Tian Zheng Undergraduate Portfolio
Thanks to my family, friend, and instructors for helping to make this work possible.
Candidate graduate with a bachelor of architecture from Northwestern Polytechnical University, China, 2014 E-mail: ztian37@foxmail.com TEL:+8618092918314
Tian Zheng
Contents High-rise Building Design Corporate Headquarters 7
Housing Estate Churruca Sagunto, Spain
15 Residential Building Design Xi'an, North-western China 19 Residential District Planning New District JinWei, Xi'an 24 Kindergarten design Samsung City, Xi'an 29 The comceptual design of future urban residence Ecological Residence 33 Visual studies Photograghy, painting
(Cover_photo) Natatorium, NWPU (Content_ photo) Sagrada Familia, Spain
Spring 2013
STUDIO I
o
Instructor: Zhenyu Tang
[Multi - program comparison]
High-rise Building Design Corporate headquarters [ Individual work] \ ~路路iii;;;;;;;;:::::.iiiill Scheme 1
Scheme 2
Scheme 3
Usage of triangular layout manifest stable Highlighting the eminent orientation. But
CONTEXT
CONTENT
GaoXin CBD is becoming the symbol of
CONCEPT
The program for the corporate headquarters of
seemed straightforward.
urban development and dynamic of
bank, on the surface.
Xi'an city It represents the achievements
But with the limited area of the base and
formation of many alien space is difficult
general layout of large space. and is hard
scheme is used as a blueprint for the final
to take full adventage.
to form a main attraction facing the
plan.
crossroad .
rectangular block. The height of building is emphasized
'------- [Site analysis]
by crisp, smooth lines of the facade. The overall modern
another high-rise building in north, the
style with glass walls highlight the charactor of bank and
This project is located in the heart of
challenge would be sunshine spacing and the
compensate the architectual style in CBD.
GaoXin CBD in Xi'an, where the location
proper functional arrangement of distinctive
All the large spatial concentration arranged in the
is convenient. The base is surrounded by
features between the bank branch and bank
podium The flow lines are seperated from major part of
city planning roads in north, west and
headquater. My solution would be arrange
east. In the west of the base locate a
them seperately. The bank branch take the quite
core landscape park. Another high-rise
side of base in west with the beautiful scenery
met by the export meet the needs of evacuation. High-rise office space is divided fiexibly to meet the needs of different
office building in north is under building.
of cenrtral park, while the bank headquater
departments.
mainly in the high-rise building, with its' own
The base planning combined with decorated entrance
fiow line distinguished by bank branch's.
plaza and surrounded by greem landscape in order to
Project land is around I I ,500 m
cutting of the base is not conducive to the consideration of a flow direction. This
The design of this building is cut and added by a simple
of modern urban development
2
The internal space is fiexible. But neglect
and strong sense of body mass. But the
high-rise building, and are functionally
settings to
Traffic flow lines
Flow of people
Landscape orientation
[Generation of body mass] The best solution comes from the
meet the need of city square and the improvement of the urban environment.
[Perspective]
.,. +
.,.
.,.
Cutting
Detailing
~
N
--1!J!III!!~!!JIII!!!~!!JIII!!!-~""'-~~~-----X=1395.384 '"---'J'~~
e-楼+-Ro-a4-
I CD
- -'?=W91., -- -
[Masterplan]
cutting and detailing on the base of a simple geometric shape.
'
[Secon dfl oor]
••• Fire flow lines
.A. Evacuation port .A. Branch Entrance .A. Logistics portal
(left) traffic flow lines (right) fire-control
Office
Staircase -
23F ZZF
Elevator -
24F Elevator room ···:::: 23F Business club
ZIF
BF 7F
N
6F
CD
SF 4F
[Thirdfloor] 3F
~~~~~~~~ ~~~~~~~~
3F Lecture Hall ·::::::·················· ZF
Multifunctional Hall
~~~~~~~~ ~~~~~~~~
IF
-IF -IF Underground:::::::.................
