NEO Bankside - Term Project

Page 1

NEO Bankside - - London, UK

Tiffany Johnson / Ryan O’Leary / Christian Lazo / Wei Liu


Contents 3...

...Term Project Discussion

4...

...Detail + Building Renders

5...

...General Enclosure Diagram

6...

...Building Section

7...

...Detail + Building Renders

8...

...Building Rendering

9...

...Structural Focus

10...

...3D Wall Section

11...

...Building Elevation


3

Term Project Discussion This term project faced many issues and setbacks due to the innovative structural logic of the NEO Bankside building complex. Our goal was to generally capture the main idea of the external cable system (how it ties in to the reinforced concrete structure) and the system of cantilevers that exist at the ends of the structure. Considering the entire structure features 100% custom parts (everything from the beam connections to the cables), it was not an easy task for a group of students who have no experience in Revit. I feel that our understanding of the structure was minimally strengthened, having been hindered by the stress associated with BIM modeling and the lack of tutorials and knowledge for the structural components we had to detail, let alone model on a massive scale. With this said, I believe that the information contained in this report satisfies the requirements of this project as they relate best to our specific structure.


Detail + Building Renders

4

Diagrid Connection Render

Diagrid Span // Curtain Wall

Angled Connection of Diagrid


General Enclosure Diagram

5

1 2

3

4

5

6

1...

...Reinforced Concrete Column

2...

...Glass Panel

3...

...Wood Panel

4...

...W12x26

5...

...Trussed Floor System

6...

...Diagrid Cable System


Building Section

6

Concrete enclosed egress system [elevator contained within] Diagrid system [every fourth floor slab there is an anchoring cylinder mounted to a reinforced column]


Detail + Building Renders

7

Corner Diagrid Condition

extension of steel beams

cantilevered suspension cable

cable system

Isolated Corner Diagrid Connection

threaded receiver fork and pin tapered stiffener

spindle brace and plate

Detail Render of Connection


Building Rendering - - Structural Focus Area

8


Structural Focus

9


3D Wall Section

10


Building Elevation

1

West 1/32" = 1'-0"