 8.75 m

NSLA 120.15 m

8.61

m

SIMBOLOGÍA

26w

WWW.BETAHECA.COM

C1

26w

16

ACOMETIDA CFE

A

C1

M

26w

MEDIDOR

IG

0.00

A

C1

0.00

INTERRUPTOR GENERAL

A 0.00

CENTRO DE CARGA

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Niño A00810504

Bethuel Serbulo A00808771

SALIDA TELEFONO 26w

CONTACTO DUPLEX EN MURO

C1

NSLA

TV

SALIDA DE TV APAGADOR

120.15 m

0.00

C1

ESPECIFICACIONES Nomenclatura

A

APAGADOR VAIVEN

I

A

26w

26w

0.00

C1

SALIDA DE INTERNET

A

ILUMINACIÓN

0.00

SPOT DIRIGIBLE CEELING LIGHT FLAT ROUND VOLTAJE = 26W

NPT

Nivel de piso terminado

NSLA

Nivel superior de Losa azotea

NSF

Nivel superior de firme

NSL

Nivel superior de Losa

Simbologia

Interruptor general del circuito esta ubicado en el Panel de control general del edificio. Alturas Marcadas en ESPECIFICACIONES

PENDANT LIGHT LUMINARIA SUSPENDIDA VOLTAJE = 44W

BAN

Nivel Cambio de acabado en piso Cambio de nivel

SALIDA DE TECHO INCANDESCENTE TROFFER LIGHT 2X4' VOLTAJE = 120W

ALTURAS DE MONTAJE

SPOT LIGHT EXTERIOR VOLTAJE: 26W SALIDA DEL LUZ A 0.00 CON REFERENCIA A NPT

- ALTURA DE MONTAJE DE CONTACTOS HC=0.40M - ALTURA DE MONTAJE DE CONTACTOS DE BAÑOS Y COCINA HC=1.10M - ALTURA DE MONTAJE DE SALIDA DE INTERNET HI=.40M - ALTURA DE MONTAJE DE SAILDA DE TELEVISION HTV=2.00M - ALTURA DE MONTAJE DE CENTRO DE CARGA HCC= 1.20M - ACOTACIONES A CENTRO DE CONTRACTOS Y A EJE DE MURO A MENOS QUE ESPEFICQUE LO CONTRARIO -TODOS LOS APAGADORES ESTAN A 1.20 CON REFERENCIA A NPT A MENOS QUE SE ESPECIFIQUE LO CONTRARIO

Ventila BAN

NSLA 120.05 m

NOTA: TODAS LAS ALTURAS ESTAN REFERENCIADAS A N.P.T

e nt ie nd Pe

VER PLANO DE AIRE ACONDICIONADO PARA VER ESPECIFICACINES DE REQUERIMIENTOS ELECTRICOS

2%

NOTAS -TODO LOS CONTACTOS Y O INTERRUPTORES ESTAN REFERENCIADO A PAÑO A MENOS QUE SE INDIQUE LO CONTRARIO. -ACOTACIONES A CENTRO DE LUMINARIAS Y PAÑOS INTERIORES - DUCTOS DE CIRCUITOS = 3/4"

CITELIS Stela City 50000 m2 Ubicación: Monterrey, Nuevo León Av. Covarrubias, esquina con Revolución

1:50 0

4

10 m

26w C1

26w

A

C1

Electrico Azotea

A

C1 26w

NSLA

0.00

0.00 A

120.15 m

0.00

0001

Numero de projecto

-

Fecha

1

031 Nivel Eléctrico Azotea 1 : 50

Author

Autor

11.27°

NSLA

Checker

Revisado 3° 11.2

120.15 m

18

H125

17

Escala 16

1:50

y/o especificada


Listado de errores

Listado de errores

Cruce de intalaciones en drenaje. Antes

Despues

WWW.BETAHECA.COM

Antes

Despues

Antes

Listado de errores

Despues

Jose O. Gonzalez A0036670

Carolina Rdz A00810722

Hector Ni帽o A00810504

Bethuel Serbulo A00808771

ESPECIFICACIONES Simbologia hidrosanitario Agua caliente Agua fria Gas Nivel REXOLIT COLADERA INSTA-REX 100 MM Subida Agua/Gas Drenaje

Simbologia HVAC Condensadora air cooled condensing unit

ManejadoraAir handling Units Difusor

Retorno

Cruce de intalaciones en Electrico

Cruce de intalaciones en Electrico

Ducto HVAC

Tuberia HVAC

Antes

Despues

Antes

CITELIS Stela City

Despues

50000 m2 Ubicaci贸n: Monterrey, Nuevo Le贸n Av. Covarrubias, esquina con Revoluci贸n

1:1000 Antes

Despues 0

Listado de errores

Listado de errores

50

100 m

Cruce de instalaciones

Listado de errores

0001

Numero de projecto

-

Fecha

Author

Autor

Checker

Revisado

H126 Cruce de intalaciones en drenaje.

Escala

1:1000

y/o especificada


Stela City




LUNES 11

MIERCOLES 13

JUEVES 14


LUNES 18

MIERCOLES 20

JUEVES 21


LUNES 25

MIERCOLES 27

JUEVES 28



LUNES 1

MIERCOLES 3

JUEVES 4


LUNES 8

MIERCOLES 10

JUEVES 11


LUNES 15

MIERCOLES 17

JUEVES 18


LUNES 22

MIERCOLES 24

JUEVES 25


LUNES 29

MIERCOLES 1

JUEVES 2



LUNES 6

MIERCOLES 8

JUEVES 9


LUNES 13

MIERCOLES 15

JUEVES 16


LUNES 20

MIERCOLES 22

JUEVES 23


LUNES 27

MIERCOLES 29

JUEVES 30



LUNES 3

MIERCOLES 5

JUEVES 6


LUNES 10

MIERCOLES 12

JUEVES 13


LUNES 17

MIERCOLES 19

JUEVES 20


LUNES 24

MIERCOLES 26


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.