(left) flow lines
Equipment room
parking
(right) function
Business hall
[Groundfloor]
~ ~
[Airview] ~ § ;:!,
~
~ II.J-_
N
CD
[Office mode]
[Energy saving] Glass curtain wall
~
•• •
Hollow low-E glass has been used. In the bottom of window sash, there are power controlled ventilation shutters, conveying fresh air to the room through ventilation cavity (Figure I)
(left) single room type (right) open type
This program use single room type and open type at the same time. Leadership offices, reception, conference room adopt single room type, while general staff and office space where people get together adopt open type. So you can take the advantages of open-plan offices and single room type at the same time.
Rooftop rainwater harvesting
(from top to bottom)
Rainwater collected from the roof through purification are collected for further use, stockpiled for cleanning of sanitary ware, landscape irrigation , which saves a lot of clean tap water. (Figure II)
Rain water harvesting
perspective of business hal l b linds in west facade sun visor in south facade
Active intergrated shading& light control
Active interior atriu m
[Economic& Tecnical norms] Area Total construction area
45334m2
Ground floor area
37583m 2
Underground construction area
7751m 2
Volume rate
3.94
Building density
31.9%
Green rate
32.6%
Building height
98.4m
Floor Ground Underground Park1ng Ground Underground
(from top to bottom) main entrance minor entrance
(from top to bottom) plan 4-BF plan 9-IBF plan 19-22F plan 23F
Function and form are properly considered in the design of business hall, and it has good view of the park in the west But the problem would be western exposure. The vertical frame and horizontal sun visor can prevent western exposure effectively and ensure good view Vertical sun visor also play a role in preventing western exposure effect in the south facade of business hall.
[Section 11-11]
11500m2
23F -IF
32 162
7
STUDIO II
Instructor·. T eresa R.lchart Frances
Fall 2011
Housing Estate Sag unto
Intervention In U Course 2011/2012 rban Residential Area
T
Churruca
SPa 1 n
[Team work]
CONTEXT
CONTENT
Churruca is an residential are was built in I 954. nearly 60 a located in Sagunto. it Churruca is not lively . years from now Today . · . OJng to transform the . . . . e course work is g living environment AddexJstlng living space and · Jngm 0 d . ern facilities enhancing the serv1ce ability · to adapt to an agJng . society. of this old com munJty .
Project co ncerns are· ad residential area h . . ~ustment of road system . . ous1ng re . 1n . diversity, develo novation and famil · pment of se · . Y improvement of su . mJ-pnvate space. and d . ppornng facilitie e ucanon facilities s. green area
~~~sTh
CONCEPT
. etc
[L oca ti on ]
GRUPO CHURRUCA
[ Ana lys is o f t he en Vlr . onmen t] LE G E N D : -
M A IN
-
SE C OND A R
-
PEDEST:~AANFFIC RO A D TR ACK
-
RO A D
LOC A L
y
RO A D
=
MA IN HIGH WAY
-
SE CO NDA R Y RO A D
MA IN RO A D
R AILWAY TR A C K
-
L EGEND:
,,...
.
~ ·:;J~;:<'
. ,,!: ••,.:6
.Y.~#h -.,,, '!~, ~~'
--~/,-:;:::. P 0
.· ;.. ·:
R T
~
':~-·~
(from top to b ottom) general road network ( . . public and pr·1vate .res1dental ar ea I schwarzplan equipment
[Pr ob lems ]
barriers inside churruca no connection to surrounding
too many
streets and car parks
no seperated pedestrian ways
.:·-...
; ··· ...
················... / .,.
desert areas w ithout function
averaged building layout& apartments
... ···
no private nor semi-private space
[Pr oposa l of the genera l structure - new master of Churruca ] [Pr oposa ls] In this project I was in charge of analysis of the figure-ground relationship in residential area at preliminary work and responsible for planning the layout of school and park at interim period. A lso I participated the analysis and comparison between the proposal and existing situation. I completed the 30 computer model in the later period.
(left) Occupied space Pro posa I (right) Occupied space Existing
T
(left) Mirror of apartments Proposal (right) Mirror of apartments Existing
.
UR
··············....
-
type 01 (exist)
-
type 02 (exist)
(left) Use of the building Proposal (right) Use of the building Existing
-
type 03 (exist)
-
type 04 (new)
primary I secyndary school :····
-
type 05 (new)
-
type 06 (new)
-
type 07 (new)
-
other uses
62'600m2
... ···-~-- ..
