YI TAO
ARCHITECTURE AND LANDSCAPE ARCHITECTURE PORTFOLIO SELECTED WORKS FROM 2012 - 2016
CONTENTS PART 1
Art Incubator
PART 2
Urban Waterfront Edge
PART 3
Shisuo Elementary School
PART 4
1
10
16
Monster Temple
20
SUPPLEMENTS
20
PART 1
Art Incubator Chicago | 2015
Roosevelt University
Robert Morris University
Auditorium Theatre
s
pu
ge
lle
o aC
m Ca
Museum of Contemporatray Photography
bi
m olu
C
Columbia College Art Center
Jones College Prep DePaul University Theatre Elephant Art Gallery
East-West University
SITE
WA BA SH A
RT
By Louis Sullivan 1887 1895 By Solon S. Beman Office and Warehouse Funiture Firm Factory & Office Steak House & 1967 Sawyer Secretarial College 1983 Columbia College Fire & Demolished 2006
SOUTH LOOP CHICAGO
WABASH ARTS CORRIDOR Fire Redevelopment
2
OR
2015
1920 1900s Fire
Immigrants Houses
OR RID
2006 1985
Decline Nation’s Printing Center The Great Fire
SC
1874 1871 before 1871
Wild Grass
flower
leaf
Arts Incubator
Space between wild Grass - Public Space
apartment
shared studio
stem
art
root
community & history
3
N
Columbia College Arts Center
S 2
1
1
3
S
1 shared studio 2 auditorium 3 train station 4
SECOND FLOOR PLAN 1”=1/32’
4
3 4
3
3
4
5 2
2
1
1 exterior performance space 2 reception 3 classroom 4 library 5 office
1
1 exterior performance space 2 cofe 3 library 4 performance/exihibition
BASEMENT PLAN 1”=1/48’
THIRD FLOOR PLAN 1”=1/48’
GROUND PLAN 1”=1/48’
FOURTH FLOOR PLAN 1”=1/48’
5
6
SECTION 1”=1/16’
MODEL 7
MODEL 8
MODEL 9
PART 2
Urban Waterfront Edge
Baton Rouge | 2014
AREPENT SYSTEM
river
house
plantation
backswamp
fifth generation
second generation
first generation
parking
SITE
office
parking
Legend
office
waterconnetion
museum
restaurant & hotel
parking
office
hotel
waterfront circulation railway waterfront space potential user hotpoints
office parking
11
B
DETAIL C
B
DETAIL D D
A
DETAIL B DETAIL A C
D
A C
N 12
Plan 1/64” = 1’
Section A-A 1/64”=1’ Action Flood Stage
Section B-B 1/64”=1’ Major Flood Stage
Section C-C 1/64”=1’ Mean Flood Stage 13
Detail A 1/16” = 1’
35 3
14
Detail B 1/16” = 1’
Detail D 1/16” = 1’
Detail C 1/32” = 1’
15
Model
16
Model
17 8
Part 3
Shisuo Elementary School
[Sustainalbe Self-constructed Project ] Green School Refroming Competition Honarble Metion China | 2013
19
palm leaves waterproof memberane 15mm plank 60mm wood purline 80mm plank
waterproof memberane 15mm plank metal component
sight
folding window
wind
cooling system
1mm sieve 150mm cobble 1mm sieve 1mm sand 1mm strainer 1mm actived charcoal 1mm strainer 100mm cotton
20
SELF CONSTRUCT PROCESS Step 1: concreting, wood load-bearing column, girders.
Step 2: floor, roof truss, main structure
Step 3: walls, roof, window, rainwater collecting equipments
warm wind pressure ventilation
wind pressure ventilation
classroom
bathroom
bathroom
bedroom
kitchen
bedroom
dormitory
rainwater utilization
21
PART 4
Monster Temple Honey Island Swamp | 2015
23
24
25
26
SUPPLEMENTS
Storehouse Renovation
Baton Rouge | 2015
21
27
SUPPLEMENTS
Soil Improvement
What would happen in 20 years Planting rape to abosorb the soil polluted by alkali and heavy metal. Wetland raised by preservation of orignal vegetation and growing particular species with water purification ability. Ecological strategy are being used to deal with land and water.
After 10 years, some light-polluted area could be used for planting. Education center is built for people from community to know about the ecological strategy being used in park and learn the skill of horticulture and agriculture. Wetland grows bigger and bigger.
20 years of soil improvement process provides more avaliable lands. Glass houses are putted in flower field for recreation. Practice of horticulture in pollution free land. In wetland, an integrated and reliable water purify system is built. A resevior supply by purification of the water from river, to feed the need of landscape, agriculture and entertainment.
Polluted materials like alkalis and heavy metal elements are absorb from the root of vegetation. Then these enrichment materials are transported to recycle industry. Time pass by and the pollution situation become better. After this, land could be used for new founction like horticulutre.
Burn & Recycle
Stage 1
Stage 2
Stage 3
·Soil Improvement ·Water Purification
·Horticulutre ·Wetland ·Education Center
·Grass Houses ·Resevior
Gain & Transport
Wetland Purification
For preservation of water resource, the design of park aim to supply its need on water by purification. Water is pumped from polluted river, flow through the wetland and go through the purification process of sedimentaion, aeration and plant absorption, eventually flow into the resevior. People could use the clear water from resevior for agriculture, horticulture and recreation activities. At the same time, the process show in wetland is a good teaching case for ecology education.
Vegetation absorbing
Sunlight
Solar Energy
O2 O2 O2
Submerged Plant Polluted Water Sand Microbial Decomposition
Floating Plant
Hydrilla
Lotus Eichhornia
Metabolism Shanghai 28
Reservoir
Aeration
Sedimentation
Shanghai | 2012
Emergent Plant
Pebble Zizania Calamus
Potamogeton
Agaricus
Reed
Pistia
Iris
Alisma
Trapa Ceratophyllum
Autumn Scene Season for Harvest
Spring Scene Season for Seeding
Night Scene
Lighting Design Festival
Deisgn for Four Seasons
Summer Scene
In different periods of year, various activities could be held on the gardens. Crops are growed on the ground, seeding happen in spring and sow in autumn. In summer we have Construction Festival and in winter, we hold on Lighting Design Festival.
Construction Festival
IMPARTATION AND INHERITANCE
[Regeneration of Residential Quarters] Shanghai | 2013 29
SUPPLEMENTS
Hand Drawings 30
Yi Tao | 陶逸 MArch I and MLA I Candidate 2018, Louisisana State University BLA, Tongji University, China Email: ytao3@lsu.edu Address: 5075 Nicholson Drive, Apt. F307, LA 70820, Baton Rouge, US Tel: 225-572-1678
31