MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 2 DRAFT July 24, 2023 TABLE OF CONTENTS EXECUTIVE SUMMARY 3 Redevelopment Rationale 4 Marine Drive Master Plan 5 THE PROCESS 7 ANALYSIS 9 THE FUTURE OF MARINE DRIVE 11 Open Space & Views 12 Parking Strategy 13 Phasing & Sequencing 14 Development Quantities & Potential Development Timeline 17 Table of Contents

EXECUTIVE SUMMARY

MARINE DRIVE TODAY

Marine Drive is a New York State public housing complex with seven brick towers completed in 1952. The 12-story towers are located on the waterfront of the Buffalo River adjacent to Canalside, the heart of downtown Buffalo's waterfront revitalization. While the location is loved, buildings have reached the end of their useful lifespan and would require significant investment to bring them up to modern standards. Residents face challenging conditions, including:

• Heating, electrical, and plumbing systems that are over 70 years old;

• Deteriorating exterior windows, roofs, and brick;

• Small kitchens, bathrooms, and bedrooms;

• Low ceilings;

• A lack of central air conditioning; and

• A lack of accessibility within units and in common areas.

Due diligence analysis revealed that renovation costs would be comparable to new construction costs.

DEVELOPMENT PRINCIPLES & COMMITMENTS

The redevelopment plan for Marine Drive was based on multiple rounds of resident input and participation. The phased development plan will replace obsolete buildings with high quality new construction housing. New walkable streets with improved infrastructure will connect to the existing grid and complement future improvements. BMHA and the development team made the following commitments to residents and the plan is based on these guiding principles:

1. Build first, relocate, then demolish

2. No resident will have to move before their permanent new unit is ready

3. All 616 Affordable units will be replaced on the waterfront at Marine Drive

4. Every resident at Marine Drive in good standing will have a new unit that meets their needs

In Good Standing Means:

• Current on rent

• Not subject to a 30-day notice to terminate

• Complied with the certification process

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 3 Executive Summary DRAFT July 24, 2023
The Marine Drive Apartments will be redeveloped to preserve all 616 affordable homes on the waterfront, enhancing livability and quality of life for residents.

Redevelopment Rationale

WHY DOES MARINE DRIVE NEED TO BE REDEVELOPED?

• The buildings and the systems are over 70 years old

• The heating, electrical, and plumbing systems; roofs; windows; interior walls; and exterior brick all need to be replaced

• Significant investment and funding from federal and state sources would be needed to create safe, accessible, energy-efficient housing for all residents of Marine Drive, even in the case of renovation.

WHY IS NEW CONSTRUCTION THE MOST VIABLE OPTION?

• Less Disruption to Residents’ Lives

– With new construction, residents can stay in their home until their new unit is ready.

– With a renovation, residents would have to move off-site for several years.

• ADA Accessibility

– The existing buildings have zero accessible units.

– The existing buildings are difficult to retrofit to be fully accessible (entries, hallways, and elevators must get larger)

• Shorter Construction Timeline & Fewer Unknowns

• Equivalent Cost

BENEFITS OF NEW CONSTRUCTION

Residents shared with the development team about their desires for the transformed Marine Drive. Residents emphasized the following priorities:

In-Unit Benefits

• Central Air Conditioning

• Responsive heating (controlled by residents)

• Bigger kitchens

• ADA Accessibility

• Higher ceilings, bigger windows, and improved views

• Increased energy efficiency

Site Benefits

• More sensible parking, convenient to all units and buildings

• Higher quality community amenities (green spaces, play areas, and community rooms)

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 4 Executive Summary DRAFT July 24, 2023
Google Planning context StraightenedErieStreetMarine Drive Apartments Future Development Future Development Future Development Mixed Use Development Mixed Use Development Renovation Public Infrastructure Improvement PublicInfrastructure Improvement Renovation

Marine Drive Master Plan

New streets, buildings, and open spaces will transform the Marine Drive site into a vibrant, well-connected neighborhood. New construction buildings will be energy efficient, with modern amenities. Residents helped determine the heights of buildings in each part of the site to maximize views of the waterfront. A new central green space will provide opportunities for gathering and amenities such an updated play area and community gardens.