:·········· ...
······ ...
retirement home
-
PEDESTRIAN WAYS
-
/
ON E- WAY STREET S
-
PUBLIC ZONES
communal cultur-center
-
residential building
-
residential building with comercial use in first
come rcial building
-
office building
-
public building
-
tertiary building
(top) Connecting system Proposal (left) Parking zones; Car moving system Proposal (right) Streets; Parking zones Existing
[Section sca le 1:800]
existingjnewjold houses the new residential units !
apartments buildings
l current situation ; - demolished ........... : -existing
: + new
: =total
31'300m 2 (100%) 369 dwellings ~ 3'900m2 (12.4%)- 48 dwellings : 27'40Qm2 {87.6%)- 32 1 dwellings
l
168dwellings
43'400m2
489 dwellings :
-
· ,.
l
16'00Qm2 (51.1%) -
:./·......
················....,..
Legend
DEM OLIS HED HOUS ES
-
NEW HOUSES
-
public space semi-private space private space
- E XIS TI NG HOUSES FLOORS OF THE PROPOS ED BUILD IN G
3D model of the proposal (top) topview (middle) south-eastern perspective (bottom) south-western perspective ; balconies(north) ;- COI'II'IeCtedwithkitchen
: sta1n::ase
;-withelevator
811Itff~,~~ 1
__j: ~ ~ ~
new e•tenslon \o lheeas! ~ 2 mora sleeping rooms
1/j I /
(middle) Building type Existing/ Mirror of apartment Proposal (bottom-left) A new public space (bottom-right) The new dwelling with private space
\
:
L_
:L_~
.
; ellten$100 of balcony (south)
-----1
_j
l
newe~ttension to !he west : -connected to the parll ;
A new park
Section scale I 400
15
STUDIO Ill
Fall 2012
Instructor: Jian Cao
Residential Building Design X1'an,
North-western
China
[ Individual work]
CONTEXT
CONTENT
CONCEPT
With rapid economic development, urbanization
The design of this program is going to complete
There are two main concepts. Housing design is
level has increased significantly in a lot of cities in
the goal that develop low-cost small and
according to the proportion of different family types to
China. With the rapid transformation of society
medium size ordinary commodity housing and
meet different requirements. Also let the south facade
and infiuence brought by government policy,
affordable housing. It should be effective to solve
tending to the good landscape around the river
the main type of family consist of 3 family
the problems and contradictions brought by
members, so the small and medium size of
rapid development and lead the design of
apartment will become popular for a long period
residental building to be land-saving, sustainable,
integration to form a scenic trail and to contact with
of time.
and affordable.
the river landscape in between.
External environmental design is focused on spatial
[Master plan]
Considering the different types of family, the 7100
design also should meet the need of them and
1800
1800
100[, 11
(i 01 ,120
ll
also. while also taking into account of housing
2100
1500
2100
tftt
comfort and functionality.
D type
0
120 JI 9oo I ll
1
3600
4200
2700
A I type
covered area usable area service factor
I 06.44M 2 83.55M 2 0.78
covered area usable area service factor
64. 11M2 47.8M 2 0.74
living room main bedroom bedroom kitchen toilet balcony hallway study room
27.67M 2 IS. 15M2 /0.28M 2 4.95M 2 8.70M 2 9. /9M 2 I .55M 2 900M 2
living room main bedroom kitchen toilet storage room balcony
20.36M 2 //.47M 2 4.96M 2 4.83M 2 /.56M 2 7.56M 2
Analysis of household types and needs
111 20 1'1
11 640
Couple familiy: A family type constituted by 25-35 year-old young couples. This type of families pursuits the quality of life. They need multiple functions and comfort in living room even it's not large. The interior space especially bedrooms should be well-designed,
8900 2100
1500
JJOO
1800
and with balcony, locker room, toilets and so on.
