E589 Apartments @ 587-589 Elizabeth St
Information Construction Company: MAXSTRA Construction: Concert construction Structure: Mass Structure mainly 10 story, 55 apartments, no basement Length: 40m Span: 12m
Ground Floor
PVC Material: Copper
Bricks wall
Pvc : for sewage and rainwater
Precast Panel Wall Precast Panel Wall Sketch:
Top Floor Inside: Steel Construction
Purlin
Crossing bracing system
-Bathroom
The current ground is lower than normal, because the tiles wll be add later. (30mm reduce)
Panle Board: Three different panle board. 1 read: Kitchen, laundary –fireproofing. 2 bule : bathroom. 3: with : noraml
Roof
Channels make more water flow.
Flashing:
to prevent the
passage of water into a structure from a joint.
Flate Roof
Pitch 2 degree
Aesthetics
Morden design Combined with the geometric
aesthetic
Privacy Screen
On color, mainly to prudent black, white, as well as grey.