Comunity Hub

Page 1

01 INTRO

COMMUNITY HUB A PLACE FOR CEREMONY + LOCAL ART & DESIGN GALLERY

View along Thomas Street


02 SITE LOCATION & NARRATIVE

AREA PHOTOS Manchester, UK SOUTH EAST VIEW OF THOMAS STREET ELEVATION

SW AN

/001 ST

RE

ET

(A

5)

LL

NORTH WEST VIEW OF THOMAS STREET ELEVATION

SH

WITH

/002

66

HI

E UD

NORTH WEST VIEW OF THOMAS STREET ELEVATION

VIEW LOOKING ALONG KELVIN STREET TO CAFE

CORNER OF BACK TURNER STREET AND KELVIN STREET.

s

Y GR

OVE H

HIG

ET

RE

ST

u io ev r P te Si

/003

TE

SI

TH

/004

/005

O

M

A

S

ST

RE

LAYERS OF TORN WALLPAPER AGAINST EXTERNAL BRICKWORK

“HOME IS WHERE THE HEART IS”

STRE

B

RCH

ET

TI

CHU

ST RE

ET

O

LD

HIG

HA

M

H ST

ST

RE

REET

ET

ET

/006

MA

RKE

T ST

REE

T

N

Site Location Plan @ 1:2000 NARRATIVE My initial project, ‘A Place For Ceremony’, was designed as a purpose-built venue for secular ceremonies (weddings & funerals). Though my previous site choice had been inappropriate, the area suited the building aptly. However, the appropriatness of the building in its location was questionable, and how greatly would the area have benefitted from its presence. Therefore, the new incarnation of ‘A Place For Ceremony’ is entitled ‘Community Hub’. The design is now focussed on providing a location, around which, a community can be established in Northern Quarter.

REAR ELEVATION OF SITE 3, LOOKING SOUTHEAST ALONG BACK TURNER

/009

/007

EVIDENCE OF PREVIOUS OPENINGS, BUILDING MODIFICATIONS OVER TIME, MUTABLE BUILDING USE PALIMPSEST. /008


COMMUNITY HUB

03 FIRST FLOOR PLAN @ 1:100

TREET

NER S R U T K C A B

VOID

Stair to Gallery & Fire Escape

LIFT

LIFT

Staff FWC

Staff M/DWC

Kitchen Area

Admin Office

LIFT

Coffin Lift

S KELVIN

ge a t S

ny

o m e er

ll a H

D

I VO

VOID

b

TREET

C

To Exit

FWC MWC

DWC

a

a

VOID

D

I VO

b

na

io ess

c

Pro

e

ut o R l

ng i t a e Se rag Sto

Post- Ceremony Space

Balcony

THOMAS STREET


04 GROUND FLOOR PLAN @ 1:100

STREET R E N R U T K BAC

To Ceremony Hall

LIFT

KELVIN

Fire Escape

Plant

Gallery Store

Vent. Shaft

To Kitchen

Staff Entrance & Staff Room

LIFT

b2

Coffin Lift

STREET

b

a

LIFT

Ceremony Car Stop

Ceremony Entrance

To Processional Route

Gallery Space

a From Post Ceremony Space

b

RAMP

Ceremony Exit

Gallery Entrance

THOMAS STREET


13 ELEVATIONS

Thomas Street Elevation @ 1:100

Back Turner Street Elevation @ 1:100

COMMUNITY HUB


14 ELEVATION & LONG SECTION

Kelvin Street Elevation @ 1:200

View: Thomas Street 01

Ceremony Hall

Gallery

Section a - a @ 1:100

Post Ceremony Space

Car Stop

Ceremony Exit

View: Thomas Street 02


COMMUNITY HUB

07 CEREMONY + GALLERY MODE

R STREET

NE BACK TUR

Kitchen

Admin Office

Staff WCs

Ceremony Hall

To Exit

KELVIN

5

6

8

STREE

Post Ceremony Space

T

3 4

re

Sto

Processional Route (3)

Entrance to Ceremony Hall (4)

Post Ceremony Space (7)

7

e

ut l Ro

a

ion

s ces o r P

Ceremony Entrance (1)

Balcony

THOMAS STREET

First Floor Plan @ 1:200

R STREET

NE BACK TUR

Ga lery Store

LIFT not in service

Staff Room / Entrance LIFT

LIFT Coffin Lift

Door To C.Hall Closed (Except for Fire Escape)

