The Bloor West Villager, September 22, 2016

Page 1

grace Stillo

Serving HIGH PARK-SWANSEA, BLOOR WEST VILLAGE, THE JUNCTION and RONCESVALLES

• High Efficiency Furnaces • Boiler for Hot water Radiator Heating • Oil to Gas Conversion Specialists • Air Conditioners Serving The GTA since 1967

416-259-1109

inside Photographer marks 50 years of Canadian creativity / 5

Get out and explore your town with a little help from us / 7

Broker

416-880-0067

www.GraceStillo.ca

thurs sept 22, 2016

www.insidetoronto.com

special report: gender identity

LANGUAGE MATTERS!

uReport When you see news happening let us know... newsroom@insidetoronto.com www.facebook/InsideToronto

@InsideTOnews

shopping wagjag.com amazing deals on group discounts

shop.ca

shop and earn, every time!

save.ca coupons-flyers-deals-tips

keep in touch @InsideTOnews www.facebook.com/ InsideToronto

more online

when gender collides with the words we use read part 1 of our metroland media series on page 3 Thank you Bloor West Villager readers for voting us

BEST THAI RESTAURANT

3006 Bloor Street West 416.233.5004

Member of the Green Mango Group.

Serving T.O. with the best Thai food since 1995.

2014

READERS’

CHOICE GOLD

Development planned for Bloor/Dovercourt Lisa RainfoRd lrainford@insidetoronto.com Bloorcourt residents who attended a pre-application meeting to discuss the future of a property on the northwest corner of Bloor Street West and Dovercourt Road remained skeptical of a developer’s assurances that their input will have an impact. The proposed mixed-use, mid-rise project’s height, massing, setbacks and design materials have yet to be determined, stressed Daniel Byrne, vice-president of development at Main and Main, the real estate developer that purchased 980-990 Bloor St. W. and 756

As part of its vision to build an “integrated campus of care,” West Park Healthcare Centre has altered its redevelopment plans; instead of retrofitting the

INSTYLE KITCHENS AND BATHROOMS Celebrating 12 Years in Bloor West Village

Dovercourt Rd. “We don’t know what definitively we want to do,” Byrne told the audience gathered at New Horizons Tower at Bloor West and Dufferin streets Monday. “It’s up to you as a community to decide what’s important to you – what makes Bloorcourt a great place to live? What’s missing? What are your goals for new development in the area? What do you want to tell us? The area has been designated mixed-use, which allows for a combination of residential and commercial uses and allows for 16 metres in height, about three to five storeys, city planner Barry Brooks said. >>>character, page 6

West Park health to build six-storey hospital campus Lisa RainfoRd lrainford@insidetoronto.com

n the cultural impact of our changing language n tips on gender sensitivity n what’s in a name? insidetoronto.com

Residents wary their voices will fall on deaf ears

original, a new six-storey hospital will be built in its place. Patient rooms in the new hospital will be 80 per cent private and 30 per cent doubleoccupancy, each patient will have his or her own three-piece >>>plans, page 12

Joe’s Friendly Neighbourhood Hardware Store

Join over 500 of your neighbours in a Stress Free renovation

Complete Renovation Service • From Design to Completion. • Trained Teams of Professionals. • Fully Insured including WSIB.

For more info call Instyle at

(416) 833-4343 Get Inspired at www.IKB.ca

Quality Products... Old Fashion Service 777 Annette St. (at Jane) 416-769-7774 babypointhardware.com

1 | BLOOR WEST VILLAGER | Thursday, September 22, 2016

West End Heating 67 Ltd.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
The Bloor West Villager, September 22, 2016 by The Bloor West Villager - Issuu