PORTFOLIO
TUNG HOANG -
PREFERRED NAME : TOM ---------------------------------------------------TUNG.HOANG.2406@GMAIL.COM CONTACT NO 0420240687
--------------------------------------------------Applying Positions ARCHITECTURE GRADUATION URBAN DESIGNER 3D VISUALISER
TUNG HOANG ‘S PORTFOLIO
EDUCATION AND HONOUR • Golden Key International Honour Society in Deakin University
[2017 - current]
• Master of Architecture of Deakin University, VIC, Australia
[2017 - 2018]
• MBA of Wolverhampton University UK, Singapore
[2012 - 2013]
• Bachelor of Regional Urban Planning in
[2005 - 2011]
Ho Chi Minh City University of Architecture, Vietnam
KEY EXPERIENCE
TUNG HOANG -
PREFERRED NAME : TOM ---------------------------------------------------TUNG.HOANG.2406@GMAIL.COM CONTACT NO 0420240687 HOBBY TENNIS, SOCCER, MUSIC, TRAVELLING, DRINKING,
---------------------------------------------------
Graduate Architect - Bruce Henderson Architects, Melbourne
[2018 - Current]
Urban Designer - CPG Consultants Pte Ltd, Singapore
[2013 - 2016]
Associate Architect - Hai An Ltd. Company, Vietnam
[2011 - 2012]
PARTLY RESPONSIBLE FOR FOLLOWING AWARDS • Best Green Development in Vietnam, VanGiang Ecopark, Hanoi, Vietnam, 2014 • 1st Prize for Nanjing Eco High-Tech Island, 2013 • 1st Prize for Ecopark Onemarket District and Promenade Development, 2015 • 2nd Prize for Xiamen Line 1 Jiangjunci station - Traffic Oriented Design (TOD) Planning, 2015 • Merit Arward Van Giang Southern Gateway Urban Design and Landscape Plan - Singapore Institute of Planner (SIP) Planning Awards 2015
SKILLSET Autodesk AutoCAD Autodesk Revit Architecture Sketch Up Adobe Photoshop Adobe InDesign Adobe Illustrator Vray in 3DsMax Enscape 3D rendering (Sketch up) Lumion3D (Sketch up) Professional Presentation
RESUME
SELECTED WORK
ARCHITECTURAL PROJECTS
MASTER PLANNING PROJECTS
3D VISUALISATION WORK
GRADUATE ARCHITECT ---------------------------------
URBAN DESIGNER ---------------------------------
3D ARTIST ---------------------------------
SUNBAY SG. [A]
SEN H. [MP]
SELECTED WORK ONLY
ECO X. [A]
VINH C. [MP]
[FREELANCER WORK]
ROSE ST. [A]
HYPERLOOB SC. [MP]
MALVERN RD. [A]
TAI-YU [MP]
BRUCE ST. [A-C]
JIANJUNCI STN. [MP]
CHRUCH ST. [A]
CHAOA. [MP]
MILTON PA. [A]
PHU H. [MP]
HARMONY T. [A]
BACH VI. [MP]
[DEC 2011- CURRENT]
[APRIL 2013 - SEPT 2016]
[2015-PRESENT]
MIC T. [A] HOSIER L. [A] O. MARKET DI. [A-C] O. MARKET DI.[A] HY. HOTEL [A] MA. ARC [A] BULLA RD. RL. [A] CP. CAFE [A] MIPEC SH. [A] MASTER CLASS [A]
--------------------------------PAGE 4-22
[A] ARCHITECTURAL PROJECTS
[A-C] ARCHITECTURAL COMPETITION
--------------------------------PAGE 24-32
[MP] MASTER-PLANNING
-------------------------------PAGE 34-36
TABLE OF CONTENT
ARCHITECTURE
SUNBAY SG. -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXSITING URBAN CONTEXT DEVELOPING DESIGN CONCEPT OF HOUSING DEVELOPMENT SCHEME DEVELOPING SELECTED DESIGN OPTION IMPLEMENTING DESIGN DEVELOPMENT PACKAGE COORDINATING WITH CLIENTS AND STAKEHOLDERS ISSUING ARCHITECTURAL LAYOUT PLANS 3D VISUALISATION IN SKETCH UP
--------------------------------------------------DESIGN DEVELOPMENT
WORK PERFORMED AT HAI AN COMPANY
RESIDENTIAL PROJECT
4
ARCHITECTURE
ECO X. -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXSITING URBAN CONTEXT DEVELOPING DESIGN CONCEPT OF HOUSING DEVELOPMENT SCHEME DEVELOPING SELECTED DESIGN OPTION IMPLEMENTING DESIGN DEVELOPMENT PACKAGE COORDINATING WITH CLIENTS AND STAKEHOLDERS ISSUING ARCHITECTURAL LAYOUT PLANS 3D VISUALISATION IN SKETCH UP
--------------------------------------------------DESIGN DEVELOPMENT
WORK PERFORMED AT HAI AN COMPANY
RESIDENTIAL PROJECT
5
8860
BALC. 8.0 m²
2000
1E.05 3B2B 125.0 m²
1E.02
8000
3000
2400
UP 850 CLEAR OPE
3000 3200
1E.01
BALC. 13.6 m²
BALC 13.7 m²
3100 1.2M
3000
3000 1E.06
10.3M
3B2B 132.7 m²
850 CLEAR OPE
3690
O/W
3000
S/D
WIDTH 3.6M
3670 O/W O/W
O/W
O/W
O/W
3000
1200
1200
850 CLEAR OPE 850 CLEAR OPE
850 CLEAR OPE
O/W
O/W
S/D
1E.06 BALC. 12.9 m²
2400
S/D
1W.07
850 CLEAR OPE
1E.01 3B2B 144.3 m²
WIDTH 3.6M
3000 3380
850 CLEAR OPE
DEPTH 3.4M
LIVING AREA 12SQM MIN
850 CLEAR OPE
3000
7200
3050
3B2B 144.2 m²
1690
O/W
WIDTH 3.6M
1W.07
2.7M
1.2M
3000
3000
4M 12.
