THE JEWEL OF ARIZONA
INTRODUCTION PROJECT STATEMENT
RILLITO RIVER 1
2 This student project sponsored by The Tucson Department of Transportation and Mobility and Pima County Flood Control is aimed at reenvisioning the proposed Prop 407 Palo Verde / Camino Miramonte Bicycle Boulevard. The main goals of this design is to implement green infrastructure that will help mitigate flood concerns and encourage a complete streets culture that will provide safety for bicyclists and pedestrians into the site. These improvements will not only benefit the surrounding community but as well as provide a central “oasis� of the bicycle boulevard that links to the existing bike loop around Tucson.
3
4
5
6
THE TEAM COORDINATOR COURTNEY CROSSON ASSISTANT PROFESSOR | UNIVERSITY OF ARIZONA
SPONSORS DIANA ALARCON RYAN FAGAN PATRICK HARTLEY JESSE SOTO JENNIFER TOOTHAKER TUCSON DEPARTMENT OF TRANSPORATION MOBILITY
STUDENT DESIGNERS DEIANIRA MINTON 4TH YEAR B.ARCH STUDENT | UNIVERSITY OF ARIZONA CYNTHIA YEPIZ 4TH YEAR B.ARCH STUDENT | UNIVERSITY OF ARIZONA
CONSULTANT JACOB PRIETTO & YINAN PIMA COUNTY FLOOD CONTROL
COLLABORATORS COLONIA SOLANA NEIGHBORHOOD ASSOCIATION
F R A M I N G O F S TO R M WAT E R WATERSHED CHRIST M A
R I LLITO RIVER
SW ASH
1
UPPER RILLITO RIVER
WILSON AVENUE WASH
CHRISTMAS WASH
2 ALVERNON WASH
3
4 HIG H
S CHOOL WAS H
W ARROYO CHICO ASH
5
C T ITA
IO
RA
ARROYO CHICO-SANTA CRUZ RIVER
ILR
OA D
WA S
NW A SH
AVIATION WASH TRIBUTARY
6
H TUCSON DIVERSION CHANNEL
ULIAN W JULIAN WASH
SITE FLOODING
ARROYO CHICO
MAXIMUM FLOOD DEPTH (FT) 2.0 - 3.0+ 0.5 - 2.0 0.2 - 0.5
N
COMMUNITY FEEDBACK E BROADWAY BLVD
4
S AV A DE ENID AS PALM
1
3
VE
EV
SA VEN
IDA
NA
I DR
N LO
IA
E VIA GUADALUPE
DE PAL MA S
RANDOLPH WAY
IA
S LO PA
G E VIA
INA
NDR
OLO
ES RD
GO
GU AD AL UP
E
S COUNTRY CLUB RD
EV
EV
IA
NZA SPERA E VIA E
1
E ARROYO O CHICO CH O
E ARROYO CHICO
E ARROYO CHIC CO
E ARROYO CHICO
EA
E CAMINO CAMPESTRE
EA RR E VIA ESPERANZA
E VIA GUADALUPE
E CAMINO CAMPESTRE
1
E CAMINO CAMPESTRE
CHALLENGES + NEEDS
OY O
RR
OY O
CH
ICO
2 CH
ICO
2
1 E CAMINO CAMPESTRE
ASSETS + OPPORTUNITIES
E CAMINO CAMPESTRE
E CAM CAMINO CAMPESTRE
E CAMINO CAMPESTRE
G
S COUNTRY CLUB RD
PA RK IN 2
RECREATION CENTER
S COUNTRY CLUB RD
PARKING
REID PARK ZOO
PARKING
LEARNING CENTER
MOBILITY + ACCESSIBILITY ISSUES
FLOODING ISSUES
PARKING G
E 22ND STREET ST
COMMUNITY FEEDBACK
1
1
ARROYO CHICO 1/2 MILES
ON
1
EPES RANDOLPH PLAZA, IMPORTANT TO THE HISTORY OF THE NEIGHBORHOOD
POOLING IN THIS AREA
2 CANNOT ENTER THIS AREA DUE TO FLOODING
1 4
NEW BUS PULLOUT LOCATION
TRIANGULAR INTERSECTIONS CAUSE MANY BLINDSPOTS 3
2 FIRST AREA THAT FLOODS
2
LOST PEOPLE CONSTANTLY CUT THROUGH HERB’S DRIVEWAY
BASEBALL FIELD FIREWORKS CAUSE MAJOR DISTURBANCES
CHALLENGES + NEEDS
ASSETS + OPPORTUNITIES
MOBILITY + ACCESSIBILITY ISSUES
FLOODING ISSUES
LINE SURVEYS
If there was a market implemented, I would like to see Cultural events held there.
I think this area would benefit from Mesquites or Palo Verdes. Something to provide more shading.
If there was a market implemented, I would like to see local produce sold there.
If there was a community garden in this area, would you use it?
Have you noticed or experienced Yes flooding in this No area? If so at what scale
I think the park would benefit from an open market.
If there was a market implemented, I would like to see Cultural goods sold there.
Scale 0 Scale 5
Do you think there needs to be more shade throughout the parking lot that runs along the golf course?
Yes No
K I T O F PA R T S SENSE OF PLACE
MESQUITE
WORKOUT STATION #1
WORKOUT STATION #2
RE
WORKOUT STATION #3 PALO VERDE
BICYCLE RACK
BIKE STAND
AIR PUMP
TOOLS
DESERT ASH
TRAFFIC MANAGEMENT
BIKE LANE
BENCH
LIGHT BOLLARD
A
DIRECTION
PICNIC SEATING
SPEED SIGN
LIBRARY MAILBOX
DIRECTIONAL SIGNAGE
GARDENSOXX
SPEED TABLE
STORMWATER MANAGEMENT
ED YUCCA
SAGUARO
PRICKLY PEAR
AGAVE
BARREL CACTUS
RAISED GRATING BASIN
NAL ARROW
RANDOLPH WAY BASIN
SHARED LANE
NEIGHBORHOOD SIGN
CURB EXTENSION
MARKET SPACE BASIN
TYPICAL BASIN
SITE PLAN GUIDE
PART A
PART B
PART C
PART D
N
PART E
PROJECT OBJECTIVES PROJECT GOALS + METRICS
G EN
E G A MINIMIZING DESIGN OF THE BICYCLE BOULEVARD THROUGH THE NEIGHBORHOOD PROVIDE AN ALTERNATE OPTION FOR THE BICYCLE BOULEVARD
CREATE MORE OPPORTUNITIES FOR WORKOUT ROUTINES FOR COMMON PATH USERS
P
R
O
HELP REDUCE THE HEAT ISLAND EFFECT IN HOT SUMMERS
M
O
T
E
NEC
PROVIDE A SAFER CONNECTION FOR PEDESTRIANS/BICYCLISTS INTO THE ZOO/PARK
CON
CONNECT USERS FROM THE BICYCLE BOULEVARD, ZOO AND THE PARK INTO ONE COMMON SPACE
T
PRESERVE HISTORICAL NEIGHBORHOOD OF COLONIA SOLANA
REDESIGNING THE BASEBALL PARKING SPACE INTO A SPACE THAT CAN BE CONVERTED FROM PARKING TO A MARKET AND COMMUNITY GARDEN
REDESIGNING THE PARKING LOTS WITH MORE GREEN INFRASTRUCTURE AND IMPLEMENTING SHADING TECHNIQUES SUCH AS SOLAR PANEL MODULES
ENGAGE CONNECT PROMOTE
DESIGNIN NG AND D IMPPLEMENTING SIMPLE OU UTDOOR R WO ORKOUT EQUIPMENT THATT USERS OFF ANY AGE CAN ENG GAGEE
REDESIGN A SAFE PATHWAY FOR PEDESTRIANS AND BICYCLISTS COMING FROM THE BOULEVARD OR PARKING LOTS
SITE PLANS PART A
N
NEIGHBORHOOD SIGN
SHARED LANE
PRICKLY PEAR SAGUARO AGAVE
BARREL CACTUS
PART A
DIRECTIONAL SIGNAGE
SPEED SIGN
CAMINO MIRAMONTE
NETWORK INTERSECTION DESIGN E BROADWAY BLVD
E BROADWAY BLVD
VIA PALOS VERDES
BEFORE
CAMINO MIRAMONTE
E BROADWAY BLVD
VIA PALOS VERDES
AFTER
SITE PLANS PART B
PRICKLY PEAR SAGUARO AGAVE
BARREL CACTUS
SHARED LANE
SP
SPEED SIGN
PART B
N
ROAD SECTIONS FOR ALL TYPICAL DESIGN CONDITIONS S AVENIDA DE PALMAS - E CAMINO CAMPESTRE
16'
107'
16'
EXISTING ROAD CONDITIONS - NEIGHBORHOOD
BIKE ROUTE
COLONIA SOLANA
16'
107'
16'
UPDATED ROAD CONDITIONS - NEIGHBORHOOD
BIKE ROUTE
COLONIA SOLANA
15'
12'
3'
10'
12'
12'
20'
EXISTING ROAD CONDITIONS - CAMINO CAMPESTRE
15'
12'
3'
12'
11'
11'
20'
UPDATED ROAD CONDITIONS - CAMINO CAMPESTRE
FILTRATION ROCKS PLANTING SOIL MIX AS SPECIFIED
STRUCTURAL SOIL COMPACTED SUBGRADE
SITE PLANS PART C
MESQUITE CURB EXTENSION
PALO VERDE
PART C
DESERT ASH
BARREL CACTUS
N
RED YUCCA
NETWORK INTERSECTION DESIGN E CAMINO CAMPESTRE
S VIA ESPERANZA
E CAMINO CAMPESTRE
BEFORE
S VIA ESPERANZA
E CAMINO CAMPESTRE