Nuclear family: A family type consists of main members who are middle-aged couples aged from 30
covered area usable area service factor
"
62.20M 2 45.59M 2 073
living room main bedroom kitchen toilet balcony
2/ .94M 2 // .67M 2 4.96M 2 3.6/M 2 6.92M 2
to 40 years old, and have one child. The nuclear family
A2 type:
8900
need a parent-child communication space. Fullfil/ the need to be private seperately. The type of family pay attention to the comfort of living space and the functionality of the shared space and private space.
tftt
Stem family:
Also known as extended family. The main members of the family are more than two
generations. This type focus on the arrangement of the relationship between bedrooms and leave each bedroom from interference. Independent toilet would be ideal. One potential bedroom would be used as a study room in normal time and changed into bedroom
[Dwelling plan scale I: I 00]
when necessary.
[Typical floor plan A 1+A2+B2& C2+C2] 8900 10o\, 1200 ,
g
11
2100
3300
2100
J10o
n
1
g
B 1 type
type 82
•
type A2
-
type AI
•
type C2
•
typeD
•
type Cl
82 type
covered area usable area service factor
74.43M 2 57.08M 2 077
covered area usable area service factor
77.96M 2 58. 1M2 0.75
living room main bedroom bedroom kitchen toilet balcony
24.06M 2 12.3M2 8. 17M2 5. 10M2 3.37M 2 5.63M 2
living room main bedroom bedroom kitchen toilet balcony
22.34M 2 II .47M 2 8.99M 2 4.96M 2 4.75M 2 6. 14M2
8040 1800
8040 3600
3900
C 1 type: covered area usable area service factor
•
2400
[Typical floor plan C 1+D]
~0~1120
fl1
C2 type: 89.94M 2 71 .06M 2 0.79
living room 27.67M 2 main bedroom IS. 15M2 bedroom I 0.28M 2 kitchen 4.95M 2 toilet 7.29M 2 balcony 5.46M 2 hallway I .55M 2
1 20~~-U---4"'2o"'o_ _ _
,r-l
- --il !'
_----'C36"'o"-o
20 §
8040
Design strategy intergrated functional space Dining room and living room: the intergration of them create a larger space which could be used ftexible and save the space as a corridor.
Kitchen: the function of kitchen was split into several parts, set up service terrace, stir-fried kitchen and move part of cabinets and refrigerators to the dining room
[Section]
covered area usable area service factor
88.39M 2 65.53M 2 0.74
living room main bedroom bedroom kitchen toilet balcony
25. 65M2 13.41M2 10.21M2 5.24M 2 6.25M 2 5.70M 2
[Typical floor plan B 1+B 1] •
type 81
19
STUDIO IV
Fall 201 2
Instructor: Weili Yang
Residential district planning New d1str1ct J1nWe1.
Land balance ratio total area dwelling public building road
155000m2 94550m 2 29450m 2 20150m 2 ,OO>Om'
ratio 100% ratio 61% ratio 19% ratio 13% ""o >%
average 26.00m 2 average 15.76m2 average 4.90m 2 average 3.35m 2
_ , , '~
X1 an
[ Individua l work]
Primary school Kindergarten
Location
Suburbs of Xi'an
Location
~ ~
Commerce
-
Clubhouse Pedestnanized street Central green1ng
-
Surrouding
Concept
-~ ~
-
Structural evolution
~
Urban Agriculture
Quadrangle courtyard
STEPl Segmentation of group is accordrng to the form and landscape axrs.
Central green Street green
Pedestrian Street
Traditional planning
~ ~
Minor green -
Maingreen Central Landscape Group Landscape -
STEP2 Base on the traditional Chrnese layout form quadrangle courtyard. arrange the building in the group.
Structure
Landscape
Detailing the function and form of dwellings and public buildings.
f==============================~======================================================~6~F ~ 9F -
Pespectives
Design
Design description
The design of central landscape coincident with the main axis of the residental district. The commercial buildings at the very start, the clubhouse in the middle and the kindergarden in the end form an coherent and smooth landscape axis. Modernist together with classic wood texture and windows to give the implication of Han dynasty style.
Airview of central landscape
Accordingly. a plaza which is at the intersection of two main landscape axis. was arranged before the clubhouse to form the visual focus and climax of the landscape axis. A central plaza. which meets the need of evacuation. was set at the end of the axis to form the end of landscape and satisfy the security needs.