2000
3050
S/D
O/W
O/W
3000
3200
3050
7230
O/W
4480
1280
O/W
O/W
3090
850 CLEAR OPE
3000
3000
DEPTH 3.4M
M 15.7 1W.01
WIDTH 3.6M
O/W
3000
850 CLEAR OPE
--------------------------------------------------TOWN PLANNING
O/W
1E.05 BALC. 12.4 m²
O/W
1600
2B2B 95.2 m²
DEPTH 3.4M
O/W
3090
850 CLEAR OPE
3000
S/D
O/W
DEPTH 3.4M
1200
1E.02
O/W 850 CLEAR OPE
3210
9000
1.2M
1200
2000
2700
850 CLEAR OPE
WIDTH 3.6M
1200
850 CLEAR OPE
850 CLEAR OPE
3440
3000
DEPTH 3.4M
1200 3000
O/W
DEPTH 3.4M
1200
850 CLEAR OPE
2750
DEPTH 3.4M
3700
3380
2400
3200 3000 3260
850 CLEAR OPE
O/W
1200
7910
1200
11.4 M
850 CLEAR OPE
O/W
BALC. S/D 8.0 m²
2000
2.7M
DEPTH 3.4M
1W.01
850 CLEAR OPE
3200
3200
3000
1200
3000
850 CLEAR 2.7M OPE
850 CLEAR OPE
3B2B 142.3 m²
3800
O/W
3000
850 CLEAR OPE
3400
3B2B 126.5 m²
2.7M
3400
3600
1200
1200
DEPTH 3.4M
850 CLEAR OPE
BALC. 12.1 m² S/D
1E.04
1W.02 2B2B 95.1 m²
1E.04
1.2M
WIDTH 3.6M
3150
8080
UP
850 CLEAR OPE
850 CLEAR OPE
8710
DEPTH 3.4M
1200
WIDTH 3.6M
6450
O/W
3000
850 CLEAR OPE
850 CLEAR OPE
1W.06
3000
2450
BALC. 18.6 m²
3B2B 133.0 m²
M .5 10
PROVIDING PROJECT DEVELOPMENT SCHEDULE/SUMMARY
1W.06 2B2B 95.3 m²
3000
WIDTH 3.6M
O/W O/W
1280
BALC. S/D 8.3 m²
1200
1W.02
DEVELOPING AND RESOLVING LAYOUT PLANS ACCORDINGLY
ENSURING RESCODE REQUIREMENT.
3160 1200
850 CLEAR OPE
1600
2410
3B2B 136.2 m²
S/D
1E.03
3000
850 CLEAR OPE
O/W
1W.05
O/W
3400
850 CLEAR OPE
DEPTH 3.4M
O/W
1.2M
850 CLEAR OPE
1.2M
ENHANCING ARCHITECTURAL DESIGN OF BUILDING ENVELOP
IMPLEMENTING & REVISING INDICATED LAYOUT PLANS
850 CLEAR OPE
850 CLEAR OPE
3000
ENSURING THE PROPOSED MEETS B.A.D.S REQUIREMENT
850 CLEAR OPE
3300
ENSURING THE PROPOSED COMPLY WITH ALL REPORTS FROM ALL CONSULTANTS INVOLVED.
6960
7530
3000
4120
ARCHITECTURAL DESIGN ASSISTANT
850 CLEAR OPE
850 CLEAR OPE
1200
1200
O/W
850 CLEAR OPE
BALC. 13.4 m²
O/W
3000
O/W
WIDTH 3.6M
3000
850 CLEAR OPE
WIDTH 3.6M
ROLE RESPONSIBILITY ----------------------------------------------------
850 CLEAR OPE
1.2M
3000
-
BALC. 21.9 m²
WIDTH 3.6M
1200
1.2M
O/W
3B2B 125.0 m²
1200
3000
3000
ROSE ST.
3B2B 137.4 m²
1W.04
WIDTH 3.6M
3000
1W.05 S/D
O/W
1E.03
6M 7.