1

Ceremony Entrance

KELVIN

2

Gallery

T

STREE

Through-door 9 closed

Gallery Entrance

Ceremony Exit

THOMAS STREET

Ground Floor Plan @ 1:200

View of Ceremony Hall


08 EXHIBITION MODE

R STREET

NE BACK TUR

Kitchen Staff WCs

Admin LIFT Office

LIFT

KELVIN

Exhibition Area

Display Boards

DWC

MWC

LIFT

FWC

To Exit

STREE T

Social Area re

Sto

Balcony

THOMAS STREET

First Floor Plan @ 1:200

Internal View of Gallery 01 R STREET

NE BACK TUR

Deliveries

Plant

LIFT

Ga lery Store

Staff Room / Entrance LIFT

LIFT

KELVIN

Open Circulation

Gallery

T

STREE Gallery Entrance

Exhibition Exit

THOMAS STREET

Ground Floor Plan @ 1:200

Internal View of Gallery 02


COMMUNITY HUB

11 DETAIL SECTION @ 1:50 (SECTION b - b) White ruberoid heat-welded roof over 200mm rigid insulation on 15mm plywood over 150mm steel trusses

White painted filigree screen hung 200mm from external insulated wall panels, fixed to 200mm UC steel sections internal insulated panels also fixed to UC steel sections, with 22mm fireboard & skim finish, painted white

Ventilation void

Recessed rainwater gutter

Floating Filigree Screen made from white painted aluminium set 200mm from external faรงade Large glazing unit with 16mm argon filled cavity

Light tunnel taking natural light down to the Gallery at Ground Floor

Ceremony Hall 500mm deep steel beam Protective metal grid over roof-light

40mm finishing screed over 100mm concrete slab on 80mm insulation on 15mm plywood over 250mm deep steel joists

Recessed rainwater gutter above cavity closer External 22mm concrete wall finish 100mm medium dense concrete block 60mm solid foam insulation 50mm cavity 100mm high dense concrete block Internal 22mm concrete wall finish

Gallery

12mm plasterboard ceiling suspended from steel joists

Concrete step cast in-situ

DPC lapped into DPM Weak mix sand & cement Concrete raft foundation over sand blinded hardcore

40mm finishing screed over 100mm insulation on 15mm plywood on 50 x 100mm timber joists on 100mm medium dense concrete block

40mm Finishing screed over 110mm Insulation over DPM Section b - b2


SECULAR COMMUNITY

SITE 3

N

KEY :FOOD + DRINK :CREATIVE INDUSTRIES

SOUTH EAST VIEW OF THOMAS STREET ELEVATION

Manchester Transport Interchange

:RESIDENTIAL :MISCELLANEOUS

Sw

an

:TRANSPORT/PARKING :PEDESTRIAN FLOW INTO NORTHERN QTR.

NORTH WEST VIEW OF THOMAS STREET ELEVATION

St

re e

/001

t

/002

ill

h en

d

u Sh

:NORTHERN QUARTER PERIMETER

et

gh

Hi

re St

2

S ge Ed

1

Wi

SUNPAT

ove thy Gr

VIEW LOOKING ALONG KELVIN STREET TO CAFE OPPOSITE SITE.

CORNER OF BACK TURNER STREET AND KELVIN STREET.

H

NORTH WEST VIEW OF THOMAS STREET ELEVATION

1700

tre

5

et

07

/003

/004

/005

as

m

o Th t

e re

St

3

LAYERS OF TORN WALLPAPER AGAINST EXTERNAL BRICKWORK re e

16

St

00

am

08

dh

National Car Parks

/006

so

et

14 0 0

re St

120

tree

t

nS

qu

ar e

1:1500 LOCATION PLAN WITH VARIOUS SITES AND SURROUNDING BUILDING USES. PEDESTRIAN FLOW INTO AREA INDICATED BY BLUE ARROWS.

NO

RT H

ER

1

474.2 m2 PERIPHERAL LOCATION TO NRTHN.QTR. AWKWARD BUT VACANT SITE.

2

447.5 m2 PROMINANT CORNER POSITION, THOUGH VERY SMALL SITE.

3

600.8 m2 VERY LARGE SITE ON MOST BUSY THROUGH ROAD IN NRTHN.QTR.

4

332.7 m2 SMALLER SITE NEXT TO SITE 3, COULD BE USED AS EXTENSION TO SITE 3.

5

587.2 m2 GOOD SIZE SITE WITH CENTRAL LOCATION, HOWEVER HIDDEN BY SURROUNDING TALL BUILDINGS.

N

/008

REAR ELEVATION OF SITE 3, LOOKING SOUTHE ST ALONG BACK TURNER STREET.

1000

ket S

ev en

/007

N

St

Tib

EVIDENCE OF PREVIOUS OPENINGS, BUILDING MODIFICATIONS OVER TIME, MUTABLE BUILDING USE - PALIMPSEST.

00

Ol

National Car Parks

Mar

“HOME IS WHERE THE HEART IS”

t

High

Stree

t

4

QR TR

.

R R T NO H N Q TR E . RT R RT /009


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.