TOM GREENFI ELD PART I IPORTFOLI O
ABSTRAC T S I T E A N A LYS I S ARTI C L E S V I E W E D D U R I N G VIS IT: TWO BL I M P S GA SOM E TE R S LIG HT I N D U S T R I A L U N I T S RI VE R PA RK LOW RI SE N E W B U I LD S LOW RI SE GE N T R I F I R E D H O U S ING BOW L I N G A L L E Y AE ROP L A NE S CI TY SK YL I N E
POPLAR
1: 5 FA L C O N M O D EL A S S EM B LY
1
1
POLYC ARBONATE OU TER SH EL L
2
WING STRU TS
3
WING STRU C TU RE
4
EL EVATOR
5
B ATTERY
6
EL EVATOR MOTOR
7
C H ASSIS
8
C RANKSH AF T
4
5
G RO U N D F L O O R P L A N
15
1
BRIDGE OVER DIELECTRIC FLUID
2
ENTRANCE LOBBY
3
BIRD MAINTENANCE TOWER AND STAIRS
14
13
4 VISITOR WC AND CHANGING 5
RECEPTION 12
6 TECHNICIAN WC AND DIVER CHANGING 7
FLOOR TO CEILING OBSERVATION WINDOW
8
DIELECTRIC FLUID CHAMBER
11
9 TEMPERATURE REGULATING TANKS/FILTERS 10 DIELECTRIC FLUID WITH SERVERS SUBMERGED (38 OC)
10
11 COOLING PIPES 12 COOLING FLUID (24 OC) 13 SERVER PREPERATION STATIONS
6 7
14 SERVER RECYCLING AND WASTE AREA 5
15 FLUID DIAGNOSTICS SYSTEM
715
9
8
5580
3 4 715
2
1
1:200
FAC ADE CONCEPT
1:100
1 FA L C O N I N U P L OA D I N G P O S I T I O N 2 B I RD D O C K I N G H O U S I N G 3 B E A K DATA TR A N S F E R
A
4 5 6 7 8
FAC A D E S T RU C T U R E G L A Z I N G W I T H TH E R M A L G A P S O L A R D E F L E C TO RS P O LYC A RB O N AT E FAC A D E R E C Y C L E D S E RV E R H E AT
A
B
B
1 2
5 6
3
8 3
7 1:5 DATA TRANSFE R AND FAC ADE SECTION
4
1 :1 0 FAC ADE TO F L OOR CONNE CTION
1 : 1 0 0 F A C A D E A S S E M B LY 1 P O LY C A R B O N AT E B I R D H O U S I N G F A C A D E 2 FAC A D E M O U N T I N G G R I D 3 1 0 M M D I A M E T E R T U B U L A R S T E E L C RO S S - B R AC E 4 GLASS 5 STRUCTURAL ELEMENTS 6 F L O O R S L A B A N D RO O F
6
7 DIELECTRIC FLUID B I R D S U P L O A D I N G D AT A IN BIRDHOUSING 2
2 1
5
4 5 3
2
6
6 7
1 : 2 0 FAC A DE /FLO O R C ONNEC TION D ETAIL
3
7 11
2
5
9 6
4
5
9 1 12
1
C ONCR E T E E N C AS E D R H S BE AM S ( 6 0 0 X3 0 0 )
2
G L A S S PAN E LS
3
S U PP ORT IN G GLAS S C AS E M E N T S
4
G L A S S- R AIN S CR E E N FAS T E N E R S
5
P OLY C AR BO N AT E BIR D H O US IN G / R AIN S CR E E N
6
C ONCR E T E TO P P IN G
7
R E I NF O R CIN G B AR S
8
P ROF ILE D S T E E L DE CKIN G
9
I - B E A M S E CT IO N
10
H E AT IN G P IP E S , P OW E R AN D V E N T
11
I NS U LAT IO N
12
L I G H T W E IGH T S US P E N DE D F IBR E CE M E N T S O F F IT
3
10 12
1
1 :50 SEC T I ON OF S E RV E R S A N D CO O L I N G S YS T E M
4 6
1 1
2 6 13 10
4
3
0M
7
5M
12 11
9
5
15
8
1 DIE L E CTRIC F L UID VAT 2 TE MPE RATURE RE GUL ATOR 3 ACCE S S PIT 4 E NTRY PIPE 5 COOL F L UID OUT 6 S E RVE R TO B E S E RVICE D 7 S E RVE RS IN OPE RATION 8 AIR PUMP F OR HE ATING 9 PUMP F OR COOL ING F L UID 1 0 PIPE S F OR COOL ING DI. F L UID 1 1 WATE R 1 2 HE AT VE NT 1 3 DIAGNOS TICS PIPE TO MACHINE 1 4 DIAGNOS TICS MACHINE 1 5 S E ATS F OR RE S TING S WIMME RS
15
CO OLI N G GROU ND F L OOR PL AN 1
4
2
3
S ERVER H OU S ING ZON E S
4
F L U ID C OND ITIONIN G UN IT S
5
C OOL ING INF L OW AN D O UT FLOW PIPE S
6
D IEL EC TRIC F L U ID 3 8 DE G .
7
C OOL ING WATER 28 DE G .
8
INF L OW F ROM D IEL ECT R IC R E S E RVO IR S TORED IN D IS U S ED G AS O M E T E R S
NOT TO S C A L E
4
5 1
1
DIE LE CT R IC F LUIDLIN E
6
2
7
3
1 8 5
site analysis