Contami-Nature Repairing lost green links in a heavily modified landscape
Regenerate Re R ege gene nerate rate ra te | H Harry arrrry a yD Dunn un u nn nn z5205194 z520 z5 205 5119 94 4
1
I would like to acknowledge the D’harawal, Dharug, Eora, Gaimaragal, Gundangara and Guringai people among others that are the Traditional Custodians of this land. I would also like to pay my respects to the Elders both past and present and extend that respect to other Aboriginal and Torres Strait Islanders who are present here today
Regenerate | Harry Dunn z5205194
2
3
2
1. White Bay Power Station with trees, Photograph, Harry Dunn (Author) 2. White Bay Power Station, Photograph, Harry Dunn (Author) 3. Shipping container crane, Photograph, Harry Dunn (Author) 4. Harbour Buoy, Photograph, Harry Dunn (Author)
4
Regenerate | Harry Dunn z5205194
3
6
5
5. Superb Fairy Wren Mating, Photograph, Harry Dunn (Author) 6. Lichen planting, Photograph, Harry Dunn (Author) 7. Banana Tree, Photograph, Harry Dunn (Author) 8. Kumquat tree, Photograph, Harry Dunn (Author)
7
8
Regenerate | Harry Dunn z5205194
4
How can the expansion of existing vegetation activate a deeper connection to the site and its systems? How the human experience can be enhanced when the Casuarina, Cenchrus, and native tree species are prioritised.
Regenerate | Harry Dunn z5205194
5
Fundamental Asset| Location in Sydney Ria
9
Prime Realestae
0 0.5
1
10
20km
Borders the Eastern edge of the Inner West, with Opportunities to design large open space, residential buildings, and a prime views of the Sydney Skyline 9. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Regenerate | Harry Dunn z5205194
6
Study Area | Defining the boundary
Birrc Bi chg hgro rove ve
Ba B alm lmai ain
ay
eB hit
W
Roz Roze Ro ze elllle
Sydney Sy dney dn ey CBD BD Pyrrm Py mo on nt
Bay e l l e Roz
10
Bl ac
kw at
tle
Ba y
Prime Realestae
0 0.5
1
10
20km
60% of the sites existing vegetation is found in my study area Space for residents to come to from all areas of the site 10. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Regenerate | Harry Dunn z5205194
7
Fundamental Asset | Views of the skyline
Sy ydn ney ey Har arbo bour urr Bri r dg dge e
Sy ydn d ey y CBD B
ANZA AN ZAC C Br Brid id dge
Wh W hit ite e Ba ay Po Powe we er S Sttat a io i n
11
11. Airview, https://airviewonline.com/aerial-photography/looking-north-east-from-white-bay-in-rozelle
Regenerate | Harry Dunn z5205194
8
Fundamental Asset | Development scenes
12
12. Airview, https://airviewonline.com/aerial-photography/looking-north-east-from-white-bay-in-rozelle
Regenerate | Harry Dunn z5205194
9
Analysis | Contaminated Landscape
13
Contaminated Harbour
0 0.5
A heavily disturbed terrain lies beneath the concrete capping, where the tidal fluctuations in the adjacent deep harbour, pull out the toxins and spread it around Sydney Harbour 13. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
1
10
20km
Regenerate | Harry Dunn z5205194
10
Analysis | Ecological Corridor System
Strong Ecological Links
Ca all llan Par a k
Moderate Ecological Links
Whit Wh ittes ites s Cre r ek k Gree Gr e nW ee nWay ays ay ys J hn Jo hnst ston o Crre on eek k
14
Corridor Links
0 0.5
1
10
20km
Redevelopment of the Greenways project, Johnston Creek and White Street park corridor support non-human users that can expand into the Bays Precinct. 14. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Regenerate | Harry Dunn z5205194
11
Fundamental Asset 2 | Successional Ecology May 2014
Wh W hit ite B ite Ba ay Pow Po we er S Sttat a io ion on
15
0
15. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
30 60
150
300m
Regenerate | Harry Dunn z5205194
12
Analysis | Displaced Ecology October 2021
Whiitte B Wh Ba ay Powe Po P ow we er S Sttatio attiio on
16
20% 16. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
of existing corridor
0
30 60
150
300m
Regenerate | Harry Dunn z5205194
13
Objective | Vegetation cover October 2021
Wh W h hit ite Ba it Bay Bay Po ow we er St Stattio ion
17
15% vegetation cover
0 20 40
100
200m
Expanding the vegetation There are seven ecologies existing in the site. Some vary from stages in successional growth, whereas some are remnants of a Casuarina forest. 17. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Regenerate | Harry Dunn z5205194
14
Objective | Vegetation objective July 2080
Whit Whit Wh ite Ba Bay Bay Po ow we er S Sttat atiio on
18
50% vegetation cover Cleaning of contamination
18. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Enhance Habitat Links
0 20 40
100
200m
Micro-climate adjustments
Open Space
Regenerate | Harry Dunn z5205194
15
Connection to the Cause | World and State Government Goals Sydney Green Grid 2030 The Bays Precinct is apart of the Central District zone - Increased Foreshore Access - Public Open Space - Increase tree canopy cover
19
United Nations Sustainable Development Goals 2030 Goals 15 Life on Land - End Desertification and restore degraded land 2030 - Conserve and restore terrestrial and freshwater ecosystems
20
19. Sydney Green Grid Central District, GANSW, https://www.governmentarchitect.nsw.gov.au/projects/sydney-green-grid 20. Life on Land Goal, United Nations Sustainable Development Goals, https://sdgs.un.org/goals
Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt biodiversity loss.