To meed residents路 different needs. civic plaza, leisure trails. landscape sketches. children's playground, elderly activities, etc. were also arranged in the central park
Landscape sketch
Pedestrian street Entance Top-level duplex apartment combined with large landscape window has great view of landscape.
Street space designed to meet the need of business. creating unique antique business atmosphere.
Section scale 1:200
Walking Street get along through the residential area from west to east. The main entrance in the west is both a car entrance also a pedestrian entrance.
Pedestrian street The greenbelt of pedestrian street consists of greening and leisure space. Seats are arranged along the central waterbelt Which creats a hydrophilic space.
Crossroads in the crossroads where pedestrian streets meet landscape roads. water platforms are set as visual focus where residents can get together and chat with each other.
Section of traffic roads
East facade 6000
Section of walking street (in groups)
Economic Indicators
Urban agriculture 8000
Section of walking street (between groups)
Land area I 55000m 2 Population 6000 No.Households 1590 Building area 2 I 5500m 2 Residential area 198000m 2 Type: 90m 2 - I 10m2 42% I 10m2 -130m 2 41% >160m 2 17%
Public Buildings I 7430m 2 Average level 6.3F Gross density of population 390jHa Building density 22% Volume rate I .39 Green rate 43% Parking space I 700 Parking lot 3
South facade
Landscape in group
24
Design description
Spring 20 13
STUDIO V Courtyard design combined functionality and comfort of use. Not only creates public space for party and entertainment where elder people can do excercise and children can play games, but also
walking trail
creates quiet space such as walking trails where people can take a walk after dinner. Trails between groups of buildings were somehow connected to create the implication of traditional gardens
Instructor: Yu Liu
Kindergarten Design Samsung
Courtyard design
c 1t y,
X i an
[ Individual work]
[Masterplan]
Public space
CONTENT In this program. I am about to investigate a new
Multi-storey residential
Plan of unit courtyard
the local environment and young children . And
operating mode of kindergarden in this new
focus on the desperate need and actual
technological industry district which considers
demand of children in modern. creating a
ecology, environment-friendly and innovation
fiexible open space which is changing
into the design of the program By passive
according to the needs by the combination and
energy-saving design, and active ecological
seperation of monomers. That would be
energy-saving equipment to achieve
considered as an innovative attemption to solve
low-carbon energy-efficient buildings suitable for
the problem of kindergarten in new era.
TypeO Building area 127.35M2 Use area 99.33M2
CONTEXT Type I Building area I 09.17M2 Use area 88.43M2
Samsung Industrial Park is settled in GaoXin District Xi'an. This district includes industry, bussiness. residential area. education and connecting services.
TypeJ Building area I 13 06M2 Use area 9 I .58M2
This kindergarten is about to built in order to meet the need of children of staff. It is close to the residen tial area and should be convenient for
Type P Building area I 18.04M2 Use area 92.63M2
parents to send their children. It should be energy-saving and friendly to environment in order to show the Corporate culture and technological
TypeO Building area 89.62M2 Use area 72.59M2
strength of Samsung.
[Base analysis]
Type K/L K Building area 89.83M2 Use area 7 I .86M2 L Building area 130.23M2 Use area I 04.20M2
Outline of kindergarden was adapted to the terrain well. The
Type M/N M Building area I 03 04M2 Use area 82.43M2 N Building area 92.81 M2 Use area 74.25M2
entrances are close to the roads in the residential area. So the playground was left in south
Building facade
and west
The lake in the south-west can cool down the hot air from that direction in summer. the trees in the north-east were kept to prevent the South facadeJ9FJ
South facadeJ6FJ
North facadeJ6FJ
cold wind in winter.
[Perspective]
[Concept]
Formation
Convergence
Aggregation
[Assembling]
[Combination]
Fan -shaped template
Detachable enclosure structure
[Mode change - monoter]
Rest mode
Active mode
[Mode change - window]
Teach mode music class
Teach mode handwor k class
Double Low-E glazing
Adjusted according to need of ventilation and lighting
Observation: Integration of water droplets
1.
Derivation of concept
IF
··+
[Ground fl oor]
[Secon dfl oor]
~ ..
