Working and Occupational Resource Connections Phoenix
Tempe E. Broadway Rd
S. 12th St
Guadalupe South Mountain
Rio Salado Ecological Continuation Through the Site
Looking South-East
Bus Stop on Broadway
500’
250’
0’ 1” = 250’
Current Location of Master Plan Site
Right Side of 12th St
Left Side of 12th St.
Site Might Have Utilities
Process Drawings
Master Plan For WORC Hub
Second Iteration
12th St.
First Iteration
Third Iteration
E Wood St.
1 : 30 Site Path to Courtyard Transition
0’
30’ 60’
Perspective of Pathways in the Evening
South Mountain Beacons on Site
10 Minutes
Employment
10 Min utes s te u in M 0 1
Equity Nature
Family
Complimentary Aspects Diagram
Site Services
m y o l mp
E 7 / 4
•2
b u H ent
o J d ate
g n i t b Lis
d p U •
10 Minute Walk Diagram
e t i s b We
ill k S •
o i t a uc
d Ed
n a t Se
e r o nC
g n i s cen
i L y t l a i ec
• Sp
r e t n Ce
b u H lief
•F
e R y l i m a
W - E Section
1 : 30
N - S Section
1 : 20
Site Benefits
e n g g o r i t n a i l n h y o t e c t o e e f e C R a R S r e e l v e n i t b t a i a a a r T r t w r s o e e m p t r • Eva • Wa • Sto • Ped
Shade Structure for Existing Bus Stop
City water could be connected to the structures misting system which would provide relief from the summer sun for both the people and the plants.
Desert Plants would grow in PVC Troughs above to enhance shade and aesthetic appeal Green walls would be made out of wood or plastic pallets that would be lined with landscape fabric and filled with soil. Incisions could then be made in the fabric through the pallet slits to plant several types of flora.
Horizontal planks could be rearranged by the users of the space to provide both solar and wind protection. They could also serve as a play feature for younger kids.
LDE 461: Fall 2018 Landscape Architecture Design Studio III
Student: Lucas Ayers Instructor: P. Coseo, A. Hargrove