Regenerate | Harry Dunn z5205194
16
How can the expansion of existing vegetation activate a deeper connection to the site and its systems?
Regenerate | Harry Dunn z5205194
17
Analysis | Existing Vegetation Casuarina Forest Cenchrus Grass Meadow Lichen Grass mix Grass and Shrub Native Tree Exotic Species Kikuyu Swale Grass
et tre
sS ert b Ro
ia or ct Vi a Ro d A4
21
0
21. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
10
20
50
100m
Regenerate | Harry Dunn z5205194
18
Analysis | Existing Vegetation
22
Lichen
Mixed Grass Species
Mixed Shrubs Species
Existing Native Species
29
Casuarina Forest
22-29. Existing Vegetation, Photograph, Harry Dunn (Author)
Exotic Species
Kikuyu Swale Grass
Cenchrus Meadow
Regenerate | Harry Dunn z5205194
19
Analysis | Existing Vegetation
Lichen
Mixed Grass Species
Mixed Shrubs Species
Existing Native Species
Casuarina Forest
Exotic Species
Kikuyu Swale Grass
Cenchrus Meadow
Regenerate | Harry Dunn z5205194
20
Fundamental Asset | Geography
t
e tre
sS ert b Ro
Strong Ecological Links
Moderate Ecological Links
Low Ecological Links ia or ct Vi a Ro d
Weak Ecological Links
A4
30
North Eastern Aspect The landscape was quarried in the early 1930’s to create a flat landscape that would allow for the movement of trains, trucks, and small cars. Now all that is left is a lacerated sandstone cliff. - Accentuate the views 30. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
0
10
20
50
100m
Regenerate | Harry Dunn z5205194
21
Fundamental Asset | Exposure to the sun
t
e tre
sS ert b Ro
100% Exposure
80% Exposure
60% Exposure ia or ct Vi a Ro d
40% Exposure
A4
31
Sun Path All of the existing vegetation recieves full sun throughout the day. Any new planting must be adaptable to full sun conditions or low shade plants can be integrated when a dense PFC is established. 31. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
0
10
20
50
100m
Regenerate | Harry Dunn z5205194
22
Summer Sun
9am
12pm
3pm
9am
12pm
3pm
Winter Sun
11. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
Regenerate | Harry Dunn z5205194
23
Analysis| Water Pooling
t
e tre
sS ert b Ro
1m pooling
0.5m pooling
0.2m pooling ia or ct Vi a Ro d
0.1m pooling
A4
32
Water will flow to the Power Station During the event of a 100 year flood, it is estimated by ArcGIS, that water will pool up to 1m around the power station. The expansion of the surviving habitats will act as a sponge to soak up the surface runoff. Topographical changes must be designed. 32. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
0
10
20
50
100m
Regenerate | Harry Dunn z5205194
24
Fundamental Assets | Study Area Prospect in the site and on the horizon + Create a scene when looking at the harbour bridge + Frame the prospects in the site with casuarina forrest
Existing Vegetation + Soften edge with Cencrus meadow + Avenues to direct views and provide shelter from extreme weather
lla
Ca
ur
n
o rb
Pa
a yH
ge
id Br
Contaminated Soil - Will impact plant growth and succession of species
rk
ne
d Sy
Geography + Protection from strong southerly winds + Flat landscape allows for easy sight lines
Sun Path + Silhouette of city in the morning and power station in the afternoon - Will be too hot in summer months to relax around the power station
Whites Creek
w ay en re
Th eG
0
10
20
50
100m
Adjacency to surrounding Green Corridors + Johnston Creek (Water flora, fauna) + Callan Park (Casuarina forest + White Creek Park (Cenchrus) + The Greenway (Bandiccot, Birds)
k
33. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004
ree on C nst
Joh
33
Regenerate | Harry Dunn z5205194
25
Design | Principles
Meadow Foreshore
Casuarina Frames
Native Stroll
Maintain sight lines with low planting
Celebrate views of sydney skyline from within the White Bay area
Proactive adaption of the landscpae to extreme climatic events
Regenerate | Harry Dunn z5205194
26
Abiding Events | Phases and events Prepare the site
Cleaning the contaminants
The grand expansion
Opening of gates O Access
First sunflower planted
20th self-germinated sunflower a