BUILDING FIRST

In order to accomplish the commitment that no resident will have to move until their permanent new unit is ready, it is essential to build a first phase of approximately 300 new construction units on the existing parking lot site. Once that building is open, residents of Driftwood, Ebbtide, Flagstaff, and Gulfstream would move into the new Phase 1 building. Once residents are relocated, those four towers would be demolished, and Phase 2 would be built on the site where the four tower previously stood. This pattern would continue until all 616 existing units are replaced and all existing residents are living in new buildings.

PHASE 3

DEVELOPMENT SUMMARY

Phase Units

Phase 1 approx. 300 units

Phase 2 approx. 225 units

Phase 3 up to 200 units

Total up to 725 units

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 5 Executive Summary DRAFT July 24, 2023
PHASE 1 FULL BUILD-OUT 1A 1A 1A 2A 2A 2B 2B 3A 3B 3C 1B 1B 1B PHASE 2
MarineDrive(B) Erie Street PerryBlvd.
MarineDrive(A) UP TO 10-STORY BUILDINGS 4-6 STORY BUILDING TOWNHOUSES (2 STORIES) AMENITY/COMMUNITY SPACE PARKING DECKS
New Street
MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 6 Executive Summary DRAFT July 24, 2023
View of Future Development from Canalside Community Space and Park View from Naval Park

THE PROCESS

LISTENING

The Marine Drive engagement process launched in December of 2021 to with meetings that invited residents to share their priorities. In this initial stage of the project, all alternatives were being considered, including renovation of the existing buildings. Residents identified key strengths, such as the waterfront location and convenience to amenities, while also discussing the challenges of aging building infrastructure. Resident Ambassadors were recruited to be champions for the process.

TESTING

Following the initial resident and stakeholder meetings, the development team began a process of due diligence, analyzing and evaluating the existing building systems and estmating the costs of renovation versus new construction. This analysis revealed that the costs to build new are comparable to renovation, while allowing for fewer unknowns and less disruption for the residents. These findings were discussed with residents in early February of 2023 in preparation for a design workshop. The workshop, which took place in late February and early March of 2023, focused on a new construction solution. During the workshop, residents participated, providing their design ideas for units, buildings, amenities, and the site.

MOVING FORWARD

The next steps will focus on detailed design of the Phase 1 buildings and obtaining the required reviews and approvals of plans. Resident input will continue to guide the process.

RESIDENT AMBASSADORS

WHAT WERE RESIDENT AMBASSADORS ASKED TO DO?

• Attend a bus tour of similar new developments on Saturday, Feb. 25th

• Encourage neighbors & other Marine Drive residents to attend workshop meetings on Feb. 28th and March 1st

• Participate in 1-2 additional check-in meetings during the workshop to share your input

• Be a champion for the process

RESIDENT AMBASSADORS

• Toni Guercio

• Mia Dawson

• Judy Jones

• Sharlene Barilla

• Susan Hayden

• Kay Diffley

• Norm Selle

• Barbara Aviles

• Joe Mascia

• Mike McNamara

• Sherrill Cooper

• Mark Gallivan

December 2021 Resident Meetings

Listen to Resident Priorities

2022

February 2023 Resident Meetings

Share findings about the viability of renovation vs. new construction

February 28th -March 2nd Workshop

Development team & engineers evaluated building conditions & estimated costs to renovate vs. new construction

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 7 The Process DRAFT July 24, 2023
The redevelopment of Marine Drive is a resident guided process, designed to hear a wide variety of voices and implement a path forward.
Q1 2022 Q2 2022
Q3 2022 Q4 2022 Q1 2023 Q2 2023

RESIDENT IDEAS FROM THE WORKSHOP WEEK

IN-UNIT AMENITIES

• Juliette balconies

• Closet space

• Controllable thermostats

• Accessible units

SITE AMENITIES

• Safer playground

• Improved laundry

• Fitness rooms

• Community space

• Green & trees

• Bike racks

• Community garden

• Barbecue area

WHAT WE HEARD: RESIDENT PRIORITIES

WHAT RESIDENTS LOVE ABOUT LIVING AT MARINE DRIVE

• Waterfront location is special

• Convenient to jobs, transit, and amenities

• Affordable rents

• Safe place to live

• Green space on site

• Diverse, close-knit community

RESIDENT-IDENTIFIED PROBLEMS

• Buildings need major updates and repairs (windows, doors, plumbing, heating, accessibility)