Formation of larger space
Baffle & furniture
•+ 2F
~
Splice of monomers
Connect pillars
2.
..
Derivation of Class monomer
Derivation of Plan
..
••+
1.
3F 3.
3.
Beam
'~
[Construction growth model]
[Connection between toilets and monoters]
[Third f loor]
4.
N
+~
__(_ Pillar I Precast slab
Enclosure components
Get close
. glaz1ng
[Design strategy]
5.
Apical plate
+
glazing
•••
Connect
The space between class monoters are used as active space where kids can play games interior . Use different colors, textures to distinguish area to fulfill different needs such as story -telling, singing and game -playing
2.
6.
__(_ Pillar I Precast slab
~
Skylights
Maximum connection
The green roof can expand the activity space of k ids, it also creates a great scenery for teachers who wor k in the office It also used as a way to achieve energy-saving such as water collecting and energy storing of the building
[ Flow lines]
East facade
[ Interior perspectives] 3.
7.
South facade
consummation
8.
Teaching
Office
Logistics
Vegetation layer' - - - - - - - - - ,
(left) Daylight factor in solstice (middle) interior visibility (right) CFD simulation
H
111111tiU111j
Planting soil Filter layer
1111
1(,
1: II ' Ill IU Jl ,
Ill
,. ,
UIIIIIUU.
1
IF
IF
collected_ Children can even
see the total process, which can stimulate children's
Leveling layer
IRIII
'-----------+- + - 1nsulation layer f - -.._,__ _ _ __ J
l!!IIIJ..IIIIf' illlllllllllll
Vapor barrier
.IMUUIIIU~·
insulation, keeping the interior
Catchment device combined with umbrella shaped atrium
show the way how rain water
Drainage layer Waterproof lay r
1 111111111'1~
·IIIIIIIIIIR ·111111111111 ·111111111111 ·11111111111 rlllllllllll
Glass structure meet the lighting needs of
111111111
curiosity and desire to explore
Solar cogeneration
Atrium
device
Structural layer
temperature steady
teaching, playing and other activities .
This device is used to produce part of electricity and energy the building need
Seperated to each other, monomers are private inside and public in between, which has more benefits to fit the need of daily
2F
2F
~
:: I
activites of kids .
~,T Curtain Curtain are settled in the class monoters which is used
"~~.·~~~~~;;~~~__j
3F
.....:
3F
~~~~~~;;~
to change the mode of class space
Shutter It can increase or decrease the solar radiation initiatively
In
summer night, when the building is not
being used, open the window to let cool air flow in The cool air can pre -cooling the slabs, structures and interior temperature by
Permeable pavement
[Summer night ventilation]
pressure ventilation in atrium and by the nature wind from south -west to north -east.
In
Water in the middle is relatively clean, It first enters the Iris gabion wall built of limestone and then goes to reed to get purification before get into the lake ~ Septic tank
Rainwater from the
J.
ro~o~f;--;:====1:=:__
collected from the atr1um stored in the storage tank underground, which can be used as irrigation water and flush water
_::;
~ Water tank
winter night. close all doors and windows
Excess heat generated by solar cogeneration device stored in the underground tank, It can be used to heat Thermal the fresh air in cold storage tank weather
and turn off the atrium vents . The building can sustain the temperature relying on the Use chimney effect and thermal compressive to exclude air
thermal radiation storaged in interior floor and ceiling during the day .
[Winter night ventilation]
[Airview]
Summer monsoon (southwest)
[Perspective]
[Summer day ventilation & Winter day ventilation] The lake can humidate wind, decrease the temperature and absorb some radiation
The air chamber has cool and constant temperature, which can pre-cooling the fresh air in hot weather
The thermal storage tank can make sure the cold fresh air entered in this air chamber is pre-heated in cold winter
[Water system]
[ EI ectric ity& He at system] PV panels
,........................................... Irrigation/ Flushing
Rainwater
:;:.;)
shing
.................................fl;S~bdl.J Purificatio 1 ••••••••••••••••••• ~
Reed
Gabion wall
Septic tank
Rainwater
Sand filtration
Water tank
29
Spring 2013
STUDIO VI
Instructor: Yu Liu
[Climate Ana lysis] Wind direction; wind frequency
Average temperature
---
The comceptual design of future urban residence Ecological
CONTEXT
路o-
Residence
[Individual work]
CONCEPT
.