AFTER
ARCHITEC TURAL DEVELOPMENT SHADING STRUCTURE
20’
RAIN GA CURB ASPHALT SUBGRA
PLAN VIEW
ELEVATION
SECTION
EXPLODED AXON
15’
GUTTER
ARDEN T ADE
DETAIL CONNECTION
RUSTED METAL
V I S UA L R E P R E S E N TAT I O N HI CORBETT FIELD PARKING LOT - EXISTING
V I S UA L R E P R E S E N TAT I O N HI CORBETT FIELD PARKING LOT - ADDED SHADING
V I S UA L R E P R E S E N TAT I O N HI CORBETT FIELD PARKING LOT - MARKET SPACE
SITE PLANS PART D
PICNIC SEATING
GARDENSOXX
LIGHT BOLLARD
LIBRARY MAILBOX SPEED TABLE
BIKE LANE
DIRECTIONAL ARROW PART D
N
NETWORK INTERSECTION DESIGN E ZOO CT
E ZOO CT
BEFORE
E ZOO CT
E ZOO CT
AFTER
ROAD SECTIONS FOR ALL TYPICAL DESIGN CONDITIONS E ZOO CT
52'
13'
13'
135'
EXISTING ROAD CONDITIONS - ZOO ENTRANCE
52'
13'
13'
135'
UPDATED ROAD CONDITIONS - ZOO ENTRANCE
PICNIC SEATING
FILTRATION ROCKS CURB PLANTING SOIL MIX AS SPECIFIED STRUCTURAL SOIL COMPACTED SUBGRADE
19'
24'
19'
24'
18'
18'
18'
27'
9'
17'
13'
13'
13'
3' 3'
12'
18'
27'
9'
17'
13'
13'
13'
3' 3'
12'
CURB STRUCTURAL SOIL COMPACTED SUBGRADE PLANTING SOIL MIX AS SPECIFIED
CURB STRUCTURAL SOIL COMPACTED SUBGRADE
V I S UA L R E P R E S E N TAT I O N ZOO CT ENTRANCE
SITE PLANS PART E
MESQUITE
WORKOUT STATION #1
WORKOUT STATIO
WORKOUT STATION #3
DESERT ASH PART E
RED YUCCA
AGAVE
ON #2
BIKE STAND
N
AIR PUMP
TOOLS
NETWORK INTERSECTION DESIGN E 22ND STREET
S RANDOLPH WAY
E 22ND STREET
BEFORE
S RANDOLPH WAY
E 22ND STREET
AFTER
ROAD SECTIONS FOR ALL TYPICAL DESIGN CONDITIONS RANDOLPH WAY
15'
3'
13'
12'
13'
13'
18'
24'
18'
15'
EXISTING ROAD CONDITIONS - PUBLIC AREA
15'
3'
13'
12'
13'
13'
18'
24'
18'
15'
UPDATED ROAD CONDITIONS - PUBLIC AREA
PLANTING SOIL MIX AS SPECIFIED
PLANTER/SITTING METAL GRATING CURB STRUCTURAL SOIL COMPACTED SUBGRADE
V I S UA L R E P R E S E N TAT I O N SOCIAL SPACE BEFORE
V I S UA L R E P R E S E N TAT I O N SOCIAL SPACE PROPOSAL
SECTIONAL PERSPECTIVES
RANDOLPH WAY BASIN
COMMUNITY SPACE
MARKET SPACE BASIN
SHADING STRUCTURE
PUBLIC SITTING AREA
RAISED GRATING BASIN
BASIN
TYPICAL BASIN
F LO O D C A LC U L AT I O N S SITE DEPTH DIFFERENCE
TOTAL GREEN INFRASTRUCTURE AREA = 92,304 SF
5%
25%
15% DEPTH DIFFERENCE (FT) (-0.49) - (-0.2)
20%
10%
(-0.19) - (-0.1) (-0.09( - (-0.05) 0.051 - 0.1 0.11 - 0.2 0.21 - 0.5 > 0.5
(X17
5%
20%
TOTAL STORAGE IN GALLONS
X17) 100,000 SQ FT WATERPARK
APPENDIX ALL OTHERS BUDGET
HI CORBETT FIELD & SOCIAL SPACE BUDGET
NEIGHBORHOOD BUDGET
TOTAL : $1,720,460
FLOOD CALCULATIONS
Legend Depth Difference (FT) < -0.5 -0.49 - -0.2 -0.19 - -0.1 -0.09 - -0.05 -0.049 - 0.05 0.051 - 0.1 0.11 - 0.2 0.21 - 0.5 > 0.5
Basin Depth 1 ft Total GI Area 92304 sf
Floodplain Storage (ft3) The Maximum Inundated Area(Depth > 0.5 FT) (sf)
Pre Post Post Minus Pre 341771.8 361852.9 20081.16 199112.8 237576.2 38463.48
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
¯
0
250 500
1,000 Feet
Study Area #5