• Buildings lack modern amenities and conveniences (secure lobbies, package rooms, gym)

• Inefficient heating system (and leaky windows and doors)

• Parking (spaces are too far from many apartments, the layout is a free-for-all, lot feels unsafe)

• Slow response for repairs and maintenance requests

• Events in the waterfront district cause traffic and parking issues

• Current approach to garbage storage isn’t working

• Insufficient amenities for specific age groups (seniors, kids)

RESIDENTS' DREAMS FOR THE FUTURE

• Update the buildings and units (entrances, lobbies, elevators, modern kitchens and appliances, accessible bathrooms, new HVAC systems, electrical, Internet, windows, flooring, etc.)

• Improve common amenities (community/family spaces, laundry, packages, storage)

• Improve the condition, layout, and safety of parking areas

• Incorporate new uses to serve residents of all ages (food/café, library, greenhouse)

• Enhance security with thoughtful lighting, cameras, & management

• Ensure responsive management

• Communicate proactively with residents during construction and relocation

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 8 The Process DRAFT July 24, 2023

UNDERSTANDING MARINE DRIVE

The seven Marine Drive towers enjoy a prime location on the Buffalo River waterfront, in the growing Canalside District. Several major Cityled infrastructure improvements will shape the edges of the site in the future, and the future Marine Drive development plan will connect to amenities and take advantage of the site's opportunities.

CITY-LED EFFORTS AROUND MARINE DRIVE

1. The City is interested in exploring options to improve the pedestrian access and comfort of Marine Drive in front of the Naval Park. Interventions may include a threeway stop and crosswalks mid-block along Marine Drive to better connect the park and the new development.

2. Currently the Empire State Trail exists as a multi-use path northwest and southeast of the Marine Drive site, but it is routed on-street along Perry Boulevard, around the site. In the future, there may be an opportunity to extend a dedicated off-street route as part of this project, to offer resident a safe connection to access LaSalle Park and Canalside.

3. The City has developed plans that explore straightening Erie Street and creating a street network that supports future development. The Marine Drive Master Plan will tie into this future grid, while maintaining on-street parking and fire access for new buildings on the Erie Street side of the site.

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 9 Analysis DRAFT July 24, 2023
City-Led Efforts Happening Around Marine Drive Portrait of Existing Conditions ERIE STREET STRAIGHTENING MARINE DRIVE EMPIRE STATE TRAIL EXISTING RESIDENTIAL PARKS & OPEN SPACE EXISTING INSTITUTIONAL EXISTING COMMERCIAL PARKING EXISTING OFFICE
ANALYSIS
MarineDrive
Empi reStateTrail
ErieStreetStraightening
Buffalo River Buffalo River

CONSTRAINTS & AMENITIES

The largest off-site constraint for the Marine Drive site is the Buffalo Skyway which borders the Phase 1 site. The Skyway creates challenges with noise and pollution. While there has been discussion of its removal over the years, it will likely remain in place through Phase 1 construction. This will require enhanced construction standards to ensure that noise and other impacts are fully mitigated so that residents can fully enjoy their new homes.

An analysis of the building systems and utilities indicated that the Marine Drive towers have complicated constraints that will impact the phasing of redevelopment. In some cases, tower structures are physically connected. Additionally, buildings share boiler and electrical systems. For this reason, buildings will be demolished in groups to prevent orphaning single buildings without critical systems during the process.

The waterfront location and parks are an asset highly valued by Marine Drive residents. edestrian connectivity existis within the site, but pedestrian connections are limited between the site and the surrounding areas.

Proximate parking, especially along the streets, is an often overlooked on-site amenity. Some existing towers, such as Bayshore, Coastline, and Driftwood, are further away from the parking lots on the eastern side of the site, and these residents rely on-street parking regularly.

Because Marine Drive was developed when the waterfront was a working waterfront, the buildings and site face inward. The units often do not have views of the waterfront, except through small windows located in the bathtub.

