07 tingting kong 1

Page 1

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013 WEEK7 JOURNAL _OFF CAMPUS

E589 Apartments @ 587-589 Elizabeth St

Information Construction Company: MAXSTRA Construction: Concert construction Structure: Mass Structure mainly 10 story, 55 apartments, no basement Length: 40m Span: 12m

Ground Floor

PVC Material: Copper


Bricks wall

Pvc : for sewage and rainwater

Precast Panel Wall Precast Panel Wall Sketch:


Top Floor Inside: Steel Construction

Purlin

Crossing bracing system

-Bathroom


The current ground is lower than normal, because the tiles wll be add later. (30mm reduce)

Panle Board: Three different panle board. 1 read: Kitchen, laundary –fireproofing. 2 bule : bathroom. 3: with : noraml

Roof


Channels make more water flow.

Flashing:

to prevent the

passage of water into a structure from a joint.

Flate Roof

Pitch 2 degree

Aesthetics

Morden design Combined with the geometric


aesthetic

Privacy Screen

On color, mainly to prudent black, white, as well as grey.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.