ARCHITECTURE
1W.03
7M O/W
DEPTH 3.4M
WIDTH 3.6M
3230
3000
S/D
1410
3090
DEPTH 3.4M
S/D
BALC. 16.6 m²
3170
9.6M
BALC. 16.1 m²
1W.04
3580
O/W
2400
1W.03
3000
3000
2400
3090
O/W
O/W
O/W
O/W
2400
O/W
3000
3580
O/W
O/W
O/W
O/W
O/W
O/W
F/W
2ND FLOOR PLAN - BADS PLAN
NOTES: Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia. CHECKED
BHA
© COPYRIGHT Bruce Henderson Architects P/L REPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AN INFRINGEMENT OF COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THIS DOCUMENT IS/ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS/ARE PROHIBITED FROM DISCLOSING SUCH INFORMATION, IDEAS AND CONCEPTS TO ANY PERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
REV DATE DESCRIPTION A 04/03/2021 Council RFI
ACCESSIBLE PATHS / AREAS AS PER 55.07-7
PROJECT:
DATE:
04/03/2021
JOB No:
BREEZE PATH AS PER 55.07-15
PROPOSED RESIDENTIAL DEVELOPMENT 1-9 ROSE ST BRIGHTON
SCALE:
1:100@A1 1:200@A3
REVISION N
DRAWN:
BHA
N 0 0.5 1
2
5m
DRAWING TITLE:
BADS - LEVEL 1
DRAWING STATUS:
DRAWING N
TOWN PLANNING
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
6
T
3
4
5
6
7
8
20 30.
DOOR
7°39' 12.97(S) 12.93(T)
BEDROOM
13
14
15
16
17
18
OPAQUE GLASS UP TO 1.7m FROM FFL
4500
CAR PARK EXHAUST
12
29 .2 9
257 m²
3 EA2.7 VE2
0 .6 30
REFRIGERANT PIPEWORK, GAS, COLD WATER MAIN PIPES, HOT WATER PIPES, COMMS, NBN RISER CABLES
30 .6 6
30 .4 8
3
29 .5 5
29 .8 7
29 .9 9
30 .1 9
5
CONCRETE CROSSOVER
6
7
E-E
D-D
TP-4.03
TP-4.02
REV DATE
DESCRIPTION
1.0
2.0m
CO CRO
29 .1 7
8 1m² RAIN GARDEN WITHIN PLANTER BOXES
9
FOR LANDSCAPE AND PUBL REFER TO LANDSCAPE ARC
PROJECT:
DATE:
26/10/2019
Proposed Mix use development 617 Malvern Road, Toorak
SCALE:
1:50 @ A1 - 1:100 @
DRAWING TITLE: 0 0.2 0.5
29.32
29 .4 2
C-C
REV DATE DESCRIPTION 30-03-2020 TOWNPLANNING ISSUE
29 .1 9
29 .5 0
29 .5 7
TP-4.02
Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia.
2850
29 .4 0
29.68
29 .8 2
4
29 .2 9
0 9.2
30 .5 7
30 .4 0
29.29
CONCRETE FOOTPATH
29 .8 1 CONCRETE CROSSOVER
29 .5 0
29 .6 3
29.40
30 .7 6
2
30 .6 0
30.13
29 .8 0
29.80
1
30 .6 5
31.12S) 31.06(T) SV
30.77 30.88
30 .6 9
30 .7 9
30 .5 1
30.30 30.26
E
30 .7 9
30 .7 1
30 .3 4
30.00
30.80
30 .7 6
30 .0 0
29 .9 8
FH
30.89 30.80
.80
30 .5 8
30 .1 6 SIGN
30
30 .2 3
187°36'
2500
2500
29 .3 1
SV
CONCRETE FOOTPATH
30 .6 4
30 .2 4
SV
2
© COPYRIGHT Bruce Henderson Architects P/L
Level 03
DRAWN: BHA DRAWING STATUS:
TOWNPLANNING
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
2
STUDY
SV
3RD FLOOR - PENTHOUSE UNIT 30 .7
37.88 PARAPET
--------------------------------------------------TOWN PLANNING
11
TERRACE
SIGN
PROVIDING PROJECT DEVELOPMENT SCHEDULE/SUMMARY
10
152 m²
SIGN
ENSURING RESCODE REQUIREMENT.
1
30 .7 2
30 .8 6 30 .7 7
2
SITTING
SV
IMPLEMENTING & REVISING INDICATED LAYOUT PLANS
3
MASTER
30 .8 0
30 .7 3
4
AHD 41.370 m
3160
DEVELOPING AND RESOLVING LAYOUT PLANS ACCORDINGLY
5
SV
SIGN
ENHANCING ARCHITECTURAL DESIGN OF BUILDING ENVELOP
6
3.01 3B3B
F 30 .6 6
BITUMEN SURFACE
B-B TP-4.01
ENSURING THE PROPOSED COMPLY WITH ALL REPORTS FROM
ENSURING THE PROPOSED MEETS B.A.D.S REQUIREMENT
7
30 .6 3
30 .6 2
ALL CONSULTANTS INVOLVED.
8
GP
E
48
9
2
98°56'
D 30.
PANTRY
15.11
G-G TP-4.05
SIGN
ARCHITECTURAL DESIGN ASSISTANT
PDER
278°12' 15.21
ROLE RESPONSIBILITY ----------------------------------------------------
ENSUITE
SEAT
-
C
28 .7 38.92 2 4 PARAPET 8.7 4 28 28 .8 0
FH
LDRY
CONCRETE FOOTPATH
MALVERN RD.
K EX ITC H HE AU N ST
30 .4 1
ARCHITECTURE
30 .5 7
4460
40 30.
SIGN
1
F-F TP-4.04
OPAQUE GLASS UP TO 1.7m FROM FFL
ENSUITE
BEDROOM
30 .4 7 30 30 .4 .4 3 8
3200
DOOR
7°53' 18.34
K EX ITC H HE AU N ST
BIKE RACK
A-A
ENSUITE
TP-4.00
B 30.3
3965
11 31.
38.91 PARAPET
3500
30 .3 5
30 .2 9
37.88 PARAPET
SV
30 .3 4
38.97 TOP
A
30 .1 7
3000
4 3.7 H3 3.11 S3 ER OV
DOOR
9
G DIN
7165
28 .7 0
0
2
D-D TP-4.02
IL BU
1
E-E TP-4.03
Y ON LC BA
C-C TP-4.02
74 33. .11 S33
No. 611
UBLE STOREY CK BUILDING
EC
.3 6
7
ARCHITECTURE
BRUCE ST.
PENT-HOUSE #1
PENT-HOUSE #2
-
ROLE RESPONSIBILITY ---------------------------------------------------STUDYING SUBJECT SITE FEASIBILITY ARCHITECTURAL DESIGN ASSISTANT DEVELOPING MASSING THROUGH 3D MODELLING IMPLEMENTING PROJECT SCHEDULE IMPLEMENTING ILLUSTRATIVE SITEPLAN MAKING PROFESSIONAL PRESENTATION REPORT
--------------------------------------------------COMPETITION
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
3D RENDER BY BHA
RESIDENTIAL PROJECT
8
ARCHITECTURE
CHURCH ST.
TOWNHOUSE #3 2B3B
TOWNHOUSE #2 2B2B
TOWNHOUSE #1 2B3B
-
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXISTING APARTMENT PROPOSAL APPLYING TOWNHOUSE SCHEME ENSURE PROPOSED ENVELOP DEVELOPING BUILDING ENVELOP & MAIN FACADE IMPLEMENTING & REVISING INDICATED LAYOUT PLANS ENSURING RESCODE APPLICATION
TOWNHOUSE #4 2B3B
TOWNHOUSE #5 2B3B
IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES
--------------------------------------------------TOWN PLANNING GROUND FLOOR PLAN
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
3D RENDER BY BHA
RESIDENTIAL PROJECT
9
6600
7500
3449
W.I.R
1800
1800
TERRACE 12m2
2000
TERRACE 12m2 TERRACE 12m2
5.0m2 4250
1200
4975
3430
4850 4900
2350
10870
9900
TH03 65.9m2
TH02 73.9m2
3000
TH04 65.9m2
TH05 73.8m2
TH01 96.9m2 3250
1611
SETBACK ADVISED BY PLANNER
STUDYING SUBJECT SITE FEASIBILITY
1634
ARCHITECTURAL DESIGN ASSISTANT
700
3350
700
ROLE RESPONSIBILITY ----------------------------------------------------
3100
4350
-
9900
MILTON PA.
1600
700
ARCHITECTURE
6600
3950
1892
3027
6600
2000
6700
APPLYING TOWNHOUSE SCHEME ENSURE PROPOSED ENVELOP DEVELOPING BUILDING ENVELOP & MAIN FACADE MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING INDICATED LAYOUT PLANS ENSURING RESCODE APPLICATION IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES
--------------------------------------------------TOWN PLANNING
REV
Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia.
DATE
DESCRIPTION
REV
DATE
DESCRIPTION
PROJECT:
128, MILTON P DRAWING TITLE: 0
0.5
1.0
2.0
4.0m
LEVEL1 FLOO
© COPYRIGHT Bruce Henderson Architects P/L
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
RESIDENTIAL PROJECT
10
ARCHITECTURE
HARMONY T. -
ROLE RESPONSIBILITY ---------------------------------------------------STUDYING SUBJECT SITE FEASIBILITY ARCHITECTURAL DESIGN ASSISTANT DEVELOPING MASSING THROUGH 3D MODELLING 3D DIAGRAM DEVELOPMENT MAKING BILINGUAL REPORT IMPLEMENTING PROJECT SCHEDULE IMPLEMENTING ILLUSTRATIVE SITEPLAN MAKING PROFESSIONAL PRESENTATION BOARDS COORDINATING WITH CLIENT AND STAKEHOLDERS ( IN VIETNAM)
--------------------------------------------------COMPETITION
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
3D RENDER BY BHA
3D RENDER BY BHA
HOSPITALITY PROJECT
11
ARCHITECTURE
MIC T. -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT IMPLEMENTING INDICATED LAYOUT PLANS APPLYING FIRE SAFETY OF BUILDING REGULATION MAKING BILINGUAL DOCUMENTATION IMPLEMENTING PROJECT SCHEDULE COORDINATING WITH CLIENT AND STAKEHOLDERS ( IN VIETNAM) CHECKING DESIGN TO ENTIRELY MEET CONSTRUCTION LAW
--------------------------------------------------DESIGN DEVELOPMENT
3D RENDER BY BHA
GROUND FLOOR PLAN
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
1ST FL- TYPICAL RETAIL LEVEL
3D RENDER BY BHA
TYPICAL APARTMENT LEVEL
MIXED-USE
12
ARCHITECTURE
HOSIER L. -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT TAKING OVER TOWN PLANNING PACKAGE REVISING BUILDING ENVELOP & MAIN FACADE REVISING ENTIRE LAYOUT PLANS UPDATING PROJECT SCHEDULE UPDATING 3D VISUALISATION
--------------------------------------------------TOWN PLANNING
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
RESIDENTIAL PROJECT
13
ARCHITECTURE
O. MARKET DI. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF TOWERS STUDYING SHADOW DIAGRAMS COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) APPLYING URBAN DESIGN PARAMETERS ENSURING POPULATION DISTRIBUTION IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER
--------------------------------------------------COMPETITION (AWARDED)
WORK PERFORMED AT CPG CONSULTANTS
3D RENDER BY CPG
RESIDENTIAL PROJECT
14
ARCHITECTURE
O. MARKET DI. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF TOWERS STUDYING SHADOW DIAGRAMS COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) APPLYING URBAN DESIGN PARAMETERS ENSURING POPULATION DISTRIBUTION IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION
--------------------------------------------------DESIGN DEVELOPMENT
WORK PERFORMED AT CPG CONSULTANTS
RESIDENTIAL PROJECT
15
ARCHITECTURE
HY. HOTEL -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING 2 LAYERS-FACADE EXPERIMENTING DIFFERD SPECIFICATION OF PIXELATED FEATURE SCREEN MAKING 3D MODELLING COMPLEXITY OF THE PODIUM FACADE ASSISTING 3D RENDER ARTIST IMPLEMENTING PROFESSIONAL PRESENTATION PRELIMINARY MATERIAL FINISHES
--------------------------------------------------TOWN PLANNING
3D RENDER BY BHA
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
HOSPITALITY PROJECT
16
Rooftop garden
ARCHITECTURE
MA. ARC -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER
Service apartment
Image. Semi-basement plan
Image. Ground floor plan - Access
Image. Ground floor plan - Uses
Image. 2nd floor plan - Uses
Image. 3rd – 9th floor plan - Uses
Image. 10th floor plan - Uses
SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF 2 BUILDINGS STUDYING BUILDING FUNCTIONS COORDINATING WITH IN-HOUSE LANDSCAPE TEAM AND STAKEHOLDERS APPLYING URBAN DESIGN PARAMETERS IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION
--------------------------------------------------DESIGN DEVELOPMENT
Green balconies Shops/ Restaurants
Semi basement
3D RENDER BY CPG
WORK PERFORMED AT CPG CONSULTANTS
COMMERCIAL PROJECT
17
B
71.62
L NE C
L
D AN
OPE N SP AC E GRA SS
71.79
CRETE CON
71.80
72.69
ST RIP
CO NC RE TE
72.57
72.68
LE 70.26 71.00 70.99 70.86
70.81
71.65
LOADING AREA
71.30
1
3
5
10m
PROJECT:
69.07
70.96 70.61
EB 71.03
DRAWING TITLE:
PROPOSED GROUND FLOOR
GROUND FLOOR PLAN- PRELIMINARY
67.61
70.65 70.47
69.85
70
70.86
70.23
70.63EB
70.71CB
0
BULLA ROAD RETAIL ESSENDON FIELDS
71.13
71.28
AHD 71.300
71.10
EB 71.33
D
71.49
71.W52 2. IRE 7m MESCHAI H FE N NC E
TB M R.L RIV 71. ET 18
71.09Lip 71.01Inv
RO LLE RD OO R
.69 71
71
71.69
71.68 VE L
B
GRA
71 .69E
71.58
70.99 70.91 70.78 CH 70.19 AIN WIRE ME SHFE NC E
71.80
.65
71.70
.74C B
71.64
71
71.67
BITU MEN
B
71.61
RY
FE NC E
71.19
DA
m CH AIN WIR E ME SH
CANOPY OVER
UN
2.7
LOADING BAY
BO
ES S AIR END PO ON RT
ROLLER DOOR
71.77 EB
TUL LAM ARI NE FWY
LOADING BAY
GRAV EL
--------------------------------------------------SCHEMATIC DESIGN
BITUMEN
71.55 CHAINWIR EMESHFEN CE
FRE
70 72.16CB
72.25
ROA D
72.00
FE NC E
72.45 EB
TIT
PROVIDING PROJECT DEVELOPMENT SCHEDULE/SUMMARY
m CH AIN WIR E ME SH
TU LLA MA RIN E
72
ENSURING MEET ALL AVIATION ASSESSMENT REQUIRED.
2.7
EW AY
EN
PE RIM ET ER RO AD
A RO
UM
CONCRE TE STRI P
71.98
BIT
MEZZANINE OVER 200 m2
72.08 72.25EB
.78E
B
72.20
72.37 72.37
GR AV EL
71
0C
73
ST RIP
CO NC RE TE
.9
DEVELOPING AND RESOLVING LAYOUT PLANS ACCORDINGLY
TP-402
72
72.81
CO NC RE TE
E
92 m²
70.23
72.88 72.82 .02E
B
B
FE NC E
AR 71 K .70C 71.41
L
71.37
B 73.05S
73.05E B
72.99
73.17CB BITUMEN
73 OPE N SP AC E VE L GRA
AHD 72.500
CAFE
LOBBY
UP
72.83 72.82
.75E
m CH AIN WIR E ME SH
2000 m²
MEZZANINE OVER 200 m2
72
2.7
TENANCY 3
AHD 72.500
DARY
PROVIDING SCHEMATIC DESIGN PROPSAL
BOUN
E TP-402
TENANCY 2 1600 m² +200 M2 MEZZANINE
AHD 72.500
(SERVIC EROAD )
1I nv 73.10EB
TENANCY 1 589 m² +200 M2 MEZZANINE
E
BOUNDARY
ROLE RESPONSIBILITY ----------------------------------------------------
L NE
TITL
AN CH
73.03Lip CONCRETE 73.02Inv
SITE
-
71.56 TA NB
71.65 71.66 71.54 71.39
5400
.9
B
71.39
72
AHD 72.500
ip .01L 9Inv 73 .9 72
D TP-402
MEZZANINE OVER 200 m2
CL
.0 2
73.05S
AHD 72.400
72.95CB
ip 72.99L
71.29Inv 71.33Lip
AHD 72.500
6400
B 73.04S
73
SUBJECT
LOADING BAY
Inv 71.68 Lip 71.72
7
RB KE
5C 1.8
71.80 D BE N DE AR
9000 CL
Y
5400
G
3500 3500
E
R
SITE ACCESS & EGRESS
DESCRIPTION
N HA
L 3C .8 71
BED GARD EN
REV DATE
A
72.96
FE N C
D
1300 m² +200 M2 MEZZANINE
73.00
HA IN
TENANCY 4
C
ROA D
POSSIBLE KIOS CAFE/ OTHER RETAIL
N
UNDERCROFT ACCESS & EGRESS
U
B
71.78
71.65I nv
O
72.97S
R Y71.76
B
D TP-402
BULLA RD. RL.
ENHANCING ARCHITECTURAL DESIGN OF BUILDING ENVELOP
© COPYRIGHT Bruce Henderson Architects P/L
5400
700 0
NDA
E
ARCHITECTURE
BOU
71.85
71.81
STAIRWELL
71.76Lip 71.73Inv
71.68CL
LE
GARDEN BED POST AND CHA IN FENC E
71.80
TIT
71.95
LOADING BAY
71.61CL
71.73
71.52
71.49Inv
71.65
OPE N SP AC E GRA SS
0 .4
71.81 BO L
71.25
71.64
71.92
71
71.94 71.91
71.89 71.92CL
6400
71.46Inv
CL
72.44 72.41 Lip Inv
72.52
D CH ANNE L
71.47CL 71.54
71.46
D
BITUM EN
CARPARK 59 SPACES
71.33 71.23CL
Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia.
71.52Lip 71.44Inv
AN
CONC RETE KERB AN
71.21CL 71.45
AND CHANNEL
PO ST
B
GARDEN BED
CONCRETE KERB
L
72.92S
71.33
POST AND CHAIN FENCE
71.24Lip 71.21Inv
IT
72.87Lip 72.85Inv
(TBC)
72
72.21
N SIG
72.30
BOUNDARY
BO L
71.7
71.78
72.08
72.25 72.34
72.39
SIGN
PROPOSED
71.13Lip 71.06Inv 71.21
.91
71.24Lip 71.22Inv 71.36CL
71
GARDEN BED
CHANNE L
71 .8 8C L
SIGNAGE
CONCRE TE KER B AND
TP-401
BULLA ROAD
v
71.74
T
15m
A
TP-401 72 BED EN RD GA
71 71 .81I .86L nv ip
C TP-401
C
B
A
TP-401
TP-401
TP-401
DATE:
02/11/2021
JOB N :
SCALE:
1:250@A1
REVISION N :
DRAWN:
BHA
DRAWING STATUS:
PRELIMINARY
3D RENDER BY BHA
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
41006
O
O
DRAWING N : O
TP-205
3D RENDER BY BHA
18
ARCHITECTURE
CP. CAFE -
ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING SUBJECT SITE FEASIBILITY INTEGRATING LANDSCAPE CONSULTANT’S PROPOSAL INTO THE DESIGN DEVELOPING BUILDING ENVELOP & MAIN FACADE REVISING STREETSCAPE FURNITURE TO ENSURE ACOUSTIC ISSUE MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING LAYOUT PLANS IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES
--------------------------------------------------TOWN PLANNING
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
COMMERCIAL PROJECT
19
ARCHITECTURE
MIPEC SH. -
ROLE RESPONSIBILITY ---------------------------------------------------CONSULTING ARCHITECTURAL DESIGN STUDYING SUBJECT SITE FEASIBILITY DEVELOPING BUILDING ENVELOP & MAIN FACADE MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING LAYOUT PLAN IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES
--------------------------------------------------SCHEMATIC DESIGN
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
COMMERCIAL PROJECT
20
STUDENT WORKS
ARCHITECTURE IN URBAN CONTEXT
21
STUDENT WORKS
ONE-ROOF-MARKET (MASTERCLASS)
22
SELECTED WORK
ARCHITECTURAL PROJECTS
MASTER PLANNING PROJECTS
3D VISUALISATION WORK
GRADUATE ARCHITECT ---------------------------------
URBAN DESIGNER ---------------------------------
3D ARTIST ---------------------------------
SUNBAY SG. [A]
SEN H. [MP]
SELECTED WORK ONLY
ECO X. [A]
VINH C. [MP]
[FREELANCER WORK]
ROSE ST. [A]
HYPERLOOB SC. [MP]
MALVERN RD. [A]
TAI-YU [MP]
BRUCE ST. [A-C]
JIANJUNCI STN. [MP]
CHRUCH ST. [A]
CHAOA. [MP]
MILTON PA. [A]
PHU H. [MP]
HARMONY T. [A]
BACH VI. [MP]
[DEC 2011- CURRENT]
[APRIL 2013 - SEPT 2016]
[2015-PRESENT]
MIC T. [A] HOSIER L. [A] O. MARKET DI. [A-C] O. MARKET DI.[A] HY. HOTEL [A] MA. ARC [A] BULLA RD. RL. [A] CP. CAFE [A] MIPEC SH. [A] MASTER CLASS [A]
--------------------------------PAGE 4-22
[A] ARCHITECTURAL PROJECTS
[A-C] ARCHITECTURAL COMPETITION
--------------------------------PAGE 24-32
[MP] MASTER-PLANNING
-------------------------------PAGE 34-36
TABLE OF CONTENT
MASTER PLANNING
SEN H. -
ROLE RESPONSIBILITY ---------------------------------------------------TEAM LEADER CONSULTING URBAN PLANNING & URBAN DESIGN WORKS STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING SELECTED PLANNING SCHEME COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) ENSURING URBAN PLANNING CRITERIA PROJECTING POPULATION DISTRIBUTION ISSUING TECHNICAL DRAWINGS IMPLEMENTING PROFESSIONAL PRESENTATION PRESENTATION INTERPRETER 3D VISUALISATION SPECIALIST
--------------------------------------------------1:500 MASTER PLAN
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
MASTER PLANNING
24
MASTER PLANNING
S.E.VINH C. -
ROLE RESPONSIBILITY ---------------------------------------------------TEAM LEADER CONSULTING URBAN PLANNING & URBAN DESIGN WORKS STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING SELECTED PLANNING SCHEME COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) ENSURING URBAN PLANNING CRITERIA PROJECTING POPULATION DISTRIBUTION ISSUING TECHNICAL DRAWINGS IMPLEMENTING PROFESSIONAL PRESENTATION PRESENTATION INTERPRETER
--------------------------------------------------1:500 MASTER PLAN
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
MASTER PLANNING
25
Research
Education
Incubator
Water space
Slow core plaza
Fast core plaza
Material
Material
Material
MASTER PLANNING
THE HYPERLOOP CITY XIAN SCIENCE PARK -
Material
stone & concrete
Material
Material
pavers & granite
pavers & granite
concrete & granite
pavers
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS
ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN & MASSING PROPOSING URBAN DESIGN GUIDELINES APPLYING URBAN PLANNING CRITERIA INTO URBAN DESIGN PROPOSAL IMPLEMENTING PROFESSIONAL PRESENTATION
Legend 1 Fast Spot A 2 Fast Spot B 3 Slow Spot 4 Fast Spot Green Ramp A 5 Fast Spot Green Ramp B 6 MRT Station 1 7 MRT Station 2 8 Community Centre 9 Commercial Strips
10 Residential Estates 11 Hospital Core 12 Healthcare Extension Facilities 13 High School 14 Secondary School 15 Primary School 16 Kindergarten 17 Slow Core Square 18 Utility (Electricity) 19 Utility (Heat) 20 Utility (Water) 21 Research Buildings 22 Education Buildings 23 Incubator Buildings 24 Wet land Park 25 Central Park 26 Future wetland 27 Potential & future park developments 28 Potential & future green corridor 27 connectors outside
IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS IMPLEMENTING 3D HUMAN VIEWS ASSISTING IN 3D VISUALISATION
--------------------------------------------------PLANNING SCENARIO
20 Utility (Water) 21 Research Buildings 22 Education Buildings 23 Incubator Buildings 24 Wet land Park 25 Central Park 26 Future wetland 27 Potential & future park developments 28 Potential & future green corridor connectors outside
27 24
27
10 15 23
16
10
28 9
28
12
8
11 3
21 25
23
13 14 8
10
7 10
10
28 15
5
卫环路 28
28
2
5 28
22
27
22
10
10 9
16
21
18
10
4
10
19
新沣大道
1 6
23
21
4
9
17
22
22
10
28
12
28
28
23
21
卫环路
STUDYING PEDESTRIAN & BICYLE LOOPS THROUGHOUT THE SITE
27
28
27
WORK PERFORMED AT CPG CONSULTANTS
MASTER PLANNING
26
MASTER PLANNING
TAI-YU. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS STUDYING PEDESTRIAN FRIENDLY CONNECTION THROUGHOUT THE SITE DEVELOPING 3D MASSING ENTIRE THE SITE PROPOSING URBAN DESIGN GUIDELINES APPLYING URBAN PLANNING CRITERIA INTO URBAN DESIGN PROPOSAL IMPLEMENTING PROFESSIONAL PRESENTATION IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS IMPLEMENTING 3D HUMAN VIEWS BY HANDSKETCH ASSISTING IN 3D VISUALISATION
--------------------------------------------------1:500 MASTERPLAN
WORK PERFORMED AT CPG CONSULTANTS
3D RENDER BY CPG
MASTER PLANNING
27
MASTER PLANNING
JIANGJUNCI STN. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS DEVELOPING PEDESTRIAN FRIENDLY CONNECTION THROUGHOUT THE SITE DEVELOPING 3D MODELLING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS ASSISTING IN 3D VISUALISATION
--------------------------------------------------1:500 MASTERPLAN
3D RENDER BY CPG
WORK PERFORMED AT CPG CONSULTANTS
MASTER PLANNING
28
MASTER PLANNING
CHAOA. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS ASSISTING IN 3D VISUALISATION
--------------------------------------------------1:500 MASTERPLAN
WORK PERFORMED AT CPG CONSULTANTS
MASTER PLANNING
29
MASTER PLANNING
PHU H. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS COORDINATING WITH CLIENTS AND STAKEHOLDERS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING 3D MASTERPLAN PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION
--------------------------------------------------1:500 MASTERPLAN
Sem i-D House
Link House
Shop House
Villa
WORK PERFORMED AT CPG CONSULTANTS
Cond om inium