-路-
---
ftJt
Spring
Summer
Spring
Summer
Spring
Summer
Autumn
Winter
Autumn
Winter
Autumn
Winter
AIRVIEW
Urban separated villa has the advantages of high privacy standard, quietness. beautiful scenery, broad view as well as possessing private yard and fresh air. It is a high quality living style that is beneficial for both physical and mental
Leaves can maximize the use of sunlight through reasonable arrangement
health. Therefore, urban seperated villa has unlimited prospect However, its development is undermined by
Branches are support of
financial and political factors because of the scarcity of
leaves and responsible for
urban land resources.
nutrition transportation. Trunk is the main structural
How to solve this contradiction, to improve living standard while saving land resources and to offer people
, support of tree. but also the transportation corridors.
a healthy residenoal environment? In the light of eco perspective, we discussed the possible solutions and proposed the idea of creating vertical villa, which protray a healthy and ecological dwelling.
Villas were arranged like leaves around the core to make full use of solar energy and light Platforms Cantilevered out of the core provide
Advantages of villa
Fresh air
Privacy
Comfort
the base of villa and private yard . The main structure is made of steel trusses. consist of the core of
Disadvantage of
View
Limited space
Noise
transportation .
high -r ise residence
Comfor.t Pr1vacy
Vi:~ Yard
F
Villas are more comfortable for living and they provide us with
a healthy housing style
Type L, adapt to four members of family with
High -r is.e residences have h1gh res1dent1a/
density and they have many d rsadvantages
High -r ise residence
According to the integrated analysis, villas are more suitable for living
parents and two children.
Type M adapt to three members of family with parents and one child.
and they are bound to have a bright prospect in future cities_ But with the process of urbanization, the development of urban villas is restricted
TypeS, adapt to two
by various factors_ We will discuss the issue of how to solve the contradictory between the disaboundant of urban land use and good living style and how to create a green and comfortable home for us human beings
members of family with a couple.
.
Relative humidity
Urban Development
Urbanization
Shortage of land
[Perspective]
[Growth of building]
Roof greening
[Ventilation & water system]
Karesansui sun room
Internal circulation In winter
Air exchange In summer
Private yard Increase urban green
Air purification Thermal insulation
-
Dirty water
Sun shutters
Low-E glass
Shad1ng
Daylighting daytime in
daytime in summer
wmter
Modular constrction
I
control daylighting artificially
[Modular units]
[Res i d entia I type]
• Passive ventilation is achieved by the building core Preventing excess radiation in summer,
Enrich variations
allowing more radiation in winter and
Convenient construction
reduce heat loss
Resource conservation
Partial perspective
Inner perspective of the core
Greening of atria in the core of buiding can purify part of water used in villas_ The reclaimed water is used for irrigation and
Inner perspective of the villa
Framework of single block
-C""0 (iU~
[Plan]
-
'
.
0
D
Four family members
House type L
First floor
Second floor
First floor
4th floor
7th floor
I Oth floor
13th floor
Second floor
5th floor
8th floor
I I th floor
14th floor
This design adopt basic modular unit which is 12m* 3m* 3m steel frame Three different type of house is the
Three family members
House type M
combination of modular units, which
First floor
Second floor
i@ ~[ ~·· ., ,; i
can meet the needs of different families and reduce the waste of materials .
I
At the basic idea to be environmental friendly and conservation of resources .
•
0 0
The residence can also be like a tree to fully use the solar energy and also can grow or evolve organically according to needs like a tree .
Two family members
House type S
First floor
Second floor
Third floor
6th floor
9th floor
I 2th floor
•
33
Photography 1
I Monitor 2 Saddle 3 Barbed wire
3
I Branch 2 Eyes 3 Bicycle 4 Deadwood
Which of my photographs is my favorite? The one I ' m going to take tomorrow . - Imogen Cunningham-
Aquarelle, Sketch, Gouache Ancient town of Phoeni x, 2011
Still life
Sketches of modern building