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 10 Analysis DRAFT July 24, 2023
Diagram of Connected Building Systems and Utilities Pedestrian Connectivity Existing Off-Street Parking Building Footprints Existing Parks & Open Space Existing On-Street Parking
Admiral
Ebbtide
Gulfstream 48” WATER MAIN PERIMETER GAS LINE VARIOUS UTILITIES UNDER EXISTING ROADS BOILERS/HEATING SYSTEMS ELECTRICAL TRANSFORMERS & SYSTEMS
Bayshore Coastline Driftwood
Flagstaff

THE FUTURE OF MARINE DRIVE

THE PLAN FOR MARINE DRIVE

The transformed Marine Drive will be a walkable neighborhood with sidewalks, trees for shade, green spaces, and community amenities. The realignment of Marine Drive and addition of a new access street will create four walkable blocks, with buildings and homes that front streets. Three parking garages will provide residents convenient parking, close to their homes. Buildings range from two to ten stories will allow for a variety of choices in the ways families want to live. During early phases of construction, the existing streets and utilities will remain in place, minimizing the impact on existing residents.

DEVELOPMENT SUMMARY

Phase Units

Phase 1 approx. 300 units

Phase 2 approx. 225 units

Phase 3 up to 200 units

Total up to 725 units

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 11 The Future of Marine Drive DRAFT July 24, 2023
RealignedMarineDrive(B) Erie Street PerryBlvd. MarineDrive(A) New Street UP TO 10-STORY BUILDINGS 4-6 STORY BUILDING TOWNHOUSES (2 STORIES) AMENITY/COMMUNITY SPACE PARKING DECKS Design Framework Community Space & Park View from Marine Drive (A) Community Space Green Paseo A A B B

Open Space & Views

Outdoor amenity spaces will be located throughout the site, with a central community gathering space at the heart of the new neighborhood. This central location was identified by residents as the best place for a green area, easily accessible from all the future buildings, and protected from wind, sun, and noise. The relocated community room would front onto the central gathering space.

Blocks will also include small green spaces with play areas that families with young children don't have to cross streets to access outdoor space.

The newly developed buildings will take advantage of the spectacular views. Residents helped to determine that taller buildings should be located against the Skyway, blocking noise while providing great views to the waterfront. Buildings step down toward the water, ensuring that all residents can enjoy the site's views.

POSSIBLE COMMUNITY AMENITIES

• Central green gathering space

• Community gardens

• Community rooms

• Children’s’ play equipment

• Benches, walking paths

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 12 The Future of Marine Drive DRAFT July 24, 2023
Open Space Plan

Parking Strategy

During the listening process, residents expressed the following concerns about parking:

• The current layout feels like a free-for-all.

• The existing parking spaces are not located conveniently to units, making it difficult for residents carrying groceries or those with mobility challenges.

• The parking lot sometimes feels unsafe.

• Visitors to the Canalside district often park in the lot, making it difficult for residents to find parking spaces.

The redeveloped site would include three parking structures and small surface lots to create more parking than exists today and to more conveniently locate parking close to homes. The existing site has approximately

525 parking spaces with 370 of those being off street (in the surface parking lot) and the remainder located on-street. The first phase of construction would take place on the 370 space lot, which would be replaced in Phase 1 with a parking structure and a small amount of surface parking. BMHA and the development team will work with residents to ensure they have safe and accessible parking options during construction. As construction continues, two additional garages and on-street spaces would become available with the implementation of the new streets.

The garages also act as a strategic buffer between the Buffalo Skyway and new development, and reducing noise impacts in the interior of the site.

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 13 The Future of Marine Drive DRAFT July 24, 2023
EXISTING CONDITIONS – 525 SPACES PHASE 1 – 546 SPACES 325 18 370 42 Garage Spaces 325 Surface Spaces 60 On-Street Spaces 161 Surface Spaces 370 On-Street Spaces 155 FULL BUILD-OUT – 981 SPACES PHASE 2 – 778 SPACES 325 325 240 240 18 18 42 280 Garage Spaces 565 Surface Spaces 60 On-Street Spaces 153 Garage Spaces 845 Surface Spaces 18 On-Street Spaces 118
Marine Drive (C) Marine Drive (C) Marine Drive (B) MarineDrive(A) Erie Street PerryBlvd CommercialStreet Marine Drive (C) Marine Drive (B) MarineDrive(A) Erie Street PerryBlvd CommercialStreet Marine Drive (C) Marine Drive (B) MarineDrive(A) Erie Street PerryBlvd CommercialStreet Marine Drive (B) MarineDrive(A) Erie Street PerryBlvd CommercialStreet

Phasing & Sequencing

The transformed Marine Drive will be phased to minimize disruption to residents. Construction will begin on the current parking lot between the Buffalo Skyway and the rest of the site. Approximately 300 new units will be built and residents from four towers will move into this new building before any demolition occurs. The phased approach allows residents to move only once, if they so choose, into their new, completed residence. Residents would receive support for moves based on their personal needs and situations.

