FRESH TENDERS Project

Scope of Work

Issue Date

Closing Date

Authority

Delhi Metro

Design and Construction of Underground UP & Down Tunnels by Shield TBM from end of Cut & Cover tunnel near Sangam Vihar metro Station up to existing Sarita Vihar depot, Underground Ramp and Cut & Cover Tunnels near Sangam Vihar and Tughlakabad metro station and Underground Metro Stations at Maa Anandmayee Marg, Tughlakabad Railway Colony and Tughlakabad including Retrieval / Launching shafts on Aerocity Tughlakabad corridor of Delhi MRTS Project of Phase - IV

03.05.2021

21.06.2021

DMRCL

High Speed Rail

Design and Build Works for Construction of Training Institute Buildings (including interfacing works for installing the training equipment) (Phase-II) at Vadodara for MumbaiAhmedabad High Speed Rail Project.

04.05.2021

31.07.2021

NHSRCL

Delhi Metro

Design and Construction of Twin Tunnel (Up & Down Line) by Shield TBM, Cut and Cover Tunnel box, Underground Ramp and four Underground stations namely Chhattarpur, Chhattarpur Mandir, IGNOU and Neb Sarai with Entry/Exits & Connecting subways from chainage 5356.285 mtr. to 11867.000 mtr. of Aerocity to Tughlakabad Corridor of PhaseIV of Delhi MRTS.

04.05.2021

21.06.2021

DMRCL

RRTS

Integrated Design, Supply, Installation, Testing, Integration, Commissioning and Support of Integrated and Realtime Enterprise Asset Management System (iDREAMS) for RRTS.

05.05.2021

12.07.2021

NCRTC

Bangalore Metro

Detailed Design Consultancy (DDC) for Airport Depot at Doddajala and Remodelling of existing Baiyappanahalli Depot for Bangalore Metro Rail Project Phase 2A & 2B

06.05.2021

30.06.2021

BMRCL

Delhi Metro

Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic fare Collection System for Mukundpur-Maujpur Corridor including Central System.

17.05.2021

28.06.2021

DMRCL

RRTS

Package 26A Design, Supply, Installation, Testing and Commissioning and Comprehensive Annual Maintenance Contract of EMV based Open Loop Automatic Fare Collection (AFC) System for Delhi Ghaziabad Meerut RRTS Corridor

26.05.2021

27.07.2021

NCRTC

RRTS

Operation and Maintenance of the Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS)

26.05.2021

13.08.2021

NCRTC

Delhi Metro

Independent Safety Assessment Services for Train Control and Signalling System works of Rithala to Shaheed Sthal (New Bus Adda) Corridor

27.05.2021

14.07.2021

DMRCL

Chennai Metro

Supply, installation,testing and commissioning of Track works of Standard gauge including all associated works in Underground and Elevated sections between Light House Station and Poonamalle Bypass Station and Poonamalle Depot.

28.05.2021

19.08.2021

CMRL

Noida Metro

Part Design and Construction of Elevated Viaduct and 5 elevated stations viz NOIDA SEC -122, NOIDA SEC-123 GR. NOIDA SEC-4 ECOTECH-12 GR NOIDA SEC-2 (excluding Architectural finishing Works and PEB works of stations) from Chainage 0.00 m to Chainage 9605 m of Noida -Greater Noida Metro Rail Project

31.05.2021

30.06.2021

NMRCL

WWW.METRORAILTODAY.COM

METRO RAIL TODAY JUNE 2021

15


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.