Energy efficiency improvements

efficiency.

Measures ongoing and undertaken through 2021:

Warwick

• Installation of a new roof, insulation and skylights in Unit 1.

• The additional natural light into the building has reduced the lighting demand.

• New energy efficient burners have been installed in the Beta 2 paint shop, Unit 1.

• Timers have been installed on the compressors in Unit 3, restricting usage to periods of demand.

• New control panels & timers have been installed for the extraction systems in Fabrication & Paint, minimising energy waste.

Blackpool

• An energy efficient boiler has been installed in the paint shop mixing room.

Terberg – Warrington

• Installation of lighting occupancy sensors in office areas.

Measures prioritised for implementation in 2022:

• Understand carbon emissions and develop and implement plan to mitigate emissions with Inspired PLC

• Sourcing of green energy, wherever possible for all sites

• Review energy usage and implement a turn off when not in use policy. Utilise controllers with timer sensors wherever possible

• Review diesel usage – both bulk tank (where applicable) and business vehicles