POSTFALLSAPARTMENTCOMPLEX
TEAMCOMPLEXDESIGNERS
MEMBERS:ALIYANAAVALOS,NOAHGEORGE,PARKERSCHWERS
PROJECTSPONSOR:ARDURRAGROUP,INC.SPONSORCONTACT:JOANNALITALIEN

BACKGROUND
•LocatedinPostFalls,Idaho

•Developingarea
•16-acreplot
•ProposednewhousingbetweenWal-Mart andCabela’s
DESIGN UTILITIES

•WaterandSewermains
•WaterandSewerservices
•Fire-RiserandHydrant connectionandlocation
•MunicipalNetworkConnection
OBJECTIVES
•Designbuildingandparkinglayout

•Designstormwaterstorage
•CreateGradingPlan
•Designutilitiestoalignwithexistingmainline connections
COSTESTIMATE
TotalCost Design $362,016 Utilities $733,584 SiteLayout
STORMWATER&GRADING

•Sitedividedintofourstormwater basins
•Sevendoubledepthdrywells
•Designedto20year2hour stormevent

•GradingdesignedtomeetPost FallsandADAstandards
SITELAYOUT
•16Buildings
•384Units
•Pedestrianramps
•Parallelandperpendicular
Grading/Storm$195,965 $1,291,565
Total