1 minute read

PARKS AND RECREATION FUND PROJECTS

Capital Project: Newlin Gulch Trail Connection

Description

The Newlin Gulch Trail is a proposed north/south trail connection that will generally follow along the east side of Chambers Road to connect with the East/West Trail on the south. It will then continue north under Mainstreet. This trail will be a combination of a 10-foot-wide sidewalk along the east side of Chambers Road and detached/separated trail segments under Mainstreet to the north and connecting to the East/West Trail to the south.

PURPOSE/DISCUSSION

The Newlin Gulch Trail will provide an important north/south trail connection in this area of Town which will eventually allow trail users to access the Cherry Creek Regional Trail via existing trail connections through the future Newlin Meadows Community and the existing Stonegate Community.

Project Budget

Funding Sources

Parks and Recreation Fund Revenue

Impact On Operating Costs

On-going repair and maintenance of any new additional trail segments

Impact On Other Departments

Parks and Recreation coordinates with Public Works/ Engineering on selecting and hiring contractors and on construction. The department’s time and resource allocation is limited with these trail sections.

TOWN STRATEGIC GOALS ACHIEVED Support an Active Community

The continued construction of an inter-connected trail system throughout the Town will both encourage outdoor exercise and alternate modes of commuting.

Develop a Visionary Community through Balanced Growth

An integrated trail system with both regional and local connections and opportunities for expansion is critical for balanced community growth. The Newlin Gulch Trail connection will provide an important component of the Town’s overall trail system while also contributing to future balanced growth.

Promote a Safe and Healthy Community

Additional trail opportunities will encourage Parker residents to engage in more outside exercise such as walking, running and cycling. These activities contribute to a healthier community.

Capital Project: Newlin Gulch Trail Connection (cont)

This article is from: