SR-248 SHOULDER RUNNING BUS LANE FATEMA ALTOUBI, HANNAH DOYLE, GRACE OLSON, MILLER THURMAN
Traffic Analysis
Signal Timing
Objectives
• Annual Average Daily Traffic: 11,744 vehicles (WB only) • Free flow: 3.58 minutes, Peak Flow: 6.48 minutes • End bus lane at Comstock, where traffic improves
• Adjusted two intersection green times to accommodate for new flow • Average delay decreases 13.1 seconds per vehicle at 20% reduction in vehicle demand
• Add a free flow shoulder bus lane to encourage to improve travel times on the corridor • Minimize widening due to environmental constraints • Justify the project to the public with the amount of time drivers will save commuting
Round Valley Dr. Annual Delay
Comstock Dr. Annual Delay
3500 7000
7000 7000
6315 6315
6000 3000
6000 6000
5000 2500
5000 5000
4000 2000
3127
1580
HOURS HOURS
Project Background
HOURS HOURS
3127
1494
3000 1500
4754 4754
4553 4553
4258 4258
4000 4000
3000 3000
1070
2000 1000
1580
2000 2000
1494 1070
1000 500
00
Roadway Design
1000 1000
Current Current
5% Reduction Reduction 5%
10% Reduction 10% Reduction
20% 20% Reduction Reduction
00
Current Current
TRAFFIC REDUCTION TRAFFIC REDUCTION
5% Reduction Reduction 10% Reduction 5% 10% Reduction TRAFFIC REDUCTION TRAFFIC REDUCTION
20% 20% Reduction Reduction
Construction • Typical roadway plan view after the road diet design • Signing and striping followed MUTCD and the UDOT RDM and BRT Standards
• Past Richardson Flat Intersection, there will be 648 CY of excavation that will extend 1000 ft along road • Tapers off as roadway transitions to 2-lane
.
• Phases: excavation, paving, chip seal, striping and signage • Lane closure may only occur when the traffic is less than 1200 vehicles per hour per lane • Available time for lane closure is between 7 PM – 6 AM
State Route 248 in Park City, Utah, experiences high westbound congestion, especially on the weekends due to recreational travel, that needs to be alleviated in the morning commute. To address this, a roadway rehabilitation and lane configuration project will be completed for the roadway that will include striping improvements and widening to add a westbound shoulder running bus lane from US-40 to SR-224, as well as two retimed intersections.
Cost Analysis
• UDOT User Cost: $18.12 per hour per car and $52.14 per hour per truck 10-YEARSAVINGS SAVINGSDUE DUETO TOTRAFFIC TRAFFICREDUCTION REDUCTION 10-YEAR $600,000.00 $600,000.00
$500,000.00
$484,606.26 $484,606.26
$500,000.00
$433,415.46 $433,415.46
$400,000.00 $400,000.00
$399,288.25 $399,288.25
$484,606.26
$433,415.46
$399,288.25
$300,000.00
Roadway Costs: $823,913.09 Signage Costs: $73,143.60 Total Costs w/ 10% Contingency: $986,762.36
ACKNOWLEDGEMENTS: SPONSOR: RIKKI SONNEN, P.E., P.T.O.E.
Time Saving Per Vehicle
FACULTY ADVISOR: RICHARD NIELSEN, PH.D., P.E.
$300,000.00
$200,000.00
$200,000.00
$100,000.00 $100,000.00
$-
$5.00% 5.00%
10.00% 10.00%
20.00% 20.00%