Mid -Rise Ap a rtm ent
MASTER PLANNING
30
MASTER PLANNING
BACH VI. -
ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS COORDINATING WITH CLIENTS AND STAKEHOLDERS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING 3D MASTERPLAN PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION
--------------------------------------------------1:500 MASTERPLAN
WORK PERFORMED AT CPG CONSULTANTS
MASTER PLANNING
31
SCHOOL ZONE
STREETSCAPE URBAN DESIGN
MIPEC BO. -
ROLE RESPONSIBILITY ---------------------------------------------------TEAM LEADER CONSULTING STREET-SCAPE DESIGN CONFERENCE CENTRE
STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING CONCEPTUAL DESIGN
ENSURING CONSTRUCTION LAW IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION 3D VISUALISATION SPECIALIST
PARKING
--------------------------------------------------CONCEPTUAL DESIGN
SHOPPING MALL
COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM)
WORK PERFORMED AT BRUCE HENDERSON ARCHITECTS
LANDSCAPE PROJECT
32
SELECTED WORK
ARCHITECTURAL PROJECTS
MASTER PLANNING PROJECTS
3D VISUALISATION WORK
GRADUATE ARCHITECT ---------------------------------
URBAN DESIGNER ---------------------------------
3D ARTIST ---------------------------------
SUNBAY SG. [A]
SEN H. [MP]
SELECTED WORK ONLY
ECO X. [A]
VINH C. [MP]
[FREELANCER WORK]
ROSE ST. [A]
HYPERLOOB SC. [MP]
MALVERN RD. [A]
TAI-YU [MP]
BRUCE ST. [A-C]
JIANJUNCI STN. [MP]
CHRUCH ST. [A]
CHAOA. [MP]
MILTON PA. [A]
PHU H. [MP]
HARMONY T. [A]
BACH VI. [MP]
[DEC 2011- CURRENT]
[APRIL 2013 - SEPT 2016]
[2015-PRESENT]
MIC T. [A] HOSIER L. [A] O. MARKET DI. [A-C] O. MARKET DI.[A] HY. HOTEL [A] MA. ARC [A] BULLA RD. RL. [A] CP. CAFE [A] MIPEC SH. [A] MASTER CLASS [A]
--------------------------------PAGE 4-22
[A] ARCHITECTURAL PROJECTS
[A-C] ARCHITECTURAL COMPETITION
--------------------------------PAGE 24-32
[MP] MASTER-PLANNING
-------------------------------PAGE 34-36
TABLE OF CONTENT
3D VISUALISATION
FREELANCER WORK -
SOLFWARE PLATFORM ---------------------------------------------------3D SKETCH UP AUTODESK 3DSMAX VRAY IN 3DSMAX 3D ENSCAPE 3D LUMION POST-EDITED PHOTOSHOP
--------------------------------------------------CONTRACT
More 3D rendering, click here: https://issuu.com/tunghoang2406/docs/knht_20portfolio
WORK PERFORMED AS 3D VISUALISER
3D VISUALISATION WORK
34
3D VISUALISATION
FREELANCER WORK -
SOLFWARE PLATFORM ---------------------------------------------------3D SKETCH UP AUTODESK 3DSMAX VRAY IN 3DSMAX 3D ENSCAPE 3D LUMION POST-EDITED PHOTOSHOP
--------------------------------------------------CONTRACT
More 3D rendering, click here: https://issuu.com/tunghoang2406/docs/knht_20portfolio
35
3D VISUALISATION
FREELANCER WORK -
SOLFWARE PLATFORM ---------------------------------------------------3D SKETCH UP AUTODESK 3DSMAX VRAY IN 3DSMAX 3D ENSCAPE 3D LUMION POST-EDITED PHOTOSHOP
--------------------------------------------------CONTRACT
More 3D rendering, click here: https://issuu.com/tunghoang2406/docs/knht_20portfolio
36
REFERENCE
ROBERTO MELO
GRAHAM MORRISON
CHOMKLIN ANUCHA
DESIGN PRINCIPAL ----------------------------------------------------
GENERAL DIRECTOR ----------------------------------------------------
SENIOR PRINCIPAL LANDSCAPE ARCHITECT ----------------------------------------------------
BRUCE HENDERSON ARCHITECTS, MELBOURNE
BRUCE HENDERSON ARCHITECTS, MELBOURNE
URBAN PLANNING, CPG CONSULTANTS PTE LTD
TEL: +61 3 9860 4000 | +61 4 1285 5101
TEL: +61 3 9860 4000
TEL: +65 6357 4018
EMAIL: rmerlo@bh-architects.com
EMAIL: gbmorrison@bh-architects.com
EMAIL: anucha.chomklin@cpgcorp.com.sg
---------------------------------------------------
---------------------------------------------------
---------------------------------------------------
-
-
-
KATHIK KARKAL -
VICE PRESIDENT ---------------------------------------------------URBAN PLANNING, CPG CONSULTANTS PTE LTD TEL: +65 6357 4662 EMAIL: karkal.karthik@cpgcorp.com.sg
---------------------------------------------------