DEVELOPMENT SUMMARY

Phase Units

Phase 1 approx. 300 units

Phase 2 approx. 225 units

Phase 3 up to 200 units

Total up to 725 units

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 14 The Future of Marine Drive DRAFT July 24, 2023
1
3 PHASE 2 RealignedMarineDrive(B) Erie Street MarineDrive(A) New Street PerryBlvd. PHASE 1 2A 2B 3A 3B 3C 1B PHASE 2 PHASE 3
PHASE
PHASE
1A

PHASE 1

1. Build approximately 300 units in new construction buildings on the existing parking lot.

2. Relocate resident from the following four buildings into the new Phase 1 building:

3. Demolish the Driftwood, Ebbtide, Flagstaff, and Gulfstream towers.

PHASE 2

1. Build approximately 225 units in new construction buildings on the site of the four demolished towers.

2. Relocate residents from the final three buildings into apartments in the new Phase 2 buildings:

– Coastline

3. Demolish the Admiral, Bayshore, and Coastline towers.

PHASE 3

1. Build up to 200 units new construction in Phase 3

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 15 The Future of Marine Drive DRAFT July 24, 2023
– Driftwood Ebbtide Flagstaff Gulfstream Gulfstream Flagstaff Ebbtide Driftwood Residents move into Phase 1
D, E, F,
G
Phase 1 New Construction Demo Buildings
&
– Admiral Bayshore Coastline Admiral Bayshore Demo Buildings A, B, & C Phase 2 New Construction
1 2 3
Phase 3 New Construction
MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 16 The Future of Marine Drive DRAFT July 24, 2023
View during Phase 1 View of the Redeveloped Marine Drive

Development Quantities & Potential Development Timeline

MARINE DRIVE / BUFFALO, NEW YORK / J ULY 2023 17 The Future of Marine Drive DRAFT July 24, 2023
Residential Amenity/ Community Space Community Retail Garage Subtotal 1 Br Flat 2 Br Flat 3 Br Flat 3 Br TH Subtotal Surface Garage On-street Subtotal 1A 6 to 10 181,000 - 6,700 125,000 312,700 118 52 8 4 182 1B 10 118,000 2,250 - - 120,250 63 40 9 3 115 Subtotal 299,000 2,250 6,700 125,000 432,950 181 92 17 7 297 2A 6 132,000 5,300 - - 137,300 96 18 16 6 136 2B 6 98,000 7,850 - 90,000 195,850 47 20 15 9 91 Subtotal 230,000 13,150 - 90,000 333,150 143 38 31 15 227 3A 4 51,000 - - - 51,000 24 24 - - 48 3B 4 to 6 163,000 - - 108,000 271,000 58 88 - - 146 3C 2 5,500 - - - 5,500 - - - 4 4 Subtotal 219,500 - - 108,000 327,500 82 112 - 4 198 748,500 15,400 6,700 323,000 1,093,600 406 242 48 26 722 18 845 118 981 546 153 118 778 981 Building Stories Unit Mix (Units) Parking (Spaces) Development Numbers 60 565 845 60 18 325 161 Phase 1 2 3 Building Area (GSF) BUILD-OUT TOTAL MarineDrive(B) Erie Street MarineDrive(A) New Street PerryBlvd. POTENTIAL DEVELOPMENT TIMELINE DEVELOPMENT QUANTITIES BY PHASE Phase 1 Design Phase 2 Design Phase 3 Design 2023 2024 2025 2026 2027 2028 2029 2031 2030 2030 Phase 1 Construction Demo D, E, F, & G Phase 2 Construction Demo A, B, & C Phase 2 Construction