Phytoremediation Casuarina reaches max growth
First casuarina tube stock t Expansion of vegetation Last metal fence removed Re-use of industrial materials
2m sea level rise Sea level rise
Impact potential from severe rain event
Phytoremediation plants
Larger expansion
Sale of first apartment Urban development on apron 50% Vegetation Cover Vegetation cover 15% Vegetation Cover
The driver of time and abiding events are indicative of ecological processes
Regenerate | Harry Dunn z5205194
27
Stage 1 | Prepare the site
2 years
2022-2024
Excavate Concrete
Temporary Path
t ee Str rts be Ro
Remove Obstructions
Metro
or
ct
Vi ia ad Ro
Existing Vegetation A4 A4
34 0 15
30
75
150m
35 34. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004 35. Stage 1 Section, Harry Dunn
Regenerate | Harry Dunn z5205194
28
Stage 2 | Cleaning the contaminants
20 years
2024-2044
Phytoremediation locations
t ee Str rts be Ro
Concrete Path
Metro
or
ct
Vi ia ad Ro
Existing Vegetation A4 A4
36 0 15
30
75
150m
37 1:1000 @ A3 36. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004 37. Stage 2 Section, Harry Dunn
Regenerate | Harry Dunn z5205194
29
Stage 3 | The grand expansion
50 years
2044-2094
Native Tree Expansion
Cenchrus Expansion
Casuarina Expansion
t ee Str rts be Ro
Metro
ia or ct
Vi ad
Ro
Existing Vegetation
A4 A4
Concrete Path
38 0 15
30
75
150m
39 38. Near Maps 2021, https://apps.nearmap.com/maps/#/@-33.8670420,151.1772305,21.00z,0d/V/20211004 39. Stage 3 Section, Harry Dunn
1:1000 @ A3 Regenerate | Harry Dunn 30 z5205194
Cenchrus edge | Stage 1 - Prepare the site
2 years
2022-2024
40
Original condition of the Cenchrus Meadow The grasses have succeeded in the cracks of the concrete
40. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
31
Cenchrus edge | Stage 1 - Prepare the site
2 years
2022-2024
Concrete Top Soil Sandy Soil Sandstone
41
0 0.5
1
2.5
5m
Clearing obstructions The fences and bollards have been relocated to Glebe Island where they will be assembled into gabion walls and other reconstructed designs 41. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
32
Cenchrus edge | Stage 1 - Prepare the site
42
2 years
2022-2024
0 0.5
1
2.5
5m
Erecting a path A 0.5m elevated steel path will provide opportunities to walk along the waters edge while not interfering with the future expansion of the meadow. 42. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
33
Cenchrus edge | Stage 1 - Prepare the site
43
2 years
2022-2024
0 0.5
1
2.5
5m
Cutting into the concrete Preparing the soil for phase 2. The cutting off all the concrete in this area will signify the transition into stage 2 43. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
34
Arsenic Nickel Cadnium TPH Zinc
44. Phytoremediation planting, illustration by Harry Dunn (Author)
Zinc Lead Cadnium Copper Arsenic PAH Cadnium Zinc Nickel
Kik kuyu Grass Pen nnisetum clandestinu um
Dan ndelions Taraxacum
Lav vender Lav vandula
Wh hite Lupins Lup pins albus
Vettiver Grass Vettiveria zizanioides
Summer Feast Sorgum Sorgum bicolor
Sunflower Helianthus
Pig face Carpobrotus
Fen nnel Sweet Foe enicilum Vulgare
Blu ue Flax Lily Dia anella caerulea
Red Clover Trifolium pratense
Field Mustard Brassica rapa
Sta arfire marigold Tag getes tenuifolia
Phytoremediation Planting | Powerplant Precedent
44
Nitrates Ar PAH
Regenerate | Harry Dunn z5205194
35
Cenchrus edge | Stage 2 - Clean the contaminants
45
20 years
2024-2044
0 0.5
1
2.5
5m
Phytoremediation Planting Opening of the foreshore to the public, commencement of stage 2
45. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
36
Cenchrus edge | Stage 2 - Clean the contaminants Phytodegredation
Phytovolatisation
Phytostabilisation
20 years
2024-2044
Rhizodegredation
46
Rhizofiltration
0 0.5
1
2.5
Phytoextraction
5m
Growth Remediation of toxins in the soil
46. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
37
Cenchrus edge | Stage 2 - Clean the contaminants
47
20 years
2024-2044
0 0.5
1
2.5
5m
Harvesting Once a year the phytodegredation and phytoextraction plants must be harvested. Disposal and use of the harvested material will be revised in this stage. New Technology may provide an alternative use 47.. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
38
Precendent | Meadow
49
48
Prince Alfred Park Surry Hills, Sydney, AUS
Resoring ecosystems in a highly modified and changing landscape. The meadow design creates seperation from the park to the busy Cleavland St.
Designing with long views 48. Meadow, Sue Stubbs, https://arcadiala.com.au/a-beautiful-mess/ 49. https://arcadiala.com.au/a-beautiful-mess/ 50. https://arcadiala.com.au/a-beautiful-mess/
50
Regenerate | Harry Dunn z5205194
39
Design testing | Planting
Regenerate | Harry Dunn z5205194
40
Cenchrus edge | Stage 3 - The grand expansion
51
50 years
2044-2094
0 0.5
1
2.5
5m
Beginning of the end Allow for phytovolatisation, phytostabilisation, and Rhizofiltration plants to decompose into soil, Plant Cenchrus along foreshore edge. 51.. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
41
Cenchrus edge | Stage 3 - The grand expansion
52
50 years
2044-2094
0 0.5
1
2.5
5m
Growth 1.5m in height, 1.2m in width The seeds will self germinate every year and will allow the plant to expand into ongoing cracks in the concrete. 52.. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
42
Cenchrus edge | Stage 3 - The grand expansion
53
50 years
2044-2094
0 0.5
1
2.5
5m
Night use / CPTED Ambient, subtle lighting that is low to the ground and does not inhibit the meadow night users. Maintaining the awe of the city lights at night 53.. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
43
Cenchrus edge | Feeling the wind
Superb FairyWren Malurus cyaneus
Field Mouse Apodemus sylvaticus
50 years
2044-2094
Skink Scincidae
Willie Wagtail Rhipidura leucophrys
White Faced Heron Egretta novaehollandiae
54
Aspect With the north easterly aspect the site welcomes warm north Easterly in the summer time. The waving of the grass softens the Industrial edge that resides below 54.. Screenshot from Patrick Franklyn August 14, 5:27pm, https://moodle.telt.unsw.edu.au/course/view.php?id=62106
Regenerate | Harry Dunn z5205194
44
Native stroll | Stage 1 - Prepare the site
2 years
2022-2024
55
Original condition of the Concrete Capping Open space with over exposure to the sun, wind, and rain
55.. Photograph by Joe Harvey
Regenerate | Harry Dunn z5205194
45
Native Stroll | Stage 1 - Prepare the site
2 years
2022-2024
Top Soil Sandy Soil Sandstone 56
0 0.5
1
2.5
5m
Remove the fences All fences will be removed from the design area and used to create gabion walls 56. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
46
Native Stroll | Stage 1 - Prepare the site
2 years
2022-2024
57
0 0.5
1
2.5
5m
Creating the path The repurpose of left over bricks will be used as a path to move through the evolving landscape a representation of its Contaminated past 57. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
47
Native Stroll | Stage 1 - Prepare the site
58
2 years
2022-2024
0 0.5
1
2.5
5m
Removing the concrete Preparing the landscape for the next stage of phytoremediation
58. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
48
59
Arsenic Nickel Cadnium DDE (Weathered DDT) TPH Zinc
59. Phytoremediation planting, illustration by Harry Dunn (Author)
Asenic Copper Cadnium Lead Zinc Zinc Lead Cadnium Copper Arsenic PAH Cadnium Zinc Nickel Nitrates Ar PAH Zinc Copper Cadnium Arsenic
Regenerate | Harry Dunn z5205194
49
Kikuyu Grass Pennisetum clandestinum
Dandelions Taraxacum
Lavender Lavandula
White Lupins Lupins albus
Vetiver Grass Vetiveria zizanioides
Summer Feast Sorgum Sorgum bicolor
Sunflower Helianthus
Pig face Carpobrotus
Fennel Sweet Foenicilum Vulgare
Blue Flax Lily Dianella caerulea
Red Clover Trifolium pratense
Field Mustard Brassica rapa
Starfire marigold Tagetes tenuifolia
Native Stroll | Stage 2 - Clean the contaminants Phytodegredation
Phytovolatisation
20 years
2024-2044
Phytostabilisation
60
Phytoextraction
Rhizodegredation
0 0.5
1
2.5
5m
Phytoremediation Planting Opening of the site to people.
60. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
50
Native Stroll | Stage 2 - Clean the contaminants
61
20 years
2024-2044
0 0.5
1
2.5
5m
Phytoremediation Planting Extraction of contaminants from the soil.
61. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
51
Precendent | PowerPlants
63
62
White Bay Power Station Balmain, Sydney, AUS
Learning from Sue Anne Ware’s Power Plants project has allowed me to understand a site specific approach to remediating the soil
Plants 62. Phytoremediation process, https://powerplantsphytoremediation.com/powerplants-garden-01-1 63. Planting plan, https://powerplantsphytoremediation.com/powerplants-garden-01-1 64. planting section, https://powerplantsphytoremediation.com/powerplants-garden-01-1
Stratergy for cleaning contaminants
64
Regenerate | Harry Dunn z5205194
52
Design Testing | Native Stroll
Regenerate | Harry Dunn z5205194
53
Native Stroll | Stage 3 - The Grand Expansion
65
2044-2094
0 0.5
1
2.5
5m
Community planting
65. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Removal of all phytoremediation plants where further design testing must be taken place. Tube stock planting will be used to allow the plants to adapt to the landscape and evolve to the conditions
Regenerate | Harry Dunn z5205194
54
Native Stroll | Stage 3 - The Grand Expansion
66
50 years
2044-2094
0 0.5
1
2.5
5m
10 years Opening of the site for night time use, erecting of light poles to Provide key line of sight to entry and exit points. 66. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
55
Native Stroll | Stage 3 - The Grand Expansion
67
2044-2094
0 0.5
1
2.5
5m
Native planting maturity
67. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
The 70% PFC will mask the White Bay Power Station, and Sydney Harbour Bridge on the horizon when it was once visible. The Fragmented view will build suspension when navigating along the path
Regenerate | Harry Dunn z5205194
56
Native Stroll | Stage 3 - The Grand Expansion
68
50 years
2044-2094
0 0.5
1
2.5
5m
Night time The soft ambient lighting faces the path to not disturb night time fauna. It will be turned off at 10pm in summer and 9pm in winter 68. Photograph by Joe Harvey, illustration by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
57
Casu Ca sua arrin ina cu c un nn nin ing gh ham amia amia iana na
Ra R ainbo inbo in bow Lo Lori rik ke eet et
Elae El aeo oc ca arrpu pus Eu Eumu mun nd di
Glloc G och hiid diio on n fer erdi din na an nd di
Ba ank nksi siia a In Inte teg grriiffo ollia lia ia
Melale Me lalle la euc uca br brac ra ac cte teat ea atta
Supe Su perrb b Fa aiiry ry Wre ren Bllu B ue e Ton ongu gue LLiiz za ard rd
69
69. Model by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
58
Casuarina Frames | Stage 1 - Prepare the Site
2 years
2022-2024
Concrete Top Soil Sandy Soil Sandstone
70
Existing condition of the site
70. Section by Harry Dunn (Author)
0 1
2
5
10m
Regenerate | Harry Dunn z5205194
59
Casuarina Frames | Stage 1 - Prepare the Site
2 years
2022-2024
71
Construction of the Metro
0 1
2
The metro will not open its doors until the commencement of stage 2. The cleaning of contaminated soils will make the entry and exit from the metro capture the transformation of the site through time. 71. Section by Harry Dunn (Author)
5
10m
Regenerate | Harry Dunn z5205194
60
72
Arsenic Nickel Cadnium DDE (Weathered DDT) TPH Zinc
72. Phytoremediation planting, illustration by Harry Dunn (Author)
Asenic Copper Cadnium Lead Zinc Zinc Lead Cadnium Copper Arsenic PAH Cadnium Zinc Nickel Nitrates Ar PAH Zinc Copper Cadnium Arsenic
Regenerate | Harry Dunn z5205194
61
Kikuyu Grass Pennisetum clandestinum
Dandelions Taraxacum
Lavender Lavandula
White Lupins Lupins albus
Vetiver Grass Vetiveria zizanioides
Summer Feast Sorgum Sorgum bicolor
Sunflower Helianthus
Pig face Carpobrotus
Fennel Sweet Foenicilum Vulgare
Blue Flax Lily Dianella caerulea
Red Clover Trifolium pratense
Field Mustard Brassica rapa
Starfire marigold Tagetes tenuifolia
Casuarina Frames | Stage 2 - Clear the Contaminants
20 years
2024-2044
73
Opening of the Metro
73. Section by Harry Dunn (Author)
0 1
2
Signifying the expansion of the study area into the western Suburbs via public transport, The Bays Metro station open into a view of the Power Station, Sydney Harbour Bridge, and transformative Landscape
5
10m
Regenerate | Harry Dunn z5205194
62
Casuarina Frames | Stage 2 - Clear the Contaminants
20 years
2024-2044
74
Phytoremediation Planting
0 1
2
Clearing the soil of the highly toxic fly ash. The landscape will be deemed safe for permenant residents and transition into stage 3 74. Section by Harry Dunn (Author)
5
10m
Regenerate | Harry Dunn z5205194
63
Precendent | Contaminated Headland Regenerated through time
76
75
Ballast Point Park Balmain, Sydney, AUS
Effective Re-purpose of on-site materials to create more site specificity. The weathering of materials over time has created a seemless flow into the park. 77
of landform 75. https://mcgregorcoxall.com/project-detail/125 76. https://mcgregorcoxall.com/project-detail/125 77. https://mcgregorcoxall.com/project-detail/125
Regenerate | Harry Dunn z5205194
64
78
78. Photograph by Joe Harvey
Regenerate | Harry Dunn z5205194
65
79
79. Model by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
66
80
80. Model by Harry Dunn (Author)
Regenerate | Harry Dunn z5205194
67
Casuarina Frames | Stage 3 - The Grand Expansion
50 years
2044-2094
81
Casuarina planting
0 1
2
The disposal of the herbaceous phytoremediating plants and integration of Casuarina tress. 81. Section by Harry Dunn (Author)
5
10m
Regenerate | Harry Dunn z5205194
68
Casuarina Frames | Stage 3 - The Grand Expansion
50 years
2044-2094
82
10 years later
0 1
2
Greater use of the Metro to access the Bays Precinct. Completion of development around Glebe Island and the Balmain apron 82. Section by Harry Dunn (Author)
5
10m
Regenerate | Harry Dunn z5205194
69
Casuarina Frames | Stage 3 - The Grand Expansion
50 years
2044-2094
83
Mature Casuarina
0 1
Increase sound barrier and protection from southerly Increased shade around the Metro 83. Section by Harry Dunn (Author)
2
5
10m
Regenerate | Harry Dunn z5205194
70
Casuarina Frames | Stage 3 - The Grand Expansion
20 years
2024-2044
84
Night
0 1
2
The Metro will become an illuminated prospect in the landscape at night time. Security and large numbers of people will assist with surveillance and viability 84. Section by Harry Dunn (Author)
5
10m
Regenerate | Harry Dunn z5205194
71
60% vegetation cover
Regenerate | Harry Dunn z5205194
72
Ecological Connection |
Call Ca lllan n Par ark k
Strong Ecological Links
G ee Gr en nW Way ays Bays West
Wh hittes es Creek re eek k Jo ohnst hn nst ston on n Crre eek
0 0.5
1
10
20km
Corridor Links Redevelopment of the Greenways project, Johnston Creek and White Street park corridor support non-human users that can expand into the Bays Precinct.
Regenerate | Harry Dunn z5205194
73
Thank You
Regenerate | Harry Dunn z5205194
74