1 minute read

Stakeholder analysis pre-disaster

Next Article
References

References

Analyzing the Power –Interest dynamic of the stakeholders, municipality, the developers and architects has the most interest as well as power as they are responsible of developing Nyhavna in the future. The residents, or future residents and property owners have interest but not as much power and thus it will better to integrate them with in the design process. The dynamics are assumed to change during and post disaster, for example the student organizations, rescue teams, medical service providers, and NGOs will have shift in interest in case of the flood. The analysis helps to understand and plan the role of the actors of the contingency plan. The post-disaster stakeholder analysis will be presented as a part of the operational support plan in the contingency plan (fig. 22)

Advertisement

This article is from: